SHORT TENDER NOTICE

Item rates tender for the following work are hereby invited from the approved contractors/Firms of PHE Department who have already executed similar nature of work and have deposited their enlistment/renewal fee for the year 2016-17, tender documents / forms can obtain from the Head clerk of Executive Engineer, Public Health Engineering Division on cash payment / drafts in the name of Executive Engineer which is not refundable in any case. The tender documents will be issued from the date of advertisement in the news paper from the Head Clerk of the Office of undersigned upto 28.03.2017 in office time and will be received on 29.03.2017 at 2:00 P.M and opened at 02:30 PM in the presence of the contractors or their authorized agents and tendering opening committee. Earnest money @2% of the tender / bid must accompany with each tender in shape of deposit at call from any schedule bank/treasury Challan and shall be shown to Head Clerk at the time of purchase of tender forms. Postal/conditional tenders or tenders without deposit at call and tender not fulfill PPRA rules will not be entertained.

App: Cost Tender Earnest Time S.# Description of item In Million Cost (Rs.) Money limit NA-57 UC Mala i) PCC/Drain/Sullage Carrier/ Culvert in village Malik Mala Tehsil Hazro District Attock (Mohallah Masjid Farooq-e-Azam, Saydan) ii) PCC/Drain/Sullage Carrier in village Tehsil Hazro District Attock (Mohallah 03 1 Makhdozai High School Magrabi Dhoke) 11.650 2000 0.233 Months iii) PCC/Drain in village Kot Kay Tehsil Hazro District Attock (Mohallah Elementary School) iv) PCC in village Injarsar Tehsil Hazro District Attock (Dhoke to Main Road) PCC in Street Pavement, Drain Type-I, Sullage Carrier, Culvert Box and other allied works. UC Ghourgushti PCC/Sullage Carrier in Village Ghourgushti Tehsil 03 2 Hazro District Attock (Bilal Masjid to Ghazi Road) 9.500 1000 0.190 Months PCC in Streets, Sullage Carrier and other allied works. UC Jalalia Construction of Culvert on Chail in village Moman 03 3 Pur Tehsil Hazro District Attock 2.720 1000 0.054 Months Construction of Culvert Box and other allied works. PP-15 UC No.03 Attock City Extension of Water Supply System in Mohallah Mehmood Abad , Mohallah Shed, Mari More in 03 4 13.200 2000 0.264 Attock City Tehsil & District Attock Months Tube Well, Rising Main, Distribution System and other allied works. UC No.01 Attock City RCC Sewer/PCC H/o Sulman Ashraf to H/o 03 5 Muhammad Imran in Peoples Colony in Attock 0.970 1000 0.019 Months City Tehsil & District Attock. PCC in Street, RCC Sewer and other allied works. UC i) PCC/Drain/Repair of Cause Way in villages Karma, Thikrian, Madrota & Gondal Tehsil & District Attock 03 6 11.000 2000 0.220 ii) PCC/Drain/Repair of Cause Way Kamra to Months Madrota Road, Mohallah Meerpur Hussain, Mohallah Urtak Pur in village Karma, Tehsil & District Attock PDF created with pdfFactory Pro trial version www.pdffactory.com

iii) PCC in Mohallah Thikrian in village Thikrian Tehsil & District Attock

iv) PCC/Drain in Mohallah Madrota in village Madrota Tehsil & District Attock

v) PCC/Drain Mohallah Fatuchak in village Gondal Tehsil & District Attock PCC in Street, Drain Type-I, Repair of Cause Way and other allied works. UC Sheen Bagh i) RCC Sewer from Qari Khushi Muhammad to Main Jassian Road in village Jassian Tehsil & District Attock

ii) PCC Dhoke Sharfa to Jassian Road in Dhoke 03 7 5.000 1000 0.100 Sharfa Tehsil & District Attock Months

iii) PCC Dhoke Peshawari to Jassian Road in Dhoke Peshawari Tehsil & District Attock PCC in Streets, RCC Sewer and other allied works. 03 8 Filtration Plant at Ghazi Brotha Colony 1.950 1000 0.039 Months PP-16 UC Musa Tehsil Hazro District Attock i) PCC/Drain in Mohallah Darbar, Israr Shah House to Kalu Road in Village Darya Shareef 03 9 3.900 1000 0.078 ii) PCC in Mohallah Hujrawala, House Tufeel to Months Main Road in Village Kudlathi PCC in Streets, Drain Type-I and other allied works. UC Haroon Tehsil Hazro District Attock i) PCC/Drain/Sullage Carrier in Mohallah Raiti, Mohallah Jinazagah, House Zaman to Razzaq in Village Daman Tehsil Hazro District Attock.

ii) PCC/Drain in Khizar Khan House to Jamia 03 10 Mosque, Sajid Mehmood House to Rashid 3.900 1000 0.078 Months House, Usman House To Younis House, Sohrab Khan House to Nazakat Khan House in Village Tehsil Hazro District Attock.

