www.aldonco.com IN FOR THE LONG HAUL: 110 YEARS OF RAILWAY SAFETY priceless . c n I ny, ny, FALL / WINTER 2014 a Copyright © 2014, 2014, © Copyright Comp Aldon

Since 1923 the Railroad 1 has been the transportation lifeline for the biggest state in the Union. Some 75 percent of Alaskans live along the rail line. Starting from the ice-free, deep water ports of Anchorage and Seward, the railroad snakes its way 467 miles north through some of the most spectacular and rugged scenery in North America, (and the harshest climate next to Siberia) to the terminus at Fairbanks. The is an unusual railroad: • It is the only major railroad ever built by the federal government. • It is entirely “landlocked,” with no rail connections with any other North American railroad. • Its only direct access to the lower 48 states is by barge and railroad car ferries which make the 1200 nautical mile voyage to . • It is the only U.S. freight railroad that still maintains regular passenger service. Building the Alaska Railroad 1914-1923

of native and peoples, the interior of Alaska Frederick Mears, a 5 was unexplored and inaccessible. Untold mineral wealth career Army officer and might lie beneath its permanently frozen subsoil, but in civil engineer was put 1867 there was no practical way to get at it, or bring it out. in charge of surveying and construction, at a Alaska remained undeveloped until 1897, when the salary of $10,000 per discovery of gold in the neighboring Canadian year. Mears had served awakened U.S. interest in its faraway territory. in the infantry during the Government geological expeditions were sent deep into Phillipine Insurrection the backcountry; they reported finding large reserves in the early 1900s in the of coal, copper and other minerals. By the early 1900s aftermath of the Spanish mining companies had begun exploiting these resources. American War. In 1906 Several shortline railroads were constructed to carry the he went to work on the coal and copper ore out. There were no rail connections Panama Canal, in charge through , so the loads had to be dumped of relocating the Panama 2 into barges at the port towns of Cordova and Seward railroad and operating it. and then towed 1200 nautical miles south to the nearest In 1914 the canal opened laska, our 49th state, was once U.S. port at Seattle. The shortlines soon found that and Mears was available owned by Russia. In 1867, needing operating in a sub-Arctic climate with essentially one way for an even greater money and worried traffic devoured challenge. that the British their profits. With a might seize Alaska for Canadian population in 1910 The building of the Alaska Railroad was an engineering territory, Russia offered to sell of less than 65,000 achievement comparable to the Panama Canal. its distant colony to the U.S. The people, Alaska Mears commanded an army of civilian workers American government was equally could not support and contractors, which at the peak of construction concerned that the British not a railroad run by numbered 4500. Except for what could be utilized of expand Canada. Secretary of State private enterprise. the existing shortline railroads, everything needed for William H. Seward negotiated a 3 If Alaska was ever a major railroad had to be created from scratch: rail treaty in which the August 1, 1867, the Treasury warrant to be developed, yards and depots, machine and repair shops, housing handed over $7.2 million ($119 authorizing the payment for Alaska the Federal for workers, hospitals, power plants, and sawmills million today) in gold bullion government would have to build a railroad and subsidize for converting tree trunks into cross-ties. Town sites, to the Imperial Russian its losses. streets and waterworks were laid out for the increase in Government, in exchange population which the railroad would bring. Engineers, for a vast wilderness, In Seattle, business interests saw such a possibility surveyors, track gang bosses, doctors and nurses, cooks twice the size of Texas, as a tremendous opportunity for their city. They and telegraphers, had to be hired; many of them that bordered the Arctic lobbied Congress hard to enact a railway bill. The were veterans of the Panama Canal construction. Circle. U. S. Navy was also interested in getting Alaska coal for their North Pacific squadron. In December 1913, Modern docks had to be built at Seward, on the The newspapers of the President Woodrow Wilson included a proposal for south coast and at Ship Creek, a small village at day called it “Seward’s an Alaska rail line in his State of the Union message, the head of on the Pacific side, which Folly,” and “Seward’s and declared: “We must use the resources of the would soon be re-named Anchorage. Into these Icebox,” and country, not lock them up.” new would come shiploads of rail, spikes, questioned the tie plates and switch stands; reels of telegraph and 4 value of acquiring On March 12, 1914, the Alaska Railroad Bill was telephone wire; timber and steel bridge sections, this remote and enacted into law. Congress appointed an engineering steam shovels, derricks, locomotives, freight and forbidding land of deep forests, wild rivers, commission to oversee the project, and gave it a simple passenger cars. With few roads into the outback, and towering mountain ranges. It was located mandate: build a rail line not to exceed 1,000 miles trucks were of little use. Thousands of horses were so far north that for weeks in winter the sun long that would connect Alaska’s Pacific coast with needed to haul equipment and supplies; each animal, barely rose, and for weeks in summer the sun its interior coal fields, and do it for $35 million ($842 kicking and whinnying, was lowered to the dock by barely set. Except for scattered settlements million today). a canvas sling under its belly. ALDON Company, Inc. | 3410 Sunset Avenue, Waukegan, Illinois 60087 | 847.623.8800 | aldonco.com | [email protected] By November 1914, the surveying parties had mapped out the main route for 8 From the Tropics to the Arctic: steam shovels the railroad. Starting from Seward on the Gulf of Alaska, the rails would run and side-dump cars that had once been used in north 467 miles — through Anchorage, then across mountain ranges with building the Panama Canal were now used to haul three of the highest peaks in North America, and ending at Fairbanks, a gold rock for the Alaska Railroad right-of-way. mining town on the Chena River.

