C&C 27 Running Rigging Specs

Total Page:16

File Type:pdf, Size:1020Kb

C&C 27 Running Rigging Specs C&C 27 Running Rigging Specs Item Material Length Remarks All materials dacron braid. Main Halyard 3/8" bd 86' Headboard Shackle Main Boom Topping Lift 1/4" bd 75’ Heated & Whipped Both Ends Lash Eye One End Main Cunningham 3/8" bd 3’ Heated & Whipped Other End Main Sheet 7/16" bd 60' Heated & Whipped Both Ends Spinnaker Pole Topping Snap Shackle One End 3/8" bd 65' Lift Heat & Whip Other End Heat & Whip One End Genoa Halyard 7/16" bd 86' Snap Shackle Other End Genoa Sheets 7/16" bd 2x30' Heated & Whipped Both Ends Whip Both Ends Spinnaker Halyard 3/8” bd 88’ Tie On Snap Shackle Eye Splice With Snap Shackle and Spinnaker Sheets 3/8" bd 2x60' Shackle Guard Snap Shackle On One End Spinnaker Pole Lift 3/8" bd 66' Heat & Whip Other End Eye Splice with Snap Shackle Spinnaker Pole Foreguy 3/8" bd 36' Heat & Whip Other End Reefing Lines (2) 3/8" bd 2x40' Heated & Whip Both Ends Main Clew Outhaul 3/8" bd 28' Heat & Whip Both Ends Adjustable Backstay 3/8" bd 40' Heat & Whip Both Ends Lanyard Midstay Lanyard 3/8" bd 25' Heat & Whip Both Ends Mainsheet Crosshaul 3/8" bd 17' Heat & Whip Both Ends C&C 27 Mark V Standing Rigging Item Size Style Upper Fitting Lower Fitting Remarks Forestay 7/32" 1x19 s.s. - Stemball Eye - Marine Eye Jaw & Jaw Wire & Toggle - Turnbuckle on Marine Eye Stem Backstay 7/32" 1x19 s.s. - Stemball & - M.S. Eye Adjusting Wire Washer Tackle Optional Main Shroud 7/32" 1x19 s.s. - Stemball & - 7/32" Stop Sleeve and Wire Washer Turnbuckle Washer at with Toggle Spreader Location Lower Shroud 7/32" 1x19 s.s. - Stemball & - 7/32" Stop Sleeve and Wire Washer (Turnbuckle Washer at with Toggle) Spreader Location Midstay 3/16" 1x19 s.s. - Swaged - 3/16" Block and Wire Toggle with Turnbuckle Tackle Option 3/8" Pin with Toggle Adjustable 3/16" 1x19 s.s. - Swaged - 3/16" Fork Block & Tackle Midstay Wire Toggle with Assembly with 3/8" Pin Shackle Backstay 7/32" 1x19 s.s. - MS Fork - Turnbuckle Bridle Wire with Toggle.
Recommended publications
  • Armed Sloop Welcome Crew Training Manual
    HMAS WELCOME ARMED SLOOP WELCOME CREW TRAINING MANUAL Discovery Center ~ Great Lakes 13268 S. West Bayshore Drive Traverse City, Michigan 49684 231-946-2647 [email protected] (c) Maritime Heritage Alliance 2011 1 1770's WELCOME History of the 1770's British Armed Sloop, WELCOME About mid 1700’s John Askin came over from Ireland to fight for the British in the American Colonies during the French and Indian War (in Europe known as the Seven Years War). When the war ended he had an opportunity to go back to Ireland, but stayed here and set up his own business. He and a partner formed a trading company that eventually went bankrupt and Askin spent over 10 years paying off his debt. He then formed a new company called the Southwest Fur Trading Company; his territory was from Montreal on the east to Minnesota on the west including all of the Northern Great Lakes. He had three boats built: Welcome, Felicity and Archange. Welcome is believed to be the first vessel he had constructed for his fur trade. Felicity and Archange were named after his daughter and wife. The origin of Welcome’s name is not known. He had two wives, a European wife in Detroit and an Indian wife up in the Straits. His wife in Detroit knew about the Indian wife and had accepted this and in turn she also made sure that all the children of his Indian wife received schooling. Felicity married a man by the name of Brush (Brush Street in Detroit is named after him).
