FORM-I

(I) Basic information S.No Item Details AMRL HITECH CITY LIMITED, an existing SEZ Zone located at S.F. No: - 249/C, 250/A, 250/B, 253/A, 253/C, 253B/1, 253B/2, 1 Name of the project 253B/3, 254/A, 254/1A, 282, 283, 284, 285, 286, 287, 383/1, 383/3, 388/3, 303/2, 308/1, etc.., village (extent of 1019 Ha), , District - 627108 S.No: 7(c) Project Activity: Multi Product SEZ Zone. 2 S.No.in the Schedule Category: “A” Industrial estates with area > 500 ha and housing at least one Category B industry

No proposed or change or amendment in the activity and operation of the SEZ Zone. Total Plot area is 1019.225 Hectares Proposed capacity/area Total No. of Plots - 259 numbers with different size of /length/tonnage to be 3 industries. Handled/command area/lease (Processing Zone - 701.38 Hectares and area/number of wells to be drilled Non-Processing Zone - 317.85 Hectares). Total no. of wells – 3 Nos.

4 New/Expansion/Modernization Existing

Total Plot area is 1019.225 Hectares Total No. of Plots - 259 numbers with different size of industries. 5 Existing capacity/ Area etc., (Processing Zone - 701.38 Hectares and Non-Processing Zone - 317.85 Hectares).

6 Category of project i.e. ‟A‟ or „B‟ Category – A Does it attract the general 7 No it is not attracting any general Conditions condition? If yes, please specify.

Location Nanguneri, Tirunelveli. SF. No. Therkku Nanguneri Survey Nos. - 249/C, 250/A, 8 250/B, 253/A, 253/C, 253B/1, 253B/2, 253B/3, 254/A, 254/1A, Plot/Survey/Khasra No. 282, 283, 284, 285, 286, 287, 383/1, 383/3, 388/3, 303/2, 308/1, 323/2, 325/2, 326/4, 327/2, 333/24, 340/39, 342/2, 343/1B, 344/2, ------APPLICATION FOR TIME EXTENSION OF ENVIRONMENT CLEARANCE FOR THE MULTI PRODUCT SEZ ZONE AT NANGUNERI TALUK, 1 | Page

FORM-I

345/2, 381/2, 309, 310, 312, 313, 314, 315, 316, 317, 318, 319, 320, 324/2, 326/2, 327/4, 335/2, 336/2, 337/1, 330/1C, 254/B/B, 255/B1, 255/B2, 303/1, 303/3, 304, 305, 306, 307/1, 307/2, 308/2, 308/3, 299/1, 299/2, 300/1, 300/2, 300/3, 301/1, 301/2, 301/3A, 301/3B, 301/3C, 301/4A, 301/4B, 301/4C, 302/1, 302/2, 302/3, 258B/1A, 258B/1B, 258B/1C, 258B/2A, 258B/2B, 258B/2C, 258B/3, 258B/4, 259B/1, 259B/2, 259B/3, 259B/4, 259B/5, 259B/6, 259B/7, 259B/8, 259B/9, 259B/10, 260/1, 260/2, 261A/1, 261A/2, 262/1, 262/2, 262/3A1, 262/3A2, 262/3B, 264, 265/A, 274A/3D, 274A/4B, 291, 292/1, 292/2, 292/3, 292/4, 292/5, 292/6, 292/7, 292/8, 292/9, 292/10, 292/11, 293/1, 293/2A, 293/2B, 293/2C, 294, 295, 296/1, 296/2, 297/1A, 297/1B, 297/2A, 297/2B, 298/1, 298/2, 298/3, 298/4, 263/1, 263/2, 263/3, 275/1A, 275/1D, 275/2A, 275/2C, 275/3, 276/1A, 276/1C, 276/2A, 276/2C, 277/1A, 277/1B1, 277/1B3, 277/2A, 277/2C, 289/1, 289/3, 290/1A, 290/2A1, 290/2A3, 290/2B, 290/2C, 290/3, 290/4, 321, 322, 323/1, 323/3, 324/1, 324/3, 325/1, 325/3, 326/1, 326/3, 326/5, 327/1, 327/3, 327/5, 328, 329, 330B/1A1A, 330B/1A1B, 330B/1A2, 330B/1B1, 330B/1B2, 330/B2, 330/B3, 332/1, 332/2, 332/3, 332/4, 332/5, 332/6A, 332/6B, 332/6C, 332/6D, 332/6E, 332/7, 332/8, 332/9, 332/10A, 332/10B, 332/11, 332/12, 333/1, 333/2, 333/3, 333/4, 333/5, 333/6A, 333/6B, 333/7, 333/8, 333/9, 333/10A, 333/10B, 333/10C, 333/11, 333/12, 333/13, 333/14, 333/15, 333/16, 333/17, 333/18, 333/19A, 333/19B, 333/19C, 333/20, 333/21, 333/22, 333/23, 334, 335/1, 335/3, 336/1, 336/3, 337/2, 338, 339, 340/1, 340/2, 340/3, 340/4, 340/5A, 340/5B, 340/6A, 340/6B, 340/7, 340/8, 340/9, 340/10, 340/11A, 340/11B, 340/12A, 340/12B, 340/12C, 340/13, 340/14, 340/15, 340/16, 340/17, 340/18, 340/19, 340/20A, 340/20B, 340/21, 340/22, 340/23, 340/24A, 340/24B, 340/25, 340/26, 340/27, 340/28, 340/29, 340/30, 340/31, 340/32, 340/33A, 340/33B, 340/34,

