Sub: Minutes of 54th meeting of Operation and Coordination Committee of MP.

The Minutes of 54th meeting of the Operation and Coordination Committee of MP held on 22nd October 2016 at 11.00 AM at SLDC, MPPTCL, Nayagaon, Jabalpur has been uploaded on the website of SLDC ‘www.sldcmpindia.com’ and can be downloaded.

(K.K.Parbhakar) Memebr Secretary OCC SLDC, MPPTCL, Jabalpur

Distribution List

1. The Chief Engineer (T&C), MP Power Transmission Co. Limited, Jabalpur. Fax No- 0761-2665593, 2702710 Email- [email protected] 2. The Chief Engineer (Plg & Des), MP Power Transmission Co. Limited, Jabalpur, Fax No- 0761-2660908 Email- [email protected] 3. The Chief Engineer (Procurement.), MP Power Transmission Co. Limited, Jabalpur, .Fax No- 0761- 2660908 Email – [email protected] 4. The Executive Director (O & M:Gen), MP Power Generating Company Limited, Jabalpur. Fax No- 0761- 2664749, Email- [email protected], Email- [email protected] 5. The Chief Engineer (O & M:Hydel), MP Power Generating Company Limited, Jabalpur. Fax No- 0761-2664749. 6. The General Manager(PM), MPPMCL, Jabalpur Email – [email protected] [email protected] 7. The Superintending Engineer (GCC), MPPGCL, Jabalpur Email – [email protected] [email protected] 8. The General Manger (DCC-EZ), DISCOM Control Centre, MP Poorva Kshetra Vidyut Vitaran Co. Limited, Jabalpur, Fax No- 0761-2668503, Email – [email protected] 9. The Dy. General Manager (DCC –CZ), DISCOM Control Centre, MP Madhya Kshetra Vidyut Vitaran Co. Limited, Bhopal, Fax No-0755-2580611,Email- [email protected] 10. The Executive Engineer (DCC-WZ), DISCOM Control Centre, MP Paschim Kshetra Vidyut Vitaran Co. Limited, Near Polo Ground, Jail Road, Indore, Fax No- 0731-2421554, Email- [email protected] 11. The Executive Engineer, Sub Load Despatch Centre, MPPTCL, Indore, Fax No- 0731-2874515, Email – [email protected] 12. The Executive Engineer, Sub Load Despatch Centre, MPPTCL, Bhopal, Fax No- 0755-2885220, Email – [email protected] 13. The General Manger(RO), MPPMCL, In front of Bhojpur Club, E-4, Arera Colony,Bhopal, Fax No-0755- 2423046, [email protected] 14. The Chief Engineer (PM&C), Narmada Hydroelectric Development Corpn. Ltd, NHDC Parisar, Shamla Hills, Bhopal – 462013., Fax No- 0755-4030130,Email – [email protected] 15. The Chief Electrical Distribution Engineer, West Central Railway (WCR), General Manager’s Office, Electrical Department, Jabalpur-482001 (MP), Fax: 0761-2627629, Email- [email protected] 16. The General Manager, Indira Sagar Power Station, NHDC Office complex, PO : Narmada Nagar, Distt : Khandwa (MP) – 450 119, Fax No- 07323-284080, Email – [email protected] 17. The General Manager, Omkareshwar Power Station, Prashsnik Bhawan, Urja Vihar, Sidhwarkut, Distt : Khandwa (MP) – 450 554, FaxNo-07280-271703, Email- [email protected] 18. The Director (Projects), BLA Power Limited, At : Niwari, PO: Khorsipan, Tah : , Distt ; 487 551, Fax No. 07791-243667 / 243669, Email – [email protected] 19. The Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Agasod, Post Office-Bina- 470113 Distt- Sagar, Fax No. 07580-277200, Email – [email protected]

20. The Deputy General Manager, Kalpataru Satpura Transco Pvt. Ltd., Satpura Colony, Betul Road, Old Itarsi, Distt. Hoshangabad, Email – [email protected]

21. M/s Ujaas Energy Ltd. 701, NRK Business park, Vijay Nagar Sqaure, Indore – 452010, Email id :- [email protected] 22. M/s Suzlon Global Services Ltd., 1090, Scheme no. 114, Park-2, Ring Road, Universal Hospital Row, Email- [email protected], Indore – 452010, [email protected]

MINUTES FOR 54TH MEETING OF OPERATION & COORDINATION COMMITTEE OF MP HELD AT SLDC, MPPTCL, NAYAGAON, JABALPUR ON 22ND OCTOBER 2016 AT 11.00 AM.

The 54th meeting of Operation & Coordination Committee of MP held on 22nd October 2016 at SLDC, MPPTCL, Nayagaon, Jabalpur under the Chairmanship of Shri P.A.R. Bende C.E.(SLDC) & Chairman OCC. The list of participants is enclosed at Annexure -1.0.

Shri P.A.R.Bende C.E (SLDC) & Chairman OCC welcomed all the participants attending the OCCM.

He stated that the frequency profile has been improved considerably over the last two months and informed that the constituents of regional grid as well as state grid in general are keeping their drawal within the permissible range defined in the DSM regulation. Percentage of time frequency within the permissible range of 49.9 -50.5Hz was 73.74% for the month of Aug 2016 and 75.15% for the month of Sept 2016. The frequency was within operating range for higher duration which is a remarkable improvement in the system. The average frequency for the month of August & September 2016 was 50.00 Hz. The % of time frequency above 50.05 Hz. for the month of September 2016 has reduced to 19% in comparison to 20.32% in the month of August 2016. The % of time frequency below 49.9 Hz was 5.94% for the month of August and was 5.85% for the month of September 2016. Chairman OCC also stated that efforts are being made and measures are being taken to run the system within the permissible frequency range so as to increase to achieve 85% for better system operation. He also intimated the committee that during rainy season the system operated smoothly and the system parameters was maintained well within limits.

The Chairman OCC also informed the committee that in the month of September 2016, Black Start Mock Drills has been conducted successfully at 5 Nos. Hydel Power Stations i.e., at Bargi HPS, Pench HPS, Tons HPS, ISP and OSP. The Black Start Mock Drill at OSP HPS was successfully conducted for the first time and it is a remarkable achievement as the Unit at OSP HPS was operating below MDDL and its governor has responded/operated smoothly during the mock drill. He also stated that a mock drill exercise has to be planned and conducted in which two Black Start islands are to be formed and synchronized with each other and with the National Grid. To perform this activity synchronization trolley will be required at S/s falling on the Black Start path.

Thereafter he informed the committee that the Draft Regulation of the CERC (Communication System for Inter-State transmission of electricity) Regulation 2016 has been forwarded for suggestion/objection/comments. As per the regulation 99.98% and above availability of communication/SCADA is required to be maintained.

He also informed the committee that the interruption occurring for 15min and above in a day is to be reported daily to energy department and all concerned. Thus the attention is required to avoid and minimize the interruption and emphasizing on supplying the power uninterruptedly.

Thereafter Chairman OCC requested, Member Secretary OCC to take- up the agenda points.

ITEM NO.1 : CONFIRMATION OF MINUTES : Member Secretary OCC informed the committee that the minutes of 53rd meeting of operation & coordination committee of MP held on 27th Aug 2016 at SCADA Control Centre, Nayagaon, MPPTCL,Jabalpur were forwarded to the committee members vide NO. 07-05/SG-9B-II/2288 dated 22.09.2016.No comments have been received to SLDC, Committee confirmed the minutes.

