S S

1 1/2" HC14 SILICONE SPLICE SLEEVE (FIELD INSTALL) HC14

LC50

FM70 SPLIT CLIP STB1 STB1 STC7 SEE ELEVATION WEA4 FOR LOCATION

FM38 M173/MTZ0 M173/MTZ0 D.L.O. 110 O.G. HEAD 3" M173 SERIES: 8750XD - 7 1/2" CAPTURED LC46 ERECTOR NOTE: HN09 E11 = TO INSURE A WATERTIGHT SEAL, BACK BED WITH SEALANT BEFORE THE STACK JOINTS IS STB1 ROUGH OPENING

S INSTALLED. MTZ0 S 17T6 FM41 25/32" 17T1 17T5 KV20 E12 UNIT DIM.

ERECTOR NOTE: ERECTOR NOTE: STB1 M173 SET HC13 SILICONE SPLICE IN A BED OF SET HC09 SILICONE SPLICE IN A BED OF WC22 E8 = E12 = H12A FRAME GASKET SEALANT SLEEVE ABOVE VERTICAL MULLION MTZ0 WSD2 SEALANT SLEEVE ABOVE VERTICAL MULLION OVERALL FRAME DIM. MTZ0 MTZ0 MTZ0 MTZ0 MTZ0 MTZ0 AT HORIZONTAL STACK JOINT. AT HORIZONTAL STACK JOINT. HC09 (SILICONE SPLICE) M173 M173 M173 M173 M173 M173

FM41

FM41 FM41 FM41 FM41 MTZ0 FM41 FM41 ERECTOR NOTE: STB1 STB1 STB1 STB1 M173

TO INSURE A WATERTIGHT SEAL, BACK BED UNIT DIMENSION D.L.O. E11 = WITH SEALANT BEFORE THE STACK JOINTS IS INSTALLED. STB1 MTZ0 FM40 SPLIT CLIP STB1 SEE ELEVATION KV49 CORNER ALIGNMENT CLIP OVERALL FRAME DIMENSION M173 E9 M173 M173 M173 STC7 M173 E9 M173 17W9 FOR LOCATION ERASE NOTE AFTER READING HD25 (MULL PLUG) WORK POINT TO ROUGH OPENING 8" LONG CAULK BACKER 8" LONG CAULK BACKER 8" LONG CAULK BACKER 8" LONG CAULK BACKER AT VERTICAL STACK JOINTS MTZ0 MTZ0 AT VERTICAL STACK JOINTS MTZ0 MTZ0 AT VERTICAL STACK JOINTS AT VERTICAL STACK JOINTS MTZ0 MTZ0 1" SHOP DRAWER NOTE: M173 IF EFCO FABRICATING AND ASSEMBLING CURTAIN WALL UNITS THE DETAIL WILL NEED TO ?? SHOW "S4" WITH THE S4 FACTORY ORDER NOTE. WC21 WC18 7 1/2"

KV39 (SILICONE END DAM) ERASE NOTE AFTER READING ERASE NOTE AFTER READING IF THE CUSTOMER ASSEMBLING CURTAIN WALL ERASE NOTE AFTER READING KV39 (SILICONE END DAM) UNITS THE DETAIL WILL NEED TO SHOW "E7"

17T3 WC21 17T8 STC7 7/8" 17T3 17T7 WITH THE E7 ERECTOR NOTE 17W8 SHOP DRAWER NOTE: SHOP DRAWER NOTE: WC22 SHOP DRAWER NOTE:

?? STB1 IF EFCO FABRICATING AND ASSEMBLING STB1 E11 STB1 HC13 IF EFCO FABRICATING AND ASSEMBLING E11 IF EFCO FABRICATING AND ASSEMBLING STB1 ?? E6 CURTAIN WALL UNITS THE DETAIL WILL NEED TO ?? CURTAIN WALL UNITS THE DETAIL WILL NEED TO STB1 ?? CURTAIN WALL UNITS THE DETAIL WILL NEED TO E6 E8 E8 SHOW "S4" WITH THE S4 FACTORY ORDER NOTE. WA02 SHOW "S4" WITH THE S4 FACTORY ORDER NOTE. 17V2 1/2" SHOW "S4" WITH THE S4 FACTORY ORDER NOTE. STC7 STC7 IF THE CUSTOMER ASSEMBLING CURTAIN WALL IF THE CUSTOMER ASSEMBLING CURTAIN WALL IM04 STC7 IF THE CUSTOMER ASSEMBLING CURTAIN WALL FACTORY ORDER NOTE: STC7 IM04 UNITS THE DETAIL WILL NEED TO SHOW "E7" E8 UNITS THE DETAIL WILL NEED TO SHOW "E7" STC7 LC46 UNITS THE DETAIL WILL NEED TO SHOW "E7" HC13 (SILICONE SPLICE) PLACE STC7 FASTENER 1/8" FROM BOTTOM END HC13 (SILICONE SPLICE) WITH THE E7 ERECTOR NOTE WITH THE E7 ERECTOR NOTE S4 = HN09 WITH THE E7 ERECTOR NOTE OF MULLION TO KEEP DURACAST CLIP FROM FALLING OUT THE END OF UNITS. LC46 WC18 LC46 WSD2 WSD2 LC46 LC46 WSD2 WSD2 LC46 SPZ1 SPZ1 WA02 4 3/8"

S HN09 HN09 HN09 HN09 ERECTOR NOTE: HN09 S FACTORY ORDER NOTE: FACTORY ORDER NOTE: E7 = PLACE STC7 FASTENER 1/8" FROM BOTTOM END 3 1/2" FACTORY ORDER NOTE: PLACE STC7 FASTENER 1/8" FROM BOTTOM END PLACE STC7 FASTENER 1/8" FROM BOTTOM END OF MULLION TO KEEP DURACAST CLIP FROM ?? PLACE STC7 FASTENER 1/8" FROM BOTTOM END 1H97 WNC1 (MULL PLUG) S4 = WNC1 (MULL PLUG) WNC1 (MULL PLUG) S4 = FALLING OUT THE END OF UNITS. S4 = WNC1 (MULL PLUG) 1H97 OF MULLION TO KEEP DURACAST CLIP FROM OF MULLION TO KEEP DURACAST CLIP FROM HD25 (MULL PLUG) OF MULLION TO KEEP DURACAST CLIP FROM FALLING OUT THE END OF UNITS. FALLING OUT THE END OF UNITS. FALLING OUT THE END OF UNITS.

