The Joint Graduate School for Energy and Environment EGS-plan (Bangkok) Co. Ltd.

Success factors of high energy efficient buildings in Germany

Closing Seminar of Thai-German Programme on Energy Efficiency Development Plan (TGP-EEDP), 03.06.2016

Dr.-Ing. Robert Himmler Sustainable buildings and neighborhoods

Theory… … and Practice!

• Energy Plus Buildings • EGS-plan Germany Energy and sustainability concept More than 60 engineers working on for zero and plus energy buildings zero energy and energy plus buildings • Life Cycle Costs of Buildings • EGS-plan Bangkok Calculation of economic efficiency Newly established subsidiary to of energy saving measures provide engineering and consulting • Master of Sustainable Design services: Development of a new Curriculum - Energy and sustainability concepts “Master of Sustainable Design” - Building simulation - Quality control - Green building certification

© EGS / JGSEE . Success factors of high energy efficient building in Germany . 03.06.2016 2 Weather in June 2016 in Thailand and Germany

Rainy Season in Thailand Summer in Germany

© EGS / JGSEE . Success factors of high energy efficient building in Germany . 03.06.2016 3 German National Energy Plan – Long Term Objectives

100 [%]

electricity 80 change consump. – 25 %

60 RE + 60 %

primary energy 40 consump.– 50 %

20

0 1990 2020 2030 2040 2050

© EGS / JGSEE . Success factors of high energy efficient building in Germany . 03.06.2016 4 Development of the Energy Demand of Buildings in Germany

© EGS / JGSEE . Success factors of high energy efficient building in Germany . 03.06.2016 5 Market acceptance of Energy Efficiency is as stubborn as a donkey!

education emotion promotion

Tambourine

laws financial regulations incentives codes standards Stick

Carrot

© EGS / JGSEE . Success factors of high energy efficient building in Germany . 03.06.2016 6 Laws, Standards, Regulations

© EGS / JGSEE . Success factors of high energy efficient building in Germany . 03.06.2016 7 Laws and regulations regarding energy efficiency in buildings

EPBD EU - Energy Performance of Buildings Directive

EnEG EEWärmeG EEG Energy Saving Law Renewable (Heating) Law

EnEV Building Energy Code

Solarthermal PV

Biomass

Building Envelope Grid Primary Energy

© EGS / JGSEE . Success factors of high energy efficient building in Germany . 03.06.2016 8 Energy Saving Decree and Calculation according to German Standard DIN 18599

DIN V 18599: Energy Assessment of New Buildings

Calculation of primary-, end- and use-energy demand

• In accordance with EU‘s EPBD • Whole building approach • Primary energy demand for heating, cooling, ventilation, domestic hot water and lighting • Applys to residential and non-residential buildings as well as for new and existing buildings

© EGS / JGSEE . Success factors of high energy efficient building in Germany . 03.06.2016 9 Energy Passport for New (DIN 18599) and Existing (Energy Bills) Buildings

EnEV Primary Building energy Building Energy Code envelope

© EGS / JGSEE . Success factors of high energy efficient building in Germany . 03.06.2016 10 Penalties regarding BEC for new and existing residential and non-residential buildings

Delict Parties involved Penalty Residential Owner and Building not 2 Mio. THB Consultants according to BEC Non-Residential New Buildings Building not Owner and 2 Mio. THB according to BEC Consultants

No Energy Owner 600.000 THB Passport Energy Passport Seller, Landlord 600.000 THB was not shown Existing Buildings Energy Passport was not handed Seller, Landlord 600.000 THB over

© EGS / JGSEE . Success factors of high energy efficient building in Germany . 03.06.2016 11 EEWärmeG - Renewable Energy Law (Heating)

EEWärmeG: Possibilities to fulfil

50 % • Use one of the following renewables: 15 %

solar thermal collector Heat pump 0,04 m2 per m2 floor area SEER > 3,5

30 %

50 %

Wood pellet Add biogas heating or biooil

• Alternatives: 50 %

15%

Undercut BEC Combined heat & power (CHP)

© EGS / JGSEE . Success factors of high energy efficient building in Germany . 03.06.2016 12 Financial Incentives

© EGS / JGSEE . Success factors of high energy efficient building in Germany . 03.06.2016 13 EEG Renewable Energy Law (feed-in tariff)

PV

Power Grid

© EGS / JGSEE . Success factors of high energy efficient building in Germany . 03.06.2016 14 Financial Incentives for Energy Efficiency in Buildings