Minutes Of 54th OCCM Of MP 1

ITEM NO.2: REVIEW OF SYSTEM OPERATION DURING THE MONTHS AUG & SEP 2016:

2.1 Frequency Particulars: Member Secretary OCCM informed the committee that during Sept 2016 the system frequency was below 49.9 Hz for 5.85% of time against 5.94% of time during Aug 2016. The system frequency was above 50.05 Hz for 19.00% of time during Sept 2016 against 20.32% of time during Aug 2016. The system frequency was within the IEGC range of 49.9-50.05 Hz for 75.15% of the time during Sept 2016 against 73.74% of time during Aug 2016. The average monthly frequency was 50.00 Hz during month of Aug and Sept 2016. The system frequency did not touch 49.20 Hz during the above period.

The detailed frequency particulars for the month of Aug 2016 and Sept 2016 are enclosed at Annexure-2.1. The brief detail of frequency profile is given here under:

Month Average Minimum Maximum Instantaneous Instantaneous frequency integrated integrated minimum maximum frequency over frequency over frequency frequency an hour an hour Aug 2016 50.00 Hz 49.67 Hz 50.14 Hz 49.65 Hz 50.35 Hz Sept 2016 50.00 Hz 49.85 Hz 50.09 Hz 49.67 Hz 50.24 Hz

The Member Secretary informed the Committee that average frequency during the past two months was 50 Hz which is good sign for stability and security of national grid. However matter of frequency above 50.05 Hz for more than 20% time is of great concern and Instantaneous maximum frequency 50.35 Hz is very high. Maintaining frequency within the IEGC specified band is the combined responsibility of all the constituents of national grid and MP alone cannot control the grid frequency.

2.2 Operational Matters

2.2.1 Member Secretary, OCC informed the committee that system operated in terms of frequency profile for the month of August & September 2016 is as given below for discussion by the committee-

Month % of time % of time % of time Average No. of times Frequency Frequency frequency within monthly frequency Below 49.9 above 50. 05 Hz the permissible frequency dipped below Hz range of 49.9- 49.2 Hz 50.05 Hz Aug 2016 5.94 % 20.32 % 73.74 % 50.00 Hz 0 Sept 2016 5.85 % 19.00 % 75.15 % 50.00 Hz 0

2.3.1 Voltage Profile: Member Secretary, OCC that during the months August & September 2016, the maximum, & minimum voltage as recorded at following important 400 KV sub-stations in MP Grid.

Aug 2016 Sept 2016 Max. Voltage Min. Voltage Max. Voltage Min. Voltage Name of observed observed observed observed Sr 400 KV Volt No Substation Voltage Voltage Voltage Date Date Date age Date KV KV KV KV 1 Indore 423 08.08.16 401 27.08.16 424 17.09.16 397 12.09.16

Minutes Of 54th OCCM Of MP 2 2 Itarsi 420 07.08.16 398 27.08.16 420 03.09.16 395 12.09.16 3 Bina 419 08.08.16 399 27.08.16 419 01.09.16 397 12.09.16 4 Gwalior 421 10.08.16 385 04.08.16 420 16.09.16 387 12.09.16 5 Nagda 427 08.08.16 406 29.08.16 426 02.09.16 399 12.09.16 6 Satpura 42 7 01.08.16 409 26.08.16 427 02.09.16 409 12.09.16 7 Birsinghpur 424 07.08.16 409 04.08.16 424 29.09.16 410 12.09.16 422 07.08.16 404 429 28.09.16 409 28.09.16 8 ISP 30.08.16

2.3.2 Status of Capacitor Banks in sub-transmission system : Member Secretary, OCC informed the committee that the updated information of the status of capacitor banks in sub-transmission system as on 30th Sept 2016 as submitted by DISCOMs is as detailed below:

Capacitor bank Capacitor Capacitor Req Requirem Capacitor Balance installed in Banks bank installed uirem ent against banks capacitor good condition healthy but but defective & ent of non- already banks to be (No) not in service are repairable repair repairable covered covered in due to control (No) again capacitor under ADB other ckt problem st banks T-V schemes DISCOM each unit

(No) 600 1200 1500 600 1200 1500 600 1200 1500 No of 600 1200 600 1200 600 1500 KVA KVA KVA KVA KVA KVA KVA KVA KVA 100 KVA KVA KVA KVA KVA KVA R R R R R R R R R KVAR R R R R R R Units required EZ 381 159 26 - - - 60 13 01 29 0 0 0 0 0 77 CZ 5 687 686 0 0 0 0 0 0 0 0 0 0 588 0 0 WZ 626 544 406 18 11 16 30 21 73 357 4 15 - - 0 170

Chairman OCC stated that in the forthcoming Rabi Season, the availability of capacitor banks in the distribution network is utmost necessary for maintaining the voltages within operational range. He also requested the Discoms to furnish all the information in the above mentioned format and ensure healthiness and availability of capacitor banks during ensuing Rabi season.

2.3.3 Status of Shunt Capacitor Banks installed at various EHV Transmission Substation: The Member Secretary, OCC informed the Committee that the updated information of the status of Installed capacitor banks (in MVAR) in EHV transmission system as on 30.09.2016 as submitted by MPPTCL is given below:-

Voltage Capacitor bank Capacity Capacitor banks Capacitor Bank Class installed as on Added after already covered Installed but defective 30.09.16(MVAR) Last OCC under ADB T-V & are not repairable Meeting (No & MVAR) (MVAR) 220 KV 100.00 MVAR 0.00 100.00 MVAR All in Service 132 KV 1205.00 MVAR 0.00 1205.00 MVAR

Minutes Of 54th OCCM Of MP 3 33 KV 4336.50 MVAR 48.00 4384.50 MVAR Total 5641.50 MVAR 48.00 5689.50 MVAR

The Chairman OCC brought to the notice of the committee that during the last two meetings MPPTCL assured to submit the details of capacitor banks within a week time but not kept the promise.

It was also stated that the calculation of ATC/TTC cannot be done without modeling of capacitor bank details in PSS/E software. It was requested to MPPTCL to submit the details of capacitor banks installed at various EHV sub-stations along with their capacity and healthiness, so that the same can be modeled in PSS/E software.

MPPTCL representative agreed to furnish the above information at the earliest.

2.3.4 Status of completion of ongoing Transmission Schemes being executed by MPPTCL: Member Secretary, OCC Informed the various ongoing Transmission Schemes completed during the current financial year 2016-2017 (up to Sept. 2016) and plan for completion of various ongoing Transmission Schemes for the Year 2016-2017 is enclosed as Annexure 2.3.4(i) and 2.3.4(ii).

2.3.5 U/F and df/dt Relay Operation

(i) U/F and df/dt Relay Operation: Member Secretary, OCC informed the committee that frequency did not touch 49.20 Hz during Aug 2016 and Sept 2016. There was no df/dt operation during the same period.

(ii) Defective u/f, df/dt relays; Member Secretary informed the committee that MPPTCL has informed that all the df/dt relays are in good/healthy working condition and where the U/F relays are not available, the numerical relays programmed for under frequency operation.

2.4 Power Cuts / Load restrictions/Differential Load Shedding by DISCOMS & group allocation to 33 KV feeders : (i) Member Secretary informed the committee that the details of DISCOM wise Power supply given to various domestic categories during the period Aug 2016 and Sept 2016 is enclosed at Annexure 2.4(i). (ii) Group Allocation to Newly Commissioned existing EHV substations:- Member Secretary, OCC informed the committee that the region wise list of 33 KV feeders emanating from various newly commissioned/existing EHV substations for which groups have not been allocated is given in Annexure 2.4. (iii) The DISCOM wise details of pending group allocation to 33 KV feeders is given below:-

SN DISCOM Region No of 33 KV feeders for which groups to be allocated 01 Jabalpur 03 02 Sagar 00 EAST 03 Rewa 00 04 Total 03 05 Indore 10 06 WEST Ujjain 09 07 Total 19 08 Bhopal 18 CENTRAL 09 Gwalior 05

Minutes Of 54th OCCM Of MP 4 10 Total 23 TOTAL Grand Total 45

East Discom representative informed the committee that all three nos. feeder group allocation has been done. Representative from Central Discom informed that group allocation for feeders which have been allocated group, letter will be sent shortly. West Discom representative informed that five no. feeders group allocation has been done and four no. feeders are lying under uncharged condition and nine Nos. are remaining for which group to be allocated.

