STRENGTHENING KEE MANAGEMENT INSTITUTIONS TO ACHIEVE MANAGEMENT EFFECTIVENESS THROUGH A MULTISTAKEHOLDER APPROACH AND STRENGTHENING BASELINE DATA OF HIGH BIODIVERSITY OUTSIDE CONSERVATION AREAS

Grant Final Report Perkumpulan Aliansi Relawan untuk Penyelamatan Alam (ARuPA)

Date of Report: April 23, 2021

DISCLAIMER : This report is made possible by the support of the American People through the United States Agency for International Development (USAID). The contents of this (specify) are the sole responsibility of Perkumpulan ARuPA and do not necessarily reflect the views of USAID or the United States Government

STRENGTHENING KEE MANAGEMENT INSTITUTIONS TO ACHIEVE MANAGEMENT EFFECTIVENESS THROUGH A MULTISTAKEHOLDER APPROACH AND STRENGTHENING BASELINE DATA OF HIGH BIODIVERSITY OUTSIDE CONSERVATION AREAS

Grant Final Report Perkumpulan Aliansi Relawan untuk Penyelamatan Alam (ARuPA)

Grant agreement No. TT1.2-GRA-C3-8 Grant Period of Performance: May 01, 2020 – April 30, 2021

Date of Report: April 23, 2021

This publication was prepared by Perkumpulan ARuPA for Chemonics International for activities completed under Contract No. AID-497-TO-16-00002

i

CONTENTS

ABBREVIATION ...... iii Section I – Technical ...... 1 A. Summary of Grant Activity Goals and Objectives ...... 1 B. Summary of Grant Activity Achievements ...... 3 C. Description of Any Activities/Milestones Not Completed ...... 27 D. Lessons Learned and Recommendations ...... 27 E. Grant Success Stories ...... 28 F. Product/documents resulted from grants activities ...... 29 Section II - Financial ...... 30 A. Description of grant activity funding ...... 30 B. Summary of Grant Activity Costs and Payments ...... 30 C. Explanation of higher or lower than anticipated costs ...... 31

ii

ABBREVIATION

Acronym Definition APBD Anggaran Pendapatan dan Belanja Daerah APBDes Anggaran Pendapatan dan Belanja Desa ARuPA Aliansi Relawan untuk Penyelamatan Alam BBKSDA Balai Besar Konservasi Sumber Daya Alam BBL Bening Bening Lobster BIJAK Bangun untuk Jaga Alam demi Keberlanjutan BPBD Badan Penanggulangan Bencana Daerah BPEE Bina Pengelolaan Ekosistem Esensial BTNAP Balai Taman Nasional Alas Purwo BUMDes Badan Usaha Milik Desa BTS Batas CDK Cabang Dinas Kehutanan CSO Civil Society Organization CSR Corporate Social Responsibility DD Dana Desa DID Dana Insentif Daerah DISHUT Dinas Kehutanan F Female FGD Focus Group Discussion GPS Global Positioning System KEE Kawasan Ekosistem Esensial KEE MK Pulau Masakambing KEE TP Teluk Pangpang KEE TK Pantai Taman Kili Kili KEE UP Mangrove Ujungpangkah KSDAE Konservasi Sumber Daya Alam dan Ekosistem M Male MoEF Ministry of Environment and Forestry MPA Marine Protection Area OPD Organisasi Perangkat Daerah Sistem Informasi Manajemen Area dan Keanekaragaman Hayati Si Merak Ati Jawa Timur. SKW Seksi Konservasi Wilayah SMCA Spatial Multi Criteria Analysis R & D Research and Development TAHUJA Tata Hubungan Kerja TCA Transmission Channel Analysis ToT Training of Trainer USAID United States Agency for International Development

iii

Section I – Technical

A. Summary of Grant Activity Goals and Objectives

Since ARuPA was awarded the grant in May 2020, ARuPA has collaborated with the East Java Office for Natural Resources Conservation (BBKSDA) and East Java Forestry Service (Dinas Kehutanan), to implement a pilot activity to improve the effectiveness of the management of essential ecosystem areas (KEE) at the site level. The piloting focused on strengthening the institutional design of the KEE managers and the KEE management plans at KEE Teluk Pangpang, Banyuwangi. Teluk Pangpang is a coastal area with mangrove forests with an area of + 1,663.71 hectares. Teluk Pangpang has been designated as a KEE on July 27, 2020, through the East Java Governor Decree No. 188/338 / KPTS / 013/2020. The focus/objectives of the piloting activities in Banyuwangi is to: ▪ Assessing the need for strengthening the effectiveness of KEE management; ▪ Strengthen the multi-stakeholder forum for KEE management based on the results of stakeholder mapping; ▪ Update the KEE area arrangement map ▪ Update KEE management documents.

After three months of piloting, the new approach taken by AruPA at the KEE Teluk Pangpang has been approved by East Java BBKSDA and Forestry Service. The new approach focused on strengthen and provide more intensive stakeholder collaboration, clarify roles and functions among forum members on KEE management, and serve as a foundation to achieve the effectiveness on KEE management. Based on this approach, East Java BBKSDA and East JavaForestry Service need to replicate good practices from KEE Teluk Pangpang to three additional locations. Due to the success of the KEE pilot in Teluk Pangpang, the project will expand the pilot activities to strengthen the effectiveness of KEE management in three additional KEE locations, which are (l) KEE Mangrove Ujung Pangkah in Gresik, (2) KEE Pantai Taman Kili Kili in Trenggalek, and (3) KEE Pulau Masakambing in Sumenep. The objective of this grant was to improve the effectiveness of KEE management at the field level by promoting a multistakeholder management approach. The grant activity was implemented by working with stakeholders to strengthen KEE management institutions, strengthen the KEE management documents according to effectiveness measurements, conduct analysis of KEE management financing options from local government agencies and stakeholders, and determine the roles and responsibilities, and working relationship between involved stakeholders. The selected pilot locations were in KEE Teluk Pangpang in Banyuwangi, KEE Ujung Pangkah in Gresik, KEE Pantai Taman Kili-kili in Trenggalek and KEE Masakambing in Sumenep. The grant also worked to strengthen the process of identification and verification (inver) of high biodiversity areas outside conservation areas in East Java. The biodiversity inventory will strengthen the achievement of the East Java Province target to identify and verify 225.000 hectares of high biodiversity areas.

The main objectives of this project were: 1. Assess the need for strengthening the institution of the KEE multi-stakeholder forum 2. Strengthening the institutional functions to achieve the effectiveness of KEE management. 3. Increasing the capacity of forum members and community groups in managing KEE 4. Implementing the inventory of high biodiversity areas outside the conservation area 5. Sharing knowledge on the effectiveness of KEE management

To achieve these objectives, ARuPa carried out several activities:

Phase I May-Nov 2020 Location: KEE Teluk Pangpang Banyuwangi

1

Activities: 1. Consolidation meeting with BPEE 2. Consolidation and socialization program 3. Research - Stakeholder study of KEE Teluk Pangpang 4. Multi-stakeholder workshop to present results of stakeholder mapping and KEE management gap analysis 5. Training of KEE management through a multi-stakeholder approach and dissemination of KEE regulations and conceptions to the stakeholders 6. Writing workshop to integrate institutional strengthening options for the KEE management forum members into the draft KEE decree 7. Stakeholder workshop to present the proposed revised KEE decree 8. Technical meetings to develop a work plan to map and verify the KEE area 9. Mapping and field verification on KEE management area 10. Producing an updated map of the KEE management area 11. Collecting data and identify opportunities to improve ecosystem function, maximize wildlife protection, and contribute to community livelihoods 12. Social Assessment for the community around KEE Teluk Pangpang

Phase II Dec 2020 – Apr 2021 Location: ▪ KEE Teluk Pangpang Banyuwangi ▪ KEE Mangrove Ujungpangkah Gresik ▪ KEE Pantai Taman Kili Kili Trenggalek ▪ KEE Pulau Masakambing Sumenep

Activities: 1. Preparation for Pilot Activities 1.1. Internal preparation meeting for the program implementation team

2. Assess the need for strengthening the institution of the KEE multi-stakeholder forum 2.1. Workshop on planning and drafting research designs 2.2. Stakeholders mapping studies for 3 KEE Mangrove Ujungpangkah (UP), Pulau Masakambing (MK), Pantai Taman Kili Kili (TK) area 2.2.1. Desk research 2.2.2. Field data collecting for Stakeholders mapping studies 2.2.3. Data analysis and report writing of stakeholders mapping results 2.3. Policy and fiscal incentive opportunity studies in local government for KEE UP, MK, TK management 2.3.1. Desk research 2.3.2. Field data collecting in Policy and fiscal incentive opportunity studies 2.3.3. Data analysis and report writing in policy and fiscal incentive opportunity studies 2.4. Biodiversity inventory in KEE UP, MK, TK 2.4.1. Desk research 2.4.2. Field data collection Biodiversity inventory in KEE 2.4.3. Data analysis and report writing in KEE biodiversity potential. 2.5. Data analysis and report writing in socio-economic assessment in KEE 2.5.1. Desk research 2.5.2. Field data collection in Socio-Economic Assessment in KEE 2.5.3. Data analysis and report writing in socio-economic assessment in KEE

3. Strengthening the institutional functions to achieve the effectiveness of KEE management 3.1. KEE management document development of KEE Teluk Pangpang (TP)