WA02 WA02

WC22 WC22 WC22 WC22 WC22 ERECTOR NOTE: ERECTOR NOTE: ERECTOR NOTE: PLACE STC7 FASTENER 1/8" FROM BOTTOM END PLACE STC7 FASTENER 1/8" FROM BOTTOM END PLACE STC7 FASTENER 1/8" FROM BOTTOM END 17T2 E7 = OF MULLION TO KEEP DURACAST CLIP FROM 17T2 17T2 E7 = OF MULLION TO KEEP DURACAST CLIP FROM 17V2 E7 = OF MULLION TO KEEP DURACAST CLIP FROM 17T2 ERASE NOTE AFTER READING FALLING OUT THE END OF UNITS. WA02 FALLING OUT THE END OF UNITS. FALLING OUT THE END OF UNITS. SHOR DRAWER GLAZING NOTE: IF GLASS UNITS ARE TO BE SUPPLIED AND GLAZED BY EFCO THE DETAIL WILL NEED TO 1/8" 25/32" 25/32" 1/8" 25/32" SHOW "S1" WITH THE S1 FACTORY ORDER NOTE. 1/2" 25/32" 1/8" 15H3 - 3" LONG IF GLASS UNITS ARE TO BE SUPPLIED AND 15Y7 - 3" LONG 1835 - 3" LONG 15Y8 - 3" LONG 1 7/16" 1 7/16" 1 7/16" 1 7/16" GLAZED BY CUSTOMER THE DETAIL WILL NEED 7/8" 3 1/2" 1 7/16" 1 7/16" 3/8" FASTENER SLEEVE 1/2" FASTENER SLEEVE 1/4" FASTENER SLEEVE 1/4" FASTENER SLEEVE TO SHOW "E1" WITH THE E1 ERECTOR NOTE

3" D.L.O. ERECTOR NOTE: D.L.O. 3" D.L.O. D.L.O. 4 3/8" ERECTOR NOTE: D.L.O. 3" E8 = SET HC13 SILICONE SPLICE IN A BED OF E8 = SET HC13 SILICONE SPLICE IN A BED OF SEALANT SLEEVE ABOVE VERTICAL MULLION SEALANT SLEEVE ABOVE VERTICAL MULLION UNIT DIMENSION AT HORIZONTAL STACK JOINT. UNIT DIMENSION UNIT DIMENSION UNIT DIMENSION AT HORIZONTAL STACK JOINT. UNIT DIMENSION FACTORY ORDER NOTE: C GLASS UNIT ARE TO BE SHOP GLAZED BY EFCO. L S1 = 1" OVERALL FRAME DIMENSION ERECTOR NOTE: OVERALL FRAME DIMENSION SEE SHEET 1.02 FOR COLOR AND SEALANT TYPE OVERALL FRAME DIMENSION ERECTOR NOTE: OVERALL FRAME DIMENSION 1" FOR ALL SHOP SHOP GLAZED UNITS. FIELD APPLY KV39 SILICONE SHEET TO THE FIELD APPLY KV39 SILICONE SHEET TO THE TOP OF LOWER UNIT AT STACK JOINT. AFTER TOP OF LOWER UNIT AT STACK JOINT. AFTER ROUGH OPENING E9 = SETTING IN BOTH THE LOWER AND UPPER ROUGH OPENING ROUGH OPENING TO WORK POINT E9 = SETTING IN BOTH THE LOWER AND UPPER ROUGH OPENING UNITS INTO THE OPENING APPLY KV39 ERECTOR NOTE: UNITS INTO THE OPENING APPLY KV39 510 O.G. HORIZONTAL SILICONE SHEET TO THE UPPER UNIT BY GLASS UNIT ARE TO BE SHOP GLAZED BY SILICONE SHEET TO THE UPPER UNIT BY PLACING IN A BED OF SEALANT. (CUSTOMER NAME). IT WILL BE THE PLACING IN A BED OF SEALANT. SERIES: 8750XD - 7 1/2" CAPTURED 430 O.G. STACK JOINT JAMB 630 O.G. STACK JOINT VERTICAL E1 = RESPONSIBILITY OF (CUSTOMER NAME) TO 730 O.G. STACK JOINT 90° OUTSIDE CORNER 431 O.G. STACK JOINT JAMB VERIFY COLOR AND SEALANT TYPE FOR ALL 7 1/2" SERIES: 8750XD - 7 1/2" CAPTURED SERIES: 8750XD - 7 1/2" CAPTURED SHOP SHOP GLAZED UNITS. SERIES: 8750XD - 7 1/2" CAPTURED SERIES: 8750XD - 7 1/2" CAPTURED 1" D.L.O.

WC22 WSD2

25/32" STB1 STB1

HN09

LC46

3" H12A FRAME GASKET

FM38 UNIT DIM.

HN09 ROUGH OPENING

OVERALL FRAME DIM. STB1 STB1

25/32" 17T1 17T3

WC22 WSD2 D.L.O.

