JMB MEETING UPDATES 11th August 2018 STATUS UPDATE

NO UPGRADING ITEM STATUS DATELINE Suites 1. Propose Suites Upgrading – Installation of Big 10 ft Completed fan 2. Propose Suites Upgrading - Loading/unloading bay Awarded. Aug 2018 NO path way UPGRADING ITEM STATUS DATELINE Other upgrading; Badminton/Basketball court 3. Ventilation – Installation of Exhaust Fan Completed - 4. Benches Completed - Signages 5. Tower A exit to Jalan Laksamana Boulevard Completed - - To add exit signage 6. Installation of 2nos of Electric Charging Point for Completed - hybrid car STATUS UPDATE NO UPGRADING ITEM STATUS DATELINE

Changing Room 7. Installation of Changing Room Fittings Completed. July 2018 13. WIFI Service in Common Area and Lifts Others are completed. June 2018 (hanger, towel racks and locker) Pending installation in 9. Benches CabanaCompleted Lift only. - 10. WIFI Service in Common Area and Lifts Awarded. Pending T&C. Aug 2018

11. Water dispenser Delivered. - 12. Mosquito repellant bulb Delivered. July 2018 13. Missing Links Roof at E-deck Awarded. Kickstart in Aug 6 months. 2018. 14. Child care and multipurpose room furnishings LOT approved. Tender August 2018. Process pending award. 15. Upgrading of fencing Awarded. Installation in Sept 2018 progress. 16. Signages Upgrading Awarded – fabrication. July 2018 17. Security Upgrading Awarded. Nov 2018 LOCKER DELIVERED

Residence – E-deck – Changing Room Suites – E-deck – Changing Room MOSQUITO BULB REPELLANT DELIVERED

Mosquito Repellant Bulb to be located at Common Area Sittings –ETMS will install. UPGRADING RAISED BY OWNER

No. ITEMS/UPGRADES STATUS 1. Cleaning of external Facade Yes Will be conducted in November 2018. 2. Security system upgrade Yes Appointment Process 3. Sky Deck upgrade – Bar Counter Yes Tender Process 4. AV Systems for Function Rooms 5. E-Deck 7.1 Door upgrade Yes Fabrication and BOMBA certificate 7.2 Floor Upgrade No application in process for the new doors. 6. Reconfiguration of function Tender Process rooms UPGRADING RAISED BY OWNER

No. ITEMS/UPGRADES STATUS SUITES 7. Car Park Gantry repositioning Yes Awarded. Already in the upgrading list. 8. Loading Bay Pending Quotation from Century. 9. Mailroom – mirror to be changed Yes Tender process. to stainless steel 10. Wheelchair friendly at entrance Yes Already in the upgrading list. 11. Fire Doors to include vision panel Yes Pending fabrication. Same as No.7 (glass) (Edeck) 12. Car Stopper to be painted to Pending Project Team. prevent tripping 13. Notice board in lifts Yes Pending design from ETMS UPGRADING RAISED BY OWNER No. ITEMS/UPGRADES STATUS RESIDENCE 14. Fire Doors to include vision panel Yes Pending fabrication. Same as (glass) (Edeck) No.7 15. Corridor to badminton court – Better Yes Lighting done. Pending lighting and signages required signages. Already in the upgrading list. 16. Car Stopper to be painted to prevent Yes Painting pending delivery. tripping 17. Notice board in lifts Yes Refer Item 18. TEEGA HANDOVER MASTER LIST As of 6th August 2018 HANDOVER DATE NO. DESCRIPTION

1) Administrative / Legal 1.1 Work Permit - Workers List 05/18/2018 2) APPROVED AS-BUILT DRAWINGS 2.1 Fire Protection Services 05/18/2018 2.2 Swimming Pool & water Feature 05/18/2018 2.3 Air-conditioning and Mechanical Ventilation (ACMV) Systems 05/18/2018 2.4 Plumbing Services (Complete with Disc Soft Copy) 05/18/2018 2.5 Electrical System 26/06/2018 2.6 ELV System i. Fireman Intercom System 26/06/2018 ii. Public Adress (PA) System 26/06/2018 iii. SMATV System 26/06/2018 iv. Audio Intercom System v. Telephone + Data Services 26/06/2018 vi. CCTV vii. Access Card & Panic Button 2.7 Lift Installation 25-May-18 2.8 Interior Design (ID) 02/08/2018 2.9 Tennis Court 26/06/2018 2.10 Building Plan 26/06/2018 Note : 2.11 Road & Drainage 26/06/2018 2.12 Lift WIFI (Suites, Tower A & B) 25-May-18 Pending Handover TEEGA HANDOVER MASTER LIST

