9.0 CREATING VALUE

Umgeni Water ensures reciprocal Umgeni Water continuously reviews water All potable and wastewater sampling and value propositions are cultivated with quality risks associated with abstraction, analysis are undertaken in accordance with customers and stakeholders. Value is conveyance, treatment and bulk distribution an ISO 9001 certifi ed monitoring programme created by actively applying the entity’s to ensure that the effectiveness of controls and SANAS 17025 accredited laboratory core and distinctive competencies to is maintained and that water quality is methods. In line with our stakeholder meet identifi ed needs. assured. Furthermore, potable water quality communication plan, information on water incidents are managed in accordance with an quality performance is regularly conveyed 9.1 PRODUCT Incident Management Protocol aligned to the to customers, stakeholders and regulators. QUALITY requirements of the South African National Drinking Water specifi cation (SANS 241). POTABLE WATER QUALITY PERFORMANCE MANAGEMENT APPROACH In addition to ensuring safe drinking water, SANS 241:2015 dictates compliance Umgeni Water is committed to providing Umgeni Water is also responsible for ensuring requirements for potable water systems and all its customers with safe potable water, that wastewater discharges are not harmful requires performance to be reported against which is suitable for lifetime consumption. to the environment and downstream users. the following fi ve risk categories (as per the This is achieved through implementing This is achieved through development classifi cation tabulated further below): a rigorous water quality management and implementation of wastewater risk programme throughout the supply system. abatement plans. This process includes, This programme is based on a comprehensive, but is not limited to; comprehensive and site- (1) Acute Microbiological Health; risk-based approach which includes carefully specifi c risk assessments and implementation (2) Acute Chemical Health; planned monitoring programmes, water of agreed mitigation plans. Site-specifi c (3) Chronic Chemical Health; quality assessments, system audits and wastewater incident management protocols (4) Aesthetic; and compliance reporting – conducted from have been developed and implemented (5) Operational categories. catchment to consumer and governed by to guide the management of wastewater the implementation of water safety plans. incidents and non-compliances.

Key to Classifi cation of the Performance of Drinking Water Supply Systems According to SANS 241: 2015

Members Population up to 100 000 Population > 100 000 Proportion of Samples Compliant Proportion of Samples Compliant

Excellent Good Unacceptable Excellent Good Unacceptable Acute Microbiological Health ≥97% ≥95% <95% ≥99% ≥97% <97% Acute Chemical Health ≥97% ≥95% <95% ≥99% ≥97% <97% Chronic Chemical Health ≥95% ≥93% <93% ≥97% ≥95% <95% Operational ≥93% ≥90% <90% ≥95% ≥93% <93% Aesthetic ≥93% ≥90% <90% ≥95% ≥93% <93%

68 UMGENI WATER • AMANZI ANNUAL REPORT 2017/2018 1.0 REPORT PROFILE PG 6

2.0 ORGANISATIONAL PROFILE PG 8-17

3.0 MINISTER’S FOREWORD PG 18-2318-23

4.0 CHAIRPERSON’S REPORT PG 24-29

5.0 CHIEF EXECUTIVE’S REPORT PG 30-39

6.0 CORPORATE GOVERNANCE PG 40-53

7.0 STAKEHOLDER UNDERSTANDING AND SUPPORT PGG 54-5954 59

8.0 PERFORMANCE AGAINST 2017/2018 SHAREHOLDER COMPACT PG 60-67

9.0 CREATING VALUE PG 68-87

10.0 CONSERVING OUR NATURAL RESOURCES PG 88-9988-99

11.0 ENABLING OUR PEOPLE PG 100-109

12.0 IMPROVING RESILIENCY R918 MILLION PG 110-117 spent on maintenance 13.0 FINANCIAL over the past fi ve years SUSTAINABILITY PG 118-197

14.014 0 GRI CONTENT INDEX PG 1198-20398-203 MIDMAR WTW

UMGENI WATER • AMANZI ANNUAL REPORT 2017/2018 69 Overall, compliance of the Umgeni Water bulk potable water supply systems was excellent for the reporting period. Compliance per SANS 241:2015 risk category is shown in Figure 9.1 and the more detailed potable water quality compliance per water supply system is shown in Table 9.1.

Figure 9.1: Umgeni Water Bulk Systems Potable Water Quality Compliance (%) with SANS 241 99.97 100.00 99.35 99.94 99.97 100.00 99.46 99.96 99.85 100.00 99.93 98.94 99.79 99.87 100.00 99.87 99.34 99.84 99.98 100.00 99.85 99.48 99.88

2014 2015 2016 2017 2018

Acute Microbiological Health Acute Chemical Health Chronic Chemical Health Operational Aesthetic

Table 9.1: 2017/2018 Potable Water Quality Compliance (%) with SANS 241:2015 per Water Supply System

Water Supply System Average % Volume Per cent Compliance with SANS 241:2015 Daily Volume Acute Acute Chronic Operational Aesthetic (Ml/d) Microbiological Chemical Chemical Health Health Health 1 Heights 476.1 36.99% 100 100 100 99.98 100 2 Wiggins 255.0 19.81% 100 100 100 99.84 100 3 Midmar 238.9 18.56% 100 100 100 99.85 100 4 DV Harris 91.9 7.14% 100 100 100 99.85 100 5 78.7 6.12% 100 100 100 99.38 99.92 6 Hazelmere 55.8 4.33% 100 100 99.86 99.63 100 7 Lower Thukela 22.2 1.72% 100 100 100 99.35 100 8 14.6 1.14% 99.57 100 99.75 97.41 99.11 9 14.6 1.13% 100 100 98.67 99.68 100 10 11.8 0.92% 100 100 99.63 99.65 100 11 Mhlabatshane 4.4 0.34% 100 100 98.75 90.43 97.75 12 Maphephetheni 3.6 0.28% 100 100 100 99.65 100 13 Ixopo 2.4 0.19% 100 100 100 99.71 99.34 14 Mpofana 5.7 0.44% 100 100 100 99.05 99.58 15 Appelsbosch 0.4 0.03% 100 100 100 92.08 100 16 Rosetta 0.2 0.01% 100 100 100 99.64 98.55 17 Lidgetton 0.1 0.001% 100 100 100 97.20 99.22

70 UMGENI WATER • AMANZI ANNUAL REPORT 2017/2018 COMPLIANCE PER SYSTEM WASTEWATER QUALITY PERFORMANCE 1.0 REPORT PROFILE PG 6 Sixteen (16) bulk water supply systems Figure 9.2 and Table 9.2 show wastewater quality compliance per system, assessed complied with the excellent requirements against the relevant licence or General Authorisation General Limits prescribed by the 2.0 for all risk categories specifi ed in SANS Department of Water and Sanitation (DWS). ORGANISATIONAL 241:2015 Drinking Water specifi cation. PROFILE PG 8-17

Figure 9.2: Wastewater Quality Compliance (%) The Mhlabatshane system achieved 3.0 90.43% compliance with the Operational 88.3 MINISTER’S 86.6 84.7 84.6 81.4 81.4 81.7 FOREWORD Risk Category against a target of ≥ 93%. 78.9 PG 18-2318-23 This was as a result of the Water Treatment Works operating above its design capacity due to high demands, leading to turbidity 4.0 CHAIRPERSON’S and chlorine failures. REPORT PG 24-29

Various process optimisation initiatives are 5.0 already in progress to improve compliance. CHIEF These include the re-commissioning of the EXECUTIVE’S REPORT 2 Ml/d package plant to reduce strain on PG 30-39 the Water Treatment Works and the upgrade 2014 2015 2016 2017 2018 of the chlorine-dosing unit to match the 6.0 CORPORATE increased production levels. Umgeni Water Bulk Wastewater uMgungundlovu Wastewater GOVERNANCE PG 40-53