2

3.1.1. Development of KEE Telung Pangpang management document 3.1.2. Stakeholders consultation of KEE Teluk Pangpang management document 3.2. KEE area arrangement of KEE UP, MK, TK 3.2.1. Field mapping & verification of KEE UP 3.2.2. Field mapping & verification of KEE MK 3.2.3. Field mapping & verification of KEE TK 3.3. Development map of area arrangement/blocking of 3 KEE area 3.4. Consolidation meeting of KEE forum for strengthening of KEE institutional and management document 3.4.1. Consolidation meeting of KEE TP Forum phase 1 & 2 3.4.2. Consolidation meeting of KEE UP Forum phase 1 & 2 3.4.3. Consolidation meeting of KEE MK Forum phase 1 & 2 3.4.4. Consolidation meeting of KEE TK Forum phase 1 & 2 3.4.5. Writing workshop for finalizing institutional and management document of KEE UP, MK, TK, TP phase 1 & 2

4. Increasing the capacity of forum members and community groups in managing 4.1. Strengthening the utilization of KEE to support village potential-based KEE management objectives 4.1.1. Silvofishery training 4.1.2. Ecotourism development training in the KEE area 4.1.3. Writing workshop and assistance for drafting the ecotourism business plans of KEE TP 4.1.4. Writing workshop and assistance for drafting the ecotourism business plans of KEE UP 4.1.5. Writing workshop and assistance for drafting the ecotourism business plans of KEE MK 4.1.6. Writing workshop and assistance for drafting the ecotourism business plans of KEE TK

5. Implementing the inventory of high biodiversity areas outside the conservation area 5.1. Development of Biodiversity Information System in East Java Province 5.2. Development module for biodiversity inventory training 5.3. Training of trainer (ToT) for biodiversity inventory team 5.4. Spatial Multi-Criteria Analysis (SMCA) for developing the indicative map of high biodiversity area 5.5. The collection of repository secondary data 5.6. Field data collection for high biodiversity 17 locations in the East Java 5.7. Data consolidation of ground check results and secondary spatial data 5.8. High biodiversity map finalization and writing report of high biodiversity inventory

B. Summary of Grant Activity Achievements

Overall, ARuPA has achieved all the targets that have been determined in the planning. Here is a summary of the achievements and detail of activities during the project:

B.1 Summary of Achievements

Note No Indicator name Target Actual (to describe the achievements or justification of not achieved target) The number of studies 4 4 • Executive summary and report of stakeholders that were conducted on mapping the need to strengthen • Executive summary and report of policy and fiscal KEE management in the incentive opportunity studies targeted area. • Executive summary and report of KEE biodiversity potential

3

Note No Indicator name Target Actual (to describe the achievements or justification of not achieved target) • Executive summary and report of socio-economic assessment in KEE

ARuPA has handed over the study reports to beneficiaries on April 20, 2021, in Aston Hotel Surabaya. The beneficieries are: • KEE Teluk Pangpang Forum • KEE Mangrove Ujungpangkah Forum • KEE Pulau Masakambing Forum • KEE Pantai Taman Kili Kili Forum • The East Java BBKSDA • The East Java Forestry Service • BPEE The number of 8 11 ARuPA has handed over the study reports to beneficiaries institutions that have on April 20, 2021, in Aston Hotel Surabaya. The received data, beneficieries are: information, or tools • BPEE, the Directorate of Management of Essential related to biodiversity Ecosystem, Indonesian Ministry of Environment and protection and/or Forestry; sustainable landscape • DISHUT Jawa Timur, East Java Provincial Forestry developed by ARuPA Service; through USAID BIJAK • BBKSDA Jawa Timur, the East Java Agency for support, Conservation of Natural Resources; • Manager representative of KEE Pantai Taman Kili Kili Trenggalek (KEE TK) • Manager representative of KEE Teluk Pangpang Banyuwangi (KEE TP) • Manager representative of KEE Mangrove Ujungpangkah Gresik (KEE UP) • Manager representative of KEE Pulau Masakambing Sumenep (KEE MK) • District Government of Trenggalek • District Government of Banyuwnagi • District Government of Gresik • District Government of Sumenep The number of KEE 4 4 • Forum and action plan of KEE TK forums and action plans • Forum and action plan of KEE TP established or • Forum and action plan of KEE UP strengthened as the • Forum and action plan of KEE MK result of USAID BIJAK assistance. The project developed these documents to strengthen the management effectiveness of each four KEEs namely: • Institutional documents include The East Java Governor Decree of the KEE area and Forum of KEE Manager; roles and relations procedure of members of KEE forum. • Action plan document 2021-2025 • Protection plan document 2021

KEE Forum on four sites, East Java BBKSDA and Forestry Service have expressed gratitude that the existence of these documents have helped them manage the KEE areas. The number of maps or 3 & 17 3 & 17 Four maps of KEE areas as follows: indicative maps of KEE ▪ Management block map of KEE TK developed/ enhanced by ▪ Management block map of KEE TP ARuPA as the result of ▪ Management block map of KEE UP USAID BIJAK support. ▪ Management block map of KEE MK

4

Note No Indicator name Target Actual (to describe the achievements or justification of not achieved target) The management block map of KEEs will be used for each forum as a guideline to implement the action plan and protection plan documents.

17 maps of high biodiversity areas on 21 districts, which are Tuban, Madiun-Kediri, Trenggalek, Gunung Kelud, Malang-Kota Batu, Surabaya-Gresik, Sidoarjo, Sampang, Pasuruan, Lumajang, Dataran Tinggi Hyang, Probolinggo, Jember, Situbondo, Ijen Baluran, Banyuwangi Utara, and Banyuwangi Selatan.

These 17 maps of high biodiversity areas will be used by the East Java Forestry Service; East Java BBKSDA and the government of each district for: • biodiversity data center for conservation program planning • data-based decision making • provision of a biodiversity profile for district environmental services • monitoring the circulation of protected and wild • projection of proposals and designation of new KEE, and • calculation of natural resources balance The number of people a. 36 a. 38 ▪ 38 persons consist of 2 female and 36 male were trained in sustainable b. 38 b. 38 trained in silvofishery. Most of the participants' landscapes supported by c. 36 c. 147 knowledge level about silvofishery have increased. USG assistance: d. 20 d. 20 Before the training, 31.25 percent did not a. Silvofishery understand silvofishery compared to 3.13 percent b. Tourism after the training. The number of participants who development became very familiar with the concept of c. Tourism business silvofishery/cultivation of mangrove connected ponds d. ToT biodiversity increased from 37.5 percent to 71.88 percent. inventory ▪ 38 persons consist of 7 females and 31 males have been trained in ecotourism development. Through a trainer, the community understood the concept and basics of ecotourism management, specifically in the KEE context. The achievement is indicated by the post-test result as below: o Low level in the pre-test was 10 persons, and the post-test is 2 persons. o Medium level in the pre-test was 12 persons, and the post-test is 11 persons. o High level in the pre-test was 4 persons, and the post-test is 13 persons. ▪ 147 persons consist of 36 female and 111 male trained in ecotourism business plan, with the detail: o KEE TK: 41 persons (11F; 30M) o KEE TP: 55 persons (11F; 40M) o KEE UP: 24 persons (8F; 16M) o KEE MK: 27 persons (6 F; 21M) ▪ 20 persons consist of 3 females and 17 males who were trained in the training of trainer biodiversity inventory. Most of the participants' knowledge levels increased. These were indicated by pre and post-test results and discussion processes during training. Pre and post-test result showed that: o Low level in the pre-test was 7 persons, and the post-test is 2 persons. o Middle level in the pre-test was 14 persons, and the post-test is 9 persons. o High level in the pre-test was 6 persons, and the post-test is 16 persons.

5

Note No Indicator name Target Actual (to describe the achievements or justification of not achieved target) The number of 1 1 There is already a web-based information system. Please biodiversity information check it: https://inver-kehati-jatim.karogis.com system developed by ARuPA through USAID The website is fully operational and has officially been BIJAK support. handed over to the East Java Forestry Service on 20 April 2021 at Hotel Aston Surabaya. The East Java Forestry Service will manage this website as the East Java biodiversity information system after the close-out of this project. Until the date of this report, ARuPA is still in coordination with the East Java information and communication officer to obtain the definitive website address before the end of May 2021.

The number of news 5 38 38 media coverage. Follow the link below to read the featuring sustainable individual news clippings: landscapes or conservation messages Media Coverage of BIJAK or BIJAK https://drive.google.com/drive/folders/1jnHcMXbh8Bko41 partners that are qYVJEY9iBUTtDhLSfu covered in the media Overall, four KEEs were covered in the news by online media. The news were dominated by KEE Mangrove Ujungpangkah Gresik and KEE Taman Kili Kili Trenggalek. The district governments of these KEEs were active in sharing with the local journalists about the sites. The media has covered KEE Teluk Pangpang a year ago during phase 1. The media rarely writes about KEE Masakambing because of its remote location.

Among others, the news covered topics about the existing KEEs, the establishment of the KEE Forums, the uniqueness of the landscapes, flora, and fauna in each of the KEE areas, the support from the district government towards this project.