------APPLICATION FOR TIME EXTENSION OF ENVIRONMENT CLEARANCE FOR THE MULTI PRODUCT SEZ ZONE AT NANGUNERI TALUK, TIRUNELVELI DISTRICT 2 | Page

FORM-I

340/35, 340/36, 340/37, 340/38A, 340/38B, 340/40A, 340/40B, 340/41, 340/42, 340/43, 341/1, 341/2, 341/3, 341/4, 341/5, 341/6, 341/7A, 341/7B, 341/8, 341/9, 341/10, 341/11A, 341/11B, 341/11C, 341/11D, 341/12, 341/13, 341/14, 341/15, 341/16, 341/17, 341/18, 341/19, 341/20A, 341/20B, 341/21, 341/22A, 341/22B, 342/1A, 342/3, 343/1A, 343/1B, 343.1B, 344/1, 344/3, 345/1B, 345/3A, 345/3B, 381/1. Rajakkalmangalam Survey Nos. - 415/1A, 415/1B, 415/1C, 415/2, 416/1, 416/2, 424, 425/1, 425/2, 426, 417, 419, 420/1, 421/1, 422,423/1, 423/2, 481/1, 481/2, 482/1, 447/1, 447/2, 448/1, 448/2, 448/4, 448/5, 448/6, 448/7, 449, 450, 451, 452, 453/1, 453/2, 454, 455, 456/1, 457, 458, 459/1, 459/2, 459/3, 459/4, 459/5, 459/6, 459/7, 459/8, 459/9, 460/1, 460/2, 460/3, 460/4, 465/1, 465/2, 465/3, 466, 467/1, 467/2, 468/1, 469/1, 469/2G, 469/3, 469/4, 470/1, 470/2, 470/3, 471/1, 471/2A, 471/2B, 471/2C, 471/2D, 471/2E, 471/2F, 471/2G, 471/2H, 471/2I, 471/2J, 471/2K, 471/2L, 471/2M, 471/2N, 471/2O, 471/2P, 471/2Q, 471/2R, 471/2S, 471/2T, 471/2U, 471/2V, 471/2W, 471/2X, 471/2Y, 471/2Z, 471/2AA, 471/2BB, 471/2CC, 471/2DD, 471/2EE, 471/2FF, 471/2GG, 471/2HH, 471/2II, 471/2JJ, 471/2KK, 471/2LL, 471/2MM, 471/2NN, 471/2OO, 471/3A, 471/3B, 471/3C, 471/3D, 471/3E, 471/3F, 471/3G, 471/3H, 471/3I, 471/3J, 471/3K, 471/3L, 471/3M, 471/3N, 471/3O, 471/3P, 471/3Q, 471/3R, 472/4, 472/7, 472/8, 475/1, 475/2A, 475/2B, 475/3A, 475/3B, 475/5A, 475/5B, 475/5C, 475/5D, 475/5E, 476/1, 476/2, 477/2, 477/3, 473/1, 473/2, 474/1A, 474/4K, 478/1A, 478/1B, 478/2, 478/6A, 478/6B1, 478/6B2B, 478/6B4, 479/1, 479/2, 433/1, 434/1, 434/2, 446/2, 480, 462/4, 463/21, 464, 469/2A, 469/2B, 469/2C, 469/2F, 470/5, 472/1, 472/2, 472/3, 472/6, 473/3, 475/6, 475/7, 478/4, 478/6B 2A, 478/6B 2C, 478/6B/3, 425/4, 418, 415/3, 416/3, 420/2, 423/3, 425/3, 447/3, 448/3, 453/3, 456/2, 467/3,