The current updated status is enclosed at Annexure-2.4(ii).

ITEM NO. 3 : OPERATIONAL PLANNNING:

3.1 Generating Units under planned outage and proposed maintenance programme : Member Secretary, OCC informed the committee that the annual maintenance /outages of thermal generating units of MPPGCL during Nov’16 to Dec‘16 is Nil as intimated by ED(O&M:Gen.), MPPGCL, Jabalpur.

3.2 Proposed shutdown programme of Transmission lines / Transformers : The Member Secretary, OCC informed the proposed shutdown of transmission elements for the period 01.11.2016 to 31.12.2016 submitted by MPPTCL is enclosed as Annexure-3.2.

3.3 Long Outages of transmission elements and protections : The status submitted by MPPGCL / MPPTCL are given below :

S Line/Transformer/ Outage date Reason Response from Utility N Breaker/ Reactor etc under long outage MPPGCL representative informed that 220 KV Busbar protection scheme of M/s GE Bangalore has been commissioned on dtd.23-05-2016 & taken into service w.e.f 220 KV Bus bar Due to mal-operation 26.07.2016. Due to mal-operation 1. protection scheme at 07.09.2016 220 KV Bus Bar it has been kept out since SGTPS Birsinghpur Protection kept out. 07.09.2016 as intimated by SE (ET&I), SGTPS. MPPGCL representative informed that 220 KV bus-bar protection has been kept under observation from last week of September 2016 and at present it is out of service. 400 KV Rajgarh II is charged from 400 KV Main Bus-I, for ensuring connectivity with Main Bus-II. The work is in progress with work of providing Reactor on ISP Bay. Main Breaker of 400 Y-phase CT burst / 400 KV Rajgarh-I is shifted in 2. 23.07.15 KV Nagda-Rajgarh-II BKR Problem diameter of 315 MVA ICT-IV, which has facility to connect on Main Bus-I and Main Bus-II. This will impact when outage of Bus-II occurs in outage of Nagda- Rajgarh–II circuit. MPPTCL

Minutes Of 54th OCCM Of MP 5 representative informed in the meeting that the work will be taken up by end of December, 2016. The defect developed in transformer and matter taken up with M/s ECE for its repair. The transformer has been shifted to 40 MVA 132/33 KV ECE works for repairs and Internal sparking in Transformer ECE reconditioning. Repair work is 3. 06.10.2015 Y Ph. HV side make at 132 KV completed, testing is also winding. completed. Transformer will be commissioned by 31.10.2016 as intimated by MPPTCL. MPPTCL representative confirmed the above in the meeting. . The transformer bank is out of circuit from 02.08.2015. 2 No. 105 MVA Units of these banks have failed. The complete bank has to Differential be replaced with 1X315 MVA 3 3x105 MVA, 400/220 protection optd. and Ph. Transformer. 315 MVA BHEL 4. KV ICT-I at 400 KV 02.08.15 33 KV tertiary PT make transformer has been Indore burst unloaded on plinth on 28.04.2016 and erection work is in progress. As intimated by MPPTCL, the transformer has been commissioned on 14.10.2016. The 315 MVA X’mer Sr. No. 6005210 is out of circuit from 15.10.2015. The Transformer has been shifted from Bina to M/s 315 MVA, 400/220 Due to Buchholtz BHEL works for repairs. The 5. kV ICT-I at 400 kV 15.10.15 relay alarm. order for repair has been placed S/s Bina and expected ICT to be received by end of December 2016 as intimated by MPPTCL in the meeting. The ICT has been removed for installation at Bina 400 KV S/s and commissioned there at 16:49 Hrs. on dtd. 05.01.2016. In 52nd OCCM MPPTCL representative 315 MVA, 400/220 informed the committee that new 6. KV ICT at 400 KV 05.01.2016 Transformer of 315 MVA, 400/220 S/s, Julwaniya KV EMCO make order has been placed and it will be commissioned by the end of Jan- 2017. MPPTCL representative confirmed the same in the meeting. It has come to notice that the transformer-II has been connected through bus coupler breaker both side (400 KV & 220 KV) and there is no main breaker 315 MVA, 400/220 X’mer commissioned nd for this 315 MVA X’mer-II. In 52 KV X’mer II (TELK through bus coupler 7. 03.11.2015 & 53rd OCCM MPPTCL informed make) Main Breaker breaker since the committee that work will be at 400 KV S/s commissining. completed by the Sep-2016. MPPTCL representative informed that work of 220 KV side circuit breaker has been completed and 400 KV side CB shall be

Minutes Of 54th OCCM Of MP 6 completed by end of November 2016. The replacement of the failed Differential transformer by another 20 MVA 20 MVA, 132/33 KV Protection optd. 20 transformer carried out and 8. transformer at 132 01.03.2016 MBA BBL make transformer charged on KV Neemuch X’mer Sr. No. 1991/2 05.10.2016 as intimated by failed on 01.03.2016 MPPTCL. 40 MVA ,132 /33 KV Internal inspection of X’mer will Transformer failed EMCO make X’mer be done after rainy season and on dated 10.05.2016 9. Sr.No. HT- 10.05.2016 transformer is likely to be charged as intimated by T&C, 1344/11641 at 132 by 10.11.16 as intimated by MPPTCL. KV S/s Ashta MPPTCL representative. 20 MVA APEX make Transformer failed 132/33 KV X’mer Sr. New 50 MVA X’mer charged on on 16.05.16 as 10. No. T-739/45342 at 16.05.2016 28.09.2016 as intimated by intimated by T&C, 220 KV S/s MPPTCL. MPPTCL. Nepanagar The load is manageable through (1x20 + 1x40) MVA X’mers in running condition at S/s Pichhore. Hence replacement of failed X’mer is not required as intimated by MPPTCL. In 52nd OCCM, 12.5 MVA, 132/66/33 Transformer failed Chairman OCC requested KV X’mer CGL make on 19.05.2016 as 11. 19.05.2016 MPPTCL, P&D to submit the Sr. No. 23615 at 132 intimated by T&C, letter for removal of transformer KV S/s Pichhore MPPTCL. from Asset. Chairman, OCC again requested MPPTCL, P&D in the meeting for necessary formalities for decommissioning of transformer from asset. X’mer is under testing and investigation. Another transformer 20 MVA, BBL Make Tripped on has been allocated for X’mer (Sr. No.- 12. 08.07.2016 differential replacement and likely to be 2195/4) at 132 KV indication. charged by 10.11.2016 as S/s . intimated by MPPTCL representative in the meeting. It has been proposed to withdraw the X’mer from system as intimated by MPPTCL. 12.5MVA, BBL Make Chairman OCC requested P&D, 13. (Sr. No.-1428/3) at Not intimated X’mer failed MPPTCL in the meeting for 132 KV S/s Chapda. decommissioning of the transformer and necessary formalities thereof. X’mer is under investigation and testing. Internal Inspection of 40 MVA, ECE Make X’mer shall be done as soon as X’mer (Sr. N0.- Tripped in differential monsoon permits. Transformer is 14. 14.06.2016 86020) at 132 KV S/s indication. likely to be charged by Shajapur. 06.11.2016 as intimated by MPPTCL representative in the meeting. 50 MVAR Line MPPTCL representative informed Reactor of 400 KV the committee that matter is being Tan-∂ of the bushing 15. Katni – Damoh Ckt at Not intimated. resolved and by end of November was not correct. 400 KV S/s Damoh 2016 line reactor shall be put into (PGCIL). service. 40 MVA, 132/33 KV DI of 50 MVA transformer is Defect developed in 16. BBL X’mer at 132 KV 25.09.2016 issued and likely to be charged by transformer S/s, Chourai 10.11.16 as intimated by

Minutes Of 54th OCCM Of MP 7 MPPTCL representative in the meeting. 40 MVA, 132/33 KV The transformer commissioned Defect developed in 17. APEX X’mer at 220 17.08.2016 on dtd. 20.10.16 as intimated by transformer KV S/s S/Z, Indore MPPTCL. 160 MVA, 220/132 MPPTCL representative informed 18. KV BHEL X’mer at 30.09.2016 Not intimated that transformer is under testing & 220 KV S/s Jabalpur investigation. Capacity 20 MVA, 132/33 KV enhancement work The 20 MVA transformer shifted 19. X’mer at 132 KV S/s 07.09.2016 (20 MVA X’mer to be to Neemuch as informed in the Jaora. replaced by 50 MVA meeting by MPPTCL. X’mer).