6

B.2 Summary of Activities

PARTICIPANTS NO ACTIVITY OUTCOME BENEFICIARIES DATE PLACE F M Total PHASE I (MAY – NOV 2020) 1.1 Consolidation meeting with Advice from the director of BPEE to USAID BIJAK & ARuPA on the 4 beneficiaries: 9 14 23 Jun 4, 2020 Virtual BPEE project plan to be implemented. The Director of BPEE advised the BPEE, BBKSDA of Meeting project implement to capture existing conditions in the field at KEE East Java, Forestry Teluk Pangpang Banyuwangi to get actual baseline data for the project Service of East Java, and maximize the involvement of the right parties during the project. In and ARuPA response, USAID BIJAK and ARuPA conducted a stakeholder mapping to capture the parties who are already and supposedly involved in the KEE Forum in Banyuwangi. ARuPA had also maximized the involvement of the parties in every project activity and always coordinate with BPEE, East Java BBKSDA, and Forestry Service. 1.2 Consolidation and Agreement on the project activity plan developed by BPEE, East Java 4 beneficiaries: 11 28 39 Aug 19, Virtual socialization program BBKSDA and Forestry Service, and ARuPA. The result of this meeting is BPEE, BBKSDA of 2020 Meeting as follow: East Java, Forestry o BPEE, USAID BIJAK ARuPA, East Java BBKSDA, Forestry Service, Service of East Java, and all participants agree on strengthening the effectiveness of KEE and ARuPA Teluk Pangpang management. o The parties who attended the consolidation and socialization activities were committed to supporting this joint activity matrix. This activity matrix consisted of activities from USAID BIJAK ARuPA, East Java BBKSDA, and Forestry Service. o The activity matrix was socialized in a stakeholder meeting in Banyuwangi in September 2020, held by Bappeda Banyuwangi. 1.3 Research - Stakeholder study Draft report on the KEE Teluk Pangpang stakeholders study developed. 27 beneficiaries of 1 1 2 Jun 2 – Jul Yogyakarta of KEE Teluk Pangpang One important finding was that village institution has the greatest level stakeholder in KEE 30, 2021 Banyuwangi of interest towards the KEE compared to other actors. However, in Teluk Pangpang contrast, the level of influence of the village is very low. The recommendation is to empower the village institution. In another finding, there is a knowledge and perception gap from several stakeholders related to the definition, function, and management of KEE areas. The recommendation is the need to consolidate and coordinate among stakeholders. 1.4 Multi-stakeholder workshop Final report on the KEE Teluk Pangpang stakeholders’ study developed 27 beneficiaries of 2 28 30 Sep 9, 2020 Banyuwangi to present results of based on inputs at the stakeholder workshop. The important inputs stakeholder in KEE stakeholder mapping and KEE were: the need to align work programs and budgets from various Teluk Pangpang management gap analysis parties to focus on the activities of the Teluk Pangpang KEE management forum. In this sense, the Banyuwangi Bappeda office has the authority to consolidate all of OPD (District Apparatus

7

PARTICIPANTS NO ACTIVITY OUTCOME BENEFICIARIES DATE PLACE F M Total Organizations) to focus on KEE management. Another input: village institution has the potential as the implementing management of KEE Teluk Pangpang. The Village Law provides villages as very strategic institutions and village institutions have the authority to consolidate various institutional community groups in the village. So, all of the programs from several OPD should be organized by the village at the field implementation. 2.1 Training of KEE management Stakeholders’ understanding and awareness in KEE Teluk Pangpang 27 beneficiaries of 7 18 25 Nov10 – 12, Yogyakarta through a multi-stakeholder improved related to KEE management. The results are as follow: stakeholder in KEE 2021 approach and dissemination of o Training participants have increased understanding of the KEE Teluk Pangpang KEE regulations and regulations, multistakeholder management approach, and gender conceptions to the mainstreaming. Results of the pre-post test showed increased stakeholders understanding among participants by 20 to 30 percent. o Participants agree to arrange an action plan document of KEE Teluk Pangpang and hold a public consultation. 2.2 Writing workshop to Draft SK Forum and the role of forum members arranged. The draft 27 beneficiaries of 3 7 10 Sep10, 2020 Banyuwangi integrate institutional East Java Governor decree states that the forum structure is made out stakeholder in KEE strengthening options for the of 3 divisions: protection, utilization, planning, and research and Teluk Pangpang KEE management forum development. Another important point stakeholders agree on was the members into the draft KEE village institution, as a forum member, represents all the community decree groups in the KEE area.

A legal opinion needs to be developed to accompany the draft SK Forum before it is submitted to the provincial government, 2.3 Stakeholder workshop to Proposed draft KEE Forum decree completed. At the workshop, 27 beneficiaries of 5 25 30 Oct 7, 2020 Banyuwangi present the proposed revised participants agreed to add an obligation for the Teluk Pangpang KEE stakeholder in KEE KEE decree forum to develop an action plan and protection plan document. The Teluk Pangpang meeting mandated the East Java Forestry Service to submit the draft forum decree to the East Java provincial government legal bureau. 3.1 Technical meetings to develop Mapping team for KEE areas and work plans established. The team 27 beneficiaries of 2 11 13 Oct 8, 2020 Banyuwangi a work plan to map and verifiy members consist of: stakeholder in KEE the KEE area o Chairman: Januar (Perhutani KPH Banyuwangi Selatan) Teluk Pangpang o Team members: 3 persons from Kedungringin village, 3 persons from Kedunggebang village, 3 persons from Kedungasri village, 3 persons from Wringinputih village, Bappeda (1 persons), Balai TNAP (3 person), Perhutani (6 person), BPEE (1 person), CDK Banyuwangi (2 person), SKW V Banyuwangi (1 person), BBKSDA Jatim (1 person).

8

PARTICIPANTS NO ACTIVITY OUTCOME BENEFICIARIES DATE PLACE F M Total The team has agreed to use the SMCA map as a baseline map during field verification and block mapping in KEE areas. 3.2 Mapping and field verification KEE area boundary field coordinates and spatial data to determine the 27 beneficiaries of 1 31 32 Oct 15 – 16, Banyuwangi on KEE management area KEE map areas are obtained. stakeholder in KEE 2020 o There are 34 KEE boundary area GPS points recorded in the field. Teluk Pangpang o The border pal or markers have been installed. They measure L 12 cm x W 12 cm x H 100 cm and marked “BTS KEE” o In the field, the team has identified land control, land use, and land cover of the KEE area, and identified various flora and fauna, mostly bangau tong tong (Leptoptilos javanicus). 3.3 Producing an updated map of Map of KEE Teluk Pangpang management area. ARuPA produced 27 beneficiaries of 0 1 1 Oct17 – 30, Yogyakarta the KEE management area blocking map of the KEE area that is used in the management of the stakeholder in KEE 2020 action plan document. Teluk Pangpang 4.1 Collecting data and identify Assesment report of the KEE Biodiversity’s potential completed. We 27 beneficiaries of 1 7 8 Sep11 – 15, Banyuwangi opportunities to improve found 10 mangrove , with Tanjang Clengkreng (Rhizophora stakeholder in KEE 2020 ecosystem function, maximize apiculata) as the dominant species; 12 species and 1 deer (Rusa Teluk Pangpang wildlife protection, and timorensis), identified that more than 51 percent of the area are dense contribute to community vegetation. We defined 3 grades or blocks namely low (red), middle livelihoods (yellow), and high (green). Each grade/block have recommendation such rehabilitation activity in the low block need to increased. 4.2 Social Assessment for Assessment report of KEE Teluk Pangpang’s social aspect competed. 27 beneficiaries of 2 13 15 Oct9-14, Banyuwangi community around KEE Teluk The social assessment used Transmission Channel Analysis (TCA) stakeholder in KEE 2021 Pangpang approach to capture social problems, potentials, and arrange Teluk Pangpang transformation on them. Based on this assessment, we recommended that among OPD, Perhutani, BTNAP, Village Government, and community, they need to build consensus to detail the KEE’s management plan. Because the existing condition showed that there are gaps in knowledge and perception of land use towards KEEs. PHASE II (DEC 2020 – APR 2021) 1 Preparation for Pilot Activities 1.1 Internal preparation meeting Seventeen ARuPA program staff have improved understanding about 17 program staff of 3 15 18 Dec 18, Yogyakarta for the program the program, their duties & responsibilities; Detail of activity plan ARuPA 2020 implementation team developed. Most of ARuPA’s program staff had a 2-year experience with stakeholder engagement, biodiversity conservation, and community development. We had arranged scopes of works and 4-month working plans for each staff. 2 Assess the need for strengthening the institution of KEE multi-stakeholder forum 2.1 Workshop on planning and Four research design of stakeholder mapping, fiscal opportunities, 3 KEE, namely: UP, 25 13 38 Dec 26-27, Yogyakarta drafting research designs biodiversity and socio-economic on KEE Mangrove Ujungpangkah (UP), MK, TK 2020 Pulau Masakambing (MK), Pantai Taman Kili Kili (TK)

9

PARTICIPANTS NO ACTIVITY OUTCOME BENEFICIARIES DATE PLACE F M Total 2.2 Stakeholders mapping studies for 3 KEE Mangrove Ujungpangkah (UP), Pulau Masakambing (MK), Pantai Taman Kili Kili (TK) area 2.2.1 Desk research Three packages (KEE UP, MK, TK) stakeholders list, interest, and 3 KEE, namely: UP, 4 0 4 Jan 2-5, 2021 Yogyakarta authority of stakeholders were collected based on literature. MK, TK 2.2.2 Field data collecting for Three field finding packages (KEE UP, MK, TK) of the stakeholders’ 3 KEE, namely: UP, 4 0 4 UP: Jan9 to Gresik, Stakeholders mapping perception of the KEE initiative were collected, based on interviews and MK, TK Feb9, 2021. Sumenep, studies FGD at 3 KEE sites. MK: Trenggalek 7,8,11,13, and 19 Jan 2021 TK: Jan5 to 9, 2021 2.2.3 Data analysis and report Three packages (KEE UP, MK, TK) of the stakeholders’ mapping 3 KEE, namely: UP, 4 0 4 Feb10-25, Yogyakarta writing of stakeholders reports in three KEE completed. The studies found two important MK, TK 2021 mapping results things as follows: (1). Some parties have high interest but low power. In contrast, some parties have low interest but high power. Balance among the parties needs to be developed; (2). There were gap perceptions among parties related to how KEE areas should be managed.