------APPLICATION FOR TIME EXTENSION OF ENVIRONMENT CLEARANCE FOR THE MULTI PRODUCT SEZ ZONE AT NANGUNERI TALUK, TIRUNELVELI DISTRICT 3 | Page

FORM-I

468/3, 470/4, 471/4, 471/5, 471/6, 472/5, 474/3, 475/4, 476/11, 478/3, 478/5, 479/3, 481/3, 438/12, 434/3, 435, 461/1, 461/2, 461/3, 461/4, 461/5, 461/6, 462/1, 462/2, 462/3, 462/5, 462/6, 462/7, 463/1, 463/2, 463/3, 463/4, 463/5, 463/6, 463/7, 463/8, 463/9, 463/10, 463/11, 463/12, 463/13, 463/14, 463/15, 463/16, 463/17, 463/18, 463/19, 463/20, 443/1A, 443/1B, 443/5, 445/1. Mada Alanglam Survey Nos. - 2/1 to 2/11, 3/1 to 3/12, 4/1 to 4/13, 5/1, 5/2, 5/5, 7/1 to 7/7, 11/1 to 11/5, 48/1, 48/2, 57/1 to 57/5, 60/1 to 60/4, 62/1 to 62/3 & 62/5, 12/1 to 12/23, 13/1 to 13/18, 14/1 to 14/22, 15/1 to 15/20, 16/1 to 16/17, 22/1 to 22/11, 23/1 to 23/17, 24/1 to 24/20, 25/1 to 25/24, 27/1 to 27/17, 31/1 to 31/16, 32/1 to 32/24, 33/1 to 33/23, 34/1 to 34/19, 35/1 to 35/16, 36/1 to 36/22, 37/1 to 37/9 & 37/11 to 37/20, 39/1 to 39/15, 40/1 to 40/16, 41/1 to 41/19, 49/1 to 49/21, 51/1 to 51/14 & 51/17 to 51/20, 52/1 to 52/16, 53/1 to 53/24, 54/1 to 54/21, 55/1 to 55/18, 59/1 to 59/21. Vepankulam Survey Nos. - 1, 3, 6/2, 7, 8, 9, 10, 12/1, 12/2, 13/1A to 13/5C, 15/1A to 15/14, 18/1 to 18/16, 19/1 to 19/23, 20/1 to 20/14, 21/1 to 21/4, 21/6 to 21/26 & 21/28 to 21/33, 22/1 to 22/11, 27/1, 27/2, 27/4 to 27/7, 28/1. Puliyurkurichi Survey Nos. - 798/5, 798/6, 799/3, 801/3, 804/9, 804/1, 807/8, 812/3, 813/6, 815/5, 816/4, 824/6, 825/3, 826/2, 827/3, 828/5, 798/1, 798/2, 798/3, 798/4, 799/1, 799/2, 800/1, 800/2, 800/3, 800/4, 801/1, 801/2, 801/4, 801/5, 802, 803/1, 803/2, 804/1, 804/2, 804/3, 804/4A, 804/4B, 804/5, 804/6, 804/7, 804/8, 805/1, 805/2, 805/3, 805/4, 806/1, 806/2, 806/3, 806/4 ,806/5, 807/1, 807/2, 807/3, 807/4, 807/5, 807/6, 807/7, 808/1, 808/2, 808/3, 808.3, 808/4, 809, 810/1, 811/1, 811/2, 811/3, 811/4, 811/5, 812/1, 812/2, 813/1, 813/2, 813/3, 813/4, 813/5, 814, 815/1, 815/2, 815/3, 815/4, 816/1, 816/2, 816/3, 817/1, 817/2, 817/3, 823/1 ,823/2, 824/1, 824/2, 824/3, 824/4, 824/5, 825/1, 825/2, 826/1, 827/1, 827/2, 828/1, 828/2, 828/3, 828/4, 829, 830/1, 830/2.