PCC in Streets, Drain Type-I, Sullage Carrier and other allied works. UC Khagwani Tehsil Hazro District Attock. i) PCC/Drain Chaki Saleem to Riaz House, Main Road to Riaz House, Mureed House to Iftikhar House, Bashir House to Afzal House in Village Shahder Tehsil Hazro District Attock 03 11 4.850 1000 0.097 ii) PCC/Drain Tariq House to Rafaqat House, Months Sher Hussain House to Bilal Mosque, Dr: Shoukat House to Saleem Malik House in Village Sherani Tehsil Hazro District Attock

PCC in Streets, Drain Type-I and other allied works. PDF created with pdfFactory Pro trial version www.pdffactory.com UC Kamal Pur Musa Tehsil Hazro District Attock. i) PCC/Drain/Sullage Carrier Islami School to Sajad House in Village Kamal Pur Musa Tehsil Hazro District Attock. 03 12 ii) PCC/Drain in Mohallah Sheikh Abad, 3.900 1000 0.078 Months Mohallah Raiti Village Tehsil Hazro District Attock. PCC in Streets, Drain Type-I, Sullage Carrier and other allied works. UC Shamas Abad Tehsil Hazro District Attock. PCC/Sullage Carrier in Mohallah Ahmed Abad in 03 13 Village Saman Tehsil Hazro District Attock. 2.920 1000 0.058 Months PCC in Streets, Sullage Carrier and other allied works. UC Formali Tehsil Hazro District Attock. i) PCC Iltaf House to High School Chowk in Village Shadi Khan Tehsil Hazro District 03 14 Attock 4.850 1000 0.097 Months ii) PCC from Gondal Road to village Walia Tehsil Hazro District Attock. PCC in Streets and other allied works. UC Mullan Mansoor Tehsil Hazro District Attock. RCC Sewer/Sullage Carrier Toor Gul House to 03 15 Rehman-ud-Din in Village Garhi Matani Tehsil 1.950 1000 0.039 Months Hazro District Attock. RCC Sewer and other allied works. UC Tehsil Hazro District Attock. i) PCC/Drain in Mohallah Masjid, Ghazi Road to main chowk in Village Shinka Tehsil Hazro District Attock.

ii) PCC/Drain/Sullage Carrier Naseem House to Hujra, abdul Qayoom House to Ali Akhtar House, Meer Afsar House to Medical Center, Iqbal House to Dilnawaz House, Master 03 16 7.300 1000 0.146 House to Mansub House in Village Asghar Months Tehsil Hazro District Attock.

iii) PCC/Drain/Sullage Carrier in Mohallah Magrabi, Mashriki, Qubrustan in Village Yasin Tehsil Hazro District Attock.

PCC in Streets, Drain Type-I, Sullage Carrier and other allied works. UC Jalalia Tehsil Hazro District Attock. PCC/Sullage Carrier in Mohallah Mehran, Mohallah Uqman Khel, Mohallah Dheri in Village 03 17 2.920 1000 0.058 Jalalia Tehsil Hazro District Attock. Months PCC in Streets, Sullage Carrier and other allied works. UC Rangu Tehsil Hazro District Attock.

i) PCC/Sullage Carrier Mohallah School, Masjid Ahleh Hadees in Village Awan Abad Tehsil Hazro District Attock. 03 18 2.920 1000 0.058 Months

ii) Sullage Carrier Main Chowk to Gondal Road in Village Kalu Tehsil Hazro District Attock.

PDF created with pdfFactory Pro trial version www.pdffactory.com UC Waisa Tehsil Hazro District Attock. PCC Qabrustan to G.T Road in Village Kotha Tehsil 03 19 0.970 1000 0.019 Hazro District Attock. Months PCC in Streets and other allied works. UC Bahadar Khan Tehsil Hazro District Attock. i) PCC/Drain in Mohallah Nahi Dhoke, Purani Dhoke, Upper, Lower in Village Saidan Tehsil Hazro District Attock.