    [Show full text]
  • SUN CAT DAYSAILER 2018.Xlsx
    1195 Kapp Dr Clearwater, FL 33765 Phone (727) 443-4408 Fax (727) 443-1088 www.Com-PacYachts.com [email protected] Dear Com-Pac Yacht owners: The following is a list of frequently requested spare parts and model update parts for Com-Pac Yachts. These parts may be ordered from Hutchins Company by calling 727-443-4408, emailing [email protected] or faxing to 727-443-1088. We take MasterCard/Visa, or can ship UPS/COD . All orders will have shipping and handling charges added. We are pleased to handle custom and/or non-stock orders. There will be a 25% non- refundable fee for custom and/or non-stock orders. There will be a $25 returned check fee. Products returned solely due to the ordering errors by the customer may be charged a 10% re-stocking fee and will not be reimbursed for shipping costs. Remember, your boat may have been customized after leaving the factory. Hutchins Company can not be held responsible for any parts not fitting due to customizing. Please allow four to six weeks for delivery. Prices may have changed. Please call our office about any questions you have concerning your order or about any parts you do not see on the list. Thank you, Hutchins Company, Inc. COM-PAC YACHTS 1 SUN CAT DAYSAILER PARTS JULY 2018 Item Number Description Price IN00B0030 BILGE DISCHARGE ASSEMBLY $14.00 EA. IN00B0035 BOWEYE BLOCK $3.00 EA. IN00C0047 CENTERBOARD BLOCK SUN CAT $35.00 EA. IN00G0060 GALLOWS WOOD, ALL CATBOATS $162.00 EA. IN00G0080 GAS LOCKER DROP BOARDS, SUN CAT $147.00 EA.
    [Show full text]
  • N*Ff L/R/ Ihf L' Th"
    n*ff l/r/ Ihf l' Th" t rff, .o.. J, A( th in at c( Al al rh +l br he searchtirr the perf'ectcruising boat, especiallyfbr f al I couples.cun be a long,frustlating one. Eachhas their S( priorities "rnake own setof and or breakissues." Finding t\ a boatthat satisflesenough priorities of both parties o without any leal "break"issues is, well...difficult. For Jakeand Jackie Adarrs, the searchtook a coupleof years, V but the outconre,Hokulc'u. a Liberty458, is one they are p both thlilled with. Jakehad been cruising betbre. which greatly influencedhis prioritiesfbr the nextcruising boat. In his early30s, he and two friendswent into partnershipon a I Sr Tayana37, Far Niente,and setsail for Mexico and the SouthPacific. He was satisfledwith the boatexcept for Jakehad tried to talk Jackieinto going on the cruisc, its windwardperfbnnance. The nextboat would needto but shewas contentto help the guys with all the prep performwell on all pointsof sail. and then visit sornewherealong the way. That ended up being Tonga,and Jackiegot a good tasteof what cruisingwas reallyall about. Shewas readyand willing to give the lil-estylea try. Fastforward a few years... Jakeand friends finished their grandadventure, sailed back horne, sold Fur Niertte and went backto their respectivecareers. Jake and Jackie got rrrarried,bought a Hunter Passage42 narnedHokLrlatti and movedaboard. The plan was to live aboardand cruiselocally fbr a few years,and if all went well, start lookingfor their ultirnatecruising boat to takethem on a circumnavigation.Needless to say,all went very well. The searchwas on. Jackie'srnain priority was a strongbluewater boat with a greatlayout fbr living aboard.She was spoiledwith the liveabilityo1'the Passage 42.
