COVENTRY & GATEWAY

Delivering Jobs and Growth

An overview of the application for planning permission made to District Council and City Council Autumn 2012 1 2 Preface

The Coventry & Warwickshire Development Partnership LLP was established to promote the development of land adjacent to for new employment.

It has taken its lead from Government following publication of “The Plan for Growth” and the “National Planning Policy Framework”.

It has welcomed the strong support it has received from the Local Enterprise Partnership.

3 4 CONTENTS

1 WHY...? 5 WHEN...? The Plan for Growth Consultation National Planning Policy Framework Masterplan Why Here? Phasing and Timeline

2 WHAT...? 6 HIGHWAYS Investment Public and Private Sectors come together Jobs Links with Highways Agency Scheme Strategic Highways

3 WHERE...? 7 LANDSCAPE Whitley Extensive Framework Stonebridge Biodiversity Enhancement Middlemarch The Airport 8 SUMMARY 4 HOW...? Technology Hub Logistics Park Highway Infrastructure

5 6 1 WHY...?

The fragility of the Country’s economic situation, as it has emerged over the last few years, is articulated very well by the Government and taken forward by the Local Enterprise Partnership.

The Coventry and Warwickshire Gateway scheme is established and the planning application is made within this context.

7 COVENTRY AND WARWICKSHIRE GATEWAY

WHY?

THE PLAN FOR GROWTH

In March 2011, shortly after the Government took Remarkably, “Our share of world exports has fallen Growth means development and Government office, it published its ‘Plan for Growth’, which from 4.4% in 2000 to 2.8% in 2009. Germany’s share recognises that its Plan for Growth is not without set out some disturbing and unpalatable facts of world exports actually rose from 8.5% in 2000 to controversy – “all of it involves choices about regarding the state of the Nation’s economy. 9.0% in 2009. priorities. But the alternative is to accept Britain’s economic decline and falling standards of living The report pulled no punches. Not only do we now export just a third as much as for our population”. Germany, we even lie behind the Netherlands, a It said; “If we do not act now, jobs will be lost, country a third of our size”. As an integral part of “The Plan for Growth”, our country will become poorer and we will find it WHY? Government has introduced a “presumption difficult to afford the public services we all want. As Government has said, “we literally cannot in favour of sustainable development” and it is If we do not wake up to the world around us, our afford to go on like this” and “….we must build a demanding the “opening up of more land for standard of living will fall, not rise”. new model of economic growth – where instead development”. of borrowing from the rest of the world, we invest, The Plan for Growth supported this contention and we save and we export”. Since March 2011, Government has set “clear with hard facts: expectations that local planning authorities and “Far reaching changes are needed to make our other bodies involved in granting development “In the World Economic Forum’s Global economy more competitive. Our economy needs consents should prioritise growth and jobs”. Competitiveness Index, we’ve fallen from 4th to to become much more dynamic, less burdened 12th. Manufacturing has halved as a share of our by pointless barriers and retooled for a high tech economy and 50% of all manufacturing jobs have future, if we are going to create the jobs and been lost”. prosperity we need for the next generation”.

8 COVENTRY AND WARWICKSHIRE GATEWAY

THE NATIONAL PLANNING POLICY FRAMEWORK

The NPPF formally introduces the concept These roles are mutually dependent, but the NPPF of a presumption in favour of sustainable makes it clear that sustainable development development. includes “making it easier for jobs to be created in cities, towns and villages”. In this regard, “sustainable means ensuring that better lives for ourselves don’t mean worse lives The NPPF requires local planning authorities for future generations”; and “development means to “proactively drive and support sustainable growth”. economic development to deliver the homes, business and industrial units, infrastructure and This uncompromising, unequivocal focus on thriving local places that the country needs growth follows the lead set by The Plan for Growth, to respond positively to wider opportunities for a year ago. growth”.

There are three dimensions to sustainable The NPPF reiterates that the Government is development; committed to securing economic growth in order to create jobs and prosperity and to ensuring that • An economic role, ensuring sufficient land of the planning system does everything it can to the right type is available in the right place, at support sustainable economic growth. the right time, to support growth; Importantly local planning authorities are required • A social role, supporting strong, vibrant and to identify strategic sites for local and inward healthy communities; investment to meet anticipated needs.