7.0 Table 9.2: Wastewater Compliance per Treatment Works STAKEHOLDER UNDERSTANDING AND SUPPORT Wastewater Treatment Average Daily 2014 2015 2016 2017 2018 2018 PGG 54-595459 Works Volume Treated Target Actual

(Ml/d) (%) 8.0 1 Darvill 67.2 83.7% 78% 85% 82% 72% ≥ 80% 73.8% PERFORMANCE AGAINST 2017/2018 2 Howick 5.5 6.9% 87% 87% 89% 86% ≥ 85% 91.1% SHAREHOLDER COMPACT 3 Ixopo 0.5 0.6% 95% 96% 93% 94% ≥ 85% 96.0% PG 60-6760-67 4 Lynnfi eld Park 0.2 0.3% 66% 87% 86% 96% ≥ 85% 95.9% 5 Mpofana 5.6 7.0% - - 65% 72% ≥ 60% 78.0% 9.0 CREATING VALUE 6 Richmond 0.6 0.7% - - 89% 87% ≥ 85% 93.9% PG 668-878-87 7 Cool Air 0.4 0.5% - - 90% 98% ≥ 85% 98.2%

8 Camperdown 0.2 0.2% - - 91% 97% ≥ 85% 91.7% 10.0 CONSERVING 9 Applesbosch 0.1 0.1% - - 94% 91% ≥ 85% 81.9% OUR NATURAL RESOURCES PG 88-9988-99

COMPLIANCE PER SYSTEM 11.0 ENABLING Two (2) WWTWs did not meet the set targets: OUR PEOPLE PG 100-109100-109

Darvill WWTW achieved 73.8% against the target of 80% (6.2% variance). The non-compliance recorded for Darvill WWTW was mainly 12.0 due to process overloading, construction related activities, power outages and intermittent spillages of the storm dam. The completion of IMPROVING the works upgrade project remains critical to increase capacity and improve effl uent compliance. Furthermore, the proposed constructed RESILIENCY PG 110-117 wetland, for detention of some storm dam spills, will also have a signifi cant benefi t once completed.

13.0 Applesbosch WWTW did not meet the set target of 85%, achieving 81.9% during the reporting period (3.1% variance). Challenges FINANCIAL SUSTAINABILITY experienced at Appelsbosch WWTW included aerator failures, power problems, poor clarifi cation and loss of activated sludge and sewage PG 118-197 solids to ponds. Disinfection challenges also contributed to non-compliance. However, one of the Darvill WWTW supplementary fl oating aerators was installed at Appelsbosch WWTW to replace the old aeration units. This aerator is now functional and is benefi tting the process. 14.014 0 GRI CONTENT INDEX PG 1198-20398-203

UMGENI WATER • AMANZI ANNUAL REPORT 2017/2018 71 9.2 CUSTOMER SATISFACTION

GEOGRAPHICAL MARKETS AND CUSTOMERS

Umgeni Water has identifi ed the following markets for growth of water services (water and wastewater) and water related services: 1. KwaZulu-Natal: water services and other related activities. 2. : water services and other related activities on demand. 3. Rest of Africa: knowledge management, networking and responding to bi-lateral agreements between South Africa and other countries.

Within KwaZulu-Natal, bulk water and wastewater services and/or water related services will progressively be increased in customer areas: 1. eThekwini Metropolitan Municipality: Retain and grow 2. Msunduzi Local Municipality: Retain and grow 3. iLembe District Municipality: Retain and grow 4. uMgungundlovu District Municipality: Retain and grow 5. Harry Gwala District Municipality: Market penetration 6. Ugu District Municipality: Market penetration 7. uThukela District Municipality: Market development 8. Newcastle Local Municipality: Market Development (Demand driven) 9. Amajuba District Municipality: Market Development (Demand driven) 10. uMzinyathi District Municipality: Market Development (Demand driven) 11. King Cetshwayo District Municipality: Market Development (Demand driven) 12. uMkhanyakude District Municipality: Market Development (Demand driven) 13. uMhlathuze Local Municipality: Market Development (Demand driven) 14. Zululand District Municipality: Market Development (Demand driven)

BULK PROVISION AND receiving systems, mindful of the quality Treatment works’ capacities and utilisation are INFRASTRUCTURE ASSETS and potential impacts on receiving systems shown in Figure 9.4 (a) and (b) respectively. as well as potential for reuse. The core bulk water and wastewater In the year, there were zero (0) supply days business is undertaken in a manner that Umgeni Water’s infrastructure assets in with unplanned supply disruptions that most effectively serves customers and support of water business comprise of: exceeded 24 hours across all seventeen (17) stakeholders. As part of the value chain • Approximately 897 kilometres of pipelines supply systems. Where disruptions occurred, function, raw water is carefully abstracted and fi fty-three (53) kilometres of tunnels; supply was successfully restored in these from dams, rivers and borehole sources systems within 24 hours. Customers are kept • Fourteen (14) impoundments; and conveyed using both gravity and the informed on progress of any interventions. most effective pumping options to bulk • Seventeen (17) Water Treatment Works; and Umgeni Water continues to engage regularly water treatment works, where it is treated • Nine (9) Wastewater Treatment Works. with its customers in line with service level to meet SANS 241 quality standards and agreements. distributed to customers. A total of 435 million cubic metres of potable water per annum (1 191 Ml/d) are The entity treated bulk wastewater totalling Equally, with regards to wastewater treatment, currently supplied to customers (Figure 9.3) 32 million cubic metres per annum (87 Ml/d). infl uent is received from municipal sewer who serve a population of 6.7 million or Wastewater Treatment Works’ capacities systems, treated at bulk Wastewater Treatment 1.9 million households through reticulation and utilisation are shown in Figure 9.4 Works and effl uent discharged back into networks. (c) and (d) respectively.

72 UMGENI WATER • AMANZI ANNUAL REPORT 2017/2018 Figure 9.3: Customer Volumes Supplied (million m3) 1.0 REPORT PROFILE 447 PG 6 440 436 435 426 423 416 415 417 410 404 2.0 ORGANISATIONAL 374 PROFILE PG 8-17

316 3.0 MINISTER’S FOREWORD PG 18-2318-23

4.0 CHAIRPERSON’S REPORT 20062007 20082009 2010 2011 2012 2013 2014 2015 2016 2017 2018 PG 24-29

5.0 CHIEF EXECUTIVE’S BULK SUPPLY AGREEMENTS REPORT PG 30-39 Bulk Supply Agreements are concluded to cover obligations of both Umgeni Water and its customers in relation to water volumes, water quality, supply pressure, service interruption intervals, metering, tariff consultation, assurance of supply and capital infrastructure plans. 6.0 In 2017, Umgeni Water successfully concluded a supply agreement with uThukela District Municipality. CORPORATE GOVERNANCE PG 40-53 Water demand projections are updated based on trends in historical water sales volumes and customer demand trends. In parallel, analysis of Umgeni Water’s bulk infrastructure and water works capacity, in relation to demands, highlight any infrastructure supply constraints 7.0 STAKEHOLDER or limitations on future growth that need to be responded to. UNDERSTANDING AND SUPPORT PGG 54-595459 Figure 9.4 (a): WTW Capacity (Ml/d)

8.0 PERFORMANCE AGAINST 2017/2018 SHAREHOLDER Durban Heights, 614 Maphumulo, 6 COMPACT Wiggins, 350 Maphephetheni, 5 PG 60-6760-67 Midmar, 250 Ixopo, 3.2

DV Harris, 110 Mzinto, 1.2 9.0 Hazelmere, 75 Appelsbosch, 0.70 CREATING VALUE PG 668-878-87 Lower Thukela, 55 Mpofana, 0.7 Amanzimtoti, 24 Lidgetton, 0.50 Mtwalume, 7.5 Mhlabatshane, 0.4 10.0 CONSERVING Rosetta, 0.26 OUR NATURAL RESOURCES PG 88-9988-99