Thousands of trees had to be felled to create the right of way; the trunks were sawn into ties. Private contractors were hired to clear and grade 100 foot sections called “stations.” Working 12 hour shifts, small groups of workers used horses pulling grading plows to smooth the ground so tie-laying crews could begin their work. Dynamite was used to blast away millions of cubic yards of rock. The broken rock was hauled away to be crushed for ballast and 6 fill. As soon as a new section of track was laid, supply trains could bring up rail and track components. These were transferred onto flat bed carts — or in winter onto sleds — pulled by teams of sturdy Percheron horses.

Mile by mile, the railroad advanced north during 1915 and 1916. Mears and his Laying ties on frozen ground. engineers had to build 8-1/2 miles of bridges and trestles — many built first in timber and then later more permanently in steel. There were three rivers to cross The half-way point in construction: and deep canyons to span. Seven tunnels had to be bored through the mountains. March 4 1919, a mixed train arrives The bridge builders worked all year, even in the depths of winter, when the at mile 227.

7 temperature could plunge to 60 degrees below zero. In the intense cold, boilers provided hot water to mix the cement and gravel and to keep the mixture from freezing before it could cure properly.

The long winter season — from October to May — brought frequent blizzards that buried tracks under huge drifts. To keep the line clear, several steam locomotives were needed to push the plow blades forward. Trains ran between walls of snow as high as 20 feet in places, after the worst storms. In spring, heavy snow melt brought floods that washed away gravel and undermined ties. 9

In April, 1917, the United States entered World War One. The Army sent Mears and With the completion of the Alaska Railroad, Mears resigned from Army service and half of his engineering and clerical staff to went to work for the Great Northern Railroad. He built the eight-mile long Cascade France, where they built railroads to sup- Tunnel in Washington State – another one of the great achievements of American Huge columns of smoke pour skyward from three coupled locomotives port the troops fighting on the Western engineering in the first half of the twentieth century. Mears never returned to Alas- pushing a snow plow Front. The manpower shortage on the Alaska ka. He died at the age of 67 in 1939. The Tanana River bridge was later re-named Railroad slowed but did not stop construction. the Frederick Mears Memorial Bridge. In August, 1919, when Mears returned from Europe to take charge again, he found that half the line had been completed. By September 1920, the track had reached the 264 mile point. The US Department of the Interior operated the Alaska Railroad from its begin- nings until 1967, when it was turned over to the Department of Transportation. Now the push was on to finish the job. In 1922, the last great bridge was completed – In 1985, the State of Alaska acquired ownership of the line and operates it today. across the Tanana River, which flows south of Fairbanks. The first train crossed the In the early years of operation the railroad lost money every year, with too little Tanana as crews were hammering the final rivets into the upper bridge framework. traffic going, in effect, “from nowhere to nowhere.” Congress had to pick up the deficit. Not until 1938 did Alaska’s population and economy reach the point of On July 15, 1923, President Warren G. Harding drove the ceremonial last spike – growth for the railroad to finally earn a profit. made of solid gold – to mark completion of the railroad. The gold spike was giv- en a light tap and then replaced with a steel spike. The president had to try three During World War Two, the Alaska Railroad proved to be vital in winning the times to set the spike into the tie. Now it was done. Eight years after the first war in the Pacific. In June 1942, Japanese military forces seized two small is- survey stakes were hammered into the ground, the line was open from Seward lands in the Alaska’s Aleutian chain which stretches a thousand miles into the to Fairbanks, at a cost of $60 million. This was $25 million over what the 1914 North Pacific. The railroad brought troops and armaments to drive them out, Congressional mandate had specified. and to keep military bases supplied at Anchorage and Fairbanks.

The bridge over Hurricane Gulch – in the heart of the Alaska Range – 918 feet long from end to end and 296 feet above a creek which runs into the Chulitna River. This photo, dated August 8, 1921, shows the last beam being dropped into place.