• An environmental role, to enhance the natural and built environment.

9 COVENTRY AND WARWICKSHIRE GATEWAY

WHY HERE?

The Coventry area has a high level of employment But that seems to be changing. Investment by deprivation in relation to the rest of with Jaguar Land Rover and Aston Martin indicates a clear socio-economic need for additional local potential reinvigoration of motor industry research, employment opportunities. development and manufacture, due in no small measure to the combination of a legacy of skills Coventry and its hinterland has long been known and the regular delivery of highly qualified, highly as a Centre of Engineering Excellence. motivated graduates from the Universities.

However, that exalted status had begun to slip; In order to sustain this turn around in economic economic prospects looked bleak. Peugeot prospects, space to carry out this research, ceased car manufacture and suppliers followed. development and manufacture has to be Browns Lane closed. available.

The evidence of a serious decline in economic At the moment, it isn’t...not in the right place or of health over the last ten years confirmed the the right type. deterioration, if not disintegration of a proud heritage. The Gateway aims to remedy this deficiency.

10 COVENTRY AND WARWICKSHIRE GATEWAY

Coventry University

COVENTRY

A46

Jaguar Whitley

A46 Warwick University

A45

KENILWORTH

Location

11 12 2 WHAT...?

The Coventry and Warwickshire Gateway is a strategic employment site intended to accommodate up to 10,000 jobs in a mixture of office, manufacturing and logistics space, funded and delivered by the private sector.

13 COVENTRY AND WARWICKSHIRE GATEWAY

COVENTRY UNIVERSITY ANSTY

COVENTRY CITY CENTRE

NEC & BIRMINGHAM INTERNATIONAL

LANDROVER JAGUAR WHITLEY

TOLL BAR ISLAND RYTON

COVENTRY & WARWICKSHIRE GATEWAY WARWICK REGIONAL ACCESSIBILITY UNIVERSITY M6 6.3 miles M69 8.1 miles M40 12.6 miles M42 13.6 miles STONELEIGH M1 22.0 miles

Sub - regional highway network

14 COVENTRY AND WARWICKSHIRE GATEWAY

WHAT? WHAT?

Taking the Government’s economic objectives The Gateway scheme is situated on land to the as its lead the Coventry and Warwickshire Local north and south of Coventry airport on land Enterprise Partnership (the LEP) has set a strategy predominantly within . It combines for economic and employment growth. This has public and private investment to resolve long been followed by Coventry City Council and standing difficulties on the strategic highway Warwick District Council who have begun to network along the A46 and A45. develop employment led strategies for growth. It is proposed as part of the sub region’s strategy As part of its Strategy the LEP has selected The for growth and its £250 million investment will help Gateway as the best and most appropriate to create 10,000 jobs directly on an area of about location to stimulate and foster economic and 100 ha (net) in automotive, aerospace and digital job growth and the City and District Councils are technology; in manufacturing and logistics and in now seeking to endorse the LEP’s position through support services and facilities. their planning strategies; it is within this context that a planning application has been made. Gateway will provide a mix of employment - generating buildings to accommodate all types “The Gateway is a scheme of major strategic of space, from small ‘grow-on” units suitable for importance for Coventry and Warwickshire. those innovative enterprises concentrated in high technologies, to large stand alone manufacturing “It represents a long-term opportunity to create and distribution units serving the wider sub high value jobs, attract inward investment and region. make major improvements to the infrastructure of the area. It is a once-in-a-generation Some buildings will be very high profile iconic opportunity.” structures flanking the A45, advertising the Managing Director of the Coventry and economic dynamism of the City. Warwickshire Local Enterprise Partnership

15 16 3 WHERE...?

Land north of the A45 (Whitley Business Park) already has planning permission but its development has stalled (in part) because of inadequate access. The Gateway scheme overcomes that difficulty and provides Jaguar’s World Head Quarters with an entrance it merits and needs. South of the A45 the proposal utilises ‘brownfield’, substantially contaminated (former) Sewage Disposal Works to provide manufacturing and logistics space in addition to a high profile Technology Park with an emphasis on automotive, aeronautical and digital businesses. It acknowledges the proximity of two villages and aims to mitigate impacts, especially through careful highway planning.