    [Show full text]
  • Mast Furling Installation Guide
    NORTH SAILS MAST FURLING INSTALLATION GUIDE Congratulations on purchasing your new North Mast Furling Mainsail. This guide is intended to help better understand the key construction elements, usage and installation of your sail. If you have any questions after reading this document and before installing your sail, please contact your North Sails representative. It is best to have two people installing the sail which can be accomplished in less than one hour. Your boat needs facing directly into the wind and ideally the wind speed should be less than 8 knots. Step 1 Unpack your Sail Begin by removing your North Sails Purchasers Pack including your Quality Control and Warranty information. Reserve for future reference. Locate and identify the battens (if any) and reserve for installation later. Step 2 Attach the Mainsail Tack Begin by unrolling your mainsail on the side deck from luff to leech. Lift the mainsail tack area and attach to your tack fitting. Your new Mast Furling mainsail incorporates a North Sails exclusive Rope Tack. This feature is designed to provide a soft and easily furled corner attachment. The sail has less patching the normal corner, but has the Spectra/Dyneema rope splayed and sewn into the sail to proved strength. Please ensure the tack rope is connected to a smooth hook or shackle to ensure durability and that no chafing occurs. NOTE: If your mainsail has a Crab Claw Cutaway and two webbing attachment points – Please read the Stowaway Mast Furling Mainsail installation guide. Step 2 www.northsails.com Step 3 Attach the Mainsail Clew Lift the mainsail clew to the end of the boom and run the outhaul line through the clew block.
    [Show full text]
  • Masts & Rigging
    Masts & Rigging By Ralf Morgan Standing Rigging Careful inspection and preparation of the spars and rigging is essential prior to any voyage offshore. Embarking on the Pacific Cup is an undertaking that is likely to be the equivalent of many years of use for the average boat. To put this into perspective, sailing the Pacific Cup is the equivalent distance as sailing from the Blackhaller Buoy to the Blossom Rock Buoy 679.8 times. Many Bay sailors have not done that in a lifetime. Now, if you decide you are going to sail back too……. Many aspects of inspection and preparation are common to all sailboat rigs regardless of construction or type. If the owner/skipper has not taken the opportunity to do a careful inspection of the rig in the past three years, it makes a lot of sense to pull the rig and go over it very carefully. There are areas of the rig that can really only be inspected and serviced when it is not under tension. There are other items that are just easier to do on the ground. While the rig is down, become intimately familiar with it. Take some digital photos of key components. Remember that two in the morning during a driving squall, is not the optimal time to gain familiarity with your rig! 1) Starting at the bottom and working up: the first thing to inspect is the actual mast base. This includes both the mast tube and the mast step. On aluminum spars you should be most concerned about corrosion and electrolysis.
    [Show full text]
  • UNIT 3.5 N M a N U a L Thanks for Buying a Harken Jib Reefing and Furling System
    I N S T R U MKIII C Jib Reefing & T Furling Systems I O UNIT 3.5 N M A N U A L Thanks for buying a Harken Jib Reefing and Furling System. It will give you reliable service with minimal maintenance, but does require proper assembly and basic care. This manual is an important part of the total reefing system. Please take the time to read it carefully before assembling or using your furling system. These instructions may look intimidating, but they are very simple and use photos and drawings throughout to make assembly easy. Many sections will not apply to your boat or to your installation. If you have questions which cannot be answered by the manual or your dealer, please feel free to give us a call. We’ll be happy to do anything we can to make your sailing safer and more fun. 2 Unit 3.5 MKIII January 2007 Parts 6-7 Sailmaker Instructions 8 Preparation for Assembly 10 – 12 This section tells how to measure the headstay, prepare the wire and cut foil to length if they have not been supplied ready to assemble. Assembly 13 – 20 Assembly of the unit is explained in this section Commissioning 21 – 23 Commissioning covers how to install the assembled unit on the boat and make it operational. Operation 24 – 28 This section explains system use. It also discusses tensioning the headstay and converting to racing. Troubleshooting & Repair 29 – 30 The Assembly and Operation Trouble Shooting guides explain how to correct problems. Your seven-year limited warranty is explained on page 30.