11.0 ENABLING OUR PEOPLE Figure 9.4 (b): WTW% Utilisation PG 100-109100-109

170% 160% 12.0 IMPROVING RESILIENCY 110% 114% PG 110-117 99% 99% 96% 91% 80% 84% 79% 83% 85% 74% 75% 13.0 65% FINANCIAL 60% SUSTAINABILITY PG 118-197 30% 24% 14.014 0 GRI CONTENT 0% INDEX PG 1198-20398-203

Ixopo Wiggins Midmar Mzinto Rosetta DV Harris Mpofana Lidgetton Hazelmere Mtwalume Amanzimtoti Maphumulo Appelsbosch Lower Thukela Mhlabatshane Durban Heights Maphephetheni

UMGENI WATER • AMANZI ANNUAL REPORT 2017/2018 73 Figure 9.4 (c): WWTW Design Capacity (Ml/d)

Darvill, 75 Ixopo, 1.0 Howick, 6.8 Appelsbosch, 0.5 Mpofana, 5 Camperdown, 0.5 Richmond, 2 Lynnfi eld Park, 0.2 Cool Air, 1.5

Figure 9.4 (d): WWTW % Utilisation

170%

129%

99% 97% 84% 85%

45% 40% 42% 28% 16%

0%

Darvill Ixopo Howick Cool Air Richmond Mpofana Appelsbosch Lynnfi eld Park Camperdown

SUPPLY CAPACITY and metering. Structured consultation priorities and funding and fi nancing will AND CONSTRAINTS for communication of future demands, become the focus over the next few years. Customer engagement and consultation is Several works, as shown in Figure 9.4 (b) infrastructure plans and tariff assumptions core to Umgeni Water successfully extending are currently operated above their design took place, and robust customer inputs access to unserved areas in KZN. capacity to meet demands and both long received. In the past year, additional and short-term interventions are in place engagements focussed on implementation SUPPORT TO RURAL of emergency interventions to alleviate to address these, including major works MUNICIPALITIES capital upgrades, refurbishments, pipeline constraints caused by the drought, developments, utilisation of package plants agreements on water restrictions that needed Umgeni Water provides support to vulnerable (interim measure) and general operational to be imposed and collaborative engagement customers to implement projects that aim and process upgrades to alleviate bottlenecks. of end users regarding judicious use of to improve service delivery. In the past year, water supplies. support was provided to the following OPERATIONAL PERFORMANCE customers: AND SERVICE PLANNING Conceptual plans for growth and expansion • Ugu District Municipality for water quality monitoring; Umgeni Water meets with all customers of water services and provision of universal on a formal basis during the year to assess access have been developed, for existing • Harry Gwala District Municipality for water performance as per the signed customer bulk and new customers in KwaZulu-Natal quality monitoring; and supply agreements. Customer requirements (KZN). Discussion and communication • uMgungundlovu District Municipality for were signifi cantly met in relation to supply with customers and stakeholders water quality sampling, analysis and volumes, supply pressure, service levels regarding these, notably, implementation meter reading.

74 UMGENI WATER • AMANZI ANNUAL REPORT 2017/2018 DROUGHT MANAGEMENT ASSET CONDITION, MAINTENANCE Assessments of the condition of assets 1.0 REPORT PROFILE AND MANAGEMENT remain a vital part of determining the PG 6 In the past year, rainfall received in the useful life and future investments required Mgeni Catchment Area was slightly above Regular maintenance and inspection of all to maintain the level of service to customers. assets were undertaken during the reporting 2.0 average and improved the storage in the ORGANISATIONAL dams of the Mgeni Catchment to a level period as an intrinsic part of continued PROFILE In the year, the total asset maintenance PG 8-17 where curtailments could be lifted. The efforts operations management. spend was R213 million (Figure 9.5). made by all stakeholders during the drought Over the years, Umgeni Water has continued 3.0 period ensured that the water resources Maintenance is implemented in accordance MINISTER’S to maintain its assets and on average, invests available were suffi cient to supply the basic with the asset management strategy and FOREWORD 7.6% of its revenue on asset maintenance. PG 18-2318-23 needs of all parties. Lessons learnt during implementation plan for the year. Based on assessments conducted over the the drought have been documented and past year, there are no assets that pose these will be used to inform more effective This comprises planned maintenance - 4.0 signifi cant risk to supply and the organisation CHAIRPERSON’S early warning systems, including risks and inclusive of preventative maintenance, REPORT envisages no major interruptions to its PG 24-29 strategies that would best be implemented repairs, redesign and modifications - business over the next fi ve years and beyond. to weather the event. complemented by on-going unplanned, reactive and corrective maintenance. 5.0 CHIEF EXECUTIVE’S REPORT PG 30-39

Figure 9.5 (a): Maintenance Spend (Rm) 6.0 213 CORPORATE GOVERNANCE 188 190 PG 40-53 169 158

7.0 STAKEHOLDER UNDERSTANDING AND SUPPORT PGG 54-595459

8.0 PERFORMANCE AGAINST 2017/2018 SHAREHOLDER COMPACT 2014 2015 2016 2017 2018 PG 60-6760-67

9.0 CREATING VALUE PG 668-878-87

Figure 9.5 (b): Maintenance (%) 10.0 CONSERVING OUR NATURAL RESOURCES 8.5% PG 88-9988-99 7.2% 7.1% 7.6% 7.4%

11.0 Maintenance as ENABLING per cent of Revenue OUR PEOPLE 4.0% PG 100-109100-109 3.4% Maintenance as 2.4% 2.5% 2.6% per cent of PPE 12.0 IMPROVING RESILIENCY PG 110-117 2014 2015 2016 2017 2018

13.0 FINANCIAL SUSTAINABILITY PG 118-197

14.014 0 WATER LOSS MANAGEMENT AND METERING GRI CONTENT INDEX Non-revenue water is successfully maintained below 5%. This has been as a result of a metering strategy which focuses on metering all PG 1198-20398-203 critical nodes and monitoring of meter accuracy. This initiative will continue through meters installed by Umgeni Water at various critical points in its systems.

UMGENI WATER • AMANZI ANNUAL REPORT 2017/2018 75 9.3 INFRASTRUCTURE In implementing infrastructure, Umgeni supply footprint that still receive no water Water uses local labour as its preferred from schemes. In addition, components STABILITY work force to facilitate skills transfer and of the served areas that are characterised economic support to local communities. by small schemes have been found to be MANAGEMENT APPROACH Umgeni Water further ensures that there unsustainable. is meaningful B-BBEE through its policies, Umgeni Water plans and manages its bulk which drive provision of meaningful economic water infrastructure stability in order to Figure 9.6 (a): Main Source of Water for opportunities to targeted enterprises. meet current and future customer needs. Drinking - Umgeni Water 2017/2018 Focus Area (Community Survey 2016) The planned outcome is bulk infrastructure All bulk water infrastructure developments are that is consistent with planned service undertaken in an environmentally sustainable levels, acceptable risk levels and anticipated manner. Appropriate projects are subjected growth trajectories to ensure long-term to Environmental Impact Assessments during system reliability goals are met. To this project planning, design, construction and end, the capacity and condition of existing commissioning phases and manifests in the infrastructure is annually assessed and development and implementation of sound informs future infrastructure planning and Environmental Management Plans that are development. Infrastructure developments independently monitored and audited during therefore comprise of: implementation. • Infrastructure upgrades and rehabilitation to continue to achieve product quality STATUS OF WATER ACCESS and a sustainable supply to customers; IN SUPPLY AREA Piped (tap) water inside the dwelling • Infrastructure development for expansion Within Umgeni Water’s area of focus in house/yard, 70% Other water source outside yard, 9% and growth to new areas and to serve 2017/2018, access to piped (tap) water inside Piped (tap) water outside yard, 20% unmet needs; and the dwelling/house/yard comprises 70% of Borehole/rain-water tank inside yard, 1% • Infrastructure development and expansion the total number of people with access to to supply rural areas and municipalities to water (Figure 9.6 Community Survey 2016). reduce backlogs and increase community There are many areas that are outside of sustainability. Umgeni Water’s bulk water infrastructure