17 COVENTRY AND WARWICKSHIRE GATEWAY

The site occupies an urban edge location and is strongly influenced by existing uses, including Middlemarch and Stonebridge Business Parks, Coventry Airport and the A45/A46. The site comprises a mix of existing developed and despoiled areas, farmland and other undeveloped Jaguar areas.

Whitley Business Park The expansive boundary of the proposed application reflects the need to marry land use Stonebridge and transportation proposals.

It also allows landscaping work to be done to improve and restore the legacy of previous, Coventry Airport uncontrolled landfill operations.

The scale of this particular problem is not obvious Middlemarch to casual observation but dealing with matters of serious contamination is undoubtedly of significant environmental benefit.

Traffic congestion along the A46/A45 can cause serious peak time queuing. This is environmentally, socially and economically unacceptable and it is a situation which no doubt is stifling investment in the region.

The general extent of the Planning Application

18 COVENTRY AND WARWICKSHIRE GATEWAY

Contaminated land. Peak hour congestion. Heavy traffic through Baginton village.

KEY

Existing and Previous Land Uses

19 20 4 HOW...?

Investment will exceed £250m, with the delivery of up to 10,000 jobs, intended to be primarily in automotive, aeronautical and digital technologies as well as manufacturing and logistics.

Up to an additional 4,000 jobs could now be more readily provided in the Whitley Business Park as a direct result of the Gateway strategic highway works.

21 COVENTRY AND WARWICKSHIRE GATEWAY

Highways Significant improvements will be undertaken to the highway infrastructure. Whitley Business Park An existing planning permission to be improved significantly by new Jaguar World highway works to help to generate up to 4,000 jobs Headquarters

Technology Hub New Access Road The creation of a ‘Technology Hub’ Some airport buildings will need to with a bias towards automotive, be demolished to make way for the aeronautical and digital access road to service the Logistics technologies with appropriate Park. They will be rebuilt elsewhere ancillary uses, collectively to on the Airport, further away from create up to 4,000 jobs Baginton.

Green Space The development will promote the creation of enhanced habitat for Logistics Park wildlife with significant additional Up to 400,000 sq m of areas of publicly available open manufacturing and logistics space, extending fully around the buildings with the potential to perimeter of the site. create up to 6,000 jobs.

Stoneleigh Junction Strategic Landscape Is to be improved The development will be ‘framed’ by a new mounded and landscaped perimeter which will substantially screen the development from the outside view.

The Development Framework Plan

22 COVENTRY AND WARWICKSHIRE GATEWAY £250 million investment Up to 14,000 jobs

The economy in the UK is falling behind that of its competitors and the Government has said that “... we must build a new model of economic growth - where instead of borrowing from the rest of the world, we invest, and we save and we export.”

The Coventry and Warwickshire Gateway Scheme is proposed as part of this strategy for growth and its £250 million investment will help to create up to 14,000 jobs on land to the north and south of Coventry Airport. It responds to the Government’s demands that “Local planning authorities and other bodies involved in granting development consents should prioritise growth and jobs.”

The scheme is for the comprehensive redevelopment of land to the north and south of the A45 and to the north, west and south of Coventry Airport. KEY The proposal involves the remediation and re- use of significant areas of contamination and the creation of extensive areas of publicly accessible green space. Indeed, as a result of the proposal there will only be a small reduction in the net amount of previously unused green space: on land to the south of the A45 there will be a net reduction of about 16ha or 7% of the site area. Currently about 45% is either in built use or is previous landfill or sewage works. Proposed Land Use Plan

23 24 5 WHEN...?

A major public sector investment by the Highways Agency will start in earnest in April 2013.

This will ‘grade separate’ the Toll Bar junction and improve traffic flows through it.

The Gateway highway works will, however, benefit the strategic road network still further and a similar start date would allow this to happen.

25 COVENTRY AND WARWICKSHIRE GATEWAY

Extensive consultation with statutory bodies, groups and organisations has been ongoing for some time.

More than 25 presentations of the proposals have been given at various stages of the evolution of the plans.

Exhibitions and explanation of the proposals have taken place at Baginton, Whitley and during June and again in July.