    [Show full text]
  • JIB REEFING & FURLING Unit 0
    MKIV OCEAN - JIB REEFING & FURLING Unit 0 Installation Manual – Intended for specialized personnel or expert users 5389 03/21 Preassembly Safety Precautions/Parts Description 2 Sizing Check 3 Parts 4 Rigging Parts Check/Tools 5 Dimensions/Sailmaker's Instructions 6 Toggle Deductions/Stay Into Foil Options 7 Top Foil Length 8 Short Top Foil 9 Confirm Foil Length 10 Assembly Foils/Connectors 11–14 Halyard Swivel and Drum Assembly 15 Rod Rigging 16 Turnbuckle/Toggle 17 Final/Feeder 18–19 Commissioning Turnbuckle 20 Lead Line to Cockpit 21 Halyard Wrap/Prevent Halyard Wrap 22 Pendant/Halyard Restrainer/ Halyard Tension 23 Operation Spinnaker Halyards/Headstay and Backstay Tension 24 Raise Sails 25 Furl/Reef 25–26 Secure Sail 26 Maintenance Clean/Inspect 27 Replace Line 27 Storage/Remove Furler 27 Troubleshooting/Warranty 28 Parts Lists 29-30 Contact Harken 32 Please read these instructions carefully before installing, servicing, or operating the equipment. This manual may be modified without notice. See: www.harken.com/en/support/manuals/ for updated versions. PLEASE SAVE THESE INSTRUCTIONS Safety Precautions/Parts Description Introduction This manual gives technical information on installation and service. This information is destined exclusively for specialized personnel or expert users. Installation, disassembling, and reassembling by personnel who are not experts may cause serious damage to property or injury to users and those in the vicinity of the product. If you do not understand an instruction contact Harken. The user must have appropriate training in order to use this product. Harken accepts no responsibility for damage or harm caused by not observing the safety requirements and instructions in this manual.
    [Show full text]
  • Rigging a Mooring Oh Let Us Count the Many, Many Ways
    The Price of Staying Put The standard mooring rig—and what it’ll cost you—for a 34-foot sloop in 20 feet of water. 3/4-inch three-strand nylon pendant, 10 feet ($15 and up) Buoy ($80-$300) 3/8-inch proof coil, 25 feet ($138) 5/8-inch swivel Dor-Mor shackle Mushroom Concrete Screw ($10-$35) block 5/8-inch proof coil, 25 feet ($300) 400- to 500-pound mushroom anchor ($390-$500) Prices refl ect the results of a limited PS market scan of gear required for mooring a 34-foot sailboat according to the typical setup outlined below. Rigging a mooring Oh let us count the many, many ways ... here are plenty of variations in the do away with the top chain altogether Tdetails of permanent ground tackle, and replace it with rope (this option has and PS has covered most. The standard been mentioned several times in PS, and rig is as follows: a mushroom anchor set will be mentioned again). Some use two well in the bottom (or a concrete block pendants. And so forth. or a screw-type anchor, which works well As for the length of the chains, opinion in hard bottoms), to which is shackled a varies. Mike Muessel, owner of Oldport length of heavy chain, then a swivel, then Marine in Rhode Island, has over 30 years a length of somewhat lighter chain, a of experience installing and maintain- shackle, and a rope pendant that goes to ing moorings. In the relatively deep and the bow cleat. (There are often anchorage crowded confi nes of Newport Harbor, he requirements for pendant length; for in- follows the town’s requirement, using a stance, twice the height of the freeboard total length of chain 2½ times the depth at the bow, plus the distance from chock of the water at high tide, divided equally to cleat.) A mooring buoy is shackled between the top and bottom chains.
    [Show full text]
  • Sailing Course Materials Overview
    SAILING COURSE MATERIALS OVERVIEW INTRODUCTION The NCSC has an unusual ownership arrangement -- almost unique in the USA. You sail a boat jointly owned by all members of the club. The club thus has an interest in how you sail. We don't want you to crack up our boats. The club is also concerned about your safety. We have a good reputation as competent, safe sailors. We don't want you to spoil that record. Before we started this training course we had many incidents. Some examples: Ran aground in New Jersey. Stuck in the mud. Another grounding; broke the tiller. Two boats collided under the bridge. One demasted. Boats often stalled in foul current, and had to be towed in. Since we started the course the number of incidents has been significantly reduced. SAILING COURSE ARRANGEMENT This is only an elementary course in sailing. There is much to learn. We give you enough so that you can sail safely near New Castle. Sailing instruction is also provided during the sailing season on Saturdays and Sundays without appointment and in the week by appointment. This instruction is done by skippers who have agreed to be available at these times to instruct any unkeyed member who desires instruction. CHECK-OUT PROCEDURE When you "check-out" we give you a key to the sail house, and you are then free to sail at any time. No reservation is needed. But you must know how to sail before you get that key. We start with a written examination, open book, that you take at home.