Figure 9.6 (b): Main Source of Water for Drinking by WSA – Umgeni Water 2017/2018 Focus Area (Community Survey 2016)

Harry Gwala DM Number of people with piped (tap) water inside the dwelling/house iLembe DM Number of people with piped (tap) water inside yard uMgungundlovu DM Number of people with piped (tap) water outside yard Ugu DM Number of people with borehole/ rain-water tank inside yard Msunduzi LM Number of people with water sources outside yard eThekwini MM

0% 50% 100%

76 UMGENI WATER • AMANZI ANNUAL REPORT 2017/2018 1.0 Figure 9.6 (c): Main Source of Water for Drinking by WSA - Rest of KZN (Community Survey 2016) REPORT PROFILE PGG 6

uMkhanyakude DM Number of people with 2.0 ORGANISATIONAL piped (tap) water inside the PROFILE uMzinyathi DM dwelling/house PG 8-17 Number of people with piped Zululand DM (tap) water inside yard 3.0 MINISTER’S Number of people with piped FOREWORD PG 18-2318--23 uThukela DM (tap) water outside yard Number of people with King Cetshwayo DM borehole/rain-water tank 4.0 inside yard CHAIRPERSON’S REPORT Amajuba DM Number of people with water PG 24-29 sources outside yard

uMhlathuze LM 5.0 CHIEF EXECUTIVE’S REPORT Newcastle LM PG 30-39

0% 50% 100% 6.0 CORPORATE GOVERNANCE PG 40-53

UNIVERSAL ACCESS PLAN 7.0 STAKEHOLDER Working closely with national and provincial stakeholders in KwaZulu-Natal, Umgeni Water completed the planned development of UNDERSTANDING AND SUPPORT Universal Access Plans (UAPs) for all Water Services Authorities (WSAs) in KwaZulu-Natal in 2016. The outputs comprise of conceptual bulk PGG 54-5954 59 water supply scheme plans per municipality for all of KZN. The plans reconcile backlogs and growth in demands with bulk infrastructure to meet the needs of the 2045 planning horizon. 8.0 PERFORMANCE AGAINST 2017/2018 Umgeni Water is taking plans forward through progressive incorporation into its Infrastructure Master Plans, presentations and discussions SHAREHOLDER COMPACT with customers and stakeholders to get further inputs that will drive funding, fi nancing and implementation. PG 60-6760--67

9.0 CREATING VALUE PG 668-878-87

10.0 CONSERVING OUR NATURAL RESOURCES PG 88-9988-999

11.0 ENABLING OUR PEOPLE PG 100-109100-100- 09

12.0 IMPROVING RESILIENCY PG 110-117

13.0 FINANCIAL AMANZIMTOTI WTW SUSTAINABILITY PG 118-197

14.0144 0 GRI CONTENT INDEX PG 1198-20398-2-2033

UMGENI WATER • AMANZI ANNUAL REPORT 2017/2018 77 Current bulk infrastructure and supply footprint and the status of bulk infrastructure implemented in the reporting period are shown in Figure 9.7.

Figure 9.7: Umgeni Water Current Bulk Supply Footprint and Status of Bulk Infrastructure Implemented in 2017/2018

Table 9.3: Major Projects Implemented in 2017/2018

Project Name Objective Major Customer Total Project Implemented Budget (Rm) as at 30 June 2018 (Rm) 1 Mkhomazi Bulk Water Supply Augmentation eThekwini MM, 5 679 8 uMgungundlovu DM uMgungundlovu WSA 2 Lower uMkhomazi Bulk Rural Development eThekwini MM, 2 894 16 Water Supply Scheme Ugu DM, 3 uMshwathi Bulk Water Rural Development uMgungundlovu DM, 972 909 Supply Scheme (Wartburg iLembe DM Phases 1 - 3) 8 WTW WTW 4 Darvill Wastewater Treatment Upgrade Msunduzi LM 961 906 Works Upgrade 5 Greater Mpofana Bulk Water Rural Development uMgungundlovu DM 757 487 Supply Scheme Phase 1 6 Mhlabatshane Sub-Regional Rural Development Ugu DM 442 8 Scheme Phase 2 – Mzimkhulu River Abstraction Bulwer

7 Mpophomeni Wastewater Expansion uMgungundlovu DM 381 19 Harry Gwala WSA Treatment Works PSPSS 8 Impendle BWSS Rural Development uMgungundlovu DM 352 5 PS 9 Vulindlela BWSS upgrade Augmentation Msunduzi LM 331 5 PSPS 10 Midmar WTW Upgrade (250- Augmentation uMgungundlovu DM, 306 244 375Ml/d) - New Raw Water eThekwini MM and Pipeline and Pump Station Msunduzi LM 11 South Coast Phase 2b Expansion Ugu DM 239 36 Kelso to Umdoni 12 Elysium Desalination Plant Augmentation Ugu DM 231 3 13 Wartburg to Augmentation uMgungundlovu DM 135 91 Bruyns Hill Pipeline 14 Maphumulo BWSS Phase 3 Rural Development iLembe DM 123 6 15 Nungwane Raw Water Rehabilitation Ugu DM and 113 79 Aqueduct (450dia x 18km) eThekwini DM

Umgeni Water Infrastructure Map

Kokstad N

NW NE

W E

SW SE

S 78 UMGENI WATER • AMANZI ANNUAL REPORT 2017/2018 Maphumulo PSPS PSP PSP 14 WTWWTTW Mandeni Mooi River PSPS PSPSSPSPS uThukela PS 3

PS5 KwaDukuza PS PS uMuMvotivoti Howick Wartburg iLembe WSA PS PS 131 7 10 PSP Ballito Ndwedwe PS PS

9 PS 4 uThongati

Msunduzi WSA PS

WTW uMgeni 1 PSPS PS Durban eThekwini WSA Richmond

MAJOR CAPEX PROJECTS STATUS 15 Construction Design Feasibilty

PS PS Commissioned WTW Ixopo PS PS uMkhomazi WTW2 EXISTING INSTALLATIONS

PS Pumpstation Reservoirs PS PSP Water Treatment Works PSS uMzinto PSS Wastewater Works PSS 11 Tunnels 6 Pipelines PS Pennington PSPS PS PSPS Dams PSPS

PS uMthwalume FUTURE INSTALLATIONS & UPGRADES 12 PS Pumpstation Ugu WSA Reservoirs Water Treatment Works Wastewater Works Tunnels Pipelines Dams uMuMzimkhuluMzim FOOTPRINTS Footprint areas currently supplied by UW Bulk Infrastructure

Footprint areas supplied by WSA

Footprint areas that will be supplied by UW’s proposed projects UMGENI WATER • AMANZIuMtamvuma ANNUAL REPORT 2017/2018 79 PERFORMANCE WITH CAPITAL expansion, upgrades and rehabilitation In addition, the Supply Chain Management INFRASTRUCTURE PLAN projects. Of this, R367 million (40%) went (SCM) process, specifi cally the turnaround Signifi cant progress with capital infrastructure towards projects for rural development. time of CAPEX programme tenders continued implementation was achieved during the Overall, 72% of target water infrastructure to improve during the reporting period. reporting period. Spend performance project milestones were met. Umgeni Water will continue to streamline for the year was R982 million, of which its processes to maintain and improve R927 million (R1.2 billion in 2017) was Key projects implemented are shown in turnaround. spent on bulk infrastructure augmentation, Table 9.3.

