The World Bank Report No: ISR13372

Implementation Status & Results TRANSPORT SECTOR SUPPORT PROJECT (P055120)

Operation Name: TRANSPORT SECTOR SUPPORT PROJECT (P055120) Project Stage: Implementation Seq.No: 7 Status: ARCHIVED Archive Date: 03-Feb-2014 Country: Tanzania Approval FY: 2010

Public Disclosure Authorized Product Line:IBRD/IDA Region: AFRICA Lending Instrument: Specific Investment Loan Implementing Agency(ies): Key Dates Board Approval Date 27-May-2010 Original Closing Date 30-Jun-2015 Planned Mid Term Review Date 08-May-2014 Last Archived ISR Date 20-Jul-2013 Public Disclosure Copy Effectiveness Date 01-Dec-2010 Revised Closing Date 30-Jun-2015 Actual Mid Term Review Date

Project Development Objectives Project Development Objective (from Project Appraisal Document) The development objectives of the project are to improve the condition of the national paved road network, to lower transport cost on selected roads, and to expand the capacity of selected regional airports. Has the Project Development Objective been changed since Board Approval of the Project?

Yes No Public Disclosure Authorized Component(s)

Component Name Component Cost A - Rehabilitation and Preparation of Designs for Rehabilitation of Paved Trunk Roads 186.50 B - Improvement of Regional Airports 69.20 C - Improvement of Road Safety Management 6.00 D - Promotion of Public Private Partnerships 5.00 E - Emergency Road and Bridge Repair 15.00 F - Rehabilitation of the Songo Songo Island jetty. (New component added) - Addtional financing 2.00 B2: Rehabilitation and extension of airport taxiways and apron. (Scale up of the airport 57.00 component) - Addtional financing Public Disclosure Authorized Overall Ratings Previous Rating Current Rating Progress towards achievement of PDO Satisfactory Satisfactory Overall Implementation Progress (IP) Satisfactory Satisfactory Public Disclosure Copy Overall Risk Rating

Page 1 of 8 Public Disclosure Authorized The World Bank Report No: ISR13372

Implementation Status Overview The overall implementation progress of the project is satisfactory and the project is on track to achieve the PDO. The works under the Kigoma and Tabora Airports have been substantially completed and provisionally accepted in June 2013. The works were completed within the contractual completion period. The runway and apron works in the Bukoba airport are substantially completed while works on the terminal building is 45 % completed by the end of November 2013. As of the same period 58.5 % of the works in the Zanzibar airport are completed, including the substantially completion of the extension of taxiway C. The progress of works under the -Minjingu and Korogwe – Mkumbara road works contracts is good with about 107 km of roads completed to Asphalt Concrete layer under the two contracts by the end of November 2013. The work under the Mkumbara – Same road contract is still falling behind schedule, primarily due to the poor performance of the contractor, with only 10 km of road paved by the end of November 2013. It is on the critical path for the overall project implementation completion. Further, 585 Km of roads has received emergency maintenance while 212 culverts were reconstructed and works are underway for two bridge works under the component E of the project through 104 small contracts in 20 regions of the mainland of Tanzania.

Five consultants have prepared the design for about 921 km of roads. The completed road design and Environmental and Social Impact Assessment (ESIA), under two separate contracts, for the Mafinga - Igawa road (137.9 km) were used for the preparation of the Southern Africa Trade and Transport Facilitation Project (SATTFP), which has been approved

Public Disclosure Copy by the Board May 21, 2013. Two other consultancy contracts have been processed for the Environmental and Social Impact Assessment (ESIA) preparation for the remaining four roads designed under the project. The railways upgrading and performance improvement study is completed and the final reports were submitted in March 2013. The study reports are being used for mobilizing funds from different Donors, including the Bank, for the re-vitalization of the Tanzania Railway Limited (TRL) central line railway system. Four short Term consultants had also submitted final reports on an ESIA screening, a land bridge concept study, a market assessment and business plan development and ESIA report as an input to the preparation of the proposed Inter-modal & Rail Development Project. The study for the removal of bottlenecks on local government roads has been completed and the designed bottlenecks for the first year of the bottleneck removal program have got financing from DFID. Although delayed, the selection of consultants have been completed and consultants are on board to (i) provide Technical Assistant to Department of Safety and Environment in the Ministry of Works, and (ii) develop a Road Accident Information system, and (ii) prepare a Civil Aviation Master Plan, while the selection of consultants is at advanced stages for other remaining technical assistants and studies included under the component B and D.