    [Show full text]
  • Sunfish Sailboat Rigging Instructions
    Sunfish Sailboat Rigging Instructions Serb and equitable Bryn always vamp pragmatically and cop his archlute. Ripened Owen shuttling disorderly. Phil is enormously pubic after barbaric Dale hocks his cordwains rapturously. 2014 Sunfish Retail Price List Sunfish Sail 33500 Bag of 30 Sail Clips 2000 Halyard 4100 Daggerboard 24000. The tomb of Hull Speed How to card the Sailing Speed Limit. 3 Parts kit which includes Sail rings 2 Buruti hooks Baiky Shook Knots Mainshoat. SUNFISH & SAILING. Small traveller block and exerts less damage to be able to set pump jack poles is too big block near land or. A jibe can be dangerous in a fore-and-aft rigged boat then the sails are always completely filled by wind pool the maneuver. As nouns the difference between downhaul and cunningham is that downhaul is nautical any rope used to haul down to sail or spar while cunningham is nautical a downhaul located at horse tack with a sail used for tightening the luff. Aca saIl American Canoe Association. Post replys if not be rigged first to create a couple of these instructions before making the hole on the boom; illegal equipment or. They make mainsail handling safer by allowing you relief raise his lower a sail with. Rigging Manual Dinghy Sailing at sailboatscouk. Get rigged sunfish rigging instructions, rigs generally do not covered under very high wind conditions require a suggested to optimize sail tie off white cleat that. Sunfish Sailboat Rigging Diagram elevation hull and rigging. The sailboat rigspecs here are attached. 650 views Quick instructions for raising your Sunfish sail and female the.
    [Show full text]
  • Running Rigging 43
    6 – Running Rigging 43 Section 6 Running Rigging Bitter End. The inboard end of a line, chain, or cable. Line Stopper (Rope Clutch). A clamp-type device that The end made fast to the vessel, as opposed to the contains a cam for securing a line. It can be released “working end,” which may be attached to an anchor, quickly. cleat, or other vessel. Tackle. An arrangement of line and blocks used to provide Boom Vang. A tackle, usually running between the boom increased mechanical advantage. and the base of the mast, which removes twist from the sail by downward pull on the boom. Traveller. A sail-positioning system composed of an athwartships track on which slides a car attached to blocks Cleat. Fitting, usually with two projecting horns, to which to permit positioning the main boom under load. lines are made fast. Turning Block. A block used to change the direction of Downhaul. A line or tackle used to exert a downward pull a line (such as a sheet or halyard) to make hauling more on a sail or spar. convenient. ® 1 The lines used to hoist and trim sails comprise the run- 5 Spinnaker halyards are almost always Dacron because ning rigging. This section discusses these lines and fit- it can take the loads created by the wind in the spinnaker tings and the layout of the fittings on the deck. while keeping weight aloft to a minimum. 6 In use, one end of the halyard is attached to the head Halyards 2 A halyard is a line used to hoist and lower a sail or flag.
    [Show full text]
  • Tips of the Trade
    Sail Handling and Neil Pryde Custom Fittings he following are some of the special Neil Pryde fittings which every boat owner should be Tfamiliar with. Genoa Sausage Bags Neil Pryde Race and Premier Series sails are supplied with genoa sausage bags as standard. These bags make repacking easier and quicker. The bags have 2 full-length zips on top of the bag which run forward and aft from the clew to the tack. Before you attempt to put the sail in the Figure 11 bag make sure both sliders are at one end of the bag. Then pack the sail inside and slide one zip from one end to the other. Do not take it off the end of the bag. You can then throw the bag around quite freely and it will not come undone. When you wish to hoist, place the bag on the foredeck and run the zipper off at the front. The whole zip will then break open freely and the sail will be in position on the foredeck ready for use. (figure 11) Dousing Sock The dousing sock can be used with either a asymmetric spinnaker or a regular spinnaker. To hoist the sail, attach the halyard to the head ring on the sail and attach the tack downhaul line to the tack ring. It should then be passed through a turning block on the deck near the bow, and then to a cleat or winch somewhere near the cockpit. The tack will initially fly approximately five feet above the deck, so allow this amount of slack in the line.
    [Show full text]