The main recommendation from this studies is efforts are needed to create collaborative governance that is closer to ideal without forgetting several dimensions that characterize the capacity of this collaboration, including bonds of trust, mutual understanding, commitment, the common ground, and the presence of actors who become a connector (the bridging actors). 2.3 Policy and fiscal incentive opportunity studies in local government for KEE UP, MK, TK management 2.3.1 Desk research Three packages (KEE UP, MK, TK) secondary data of national/local 3 KEE, namely: UP, 2 2 4 Jan 2-5, 2021 Yogyakarta fiscal incentive policy were collected. MK, TK 2.3.2 Field data collecting in Three field finding packages (KEE UP, MK, TK) of the development and 3 KEE, namely: UP, 2 2 4 UP: Jan8 to Gresik, Policy and fiscal budgeting documents from districts, sub-districts, and village MK, TK Feb9, 2021 Sumenep, incentive opportunity governments were collected. MK: 7, 19, Trenggalek studies 26 Jan 2021 TK: Jan8 to Feb9, 2021 2.3.3 Data analysis and report Three packages (KEE UP, MK, TK) of the policy and fiscal incentive 3 KEE, namely: UP, 2 2 4 Feb10-25, Yogyakarta writing in policy and opportunity studies report in three KEEs completed. Here are some MK, TK 2021 fiscal incentive findings: opportunity studies o Discussing sustainable development must always measure how the performance of regulations, institutions, and infrastructure are included in the context of KEE management. Therefore, regulations

10

PARTICIPANTS NO ACTIVITY OUTCOME BENEFICIARIES DATE PLACE F M Total on KEE must be clarified so that stakeholders can use the regulations as a reference in the management and development of KEE o The budget planning policies related to KEEs at the national, regional, and village levels have included KEEs in them, but some have not explicitly included KEEs as part of their planning. o The budget opportunity for KEE management are: - National, provincial, district level: (1). The balancing national and regional finances/budget provides opportunities that allow KEE to become one of the conservation areas; and also deconcentration budget. (2). The opportunity for revenue- sharing from the Reforestation Fund (Dana Reboisasi), based on proposals from the community, is very possible for allocations to KEE, especially for conservation activities. (3). The regional incentive budget (Dana Insentif Daerah/DID) makes it possible to include indicators related to land area. This is where KEE has an opportunity to conserve land, allowing it to take advantage of DID. - Village level: opportunities for village budget (Dana Desa/DD), especially villages in the KEE area, have a great opportunity to allocate budgets for KEE development - Grants from government, corporate social responsibility / private sector, universities, and non-government organizations / civil society, have a great opportunity to develop KEEs. 2.4 Biodiversity inventory in KEE UP, MK, TK 2.4.1 Desk research Three packages (KEE UP, MK, TK) biodiversity potential data were 3 KEE, namely: UP, 1 3 4 Jan 2-5, 2021 Yogyakarta collected & three SMCA maps were developed. MK, TK 2.4.2 Field data collection Three packages (KEE UP, MK, TK) the biodiversity data through 3 KEE, namely: UP, 2 5 7 UP: Jan10- Gresik, Biodiversity inventory in SMCA ground check were collected. MK, TK 17,2021 Sumenep, KEE MK: Jan17- Trenggalek 21,2021 TK: Jan9-16, 2021 2.4.3 Data analysis and report Three packages (KEE UP, MK, TK) of the KEE biodiversity potential 3 KEE, namely: UP, 2 5 7 Feb10-25, Yogyakarta writing in KEE reports were completed. Some key finding of the activity, as follow: MK, TK 2021 biodiversity potential. Here the main finding of fauna in each KEE: o KEE Pantai Taman Kili Kili: The types of species that have the highest density in the protected areas and sustainable use areas, are Javan-pond heron (Ardeola speciose), swallow linchi (Collocalia linchi), and brown-throated sunbird (Anthreptes malacensis).

11

PARTICIPANTS NO ACTIVITY OUTCOME BENEFICIARIES DATE PLACE F M Total Sustainable use areas, recovery areas, and protected areas have the same diversity index category which is medium. Apart from turtles, important species that can be found at KEE Pantai Taman Kili-kili include Japanese sparrowhawk (Accipiter gularis), gajahan pengala (Numenius phaeopus), kipasan belang (Rhipidura javanica), Javan ( javanicus), Javan coucal (Centropus nigrorufus), Javan myna (Acridotheres javanicus), and Rubby-throated bulbul (Rubigula dispar). o KEE Mangrove Ujungpangkah: Little egrets (Egretta garzetta) are the species that have the highest density values in the protected, sustainable use, and recovery areas of KEE Mangrove Ujung Pangkah. The index of animal diversity in the protected and used areas is in the high category. In contrast to the two areas, in the area of recovery, the value of the animal diversity index is moderate. Important species found in KEE Mangrove Ujung Pangkah include: lesser adjutant (Leptoptilos javanicus), Javan coucal (Centropus nigrorufus), Javan plover (Charadrius javanicus), eurasian curlew (Numenius arquata), whimbrel (Numenius phaeopus), far eastern curlew (Numenius madagascariensis), Malaysian pied (Rhipidura javanica), black-tailed godwit (Limosa limosa), bar-tailed godwit (Limosa lapponica), Pasific golden plover (Pluvialis fulva), greater sand plover (Charadrius leschenaultia), kentish plover (Charadrius alexandrius), whiskered tern (Chlidonias hybrida), white- winged ter (Chlidonias leucopterus), gull-billed tern (Sterna nilotica), lesser crested tern (Thalasseus bengalensis), greater crested tern (Thalasseus bergii), terek sandpiper (Xenus cinerus), common redshank (Tringa tetanus). o KEE Pulau Masakambing: Based on observations in the KEE area on Masakambing Island, 22 bird species were recorded, 5 of which were protected, one mammal species, and 3 herpetofauna species. The results of the analysis show that KEE Masakambing has a moderate diversity of bird species in areas of protection, sustainable use, and recovery. In this protected area the most individuals encountered were marine goggles with a density of 0.372 individuals/ha. In the sustainable use area, the most individuals encountered were Cacatua sulphurea abotti with a density of 0.673 individuals/ha. In the recovery area, the most individuals encountered were species clogged rivers with a density of 0.309 individuals/ha. Bird species are more common in the mangrove areas, although some are easily visible in plantation and

12

PARTICIPANTS NO ACTIVITY OUTCOME BENEFICIARIES DATE PLACE F M Total residential areas, such as Cacatua sulphurea abotti, Zosterops chloris, Cinnyris jugularis, Todiramphus chloris. 2.5 Socio-Economic Assessment in KEE UP, MK, TK 2.5.1 Desk research Three packages (KEE UP, MK, TK) list of utilization types, potential 3 KEE, namely: UP, 1 3 4 Jan 2-5, 2021 Yogyakarta conflicts over the use of the KEE area. MK, TK 2.5.2 Field data collection in Three packages (KEE UP, MK, TK) of the utilization of KEE areas and 3 KEE, namely: UP, 1 3 4 UP: Jan8- Gresik, Socio-Economic potential conflict were collected based on interviews at 3 KEEs. MK, TK 28,2021 Sumenep, Assessment in KEE MK: Jan17- Trenggalek 20,2021 TK: Jan5- 15,2021 2.5.3 Data analysis and report Three packages (KEE UP, MK, TK) of the socio-economic assessment 3 KEE, namely: UP, 1 3 4 Feb10-25, Yogyakarta writing in socio- reports were completed. MK, TK 2021 economic assessment in A resume of the findings in the socio-economic assessment in KEE UP, KEE MK, and TK are as follow: o Utilization of KEE areas. - Economic interaction (Ujung Pangkah): The mobility of community activities and their interactions with the Ujung Pangkah area is more motivated as a source of livelihood land in the form of ponds and fishermen. - Ecologic interaction (Pantai Taman Kili-Kili): The involvement and interest of the village government and community groups (Pokmawas) in the coastal area of Taman Kili-Kili is more based on motivation to carry out turtle rescue conservation. - Ecology-economic interaction (Pulau Masakambing): This pattern further describes the form of community subsistence over the limited resources around it. o Conflict potential - Conflict of authority: In KEE Pantai Taman Kili-Kili between Perhutani and Village Government/Community. In KEE Ujung Pangkah related to oloran land (high/low-tide lands) between village government and concession holder. - Conflict of market actors: KEE Ujung Pangkah, ijon market (bonded system) detrimental to fishermen and pond managers - Conflict of roles: If one party does not have a strong commitment, there will be a potential for conflict to split the agreement that is built. This situation can happen at KEE Masakambing. The skeptical and apathetic attitude of the village government to initiate the designation of Masakambing

13

PARTICIPANTS NO ACTIVITY OUTCOME BENEFICIARIES DATE PLACE F M Total Island as KEEs, will result in the loss of public confidence in accepting KEE as a conservation area. o Potential opportunities for village institutions in managing KEE ie. Village Owned Enterprises/BUMDes. BUMDes has the opportunity to manage KEEs as long as it improves the conditions below: - BUMDes do not yet have sufficient capacity to be involved in providing added value, especially invaluable products. - BUMDes does not have a good marketing network or build partnerships with market players who control the marketing chain. - Not all village governments have provided support for the role of BUMDes as the motor that drives the economy of the community in the village. 3 Strengthening the institutional functions to achieve the effectiveness of KEE management 3.1 KEE management document development of KEE Teluk Pangpang (TP) 3.1.1 Development of KEE The draft KEE Teluk Pangpang management document was developed. 27 beneficiaries of 4 23 27 Dec 23, Banyuwangi Telung Pangpang The activity was held on 23 December 2020. 27 people participated, stakeholder in KEE 2020 management document including 23 males and 4 females. The activities to draft the document Teluk Pangpang of KEE Teluk Pangpang management (including the action plan, and internal monitoring and evaluation), was completed by experts and already discussed with the representation from the KEE forum. This document has been consulted and discussed with the KEE Teluk Pangpang forum for important input on institution and management documents of KEE Teluk Pangpang later. 3.1.2 Stakeholders Important stakeholder inputs integrated into the final draft of the KEE 27 beneficiaries of 2 25 27 Jan 19, 2021 Banyuwangi consultation of KEE Teluk Pangpang management document. stakeholder in KEE Teluk Pangpang The main inputs on the meeting are: Teluk Pangpang management document o Optimizing land utilization by agroforestry complex system and ecotourism purposes. Agroforestry complex systems are characterized by various tree species, like a natural forest that has high biodiversity and multi-layer canopies. Through mangrove landscape by applying agroforestry complex system can become an ecotourism destination. o Forum consolidation meetings need to be held monthly, to report activities from each forum member and arrange plans for next month. o Promoting KEE area and biodiversity through social media and another digital platform. 3.2 KEE area arrangement of KEE UP, MK, TK

14

PARTICIPANTS NO ACTIVITY OUTCOME BENEFICIARIES DATE PLACE F M Total 3.2.1 Field mapping & KEE border identified and confirmed in the field and marked on 15 1 beneficiary of KEE 6 29 35 Jan 19-23, Gresik verification of KEE UP coordinate points with natural boundaries such as rivers, former docks, UP 2021 bridge, etc. KEE spatial data collected, including KEE border coordinates.