HANDOVER DATE NO. DESCRIPTION

3) OPERATION AND MAINTENANCE MANUAL (O&M) 3.1 Fire Protection Services 18/05/2018 3.2 Swimming Pool & water Feature 18/05/2018 3.3 Air-conditioning and Mechanical Ventilation (ACMV) Systems 18/05/2018 3.4 Plumbing Services (Complete with Disc Soft Copy) 18/05/2018 3.5 Electrical System 26/06/2018 3.6 ELV System i. Fireman Intercom System 26/06/2018 ii. Public Adress (PA) System 26/06/2018 iii. SMATV System 26/06/2018 iv. Audio Intercom System 26/06/2018 v. Telephone + Data Services 26/06/2018 vi. CCTV 26/06/2018 vii. Access Card & Panic Button 26/06/2018 3.7 Lift Installation 25/05/2018 3.8 Rubbish Compactor 05/06/2018 3.9 Interior Design (ID) 02/08/2018 3.10 Lift WIFI (Suites, Tower A & B) 25/05/2018 TEEGA HANDOVER MASTER LIST

HANDOVER DATE NO. DESCRIPTION

3) OPERATION AND MAINTENANCE MANUAL (O&M) 3.1 Fire Protection Services 18/05/2018 3.2 Swimming Pool & water Feature 18/05/2018 3.3 Air-conditioning and Mechanical Ventilation (ACMV) Systems 18/05/2018 3.4 Plumbing Services (Complete with Disc Soft Copy) 18/05/2018 3.5 Electrical System 26/06/2018 3.6 ELV System i. Fireman Intercom System 26/06/2018 ii. Public Adress (PA) System 26/06/2018 iii. SMATV System 26/06/2018 iv. Audio Intercom System 26/06/2018 v. Telephone + Data Services 26/06/2018 vi. CCTV 26/06/2018 vii. Access Card & Panic Button 26/06/2018 3.7 Lift Installation 25/05/2018 3.8 Rubbish Compactor 05/06/2018 3.9 Interior Design (ID) 02/08/2018 3.10 Lift WIFI (Suites, Tower A & B) 25/05/2018 TEEGA HANDOVER MASTER LIST

HANDOVER DATE NO. DESCRIPTION

4) WARRANTY 4.1 Fire Protection Services 18/05/2018 4.2 Swimming Pool & Water Feature 18/05/2018 4.3 Air-conditioning and Mechanical Ventilation (ACMV) Systems 18/05/2018 4.4 Plumbing Services 18/05/2018 4.5 Electrical Equipment / System 26/06/2018 4.6 ELV System i. Fireman Intercom 26/06/2018 ii. PA System 26/06/2018 iii. SMATV 26/06/2018 iv. Audio Intercom 26/06/2018 v. Telephone + WIFI 26/06/2018 vi. CCTV 26/06/2018 vii. Access Card 26/06/2018 4.7 Lift System 25/05/2018 4.8 Waterproofing System 4.9 External Painting 4.10 Lift WIFI (Suites, Tower A & B) 25/05/2018 Note :

Pending Handover TEEGA HANDOVER MASTER LIST

HANDOVER DATE NO. DESCRIPTION

5) RELATED 3RD PARTY 5.1 List of Consultant 31/05/2018 5.2 List of Contractor 31/05/2018 5.3 List of Suppliers 31/05/2018 6) ADMINISTRATION ASSET 6.1 Common Area i. Tower A 05/06/2018 ii. Tower B 05/06/2018 iii. Suite 07/06/2018 iv. E-Deck 05/06/2018 v. Gym Equipment (Manual / DO / Brochure) - Residence 04/07/2018 vi. Gym Equipment (Manual / DO / Brochure) - Suites 04/07/2018 6.2 Management Office i. Residence 05/06/2018 ii. Suite 07/06/2018 iii. Office Tower 07/06/2018 TEEGA HANDOVER MASTER LIST