3.4 Shut down proposed by O&M Hydel, MPPGCL(During Nov. & Dec., 2016):- 3.4.1 Gandhisagar HPS –

(i) 132 KV RPS Feeder, 132 KV Bus Coupler and 20 MVA ICT – 3 days S/D for each bay will be required for replacement of existing 132 KV MOCB with SF6 GCB in November 2016.

(ii) 132 KV RPS-2, 132 KV Manasa, Garoth & Suwasara feeders, GT-4 & 5 – 3 days S/D for each bay will be required for replacement of existing 132 KV MOCB with SF6 GCB in December 2016.

3.4.2 Pench HPS –

132 KV Seoni feeders 1 & 2 and 132 KV Kanhan feeders 1 & 2 – 3 days S/D for each bay will be required for replacement of existing 132 KV MOCB with SF6 GCB in November 2016.

3.4.3 Bargi HPS –

132 KV Jabalpur 1st & 2nd Ckts, 132 KV Lakhnadon feeder and 132 KV Bus Coupler- 3 days S/D for each bay will be required for replacement of existing 132 KV MOCB with SF6 GCB in November 2016.

MPPGCL representative informed that the date-wise shut-down proposal for above work will be informed in due course after confirmation from company engineer and related work agency.

ITEM NO. 4 : OPERATIONAL STATISTICS FOR THE MONTH OF AUG 2016 AND SEPT 2016:

Member Secretary, OCC informed the committee that the details of actual generation, Schedule from Central Sector, demand etc. are given in the following Annexures:

Annex. 4.1 Unit wise actual Generation of MPPGCL thermal Units and station wise Generation of MPPGCL & NHDC Hydel Units. Annex. 4.2 Power Supply Position. Annex. 4.3 Hourly Average of Availability and Demand. Annex. 4.4 Hourly average schedule Vs Drawal of DISCOMs.

ITEM NO. 5.0 : SYSTEM DISTURBANCE IN MP DURING AUG 2016 AND SEPT 2016 : Chairman OCC informed that there was no major grid disturbance in MP during Aug 2016 and Sept 2016. The details of Grid Disturbances and Grid Incidents in MP during these months are given in Annexure 5.0.

ITEM NO. 6.0 : IMPORTANT OPERATIONAL ISSUES:-

Minutes Of 54th OCCM Of MP 8 6.1 STATUS OF COMPLETION OF ONGOING SCHEMES FOR COMMISSIONING OF REACTORS / TRANSMISSION ELEMENTS:- Chairman, OCC informed the committee that the present status regarding schedule and commissioning of reactors / transmission elements is as below:-

Sr. 400 KV S/S Size Implementing Expected Date of No. MVAR Agency Commissioning as intimated in last OCC 1 Bus Reactor : ISP 125 MVAR NHDC NHDC informed that the order for bus reactor has been placed on 03.08.2016 and tentative date of commissioning by end of June, 2017. 2 Line reactor at Nagda-ISP line 50 MVAR MPPTCL MPPTCL representative informed that the work will be at Nagda end completed by March, 2017. 3 Line Reactor on 400 kV Satpura 50 MVAR MPPGCL MPPGCL representative –ISP line at STPS. informed that procurement of line reactor is under process and tender has been opened & will be made available by February-2017. The MPPGCL representative informed in the meeting that matter is being forwarded to PSDF for sanction and thereafter work will be taken up. Chairman, OCC requested, after sending the case, tender may kindly be issued for procurement etc. 4 Bus Reactor at SSTPS 125 MVAR MPPGCL Work will be carried out under PSDF as intimated by MPPGCL. Thereafter Chairman OCC intimated that procurement process can be started without waiting for PSDF approval. MPPGCL representative informed in the 54th OCCM that NIT shall be floated in the last week of October 2016 and Reactor is expected by June 2017.

6.2 Provision of synchronization facility at EHV sub-stations of MPPTCL:- Member Secretary, OCC informed the committee that as per Grid Code, the synchronization facility should be available at all the Power Stations, 400 KV Sub-stations and 220 KV Sub-stations and 132 KV sub-stations in the path of black start. In last OCC meeting MPPTCL representative informed the committee that the procurement of synchronization trolley is under tendering stage. It was informed by chairman OCC that synchronization trolley at 400 KV S/s Indore is not in order and requires immediate attention for its proper functioning.

MPPTCL informed that procurement order for 67 Nos. synchronization trolleys has been placed on M/s Wenson, Bangalore and delivery is expected by February 2017.

6.3 System Protection Scheme (SPS) in Madhya Pradesh:- Member Secretary, OCC informed that In the last meeting Chairman OCC had requested MPPTCL to submit the complete details of all SPS

Minutes Of 54th OCCM Of MP 9 commissioned in MP along with load shed quantum to SLDC, so that the copy of the same could be placed in Control room of SLDC and concerned substation / power station for reference and record.

MPPTCL representative informed that the information has been furnished.

6.4 SCHEDULING ACTIVITY BY MPPMCL ON BEHALF OF DISCOM:- Member Secretary OCC informed the committee that SLDC has taken up the issue of round the clock functioning of MPPMCL Control Room so that revision to schedule requisitions are made on behalf of DISCOMs as only two shifts were running and only day ahead activities were performed by MPPMCL CR.

In 52nd OCCM CGM (PM), MPPMCL informed the committee that independent functioning from MPPMCL Control Room shall be started from 1st August 2016. The MPPMCL has again requested to extend the date for functioning of their control room and shifting their officials from SLDC Control Room for 15 days i.e., till 15th August 2016. Accordingly SLDC vide letter no. 07-05/RPC-54/1734 dated-06.08.2016 requested MPPMCL to arrange to shift the MPPMCL officials from SLDC Control Room to MPPMCL Control Room by 16.08.2016 positively. In last 53rd OCCM, MPPMCL representative informed the Committee that independent functioning from MPPMCL Control Room will be started by 15th September 2016. However the functioning from MPPMCL Control Room has not yet been started.

Chairman OCC requested to immediately start the functioning of Tradeco CR from MPPMCL Control Room where SLDC SCADA terminal has been provided.

MPPMCL representative informed that the independent functioning from MPPMCL Control room will be started independently after Diwali festival.

6.5 BLACK START MOCK DRILL OF OSP:- Member Secretary, OCC informed that the Black Start Mock Drill of Omkareshwar Hydel Power Station was carried out successfully by SLDC on 15th October 2016. The Black Start Mock Drill of each Hydel Power Station is conducted as per standard procedure developed by the SLDC. It is observed while conducting the Black Start Mock Drill of OSP, 220 KV bus voltage could not be kept low i.e. within 130 to 140 KV, at the time of restoration of islanded portion of the State Grid due to some inherent setting in the control circuitry of OSP machine. The voltage at 220 KV Chhegaon end was about 225 KV which was quite high for charging of transformer during restoration of the system after black out. NHDC may check the control circuitry and find out the solution for controlling bus voltage / generator voltage while restoration of the system.