------APPLICATION FOR TIME EXTENSION OF ENVIRONMENT CLEARANCE FOR THE MULTI PRODUCT SEZ ZONE AT NANGUNERI TALUK, TIRUNELVELI DISTRICT 4 | Page

FORM-I

Therku Nanguneri, Rajakkalmangalam, Puliyurkurichi, Mada Village Alanglam and Vepankulam Villages Tehsil Nanguneri Taluk District Tirunelvei State Tamilnadu Nearest Railway Station: Nanguneri Railway Station – 4 Km on Nearest railway station/airport 9 North-East along with distance in Kms. Nearest Airport: – 74 Km on North-East

Nearest Town ,City, District Located in Nanguneri Taluk, Tirunelveli District 10 Headquarters along with distance

in Kms. a. Therku Nanguneri Village – Nanguneri Panchayat Union, Nanguneri Taluk, Tirunelveli District b. Rajakkalmangalam Village – Nanguneri Panchayat Union, Nanguneri Taluk, Tirunelveli District Village Panchayats, Zilla c. Puliyurkurichi Village – Kalakkadu Panchayat Union, 11 Parishad, Municipal Nanguneri Taluk, Tirunelveli District d. Madam Alankulam Village – Kalakkadu Panchayat Union, Nanguneri Taluk, Tirunelveli District e. Vepankulam Village – Nanguneri Panchayat Union, Nanguneri Taluk, Tirunelveli District 12 Name of the applicant M/S. AMRL HITECH CITY LIMITED ANJANALAYA, 2ND FLOOR, 13 Registered Address DOOR NO. 7A(NEW), 2 to 4 (OLD), HALLS ROAD, EGMORE, CHENNAI - 600008, . Address for correspondence: M/S. AMRL HITECH CITY LIMITED Name Mr. LAKSHMI NARAYANAN, Designation(Owner/Partner/CEO) HEAD - CORPORATE AFFAIRS & ADMIN. 14 Address NH 7, NANGUNERI SEZ, NANGUNERI TALUK, Pin code TIRUNELVELI DISTRICT, TAMIL NADU-627108. E-Mail

------APPLICATION FOR TIME EXTENSION OF ENVIRONMENT CLEARANCE FOR THE MULTI PRODUCT SEZ ZONE AT NANGUNERI TALUK, TIRUNELVELI DISTRICT 5 | Page

FORM-I

Telephone No. [email protected] 04635-250150 Fax No. Details of Alternative Sites examined, if any. Location of No alternative sites are considered 15 these sites should be shown on a Topo sheet 16 Interlinked Projects No inter linked projects. Whether separate application of 17 Interlinked project has been Not Applicable submitted? 18 If Yes , Date of submission Not applicable 19 If no, Reason It is an Existing Multi Product SEZ Zone. Whether the proposal involves approval/ clearance under: if yes, details of the same and their status to be given. No Forest Area Located near to the site (a) The Forest (Conservation) 20 Act, 1980? No Wild Life Area Located near to the site (a) The Wildlife (Protection) Act 1972? No CRZ Notifications near to the site (b) The C.R.Z.Notification, 1991? Whether there is any Government No 21 order/ Policy relevant / relating to the sit 22 Forest land involved(hectares) No Whether there is any litigation pending against the project and/or land in which the project is propose to be set up? No 23 (a) Name of the Court

(b) Case No. (c) Orders/directions of the court, if any and its relevance with the proposed project

------APPLICATION FOR TIME EXTENSION OF ENVIRONMENT CLEARANCE FOR THE MULTI PRODUCT SEZ ZONE AT NANGUNERI TALUK, TIRUNELVELI DISTRICT 6 | Page