Various Coventry Ward Forum meetings have been attended to supplement the exhibitions.

An assessment of the responses from all consultees has been made before finalising the components of the planning application. Changes have been made, where possible, to accommodate local issues and concerns, particularly with regard to highway matters at Baginton and around the Cheylesmore Ward of the City.

An extension and reinforcement of the perimeter mounding and planting was also introduced.

The Environmental Statement, submitted with the application, addresses all the relevant technical issues and explains how potential impacts will be mitigated.

Illustrative Masterplan

26 COVENTRY AND WARWICKSHIRE GATEWAY

A consideration of the application by the Local Planning Authorities is expected in December and, if they are minded to grant planning permission then it will be referred to the Secretary of State (as a Departure from the Development Plan) whose decision will be either to allow the planning permission to be issued locally or to call the application in for a Public Inquiry. ZONE B: UP TO 10,000 SQ M COULD BE OCCUPIED IN 2014, BEFORE TOLL BAR However, for the scheme to proceed in line with the Highways WORKS COMPLETED Agency’s investment, a start on site will be essential in April 2013, necessitating a commitment from Government earlier in the new year.

If this commitment is not given, then there are 2 consequences:

(i) New roads built by the Highways Agency would have to be, in part, dug up at a later date to accommodate The Gateway infrastructure;

(ii) The Gateway development would not be allowed to ‘interfere’ with Highways Agency construction work for at least 3 years, so implementation would at best be delayed for that period.

Phasing Plan

27 COVENTRY AND WARWICKSHIRE GATEWAY

DEVELOPMENT TIMELINE

The construction and job creation programme is set out, assuming a favourable decision in the Spring of next year.

The infrastructure works - including restoration and cleaning of despoiled land; construction of new highways; creation of development plots and formulation of the landscape framework will take place between 2013 and 2016.

First buildings, on the Technology Park, could be available in 2014, with development progressing over the next 10 years.

28 COVENTRY WARWICKSHIRE GATEWAY - A45 TOLLBAR

CONSTRUCTION & JOB CREATION PROGRAMME Outline 1st Occupa=on Tollbar & C&W Gateway Planning Technology Park Infrastructure Decision 100,000 sqL Complete C&W GATEWAY 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 PLANNING PROGRAMME Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

1) PLANNING APPLICATION SUBMITTED

2) CONSULTATION PERIOD

3) PLANNING DECISION

4) SECRETARY OF STATE DECISION

5) DISCHARGE CONDITIONS OF PLANNING -­‐ Precommencement detail design for start on site

HA TOLLBAR HIGHWAYS AGENCY TOLLBAR WORKS A45

6) HIGHWAYS AGENCY A45 issue CPO orders

7) HIGHWAYS AGENCY A45 commence stats u7lity diversions

8) HIGHWAYS AGENCY A45 tollbar works (3 years)

C&W GATEWAY CONSTRUCTION WORKS

9) TOLLBAR SLIP ROAD =e into site; and 10) NEW A45 OVERBRIDGE entrance to site

; works to be tendered

; works to be built in HA contract

11) DEVELOPMENT INFRASTRUCTURE all onsite & offsite roads

1st Technology Park Unit 12) TECHNOLOGY PARK 1st occupa7on -­‐ limited to 100,000sqL "KEY DATE" un7l ALL infrastructure in place 1st occupa=on of permanent jobs

13) INDUSTRIAL PARK 1st occupa=on -­‐ requires;

; works to ecology

; works to earthworks plots

; 1st Industrial units occupied 1st Industrial / Distribu7on Unit

C&W GATEWAY + ST MODWENS CONSTRUCTION & PERMANENT JOBS Up to 500 Infrastructure Construc=on Jobs 14) CONSTRUCTION JOBS -­‐ Infrastructure

Up to 2,500 Building Construc=on Jobs 15) CONSTRUCTION JOBS -­‐ Buildings

16) PERMANTENT EMPLOYMENT Up to 10,000 Permanent Employment Opportuni=tes C&W Gateway Jobs Up to 4,000 Permanent Employment Opportuni=tes St Modwen Jobs

29 30 6 HIGHWAYS

A comprehensive transportation solution requires close working with the Highways Agency and a coordination between the Highways Agency’s Toll Bar improvement and The Gateway delivery, would represent an efficient, effective and economic cooperation with widespread benefit.

