MACS - trifold3-updated Oct2017.qxp_Layout 1 11/9/17 9:35 AM Page 1

PREPACKAGED HARDWARE LIST ASSEMBLY COMPONENT HARDWARE QUANTITY

Always fasten components to MPLT ½” x 1½” LG S/S 4 the supporting surface. ½” S/S Hex 4 ½” S/S Flat Washer 4 Modular Platform Tighten all hardware securely Loctite 1 before climbing. MPHR ½” x 1½” LG S/S Bolt 4 System Assembly Guide ½” S/S Hex Nut 4 Do not connect two STAIR ½” S/S Flat Washer 4 UNITS directly together. Loctite 1 MPTS ½” x 1½” LG S/S Bolt 4 Do not stack TOWER ½” S/S Hex Nut 4 SUPPORT (MPTS). ½” S/S Flat Washer 4 Loctite 1 Some configurations of platforms bolted end-to-end, and/or side-to-side may exceed supplied hardware. MPSA ½” x 3” LG S/S Bolt 3 Customer supplied hardware should be 18-8 stainless ½” S/S Hex Nut 3 steel. ½” S/S Flat Washer 6 Loctite 1 Before installing nuts, apply a drop of loctite on the MPSR-02 to 05 ½” x 3” LG S/S Bolt 5 bolt threads. ½” S/S Hex Nut 5 ½” S/S Flat Washer 10 NOTE: It is necessary to support all platforms at Loctite 1 each end with either an TOWER SUPPORT or a STAIR MPSR-06 to 09 ½” x 3” LG S/S Bolt 5 UNIT. Ends are designated with diamond tread wrap- ½” x 1½” LG S/S Bolt 1 around. ½” S/S Hex Nut 6 ½” S/S Flat Washer 12 Loctite 1 1 YEAR LIMITED WARRANTY MPSL ½” x 1½” LG S/S Bolt 4 ½” S/S Hex Nut 4 Products sold by Sam Carbis Solutions Group, LLC are ½” S/S Flat Washer 4 warranted to be free of defects in materials and work - Loctite 1 manship, exclusive of corrosion, damage from abuse or misuse, negligence, alteration, normal wear and tear, and improper installation. Liability under this warranty shall be limited to the repair or replacement of any de - COMPONENTS fective work or material FOB Florence, SC. Sam Carbis Platform Unit (MPLT) Solutions Group, LLC shall not be liable for any other damages or losses. The buyer’s sole and exclusive rem - Stair Unit (MPST) edy against Sam Carbis Solutions Group, LLC for any Tower Support (MPTS) PLEASE READ INSTRUCTIONS BEFORE ASSEMBLY & U SE ! defective material or workmanship shall be for the re - pair or replacement of the defective parts or products Stair Railing (MPRS) Component system assembly depends upon the components as provided herein. No other remedy (including, but purchased. Each component is sold separately. not limited to, incidental or consequential damages for Platform Railing (MPHR) Aluminum (metal) components conduct electricity. Do not use lost profits, lost sales, injury to person or property, or Stair Adapter (MPSA) where contact with charged electrical circuits may occur. any other incidental or consequential loss) shall be avail - Serious injury or death may result. able to the buyer. Stair Landing Adapter (MPSL) www.CarbisSolutions.com • 1.800.845.2387 MACS - trifold3-updated Oct2017.qxp_Layout 1 11/9/17 9:35 AM Page 2