FORM-I

(I)Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Details thereof (with approximate S.No. Information/Checklist confirmation Yes/No quantities /rates, wherever possible) with source of information data Total land area of 1019.225 Ha. of barren land will be converted as SEZ in phase Permanent or temporary change in wise development as Phase-I, Phase-II land use, land cover or topography and Phase-III. At present, Phase-I 1.1 including increase in intensity of land Yes development has been carried out with use (with respect to local land use plan) few industries and full fledge development is carried out to establish more industries in near future. Clearance of existing land, vegetation No building/Vegetation exists. Only 1.2 Yes and buildings? small shrubs/bushes to be cleared The area will be converted into industrial, Creation of new land uses? 1.3 Yes commercial and residential plots with

recreational facilities. Pre-construction investigations e.g. 1.4 Yes Annexure II bore houses, soil testing? Construction of boundary wall, internal roads, drains, etc., as given in the Construction works? feasibility report. Presently there are 10 1.5 Yes industries are operating and new

industries will be established in due course. 1.6 Demolition works? No No demolition works are envisaged Temporary sites used for construction 1.7 works or housing of construction No Only local labours will be engaged workers?

------APPLICATION FOR TIME EXTENSION OF ENVIRONMENT CLEARANCE FOR THE MULTI PRODUCT SEZ ZONE AT NANGUNERI TALUK, TIRUNELVELI DISTRICT 7 | Page

FORM-I

This is an infrastructure development project and basically land will be prepared for housing the industries. Apart

Above ground buildings, structures or from it common facilities for transport 1.8 earthworks including linear structures, Yes (Construction of roads, Communication, cut and fill or excavations drainage system, waste & waste water treatment facilities, solid waste disposal systems etc., construction of boundary walls will be provided). Underground works including mining No underground work including mining 1.9 No or tunneling? or tunneling is required 1.10 Reclamation works? No No Reclamation work is required 1.11 Dredging? No No Dredging work is required 1.12 Offshore structures? No Not Applicable Production and manufacturing None envisaged 1.13 No processes? Facilities for storage of goods or There is no need for storage of goods and 1.14 No materials? materials Waste water generated from the facilities will be treated in CETP and treated effluent will be used in green belt development. However excess treated Facilities for treatment or disposal of effluent will be discharged into the 1.15 Yes solid waste or liquid effluents? existing effluent channel. Solid waste will be treated in the area proposed for solid waste management. Composing is the technology proposed for the solid waste management Residential zone for an area of 268.28 Facilities for long term housing of 1.16 Yes acres is proposed within the non- operational workers? processing area..

------APPLICATION FOR TIME EXTENSION OF ENVIRONMENT CLEARANCE FOR THE MULTI PRODUCT SEZ ZONE AT NANGUNERI TALUK, TIRUNELVELI DISTRICT 8 | Page

FORM-I

New road, rail or sea traffic during No need of new road, rail or sea traffic is 1.17 No construction or operation? envisaged. New road, rail, air waterborne or other Existing Infrastructure in respects of transport infrastructure including new 1.18 No roads and Airport would be adequate. or altered routes and stations, ports, airports etc? Closure or diversion of existing There is no need for closure or diversion transport routes or infrastructure 1.19 No of existing transport routes. leading to changes in traffic movements? New or diverted transmission lines or Not required 1.20 No pipelines? Impoundment, damming, culverting, realignment or other changes to the There are no changes to the hydrology of 1.21 No hydrology of watercourses or Watercourses or aquifers. aquifers? One nallah crossing inside the site. 1.22 Stream crossings? Yes Proposal does not divert or alter the nallah course.

Abstraction or transfers of water form Total water demand is 42.08 MLD. 1.23 Yes ground or surface waters? Source – Tamiraparani river

There are no changes in water bodies or (a) Changes in water bodies or the land the land surface affecting drainage. 1.24 surface affecting drainage or run- No Runoff will be managed by adequate off? storm water drain system. Transport of personnel or materials for Only local labours will be engaged. 1.25 construction, operation or Yes No. of Trucks/day - 100 decommissioning? Long-term dismantling or 1.26 No None envisaged. decommissioning or restoration works? Ongoing activity during 1.27 decommissioning which could have No Not Applicable an impact on the environment? Influx of people to an area in either 1.28 No Only local labours will be engaged temporarily or permanently?