HANDOVER DATE NO. DESCRIPTION

7) KEYS 7.1 Electrical Room 03/07/2018 7.2 Mechanical Room i. Fire Fighting Room 03/07/2018 ii. Swimming Pool 03/07/2018 iii. DCW Tank 03/07/2018 iv. Rainwater Harvesting Tank 03/07/2018 v. Aircond Condenser Room 03/07/2018 vi. Retail 03/07/2018 7.3 ELV Keys 03/07/2018 7.4 Guard House Key 03/07/2018 7.5 Common Area i. Tower A - Sky Lounge & LG Lift Lobby 26/06/2018 ii. Tower B - Sky Lounge & Function Room 26/06/2018 iii. Tower A - Bin Room 26/06/2018 iv. Tower A - Function Room, Sky Lounge, Garden Lift Lobby 28/06/2018 v. Tower B - Level 36 28/06/2018 vi. Tower B - Bin Room - L26 - L35 28/06/2018 vii. Tower B – Bin Room Level 21 – Level 25 and Level 27 Lift Lobby) 28/06/2018 viii. Tower B - Bin Room - L1 - L10 28/06/2018 ix. Tower B - Bin Room - L11 - L20 28/06/2018 x. Tower B - LG Lift Lobby, GL, P3 & E-Deck 28/06/2018 TEEGA HANDOVER MASTER LIST

NO. DESCRIPTION HANDOVER DATE

8) ACCESS CARDS

8.1 Permanent Access Card

8.2 Temporary Access Card

i. Staff Access Card

ii. Contractor Access Card

8.3 Unprogram Card / Empty Card

Note : Pending Handover TEEGA HANDOVER – M&E SYSTEM

• Physical inspection for Mechanical system carried out by UEMS, ETMS, Ranhill (Consultant) and Contractors as follows;

ATTENDEES NAME COMPANY NO TOWER DATE ITEMS CHECKED Hardeep Singh UEMS 1. SUITES 23/07/2018 Baharudin & Sawal ETMS • Fire Fighting System and Cold 2. OFFICE 23/07/2018 water Plumbing & Sanitary Naza Ranhill System Rizan & Rais Jaya Sarana 3. A 24/07/2018 • Swimming pool Nor Dhalan Globe Engineering 4. B 24/07/2018

• Findings of defects are highlighted for Contractor’s action. • Target of inspection with JMB for technology transfer scheduled on 8th August 2018. COMMON AREA DEFECTS UPDATE

OVERALL PROGRESS

DEFECTS RECTIFICATION WORK RECORD SERVICE TEEGA TOWER CONDOMINIUM TOTAL TEEGA SUITE TOWER A TOWER B CABANA CAR PARK RETAIL APARTMENT (OFFICE) E-DECK DEFECTS DESCRIPTION E-DECK

PREVIOUS CURRENT PREVIOUS CURRENT PREVIOUS CURRENT PREVIOUS CURRENT PREVIOUS CURRENT PREVIOUS CURRENT PREVIOUS CURRENT PREVIOUS CURRENT PREVIOUS CURRENT PREVIOUS CURRENT Jun-18 Jul-18 Jun-18 Jul-18 Jun-18 Jul-18 Jun-18 Jul-18 Jun-18 Jul-18 Jun-18 Jul-18 Jun-18 Jul-18 Jun-18 Jul-18 Jun-18 Jul-18 Jun-18 Jul-18 CLOSED/ COMPLETED 106 106 290 292 130 130 214 215 7 9 196 388 17 19 31 32 9 17 1000 1208 WIP/ NEW 108 119 237 272 80 96 112 161 9 10 245 56 7 14 3 3 9 11 810 742

TOTAL DEFECT LODGED 214 225 527 564 210 226 326 376 16 19 441 444 24 33 34 35 18 28 1810 1950 Note : The defects lodged into the Novade will be deleted/rejected due to the following reason : (1) Duplicate case (2) Lodged without photo evidence (3) Lodged with wrongly location. COMMON AREA DEFECTS UPDATE Work in Progress by Aging