It was also found that during the restoration process, substation staff of 220 KV Chhegaon S/s had charged the 160 MVA Transformer-I by their own with MP Grid without instruction of SLDC which was not to be done as per procedure prepared by the SLDC. Such type of switching operations may interrupt the whole Black Start Mock Drill. Some other operational & maintenance issues were also noticed at 400/220 KV S/s Chhegaon, MPPTCL. Chairman OCC requested to instruct all the sub-station staff under their jurisdiction to follow the instructions of SLDC strictly. MPPTCL representative informed that instructions are being issued in the above matter to the field staff. OSP representative informed that issue of voltage control and other issues observed during black start performed on 15.10.2016 at OSP are being taken up with OEM and related authorities.

6.6 Overloading of 220 KV Gwalior(PGCIL)-Malanpur Ckt. I & II:- Chairman, OCC informed in the meeting that presently loading of 220 KV Gwalior (PGCIL)-Malanpur Ckt. I & II remain on higher side and it

Minutes Of 54th OCCM Of MP 10 is expected to increase further in the ensuing rabi season and may cause over loading of these lines. The matter of over loading was intimated to the Chief Engineer (T&C), MPPTCL and as suggested, request was made to the WRLDC to allow radial feed of 220 KV S/s Mehgaon from 220 KV Auraiya-Mehgaon and bunching of 220 KV Auraiya-Malanpur line & 220 KV Malanpur-Mehagaon line. This proposal was forwarded to GM, WRLDC to allow SLDC for making this temporary arrangement to cater the load of 220 KV Mehalgan and Mehgaon Substations during rabi season. WRLDC has examined the matter and intimated non feasibility for this temporary arrangement on the plea that it would stress the WR-NR corridor and make the Malanpur & Mehgaon areas vulnerable. Chairman, OCC discussed the matter and apprised of system constraints in Gwalior region. He stated that in case of over loading in Mehgaon, Gwalior-Malanpur line etc. in the area, it will be required to take up load shedding in the area. The problem will be of temporary nature till new 400 KV sub-station at Morena is constructed along with associated 220 KV lines. He requested MPPTCL to suggest and make alternate arrangement for meeting the round the clock load of Malanpur and Mehgaon area without any load shedding.

6.7 Generation from Tons HPS during Rabi Season:- Chairman, OCC informed that during meeting held in Regional Office of MPPMCL at Bhopal on 24.09.2016 to discuss availability from Sardar Sarovar Project, ISP & OPS and State Hydel Plants for Rabi season, MPPGCL had intimated that 315 MW power would be available from Tons HPS during peak load hours during the Rabi season. It has been observed in the past years that availability of water for generation from the Tons HPS is very less due to restriction imposed by WRD for discharge of water through Jinna HPS and only 10 to 15 LU per day generation was possible from Tons HPS in the Rabi season of last year and simultaneous operation of all the three machines of Tons HPS is not possible during peak demand hours during the period of low availability of water. He further stated that Tons machines are also required to be run to meet the load of Rewa, Satna & Sidhi areas to off load the over loading of 400/220 KV ICTs at 400 KV S/s Satna (PGCIL) as & when required and hence MPPGCL should take up the matter with WRD, GoMP for sufficient discharge of water for generation from Bansagar reservoir so that all the three machines of Tons HPS could be run all together to meet the peak demand hours. He also requested MPPGCL to obtain the Ten Daily reservoir operation schedule from WRD for all its reservoirs and submit the same to SLDC latest by 29th October 2016.

6.8 Requirement of load details of transmission elements for reliability study using PSS/E Software:- Chairman, OCC informed the committee that the PSS/E Software Modelling for reliability/load flow studies is being done at National level so that the grid security matters are dealt efficiently and reliably to avert grid disturbance like situations and for availing shut downs and the same is being done at state level/regional levels throughout the country. The reliability studies using PSS/E software is being done at state level by SLDC for which loading details (in MW & MVAr) of 132/33 KV X’mers, 220/33 KV X’mers, 220 KV & 132 KV Railway Traction feeders and 220 KV & 132 KV Industrial feeders of M.P State Grid were requested from CE(T&C) vide letter No.-07-05/RPC-35/502 dated- 07.05.2016 for following date & time:-

1. 25th December 2015 – 11:00:00 Hrs. 2. 25th June 2015 – 13:00:00 Hrs. 3. 19th May 2016 – 23:00 Hrs.

These details are not submitted to SLDC despite repeated persuasion. Chairman, OCC requested MPPTCL to provide the details to SLDC in soft & hard copies within a week.

6.9 Less generation from ISP Machines for not getting schedule as per Ten Daily:- Chairman, OCC informed the committee that as recorded in the Minutes of Meeting held in MPPMCL, Bhopal 24th September 2016 to ascertain hydel availability during rabi season 2016-17, NHDC had reported that they are not getting

Minutes Of 54th OCCM Of MP 11 schedule from SLDC as per ten daily and thus more generation from ISP & OSP could have been made during 2015-16, if ten daily was followed.

The Chairman, OCC informed the Committee that NVDA, Bhopal had instructed to maintain reservoir of ISP upto 247 Mtrs by 30th June 2016 and SSRRC also proposed discharge of ISP & OSP considering the limitation put on ISP reservoir and issued ten daily discharge schedule accordingly. SLDC by giving appropriate scheduling, had brought down the ISP level to 246.91 Mtrs on 30.06.2016 i.e. below the minimum level that was to be maintained as per instructions of NVDA, Bhopal,, which proves that less generation from ISP/OSP was not done.

The full quantum of water available for electricity generation in ISP reservoir was utilized and ISP may apprise the committee how more generation from ISP & OSP machines could have been possible with strictly following ten daily.

Chairman, OCC stated that as per restriction of 247 Mtr level as on 30.06.2016, the water at ISP reservoir was utilized efficiently. The NHDC also agreed for the same.

6.10 Non Compliance of SLDC Instructions by ISP:- Chairman, OCC informed in the meeting that it has been noticed on several occasions that Shift In-charge of ISP refuses to reduce generation on the running machines whenever it is required reliable & secure system operation of the State Grid. The request made to ISP to reduce the generation to the tune of 90MW on each running machines for the time being to avert emergency in the grid is not honoured by Power House Incharge which is violation of IEGC & MPEGC.

The matter was discussed in the meeting and representative from ISP, NHDC agreed for reducing the generation to the tune of 90 MW on each running machines from grid security and safe system operation point of view and necessary instruction to this effect will be issued to Power House staff.

6.11 Reactive Power Management in high demand period:- Member Secretary informed the committee that during the ensuing rabi season, irrigational load shall increase tremendously which may deteriorate the voltage profile of the grid. Thus to improve the voltage profile and to keep the system parameter within operational limit, it is necessary to provide appropriate reactive compensation in the transmission as well as distribution network.

He requested Transco and Discoms to ensure that Capacitor Banks installed under their area of jurisdiction are in healthy conditions and may be taken into service as & when required with the increased load of irrigational pumps to maintain voltage profile of the grid. Any low voltage noticed in the transmission & distribution network should be reported to SLDC promptly for taking appropriate measures to improve the voltage profile in that particular area.

6.12 Integration of New Transmission Elements into the Grid:- Chairman OCC informed that the transmission system in Madhya Pradesh is growing at a rapid pace. The process of integration/charging of new transmission elements belonging to each entity require compliance of certain regulatory requirements and sharing of information/submission of documents to SLDC/RLDC. Therefore minimum required mandatory documents to be submitted to SLDC/RLDC prior to issue of charging code for new transmission element are as follows:-

1. Copy of approval by Electrical Inspector.

2. Intimation by Transmission Licensee Regarding anticipated charging of new elements (Annexure6.12-A)

3. List Of Elements to be charged and Element Rating details. (Annexure- 6.12-B).

4. Undertaking by Transmission Licensee in respect of Telemetry and communication (Annexure- 6.12-C).

He requested that all the intra-state entities should provide the above data in prescribed formats (enclosed) to SLDC/RLDC prior to charging of new transmission elements.

