ARCHITECT

Portfolio work Giuseppe D’ERRICO mail [email protected] PEC [email protected]

Cell +39 3336306240 P.iva : 056 44 70 12 10

2013

portfolio work

Name and surname: Giuseppe D’Errico

Place and date of birth : Napoli 28/07/1971

Location-Studio : Via Filippo Turati n° 4/ (NA)

Telepho:+39 081/8802006(Studio);+39 333/6306240 (Cell.) P.iva : 056 44 70 12 10

E-mail: [email protected] P.E.C. [email protected]

EXPERIENCE

THESIS -2002 June: Design of the new complex of the Second University of for the Faculty of Architecture and Engineering site in former Psychiatric Hospital Aversa (CE), Italy

2 WORK EXPERIENCE (Collaboration unsigned)

2002 Maggio : Collaboration on the project for renovation, rehabilitation and retrofitting of a building urban-rural in via c \ da Selva Paladina BN application of law 14/05/1981 n ° 219 et seq. mod. and int ;

2003 Luglio : Collaboration Company A.Mozzillo Executive Planning for renovations inside of an apartment located in Piazzetta Valentino Orta di Atella location Casapozzano CE Italy.

project Realization Realization

Realization WORK EXPERIENCE (Directly signed )

DESCRIPTION OF THE PROJECT DATE COST

PRIVATE BUILDING CLIENT: Dott. AURIEMMA Salvatore (NA) Definitive Project-Executive e D.L. Permesso a Costruire n°07/06 Lavori di Costruzione villetta unifamiliare in via Selva Trav. Via Vergara 06.02.06 €. 385.618,00 IMPORTO AGGIORNATO AL 06/02/2006 SECONDO GLI INDICI € 385.618,00 ISTAT DESIGN "SIGNED" SI COORDINATION IN SAFETY DESIGN SI DIRECTION OF WORK PERFORMED IN DATE 18/01/2008 SECURITY COORDINATION IN PROGRESS

CLASSE CATEGORIA IMPORTO IN €. I d 385.618,00

Project Realization

3 PRIVATE BUILDING CLIENT: SIG.ra FORIO Concetta CASTELLO DI CISTERNA (NA) Definitive Project-Executive e D.L. Lavori di Abbattimento e Ricostruzione Edificio a corte 22.03.04 €. 385.618,00 IMPORTO AGGIORNATO AL 22/03/2004 SECONDO GLI INDICI € 385.618,00 ISTAT DESIGN "SIGNED" SI COORDINATION IN SAFETY DESIGN SI DIRECTION OF WORK PERFORMED IN DATA 05/09/2006 SECURITY COORDINATION IN PROGRESS

CLASS CATEGORY COST IN €. I d 385.618,00

Stato di Fatto Project Realization

CLIENT: MAGA s.r.l. Amm. CHIACCHIO Maria GRUMO NEVANO (NA) Definitive Project-Executive Permesso a Costruire n°06/03 Variante n°01/08 Lavori di Abbattimento e Ricostruzione Edificio per N° 6 unità 22.03.06 €. 705.000,00 N° 2 Duplex e N° 4 Simplex in via Donizetti Grumo Nevano NA IMPORTO AGGIORNATO AL 22/03/2006 SECONDO GLI INDICI € ISTAT DESIGN "SIGNED" SI COORDINATION IN SAFETY DESIGN SI DIRECTION OF WORK PERFORMED IN DATA 22/02/2010 SECURITY COORDINATION IN PROGRESS

CLASS CATEGORY COST IN €. I d 705.000,00

Stato di Fatto Project Realization Realization

4

CLIENT: Fratelli TREVIGLIO Pasquale e Innocenzo (NA) Definitive Project-Executive e D.L. alle norme di legge Lavori di Ristrutturazione Locale Commerciale Pavim./Rivest e Deposito 18.09.06 €. 80.518,00 in via Napoli 186 Casandrino NA IMPORTO AGGIORNATO AL 18/09/2006 SECONDO GLI INDICI € 80.518,00 ISTAT DESIGN "SIGNED" SI COORDINATION IN SAFETY DESIGN SI DIRECTION OF WORK PERFORMED IN DATA 18/04/2007 SECURITY COORDINATION IN PROGRESS