310 O.G. HORIZONTAL STACKS SERIES: 8750XD - 7 1/2" CAPTURED

7 1/2"

1" FM47 (LOADING CLIP)

?? D.L.O.

H12B FRAME GASKET WC22 WSD2 STB1

17T2 17U0 D.L.O.

UNIT DIM. FACTORY ORDER NOTE: STACK JOINT LOADING CLIPS WILL NEED TO BE STB1 STB1 HC05 25/32" SHOP DRAWER NOTE: ERECTOR NOTE: S2 = MOUNTED TO THE CURTAIN WALL UNIT BY THE BOTTOM TWO ATTACHMENT HOLES AT THIS IF EFCO FABRICATING AND ASSEMBLING TO INSURE A WATERTIGHT SEAL, BACK BED FM70 SPLIT CLIP SEE HN09 CURTAIN WALL UNITS THE DETAIL WILL NEED TO E11 = WITH SEALANT BEFORE THE STACK JOINTS IS DETAIL LOCATION. ELEVATION FOR LOCATION LC46 STB1 WEA2 SHOW "S2" WITH THE S2 FACTORY ORDER NOTE.

S INSTALLED. S 1 15/16" ERECTOR NOTE: IF THE CUSTOMER ASSEMBLING CURTAIN WALL

W07V (TAPE) LC54 LC23 STACK JOINT LOADING CLIPS WILL NEED TO BE UNITS THE DETAIL WILL NEED TO SHOW "E4" HC13 E4 = MOUNTED TO THE CURTAIN WALL UNIT BY THE WITH THE E4 ERECTOR NOTE FM45 (LOADING CLIP) C BOTTOM TWO ATTACHMENT HOLES AT THIS L HC13 SILICONE SPLICE E3 3 7/8" DETAIL LOCATION. FM45 (LOADING CLIP) FM46 (LOADING CLIP) FM45 (LOADING CLIP) SLEEVE (FIELD INSTALL) 17T9 ERASE NOTE AFTER READING

STB1 ERECTOR NOTE: STB1 17V6 TO INSURE A WATERTIGHT SEAL, BACK BED KV49 CORNER ALIGNMENT CLIP STB1 E11 = STB1 LC46 WITH SEALANT BEFORE THE STACK JOINTS IS STB1 INSTALLED. UNIT DIMENSION ROUGH OPENING HN09

OVERALL FRAME DIM. 17T2

1 15/16" STB1 STB1 FM40 SPLIT CLIP E2 STB1 H12G MULLION OVERALL FRAME DIMENSION SEE ELEVATION CAP GASKET M173/MTZ0 M173/MTZ0 8" LONG CAULK BACKER STC7 FOR LOCATION 17W9 AT VERTICAL STACK JOINTS WORK POINT TO ROUGH OPENING 25/32" 17U1 17T5 ERECTOR NOTE: ERASE NOTE AFTER READING APPLY H12G MULLION CAP IN A BED SEALANT AT 8" LONG CAULK BACKER 17T7 17T8 8" LONG CAULK BACKER 8" LONG CAULK BACKER E2 = AT VERTICAL STACK JOINTS AT VERTICAL STACK JOINTS AT VERTICAL STACK JOINTS VERTICAL STACK PRIOR TO INSTALLATION 17T9 17T3 SHOP DRAWER NOTE: 17T3 WC22 STACK JOINT NECK IN PLACE. IF EFCO FABRICATING AND ASSEMBLING ?? WSD2 CURTAIN WALL UNITS THE DETAIL WILL NEED TO H12C FRAME UNIT DIM. SHOW "S4" WITH THE S4 FACTORY ORDER NOTE. WC21 WC18 GASKET ERECTOR NOTE: ERASE NOTE AFTER READING

KV19 APPLY CONTINUOUS BEAD OF SEALANT

SPZ1 IF THE CUSTOMER ASSEMBLING CURTAIN WALL SPZ1 E3 = ERASE NOTE AFTER READING WC21 ERASE NOTE AFTER READING HORIZONTAL STACK JOINT GUTTER TRACK PRIOR SHOP DRAWER NOTE: UNITS THE DETAIL WILL NEED TO SHOW "E7" STC7 7/8" TO SETTING 17T9 STACK JOINT NECK IN PLACE. STB1 E11 STB1 WITH THE E7 ERECTOR NOTE 17W8 KV32 (END DAM) SHOP DRAWER NOTE: IF EFCO FABRICATING AND ASSEMBLING WC22 SHOP DRAWER NOTE: KV32 (END DAM) D.L.O. ?? CURTAIN WALL UNITS THE DETAIL WILL NEED TO ?? STB1 IF EFCO FABRICATING AND ASSEMBLING WA02 SHOW "S4" WITH THE S4 FACTORY ORDER NOTE. E11 IF EFCO FABRICATING AND ASSEMBLING STB1 ?? E6 CURTAIN WALL UNITS THE DETAIL WILL NEED TO STB1 ?? CURTAIN WALL UNITS THE DETAIL WILL NEED TO E6 STC7 STC7 SHOW "S4" WITH THE S4 FACTORY ORDER NOTE. IF THE CUSTOMER ASSEMBLING CURTAIN WALL 17V2 1/2" SHOW "S4" WITH THE S4 FACTORY ORDER NOTE. UNITS THE DETAIL WILL NEED TO SHOW "E7" IM04 STC7 IF THE CUSTOMER ASSEMBLING CURTAIN WALL WITH THE E7 ERECTOR NOTE FACTORY ORDER NOTE: IF THE CUSTOMER ASSEMBLING CURTAIN WALL STC7 IM04 UNITS THE DETAIL WILL NEED TO SHOW "E7" STC7 LC46 UNITS THE DETAIL WILL NEED TO SHOW "E7" PLACE STC7 FASTENER 1/8" FROM BOTTOM END WITH THE E7 ERECTOR NOTE S4 = HN09 WITH THE E7 ERECTOR NOTE OF MULLION TO KEEP DURACAST CLIP FROM WSD2 LC46 LC46 WSD2 FALLING OUT THE END OF UNITS. LC46 WC18 LC46 WSD2 WSD2 LC46 SPZ1