31 COVENTRY AND WARWICKSHIRE GATEWAY

HIGHWAYS HIGHWAYS HIGHWAYS

Current access arrangements in and around the iii) Closure of the current Airport access onto The above package will be delivered in site are poor and in order to support development, Stoneleigh Road south of Baginton; accordance with a Phasing Programme, which will major improvements are needed. be agreed and formalised as part of the planning iv) Prevention (by financial penalty) of Gateway process. Based on an ongoing detailed appraisal of the development traffic using Baginton village current highway situation, the following primary roads. package of elements is proposed:- v) Part closure of Bubbenhall Road around i) Construction of a new grade-separated the southern edge of the Airport to allow junction onto the A45 Stonebridge Highway to emergencies and local use only; serve the Gateway site, and also the Jaguar Headquarters and Whitley Business Park vi) A new access road to serve the Logistics Park. development The new access road will require the demolition of airport buildings and their replacement ii) Construction of a new link-road through Jaguar elsewhere on the airport site Whitley to the A444, where the interchange with Leaf Lane will be replaced with an “all vii) Improvement through widening and/or better movements” junction, including a new bridge. signalisation of the; The existing north-bound slip road will be split into two at the junction, to resolve current A46/A428 Binley Road Roundabout; weaving issues; A45/A46 Stonebridge Island; A46 Stoneleigh Road Junction, (Warwick University) A45 St. Martin’s Island; HIGHWAYS A444 Whitley Roundabout.

32 COVENTRY AND WARWICKSHIRE GATEWAY

33 34 7 LANDSCAPE

Great care is being taken to acknowledge and respect the Green Belt status of the land. Whilst much of it is previously-used and contaminated, an extensive landscaped perimeter will aim substantially to screen the development from outside view; to create new habitat for flora and fauna; to offer opportunities for casual or formal recreation and to help to provide a high quality, environmentally sensitive development.

35 COVENTRY AND WARWICKSHIRE GATEWAY

Conservation of existing pasture fields and establishment of new woodland, tree and hedgerow planting and wetland habitats. Creation of circular walk from the settlement edge and the Fort, incorporating viewpoint, seating and interpretation

Creation of a new Community Park area, Conservation, enhancement and with conserved and new woodland and management of the existing Bird Sanctuary tree planting providing a “buffer” to the and surrounding riverside habitats for wildlife proposed development access road and benefits. Creation of an informal riverside airport beyond. To include new footways/ walk. cycleways, public open space,

Landscape “buffer” to the proposed development access road and airport, comprising mounding, woodland and tree planting, grassland and footway/ cycleway.

Potential new or future bridge over the River Avon – for pedestrians and cyclists. To offer the potential for access to the countryside and Ryton Pools County Park to the south. Formation of broad outer landscape corridor (typically 100 - 300 metres wide)

to include mounding, extensive woodland, Conservation of Rock Spinney and tree and hedgerow planting and habitat establishment of new woodland areas creation proposals. Continuous footway/ and other habitats to improve ecological cycleway link provided with connections to connectivity. existing points of access.

Landscape Framework Plan

36 Revision:

-

COVENTRY AND WARWICKSHIRE GATEWAY

A B C

37.8m 30.0m

83.50

81.65 81.57 80.76 80.21 Site boundary

Properties on Coventry Road Oak Close Properties on Oak Close Existing shrubs Grassed Area on mound Hard standing area and surrounds Existing close board fence to building (approx. 1.8m high)

Approx. 37.8m to existing airport building EXISTING Section A1 - Existing 1: 250@A1

87.21

83.50 5m above road level 82.21 81.65 80.76 80.21 Site boundary Existing Ground Level 3.4m high noise Footway Footway / barrier fence Properties on Coventry Road Oak Close Properties on Oak Close Existing shrubs cycleway on mound Removal of Building Development road Site boundary with 3m high Existing close board fence Formation of mounding Formation of road secure Airport fence (approx. 1.8m high)

Bollard style or low level lighting to the Approx. 67.8m to proposed development road footway / cycleway DURING CONSTRUCTION Section A1 - During Construction 1: 250@A1