------APPLICATION FOR TIME EXTENSION OF ENVIRONMENT CLEARANCE FOR THE MULTI PRODUCT SEZ ZONE AT NANGUNERI TALUK, TIRUNELVELI DISTRICT 9 | Page

FORM-I

1.29 Introduction of alien species? No None envisaged. Loss of native species or genetic 1.30 No None envisaged. diversity? Any other actions? 1.31 No Nil

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non- renewable or in short supply):

S.No. Information/checklist Yes/No Details thereof (with approximate confirmation quantities /rates, wherever possible) with source of information data Land especially undeveloped or Total land area of 1019.225 Ha. of barren land agricultural land (ha) will be converted as SEZ in phase wise development as Phase-I, Phase-II and Phase-III. 2.1 Yes At present, Phase-I development has been carried out with few industries and full fledge development is carried out to establish more industries in near future. Water (expected source & Source – Tamiraparani river 2.2 Yes competing users) unit: KLD Quantity – 42.08 MLD

2.3 Minerals (MT) No None envisaged. Construction material – stone, Stone & Coarse aggregates – 40000m3 Soil – 30000m3 aggregates, and / soil (expected Cement – 250000 bags 2.4 source – MT) Yes Steel – 2000 tons All the construction materials shall be taken from approved quarries and other approved agencies/sources from the nearby/place. 2.5 Forests and timber (source – MT) No None envisaged Energy including electricity and Source – TNEB grid 2.6 fuels (source, competing users) Yes Usage – 126 MW Unit: fuel (MT), energy (MW) 2.7 Any other natural resources (use No Nil

------APPLICATION FOR TIME EXTENSION OF ENVIRONMENT CLEARANCE FOR THE MULTI PRODUCT SEZ ZONE AT NANGUNERI TALUK, TIRUNELVELI DISTRICT 10 | Page

FORM-I

appropriate standard units) 3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health.

Yes/No Details thereof (with approximate quantities/rates, S.No. Information/Checklist confirmation wherever possible) with source of information data 3.1 Use of substances or materials, which There is no use of substances or are hazardous (as per MSIHC rules) to materials, which are hazardous to No human health or the environment (flora, human health or the environment fauna, and water supplies) 3.2 Changes in occurrence of disease or The wastewater will be treated and affect disease vectors (e.g. insect or suitably disinfected to control any water borne diseases) No risk to human health or environment. The solid waste will be managed as per the regulatory requirement 3.3 Affect the welfare of people e.g. by There is no major adverse impacts on changing living conditions? No the human health/ environment are envisaged 3.4 Vulnerable groups of people who could There are no vulnerable group of be affected by the project e.g. hospital No people who could be affected by the patients, children, the elderly etc., project e.g. Family, etc. 3.5 Any other causes No None envisaged

------APPLICATION FOR TIME EXTENSION OF ENVIRONMENT CLEARANCE FOR THE MULTI PRODUCT SEZ ZONE AT NANGUNERI TALUK, TIRUNELVELI DISTRICT 11 | Page

FORM-I

4. Production of solid wastes during construction or operation or decommissioning (MT/month) Details thereof (with approximate S.No Information/Checkli quantities/rates, wherever possible) with source . st confirmation Yes/No of information data 4.1 Spoil, overburden or No There is no Spoil , overburden or mine wastes mine wastes 4.2 Municipal waste Yes Only local labours will be engaged. Hence during (domestic and or the construction phase the generation of municipal commercial waste will be limited. wastes) During the operation phase of the project, it is estimated that the municipal solid waste generation from the proposed SEZ will be approximately 40 MT/day 4.3 Hazardous wastes (as Yes Hazardous waste generated from the project per Hazardous Waste facilities and industries will be mainly Management Rules) . CETP sludge . Used oil . Waste oil etc., . Apart from it, industries may generate their hazardous waste. 4.4 Other industrial Yes Depends on the occupying process industries. process wastes 4.5 Surplus product No Not applicable 4.6 Sewage sludge or other Yes Individual occupying industries will treat the sludge sludge from effluent and then discharge. treatment 4.7 Construction or No Wastes generated during the construction phase shall demolition wastes be reused during construction itself. 4.8 Redundant machinery Yes or equipment 4.9 Contaminated soils or No No soil contamination other materials 4.10 Agricultural wastes No Since there is no agricultural activities will be involved hence that is not envisaged here 4.11 Other solid wastes No Not applicable