Minutes Of 54th OCCM Of MP 12 Chairman OCC requested all the interstate entities to provide the required information in advance in order to meet out regulatory requirements and to avoid delay in integration/charging of new transmission elements. He further requested MPPTCL to circulate and apprise the field officials of EHT & T&C Wing to follow this procedure invariably.

6.13 Deviation in Merit Order Despatch for Grid Security:- Member Secretary, OCC informed the committee that MPPMCL on behalf of Discoms gives requisition based on individual merit order i.e. in ascending order of cost of energy (variable cost) of ISGS, SSGS, IPPs etc. As per Section 5.12 of Balancing & Settlement Code while preparing generation schedules, SLDC shall keep in view the transmission system constraints and provision of operating margins (reserves). In compliance to aforesaid provision of Balancing & Settlement Code, SLDC may direct MPPMCL not to take certain generating units under Reserved Shut Down having higher variable cost for safe, secure & reliable operation of the State Grid.

Some of the critical locations in the State Grid are 220 KV Side evacuation from STPS to ensure reliability of ICT at 400 KV Itarsi S/s and over voltage scenario at SGTPS 400 KV side mandating running of 500 MW unit during monsoon season/low load conditions.

ITEM NO. 7: BLACK-START MOCK DRILL OF HYDEL POWER STATIONS :

7.1 Black Start mock drill of Hydel stations of MPPGCL :- Member Secretary, OCC informed the committee that the last black start mock drill of Gandhisagar HPS was done successfully on 04.04.2016 with extending supply to 132 KV S/s, Bherugarh, Ratadiya & Ujjain for Simhastha 2016. The Black Start Mock Drill at Bargi, Pench, Indira Sagar Power Station (ISP) and Omkareshwar Power Station ( OSP) was successfully completed on 28.09.16, 06.10.16, 14.10.16 & 15.10.16 respectively. As per IEGC Black Start Mock Drill shall be conducted in every 6 months duration.

In compliance to IEGC, SLDC proposed that the black start mock drill of all the Hydel Power stations in MP including Tons, Birsinghpur, Rajghat and Madikheda HPS shall be conducted on 20.10.16, 10.11.16, 16.11.16, & 18.11.16, respectively. He requested MPPGCL to take up necessary measures for conducting the Black Start Mock Drill at these Hydel Power Stations.

Representative from MPPGCL agreed for Black Start Mock Drill of the remaining Hydel Power Stations.

ITEM NO 8: SOME IMPORTANT MATTERS REQUIRED IMMEDIATE ATTENTION:

8.1 Quarterly Review of Crisis Management Plan: Member Secretary, OCC informed the committee that the NHDC & SLDC is submitting the quarterly crisis management report to Chief Engineer (GM), CEA New Delhi under intimation to SLDC Jabalpur and WRPC Mumbai.

However despite continuous persuasion by SLDC other state utilities i.e. MPPTCL, MPPGCL and IPPs are not submitting the report to CEA. It is requested to submit the CMP report in prescribed format for the First quarter & second quarter of 2016-17 (April-June & July-Sept 2016) to CEA under intimation to SLDC.

8.2 Status of Physical & Cyber Security in Power Sector regarding: Member Secretary, OCC informed the committee that the status of physical & cyber security in Power Sector for the first quarter (April to June 2016) has not been received from any of the state utilities. In the past also this report is not being furnished by any of the state utilities despite constantly pursuing the same by SLDC in OCC meetings and also through correspondence.

Minutes Of 54th OCCM Of MP 13 The state entities are requested to furnish the Status of physical & cyber security in Power Sector for First quarter and second quarter of 2016-17 (April-June & July-Sept 2016) directly to the Chief Engineer (GM), CEA New Delhi under intimation to SLDC Jabalpur and WRPC Mumbai.

ITEM NO. 9: AVAILABILITY BASED TARIFF (ABT) RELATED ISSUES: 9.1 Status of AMR system installed at SLDC:

SLDC representative informed the Committee about the status of AMR data received through AMR system in the month of Sept 2016. He informed that complete data of 558 meters was received through AMR system and data of 65 Nos meters (Monthly-55 & Partial – 10) was not received through AMR system. The incomplete data is received due to site related issues such as network problem, modem burnt, Non ABT meter installed, meter defective, Elster meter installed and time drift in meters or due to some other problems. The status of data received through AMR system is invariably sent to all concerned offices including SE(T&C) offices through email latest by 4th of every month for furnishing the missing data alongwith monthly JMR data. Further following points are discussed and resolved as under:-

1. SLDC requested the CE(T&C) office to take up the matter with M/s Secure Meters Ltd for resolving the site related issues such as time drift in meters, meter defective, Non ABT meter & elster meters installed, network problem and modem burnt, list of interface points is available at website as Annexure-I. CE(T&C) office have assured to resolve the site related issues with M/s Secure Meters Ltd.

2. SLDC representative informed that integration of ABT meters installed at the interface points of newly commissioned substation / Xmers / HT consumers / OACs / REGs is required to be done with AMR system of SLDC. He further informed that on constant pursuance with M/s Secure Meters Ltd. 10 no of meters out of 83 Nos meters have been successfully integrated and data downloaded successfully, however, balance 73 No of meters are yet to be integrated with AMR server. SLDC requested the (T&C) office to take up the matter with M/s Secure Meters Ltd and issue instructions to field offices for integration of balance meters with AMR system of SLDC. MPPTCL assured to take up the matter with M/s Secures Meters Ltd. and issue instructions to field offices for integration of balance meters with AMR server.

3. SLDC representative apprise the Committee that Ratlam circle is not furnishing the JMR as well as load survey data of ABT meters installed at the RE generators connected at 132KV level and above in case data is not received through AMR system. The site officials of Ratlam circle, MPPTCL has informed that they have received the directives from higher officials / MPPMCL that data of all the RE Generators shall be downloaded by Discoms and furnished to concerned offices. SLDC representative requested the MPPTCL and MPPMCL to look into the matter and issue instructions to field offices for furnishing the data to SLDC. MPPTCL / MPPMCL have assured to issue suitable directives to field offices.

9.2 Providing AMR facility for the ABT meters installed at MPPGCL :

SLDC representative informed that ABT meters installed at the interface points of the power stations have been integrated except 9 meters out of 22 at AMKTPS, Tons HPS, Pench HPS and Bargi HPS through AMR system. The list of meters yet to be integrated with AMR system of SLDC has been emailed to GCC, MPPGCL on 18th Oct 2016. SLDC representative requested MPPGCL to take up the matter with M/s Secure Meters Ltd for integrating the balance meters with AMR server. MPPGCL representative informed that integration of ABT meters of Bargi HPS is in progress and shall be completed within a week, Idea SIMs are being arranged to resolve the network issue to Tons HPS, 9 Nos of AMK TPS not being read are of Units 3&4 which are dismantled. MPPGCL representative further informed that due to network problem in Pench HPS meters could not be integrated, but after establishment of optical link the same shall be integrated.

Minutes Of 54th OCCM Of MP 14

9.3 Injection of power by RE generators connected at 33KV level without taking the injection permission by SLDC.:

SLDC representative informed that in accordance with regulatory provisions, all the RE generators shall have to comply the regulatory requirements such as providing telemetry, AMR facility, registration with SLDC etc. prior to injection of power into the grid. However, recently, from the monthly JMR data furnished by the SE(O&M)s, MPPKVVCL, it was observed that West Discom has allowed following RE Generators to inject power into the grid without the injection permission / issuance of injection code by SLDC.