10 After the war, the railroad had become so important to the region that the References Photo Credits federal government spent $100 million in replacing the original 70 lb./yd. rail with heavier 115 lb. rail and replacing bridges worn out from heavy war- “Uncle Sam’s Experiment: TRAINS goes to Alaska,” TRAINS Magazine, April and May, 1 Frank Keller, time traffic. In 1985, after acquiring the railroad, the State of Alaska spent 1963. www.frankkeller.smugmug.com $70 million to restore the line. “Railroads Across North America, An 2 3 4 Wikipedia Illustrated History,” Claude Wiatrowski. Today the Alaska Railroad depends on freight for 65% of its revenues — “Portrait of the Alaska Railroad,” Kaylene 5 Library of Congress makes up half of its freight traffic, with coal, gravel, and other Johnson. commodities making up the balance. by rail is another source of 6 John Urban Collection; “Rails Across the Tundra, An Historical Album revenue. The Alaska Railroad operates passenger trains that make the run of the Alaska Railroad,” Stan Cohen. Anchorage Museum, from Anchorage to Fairbanks in twelve hours. Cruise ships docking at Alas- B1964.001.693 Wikipedia: “Alaska Railroad,” “Alaska kan ports often attach their own private passenger cars to Alaska Railroad Purchased,” “History of Alaska,” “Mears trains. From the comfort of glass-roofed dome cars, visitors can see Mount Memorial Bridge” The last four images are all from McKinley (at 20,322 feet, the tallest peak in North America) and marvel at “The Alaska Railroad,” THE ENGINEERING the Alaska Railroad Collection the unspoiled vastness of National Park — the same majestic scenery AND MINING JOURNAL, Nov. 7, 1914 of the Anchorage Museum first glimpsed by Frederick Mears and his construction crews back in 1914. Alaska Railroad Travel, www.alaskarailroad. 7 image, B1979.002.AEC.L31 com. 8 image, B1979.002.AEC.H6 We publish The Aldon Express periodically for the interest of “Get Mears!, Frederick Mears, Builder of the Alaska Railroad,” Katherine Carson 9 image, B1979.002.AEC.G1156 our rail-using customers. Crittenden. Previous issues can be viewed on our website at www.aldonco.com. There is a “Pocket List of Railroad Officials,” 4th Qtr 10 image, B1979.002.AEC.G1891 (this image has been colorized) small link on the top right of each page just below the locomotive. 2014, JOC Group. COLD WEATHER TOOLS Hatch Key® Pry Bar Track De-Icer Switch Broom Switch Point Heater

4124-08 Flame will burn 4023-19 Keep switch points and for 96 hours on three frogs clear of debris and snow. gallons of kerosene. 4123-129 Non-Flammable and Tough poly bristles on one end and dilutable. Five-gallon container chisel blade on other end. with handle

4020-16 Pops open frozen hatch covers on covered hopper cars. Weighs only 5 lbs. Worker MUSCULAR MAGNETS should be secured in fall protection gear. Super Magnet Picker-Upper

4124-61 In the shop or on a spur URETHANE track, it is easy to pick up a longlasting performance dropped wrench or tie plates or spikes. Handle length adjusts from 22” to 38”.

Nine Lives Wheel Wedge 4011-18 Replaces splintery oak wedges for chocking idle freight cars on storage tracks. Wheel can be moved over wedge when it is Magnet Base time to move the car. Wedge springs back Sign Holders to life. Apply car brake before installing. for flush or exposed rail 4015-54 Stands up to high winds. Sign plate not included. Magnet Base Flag Holders for flush or exposed rail Car Stopper 4015-55 4015-91 orange 4011-11 Bring slowly moving freight car Wind -proof magnet base with twin 4015-92 white to a stop by thrusting wedge in front of sockets for 7/8” diameter dowel. 4015-21 yellow wheel several times. Dowels and flags not included. MAGNET BASE LIGHTS 4015-22 green 4015-20 red 4015-12 blue 4015-120 yellow/red