Figure 9.8: Capital Infrastructure Implemented (Parent) (Rm)

2 019 1 691

1 022 967 1 163 799 982 Rural Development 503 694 367 Upgrade, Rehabilitation, Augmentation, Expansion 736 928 577 560 Equipment, Vehicles, ICT and other Movables 290 Total CAPEX (Rm) 2014 2015 2016 2017 2018

CUSTOMERS TARGETED AND Efaye via Fawn Leas and a booster pump • Full construction will be completed by PROGRESSED WITH KEY BULK station. Design completed in 2013/2014. end of December 2018. INFRASTRUCTURE DEVELOPMENTS Construction completed in May 2018. MIDMAR RAW WATER PIPELINE • Phase 3.3a: 18 km 700mm diameter UMSHWATHI RBWSS: AUGMENTATION, RAW WATER PUMP steel pipeline – pipe supply for Phase STATION AND WTW UPGRADE: Serves uMgungundlovu District 3.2b completed. Serves eThekwini Metropolitan Municipality and iLembe District • Phase 3.3b: 18 km 700mm diameter Municipality, uMgungundlovu District Municipality. steel pipeline from Fawn Leas to Ozwathini Municipality and The Msunduzi Local • Phase 1: 26 km 850mm diameter steel reservoir. Construction completed in May Municipality. pipeline from Claridge to Wartburg. Design 2018. The construction of the raw water pipeline completed in 2012/2013. Construction • Phase 3.3c: 12 Ml reservoir at Ozwathini entails the lined and coated pipe with was completed mid 2015/2016. Cathodic – Construction in progress. Construction associated works, i.e. concrete valves and Protection AC mitigation installation is expected to be completed in March 2019. in progress. fl ow meter chambers, pipe jacks, bladder tank. Upgrade of plant capacity from 250 Ml/d to • Phase 2: 16 km 700mm diameter steel WARTBURG TO BRUYNSHILL 375 Ml/d. The new or additional components pipeline from Wartburg to Dalton, Mpolweni PIPELINE AND THE PUMP STATION: include the replacement of pumps, pulsator, and Dalton booster pump stations, an 8 Ml Serves uMgungundlovu District six gravity fi lters and sludge plant upgrade. reservoir at Wartburg and a 10 Ml reservoir Municipality. at Dalton. Design completed in 2013/2014. • Construction of Duplicate Raw Water The construction of the potable water Construction completed mid 2017/2018. pipeline was completed in 2016/2017. pipeline entails the 10.5 km 400mm ND Commissioning is in progress. • Construction of WTW upgrade was lined and coated pipe with associated works completed in June 2018. • Phase 3.1: 500kVA Eskom bulk electrical and the construction of the pump station. supply at Dalton – completed. • Construction progress is behind schedule • Snagging and Commissioning is • Phase 3.2: 29 km 750mm – 400mm (scope extended) and is approximately in progress. diameter steel pipeline from Dalton to 75% complete.

80 UMGENI WATER • AMANZI ANNUAL REPORT 2017/2018 WIGGINS OZONE The Elysium Desalination Plant is a Greenfi eld Municipalities, and will serve 150 000 1.0 REPORT PROFILE PLANT REPLACEMENT development that is in the planning stage. people in Maqumbi, Ashville, Maphumulo, PG 6 • Detail Design and Construction of the The proposed works will supply between Masibambisane, KwaSizabantu and 2.5 to 10 Ml/d to augment the Mtwalume Ngcebo supply areas. Wiggins Ozone Upgrade: 95% completed. 2.0 Water Treatment Works. ORGANISATIONAL • Finalisation of completion and Phase 1 comprises of iMvutshane River PROFILE PG 8-17 commissioning will be done during 2019 • Preliminary design is in progress. abstraction, 6 Ml/d WTW, potable water after the new Liquid Oxygen Supply (LOX) pipelines, booster pump stations and SOUTH COAST PIPELINE PHASE 2B: reservoirs. Phase 2 comprises of construction 3.0 system has been completed. MINISTER’S of the iMvutshane Dam. FOREWORD Serves Ugu District Municipality PG 18-2318-23 MPOPHOMENI WWTW: mid-south coast area, which includes • Phase 1 was commissioned in 2012/2013. Pennington, Kelso, Malangeni and • Phase 2, the construction of iMvutshane Serves uMgungundlovu District Shayamoya. The pipeline is designed Dam, was completed in 2014/2015. 4.0 Municipality and uMngeni Local CHAIRPERSON’S to supply 16.67 Ml/d of which 10 Ml/d • Phase 3, the appointment of engineering REPORT Municipality. PG 24-29 will supply the area under design consultant for the upgrade of The infrastructure development comprises of a different phase of the South Coast WTW to 12 Ml/d, detailed planning for a 6 Ml/d Wastewater Treatment Works and Pipeline. 5.0 the upgrade of the raw water and booster CHIEF a 6 km bulk sewer outfall pipeline. • Phase 2B comprises of an 800mm pump stations and relocation of a package EXECUTIVE’S • The design of the works is complete and REPORT diameter, 8.1 km steel pipeline from plant from Hazelmere WTW to Maphumulo PG 30-39 design for sewer outfall will be completed South to Pennington and a WTW, were completed during 2015/2016. by December 2018. further 355 mm x 0.7 km PVC pipeline Upgrade of pump stations is in progress. 6.0 • The construction of the Wastewater CORPORATE to Malangeni reservoir. • Phase 4, the inter-basin transfer from GOVERNANCE Treatment Works is in procurement stage PG 40-53 • The pipes supply is 90% complete with the Hlimbitwa River into iMvutshane Dam, and completion is expected in 2022/2023. most pipes delivered. detailed feasibility investigation, which 7.0 • The construction contract is in the fi nal entails the Hlimbitwa River weir location STAKEHOLDER TRUSTFEEDS WWTW: UNDERSTANDING stages of procurement with construction and transfer infrastructure, commenced AND SUPPORT Serves uMgungundlovu District expected to begin in 2018/2019 for in 2015/2016. PGG 54-595459 Municipality and iLembe District completion in 2020.

Municipality. GREATER MPOFANA BWSS: 8.0 PERFORMANCE MHLABATSHANE BWSS (PHASE 2) AGAINST 2017/2018 The infrastructure development comprises Serves uMgungundlovu District MZIMKHULU RIVER ABSTRACTION: SHAREHOLDER of a 1 Ml/d Wastewater Treatment Works, Municipality. COMPACT PG 60-6760-67 4.5 km bulk sewer outfall pipeline and a Serves Ugu District Municipality and • Rosetta Water Treatment Works (WTW): 1.5 km gravel access road. will reach and provide potable water Construction of 20 Ml/d Rosetta Water 9.0 access for over 100 000 inhabitants • Planning and design was completed at Treatment Works at Rosetta adjacent to the CREATING VALUE PG 668-878-87 the end of 2016/2017. in ten tribal authority areas: Bhekani, Spring Grove Dam. Design was completed • Construction of the bulk sewer and gravel Nhlangwini (west), KwaCele 1, Hlubi, in 2014, construction started in August Mabhaleni (west), KwaCele K, Frankland, 10.0 access road is in progress for expected 2016 and is 70% complete. The planned CONSERVING Qwabe P, Shabeni, and KwaMadladla. completion in 2019. completion date is October 2019. OUR NATURAL RESOURCES The bulk infrastructure will comprise of an PG 88-9988-99 • Construction of the Wastewater Treatment • Reservoirs: Construction of 5 Ml and 12 Ml abstraction works on the Mzimkhulu River, works is in progress for expected reservoirs feeding Nottingham Road and pump station and pipeline to deliver water completion in 2020. Bruntville reservoirs, respectively, were 11.0 to the Mhlabatshane WTW and upgrade ENABLING completed in July 2016. Commissioning OUR PEOPLE of the Water Treatment Works from 4 Ml/ PG 100-109100-109 ELYSIUM DESALINATION PLANT: of these reservoirs is 70% complete, day to 8 Ml/day. awaiting completion of the WTW. Serves Umdoni Local Municipality • Phase 1 - commissioning of the Bulk 12.0 within the Ugu District Municipality • Nottingham Road Pipeline: IMPROVING Water Supply Scheme - was completed RESILIENCY The construction of an 8km x 650mm PG 110-117 and is planned to supplement the in 2014/2015. potable water supply produced by diameter steel pipeline from Rosetta WTW • Planning of Phase 2 is now complete the Mtwalume Water Treatment to the newly constructed Nottingham and the project has progressed to 13.0 Plant which provides potable water Road reservoir. The construction of this FINANCIAL the procurement of PSP for detailed SUSTAINABILITY access for over 60 000 inhabitants in pipeline was completed in June 2016. PG 118-197 design stage. Bazley, Elysium, Ifafa, parts of Kelso • Bruntville Pipeline: The Construction of a 14.014 0 and uMtwalume along the coast and 13km x 650mm steel pipeline from GRI CONTENT MAPHUMULO BWSS: INDEX inland rural areas of and Rosetta WTW to Bruntville Reservoir, PG 1198-20398-203 kwaQologolo. Serves iLembe District Municipality, construction is in progress and 70% which includes KwaMaphumulo, complete and the anticipated completion Ndwedwe, and KwaDukuza Local date is December 2018.