Based on the field mapping process, KEE Ujungpangkah has 23 percent recovery zone, 40 percent sustainable use zone, and 37 percent protected zone. 3.2.2 Field mapping & KEE border identified and confirmed in the field and marked with 1 beneficiaries of 2 16 18 Jan 18-22, Sumenep verification of KEE MK natural boundaries & wood pal inscribed with “outermost point of KEE KEE MK 2021 Masakambing”, KEE spatial data collected, including KEE border coordinates.

During the mapping process, the team succeeded in identifying the boundaries of the KEE area on the outer boundary (batas luar) that leads to the sea and the inner boundary (batas dalam) that leads to the mainland. 10 coordinates defined the boundary of the KEE area. In addition, field verification of the SMCA map has been carried out. The SMCA map is a map produced by overlay mapping of the ecological and socio-economic variables to create three categories, namely high, medium, low. The low category means recovery zone, medium category means sustainable use zone, and high category means protected zone. Based on the field mapping process, KEE Pulau Masakambing has 39 percent recovery zone, 15 percent sustainable use zone, and 46 percent protected zone. 3.2.3 Field mapping & KEE border identified and confirmed in the field and marked with 1 beneficiaries of 5 34 39 Jan 9-15, Trenggalek verification of KEE TK natural boundaries & wood pal inscribed “KEE TKK”, KEE spatial data KEE TK 2021 collected, including KEE border coordinates.

During the mapping process, the team succeeded to identify the boundaries of the KEE area. It took 6 coordinates of the KEE area boundary. In addition, field verification of the SMCA map has been carried out. The SMCA map is a map produced by overlay mapping of the ecological and socio-economic variables to create three categories, namely high, medium, low. The low category means recovery zone, medium category means sustainable use zone, and high category means protected zone. Based on the field mapping process, KEE Pantai Taman Kili-Kili has 27 percent recovery zone, 64 percent sustainable use zone, and 9 percent protected zone.

15

PARTICIPANTS NO ACTIVITY OUTCOME BENEFICIARIES DATE PLACE F M Total 3.2.4 Development map of Blocking maps of KEE Ujung Pangkah, KEE Masakambing, and KEE 3 beneficiaries of 1 3 4 Jan 24-30, Yogyakarta area Taman Kili-Kili area management were developed based on field KEE 2021 arrangement/blocking of mapping and verification. 3 KEE area Map of KEE Ujung Pangkah have scale 1:19.000; KEE Masakambing scale 1:5.000; KEE Taman Kili-Kili scale 1:7.000.

These maps inform KEE boundaries; recovery zone; sustainable use zone; and protected zone. The map also informs village boundaries; settlement; roads; river; state forest concession; turtle landing area for KEE Kili-Kili map; important for KEE Ujung Pangkah; and important trees for cockatoos of KEE Masakambing. 3.3 Consolidation meeting of KEE forum for strengthening of KEE institutional and management document 3.3.1 TP phase 1 Important points for institutional and management document of KEE TP 27 beneficiaries of 7 26 33 Feb 10-11, Banyuwangi (1). In general, the meeting resulted in several important things, stakeholder in KEE 2021 including the role of each division in the forum such as the secretariat, TP division of planning, research and development; monitoring and evaluation; division of community utilization and empowerment; and division of conservation. 3.3.1 TP phase 2 Important points for institutional and management document of KEE TP 27 beneficiaries of 7 20 27 Mar 10, Banyuwangi (2). stakeholder in KEE 2021 o Important notes on the management document TP - It is necessary to include the number of assistance activities as an indicator for monitoring and evaluation assessments in the protection action plan document 2021 - It is necessary to add procedures for implementing monitoring and evaluation activities in the protection action plan document 2021. o Important notes on the institutional document - Between management members of KEE TP are collaborative relationships by reducing sectoral egos and prioritizing coordination and communication. - The commitments between KEE forums TP with other parties i.e private sector related to KEE activities should be agreed upon by the KEE forum leader - Immediately KEE forum leader hearing to the Banyuwangi Regent to present KEE forum activities. A letter requesting the hearing will be made by BBKSDA of East Java.

16

PARTICIPANTS NO ACTIVITY OUTCOME BENEFICIARIES DATE PLACE F M Total - Institutional governance documents that have been finalized will be given to CDK Banyuwangi as a secretary of forum KEE TP - The secretariate of the forum expected to make the form letterhead, vision and mission, and KEE logo. 3.3.2 UP phase 1 Important points for institutional and management document of KEE UP 36 beneficiaries of 9 44 53 Mar16-17, Gresik (1). stakeholder in KEE 2021 Important points for developing institutional document: To UP accommodate coordination between institutions, it is necessary to have a secretariat located at the Environmental Office of Gresik Regency. The Environmental officer of Gresik and BBKSDA Jawa Timur will be allocated their human resource to operating the secretariat. Important points for developing management document: Private sector around the KEE area needs to always be involved in management activities. The companies are: PETRONAS; PGN SAKA (PT Saka Energi Indonesia); PT Smelting Gresik; PT Petrokimia Gresik. 3.3.2 UP phase 2 Important points for institutional and management document of KEE UP 36 beneficiaries of 11 56 67 Apr12, 2021 Gresik (2) stakeholder in KEE o Important notes on the management document UP - KEE UP forum members from the Regional Apparatus Organization (Organisasi Perangkat Daerah/OPD) already have a budget from the 2021 APBD for the management of KEE UP. They are expected to immediately realize their activities. Meanwhile, members who do not have a budget from the 2021 APBD for the management of KEE UP are expected to immediately propose changes to the 2021 APBD. - KEE UP forum member from the private sector, they are expected to immediately realize their funding through a CSR mechanism according to what has been planned by their company. - Final KEE UP action plan documents for 2021-2025 and action plans for protection for 2021 immediately submitted to the Directorate General of Conservation of Natural Resources and Ecosystems (KSDAE) of the Ministry of Environment and Forestry, guided by the East Java Center for Conservation of Natural Resources and Ecosystems (KSDAE) - In managing KEE UP, managers are expected to prioritize the values of gender equality and social inclusion o Important notes on the institutional document

17

PARTICIPANTS NO ACTIVITY OUTCOME BENEFICIARIES DATE PLACE F M Total - The working relationship arrangement (tata hubungan kerja/TAHUJA) is the multi-stakeholder collaborative management principle under the coordination of the Assistant for Economy and Development Regional Secretary of Gresik as Chairman of the KEE Manager. - The scope of work of the KEE UP managers are dynamic and can undergo additions or changes following the processes that are running in each division - The Secretariat of KEE UP is located at the Office of the Environment Office of Gresik Regency Jl. KH. Wahid Hasyim No. 17. Further coordination regarding the institution will be discussed at the secretariat. Routine meetings in 2021 will be scheduled every two months by the Secretary to accommodate the planned activity programs of each division. - The Division of Planning, R & D, Monitoring and Evaluation, and Cooperation are expected to now pay serious attention to identifying opportunities for collaboration with third parties i.e private sectors. - Other divisions are Utilization, Conservation, Protection, and Security immediately to hold a meeting for each division to realize the activity plan at KEE UP - KEE UP forum need to coordinate with related agencies outside KEE, for example with the Regional Disaster Management Agency (BPBD) - Involving the Search and Rescue or SAR team in the activities of the protection and security division. 3.3.3 MK phase 1 Important points for institutional and management document of KEE 35 beneficiaries of 5 26 31 Feb 18-19, Sumenep MK (1). Here as follow, the important result of the meeting: stakeholder in KEE 2021 o Important points for developing institutional documents such as MK develop KEE secretariat at the Sumenep and Masakambing Island proposed. o Important points for developing management document such as the Masakambing village government suggested developing village regulations on mangrove protection proposed o Follow-up on forum operational agreed, including the Forum member of KEE Pulau Masakambing conducts field trips to the Pulau Masakambing when the weather conditions allow 3.3.3. MK phase 2 Important points for institutional and management document of KEE 35 beneficiaries of 4 32 36 Mar 18, Sumenep MK (2). stakeholder in KEE 2021 Important notes on institutional document MK

18

PARTICIPANTS NO ACTIVITY OUTCOME BENEFICIARIES DATE PLACE F M Total o The working relations between management members forum of KEE MK are collaborative relationship by reducing sectoral egos and prioritizing coordination and communication; o Encourage the Head of Masakambing Village and the Masakambing community as the main actors in various activities and management of the KEE MK; o Immediately KEE forum leader hearing to the Sumenep Regent to present KEE forum activities; o The institutional document of KEE MK serves as a guideline for forum KEE MK work relations.