The commitment under signed contracts is estimated about US $ 263.0 million equivalent. The signed contracts account for more than 97 % of the total credit allocations and have committed 79% of the total credits amount. The total amount of funds disbursed as of end of December 2013, is about US $ 170 million which is about 52 % of the two credit amounts of US$ 329 million, while about 70 % of the project implementation period has elapsed.

Locations Country First Administrative Division Location Planned Actual Tanzania Tanga

Tanzania Singida

Tanzania Same District

Tanzania Kilimanjaro Region Same

Tanzania Region Rusumo

Tanzania Njombe District

Tanzania Namanga

Tanzania Kilimanjaro Region Moshi Public Disclosure Copy Tanzania Tanga Region Mombo

Page 2 of 8 The World Bank Report No: ISR13372

Country First Administrative Division Location Planned Actual Tanzania Tanga Region Mkumbara

Tanzania Minjingu

Tanzania Kilimanjaro Region Marangu

Tanzania Arusha Region Manyara

Tanzania Arusha Region Makuyuni

Tanzania Iringa Region Makumbako

Public Disclosure Copy Tanzania Iringa Region Mafinga

Tanzania Tanga Region Lushoto District

Tanzania Tanga Region Lushoto

Tanzania Kagera Region Lusahunga

Tanzania Tanga Region

Tanzania Tanga Region Korogwe

Tanzania Iringa Region Igawa

Tanzania Kilimanjaro Region Himo

Tanzania Kagera Region Bukoba District

Tanzania Manyara Region Babati

Tanzania Arusha Region Arusha

Tanzania Kagera Region Nyakasanza

Tanzania Ruvuma Region District

Tanzania Ruvuma Region Songea

Tanzania Mtwara Bay

Tanzania Mtwara Region Mtwara

Tanzania Ruvuma Region

Public Disclosure Copy Tanzania Mtwara Region Masasi District

Tanzania Mtwara Region Masasi

Page 3 of 8 The World Bank Report No: ISR13372

Tanzania Not Entered Bukoba Airport

Tanzania Not Entered

Not Entered Not Entered Not Entered

Results

Project Development Objective Indicators Indicator Name Core Unit of Measure Baseline Current End Target Direct project beneficiaries Number Value 5750000.00 Public Disclosure Copy Date 30-Jun-2015 Comments Female beneficiaries Percentage Value 287000.00 Sub Type Supplemental Passenger Volume at airports Number Value 78399.00 55027.00 104000.00 Date 30-Jun-2009 30-Jun-2013 30-Jun-2013 Comments Cumulative of the three measured on Annual basis. airports the figure has reduced because of the closure of runway during construction - Bukoba Airport Number Value 26628.00 27891.00 34000.00 Sub Type Date 30-Jun-2009 30-Jun-2013 30-Jun-2013 Breakdown Comments measured on Annual basis. the figure has reduced because of the closure of runway during construction - Kigoma Airport Number Value 28859.00 22681.00 40000.00 Sub Type Date 30-Jun-2009 30-Jun-2013 30-Jun-2013 Breakdown Comments measured on Annual basis. the figure has reduced because of the closure of runway during construction - Number Value 22912.00 4455.00 30000.00 Sub Type Date 30-Jun-2009 30-Jun-2013 30-Jun-2013 Public Disclosure Copy

Page 4 of 8 The World Bank Report No: ISR13372

Breakdown Comments measured on Annual basis. the figure has reduced because of the closure of runway during construction Roads in good and fair condition as a share of Percentage Value 66.00 85.00 70.00 total classified roads Date 30-Jun-2009 30-Sep-2013 30-Jun-2014 Comments Measured on Annual basis Average vehicle operating costs on (b) Arusha Amount(USD) Value 45.00 45.00 25.00 - Minjingu Roads Date 30-Jun-2009 30-Jun-2013 30-Jun-2014 Comments Unit is USD/km Measured on annual basis.