67.8m

87.21 83.50 81.65 82.21 80.76 80.21 1.5m high noise Site boundary Roadside barrier fence Footway / column Footway / Existing shrubs Properties on Coventry Road Oak Close Properties on Oak Close Conservation grassland cycleway / lighting to cycleway on mound Mounding and native to lower slopes woodland / tree / shrub bridleway max 5m high planting Development road Site boundary with 3m high Existing close board fence 3.4m high noise Footway secure Airport fence (approx. 1.8m high) Conservation grassland barrier fence to lower slopes Bollard style or low level lighting to the footway / cycleway Approx. 67.8m to proposed development road DRAFT YEAR 1 Section A1 - Upon Completion Of Highway & Landscape Proposals 1: 250@A1 Coventry and Warwickshire Gateway

ALL LEVELS SHOWN ARE APPROXIMATE AND INDICATIVE AT THIS STAGE AND SUBJECT TO CONFIRMATION

A - Back of house on Oak Close B - Existing Hangar C - Position of Proposed Road

FPCR Environment and Design Ltd.

Figure 5.15 Photorealistic Cross Section - East Of Baginton (north) Section:LandscapeSection A1 - FrameworkExisting AndEast Proposed of Baginton

Drawing Status: Preliminary CAD Reference: - Drawn: CMW Date: September15/05/2012 2012 37 Section Location Plan 1: 5000@A1 Scale @A1: 1:250NTS @ A1 Project No: Drawing No: Rev: -4772 - E- This drawing, the works and concepts depicted are copyright of the consultant and may not be reproduced or made use of, either directly or indirectly without express written consent. All heights, levels, sizes and dimensions to be checked on site before any work is put to hand. Revision:

-

A B C

57.1m 24.2m

83.50

81.65 81.57 80.76 80.21 Site boundary

Properties on Coventry Road Oak Close Properties on Oak Close Existing shrubs on mound Hard standing area and surrounds Existing close board fence to building (approx. 1.8m high)

Approx. 57.1m to existing airport building EXISTING Section A2 - Existing 1: 250@A1

Revision:

-

87.21

83.50 5m above road level 82.21 81.65 80.76 80.21 Site boundary Existing Ground Level Footway Footway / Existing shrubs Footway / car park Properties on Coventry Road Oak Close Properties on Oak Close 3.4m high noise cycleway on mound cycleway / bridleway barrier fence Development road Existing close board fence Site boundary with 3m high Removal of Building Formation of road (approx. 1.8m high) Formation of mounding secure Airport fence Bollard style or low level lighting to the Approx. 81.3m to proposed development road footway / cycleway DURING CONSTRUCTION Section A2 - During Construction 1: 250@A1

81.3m

87.21 83.50 82.21 81.65 1.5m high noise 80.76 80.21 barrier fence Site boundary Roadside Mounding and native woodland / Footway / Footway column Footway / Existing shrubs Conservation grassland car park 3.4m high noise Properties on Coventry Road Oak Close Properties on Oak Close tree / shrub planting cycleway / lighting to cycleway on mound to lower slopes barrier fence bridleway COVENTRYmax 5m high AND WARWICKSHIRE GATEWAY Existing close board fence Conservation grassland Development road Site boundary with 3m high (approx. 1.8m high) to lower slopes secure Airport fence Bollard style or low level lighting to the Approx. 81.3m to proposed development road footway / cycleway DRAFT YEAR 1 Section A2 - Upon Completion Of Highway & Landscape Proposals 1: 250@A1 Coventry and Warwickshire Gateway A B C

57.1m 24.2m ALL LEVELS SHOWN ARE APPROXIMATE AND INDICATIVE AT THIS STAGE AND SUBJECT TO CONFIRMATION

A - Back of house on Oak Close 83.50 B - Existing Hangar A2 81.65 81.57 80.76 C - Position of Proposed Road A2 80.21 Site boundary

Properties on Coventry Road Oak Close Properties on Oak Close Existing shrubs FPCR Environment and Design Ltd. on mound Hard standing area and surrounds Figure 5.15 Existing close board fence to building Photorealistic Cross Section - East Of Baginton (approx. 1.8m high) LandscapeSection A2 - FrameworkExisting And Proposed

Drawing Status: Preliminary Approx. 57.1m to existing airport building CAD Reference: - EXISTING Drawn: CMW Section A2 - ExistingDate: 1: 250@A1 September15/05/2012 2012 Section Location Plan 1: 5000@A1 Scale @A1: 1:250NTS @ A1 Project No: Drawing No: Rev: -4772 - B- This drawing, the works and concepts depicted are copyright of the consultant and may not be reproduced or made use of, either directly or indirectly without express written consent. All heights, levels, sizes and dimensions to be checked on site before any work is put to hand.