WORK IN PROGRESS (WIP) DEFECTS CATEGORY BY AGING SERVICE TEEGA TOWER CONDOMINIUM TOTAL TEEGA SUITE TOWER A TOWER B CABANA CAR PARK RETAIL APARTMENT (OFFICE) E-DECK DEFECTS DEFECTS E-DECK AGING PREVIOUS CURRENT PREVIOUS CURRENT PREVIOUS CURRENT PREVIOUS CURRENT PREVIOUS CURRENT PREVIOUS CURRENT PREVIOUS CURRENT PREVIOUS CURRENT PREVIOUS CURRENT PREVIOUS CURRENT Jun-18 Jul-18 Jun-18 Jul-18 Jun-18 Jul-18 Jun-18 Jul-18 Jun-18 Jul-18 Jun-18 Jul-18 Jun-18 Jul-18 Jun-18 Jul-18 Jun-18 Jul-18 Jun-18 Jul-18 DEFECTS < 30 DAYS 5 15 7 41 20 17 11 53 4 2 73 2 0 8 0 1 2 8 122 147 DEFECTS > 30 DAYS 103 105 230 231 60 79 101 108 5 8 172 54 7 6 3 2 7 3 688 596

Note : The defects lodged into the Novade will be deleted/rejected due to the following reason : (1) Duplicate case (2) Lodged without photo evidence (3) Lodged with wrongly location. CONNECTIVITY

Connectivity – Current transport available in Puteri Harbour, Iskandar Puteri • Complimentary shuttle service brought to you by UEM Sunrise & Medini FREE SHUTTLE SERVICE Iskandar • Total of 4 numbers of busses operational in 1 September 2018. • Current Status : 2 number of busses undergoing PUSPAKOM inspection. • Two busses to be delivered on 11/8/18 and balance on 31/8/2018. • Trial run to be on 17/8/2018. SPAD for individual bus to be applied after trial run. • Daily Operation Hours : 6:30am to 8:30pm PHIFT ←→ ←→ Medini 6 & 7 ←→ Gleneagles Medini ←→ Mall CAUSEWAY LINK of Medini ←→ Educity ←→ East Ledang ←→ Anjung ←→ Larkin Sentral

• Causeway Link LM1 connects the PHIFT to both JB Sentral & Legoland Malaysia via several stops JB Sentral ←→ Larkin Sentral ←→ PHIFT ←→ Legoland Malaysia • Causeway Link JPO2 connects the Airport to CIQ Second Link via several stops Senai Airport ←→ JPO ←→ Kota Iskandar ←→ Puteri Harbour (Opp Jen Hotel) ←→ Kota Iskandar ←→ MOM ←→ Anjung ←→ CIQ Sec Link Note:- • Timing for the public bus are base on the operator schedule (available in mobile apps HUGO) ISKANDAR PUTERI CONNECTIVITY Iskandar Puteri Route Operation Community Time • Proposed Route - Phase 2 Community Shuttle Shuttle Service

Rumah Iskandar Route 1 RIM - PHIFT Malaysia (RIM) – (Morning & Evening only) 7:00am – 7:00pm Route 2 Edu City - PHIFT Route 3 Terminal 6:30am – (existing) Larkin - 7:00pm PHIFT Route 4 6:45am – 7:00pm Taman Nusa Perdana - Sunway Iskandar - Sunway International School

M6/M7

- Imperia - Ledang - Teega Clubhouse - Afinit Medini - Puteri Cove - Ujana - Somerset Medini - Nusajaya Center - 1 Medini

Bukit Indah Note:- • Awaiting permit approval from Land Public Transport Commission (SPAD) on the proposed route - Tesco ISKANDAR PUTERI CONNECTIVITY

• Proposed Route - Phase 2 (Specific internal route)

- Ledang - Afinit Medini Clubhouse - Somerset Medini - Ujana - 1 Medini - Nusajaya Center

M6/M7

- Ramada - Sunway Citrine - Puteri Harbour - Meridin - Sunway Marina International School

Bukit Indah

- Tesco ISKANDAR PUTERI CONNECTIVITY Starex Operation (3 nos) • Operation will start on 1st September 2018. • The trips will be increased from 4 trips per day to 6 trips per day. • New time slot will be proposed as late as 10:30am from Teega and 3:30pm from Jurong East • There will be 3 timing in the morning (Poster will be issued out in due course) • Starex routing as follows;

East Jurong Teega Ledang East BUS STOP IN FRONT OF TEEGA BUS STOP 1. Bus stop tensile roof completed. 2. Sitting area to be completed, pending Consultant design. Sitting design are the

