2019 OHRV GIA AWARDS

GRANT AMOUNT GRANT AMOUNT GRANT AMOUNT GRADING AMOUNT OF EACH OHRV CLUB AWARDED PROJECT DESCRIPTIONS AWARDED FOR EQUIPMENT DESCRIPTIONS AWARDED FOR CLUB HOURS PROJECT FOR EQUIPMENT GRADING REQUESTED PROJECTS

Project #1: Purchase 840 cubic yards of 1.5" crushed Ammonoosuc Valley ATV $15,000.00 $15,000.00 gravel for BOT District to spread on Ammonoosuc None Requested N/A $876.05 55 Rail Trail from Savageville Road south to Lisbon

Project #1: Purchase 30 posts for trail signs in $361.20 Jericho/Success/Berlin Project #2: Purchase 1200 yds. of gravel for BOT Androscoggin Valley ATV Club $34,165.20 $20,004.00 District to spread on the Scenic Lookout Trail in None Requested N/A $6,860.00 400 Jericho Project #3: Yamaha Connector Trail, Jericho-trail $13,800.00 maintenance by vendor Project #1: (Bound Tree Rd to Camp Methodist)- $1,500.00 Clean up from logging, remove rocks/stumps Project #2: (Line Hill to Bound Tree Property)- Bound Tree ATV Club $8,460.00 $1,200.00 None Requested N/A None Requested N/A Remove rocks, stumps

$5,760.00 Project #3: Line Hill Parking Lot-Add gravel to lot

Project #1: #14, Chase Rd, Henniker-Add gravel to $5,196.00 4700' of Class VI Rd to fix wash outs

Project #2: #14 Chase Brook Trail, Henniker-Fix Purchase new 9' York Rake with 2' extension from Contoocook Valley ATV $9,142.00 $1,296.00 $4,333.80 None Requested N/A 5900' of trail by adding water bars & fixing wash outs Jordan Equipment Co. in Pembroke Project #3: Purchase 2.5 tons calcium chloride to $2,650.00 spread on 14 roads in Henniker that are used as trails Project #1: Hardscrabble Trail (Jct. 68 to top of hill)- $2,400.00 Fix wash out on .6 mile of trail Project #2: Old Country Lane-Fix normal wear & tear (30 hrs excavator). P3: Rd-Provide $1,800.00 gravel to town to maintain road. P4: Pay Town to spread 10 tons of calcium chloride on gravel/dirt roads. Project #3: Halls Stream Rd-Provide gravel to town Great North Woods Riders ATV Club, Inc. $47,726.50 $10,000.00 None Requested N/A None Requested N/A to maintain road Project #4: Pay Town to spread 10 tons of calcium $7,860.00 chloride on gravel/dirt roads $6,120.00 Project #5: Brush cut both sides of 12 miles of trails Project #6: Fern Drive-Add gravel/culverts to fix .4 $18,046.50 mile of road $1,500.00 Project #7: Buzzy's Trail-Normal wear & tear .5 mile

Kilkenny Trail Riders $0.00 None Requested N/A None Requested N/A None Requested N/A

Marlow NH Family ATV Club $0.00 None Requested N/A None Requested N/A None Requested N/A

Project #1: River Loop Trail (Hop-Ev)-Re-deck $347.06 swinging bridge Purchase new 2019 ProLine Equipment/Cargo Merrimack Valley Trail Riders $806.02 $5,022.00 None Requested N/A Project #2: River Loop Trail (Hop-Ev)-Level/widen Trailer Model SNO718 from PROLine Products LLC $458.96 uphill trail using lumber to sure up footing 2019 OHRV GIA AWARDS

GRANT AMOUNT GRANT AMOUNT GRANT AMOUNT GRADING AMOUNT OF EACH OHRV CLUB AWARDED PROJECT DESCRIPTIONS AWARDED FOR EQUIPMENT DESCRIPTIONS AWARDED FOR CLUB HOURS PROJECT FOR EQUIPMENT GRADING REQUESTED PROJECTS