SPZ1 HN09 HN09 WA02 4 3/8"

HN09 FACTORY ORDER NOTE: HN09 S ERECTOR NOTE: HN09 S

PLACE STC7 FASTENER 1/8" FROM BOTTOM END PLACE STC7 FASTENER 1/8" FROM BOTTOM END 3 1/2" FACTORY ORDER NOTE: S4 = OF MULLION TO KEEP DURACAST CLIP FROM E7 = FACTORY ORDER NOTE: PLACE STC7 FASTENER 1/8" FROM BOTTOM END OF MULLION TO KEEP DURACAST CLIP FROM ?? PLACE STC7 FASTENER 1/8" FROM BOTTOM END SPZ1 1H97 S4 = FALLING OUT THE END OF UNITS. FALLING OUT THE END OF UNITS. S4 = 1H97 OF MULLION TO KEEP DURACAST CLIP FROM OF MULLION TO KEEP DURACAST CLIP FROM FALLING OUT THE END OF UNITS. FALLING OUT THE END OF UNITS. SPZ1 WC22 WC22 WA02 ERECTOR NOTE: WA02 210 O.G. STATIC STARTER SILL

WC22 WC22 WC22 ERECTOR NOTE: E7 = PLACE STC7 FASTENER 1/8" FROM BOTTOM END ERECTOR NOTE: 17T2 17T2 OF MULLION TO KEEP DURACAST CLIP FROM SERIES: 8750XD - 7 1/2" CAPTURED PLACE STC7 FASTENER 1/8" FROM BOTTOM END PLACE STC7 FASTENER 1/8" FROM BOTTOM END 17T2 E7 = FALLING OUT THE END OF UNITS. 17V2 E7 = 17T2 OF MULLION TO KEEP DURACAST CLIP FROM WA02 OF MULLION TO KEEP DURACAST CLIP FROM 7 1/2" FALLING OUT THE END OF UNITS. ERASE NOTE AFTER READING FALLING OUT THE END OF UNITS. SHOR DRAWER GLAZING NOTE: 1" IF GLASS UNITS ARE TO BE SUPPLIED AND 25/32" 1/8" 25/32" GLAZED BY EFCO THE DETAIL WILL NEED TO 1/8" 25/32" SHOW "S1" WITH THE S1 FACTORY ORDER NOTE. 1/2" 25/32" 1/8" 1 7/16" 1 7/16" IF GLASS UNITS ARE TO BE SUPPLIED AND 1 7/16" 1 7/16" GLAZED BY CUSTOMER THE DETAIL WILL NEED 7/8" 3 1/2" 1 7/16" 1 7/16" TO SHOW "E1" WITH THE E1 ERECTOR NOTE D.L.O. 3" D.L.O. 3" D.L.O. D.L.O. 4 3/8" D.L.O. 3" UNIT DIMENSION UNIT DIMENSION 3/8" UNIT DIMENSION C UNIT DIMENSION UNIT DIMENSION 3/8" L FACTORY ORDER NOTE: D.L.O. OVERALL FRAME DIMENSION GLASS UNIT ARE TO BE SHOP GLAZED BY EFCO. S1 = 1" OVERALL FRAME DIMENSION SEE SHEET 1.02 FOR COLOR AND SEALANT TYPE OVERALL FRAME DIMENSION OVERALL FRAME DIMENSION 1" FOR ALL SHOP SHOP GLAZED UNITS. H12B FRAME ROUGH OPENING GASKET WC22

ROUGH OPENING ROUGH OPENING TO WORK POINT ROUGH OPENING WSD2 UNIT DIM. ERECTOR NOTE: 17T2 17U0 GLASS UNIT ARE TO BE SHOP GLAZED BY 610 O.G. STATIC VERTICAL (CUSTOMER NAME). IT WILL BE THE E1 = STB1 RESPONSIBILITY OF (CUSTOMER NAME) TO 25/32" STB1 HC05 410 O.G. STATIC JAMB SERIES: 8750XD - 7 1/2" CAPTURED 710 O.G. STATIC 90° OUTSIDE CORNER 411 O.G. STATIC JAMB VERIFY COLOR AND SEALANT TYPE FOR ALL FM56 BRAKE METAL SHOP SHOP GLAZED UNITS. HN09 END DAM AT JAMBS SERIES: 8750XD - 7 1/2" CAPTURED SERIES: 8750XD - 7 1/2" CAPTURED SERIES: 8750XD - 7 1/2" CAPTURED STB1 WEA2 1 11/16"

OVERALL FRAME DIM. LC46 LC23 ROUGH OPENING

3" W07V (TAPE) MULLION STATIC LC54 LOADING CLIP HC13 SILICONE SPLICE SLEEVE (FIELD INSTALL)

1/2" HC13

1 5/16" 1H91 13/16"

S S 1/2"

1/4" FASTENER WASHER

1/4" FASTENER WASHER U17D3-001 (WASHER)

3/8" FASTENER WASHER FM59 (WASHER) FM68

1/2" FASTENER WASHER FM60 (WASHER)

U17D3-001

3/8" FASTENER WASHER

FM59

1/2" FASTENER WASHER

FM60

FM66

PER EMBED DWG. 1 1/2" OR ARCHITECTURAL DWG MIN. FM66

SHOR DRAWER NOTE: NEED TO VERIFY WITH STRUCTURAL DEPARTMENT IF THE STANDARD LOAD 11" OR THE HIGH LOAD 16" SLAB ANCHOR WILL BE REQUIRED ON YOUR PROJECT. ERASE NOTE AFTER READING 5 1/2" 5 1/2" HIGH LOAD SLAB ANCHOR HIGH LOAD SLAB ANCHOR HIGH LOAD SLAB ANCHOR REF. REF.