UMGENI WATER • AMANZI ANNUAL REPORT 2017/2018 81 UMKHOMAZI WATER PROJECT: • Water Treatment Plant (100 Ml/day) and - Construct a new 10 Ml Reservoir at reservoir near Quarry including potable Mpophomeni; and Serves eThekwini Metropolitan water pipeline: the detail design planned - Detailed design is in progress. Municipality. completion date is April 2019 and the • Phase 2.2 comprises of: The uMWP-1 includes the Smithfi eld Dam on commissioning is planned for August 2023. - Construct a new pump station in the uMkhomazi River, a raw water tunnel from Mpophomeni consisting of 2 x 32 Ml/ Smithfi eld Dam to the Baynesfi eld region, the NUNGWANE RAW WATER AQUEDUCT: day pump sets; Langa Balancing Dam at Baynesfi eld, a raw - 3.29 km of 800 mm diameter rising water pipeline from the tunnel outlet to a Serves eThekwini Metropolitan main from the Ridge Reservoir to Water Treatment Works (WTW) at Baynesfi eld, Municipality, along the coastal strip from Vulindlela Res 2; potable water reservoir at Baynesfi eld and a South of Durban to upper South Coast. - Construct a new pump station in potable water pipeline from Baynesfi eld to The construction of the raw water pipeline Mpophomeni consisting of 2 x 32 Ml/ Umlaas Road where it would tie into Umgeni entails the 13.5 km x 450 mm ND lined day pump sets; and Water’s existing ’57 pipeline. The technical and coated pipe with associated works - Detailed design is in progress. portion of the detailed feasibility studies for from Nungwane Dam to Amanzimtoti Water the uMWP-1 is complete. Phase 1 includes: Treatment Works. • Procurement of construction contracts will begin late in 2018. • Module 1 – Raw Water Module by DWS; • Construction of the Nungwane Raw water • Overall construction completion is • Module 2 – Environmental Impact pipeline is 65% complete. expected in 2024. Assessment by DWS and UW: investigation • Completion is expected by March 2019. has been completed and report will be submitted in September 2018 to DEA. IMPENDLE BWSS: 9.4 ECONOMIC A decision is expected in January 2019; Serves Impendle Local Municipality, EMPOWERMENT • Module 3 – Potable Water Module by within uMgungundlovu District UW; and Municipality. MANAGEMENT APPROACH • Phase 2 of the uMWP (uMWP-2) will • Comprises a 1.6 Ml/d BWSS at Stepmore Umgeni Water’s approach to empowerment is include the Impendle Dam, located and 10 Ml/d BWSS at Nzinga. upstream of the Smithfi eld Dam on the guided by enabling legislation, including the • Stepmore BWSS detailed design is uMkhomazi River, a second raw water Constitution of South Africa, the Preferential in progress. tunnel and raw water pipeline, an increase Procurement Policy Framework Act and in WTW capacity and potable water storage • Completion of Stepmore construction is Regulations and the Broad-Based Black and a second potable water pipeline. scheduled for 2021. Economic Empowerment Act. A focussed • Completion of Nzinga BWSS Construction approach is followed, including: LOWER UMKHOMAZI BWSS: is scheduled for 2024. • Facilitating access of B-BBEE compliant Serves the eThekwini Metropolitan suppliers to the entity’s procurement VULINDLELA BWSS: Municipality and Ugu District activities; Municipality. Serves the Msunduzi Local Municipality. • Ensuring that previously disadvantaged The Lower uMkhomazi Bulk Water Supply • Phase 1 comprises of: individuals achieve full participation and System (LUBWSS) is the recommended - 2.35 km of 600 mm diameter rising main involvement in businesses that support augmentation option for the existing Upper from the Vulindlela Res 2 to Vulindlela Umgeni Water in the supply of water services; and Middle South Coast Supply area, which Res 5; • Developing or establishing new, sustainable is currently supplied by water from local - 3.78 km of 200 mm diameter gravity business with black entrepreneurs, through rivers and dams and augmented by the pipeline from the Vulindlela Res 4 to the procurement process; Mgeni System. The planned supply area to be Vulindlela Res 3; • Encouraging establishment of value augmented by the LUBWSS, are the coastal - Construct a new pump station at reservoir adding joint ventures between traditional areas of eThekwini and Ugu Municipalities 2 consisting of 2 x 18 Ml/d pump sets; and emerging suppliers, giving the from Amanzimtoti to Hibberdene, connected - Construct a new 20 Ml Reservoir at the latter access to technology, skills and to the South Coast Pipeline. Vulindlela Res 2 site; and knowledge; and • Ngwadini Abstraction Works, Ngwadini - Detailed design is complete. • Contributing to skills development and Dam, Goodenough Abstraction Works • Phase 2.1 comprises of: job creation through the employment of including pipelines, high lift raw water - Construct a new pump station at Howick targeted labour. pump stations and raw water reservoir: West Reservoir Site consisting of 2 x detail Feasibility and Preliminary design 32 Ml/d pump sets; were completed by September 2016 and - 6.08 km of 800 mm diameter rising the detail design planned completion main from Howick west reservoir site date is April 2019. to Mpophomeni;

82 UMGENI WATER • AMANZI ANNUAL REPORT 2017/2018 CONTRACT PARTICIPATION GOALS 1.0 REPORT PROFILE PG 6 Umgeni Water continued to implement its B-BBEE initiatives through the continued implementation of Contract Participation Goals (CPGs). CPGs facilitate meaningful economic opportunities to targeted enterprises by requiring tenderers to allocate a certain percentage of the 2.0 scope of work and value to targeted enterprises. ORGANISATIONAL PROFILE PG 8-17 Figure 9.9: Contract Participation Goals (CPGs) (Rm) PERFORMANCE WITH CONTRACT PARTICIPATION GOALS

(CPG) TARGETS IN 2017/2018 1 381 3.0 MINISTER’S CPG targets set for 2017/2018 were 35% for construction contracts FOREWORD PG 18-2318-23 and professional services projects (of which 10% was to be allocated to Black Women-owned businesses).