Public Disclosure Copy The paving works have just started Average vehicle operating costs on (a) Amount(USD) Value 34.00 34.00 23.00 Korogwe-Same Date 30-Jun-2009 30-Jun-2013 30-Jun-2014 Comments unit is USD/km Measured on annual basis. The paving works have just started

Intermediate Results Indicators Indicator Name Core Unit of Measure Baseline Current End Target National Road/Bridge sections improved Number Value 0.00 106.00 100.00 Date 30-Jun-2009 30-Nov-2013 30-Jun-2011 Comments Most of the works are completed Transport Sector PPP transactions which have Number Value 0.00 0.00 2.00 reaqched bidding stage Date 30-Jun-2009 30-Nov-2013 30-Jun-2014 Comments Consultants that would carry out the preparation of the PPP have just been selected Road Accident Information System established Yes/No Value No No Yes and operational Date 30-Jun-2009 30-Nov-2013 30-Jun-2012 Comments Consultancy contract awarded in October 2013 and the system is being established. Driver and Vehicle Examination and Licencing Yes/No Value No No Yes

Public Disclosure Copy Agency (DVELA) established and operational Date 30-Jun-2009 30-Nov-2013 30-Jun-2012

Page 5 of 8 The World Bank Report No: ISR13372

Comments It is delayed due to the delays in finalizing the Road Safety Act. National Road Saftey Agency (NRSA) Yes/No Value No No Yes established and operational Date 30-Jun-2009 30-Nov-2013 30-Jun-2011 Comments The NRSA could not be established even on the revised time line of September 30, 2013. Runways paved Yes/No Value No Yes Yes Date 30-Jun-2009 30-Jun-2013 30-Jun-2014 Public Disclosure Copy Comments two of the three airports completed. Bukoba Runway paved, terminal building, Yes/No Value No Yes Yes access road and car parking constructed Sub Type Date 30-Jun-2009 30-Nov-2013 30-Jun-2014 Breakdown Comments Run way and apron completed terminal building 45 % completed Kigoma Runway paved Yes/No Value No Yes Yes Sub Type Date 30-Jun-2009 30-Jun-2013 30-Apr-2014 Breakdown Comments The works have been completed Tabora Runway paved Yes/No Value No Yes Yes Sub Type Date 30-Jun-2009 30-Jun-2013 30-Jun-2014 Breakdown Comments The works have been completed Design and bidding documents for Kilometers Value 0.00 908.00 911.00 rehabilitation prepared Date 30-Jun-2009 30-Nov-2013 30-Jun-2013 Comments Roads rehabilitated, Non-rural Kilometers Value 0.00 107.00 270.00 Date 30-Jun-2009 30-Nov-2013 30-Jun-2013 Comments Korogwe-Same Road Kilometers Value 0.00 53.00 172.00 Sub Type Date 30-Jun-2009 30-Nov-2013 30-Jun-2013 Breakdown Comments The works have started

Public Disclosure Copy Arusha-Minjingu Road Kilometers Value 0.00 64.00 98.00

Page 6 of 8 The World Bank Report No: ISR13372

Sub Type Date 30-Jun-2009 30-Nov-2013 30-Jun-2013 Breakdown Comments The works have started

Data on Financial Performance (as of 12-Dec-2013)

Financial Agreement(s) Key Dates Project Ln/Cr/Tf Status Approval Date Signing Date Effectiveness Date Original Closing Date Revised Closing Date P055120 IDA-47240 Effective 27-May-2010 11-Jun-2010 01-Dec-2010 30-Jun-2015 30-Jun-2015 P055120 IDA-49910 Effective 30-Jun-2011 02-Sep-2011 15-Feb-2012 30-Jun-2015 30-Jun-2015

Disbursements (in Millions) Public Disclosure Copy Project Ln/Cr/Tf Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P055120 IDA-47240 Effective XDR 177.90 177.90 0.00 86.16 91.74 48.00 P055120 IDA-49910 Effective XDR 36.40 36.40 0.00 24.65 11.75 68.00

Disbursement Graph

Key Decisions Regarding Implementation None Public Disclosure Copy

Restructuring History

Page 7 of 8 The World Bank Report No: ISR13372

There has been no restructuring to date.

Related Projects P122763-Second Transport Sector Support Project, P126205-TANZANIA TRANSPORT SECTOR SUPPORT PROJECT - ADDITIONAL FINANCING, P126206-TANZANIA TRANSPORT SECTOR SUPPORT PROJECT - ADDITIONAL FINANCING Public Disclosure Copy Public Disclosure Copy