87.21

83.50 5m above road level 82.21 81.65 80.76 80.21 Site boundary Existing Ground Level Footway Footway / Existing shrubs Footway / car park Properties on Coventry Road Oak Close Properties on Oak Close 3.4m high noise cycleway on mound cycleway / bridleway barrier fence Development road Existing close board fence Site boundary with 3m high Removal of Building Formation of road (approx. 1.8m high) Formation of mounding secure Airport fence Bollard style or low level lighting to the Approx. 81.3m to proposed development road footway / cycleway DURING CONSTRUCTION Section A2 - During Construction 1: 250@A1

81.3m

87.21 83.50 82.21 81.65 1.5m high noise 80.76 80.21 barrier fence Site boundary Roadside Mounding and native woodland / Footway / Footway column Footway / Existing shrubs Conservation grassland car park 3.4m high noise Properties on Coventry Road Oak Close Properties on Oak Close tree / shrub planting cycleway / lighting to cycleway on mound to lower slopes barrier fence bridleway max 5m high

Existing close board fence Conservation grassland Development road Site boundary with 3m high (approx. 1.8m high) to lower slopes secure Airport fence Bollard style or low level lighting to the Approx. 81.3m to proposed development road footway / cycleway DRAFT YEAR 1 Section A2 - Upon Completion Of Highway & Landscape Proposals 1: 250@A1 Coventry and Warwickshire Gateway

ALL LEVELS SHOWN ARE APPROXIMATE AND INDICATIVE AT THIS STAGE AND SUBJECT TO CONFIRMATION

A - Back of house on Oak Close B - Existing Hangar A2 C - Position of Proposed Road A2

FPCR Environment and Design Ltd.

Figure 5.15 Section: East of Baginton (south) Photorealistic Cross Section - East Of Baginton LandscapeSection A2 - FrameworkExisting And Proposed

Drawing Status: Preliminary CAD Reference: - Drawn: CMW Date: September15/05/2012 2012 38 Scale @A1: 1:250NTS @ A1 Section Location Plan 1: 5000@A1 Project No: Drawing No: Rev: -4772 - B- This drawing, the works and concepts depicted are copyright of the consultant and may not be reproduced or made use of, either directly or indirectly without express written consent. All heights, levels, sizes and dimensions to be checked on site before any work is put to hand. COVENTRY AND WARWICKSHIRE GATEWAY

Section: North of Bubbenhall

39 COVENTRY AND WARWICKSHIRE GATEWAY

Montage Viewpoint

40 COVENTRY AND WARWICKSHIRE GATEWAY

Montage Viewpoint

41 COVENTRY AND WARWICKSHIRE GATEWAY

Montage Viewpoint

42 COVENTRY AND WARWICKSHIRE GATEWAY

Montage Viewpoint

43 COVENTRY AND WARWICKSHIRE GATEWAY

Montage Viewpoint

44 COVENTRY AND WARWICKSHIRE GATEWAY

Montage Viewpoint

45

46

8 SUMMARY

• Public - Private sector co-operation to deliver significant strategic highway infrastructure benefits.

• Public sector funding to enable and assist private sector investment.

• Restoration of despoiled and contaminated land to provide a site for new buildings to accommodate up to 10,000 jobs.

• A range of jobs in a Technology Hub and a Logistics and Manufacturing Park to serve the wide ranging needs of the sub-region for the next decade.

• Almost half the site devoted to the new publicly accessible landscape and habitat creation.

• A landscape framework devised to substantially screen the development from outside view and to www.c-w-g.co.uk protect and enhance the local environment. 47 COVENTRY & WARWICKSHIRE GATEWAY

48