03 20 ii) PCC/Drain in Mohallah Boys School, Girl 2.920 1000 0.058 School, Haji Khan, Haji Dawood, Jinazahgah Months in Village Chaichian Tehsil Hazro District Attock. PCC in Streets, Drain Type-I and other allied works. UC Malik Mala Tehsil Hazro District Attock. PCC/Drain Mushtaq House to Shfqat House, Khan Mubarik House to Dawood House, Ilyas House to 03 21 Mehboob House, Allah Bakash House to Banaras 0.970 1000 0.019 Months House in Village Kot Kay Tehsil Hazro District Attock. PCC in Streets, Drain Type-I and other allied works. PP-18 22 Construction of P.C.C Streets & Drain in Union Council Khour (Main Road to Malik Khalid House village Dhoke Mela, Pulli Gulial village Kot Maliar, 03 1.950 1000 0.039 Nullah of Well, From H/o Raheel to H/o Amjad & Months Construction of Path from Police Chowki to H/o Ishaq near Khour Company) 23 Construction of P.C.C Path in Union Council Kharpa 03 (From Graveyard to Dhoke Khera & from 1.950 1000 0.039 Months Sulemanabad to Village Surag) 24 Construction of P.C.C Streets & Drain in Village 03 Maghian Union Council Garibwal . (From Mukhtiar 0.680 1000 0.014 Months Khan H/o to Syed Khan H/o) 25 Construction of P.C.C Streets in Union Council 03 Kamrial (From H/o Bali to Haji H/o Bashir & From 1.370 1000 0.027 Months H/o Haji Sadiq to H/o Riaz Bhati in village Kamrial) 26 Construction of P.C.C Streets in village Maira 03 Shareef Union Council Toot (Path of Darbar, From 1.950 1000 0.039 Months H/o Saadat Nambrdar to Mosque. 27 Construction of P.C.C Streets & Drain in Union Council Chakki (From H/o Zafar To H/o Safeer, 03 0.970 1000 0.019 From H/o Fateh Khan To Mosque in Village Dhoke Months Syedun) 28 Construction of P.C.C Streets & Drain in Union Council Malhowali (From Dhoke Saifal To Dhoke 03 1.270 1000 0.025 Badnial, Path of Dhoke Lari Habibullah in Village Months ) 29 Construction of P.C.C Streets & Drain in Union 03 Council Dandi (From Main Basal Road To 1.950 1000 0.039 Months Gangawali Road) 30 Construction of P.C.C Streets & Drain in Union Council Ahmedal (From Mehran Public School To Ashraf H/o, From Girls Primary School, Akram 03 Patwari, Sajid Mehmood, Zahid H/o To Haji 1.950 1000 0.039 Months Muhammad Khan, Dilawar Abbas, Shahid Aslam, Haji Fida Hussain, Haji Saleem Ustad, Shokat Khrwal & Karam Khan House) PDF created with pdfFactory Pro trial version www.pdffactory.com 31 Construction of P.C.C Streets & Drain in Union Council Ikhlas (From Master Saeed H/o To Masque in Village Nathial, From Muhammad Ameer Bhati To Rafaqat Bhati, Mistry Muhammad Shafi To Main Road, Muhammad Aslam To Qazi 03 1.950 1000 0.039 Manzoor, Dost Muhammad To Main Road, Months Muhammad Akber to Main Road, Muhammadi Masjid to Jahan Khan, Abdul Rasheed (Late) to Haji Abdur Rehman, Muhammad Nazir Bhatti to Nawaz Khan, Nawab Khan to Muhammad Ashraf (Late) 32 Construction of P.C.C Street. From Mazhar House 03 0.500 1000 0.010 to Sajjad in Dhoke Mangila UC Dhurnal Months 33 Construction of Main Path in Dhoke Patalian 03 1.460 1000 0.029 Additional Abbad Pari UC Malal Months 34 Construction of Nullah Gali Jageer Road and P.C.C Street from Ghulam Hussain House to Khan 03 1.460 1000 0.029 Muhammad House Jageer, Maki Dhoke, UC Gali Months Jageer(Sullage carrier).

Condition 1. The tender forms will not be issued to that contractor whose contract agreements have been rescinded in past. 2. Work order to the lowest bidder will be issued after the received of funds from the competent authority in this office. 3. Some qualified / hardworking work charge are required for the supervision of the Development schemes. 4. Those contractor who have not obtained the clause CE-09 from Engineering Council, they will not be participate in the tender. 5. As per notification issued finance Deptt: Government of the Punjab vide No. RO9Tsch) FDI-2183 (IV) (P) dated 06.04.2005 in case the total tenders amount is less than 5% of the approved DNIT, the lowest bidder will have to deposit additional performance security from the scheduled Bank ranging from 5% to his percentage of bid cost within 15 days.

No.___396__/ E Dated__08__/_03_/2017.

A copy is forwarded for information to the: - 1. Chief Engineer (N) PHED Lahore. 2. Superintending Engineer P.H.E Circle RWP. 3. Executive Engineer, Public Health Engg: Division Jhelum / Chakwal / Rawalpindi. 4. Sub Divisional Officer PHE, Sub Division Attock, and Jand. 5. Notice Board.

PDF created with pdfFactory Pro trial version www.pdffactory.com