Project #1: South Hill Trail-Construct 4 miles of new $66,484.00 trail to get trail off class V Town Rd with 2 bridges Project #2: North Hill Trail-Add gravel to class VI $6,790.00 Town Rd Project #3: Purchase 4 tons of calcium chloride $3,536.00 flakes to spread on town gravel/dirt roads (material Metallak ATV Club $143,495.00 only) None Requested N/A None Requested N/A Project #4: Pay a vendor to grade 4 miles of Kelsea $1,500.00 Notch Trail Project #5: Kelsey Notch Trail-Replace 5 pole $50,870.00 bridges with steel I beam bridges and add gravel to trail Project #6: Replace Simms Stream Bridge that was $14,315.00 washed down stream Project #1: Match for RTP 19-09 grant to pay for materials for bridge construction over $11,583.28 on A. Cloutier's property to re-route trail off of Northside Road Bridge still allowing access to gas pumps and parking pit Project #2: Purchase calcium chloride for Town of Milan Trail Huggers $13,854.91 None Requested N/A None Requested N/A $1,316.00 Stark for Paris Road, Bell Hill Rd & Leighton Meadow Rd Project #3: Purchase calcium chloride for Town of $205.63 Dummer for Old Rte. 110 Project #4: Purchase 3 loads of 1.5"- crushed gravel $750.00 to place in low areas on Cedar Brook Road Project #1: Rock Pond Trail-Re-ditch trail & add $7,500.00 gravel to road $4,800.00 Project #2: Hovel Trail-Re-ditch trail & add gravel Project #3: Newell Brook Road-Widen road, add $16,446.00 gravel, add culverts Millsfield ATV Club $52,698.00 Project #4: Carrier Trail-Re-ditch, add culverts, add None Requested N/A $1,930.60 140 $8,128.00 gravel Project #5: Millsfield Pond Road-Re-ditch, replace $12,868.00 culverts, clear brush Project #6: Baxter Trail (Cilley Brook to mountain $2,956.00 top)-Re-ditch & install 4 culverts Project #1: Old Glencliff Road (from where ended $5,500.00 last season to Hildrith Dam)-Add gravel, fix water bars & cut brush Project #2: Connector Trail/Rail Bed- (north of Warren Mall from parking area to 1st road crossing) $4,300.00 Remove rocks & add gravel AND (East Side Rd to past DOT Station) Re-ditch $2,535.00 Project #3: Dam to Old Glencliff Road-Brush cut Project #4: Gould Hill Road, class VI-Repair water Mount Moosilauke ATV Club $34,225.00 $4,850.00 None Requested N/A None Requested N/A bars towards Meador Pond Project #5: Warren & Rail Trail-Purchase 1 ton $1,050.00 calcium chloride & spread on gravel/dirt roads and rail trail Project #5: Wentworth & Rail Trail-Hire a vendor to $990.00 grade 3 miles of trail Project #7: Rail Trail (north of Pine Hill)-Purchase 65 $15,000.00 loads of 3/4 gravel for BOT District to spread on 3-4 miles of trail Project #1: South Link Trails (Pisgah SP)-Re-ditch, Mt. Pisgah ATV $10,172.50 $10,172.50 None Requested N/A None Requested N/A remove rocks/trees/stumps, add gravel Project #1: Rte. 16 By-Pass Trail, Wakefield-Re- New Durham Valley ATV Club $900.00 $900.00 None Requested N/A $1,365.00 60 ditch & crown .3 miles of trail Project #1: Hillsboro Rec Trail-Add gravel where New England Mud Hawgs $2,268.00 $2,268.00 None Requested N/A None Requested N/A needed 2019 OHRV GIA AWARDS

GRANT AMOUNT GRANT AMOUNT GRANT AMOUNT GRADING AMOUNT OF EACH OHRV CLUB AWARDED PROJECT DESCRIPTIONS AWARDED FOR EQUIPMENT DESCRIPTIONS AWARDED FOR CLUB HOURS PROJECT FOR EQUIPMENT GRADING REQUESTED PROJECTS

$14,844.00 Project #1: Hire a vendor to re-ditch and crown trail A.T.V. Club $18,084.00 None Requested N/A None Requested N/A Project #2: Hire a vendor to grade the trail for 20 hrs $3,240.00 in the Fall and 20 hrs in the Spring Project #1: Cree Notch Corridor 3 & RTW C (L. $11,729.00 Gettings/S. Tessier)-Create new trail to get trail off of road and install sign posts/signs Project #2: South Jordan HIll Road, Town of Columbia - Fix major washout on class VI road $10,310.00 above where town maintained road ends by adding gravel, fixing culverts, and smoothing road