------APPLICATION FOR TIME EXTENSION OF ENVIRONMENT CLEARANCE FOR THE MULTI PRODUCT SEZ ZONE AT NANGUNERI TALUK, TIRUNELVELI DISTRICT 12 | Page

FORM-I

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)

Details thereof (with approximate quantities/rates, wherever S.No. Information/Checklist Yes/No possible) with source of confirmation information data 5.1 Emissions from combustion of Yes Mixing machineries fossil fuels from stationary or mobile sources 5.2 Emissions from production Yes Depends on individual occupying processes industries 5.3 Emissions from materials handling Yes No. of trucks – 100 including storage or transport SO2 – 300g/day/heavy vehicle

NOX - 300g/day/heavy vehicle 5.4 Emissions from construction Yes Insignificant emissions from mixing activities including plant and machines equipment 5.5 Dust or odours from handling of Yes materials including construction Insignificant materials, sewage and waste

No emissions from incineration 5.6 Emissions from incineration of No waste waste 5.7 Emissions from burning of waste in No No Emissions from burning of open air (e.g. slash materials, waste in open air construction debris) 5.8 Emissions from any other sources No Nil

------APPLICATION FOR TIME EXTENSION OF ENVIRONMENT CLEARANCE FOR THE MULTI PRODUCT SEZ ZONE AT NANGUNERI TALUK, TIRUNELVELI DISTRICT 13 | Page

FORM-I

6. Generation of Noise and Vibration, and Emissions of Light and Heat: Details thereof (with approximate quantities /rates, wherever possible) with source Information/Checklist of information data with S.No. confirmation Yes/No source of information data 6.1 From operation of equipment e.g. Insignificant from mixing Yes engines, ventilation plant, crushers machineries 6.2 No None in the study area From industrial or similar processes 6.3 Yes Insignificant from mixing From construction or demolition machineries 6.4 Yes Quantity - 100000 m3 From blasting or piling Blasting type – Controlled Blasting 6.5 From construction or operational Yes Insignificant. Only 100 trucks/day will visit the traffic site. 6.6 From lighting or cooling systems Yes 6.7 From any other sources No Not Applicable

------APPLICATION FOR TIME EXTENSION OF ENVIRONMENT CLEARANCE FOR THE MULTI PRODUCT SEZ ZONE AT NANGUNERI TALUK, TIRUNELVELI DISTRICT 14 | Page

FORM-I

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: Details thereof (with approximate quantities/rates, Information/Checklist wherever possible) with source S.No. confirmation Yes/No of information data 7.1 From handling, storage, use or No There will be no handling of spillage of hazardous materials hazardous materials. 7.2 From discharge of sewage or other No Zero liquid Discharge concept effluents to water or the land proposed (expected mode and place of discharge) No Each of the industries have to 7.3 obtain necessary consents and operated after installing the requisite air/ water pollution control systems and discharge the By deposition of pollutants emitted pollutants with in the specified to air or into the land or into water discharge limits. No water pollution or soil contamination is anticipated, since all the effluents will pass through defined channel to ETP and then to effluent channel. 7.4 No None in the study area From any other sources

7.5 Is there a risk of long term build up No There is no a risk of long term of pollutants in the environment buildup of pollutants in the from these sources? environment from these sources.

------APPLICATION FOR TIME EXTENSION OF ENVIRONMENT CLEARANCE FOR THE MULTI PRODUCT SEZ ZONE AT NANGUNERI TALUK, TIRUNELVELI DISTRICT 15 | Page

FORM-I

8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment

Details thereof (with approximate Information/Checklist quantities/rates, wherever possible) S.No. confirmation Yes/No with source of information data 8.1 From explosions, spillages, fires No During construction phase, no such risk etc from storage, handling, use or is anticipated. During operation phase, production of hazardous industry specific risk may exist. substances However, these industries will have to take necessary precautions to avoid such situations 8.2 From any other causes No Not applicable

8.3 Could the project be affected by No The proposed project buildings will be natural disasters causing designed with Earthquake resistant environmental damage (e.g.: structures for prevention of earthquake floods, earthquakes, landslides, disasters. Also, as the project site is in cloudburst etc) Seismic Zone-III there is lesser probability of earthquakes Hazards.