Important notes on management document o BBKSDA Jawa Timur (the East Java Agency for Conservation of Natural Resources) suggested to the forum to use data from the Indonesian Cockatoo Conservation (KKI) and the BBKSDA Jawa Timur on the types of flora and fauna biodiversity on Masakambing Island. o In 2021, the Sumenep Fisheries Service will focus on forming groups for both fishermen and fish farming in Masakambing. o The Masakambing village community proposed to Sumenep Government to provide telecommunication facilities for cellular and internet networks, provide electricity and transportation access to Masakambing. o The Sumenep Tourism Office proposed KEE MK branding as "the Heart of the Archipelago" because of the island’s position in the middle of the Indonesian archipelago. o Suggestion from BBKSDA: KEE MK forum periodically updates data on demographics, flora, and fauna. o For the 2021 Action Plan, the Sumenep environmental officer proposes several activities, including Purchasing Kapook trees (Ceiba pentandra) and coconut (Cocos nucifera); Installation of information boards related to KEE on Masakambing Island; Protection of cockatoo nest trees; and Mangrove conservation area development. 3.3.4 TK phase 1 Important points for institutional and management document of KEE TK 39 beneficiaries of 10 50 60 Feb 15-16, Trenggalek (1). Here as follow, the important result of the meeting: stakeholder in KEE 2021 o Important points for developing institutional documents such as TK the Secretariat of KEE Pantai Taman Kili Kili Forum at the Panggul Trenggalek sub-district office proposed.

19

PARTICIPANTS NO ACTIVITY OUTCOME BENEFICIARIES DATE PLACE F M Total o Important points for developing management documents such as the head of the field, namely the Trenggalek Residential Area and Environment Agency, coordinate conservation activities proposed o Follow-up on forum operational agreed including the development of a logo, letterhead, and the KEE Pantai Taman Kili Kili tagline by the secretariat and ARuPA 3.3.4. TK phase 2 Important points for institutional and management document of KEE TK 39 beneficiaries of 10 36 46 Mar 15, Trenggalek (2). stakeholder in KEE 2021 Important notes on the institutional document TK o The working relations between management members forum of KEE TK are collaborative relationship by reducing sectoral egos and prioritizing coordination and communication; o There is a proposal to add the position of Deputy Regent of Trenggalek as the Steering Committee for the KK TK forum; o Immediately KEE forum leader hearing to the Trenggalek Regent to present KEE forum activities. To note, this agenda has been carried out on April 7, 2021. o The institutional document of KEE MK is a guideline for forum KEE MK work relations.

Important notes on management document o There are proposals to re-emphasize the importance of establishing a core protection zone covering land and water areas through the designation of a marine protected area (MPA). This is because the determination of the turtle conservation area cannot only be on the mainland but must also include marine areas. The determination of the MPA area is proposed to be the KEE core zone. o The area of the core zone is at least 10% of the total area proposed to be free from activities other than conservation. In this case, at KEE Pantai Taman Kili Kili, there is still a catching area for lobster seeds (BBL) in the waters of KEE Kili Kili Beach 3.3.5 Writing workshop for Draft 1 of institutional and management document of KEE UP, MK, TK, 4 KEE: UP, MK, TK, 0 4 4 20 Days Yogyakarta finalizing institutional and TP developed. The target to finalize the draft 1 institutional document TP within Gresik management document of four KEEs arranged. The target to finalize the draft 1 management Feb10- Sumenep of KEE UP, MK, TK, TP document of four KEEs arranged. Mar28, 2021 Trenggalek phase 1 Banyuwangi 3.3.5. Writing workshop for Final institutional and management document of KEE UP, MK, TK, TP 4 KEE: UP, MK, TK, 0 4 4 12 days Yogyakarta finalizing institutional and developed. TP within management document

20

PARTICIPANTS NO ACTIVITY OUTCOME BENEFICIARIES DATE PLACE F M Total of KEE UP, MK, TK, TP During approximately 33 working days, the writing team has Feb10- phase 2 successfully written 12 documents with details of 4 Institutional Mar28, 2021 documents for 4 KEE locations and 8 Management documents for 4 KEE locations. The final institutional document is a document entitled "Pedoman Tata Hubungan Kerja dan Pola Koordinasi Pengelola Kawasan Ekosistem Esensial " and a final Management document in the form of a 5-year management document entitled "Rencana Aksi Pengelolaan Kawasan Ekosistem Esensial Tahun 2021 – 2025" and an annual management document entitled " Rencana Kegiatan Pelindungan Kawasan Ekosistem Esensial Tahun 2021” for each of the 4 KEE locations.

4 Increasing the capacity of forum members and community groups in managing KEE 4.2 Strengthening the utilization of KEE to support village potential-based KEE management objectives 4.2.1 Silvofishery training Four communities group of KEE had improved understanding of the 38 beneficiaries 2 36 38 Jan 27-29, Banyuwangi sustainable utilization of marine resources and how to cultivate fish in from the community 2021 mangrove areas and maintains the sustainability of KEE. group of KEE UP, MK, TK, & TP These were indicated by pre and post-test results and discussion processes during training. Pre and post-test result showed that o Low level in the pre-test was 7 persons, and the post-test was 2 persons. o Middle level in the pre-test was 14 persons, and the post-test was 9 persons. o High level in the pre-test was 6 persons, and the post-test was 16 persons. 4.2.2 Ecotourism Eight community tourism groups had improved on the capability to 8 beneficiaries from 7 31 38 Feb 24-26, Trenggalek development training in identify the opportunity and to develop the ecotourism development the community 2021 the KEE area plan. tourism group and 4 o Through the material training delivered by trainers, the community beneficiaries from understands the concept and basics of ecotourism management, KEE forum specifically in the KEE context. The achievement is indicated by the representative of post-test result as below: KEE UP, MK, TK, & - Low level in the pre-test was 10 persons, and the post-test was 2 TP. persons. - Medium level in the pre-test was 12 persons, and the post-test was 11 persons. - High level in the pre-test was 4 persons, and the post-test was 13 persons. o The community, through forums and were assisted by a trainer, were able to identify the opportunity to develop ecotourism, such as the

21

PARTICIPANTS NO ACTIVITY OUTCOME BENEFICIARIES DATE PLACE F M Total community of KEE Pantai Taman Kili Kili who realized that turtle in KEE can be as magnitude for the visitor to learn more about turtle conservation. o The community through the forum and assisted by a trainer, were able to develop the ecotourism development plan. For example, the community around KEE Ujungpangkah plan to develop integrated track of mangrove tour in 3 village. 4.2.3 Writing workshop and Draft of Business plan for developing ecotourism inside and around KEE 9 community groups 11 40 51 14 days Banyuwangi assistance for drafting TP area developed. ecotourism within the ecotourism business Here as follow, the attraction recommended for each village are: beneficiaries Mar11-Apr8, plans of KEE TP o Kedungasri: Mangrove tour and education, and Canoeing; Dragon 2021 Fruit Agro-tourism for agro-tourism and resto; Darungan Hamlet village tour and cycling; Candi Purwo for Pilgrim Tour. o Kedunggebang: Mangrove tour and education, and Canoeing; Dragon Fruit Agro-tourism; Krajan Hamlet village tour and photos. o Wringinputih: Pine conservation– Mangrove Kawang for education mangrove and fun games; Panoramic view of Kili Kili for Bird watching; Teluk Pangpang mangrove tour; Cooking Class Produk Mangrove and homestay in Krajan hamlet. 4.2.4 Writing workshop and Draft of Business plan for developing ecotourism inside and around KEE 9 community groups 8 16 24 14 days Gresik assistance for drafting UP area developed. ecotourism within the ecotourism business 1. Ujungpangkah Exploration Tour Package beneficiaries Mar11- plans of KEE UP The preparation of the Ujungpangkah Exploration tour package is Apr12, 2021 urgent to connect tourism attractions in the three villages in the KEE UP. The main objective is to "extend" the length of stay of tourists by: o Establish regular and measurable visiting patterns in a package; o Providing Regional Interpretation Services; o Changing the visiting model to be in groups; o Providing a tourist-friendly mode of transportation (environment. Tourists, community) and attractive; o Connecting various attractions (in the form of activities) in a series of visits.

2. Ujungpangkah Bengawan Solo Mangrove Conservation. The Mangroove and Muara Bengawan Solo ecosystems are important attributes possessed by KEE UP. As branding, both are only suitable to be placed in the perspective of Ujung Pangkah as an area/landscape not a village per village. In an ecotourism perspective, the form of presenting attractions Around Mangrove is absolutely in the form of

22

PARTICIPANTS NO ACTIVITY OUTCOME BENEFICIARIES DATE PLACE F M Total education and tourist involvement in conservation efforts (Volunteerism). 4.2.5 Writing workshop and Draft of Business plan for developing ecotourism inside and around KEE 9 community groups 6 21 27 14 days Sumenep assistance for drafting MK area developed. ecotourism within the ecotourism business Based on the analysis of the current conditions in Masakambing Island, beneficiaries Mar17- plans of KEE MK ecotourism products have been designed, namely: Apr15, 2021

o Bekka’ Experience o Village Journey o Beautiful Karang Putih (white coral) o Bukit Keramat (sacred hill) o Homestay