EMBED T-BOLT & NUT (N.B.E.) SEE ELEVATION 12 1/4" SEE ELEVATION SIZED PER EMBED DWG. FOR SPACING FOR SPACING CL 6 1/8" 6 1/8"

915 6" 6" 8.??

VERTICAL CURTAIN WALL MULLION ABOVE MULLION STATIC LOADING CLIP

FM45

ANCHOR BOLT (SIZED AS REQ'D)

LC46 DURACAST CAPTURED THERMAL SPACER 1" 17V4 S.S.G. COVER 17V4 S.S.G. COVER

WC19 STRUCTURAL SILICONE WC19 STRUCTURAL SILICONE FM67 SPACER GASKET BEHIND GLASS SPACER GASKET BEHIND GLASS

STRUCTURAL LC45 DURACAST S.S.G. STRUCTURAL 6 3/4" GLAZED SEAL GLAZED SEAL PER EMBED DWG. THERMAL SPACER REF. FIELD CONDITION EDGE OF VERTICAL EDGE OF VERTICAL (N.B.E.) MULLION BEHIND GLASS MULLION BEHIND GLASS OR ARCHITECTURAL DWG PLACE STC7 FASTENER 1/8" FROM BOTTOM U17D3-001 (WASHER) EDGE OF GLASS EDGE OF GLASS .562" X .882" SLOTS AT EACH 17D3 EXTRUDED ALUM. 1/4" FASTENER WASHER END OF MULLION TO KEEP DURACAST CLIP ANCHOR BOLT LOCATION FROM FALLING OUT THE END OF UNITS SERRATED WASHERS 17T2 CAPTURED 17T2 CAPTURED (SLOT WIDTH PER BOLT SIZE) 1H97 CAPTURED 3/8" FASTENER WASHER FM59 (WASHER) HALF COVER HALF COVER M171 HALF COVER FM66 FM66 FM66

LC45 DURACAST S.S.G. 1/2" FASTENER WASHER FM60 (WASHER) THERMAL SPACER LC46 DURACAST CAPTURED LC46 DURACAST CAPTURED SHOR DRAWER NOTE: THERMAL SPACER THERMAL SPACER PLACE STC7 FASTENER 1/8" FROM BOTTOM NEED TO VERIFY WITH STRUCTURAL END OF MULLION TO KEEP DURACAST CLIP SET HC13 SILICONE SPLICE DEPARTMENT IF THE STANDARD LOAD 12 3/4" OR FM61 FROM FALLING OUT THE END OF UNITS IN A BED OF SEALANT SLEEVE APPLY A CONTINUOUS LINE SEALANT 930 DEAD-LOAD ANCHOR THE HIGH LOAD 17 3/4" SLAB ANCHOR WILL BE (FIELD INSTALL) REQUIRED ON YOUR PROJECT. STC7 W07V DOUBLE STC7 W07V DOUBLE AT THE THERMAL STRUT JOINT STC7 SIDED TAPE STC7 SIDED TAPE SERIES: 8750XD - 7 1/2" CONC. EMBED (N.B.E.) ERASE NOTE AFTER READING EDGE OF CONC. SIZED PER EMBED DWG. FIELD APPLY KV39 SILICONE SHEET IN BED OF FLOOR SLAB (N.B.E.) M169/IHQ1

SHOR DRAWER NOTE: SHOR DRAWER NOTE: SHOR DRAWER NOTE: FM63 MIN. SEALANT TO THE TOP OF LOWER UNIT AT STACK 1 1/2" JOINT. AFTER SETTING IN BOTH THE LOWER AND APPLY AND TOOL A LINE OF NEED TO VERIFY WITH STRUCTURAL NEED TO VERIFY WITH STRUCTURAL NEED TO VERIFY WITH STRUCTURAL UPPER UNITS INTO THE OPENING APPLY HC13 STACK SWEEP STACK SWEEP SEALANT BETWEEN STARTER DEPARTMENT IF THE STANDARD LOAD 11" OR DEPARTMENT IF THE STANDARD LOAD 11" OR DEPARTMENT IF THE STANDARD LOAD 11" OR FM05 SILICONE SHEET THEN APPLY HC13 SILICONE SILL SPLICE JOINT THE HIGH LOAD 16" SLAB ANCHOR WILL BE THE HIGH LOAD 16" SLAB ANCHOR WILL BE THE HIGH LOAD 16" SLAB ANCHOR WILL BE SHEET TO THE UPPER UNIT BY PLACING IT IN A HC13 HC13 REQUIRED ON YOUR PROJECT. REQUIRED ON YOUR PROJECT. REQUIRED ON YOUR PROJECT. BED OF SEALANT. FM44 SET HC13 SILICONE SPLICE IN A BED OF KV39 WNC1 MULL PLUG WNC1 MULL PLUG ERASE NOTE AFTER READING ERASE NOTE AFTER READING ERASE NOTE AFTER READING SEALANT SLEEVE ABOVE VERTICAL ANCHOR BOLT MULLION AT HORIZONTAL STACK JOINT (SIZED AS REQ'D) (FIELD INSTALL) LC46 DURACAST CAPTURED LC46 DURACAST CAPTURED THERMAL SPACER THERMAL SPACER