CLASS CATEGORY COST IN €. I e 80.518,00

Stato di Fatto Project Project Project

CLIENT: ING. PECCE Vincenzo Apice (BN) Definitive Project - alle norme di legge Lavori di Progettazione N° 3 villette a schiera Montesarchio BN 18.09.07 €. 605.518,00

IMPORTO AGGIORNATO AL 30/06/2004 SECONDO GLI INDICI € ISTAT DESIGN "SIGNED" NO COORDINATION IN SAFETY DESIGN NO DIRECTION OF WORK PERFORMED IN DATA SECURITY COORDINATION IN PROGRESS

CLASS CATEGORY COST IN €. I e 605.518,00

Project Project Project

5

PUBLIC BUILDING

DESCRIPTION OF THE PROJECT DATE COST

CLIENT: COMUNE DI grumo nevano (NA)

Definitive Project-Executive alle norme di legge Lavori di ampliamento cavalcavia Grumo-S.Arpino 07.12.05 €. 575.677,00 IMPORTO AGGIORNATO AL 07/12/2005 SECONDO GLI INDICI € 575.677,00 ISTAT DESIGN "SIGNED" SI COORDINATION IN SAFETY DESIGN SI DIRECTION OF WORK PERFORMED IN DATA SECURITY COORDINATION IN PROGRESS

CLASS CATEGORY COST IN €. IX B 575.677,00

WORK EXPERIENCE (cooperation signed)

CONSULTING CO and design Preliminary-Final Executive performed in the office of Engineering and Planning, Ing. Vincent site in vico III Victory (NA) of the following works:

PUBLIC BUILDING

DESCRIPTION OF THE PROJECT DATE COST

CLIENT: COMUNE DI FRATTAMAGGIORE (NA) BUILDING WORKS Project-Executive alle norme di legge Lavori di sistemazione e Pavimentazione del Piazzale di via Florinfo Ferro 30.10.04 €. 304.000,00 IMPORTO AGGIORNATO AL 30/10/2004 SECONDO GLI € 304.000,00 INDICI ISTAT DESIGN "SIGNED" SI COORDINATION IN SAFETY DESIGN SI DIRECTION OF WORK PERFORMED IN DATA SECURITY COORDINATION IN PROGRESS

CLASS CATEGORY COST IN €. I d 304.000,00

6 WORK EXPERIENCE (collaboration and graphical representation)

P.I.P. dal 15/07/2004 al 15/05/2005 In the office of Engineering and Planning Ing.Gaetano Dell'Aversana in via E.Chiacchio Grumo Nevano (NA) Italy and contribution to the Preliminary Design and Final Executive and 3D representation of the following works :

PUBLIC BUILDING

DESCRIPTION OF THE PROJECT DATE COST

CLIENT: COMUNE DI PIETRAROJA (BN) BUILDING WORKS

Project-Executive alle norme di legge Lavori di sistemazione e Pavimentazione Piazza Vittoria 14.10.04 €. 262.800,00 IMPORTO AGGIORNATO AL 14/10/2004 SECONDO GLI € 262.800,00 INDICI ISTAT DESIGN Collaborazione COORDINAMENTO SICUREZZA IN Progetto Collaborazione DIRECTION OF WORK PERFORMED IN DATA SECURITY COORDINATION IN PROGRESS

CLASS CATEGORY COST IN €. I d 262.800,00

Project Project Project

7 Construction museum

Preliminary design of the renovation and conversion located in Civita for the implementation of the system of access to the Park Geopaleontologico 3.11.03 €. 398.000,00 IMPORTO AGGIORNATO AL 30/06/2004 SECONDO GLI €. 415.512,00 INDICI ISTAT DESIGN Collaborazione

COORDINATION IN SAFETY DESIGN DIRECTION OF WORK PERFORMED IN DATA SECURITY COORDINATION IN PROGRESS

CLASS CATEGORY COST IN €. I c 70.000,00 I g 65.000,00 IV c 21.000,00 VI b 70.000,00 VII a 90.000,00

Project

EDILIZIA CIMITERIALE

Progetto esecutivo di Sistemazione Cimitero Comunale completamento 14.10.04 €. 40.000,00 IMPORTO AGGIORNATO AL 30/06/2004 SECONDO GLI € 41.760,00 INDICI ISTAT DESIGN collaborazione e rappresentazione