Clip-On / Stick-On Lights Pocket Lights You have received this Express because your name is 4115-07 (blue), 4115-12 (clear), 4115-114 (blue), 4115-115 (red), on our mailing list for our free Track Clearance Marker 4115-11 (red), 4115-16 (amber) 4115-117 (amber) catalog. Please call if you Also available for flush rail Belt/vest clip and magnet base. Xenon 3-1/2” wide light fits in your pocket. would like to be removed 4015-144 Marker tells switching crew how bulb. Uses single D-cell battery. Brilliant 4 LED lights. Magnet base from this list or would like far they can push a car in towards a switch or and belt clip. Uses two AA additional copies: converging track before reaching “foul line.” batteries. 847.623.8800 ALDON Company, Inc. | 3410 Sunset Avenue, Waukegan, Illinois 60087 | 847.623.8800 | aldonco.com | [email protected] See our complete line of products online at www.aldonco.com ... or ask for our free catalog. Call us for help in choosing which products are best for your needs. SPUR TRACK BASICS TANK CAR SAFETY Cast Steel Wheel Chocks with rail- biting spurs for exposed or flush rail 4020-18 The spurs are replaceable. Tank Car Pry Bar Replace the spur, not the Much Better than a Crowbar! chock! Designed to engage the grab- Handles are available in handle of tank car manway covers. standard or extra-long lengths (as When using the pry bar, the worker shown). can stand upright and avoid the escaping fumes when the lid pops Derails free. Hinged style (as shown) 4024-157 1-way and 2-way hinged derails are avail- able for freight cars and locomotives. T-Wrench for Manway Cover Eyebolts Portable style (not shown) which requires Useful where 200 ft./lbs. or less torque is enough to no tools for installation, is available in 1-way loosen or tighten bolts. and 2-way models. 7/8” OD handle - Steel 4024-195 is available in spark-resistant aluminum 1-3/8” OD handle. Car Wheel Blocks Extra-Deep Sockets for more secure chocking 4” bolt clearance, all popular sizes, on flat track (left). hex or 8 pt. Steel Sockets Car Stops (max. torque 1500 ft./lbs.) Hinged or Fixed for exposed rail on flat track Spark-Proof Bronze (right). Sockets (max. torque 500 ft./lbs.) Sign Holders

4015-95 Foot Standard OSHA Sign Plates and Special Wordings DANGER Operated Hinged RAILCARS CAN MOVE 4015-01 Clamp-On Sign plates are not WITHOUT included with sign WARNING KEEP AWAY holders. BASIC TRUCK DOCK SAFETY

There is no stabilizing jack better than an Aldon stabilizing jack. Walk-In Aluminum Wheel Block

• Class 2G Acme screw threads for Easy to Install. a smooth fit and good support. Easy to Remove. • Removable bushing to allow replacement of screw assembly. The truck driver in his cab can • Swivel head tilts 9° to reduce see if the wheel side load bending force (except block is in place. 4013-06). Wheel block size: • Zerk fitting provides uniform and constant lubrication of 7” wide screw threads. 10-1/4” long • Bolt and washer prevent over- 8” high extension of screw. 4012-11 • Steel sleeve protects axle. • Spare parts always available. • Powder coated yellow finish. Four models to provide load capacity from 25,000 to 70,000 lbs.

Install a pair of jacks at front of trailer against the smooth underfloor and always in front of the kingpin.

short videos from 30 seconds to 3 minutes www.aldoninfo.com/videosEasy-Slide VIDEO LIBRARY 2 minutes

A video clip is worth a thousand words. Check out our mini-website for informative short videos on key rail safety products Easy-Slide 2 minutes www.aldoninfo.com/videos Switch Cube™ Indicator High Security Hatch Key® Pry Bar Pop-Up Derail Mouse Trap Roadmaster Freight Car Door Openers Switch Point Lock for Covered Sign-Holder Foot Operated Rolling Gauge Reader ALDOR for Outdoor Docks Hopper Cars Sign Holder EZ-Slide for Indoor Docks A video clip is worth a thousand words. Check out our mini-website for informative Easy-Slide short videos on key rail safetySwitchCube™ products Indicator High Security Hatch Key® Pry Bars 2 minutes 1 minute Switch Point Lock for Covered Hopper Cars www.aldoninfo.com/videos 30 seconds 40 seconds Tank Car Pry Bar How to Turn and Pry Bar for Sabertooth® Magnetic Base Tie Snugger Replace Aldon Steel Swing Gate Hopper Portable Derail Sign Holder Wheel Chock Spurs Cars

ALDON Company, Inc. | 3410 Sunset Avenue,www.ALDONCO.com Waukegan, Illinois 60087 | 847.623.8800 | aldonco.com | [email protected] 71

Tank Car Pry Bar Pop-Up Derail Mouse Trap SwitchCube™ Indicator High Security Hatch Key® Pry Bars 1 minute Sign Holder Sign Holder 1 minute Switch Point Lock for Covered Hopper Cars 1 minute 30 seconds 30 seconds 40 seconds

www.ALDONCO.comwww.ALDONCO.com 71 71

How to Turn, and Replace Pry Bar for Sabertooth® Portable Tank Car Pry Bar AldonPop-Up Steel Derail Wheel Chock SwingMouse Gate Trap Hopper Cars Derail 1 minute Sign HolderSpurs Sign30 Holder seconds 3 minutes 1 minute2 minutes 30 seconds www.ALDONCO.com 71

www.ALDONCO.com 71

How to Turn, and Replace Pry Bar for Sabertooth® Portable Aldon Steel Wheel Chock Swing Gate Hopper Cars Derail Spurs 30 seconds 3 minutes 2 minutes www.ALDONCO.com 71