FOR SPACING IHQ2 LC45 DURACAST S.S.G. PLUG END OF THE SILL STARTER SEE ELEVATION M169 WITH BACKER ROD AT JAMBS THERMAL SPACER AND SLICE JOINTS (BY INSTALLER) INSIDE CORNER DETAIL OUTSIDE CORNER DETAIL RIGHT JAMB DETAIL LEFT JAMB DETAIL INTERMEDIATE DETAIL FM61

SET HC13 SILICONE SPLICE IN A BED OF 17T2 CAPTURED 17T2 CAPTURED M141 HALF COVER HALF COVER SEALANT SLEEVE ABOVE VERTICAL 1/4" 5 1/2" 5 1/2" 5 1/2" 5 1/2" 5 1/2" 5 1/2" MULLION AT HORIZONTAL STACK JOINT 935 934 933 932 931 REF. REF. REF. REF. REF. REF. FM17 (FIELD INSTALL) EDGE OF GLASS EDGE OF GLASS 8.?? 8.?? 8.?? 8.?? 8.?? M174 STARTER SILL LENGTH STARTER SILL LENGTH M169/IHQ1 EDGE OF VERTICAL EDGE OF VERTICAL FM44 1H97 CAPTURED MULLION BEHIND GLASS MULLION BEHIND GLASS HALF COVER .562" X .882" SLOTS AT EACH IHQ1 1/4" FASTENER WASHER 1/4" FASTENER WASHER 1/4" FASTENER WASHER ANCHOR BOLT LOCATION STRUCTURAL STRUCTURAL WC19 STRUCTURAL SILICONE SECTION CUT (SLOT WIDTH PER BOLT SIZE) GLAZED SEAL GLAZED SEAL SPACER GASKET BEHIND GLASS

912 REF. STATIC STARTER SILL INTERMEDIATE SPLICE FM11 FM17 6 3/4"

M174 M171 FM47 EMBED T-BOLT & NUT (N.B.E.) EMBED T-BOLT & NUT (N.B.E.) EMBED T-BOLT & NUT (N.B.E.) EMBED T-BOLT & NUT (N.B.E.) WC19 STRUCTURAL SILICONE SIZED PER EMBED DWG. SIZED PER EMBED DWG. SIZED PER EMBED DWG. SIZED PER EMBED DWG. IHQ2 LC46 DURACAST CAPTURED SPACER GASKET BEHIND GLASS 17V4 S.S.G. COVER IHQ2/M174/M141 CONC. EMBED (N.B.E.) CONC. EMBED (N.B.E.) CONC. EMBED (N.B.E.) 1/4" FASTENER WASHER FM06 THERMAL SPACER 17V4 S.S.G. COVER SIZED PER EMBED DWG. SIZED PER EMBED DWG. SIZED PER EMBED DWG. 5 1/2" REF.

M141 U17D3-001 U17D3-001 U17D3-001 SECTION CUT SECTION CUT 902 STACK JOINT END DAM 901 STACK JOINT END DAM 3/8" FASTENER WASHER 3/8" FASTENER WASHER 3/8" FASTENER WASHER

FM05/FM06 U17D3-001 8" SEE ELEVATION SEE ELEVATION 12" SEE ELEVATION FOR SPACING FOR SPACING FOR SPACING CL 6" 6" 3/8" FASTENER WASHER SECTION CUT 935 915 915 915 INSIDE CORNER DEAD-LOAD DETAIL 8.?? 8.?? 8.?? IHQ2/M174/M141 EMBED T-BOLT & NUT (N.B.E.) SIZED PER EMBED DWG. FM59 FM59 FM59 EMBED T-BOLT & NUT (N.B.E.) FM46 & FM47 MULLION SIZED PER EMBED DWG. MULLION STATIC LOADING CLIP .562" X .882" SLOTS AT EACH VERTICAL CURTAIN WALL STARTER SILL LENGTH CONC. EMBED (N.B.E.) STATIC LOADING CLIP M171 ANCHOR BOLT LOCATION MULLION ABOVE MULLION STATIC LOADING CLIP SHIMS BY INSTALLER 1/2" FASTENER WASHER 1/2" FASTENER WASHER 1/2" FASTENER WASHER SIZED PER EMBED DWG. (SLOT WIDTH PER BOLT SIZE)

FM59 14" 1/2" FASTENER WASHER LC46 DURACAST CAPTURED FM45 FM45 FM46 THERMAL SPACER

4" 4" PER EMBED DWG. 1" ANCHOR BOLT ANCHOR BOLT PER EMBED DWG. PER EMBED DWG. PER EMBED DWG. REF. REF. 5 1/2" REF. (SIZED AS REQ'D) (SIZED AS REQ'D) FM60 FM60 FM60 FM06

17V4 S.S.G. COVER OR ARCHITECTURAL DWG OR ARCHITECTURAL DWG OR ARCHITECTURAL DWG OR ARCHITECTURAL DWG 3/8" IHQ2/M174/M141

WC19 STRUCTURAL SILICONE M171 SPACER GASKET BEHIND GLASS VERTICAL CURTAIN WALL STRUCTURAL MULLION ABOVE CONC. FLOOR M171 M171 M171 M171 FM60 M171 GLAZED SEAL SLAB (N.B.E.)