4.0 CHAIRPERSON’S An average of 39% CPG was achieved with a total CPG award REPORT value of R174 million (R149 million in 2017). Of the total CPG, PG 24-29 R95 million (55%) was awarded to Black Women-owned businesses (R41.1 million in 2017). 5.0 311 CHIEF 240 EXECUTIVE’S 174 REPORT R2.34 billion worth of contracts has been awarded to Black-owned 149 89 PG 30-39 businesses since the start of the CPG initiative in 2013. The entity strives for continuous improvement and is in the process of enhancing 2013 2014 2015 2016 2017 2018 6.0 the implementation of CPG to improve alignment with regulatory CORPORATE GOVERNANCE amendments and strategy. PG 40-53

B-BBEE SPEND PERFORMANCE 7.0 STAKEHOLDER UNDERSTANDING Companies have been classifi ed and registered on a supplier database, according to their progress in achieving Broad-Based Black Economic AND SUPPORT PGG 54-595459 Empowerment. The B-BBEE spend target of ≥ 80% for the reporting period was achieved. Spend performance for the year exceeds 100%.

Four (4) new entrants were added to the database, of which, three (3) have been awarded work. 8.0 PERFORMANCE AGAINST 2017/2018 SHAREHOLDER MONITORING B-BBEE/CPG IMPLEMENTATION AT UMGENI WATER COMPACT PG 60-6760-67 Monitoring B-BBEE/CPG implementation of awarded contracts is undertaken in order to confi rm that:

• Contractors are engaging with the targeted enterprises as per contracts; 9.0 CREATING VALUE • Targeted enterprises are performing the scope as per contract; and PG 668-878-87 • Payments due to targeted enterprises are processed at the correct rates and at agreed timeframes.

10.0 CONSERVING SKILLS DEVELOPMENT AND JOB CREATION OUR NATURAL RESOURCES Infrastructure construction is targeted towards the poorest members of society and employs unskilled workers. These temporary jobs enable skills PG 88-9988-99 to be developed and utilised at a local community level and results in a meaningful fl ow of income to these communities.

11.0 ENABLING In the 2017/2018 reporting period, Umgeni Water created a total of 599 temporary jobs through its CAPEX Programme. OUR PEOPLE PG 100-109100-109

A total of R19.6 million (R27.7 million in 2017) was paid in wages to local labour. 12.0 IMPROVING RESILIENCY PG 110-117

13.0 FINANCIAL SUSTAINABILITY PG 118-197

14.014 0 GRI CONTENT INDEX PG 1198-20398-203

UMGENI WATER • AMANZI ANNUAL REPORT 2017/2018 83 Figure 9.10: CAPEX Jobs 1 514 1 258 1 157 1 010 1 073 763 599 538 378

2010 2011 2012 2013 2014 2015 2016 2017 2018

Figure 9.11: Wages Paid (Rm) 39.7

31.9 25.8 27.7 19.6 13.4 10 11.5 10.8

2010 2011 2012 2013 2014 2015 2016 2017 2018

9.5 COMMUNITY and scarce resource. To this end, the entity WATER EDUCATION AND develops and implements integrated water COMMUNITY OUTREACH OUTREACH AND education and awareness programmes that Water, environment, health education and drive home key water concepts to infl uence CORPORATE SOCIAL awareness were delivered through three (3) behavioural change. RESPONSIBILITY target programmes during the reporting period: • On site water classrooms programme; Education and awareness programmes strive MANAGEMENT APPROACH to instil sound values that will complement • Adopt-A-School Programme; and The entity’s Corporate Social Investment and ensure long-term sustainability of the • Schools and Community Outreach (CSI) programme supports socio-economic water services that are provided. Programme Programmes. development initiatives to improve content and themes are regularly reviewed community livelihoods and is driven through to assess suitability and address current On Site Water Classrooms Programme: an approved CSI Policy. This ensures a co- issues facing the region. Content targeted The water classroom programmes provide ordinated approach in implementation of CSI includes the water cycle and source-tap- learning opportunities for learners of all age initiatives, which are clustered and prioritised source view of the water value chain, water groups. Umgeni Water impacts knowledge in terms of the following categories: use, water treatment, water conservation, of the water purification process and • Education and Training; water quality, sanitation and the water, environmental issues impacting these health and environment nexus. processes. Umgeni Water has three (3) • Job Creation; accessible water education classroom facilities • Public Health, Community Development Programmes target rural and urban-based at major water and Wastewater Treatment and Support; schools and communities and a wide range of Works, namely at Durban Heights WTW, • Environmental Conservation; and learner levels. Suitable educational materials Howick WWTW and Midmar WTW. Water • Arts, Culture and Sport. and mechanisms to facilitate communication classroom presentations are followed by are identifi ed and implemented often in tours of the works where learners get to see Umgeni Water also strives to help create partnership with other sector stakeholders. the practicality of the treatment processes. a society that is aware of water as a fi nite

84 UMGENI WATER • AMANZI ANNUAL REPORT 2017/2018 A total of 98 classes were taught in Twenty (20) schools were adopted as part sustainable water access to communities. 1.0 REPORT PROFILE 2017/2018, reaching 3 364 participants of this programme. During the reporting period, successful PG 6 from 75 institutions. negotiations were concluded for land access

Initiatives at the target schools comprised with the relevant traditional authorities and 2.0 ORGANISATIONAL Schools and Community Outreach facilitating the development of school landowners for the Mshwathi, Nungwane PROFILE Programmes: The schools outreach environmental management plans, creating and Vulindlela projects. PG 8-17 programme in the year ensured that linkages with relevant departments to learners who could not access Umgeni facilitate development of library resource Project awareness was conducted for 3.0 MINISTER’S Water’s facilities were reached through centres, creating food gardens and providing communities directly impacted by the FOREWORD PG 18-2318-23 presentations made at schools, through access to mainstream environmental projects. The establishment of Project roadshows and campaigns undertaken during programmes and competitions. Steering Committees (PSC’s) was critical special day events, environmental fi eld trips, in ensuring stability, community participation 4.0 river clean ups, dam safety awareness and Environmental Education materials were and inclusion in decision-making. CHAIRPERSON’S REPORT environmental workshops. developed and distributed and conveyed PG 24-29 the target themes including eradication of Umgeni Water worked well to address

In the reporting year, the entity continued to alien weeds, biodiversity, wetlands, water challenges experienced for the Mpofana Bulk 5.0 CHIEF raise awareness regarding drought impacts, conservation, waste management and Water Supply project by facilitating workshops EXECUTIVE’S REPORT water scarcity and water conservation. dam safety. with the community representatives. PG 30-39

Other Educational Programmes implemented Environmental Management action plans Umgeni Water provides employment 6.0 in the year included: were developed and implemented in to communities during construction. CORPORATE GOVERNANCE • Commemoration of Environmental Special partnership with adopted schools, to foster This process is managed by employment of PG 40-53 Days at various schools within the entity’s environmental stewardship in communities. a community liaison offi cer who works with

area of supply; the contractor to facilitate recruitment and 7.0 INSTITUTIONAL AND selection of local labour in accordance with STAKEHOLDER • Facilitation of MiniSASS - a river health UNDERSTANDING SOCIAL DEVELOPMENT (ISD) recruitment guidelines developed by Umgeni AND SUPPORT programme initiative - for a school in PGG 54-595459 eThekwini Metropolitan Municipality; Community engagement is also a critical Water. Umgeni Water minimised negative success factor for successful implementation impacts of projects by applying appropriate • Planting of over 135 trees in 28 schools 8.0 of capital infrastructure projects and is interventions and good labour practice. PERFORMANCE in commemoration of Arbour Week; AGAINST 2017/2018 approached in a manner that ensures there No major project stoppages were experienced SHAREHOLDER • A river clean-up and spring protection during this reporting period and on-going COMPACT is community input regarding resolution of PG 60-6760-67 workshop for a local youth NGO in the issues affecting them. positive relationships were maintained. Mafakatini Area, within Msunduzi Local Municipality; and 9.0 CORPORATE SOCIAL CREATING VALUE Each project presents unique issues or PG 668-878-87 • Educator workshops on drought awareness INVESTMENT (CSI) PROGRAMME opportunities and required targeted conducted for sixty-six (66) educators interventions. Umgeni Water institutional During the period under the review, and twenty (20) learners from fi fteen (15) 10.0 and social development facilitators play a CSI projects were implemented according to CONSERVING schools within uMgungundlovu District OUR NATURAL key role in this process. the CSI policy where projects/ applications RESOURCES and Msunduzi Local Municipalities. PG 88-9988-99 were screened to ascertain alignment with As a result of successful management of the CSI Policy, as well as the CSI framework. 11.0 Adopt-A-School Programme: Umgeni these engagements, a foundation of trust Unplanned projects, also referred to as reactive ENABLING has been built with community stakeholders. projects, were utilised for implementing OUR PEOPLE Water’s adopt-a-school programme focuses PG 100-109100-109 on vulnerable schools that do not have proper initiatives across all focus areas. access to water, sanitation and environmental Communities are also being continuously 12.0 education resources. engaged regarding the risks associated with CSI spend for 2017/2018 was R4.9 million. IMPROVING RESILIENCY servitude encroachments. Umgeni Water’s Spend per customer and CSI Category is PG 110-117 experience is that all stakeholders are willing tabulated below and illustrated in Figures