CONNECTING STAIR & STAIR CONNECTING STAIR & STAIR CONNECTING PLATFORMS TO RAILING TO THE END OF A HANDRAIL TO THE SIDE OF A TOWER SUPPORTS - Align the PLATFORM - It is best to lay the PLATFORM - Repeat the proce - proper TOWER SUPPORT to the STAIR UNIT and PLATFORM UNIT dures as described in connecting PLATFORM UNIT’S holes as shown, on their side in the correct configu - to the end of a platform but align insert (B) ½” x 1-½” hex bolts into ration. This allows easy access to components to the pre-drilled holes and fasten using (C) washers, the bottom of the PLATFORM UNIT. holes in the side rail. and (D) nuts as shown. Be sure to Align one STAIR RAILING to the connect all bolts securely. STAIR UNIT making sure the holes at STAIR LANDING ADAPTERS the top of the STAIR UNIT, STAIR (MPSL) are used to allow the stair SUPPORTING TWO PLATFORMS RAILING, and PLATFORM are in line and connect using to land flush with the top of a plat - WITH ONE TOWER SUPPORT - If (A) ½” x 3” hex bolts, (C) washers, and (D) form. Align the holes in the STAIR you are connecting two PLATFORM nuts as shown. Be sure to connect all LANDING ADAPTER to the PLAT - UNITS end to end, align the END three bolts securely. FORM holes and fasten using (B) UNIT so that one set of holes is ½” x 1-½” hex bolts, (C) washers, aligned with the outer-most holes of Connect the bottom of the STAIR RAIL - and (D) nuts as shown. After the each PLATFORM UNIT as shown. ING to the STAIR UNIT using (A) ½” x 3” STAIR LANDING ADAPTER is se - PLATFORM UNITS must then be hex bolts, (C) washers, and (D) nuts as cured to the PLATFORM, align the bolted directly together at the joined shown. Tighten STAIR UNIT slots to the STAIR ends using the upper two holes. both connections securely. Larger LANDING ADAPTER holes. Fasten using (B) ½” x 1-½” STAIR RAILINGS have a center sup - hex bolts, (C) washers, and (D) nuts as shown. Place CONNECTING PLATFORM port. Fasten the center support to washer over bolt prior to attaching the nut. Ensure all bolts UNITS TOGETHER IN the STAIR UNIT using two (B) 1/2” x are secure. PARALLEL MODE - 1-½” hex bolts, (C) washers, and (D) Connecting platforms in par - nuts as shown. CONNECTING THE BOTTOM allel mode. (side rail to side OF A STAIR TO THE END OR rail.) Align platform pre- Flip the assembled apparatus over SIDE OF A PLATFORM - drilled holes and secure to - on its other side and repeat the Align holes and fasten using gether by inserting two ½” x 1- ½” hex bolts through above procedures to connect the second STAIR RAILING (A) ½” x 3” hex bolts, (C) wash - both side rails near TOWER SUPPORTS or STAIR to the assembly. ers, and (D) nuts as shown. Be UNITS. Secure by using (C) washer and (D) nut. sure to connect both bolts on Tighten all fasteners securely. For platforms longer than If a railing is desired on one side only, use an MPSA as each side securely. 60” use an additional bolt using one of the upper holes described below to fill the gap between the near center of span. PLATFORM UNIT and STAIR UNIT. CONNECTING PLATFORM CONNECTING PLATFORM STAIR ADAPTERS (MPSA) are re - RAILINGS TO THE END OR UNITS TOGETHER IN “T” quired to connect a STAIR UNIT SIDE OF A PLATFORM - Align or “L” MODE - Align one to a PLATFORM UNIT if no STAIR railing to the PLATFORM with the PLATFORM UNIT’S end RAILING is desired (use 2) or for PLATFORM RAILING’S large holes holes with those of the pre- railing one side only (use 1). facing out, insert (B) ½” x 1- ½” drilled side rail holes of the None required if STAIR RAILINGS hex bolts into holes, through second PLATFORM UNIT. are being used on both sides. PLATFORM RAILING and into Secure together by inserting PLATFORM, fasten using (C) (A) ½” x 3” hex bolts and secure by using (C) washer Align the holes and insert (A) washers, and (D) nuts as shown. and (D) nut. Tighten all fasteners securely. ½” x 3” bolt. Place washer over Be sure to connect both bolts on bolt prior to attaching the nut. Repeat for all three each railing securely. Note: Install any platform handrail before joining connections as shown. platforms together.