FIELD CONDITION EDGE OF VERTICAL FM43 (N.B.E.) MULLION BEHIND GLASS KV32 (END DAM) M170

EDGE OF GLASS FM61 FM61 FM61 FM62 M169/IHQ1

17T2 CAPTURED SPZ1 1H97 CAPTURED HALF COVER HALF COVER .562" X .882" SLOTS AT EACH APPLY AND TOOL A LINE OF 17D3 EXTRUDED ALUM. 17D3 EXTRUDED ALUM. ANCHOR BOLT LOCATION SERRATED WASHERS SERRATED WASHERS EDGE OF CONC. EDGE OF CONC. EDGE OF CONC. EDGE OF CONC. LC45 DURACAST S.S.G. SEALANT BETWEEN THE VERTICAL CURTAIN WALL (SLOT WIDTH PER BOLT SIZE) SET HC09 SILICONE SPLICE CURTAIN WALL SYSTEM AND IN A BED OF SEALANT SLEEVE M169/IHQ1 M169/IHQ1 FLOOR SLAB (N.B.E.) M169/IHQ1 FLOOR SLAB (N.B.E.) FLOOR SLAB (N.B.E.) M169/IHQ1 FLOOR SLAB (N.B.E.) M169/IHQ1 THERMAL SPACER MULLION ABOVE MIN. MIN. MIN. MIN. LC46 DURACAST CAPTURED END DAM 17D3 EXTRUDED ALUM. (FIELD INSTALL) 1 1/2" 1 1/2" 1 1/2" 1 1/2" M141 THERMAL SPACER SERRATED WASHERS PLACE STC7 FASTENER 1/8" FROM BOTTOM FM06 FM05 FM05 FM06 FM05 END OF MULLION TO KEEP DURACAST CLIP FROM FALLING OUT THE END OF UNITS 46.00° IHQ2 APPLY AND TOOL A LINE OF STC7 STC7 W07V DOUBLE FM43 SIDED TAPE SEALANT BETWEEN THE FM11 FM11 FM11 FM11 MARRY LINE OF SEALANT AT IHQ2 IHQ2 IHQ2 IHQ2 M174 CURTAIN WALL SYSTEM AND APPLY AND TOOL A LINE OF END DAM SPZ1 STARTER SILL INTO THE APPLY A BED BED OF SEALANT APPLY A CONTINUOUS LINE SEALANT APPLY A CONTINUOUS LINE SEALANT APPLY A CONTINUOUS LINE SEALANT CURTAIN WALL PERIMETER SEALANT BETWEEN STARTER FM17 TO THE END OF STARTER SILL AT THE THERMAL STRUT JOINT AT THE THERMAL STRUT JOINT AT THE THERMAL STRUT JOINT SILL SPLICE JOINT CONC. EMBED SIZE AT THE JAMB CONDIDTION BEFORE ATTACHING END DAM M174 M174 M174 M174 KV31 OR KV32 (END DAM) PER EMBED DWG. STACK SWEEP (N.B.E.) FM17 FM17 FM17 FM17 SECTION CUT

M141 M141 M141 M141 934 OUTSIDE CORNER DEAD-LOAD DETAIL APPLY A BED BED OF SEALANT 1 1/2" PER EMBED DWG. TO THE END OF STARTER SILL SPZ1 MIN. OR ARCHITECTURAL DWG M174 BEFORE ATTACHING END DAM PLUG END OF THE SILL STARTER STARTER SILL CUT STARTER SILL 1 1/2" PER EMBED DWG. SPZ1 WITH BACKER ROD AT JAMBS AT A 46° MITER AND SLICE JOINTS (BY INSTALLER) 46.00° MIN. OR ARCHITECTURAL DWG MARRY LINE OF SEALANT AT FM17 STARTER SILL INTO THE IHQ2 CURTAIN WALL PERIMETER AT THE JAMB CONDIDTION M141

FIELD JAMB CONDIDTION PLUG END OF THE SILL STARTER WITH BACKER ROD AT JAMBS 1/4" AND SLICE JOINTS (BY INSTALLER) PLUG END OF THE SILL STARTER 900 WITH BACKER ROD AT JAMBS SECTION CUT SEE ELEVATION 14" GENERAL NOTE: 8.?? 3/8" AND SLICE JOINTS (BY INSTALLER) 900 STARTER SILL END DAM FOR SPACING THE PRIMARY LINE OF SEALANT (NOT SHOWN HERE FOR CLARITY) IS AT THE FACE OF THE MULLION, IT IS STARTER SILL LENGTH 1/4" AT THE FACE OF THE COVER (NOT SHOWN FOR CLARITY) ONLY AT THE STARTER SILL AND WILL FOLLOW THE LINE OF THE END CAP TO MARRY INTO 5/8" STARTER SILL LENGTH STARTER SILL LENGTH SECTION CUT SECTION CUT SECTION CUT THE PRIMARY LINE. 931 INTERMEDIATE DEAD-LOAD DETAIL 932 LEFT JAMB DEAD-LOAD DETAIL 933 RIGHT JAMB DEAD-LOAD DETAIL SECTION CUT SECTION CUT 910 STATIC STARTER SILL JAMB 911 STATIC STARTER SILL INTERMEDIATE SECTION CUT 913 STATIC STARTER SILL CORNER SPLICE FM68

1/4" FASTENER WASHER

U17D3-001

3/8" FASTENER WASHER

FM59

1/4" FASTENER WASHER U17D3-001 (WASHER) 1/2" FASTENER WASHER

3/8" FASTENER WASHER FM59 (WASHER)

1/2" FASTENER WASHER FM60 (WASHER)

940 DEAD-LOAD ANCHOR PER EMBED DWG. 1 1/2" MIN. FM60 SERIES: 8750XD - 7 1/2" OR ARCHITECTURAL DWG FM66 INSIDE CORNER DETAIL OUTSIDE CORNER DETAIL RIGHT JAMB DETAIL LEFT JAMB DETAIL INTERMEDIATE DETAIL FM66 945 944 943 942 941 8.?? 8.?? 8.?? 8.?? 8.?? SHOR DRAWER NOTE: NEED TO VERIFY WITH STRUCTURAL DEPARTMENT IF THE STANDARD LOAD 11" OR THE HIGH LOAD 16" SLAB ANCHOR WILL BE REQUIRED ON YOUR PROJECT.