to work together in the interest of providing 9.12 and 9.13 respectively. 13.0 FINANCIAL SUSTAINABILITY PG 118-197

14.014 0 GRI CONTENT INDEX PG 1198-20398-203

UMGENI WATER • AMANZI ANNUAL REPORT 2017/2018 85 Municipality Spend Job Creation Public Health, Environmental Education Arts, Culture (Rm) Community Conservation and Training and Sport Development and Support Ugu DM 0.231 - 0.231 - - - eThekwini MM 0.645 - 0.445 - - 0.200 uMgungundlovu DM 0.364 - 0.264 - 0.100 - uMgungundlovu DM: Mngeni LM 0.500 0.500 - - - - uMgungundlovu DM: 0.027 - 0.027 - - - Mkhambathini LM uMgungundlovu DM: Mshwathi LM 2.090 - 2.090 - - - Msunduzi LM 1.097 - 0.094 1.003 - - 4.953 0.500 3.151 1.003 0.100 0.200

Summary of CSI Initiatives is provided in the section that follows.

Figure 9.12: CSI Spend per Customer (Rm) Figure 9.13: CSI Spend per Category (Rm)

uMgungundlovu DM, 2.981 Public Health, Community Development and Support, 3.151 eThekwini MM, 0.645 Arts, Culture and Sport, 0.200 Msunduzi LM, 1.097 Job Creation, 0.500 Ugu DM, 0.231 Education and Training, 0.100 Education and Training, 0.100

“Education and awareness programmes strive to instil sound values that will complement and ensure long-term sustainability of the water services that are provided.”

86 UMGENI WATER • AMANZI ANNUAL REPORT 2017/2018 1.0 CORPORATE SOCIAL INVESTMENT (CSI) INITIATIVES REPORT PROFILE PG 6

PUBLIC HEALTH, COMMUNITY DEVELOPMENT AND SUPPORT 2.0 ORGANISATIONAL 1. Mandela Day Initiatives PROFILE Initiatives implemented by various Umgeni Water divisions in 2017/2018 are shown in Table 9.4. PG 8-17

Table 9.4: Umgeni Water 2017/2018 Mandela Day Initiatives 3.0 MINISTER’S Benefi ciary Initiative FOREWORD PG 18-2318-23 Siyanda High School, Pietermaritzburg Refurbishment; furniture; and fencing. Sbongamandla Junior Primary School River clean-up and WQ testing training; Rainwater harvesting project; Supply of gardening tools; Computer room upgrade; and Soccer and netball soccer kits. 4.0 CHAIRPERSON’S Mthethomusha Senior Primary School, Pietermaritzburg River clean-up and WQ testing training; Rainwater harvesting project; and Soccer and REPORT netball soccer kits. PG 24-29 Bongekile Pre-Primary School, Richmond Painting and supply of jungle gym facilities. Amagcugwa Community Early Child Development and Appliances and Stationery. 5.0 CHIEF Arts Centre EXECUTIVE’S REPORT Thembalabantu Crèche, Pietermaritzburg Supply of building material, mattresses, blankets and tables. PG 30-39 KwaDindi Primary School Sponsorship of school uniforms.

Mzuvele High School, Durban Supply of painting equipment. 6.0 CORPORATE Prestige Development Academy Prestige Development Academy to cover international travel cost for a youth from a GOVERNANCE disadvantaged background. PG 40-53 SOS Children’s Village Supply of mattresses, linen, desks and washing machine. Ekukhanyeni School Supply and installation of JoJo Tanks. 7.0 STAKEHOLDER UNDERSTANDING AND SUPPORT PGG 54-595459 2. Umgeni Water - Linda Sibiya in partnership with NPO Zomnotho ENVIRONMENTAL CONSERVATION Foundation Youth Empowerment Community Development. Speakers, R259 635 was spent on Willowfountain Programme Partnership which included Umgeni Water Board 8.0 community Qhulula Spring rehabilitation PERFORMANCE Launch of a Community Development Chairperson, mentored and transferred AGAINST 2017/2018 initiative. During the reporting period, SHAREHOLDER Centre at uMshwathi Municipality. knowledge to the youth and motivated COMPACT Sherwood Pumps was appointed to supply PG 60-6760-67 Centre enables youth and community to them to be active participants in socio- Pump, Solar Array and Solar Controller for gain access to internet services, career economic transformation. pumping water from a reservoir to JoJo 9.0 guidance and life skills. CREATING VALUE ART, SPORT AND CULTURE Tanks. This will assist the community to water PG 668-878-87 their communal gardens. The work on site 3. Vusikhono Community Help Centre Umgeni Water provided R200 000 to has commenced, where six (6) community The Vusikhono Community Centre Lembethe Canoe Club, operating in the 10.0 members were appointed to provide labour CONSERVING was provided with R350 000 funding. Nagle dam area. The funds were utilised OUR NATURAL to the project. RESOURCES This assisted the centre to purchase towards the development of 20 youth living PG 88-9988-99 groceries for the soup kitchen that feeds in the rural areas around Nagle Dam as R744 194 spent on Duzi Adopt a river approximately two hundred (200) children canoeists and the purchase of canoeing 11.0 initiative. Ten (10) youth from Sobantu ENABLING per day. equipment including canoes, splash covers, OUR PEOPLE Village, Pietermaritzburg were appointed life jackets and paddles. The funds also PG 100-109100-109 and are being mentored by DUCT for a 4. Richmond Youth Initiative assisted in providing for entry fees for major period of two (2) years. The youth will develop Umgeni Water provided R200 000 races by the qualifying youth, which included 12.0 and work as a self-sustained business for IMPROVING funding towards provision of Youth and the Duzi Canoe marathon and selection for RESILIENCY PG 110-117 HIV programmes. A youth camp was representing South Africa in Spain. removing solid waste and alien plants along established and this included medical the banks of the Msunduzi River in the JOB CREATION proximity of the Darvill WWTW. 13.0 testing and counselling, camping material, FINANCIAL SUSTAINABILITY blankets, clothing and food parcels. R500 000 in stipend payments were paid to EDUCATION AND TRAINING PG 118-197 youth over a twenty (20) month period as part 5. Zomnotho Women of the Mpophomeni Township Khulanolwazi Inyaninga Primary school situated in the 14.014 0 GRI CONTENT Empowerment Imbizo Cooperative Youth mentorship programme. rural area of Swayimane was provided with INDEX PG 1198-20398-203 Umgeni Water provided R204 790 funding Youth skills development included: controlling R100 000. This was utilised for electrical to host two hundred and fi fty (250) alien weeds, scarifying, top soil addition and tubing for three (3) classrooms and supply women for a youth empowerment seminar grass planting. of fi ve (5) computers.

UMGENI WATER • AMANZI ANNUAL REPORT 2017/2018 87