Necessary Disaster Management plans will be followed for preventing any disasters during natural / accidental calamity.

------APPLICATION FOR TIME EXTENSION OF ENVIRONMENT CLEARANCE FOR THE MULTI PRODUCT SEZ ZONE AT NANGUNERI TALUK, TIRUNELVELI DISTRICT 16 | Page

FORM-I

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality

Details thereof (with approximate Information/Checklist quantities/rates, wherever possible) S. No. confirmation Yes/No with source of information data 9.1 Lead to development of supporting., The proposed SEZ will give employment Utilities, ancillary development or opportunities for the nearby community. development stimulated by the Material requirements will be sought project which could have impact on from the nearby supply industries. the environment e.g.: Residential and commercial zone along with recreational facilities are proposed • Supporting infrastructure (roads, Yes in the SEZ power supply, waste or waste water treatment, etc.) • housing development • extractive industries • supply industries • other 9.2 Lead to after-use of the site, which Yes could have impact on the environment 9.3 Set a precedent for later Yes developments 9.4 Have cumulative effects due to No There is no existing industry in the close proximity to other existing or proximity planned projects with similar effects

------APPLICATION FOR TIME EXTENSION OF ENVIRONMENT CLEARANCE FOR THE MULTI PRODUCT SEZ ZONE AT NANGUNERI TALUK, TIRUNELVELI DISTRICT 17 | Page

FORM-I

(III)Environmental Sensitivity

Aerial distance (within 15 km.) Name/ Proposed project location S.No. Areas Identity boundary 1 Areas protected under international conventions, national or local Kalkkad legislation for their ecological, At 6.4 km from the project boundary sanctuary landscape, cultural or other related value 2 Areas which are important or sensitive for ecological reasons - Kalkkad Wetlands, watercourses or other At 6.4 km from the project boundary sanctuary water bodies, coastal zone, biospheres, mountains, forests 3 Areas used by protected, important or sensitive species of flora or Kalkkad fauna for breeding, nesting, At 6.4 km from the project boundary sanctuary foraging, resting, over wintering, migration 4 Inland, coastal, marine or No None in the study area underground waters 5 State, National boundaries No Nil 6 Routes or facilities used by the No Nil public for access to recreation or other tourist, pilgrim areas 7 Defense installations No Nil 8 Densely populated or built-up area No Nanguneri Population @ 5 distance of approximately 5 Km 9 Areas occupied by sensitive man- No No areas occupied by sensitive man made land uses (hospitals, schools, made land uses places of worship, community facilities)

------APPLICATION FOR TIME EXTENSION OF ENVIRONMENT CLEARANCE FOR THE MULTI PRODUCT SEZ ZONE AT NANGUNERI TALUK, TIRUNELVELI DISTRICT 18 | Page

FORM-I

10 Areas containing important, high No None in the study area quality or scarce resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) 11 Areas already subjected to pollution No The proposed project is designed as per or environmental damage. (those earthquake resistant structures. Also as where existing legal environmental the project site is in Seismic Zone –III standards are exceeded) there is lesser probability of Earthquake hazards. Necessary disaster management plans will be followed for preventing any disaster during natural accidental calamity

IV: Proposed Terms of Reference for EIA Studies: As the Project is falling under Project Activity 7(c) - Category–A Industrial estates with area > 500 ha and housing at least one Category B industry all the required parameters of EIA study has been carried out.

“I hereby given undertaking that the data and information given in the application and enclosures are true to the best of my knowledge and belief and I am aware that if any part of the data and information submitted is found to be false or misleading at any stage, the project will be rejected and clearance give, if any to the project will be revoked at our risk and cost.”

Date : 19.03.2019 Place : Tirunelveli.

Signature of the applicant with Name

M/S. AMRL HITECH CITY LIMITED, Mr. LAKSHMI NARAYANAN, HEAD - CORPORATE AFFAIRS & ADMIN. NH 7, NANGUNERI SEZ, NANGUNERI TALUK, TIRUNELVELI DISTRICT, TAMIL NADU-627108. ------APPLICATION FOR TIME EXTENSION OF ENVIRONMENT CLEARANCE FOR THE MULTI PRODUCT SEZ ZONE AT NANGUNERI TALUK, TIRUNELVELI DISTRICT 19 | Page