Project #3: Bag Hill to Groveton, Corridor 5 RTW C $9,532.00 (Red Dam Conservancy/Wemyss)-Add gravel, install water bars, install culverts, install sign posts/signs Project #4: Cree Notch, Corridor 3, RTW C (J. Paul)- $10,933.00 Add gravel install water bars, install culverts, add North Country ATV $80,390.00 new sign posts/signs None Requested N/A None Requested N/A Project #5: Lightning Mt., Corridor 3, RTW C (R. $12,345.00 Korner)-Add gravel, install water bars, install culverts, add new sign posts/signs Project #6: Marquis Trail (R. Korner)-Add gravel, install water bars, install culverts, install new sign $8,548.00 posts & signs (30 hrs Excavator, 24 hrs Dozer, 150 yds. gravel, 2 12"x20' culverts, 8 posts) Project #7: Jonah Hill/Adair Trail, Corridor 3, RTW C $9,313.00 (R. Korner)-Add gravel, install culverts, install water bars, install new sign posts & signs Project #8: Hire a vendor to grade 19 miles of trail $7,680.00 (Lightning Mtn RTW C, rail bed RTW C, Marquis Rd/Trail) Project #1: Bag Hill Road from Molly Brook Rd in Northern Gateway Trails Club $7,900.00 $7,900.00 Stark to Jct of Potato Hill Trail: re-ditch trail & add None Requested N/A None Requested N/A gravel Project #1: Re-route the corner of Tinker Brook Rd $23,429.72 (Corridor 19) and Smitty's Trail Purchase used 05 JD 110TLB, 2.2L 4cyl, diesel Project #2: Presidential Rail Trail-re-deck bridge, from Umbagog ATV Club w/options of backhoe and Presidential OHRV Club $24,968.49 $688.77 $9,211.20 $1,470.00 60 replace signs posts front load bucket, AND, purchase new 2019 8' York Project #3: Purchase and spread calcium chloride on Rake R1-Heavy from York Modern Corp $850.00 rail trail Project #1: Veterans Park/Burger King Trail-Add 275 $5,210.00 yds. of 1.5" gravel Project #2: Burger King Trail-Add 162 yds. of 1.5 $5,215.00 mixed gravel Sullivan County ATV Club $14,460.00 None Requested N/A $548.80 32 Project #3: Burger King Trail-Add 150 yds. of 1.5" $2,850.00 mixed gravel Project #4: Burger King Trail-Add 60 yds. of 1.5" $1,185.00 mixed gravel (material only). Project #1: Corridor A1, Cambridge & Pond Hill $19,926.20 Sunset Riders ATV Club $20,059.88 Trails-Re-ditch, install culverts, add gravel None Requested N/A None Requested N/A $133.68 Project #2: Corridor A1-Install new sign posts Tri-City Trail Blazers ATV $0.00 None Requested N/A None Requested N/A None Requested N/A 2019 OHRV GIA AWARDS

GRANT AMOUNT GRANT AMOUNT GRANT AMOUNT GRADING AMOUNT OF EACH OHRV CLUB AWARDED PROJECT DESCRIPTIONS AWARDED FOR EQUIPMENT DESCRIPTIONS AWARDED FOR CLUB HOURS PROJECT FOR EQUIPMENT GRADING REQUESTED PROJECTS

Project #1: Dixie Brook Trail-Remove logging debris, Purchase a new 2019 Bobcat S595 Skid Steer, $24,365.00 ditch, install culverts, add gravel, install water bars 74hp, diesel with options of Cab Enclosure w/heat & AC, Selectable Joystick Controls, High Flow Umbagog ATV Club $60,235.00 $38,967.00 Hydraulics, Hydraulic Bucket Positioning, Radio, $1,886.50 110 Attachment Control, 74" Low pro Bucket with edge, $35,870.00 Project #2: Rebuild bridge in Errol 72" Power Angle York Rake w/Caster Wheels, and a Spartan Arm Mower from Bobcat of NH $599,010.50 $57,534.00 $14,936.95