III - DEPOSIT WORKS ( as on 31.10.11) I SIDINGS Sl. Date of Estimated Amount Name of work Name of the party TDC Prsent status Remarks No. sanction cost Deposited 1 Proposed HPCL Railway siding taking Hindustan Pertoleum Plan under off from proposed Kappalur Crossing Corporation Limited process. station. II LEVEL CROSSINGS Sl. Date of Estimated Amount Name of work Name of the party TDC Prsent status Remarks No. sanction cost Deposited Proposed widening of Manned B class Chief Engineer, 1 Engg. LC No.8 at Km. 10/100-200 bet. Tuticorin Port Turst, 02.08.2010 928369 914000 Tender opened MVN-TNHP siding station Tuticorin Proposed widening of Manned B class Chief Engineer, 2 Engg. LC No.9 at Km. 10/100-800 bet. Tuticorin Port Turst, 28.09.2010 1263547 1263000 Tender opened MVN-TNHP siding station Tuticorin III FOB/LUS Sl. Date of Estimated Amount Name of work Name of the party TDC Prsent status Remarks No. sanction cost Deposited 1 -(BG) section : The District Collector, 15.04.2010 3386730 3386730 Provision of LUS possibility Provision of subway of 1x2.0x2.5m Tiruttangal Town Panchyat, is not available. Alternate Reniforced Concrete Box Culvert No.38A Virudhunagar district, purpose of using fund, work at km 559/200-300 between Virdhungar Virudhunagar. requied, awaiting from state & Tirutangal stations govt.

2 Virudhunagar - Vanchi Maniyachchi The President 19..07.2010 5377773 7284054 Tender to be section: Proposed Construction of a new Town discharged, Road Under Bridge No.1582a(1x3.0m Panchayat, work being Reniforced Cement Concrete Box) at Venkatachalapuram. dropped. km.563/700-800 Viridhunagar.

3 - (BG) section: Gandhigram Rural Institute, 05.05.2009 11600000 11600000 100% completed Proposed construction of new Road under Deemed University, bridge No.1349a(1x3.0m Reincorced Gandhigram. Concrete Box) at km 442/600-700

4 Virudhunagar-Vanchi Maniyachchi (BG) Divisional Engineer(H), 18971000 6403000 Plan approved. Frequent chagne in proposal section provision of Limited use subway NABARD & Rural Works Est. sent to regarding size of LUS. of 1x7.50m Reinforced Concrete Box in Department. accounts for Which is not finalised by lieu of existing Level Crossing No.406 at . vetting. state govt. District collector km.540/200-300 approval is not received. III - DEPOSIT WORKS ( as on 31.10.11) 5 Madurai - Bodinayakkanur section - Executive Engineer, 5823099 361798 Est. sanctioned, Construction of a new bridge no.78A ( 1 Public Works Department,WRO money yet to be x 3.20m) Reinforced concrete box at Periyar Improvments Division, deposited km.39/2-3 Madurai-2.

6 Virudhunagar - Vanchi Maniyachchi Divisional Engineer(H), 6000000 150000 Est. sent to As per Hqrs instruction only (BG)section: Proposed Construction of a Projects, -2. accounts on remittence of subway of 1x3.00x2.10m Reinformced maintenance charges concrete box at km,588/9-10 near LC estimate for LUS will be No.440 in . processed. Maintenance charges not yet remitted.

7 Madurai Junction - Manamadurai (BG) Executive Engineer, 5418000 5656000 Work in section : Proposed construction of a new Public Works Department, progress. bridge No.174A(2x6.10m Reinforced Cement Concrete Slab bridge) at km.41/100-200.

8 Dindigul - Madurai Junction (BG) Divisional Engineer(H), 1840000 15168000 Plan approved & section: Proposed construction of Limited Madurai-2. Estimate under Height Subway 1x7.50x2.75m Reinforced process Concrete Box at km.486/500-600

IV Buildings Sl. Date of Estimated Amount Name of work Name of the party TDC Prsent status Remarks No. sanction cost Deposited -Nil- V Watering arrangements Date of Estimated Amount Name of work Name of the party TDC Prsent status Remarks sanction cost Deposited -Nil-