WORKING WITH BIAS ON TTC PROJECTS

David Nagler – Manager Community Relations, TTC November 17, 2015 TABIA-CITY meeting Nov, 17, 2015

November 17, 2015 1 OVERVIEW

1. Working with BIAs on major construction projects 2. Streetcar track rehab and network-accessibility 3. Station improvements 4. Subway closures for signal & track upgrades 5. TTC Contacts

November 17, 2015 2 COMMUNICATION WITH BIAS FOR MAJOR CONSTRUCTION PROJECTS

• Community Liaison • Partnership opportunities • Communication & Outreach

TTC Project Newsletter, partnership with BIA

November 17, 2015 3 TTC PARTNERSHIP WITH BIAS

• Dufferin Station – Modernization Project • Coordination with Bloordale BIA • Landscape plan – Bloordale BIA planter

Dufferin Station after project completion

November 17, 2015 4 TTC PARTNERSHIP WITH BIAS MAJOR CAPITAL PROJECTS

• Streetscaping improvements in Leslieville BIA – 2014-15

Queen Street East at Hastings Avenue

November 17, 2015 5

MAJOR UTILITY & TRACK WORK – 2014/15

Queen/Leslie Queen/Broadview

College/Spadina https://www.youtube.com/watch?v=kPJ uU8CaKAc

November 17, 2015 6 QUEEN/LESLIE INTERSECTION – UTILITY UPGRADES

7 WORKING WITH BIAS

• Communicate work and transit plans in advance with BIAs and local communities • Media, notices, postcards, signage, posters

November 17, 2015 8 MAJOR CITY & STREETCAR TRACK WORK SCHEDULED FOR 2016

• King/Charlotte and Adelaide/Charlotte intersections, watermain & track reconstruction – *March 28 to April 30, 2016 (TBC)

• Richmond Street from York to Victoria track replacement – Timing TBD with City

• Roncesvalles Streetcar Yard track replacement – Spring/Fall 2016

• Neville Loop (Queen St East at Neville Pk Blvd ) track replacement – Fall 2016

November 17, 2015 9 MAJOR UTILITY & STREETCAR TRACK WORK SCHEDULED FOR 2015-16

• College and Lansdowne intersection - managed by City – TTC track reconstruction and overhead wiring – July* to Sept* 2016 *TBC (full closure required for shorter duration) – City watermain work

• College and Bathurst intersection - managed by City – track reconstruction and streetcar platform retrofit – June* to July* 2016 *TBC (full closure required for shorter duration)

track replacement – Dundas to Elm, April 25 to May 28, 2016

November 17, 2015 10

MINOR STREETCAR TRACK REPAIR WORK AT STOPS 2015

• EB and WB streetcar stops on Queen at Jarvis 2015 – Tentative Nov 16 - 22 and Nov 23-29

• WB streetcar stop on Queen at Simcoe • EB and WB streetcar stops on Queen at Sherbourne • Both schedules TBC upon completion of City watermain work

November 17, 2015 11 STREETCAR STOP ACCESSIBILITY RETROFITS FOR 2016

• College/Bay intersection area - scheduled from July 11 to July 18, 2016 – removal of the two existing streetcar passenger platforms on either side of the intersection

• St Clair West Avenue – streetcar platforms retrofits starting in June 2016*

November 17, 2015 12 TICKET VENDING MACHINE INSTALLATION 2015-16

Line – 5 • Line - 14 • Line - 7 • Line - 21 • Line - 19 • Line - 9 • 512 St Clair Line- 5 • Line - 1 • Tripper - 2 • Line - 6 • 508 Lakeshore Line - 1 TVM at Spadina/King

November 17, 2015 13 STATION IMPROVEMENTS - 2015-2016 EASIER ACCESS PROGRAM

Overview:

• Program to make all stations accessible to people with disabilities

• New elevators, sliding doors, fare-gates, signage improvements

• All stations accessible by 2025

• 34 stations are currently accessible

November 17, 2015 14

STATION ACCESSIBILITY PROGRAM (EASIER ACCESS)

• Ossington, St Clair West, Woodbine and Coxwell stations under construction

• Dupont and St Patrick stations starting in 2016

• Royal York Station to begin in 2016, scheduled completion in 2019

Ossington Station Rendering

November 17, 2015 15 STATION IMPROVEMENTS - 2015-2016 SECOND EXITS

• Program to enhance safety during emergencies, provide another continuous exit

• Most subway stations have more than one exit

• All new TTC stations are built with at least two exits

November 17, 2015 16 STATION IMPROVEMENTS - 2015-2016 SECOND EXITS

Second Exits Project Updates: • Wellesley – under construction • Woodbine – under construction

Eight to be planned: • Chester • Donlands • College • Dundas • Dundas West Dufferin 2nd Exit completed • Greenwood • Museum • Summerhill

November 17, 2015 17 SUBWAY INFRASTRUCTURE IMPROVEMENT WEEKEND CLOSURES FOR 2015 AND 2016

• Maintaining subway infrastructure critical to ensuring safe, reliable service • One day’s work during full closure = five weeks of nightly work (230am-5am) • Signal system is 60 years old https://www.youtube.com/watch?v=yJlsSQBhKgE

• Variety of work conducted during closures: – Signal upgrades, track replacement/maintenance, tunnel repairs, fire prevention

November 17, 2015 18 SUBWAY UPGRADES WORK 2015-2016

• Next Scheduled Closures for 2015 • Bloor-Danforth line - St George to Keele: November 21-22 and December 5-6

• Planned Closures for early 2016

• Feb 27/28, Mar 5/6, 19/20 – St George to Lawrence W • Mar 12/13, 26/27 – Lawrence to Bloor • Most weekends in 2016 will require subway closures to replace 60 year old signal system on YUS line (Line 1)

November 17, 2015 19 NEW STREETCARS

• Low-floor and accessible • Presto enabled • Greater passenger capacity (holds up to 251 passengers) • Climate controlled with air conditioning

November 17, 2015 20 TTC COMMUNITY RELATIONS FOR MAJOR CONSTRUCTION • Diego Sinagoga, Senior Community Liaison, [email protected] 416-393-2197 • David Nagler – Community Relations Manager [email protected] 416-397-8887

www.ttc.ca “construction notices, construction projects”

November 17, 2015 21