In addition, two tourism products are also interesting, namely: o Voluntary program: Programs offered to institutions (eg Planette urgence, GVI, ASSA, International Schools, Universities) following the needs of Masakambing Village. Examples of programs: Coral Reef Restoration, Ecological Farming, Quality Education at the basic level, Mangrove Conservation. o Research locations: With the rich biodiversity that exists in the village of Masakambing, it opens up opportunities for research by research institutes, universities, and groups 4.2.6 Writing workshop and Draft of Business plan for developing ecotourism inside and around KEE 9 community groups 11 30 41 14 days Trenggalek assistance for drafting TK area developed. ecotourism within the ecotourism business Recommendations for the development of tourism products in KEE beneficiaries Mar10-Apr9, plans of KEE TK Pantai Taman Kili Kili: 2021 o Kili-Kili Beach Turtle Conservation: Turtle Conservation Education Tour & Turtle Nest Adoption o Jekelan Hill: Jekelan EcoCamp Site (JECS) o Wonocoyo Village: Village explore & Voluntourism Coastal conserve 5 Implementing the inventory of high biodiversity areas outside the conservation area 5.1 Development of Biodiversity The prototype of web GIS and mobile apps based biodiversity 2 beneficiaries, 0 7 7 Jan 2021 Yogyakarta Information System in East information system developed. Then followed up with activities 5.1 namely: BBKSDA; Java Province Development of Biodiversity Information System in East Java Province, Forestry Service of conducted by ARuPA Experts. The biodiversity information system has East Java been produced which is still under trial and in advanced development. Prototype of the system can access through the link as follows:

o Link webGIS https://inver-kehati-jatim.karogis.com/

23

PARTICIPANTS NO ACTIVITY OUTCOME BENEFICIARIES DATE PLACE F M Total o Link APK Android https://inver-kehati- jatim.karogis.com/auth/login?next=%2F%3Faction%3DdownloadApp login: operator; password: operator. 5.2 Development module for A biodiversity inventory module to guide the biodiversity inventory 3 beneficiaries, 1 4 5 Jan 6-8, 2021 Yogyakarta biodiversity inventory training activity in 17 locations. namely BPEE; & Jan 14-15, BBKSDA of East 2021 Java; and Forestry Service of East Java. 5.3 Training of trainer (ToT) for Twenty persons from East Java Forestry Service, East Java BBKSDA, 20 persons from 3 17 20 Jan 4-6, 2021 Batu biodiversity inventory team and others had improved understanding the method and techniques for East Java Forestry biodiversity inventory and the operation of biodiversity information Service, East Java system. These were indicated by pre and post-test results and BBKSDA, and other discussion processes during training. Pre and post-test result showed that: o Low level in the pre-test was 7 persons, and the post-test was 2 persons. o Middle level in the pre-test was 14 persons, and the post-test was 9 persons. o High level in the pre-test was 6 persons, and the post-test was 16 persons. 5.4 Spatial Multi-Criteria Analysis 17 Indicative maps of high biodiversity areas for East Java Province 2 beneficiaries, 2 7 9 Jan 7-20, Yogyakarta (SMCA) for developing the developed which has been overlaid with village administration area and namely: BBKSDA; 2021 indicative map of high forest in Perum Perhutani area are developed. Forestry Service of biodiversity area East Java 5.5 The collection of repository 17 repository secondary data of biodiversity collected. 2 beneficiaries, 0 5 5 Jan 6-20, Yogyakarta secondary data namely: BBKSDA; 2021 Forestry Service of East Java 5.6 Field data collection for high 17 row material of high biodiversity area in 17 locations in the East Java 2 beneficiaries, 15 88 103 Phase 1: Tuban biodiversity 17 locations in the province and the Improvement of biodiversity information system based namely: BBKSDA; Feb15-Mar1, Trenggalek East Java on field data collection activity. Forestry Service of 2021 Situbondo East Java Phase 2: Sidoharjo Field data collection batch 1 is still ongoing from 8 February to 3 March Mar8-22, Sampang 2021 to accomplish 9 locations from 17 locations, and batch II will be 2021 Probolinggo held on 8-22 March 2021 to complete the remaining 8 locations out of Pasuruan 17 total locations. When this activity is completed, it will produce: Malang-Batu o Row material of High biodiversity area in 9 locations in the East Madiun- Java province Kediri o The Improvement of biodiversity information system based on field Lumajang data collection activity. Surabaya

24

PARTICIPANTS NO ACTIVITY OUTCOME BENEFICIARIES DATE PLACE F M Total Jember Field data collection of biodiversity for 17 location was completed, and Ijen Baluran produce: Gn. Kelud o High biodiversity data for 17 locations of 23 district in the East Java DT Hyang province collected Banyuwangi o The Improvement of the biodiversity information system was AlasPurwo- completed, by updating the data analysis system and revising the Merubetiri placement of menus on the website. 5.7 Data consolidation of ground Report of analysis and consolidation of ground check data and 2 beneficiaries, 1 8 9 Mar24-31, Yogyakarta check results and secondary secondary data developed; Final draft of the information system was namely: BBKSDA; 2021 spatial data developed. There are three steps to doing the inventory, namely: spatial Forestry Service of study; field inventory, and data analysis. In the spacial study, we have East Java done sequentially modeling of fauna priority species distribution; analysis of biodiversity hotspots & least cost path; determination of biodiversity inventory area; and finally class analysis of the Spatial Multi- Criteria Analysis (SMCA). The spacial study resulted in 17 areas to be inventory in the field. Secondly, we have done field inventories of high biodiversity on 17 areas in East Java. The inventory team came from ARuPA, East Java BBKSDA and Forestry Service. The final step is data analysis. In sum, the finding from this activity are:

There are 17 locations of high biodiversity inventory. Determination of locations based on biodiversity hotspot which is defined by fauna distribution data combine by an environmental variable such as elevation, proximity from rivers, and degree of slope. To capture the variety of locations, we defined 4 categories of biodiversity areas, namely corridor, buffer, protected, and isolate. Corridor for areas as a connector between conservation areas. Buffer for areas around the conservation area. Protection area for coastal, mangrove, and certain geological uniqueness

The 17 locations are at 21 districts in East Java Province. From the total location of 342.102,67 hectares, 205 species of , 10 species of mammals, and 31 species of herpetofauna were recorded. Then for the types of flora in the entire location has been identified there are 154 types of flora.

Each location of 17 areas has the status of high-medium-low of biodiversity. From SMCA, we get information especially The composition of biodiversity that has status high, medium, and low are in

25

PARTICIPANTS NO ACTIVITY OUTCOME BENEFICIARIES DATE PLACE F M Total each location. The locations which have high status more than 20% are Tuban, Sampang, Sidoharjo, Malang-Batu, and Banyuwangi.

5.8 High biodiversity map Biodiversity identification and verification report in East Java province 2 beneficiaries, 1 10 11 Apr12-16, Yogyakarta finalization and writing report and high biodiversity map developed. namely: BBKSDA; 2021 of high biodiversity inventory Forestry Service of The recommendation from this biodiversity inventory are: First, the East Java East Java Provincial Government could enact the 17 locations of biodiversity inventory become KEEs. Second, on the KEEs, the government needs to establish management forums for KEEs and involve various stakeholders. Third, the need to develop action plan documents for the effectiveness of the KEE management.

Furthermore, the results of these activities obtained a regional network that can support biodiversity conservation in East Java and accommodate public participation in its management. To accommodate the public’s participation, we conducted the training of trainers for various parties so that they can pass on their knowledge to other parties. Such as the East Java BBKSDA and Forestry Service, and involved Perhutani staff, CSO, and higher-education students in the field of biodiversity inventory. The result of biodiversity inventory on 17 locations in East Java can see on this temporary website https://inver-kehati-jatim.karogis.com. in the future, this website will be embedded as part of the official East Java Government’s website. Until now, the process to embed the site is still being negotiated until the end of May 2021. This website, which is called “Si Merak Ati”, is also designed to provide biodiversity maps and data for all districts in East Java. On 21 May 2021, USAID BIJAK has handed over the biodiversity information system to the East Java Forestry Service. The website will be used to analyze biodiversity inventory data, develop plans to protect high biodiversity areas, and identify areas to establish new KEEs. The East Java Forestry Service become the host to manage the biodiversity data system in the “Si Merak Ati” website. We have discussed with the East Java Forestry Service to arrange the protocols to manage the website.

26

C. Description of Any Activities/Milestones Not Completed

There is no activities/milestones not completed.

D. Lessons Learned and Recommendations

Lessons learned and recommendations from this project are as follows: NO LEVEL LESSONS LEARNED RECOMMENDATION 1 Supra KEE By considering Law No. Enhancing the role of regional 23/2014 on regional government and reducing the government, and looking at role of the national government the situation in the field, it is in KEE affairs. In addition, we better if the role of the recommend that the Minister provincial and district of Environment and Forestry governments needs to be (MoEF) Decree of on KEE be increased on the KEE issues. issued soon. So that the role of the central government needs to be In addition, need to purpose reduced. and re-enforce the role of the provincial government on KEE development due to MoEF Decree Number P.66 of 2015 about the De-centralization of the environmental sector. 2 Forum of KEE KEE Forum members who To overcome sectoral egos, it majority government officer in is necessary to hold the district and provincial level consolidation meetings for are still concerned with the forum members periodically role of each government and continuously. In addition, officers. In addition, the the role of the Bupati (head of legality of the forum is very district) or Sekda (District important as a basis for forum secretary) is very important to members to prepare activity mobilize each district agency to plans and budgets in each focus on KEE. agency. To have the OPD prioritize KEEs in their work plan, they need to be proposed to Bappeda at the provincial and district level to add the KEE program in their planning arrangement. 3 Community Since there are KEE programs The need for KEE socialization in four locations, communities at the community level by the have started to realize how to village government and other use natural resources parties who are members of sustainably. However, the KEE forum. So, it needs to awareness among the public is be included in the KEE program uneven because of the lack of in the village’s official work socialization on KEEs. plan. 4 ARuPA The short duration of the To achieve the effectiveness of project implementation has KEE management, need more accelerated the work team time and approaches to these

27

NO LEVEL LESSONS LEARNED RECOMMENDATION and strategies. Even in a stakeholders to ensure all of COVID-19 pandemic situation, the recommendations can be ARuPA could still carry out integrated into related activities and achieve all documents. activities by optimizing the technology and roles of site Based on the experiences in officers and staff. this project, a stage that should not be missed is the stakeholder mapping to identify the important stakeholders and also in coordination and consolidation forum KEE. In addition, need to synchronization the project plan with the work plan of government institutions such as BBKSDA and Forestry Service in provincial level.