Funding by KfW and on-lending through retail banks

Capital market State liability Institution owned Funding by Federal Republic AAA Rating and federal states Refinancing Loan to loan retail customer Customer bank Interest rate Interest rate Interest Margin for credit subsidy risk and handling

German Promotional Advantages: Government mandate • No distortion of competition • Concentration on core competences or KfW defined by KfW Law • Diversification of risks

© EGS / JGSEE . Success factors of high energy efficient building in Germany . 03.06.2016 15 Financial Incentives for Energy Efficiency in Residential Buildings through KfW

payback Efficiency bonus

KfW-Effizienzhaus 40 plus 15 % Interest rate KfW-Effizienzhaus 40 (0,75 % - 1,5 Max. loan 4 Mio. 10,0 % THB per unit %) KfW-Effizienzhaus 55 5 %

• KfW-Effizienzhaus XX: Primary energy demand for heating, cooling and ventilation < XX kWh/m2a • KfW-Effizienzhaus 100: New German single family house, which fulfils requirements of BEC

© EGS / JGSEE . Success factors of high energy efficient building in Germany . 03.06.2016 16 Education, Promotion

© EGS / JGSEE . Success factors of high energy efficient building in Germany . 03.06.2016 17 KfW Information Activities

Public Customer Lobbying Relations Relations

● Internet ● Call center ● Politics ● Press ● Counseling center ● Government ● Trade fairs ● Partner liaison ● Associations etc. ● Print media ● Retail banks

Assistance to Equity Awards Marketing partners holding

KfW Academy Advisor data base

© EGS / JGSEE . Success factors of high energy efficient building in Germany . 03.06.2016 18 Information and Consulting through DENA (German Energy Agency)

19

© EGS / JGSEE . Success factors of high energy efficient building in Germany . 03.06.2016 19 Emotion

© EGS / JGSEE . Success factors of high energy efficient building in Germany . 03.06.2016 20 Pilot and Demonstration Projects

© EGS / JGSEE . Success factors of high energy efficient building in Germany . 03.06.2016 21 Energy Plus Buildings as Demonstration and Pilot Projects

Renewable Energy Generation

Renewable Energy generated onsite and supplied to grid

Renewable Energy generated and consumed onsite

Energy Saving Energy Demand

© EGS / JGSEE . Success factors of high energy efficient building in Germany . 03.06.2016 22 SMA Solar Academy Kassel, Germany

© EGS / JGSEE . Success factors of high energy efficient building in Germany . 03.06.2016 23 Plus Energy Concept

© EGS / JGSEE . Success factors of high energy efficient building in Germany . 03.06.2016 24 Single Family House Berghalde, Leonberg, Germany

© EGS / JGSEE . Success factors of high energy efficient building in Germany . 03.06.2016 25 Energy Plus Concept

© EGS / JGSEE . Success factors of high energy efficient building in Germany . 03.06.2016 26 The Pruksa+ Project in Bangkok

Idea: Design of a single family house, which fulfils the highest sustainability and energy requirements.

Implementation: • 50 % reduction of cooling energy demand by passive measures • 50 % of total energy demand (cooling & household appliances) will be covered by • DGNB Gold sustainable building certification anticipated

© EGS / JGSEE . Success factors of high energy efficient building in Germany . 03.06.2016 29 Building Physics

Roof: Back-ventilated Wall: Mineral Wool Roof Mineral Wool (10 cm, U < 0,3 (5 cm, U < 0,6 W/m2K) W/m2K)

External Shading

Window: 2 Glazing: Ug = 1,7 W/m K; g = 0,33; τ = 0,66 2 Frame: Uf = 1,5 W/m K

© EGS / JGSEE . Success factors of high energy efficient building in Germany . 03.06.2016 30 Energy Supply with 5 kW PV field and a 1000 l ice storage

Household PV Field (5 kW) appliances

Water cooled Public Grid Cold Water Chiller

1000 l Fan Coils Ice Storage (10 kW) Dry Heat Rejection

Bathroom  Energy Costs: 10.000 THB/a Domestic Hot Water Storage

© EGS / JGSEE . Success factors of high energy efficient building in Germany . 03.06.2016 31 Measurement and Verification

SR TH 01 01 TH TH TH 02 03 04

TH TH 06 07

T T 04 05

T 07 T T T T T T T T T TH 12 11 10 09 08 01 02 03 06 05

© EGS / JGSEE . Success factors of high energy efficient building in Germany . 03.06.2016 32 Thank you for your Attention!

Gropiusplatz 10 Tel. +49 711 99 007 - 5 [email protected] D-70563 Stuttgart Fax +49 711 99 007 - 99 www.egs-int.com