Proposed sitting design TEEGA RETAIL LOTS

GROUND LOWER LEVEL GROUND

YSL Freshmart Teega Handover Tribus Café SUTL Sales Gallery Target to open: 1 December 2018 The Tribus Office

Note: Target to open: 1 1. Occupied unit delineated in green December 2018 2. Units in negotiation delineated in yellow 3. Vacant unit delineated in red

SUTL-One Degree 15 Marina Puteri Harbour Target to open: 1 October 2018 TEEGA SECURITY REPORT OBJECTIVE Objective

• To identify the gap for security access control.

• To propose solution/enhancement for existing access.

• To prevent overlook risk of potential break in theft. FINDINGS AND ENHANCEMENT Tower A

NO TOWER LOCATION SECURITY GAP PROPOSED ENHANCEMENT

1 Tower A Level LG, Staircase 6 People able to access from outside to lift Access Card

People able to trespassing the fencing

Parking lot LG, 2 Tower A Extend fencing height or CCTV near to Staircase 6

3 Tower A EDeck People able to access from lift to ED Access card Tower A

NO TOWER LOCATION SECURITY GAP PROPOSED ENHANCEMENT

5 Tower A EDeck , Staircase 18 Access free from car park to P5 Access Card

6 Tower A EDeck staircase 17 Access free from car park to P5 Access Card

7 Tower A EDeck, staircase 15 Access free from car park to P5 Access Card

8 Near Tower A GL, Staircase 14 and 13 Access free from Parking Level G to ED Access card

In contract

NO TOWER LOCATION SECURITY GAP PROPOSED ENHANCEMENT

1 Tower A EDeck, Staircase Accessible from Parking lot Access Card 14,15,18,19 2 Tower A Edeck, Carpark lift Accessible form Parking lot Access Card

3 Tower A GL, Emergency exit Accessible from Parking lot Access Card mailroom Tower B

NO TOWER LOCATION SECURITY GAP PROPOSED ENHANCEMENT

1 Tower B EDeck Access free from Parking P5 to ED Access Card

2 Tower B LG Level, Staircase 8 Access free from Parking Level LG to ED Access card

GL, Staircase 18 and 3 Near Tower B Access free from Parking Level G to ED Access card 19 People able to trespassing from LG to GF

Extend fencing height 4 Tower B Near Staircase 13 Tower B

NO TOWER LOCATION SECURITY GAP PROPOSED ENHANCEMENT

People able to trespassing the fencing

5 Tower B P2, Near Staircase 20 Extend fencing height Tower B

In contract

NO TOWER LOCATION SECURITY GAP PROPOSED ENHANCEMENT

1 Tower B EDeck, Staircase Accessible from Parking lot Access Card 14,15,18,19 2 Tower B Edeck, Carpark lift Accessible form Parking lot Access Card

3 Tower B GL, Emergency exit Accessible from Parking lot Access Card mailroom Tower Suite

NO TOWER LOCATION SECURITY GAP PROPOSED ENHANCEMENT

ED, Staircase 13, 14, 1 Suite Free access from parking to ED Suite Access Card 19 and 20

2 Suite Level G, Staircase 2 Access free from Parking Level G to ED Access card

3 Suite Level G, Staircase 1 Access free from Parking Level G to ED Change to one way doorknob

To have walkway gate with Access 4 Suite Barrier Gate No access control for walkway Card

In contract

NO LOCATION SECURITY GAP PROPOSED ENHANCEMENT

1 EDeck, Staircase Accessible from Parking lot Access Card 13,14,19,20 2 Edeck, Carpark lift Accessible form Parking lot Access Card

3 GL, Emergency exit Accessible from Parking lot Access Card mailroom Tower Cabana

NO TOWER LOCATION SECURITY GAP PROPOSED ENHANCEMENT

1 Cabana ED People able to access from lift to ED Access card

2 Cabana Staircase 16 and 17 People able to access from lift to ED Access card Others

NO TOWER LOCATION SECURITY GAP PROPOSED ENHANCEMENT

People can access to Tower A, B, Cabana and 1 Open space Parking Lot P5 Propose fencing as P4 Suite People can access to other floors through 2 All Emergency staircase Change doorknob Emergency Staircase Thank you