E. Grant Success Stories

1. KEE Teluk Pangpang and KEE Ujungpangkah succeeded in emphasizing the importance of mangroves and the protection of migratory birds to the community. 2. KEE Taman Kili Kili Beach, which is the landing site for Olive ridley sea turtle (Lepidochelys olivacea) and Leatherback sea turtle (Dermochelys coriacea) has succeeded in conserving turtles and stopping poaching and illegal trade of turtles by the community. 3. KEE Pulau Masakambing has succeeded in protecting the population of abotti yellow-crested cockatoo (Cacatua sulphurea) which currently number only 25 individuals in the wild. 4. With various stakeholders’ characteristics and KEE typology, ARuPA can define the right strategies and approaches to gain commitment and support from related stakeholders. It significantly accelerated the achievement of all targeted milestones in place. 5. Stakeholder mapping and local policy analysis is considered as the most important baseline data to improve the participation of OPD in arranging their program and budget to support the implementation of KEE action plan. Furthermore, the stakeholder analysis can provide clear recommendations for determining the structure, role, and function of the members of the KEE forums. 6. Lessons learned from KEE Teluk Pangpang on drafting the KEE forum decree have provided a reference for the East Java BBKSDA and Forestry Service to replicate the decree for the other 3 KEEs. 7. The SMCA method provided strong recommendations on the different important values of KEE areas to determine blocking maps for area management. The recommendation has been integrated into the KEE action plan and KEE protection plan by determining the different approaches for managing block based on the block characteristic (protection, sustainable utilization, and rehabilitation) 8. The socio-economic studies provided alternative options to manage and utilize KEE areas in certain blocks by considering the tenure and social relation. 9. Strong demand for high biodiversity data provided by Si Merak Ati as a platform for biodiversity data center for conservation program planning, data-based decision-making, provision of a biodiversity profile for district environmental services, monitoring the circulation of protected and wild animals, projection of proposals, and designation of new KEE, and calculation of natural resources balance. So, Si Merak Ati will become a hub for the distribution of data used in

28

achieving the performance indicators of both the East Java forestry service, East Java BBKSDA, and district environmental services in East Java. 10. Acceptance of the project by BPEE at the national level and the East Java BBKSDA and Forestry Service at the provincial level because we build agreement and synchronizing the project plan with government work plan in national, provincial, and district level.

F. Product/documents resulted from grants activities

Please follow the link below: https://drive.google.com/folderview?id=1YQGWV0Bx62lXhLUJh39AhpSF5utsH-ov

1. Report of stakeholder mapping studies 2. Report of fiscal incentive studies 3. Report of biodiversity studies 4. Report of socio-economic studies 5. Institutional documents of 4 KEE (include several records of agreements) 6. Action plan documents of 4 KEE 7. Protection plan documents of 4 KEE 8. Biodiversity inventory report on 17 location in East Java 9. Module of biodiversity inventory manual 10. apps Si Merak Ati manual 11. webGIS Si Merak Ati manual

29

Section II - Financial

A. Description of grant activity funding

During the project implementation in phase I and phase II, USAID BIJAK grant funding contributed greatly in helping ARuPA implement activities and achieve its objectives. USAID BIJAK funded all the implemented activities. The only activity with third-party contribution was activity 5.3 - Training of trainer (ToT) for biodiversity inventory team. Because the East Java Forestry Services wanted to add more participants, they contributed to the budget, mostly for accommodation and transportation of additional participants who came from the province and district level in East Java.

The management of the budget became challenging, especially in phase II because we had to implement several activities almost simultaneously in 4 different locations. To avoid any funding delays from USAID BIJAK, the financial department made intensive communications with ARuPA program manager and executive director of the financial situation, and activities that are planned and implemented so that they can be executed on time which also implies in the report submission as the requirements of the fund transfer of each milestone.

B. Summary of Grant Activity Costs and Payments

Fixed amount award Chemonics Grant Total Milestone Variation Action Taken Budget Commitment Payments Milestone 1 IDR 15,900,000 - -

Milestone 2 IDR 49,420,000 - -

Milestone 3 IDR 62,820,000 - -

Milestone 4 IDR 101,800,000 - - - Milestone 5 IDR 88,480,000 -

Milestone 6 IDR 176,080,000 - -

Milestone 7 IDR 120,920,000 - -

Milestone 8 IDR 68,020,000 - -

Milestone 9 IDR 356,150,000 - -

Milestone 10 IDR 759,850,000 - -

Milestone 11 IDR 687,310,000 - -

Milestone 12 IDR 1,116,100,000 - -

Milestone 13 IDR 514,200,000 - -

Milestone 14 IDR 993,400,000 - -

30

Chemonics Grant Total Milestone Variation Action Taken Budget Commitment Payments Milestone 15 IDR 316,500,000 - -

Milestone 16 IDR 322,250,000 - -

Milestone 17 IDR 171,150,000 - -

TOTAL IDR 5,920,350,000

C. Explanation of higher or lower than anticipated costs

In activities implemented by ARuPA, all milestones and activities are completed. All the budget has been used for each of the activities. Most of the activities’ costs fell close to the budget. Only two activities were overbudget: activity 3.3.2 - Consolidation meeting for developing KEE institutional and management document of KEE Ujung Pangkah (I) and activity 3.3.2 - Consolidation meeting for developing KEE institutional and management document of KEE Ujung Pangkah (II). The over-budget was caused by the doubling of participants because all KEE Forum members are suggested to attend. Consequently, we had to provide a meeting package twice the original budget. We asked the hotel to reduce the selection of food/snack items in each pax to reduce the price and avoid excessive over-budget.

Regarding the milestone payments, at the beginning of phase II, some milestone payments were late because of the lateness of the signing of the modification of the agreement while we have to keep submitting the report of each milestone according to the schedule in the milestone. This situation forces some activities keep being implemented while the milestone funds were late to be disbursed. This situation also forces us to make more prefinance than predicted. But, in the middle of the implementation of phase II, the funding has been going well.

During the grant receipt process, several modifications were made:

• Modification I

Based on information from the Government of Indonesia Task Force for the Acceleration of Handling COVID-19, on June 28, 2020, the daily increases of positive cases of COVID in Indonesia averaged more than 1,000/day for the past week. Currently, the East Java Province is a Covid-19 red zone, with a cumulative number of 11,482 cases (http://infocovid19.jatimprov.go.id/index.php/data).

According to a notice issued by the Minister of Administrative Reform and Bureaucratic Reform No. 58 of 2020 on the work system of government employees in the new normal order, employees of central and regional agencies are encouraged to carry out meetings and communications activities through electronic media. In addition, official travel should be carried out selectively and only for priority and urgent reasons.

To comply with the government’s notice, ARuPA shifted its implementation methodology from conducting in-person events to using an online meeting platform. We conducted the Consolidation and Socialization program (activity #1.2) and Stakeholder mapping and KEE management gap analysis (activity #1.3) using the online meeting platform. This shift had two results: (1) a change in the deliverables produced; and (2) underspending of funds that were originally budgeted for the in-person events. Under this amendment, ARUPA allocated the

31

underspent funds to carry out a new activity, the social assessment of communities around KEE Teluk Pangpang (see activity #4.2).

• Modification II

The second modification was made because the four new locations were added into the project. Since the award in May 2020, ARuPA has collaborated with the East Java BBKSDA and Forestry Service to implement a pilot activity to improve the effectiveness of KEE management at the site level. This piloting focused on strengthening the institutional design of the KEE manager and the KEE management plan at the KEE Teluk Pangpang, Banyuwangi. After three months of piloting, The new approach taken by AruPA has been approved by the East Java BBKSDA and Forestry Service , where the new approach focused to strengthen and provide more intensive stakeholder collaboration, clarify roles and functions among KEE management forum members, and serve as the foundation to achieve effectiveness on KEE management. As a result, East Java BBKSDA and Forestry Agency has requested ARuPA to strengthen this process and replicate the good practices in KEE Teluk Pangpang to three additional locations.

Due to the success of the KEE pilot in Teluk Pangpang, modification no. 02 will expand the pilot activities to strengthen the effectiveness of KEE management in three additional locations, which are (1) KEE Ujung Pangkah in Gresik, (2) KEE Pantai Taman Kili-Kili in Trenggalek, and (3) KEE Masakambing in Sumenep. The expanded scope of work is summarized in Table 1 below.

With additional activities in 3 KEEs, modification 02 was made to extend the agreement period to April 30, 2021, and increase the budget for the implementation of the activities to Rp. 6,437,850,000, -

• Modification III

The third modification was made because the impact of Covid-19 was still in motion at that time. On February 10, 2021, BIJAK met with ARuPA to discuss the status of the activities, the impact of Covid-19, and the completion timeline for the remaining activities. Given the ongoing uncertainty with Covid-19, ARuPA agreed to reduce some activities that may delay the implementation of activities in the remaining weeks of the grant. As a result, ARuPA proposed these revisions to the activities: 1. Changes to the number of days of activity implementation and number of LOE of honorarium for experts on activities: • All Activities under #3.3 and Activities #4.2.3 through #4.2.6, #5.7, and #5.8 2. Cancellation of the following activities: • All Activities under #3.4 and Activity #4.1

With these changes, the overall impact on reducing the budget by Rp. 517,500,000 from the previous total budget of Rp. 6,437,850,000, -

32