COORDINATION IN SAFETY DESIGN DIRECTION OF WORK PERFORMED IN DATA SECURITY COORDINATION IN PROGRESS

CLASS CATEGORY COST IN €. I b 26.558,14

Project Project

8 DESCRIPTION OF THE PROJECT DATE COST

CLIENT: COMUNE DI SAN. LUPO (BN) BUILDING WORKS BUILDING SPORTS Preliminary Design System Sports (palestra coperta) 30/06/04 €. 516.456,90 IMPORTO AGGIORNATO AL 30/06/2004 SECONDO GLI €. 516.456,90 INDICI ISTAT

DESIGN collaborazione COORDINATION IN SAFETY DESIGN DIRECTION OF WORK PERFORMED IN DATA SECURITY COORDINATION IN PROGRESS

CLASS CATEGORY COST IN €. I c 183.342,20 III a, b, c 193.671,34 IV c 8.000,00 VIII 16.273,47

CLIENT: COMUNE DI FAICCHIO (BN)

BUILDING WORKS

BUILDING SPORTS Executive project completion excerpt Sports Ground 03.03.05 €. 288.000,00 IMPORTO AGGIORNATO AL 30/06/2004 SECONDO GLI € INDICI ISTAT DESIGN collaborazione e rappresentazione a COORDINATION IN SAFETY DESIGN DIRECTION OF WORK PERFORMED IN DATA SECURITY COORDINATION IN PROGRESS

CLASS CATEGORY COST IN €. I c 121.481,33 I g 51.531,99 III a, b, c 30.685,98

Project Project Project

9

BUILDING AND HOSPITAL CARE

Project Executive Home for the Elderly 1° Lotto adeguato 05/04/05 €. 560.355,73 RIFORMULATO IMPORTO AGGIORNATO AL 30/06/2004 SECONDO GLI € INDICI ISTAT DESIGN Collaborazione e Rappresentazione COORDINATION IN SAFETY DESIGN DIRECTION OF WORK PERFORMED IN DATA SECURITY COORDINATION IN PROGRESS

CLASS CATEGORY COST IN €. I c 100.681,52 I g 187.463,31 III a, b, c 52.716,72

Project Project

CLIENT:

A.S.L. BENEVENTO N°1 (Montesarchio)

BUILDING AND HOSPITAL CARE

Final design of a building to be used as the new headquarters of Sanitary District No. 19 of the City of Montesarchio 10.04 € 1.868.399,67 IMPORTO AGGIORNATO AL 30/06/2004 SECONDO GLI INDICI ISTAT DESIGN Rappresentazione

COORDINATION IN SAFETY DESIGN NO DIRECTION OF WORK PERFORMED IN DATA SECURITY COORDINATION IN PROGRESS

CLASS CATEGORY COST IN €. I c III a, b, c 178.808,39

10

CLIENT : COMUNE DI CASTEL DI SASSO (CE) BUILDING WORKS

BUILDING SPORTS Preliminary project completion Sports Ground 07.04.05 €. 300.000,00 IMPORTO AGGIORNATO AL 30/06/2004 SECONDO GLI INDICI ISTAT

DESIGN COLLABORAZIONE RAPPRESENTAZIONE

COORDINATION IN SAFETY DESIGN NO DIRECTION OF WORK PERFORMED IN DATA SECURITY COORDINATION IN PROGRESS

CLASS CATEGORY COST IN €. I c 241.158,00

WORK EXPERIENCE (worker employee )

Open-ended contract for Construction Company AKEI s.r.l. (CECA group) from 01/10/2006 to 31/12/2010 at the head office located in Via Napoli 189 City of Casandrino (NA); RSPP for construction company AKEI s.r.l.(CECA group) from 2008 to 2010; Technical Manager for construction company AKEI s.r.l. (CECA group) from 2009 to 2011; April 2010: By name I.M. s.r.l. (group CECA) Design Final restructuring No. 3 townhouses on a site Polveriera Old Santa Maria Capua Vetere (CE) Italy;

Project Project May 2010: By name Conglomerates s.r.l. (group CECA) Final Design / Executive restructuring and splitting in n° 2 units of apartment in Via Roma A.Rosmini 12th floor 3.

Project Project Project

I authorize the processing of my personal data in accordance with Law 196/2003. Napoli -Italy Dicembre 2012 IN FEDE Arch . Giuseppe D’ERRICO

11