M170 ERASE NOTE AFTER READING FM11 5 1/2" 5 1/2" REF. REF.

IHQ2/M174/M141

EMBED T-BOLT & NUT (N.B.E.) SIZED PER EMBED DWG. FM05/FM06

IHQ2/M174/M141 EMBED T-BOLT & NUT (N.B.E.) FM66 SIZED PER EMBED DWG.

FM66

M171 SHIMS BY INSTALLER

FM66 FM67

SHOR DRAWER NOTE: NEED TO VERIFY WITH STRUCTURAL DEPARTMENT IF THE STANDARD LOAD 11" OR THE HIGH LOAD 16" SLAB ANCHOR WILL BE SHOR DRAWER NOTE: REQUIRED ON YOUR PROJECT. NEED TO VERIFY WITH STRUCTURAL IHQ2/M174/M141 ERASE NOTE AFTER READING DEPARTMENT IF THE STANDARD LOAD 11" OR SHOR DRAWER NOTE: THE HIGH LOAD 16" SLAB ANCHOR WILL BE REQUIRED ON YOUR PROJECT. NEED TO VERIFY WITH STRUCTURAL DEPARTMENT IF THE STANDARD LOAD 11" OR THE HIGH LOAD 16" SLAB ANCHOR WILL BE ERASE NOTE AFTER READING CONC. FLOOR 6 3/4" REQUIRED ON YOUR PROJECT. PER EMBED DWG. SLAB (N.B.E.) SHOR DRAWER NOTE: REF.

ERASE NOTE AFTER READING NEED TO VERIFY WITH STRUCTURAL OR ARCHITECTURAL DWG M170 DEPARTMENT IF THE STANDARD LOAD 12 3/4" OR THE HIGH LOAD 17 3/4" SLAB ANCHOR WILL BE 5 1/2" 5 1/2" REQUIRED ON YOUR PROJECT. REF. REF. ERASE NOTE AFTER READING M171 5 1/2" 5 1/2" REF. REF. FM63 1/4" FASTENER WASHER 5 1/2" 5 1/2" REF. REF. FM61 1/4" FASTENER WASHER EMBED T-BOLT & NUT (N.B.E.) SIZED PER EMBED DWG. CONC. EMBED (N.B.E.) CONC. EMBED (N.B.E.) 1/4" FASTENER WASHER SIZED PER EMBED DWG. EDGE OF CONC. EMBED T-BOLT & NUT (N.B.E.) SIZED PER EMBED DWG. FLOOR SLAB (N.B.E.) M170 MIN. CONC. EMBED (N.B.E.) SIZED PER EMBED DWG. CONC. EMBED (N.B.E.) 1 1/2" SIZED PER EMBED DWG. U17D3-001 SIZED PER EMBED DWG. EMBED T-BOLT & NUT (N.B.E.) FM05 CONC. EMBED (N.B.E.) SIZED PER EMBED DWG. 1 1/2" PER EMBED DWG. U17D3-001 SIZED PER EMBED DWG. FM44 MIN. OR ARCHITECTURAL DWG 3/8" FASTENER WASHER

U17D3-001 3/8" FASTENER WASHER IHQ2

3/8" FASTENER WASHER FM61

EMBED T-BOLT & NUT (N.B.E.) M141 FM59 SIZED PER EMBED DWG. FM17 1/4" FASTENER WASHER M174

FM59 1/2" FASTENER WASHER FM44

M170

FM59 1/2" FASTENER WASHER FM17 REF. 6 3/4" M174 M171

1/2" FASTENER WASHER IHQ2 FM06 REF.

U17D3-001 5 1/2" 4" PER EMBED DWG.

REF. FM60 M141

OR ARCHITECTURAL DWG 3/8" FASTENER WASHER 4" PER EMBED DWG. FM60 REF. OR ARCHITECTURAL DWG PER EMBED DWG. M171 FM60 OR ARCHITECTURAL DWG CONC. EMBED (N.B.E.)

M171 SIZED PER EMBED DWG. SECTION CUT FM61 FM59 945 M171 M171 INSIDE CORNER WIND-LOAD DETAIL

FM61 1/2" FASTENER WASHER EDGE OF CONC. EMBED T-BOLT & NUT (N.B.E.) M170 FLOOR SLAB (N.B.E.) MIN.

1 1/2" SIZED PER EMBED DWG. FM61 PER EMBED DWG.

FM05 EDGE OF CONC. FM06 OR ARCHITECTURAL DWG FLOOR SLAB (N.B.E.) M170 MIN. 1 1/2" M171 EDGE OF CONC. FM06 FM11 M170 M170 FLOOR SLAB (N.B.E.) IHQ2 M170 MIN. 1 1/2" FM60 M171 FM06 FM05 M174 FM11 IHQ2 FM17 FM43 5 1/2" REF. M141 FM11 FM11 M174 IHQ2 IHQ2 FM62 FM17 M141 M174 M174 FM17 FM17 EDGE OF CONC.

M141 M141 FLOOR SLAB (N.B.E.) M170 MIN. 1 1/2"

IHQ2 FM05

M141 FM43

M174

FM17 SECTION CUT SECTION CUT 944 942 OUTSIDE CORNER WIND-LOAD DETAIL LEFT JAMB WIND-LOAD DETAIL M174 SECTION CUT 943 RIGHT JAMB WIND-LOAD DETAIL FM17 SECTION CUT IHQ2 941 INTERMEDIATE WIND-LOAD DETAIL M141

1 1/2" PER EMBED DWG. MIN. OR ARCHITECTURAL DWG