Passenger Amenities Details As on : 31/03/2012 Division : Bhopal
Total Page:16
File Type:pdf, Size:1020Kb
Passenger Amenities Details As on : 31/03/2012 Division : Bhopal Station Name Chhanera No. of passengers dealt with: Identified as Adarsh N Station Code CAER FOB 1 (a) Per Day 2082 Developed As Adarsh Station Category E Subway 0 (b) Max. at any time 297 Identified for MFC N Railway WCR Booking Windows 1 Pass. Earnings/Year(Rs. in Lac.) Division Bhopal Enquiry Office 0 2006-07 58.03 Tourist Facilation Center N State Madhya Pradesh Public Address Sys. Y 2011-12 59.5 Touch Screen Enquiry System N District Khandwa (East Clock Y Length of longest stopping train(m) 405 Electronic Train Indication N Nimar) Section KNW-ET Wheel Chairs Y MP Const. Betul ATMs 0 Km. 612.707 Cloak Room N MP Name Jyoti Dhurve Food Plaza N Route B Refreshment MLA Const. Harsud Budget Hotel N Room(sqm) Electrified Y MLA Name Kunwar Vijay Shah Trains Halting Other Items Sufficent Station IInd Entry N Remarks for Station: Good Resting Facility WAITING HALL WAITING ROOM GENTS LADIES UPPER CLASS WAITING ROOM (a) Area(sqm.) 34 Area(sqm) 0 0 Area(sqm) 0 Retiring Room 0 (b) Seats(Nos.) 6 Seats(Nos.) 0 0 Seats(Nos.) 0 Dormitory 0 (c) Lav.(Nos.) 0 Lav.(Nos.) 0 0 Lav.(Nos.) 0 (d) Urinals(Nos.) 0 Urinals(Nos.) 0 0 Urinals(Nos.) 0 (e) Bathing Cubicals(Nos.) 0 Bathing Cubicals(Nos.) 0 0 Bathing Cubicals(Nos.) 0 Circulating Area and Water Supply Circulating Area Approach Road Water Supply Area (sqm) 4000 Length(m) 150 Source Railway Supply Open Wells (Nos) 0 Surface Cement Concrete Surface Black Topped Type Piped Bore Wells (Nos) 1 Illumination Type High Mast Tower Illumination Type Y Storage Capacity(Ltr) 45000 Pay & Use Toilet Remarks During summer water supply is arranged from pvt.parties Page : 1 of 2 Report Run Date : 20/08/2013 4:44:49 PM Station Name : Chhanera Platform Detail PF PF (m.) (m.) (m.) Nos. Carr. (cm.) No. sq.m. Board Height Coach Gauge Length Shelter Breadth Lift Nos. Vending Surface* Lav.Nos. Watering Island PF FOB(No.) Stall Nos. Indication Washable Apron(m.) Fans Nos. Taps Nos. Trees Nos. Seats Nos. Lights Nos. CC-TV Nos. Ramp along Urinals Nos. Hand Pumps FOBs (No.) on Escalator Nos. 1 DN BG N 540 9 84 PS 576 0 12 0 0 0 73 4 1 4 19 1 0 0 0 0 Y 0 2&3 UP BG Y 540 10 84 PS 672 0 12 0 0 0 73 4 1 4 24 1 0 0 0 0 N 0 *Surface Type : CC-Cement Concrete PS-Polished Stone OPS-Other Pucca Surface MOR-Moorum OTH-Others Station Name : Chhanera Summary (As per Railway Board's Letter No. 2012/LM (PA)/3/5) Dt. 11.09.2012) Item -> Waiting Hall Shelter TAP/HP Lavatories Urinals Seats FOB Height of No of Water Signage (sqm) (sqm) (nos) (nos) (nos) (nos) (nos) Platforms Coolers Min. Facility 15 100 sqm 4 tap/HP at stn 1 1 20 0 Rail level 0 - As per Rec. norms 186 166 12 1 1 53 - - Actual 34.11 1247.87 24 8 2 152 1 See 1 - platform Shortage, if any - - - - - - - details - - Page : 2 of 2 Report Run Date : 20/08/2013 4:44:49 PM.