1. 0.63MW Solar Power Project of M/s Seattle Power Solutions Pvt. Ltd. connected through 33KV Vivan Ckt-II to 132KV Delchi (Makdon) substation. 2. 3MW Wind Power Project of M/s Choksi Energy & Infra Pvt. Ltd. connected through 33KV Ckt to 33/11KV Kalukheda substation. 3. 14.7 MW Wind Power Project of M/s Choksi Energy & Infra Pvt. Ltd. connected through 33KV Ckt to 33/11KV Ringnod substation. 4. 14.7 MW Wind Power Project of M/s Choksi Energy & Infra Pvt. Ltd. connected through 33KV Ckt to 33/11KV Dodhar substation. 5. 7.5 MW Wind Power Project of M/s Choksi Energy & Infra Pvt. Ltd. connected through 33KV Ckt to 33/11KV Akyadeh substation.

Chairman OCC stated that injection of power into the grid without issuance of injection code from SLDC is a violation of Grid Code provisions; SLDC in the past also has requested West Discom to issue guidelines to the field officers to not allow injection of power into the grid without the permission / issuance of grid code from SLDC. CE(T&C),MPPTCL also informed due to injection of power by the RE Generators, the transformers are getting over loaded. Chairman OCC further stated that in case West Discom still continues the violation of grid code, then SLDC will report the matter to Hon’ble MPERC as a violation of grid code in its monthly report submitted to the Commission. The representative of West Discom assured to take up the matter with CE (Comml), West Discom.

9.4 Allocation of power from all the existing and future generating capacities to MPPMCL by Energy Deptt, GoMP:

SLDC representative informed that Energy Deptt. Govt. of Madhya Pradesh (GoMP) vide notification no. 2211/F-3-13/2016/XIII dated 21st March, 2016, has allocated all existing and future generating capacities to MPPMCL for maintaining uniform tariff across the state w.e.f. April 2016 and requested the MPPMCL to inform the date of implementation of GoMP notification so that necessary changes are incorporated in ABT application software. MPPMCL expressed difficulty in implementation of GoMP notification dated 21.03.2016 and stated to continue with the existing practice of capacity Allocation in generating capacities to Discoms as per GoMP notification dtd 19.03.2013 effective from 01.04.2013.

9.5 Revision in allocation of MPAKVN (SEZ) power from MPPGCL stations in case of unit trippings:

SLDC representative informed that MPPMCL has executed a Bulk Power Supply Agreement (BPSA) with MPAKVN on 29th March 2016 for supply of 40MW power from MPPGCL Stations to MPAKVN, Indore. In accordance with agreement, SLDC furnish the entitlement of MPAKVN from MPPGCL Stations to MPPMCL which in turn forward their requisition in consultation with MPAKVN to SLDC. He further informed that in case of Unit tripping, MPPMCL revise the requisition of MPAKVN from other MPPGCL station as per Merit Order Operation without revising the allocation of power from the power stations from which the power was allocated, this leads to scheduling of power to MPAKVN from MPPGCL Station beyond the entitlement. He requested the MPPMCL to issue instructions to concerned officials to revise the allocation of power from MPPGCL stations in day ahead and real time operations in case of unit tripping. MPPPMCL intimated that in case of Unit tripping and revision in requisition from other power stations the allocation of power from other power stations shall deemed to be revised and

Minutes Of 54th OCCM Of MP 15 requested SLDC to consider the same as being done by WRLDC for URS power. SLDC representative informed that necessary changes in ABT application software shall be incorporated for increasing the allocation of power other power station in case of unit tripping.

9.6 Energy Accounting and settlement of DSM charges of Discom embedded Open Access Customers connected at 33KV level.

SLDC representative informed that in accordance with Madhya Pradesh Electricity Balancing and Settlement Code (BSC) 2015 and as decided in the 48th OCC meeting that energy accounting of Discoms Embedded Open Access Customers (DEOACs) shall be done by the Discom Energy Accounting Group (DEAG) of Discoms. Accordingly, SLDC has provided the training and necessary inputs to Discom officials on 11th Dec 2015 and requested the Commercial Sections of Discoms to issue necessary instructions to Discom Energy Accounting Group (DEAG) to take over the energy accounting of DEOACs from the month of April 2016.

SLDC representative further apprise the Committee that East Discom & West Discom are doing the energy accounting and issuing the DSM charges Bill of embedded customers from the month of April 2016, but, no feedback regarding issuance of DSM Bill / energy accounting of the embedded customers from the month of April 2016 is received from Central Discom. The Central Discom representative assured to discuss the matter with DEAG and revert back shortly.

9.7 Energy Accounting of Renewable Energy Generators (REGs) connected at 33KV as per the data recorded in ABT meter installed at the pooling station:

SLDC representative informed that it was discussed and decided in the 45th OCC meeting that energy accounting of Renewable Energy Generators (REGs) shall be done as per the actual data recorded in ABT meters installed at the pooling station, SLDC has requested the commercial sections of Discoms to furnish the details of meter, modem & SIM of the pooling station, but, Central & West Discom has mainly furnished the generator wise details whereas pooling station wise details are required for the purpose of energy accounting at pooling station. He further apprise the Committee that Discom officials has informed that in case of solar generators ABT meters are installed at the generators end only and standby meter is installed at the grid substation. In such cases where there is no separate pooling station and standby meter is installed at the grid substation, the grid substation shall be considered as a pooling substation as per MPERC draft REG regulations. Accordingly, SLDC vide letter no. 2117 dated 02.09.2016 has requested the SE(T&C), Nagda, Bhopal, Ujjain of MPPTCL to furnish the details of ABT meters installed at the grid substations, but, details have not been received so far. He requested CE(T&C) office to provide the details of ABT meter installed at the grid substation and instruct the site officials to coordinate with Wind & Solar Generators for providing AMR facility. CE(T&C) office have assured to do the same.

ITEM NO 10: SCADA/EMS RELATED ISSUES:

10.1 ARRANGENEMENT OF TELEMETRY OF IMPORTANT 220KV SUB STATIONS & 132KV S/S HAVING INJECTION FROM RENEWABLES/CAPTIVE POWER PLANTS OR HAVING INTERDISCOM FEEDERS -

SLDC informed that a list of 50 S/s were identified for commissioning of telemetry Out of which around fourteen RTUs (220KV Sirmore, 132KV Rewa, 132KV Satna, 132KV Biora,132KV Sironj, 132KV Chanderi,132KV Arniakala, 132KV Sonkach,132KV Kannod, 132KV Bercha, 132KV Poliakala, 132KV Momin Barodia,132KV Pachore, 132KV Jeerapur ) are pending. MPPTCL agreed to arrange the commissioning of balance stations at the earliest.

Further, Following issues observed in recently commissioned RTUs were also discussed:-

(i) Most of the RTUs commissioned recently is not working properly and functioning intermittently. The telemetry of 132KV Khilchipur, 132KV Alot, 132KV Kukshi, 132KV Mandideep are commissioned but functioning intermittently since its commissioning. CE(T&C) has agreed to look into the matter.

Minutes Of 54th OCCM Of MP 16

(ii) In addition to above, it is also observed that SOE signal from Dongfang RTU is not getting received from RTU buffer i.e. when RTU is functioning and communication channel is not healthy, the SOE of that time, after restoration of communication channel is received with time of comm. Channel restoration and not actual SOE time. CE(T&C) has agreed to take up the matter with SCADA & RTU vendor.

10.2 UPGRADATION OF EXISTING RTUS & DISCREPANCY IN TELEMETRERED VALUES RECEIVED FROM DIFFERENT EHV S/S & POWER STATIONS

The present status of telemetry discrepancy including upgradation requirement is discussed in detail. The list of important locations where RTU upgradation is required to accommodate renewable feeders/other feeders/transformers is detail are also given hereunder:-

Sl Name of Substation Name of feeders/transformers required to be No. whose RTU is required included in telemetry to be upgraded 220KV Sidhi S/s 220KV Sidhi –Hindalco and 220KV Sidhi- Rewa feeder 1 is not functioning since last three months. RTU is to be upgraded to provide telemetry of important 132KV Gudgaon S/s renewable feeders i.e. 132KV Gudgaon-Kukru 2 Windfarms. 132KV Gudgaon- 33kV Inox -1, 132KV Gudgaon- 33KV Inox-2. 220KV Birsingpur S/s The telemetry of 220KV IC-1 & 132KV Shahdol feeder is 3 not available since last six month 4 132 KV Alot S/s 33 KV Narbheram is not available

5 220 KV Badnagar S/s 33 KV Kshama Power is not available

6 220KV Pipariya S/S 220/132KV Transformer, 220KV Pipariya- 220KV Chichli feeder not available 7 220KV Shivpuri S/s 220/132KV Transformer telemetry is not available

8 220KV Pandurna 220KV - telemetry is not available

SLDC informed that lot of inconvenience in grid management is observed and hence upgradation of above mentioned RTU is to be taken up on top most priority for which CE (T&C) agreed.

In addition to above, following telemetry discrepancy observed during Black start mock drill of ISP/OSP were also discussed in the meeting:-

(1) At Indira Sagar Hydel Power Station :- abnormally high value of MW (approximately 510MW0 on 400Kv ISP Indore line (circuit -ii) after opening of bus coupler CB i.e. islanding mode but its actual value was 45 MW. Similarly while picking load around 8-10 MW on unit No. 7, it was showing 210-250 MW value in SCADA system. NHDC officials confirmed to look into the matter.

(2) At Indore 400KV Sub Station :- While Indore-ISP circuit was opened, it is showing 10MW value in SCADA system similarly 4 MW value was shown on 220KV Indore-Indore(east) circuit while feeder was open from both end. CE(T&C) confirmed to look into the matter

(3) AT OSP :- Even after charging of 220KV bus, the bus frequency and bus voltage in SLDC SCADA system displayed is zero. The same parameters values were normalized after line charging. It seems that in place of bus PT, line PT is extended to Voltage and Frequency transducers. The same is required to be corrected. NHDC officials confirmed to look into the matter.

Minutes Of 54th OCCM Of MP 17

MPPGCL and MPPTCL confirmed to look into the matter and provide completion schedule regarding rectification of telemetry discrepancy and upgradation of RTU’s.

10.2 PRESENT STATUS OF PROCUREMENT OF RTUs BY MPPGCL:- The matter of procurement of RTU for Rajghat HPS and Bansgar III HPS was discussed in detail. The Telemetry of Rajghat HPS is out since last two years. In the last meeting it was informed by MPPGCL that order for RTU has been placed by MPPGCL. MPPGCL officials informed that the status is same as mentioned in last meeting.

10.3 COMMISSIONING OF COMMUNICATION CHANNELS FOR DUAL REPORTIG OF RTUS AS PER BACKUP SLDC REQUIREMENT:-

The commissioning of SCADA/EMS system at SLDC Jabalpur and backup SLDC Bhopal is already completed and the additional communication channel is required to be extended to respective control centre's for testing with new SCADA/EMS system. SLDC requested MPPTCL & MPPGCL to provide RTU wise progress.

The wideband node at Birsingpur TPS is commissioned but its utilization is pending due to distance in locations between wideband node equipment, RTU panels etc. M/s Tejas engineer was deputed to Birsingpur to work out the requirement. The complete scheme along with material requirement for shifting of RTUs on wideband node was prepared and forwarded to Birsingpur for arranging on top most priority. MPPGCL officials confirmed the receipt of the scheme and they are initiating the process of procurement of the material.

10.4 Arrangement of space, Power Supply for installation of PMUs panels & wideband node equipments:-

SLDC informed that the PMUs at MPPTCL 400KV Sub stations namely Bhopal, Bina, Indore, Katni, Nagda has already been delivered and installation shall be taken up shortly. The necessary arrangement for space and power supply at these sub stations is required to be ensured by MPPTCL. MPPTCL confirmed to arrange the same before installation activities.

SLDC further informed that wideband node equipments at 220Kv Chindwara, 220KV Seoni, 220KV Ratlam,220KV Shivpuri, 220KV Indore SZ, 220KV Shujalpur, 220KV Neemuch,132KV Waidhan, 220KV Rajgarh, 220KV Malanpur,400KV Pithampur, 220KV Pithampur, 132KV Indore Chambal, Pench & Gandhisagar HPS is expected to be commissioned within next four months. MPPTCL & MPPGCL officials confirmed to look into the matter for necessary provisions of space, DCPS, Air conditions.

10.5 LONG OUTAGE OF RTUS, PROBLEM IN DATA AND VOICE CHANNELS

The long outage of telemetry of following S/s is discussed in detail:-

Sl No. Name of Sub Out from /Remark Station 1 Rajghat HPS Out from last two years 2 132KV Morwa S/s More than one and half Year 3 132KV Beohari 4 132KV Kukshi Out due to data Channel Problem 5 132KV Waidhan 6 132KV Khilchipur Out due to RTU configuration issue 7 132KV A lot Out due to communication problem

MPPTCL, MPPGCL officials confirmed to look into the matter to sort out/ rectification of above RTU/data channel.

Minutes Of 54th OCCM Of MP 18

10.6 Telemetry of railway TSS Sub Stations:-

The telemetry of 36 Nos railway Traction Sub Stations is required to be provided by railway for monitoring of drawal by each TSS and also monitoring of demand of railway in MP. The further clarification required in the matter was also provided to railway officers during the meeting held at SLDC in first week of October 2016. Railway officials informed that the work for telemetry arrangement is initiated and is in progress.

ITEM No 11 : DATE AND VENUE OF NEXT OCC MEETING :

It is proposed to hold 55th OCC meeting of Operation and Coordination Committee of MP on 22.12.2016. It will be hosted by M/s Kalpataru Satpura Transco Pvt. Ltd. at Hotel Vijan Mahal, Jabalpur. . …

Minutes Of 54th OCCM Of MP 19 Minutes Of 54th OCCM Of MP 20 Minutes Of 54th OCCM Of MP 21 FREQUENCY PARTICULARS

S. No. Particulars Aug-16 Sep-16

1 INTEGRATED OVER AN-HOUR

Between 13.00 Between 03.00 1.1 Maximum Frequency 50.14 Hz hrs & 14.00 Hrs 50.09 Hz hrs & 04.00 Hrs on 01.08.16 on 01.09.16

Between 13.00 Between 14.00 1.2 Minimum Frequency 49.67 Hz hrs & 14.00 Hrs 49.85 Hz hrs & 15.00 Hrs on 10.08.16 on 19.09.16

1.3 Average Frequency 50 Hz 50 Hz

2 INSTANTANEOUS FREQUENCY AT 13.03 HRS AT 18.01 HRS ON 2.1 Maximum Frequency 50.35 Hz 50.24 Hz ON 10.08.16 02.09.16 AT 08.10 HRS AT 18.53. HRS 2.2 Minimum Frequency 49.65 Hz 49.67 Hz ON 21.08.16 ON 19.09.16 3 Percentage of time when frequency was :-

%age of time when frequency was Aug-16 Sep-16

3.1 Below 48.5 Hz 0.00 0

3.2 Between 48.50 Hz and 48.8 Hz 0.00 0

3.3 Between 48.80 Hz and 49.2 Hz 0.00 0

3.4 Between 49.20 Hz and 49.5 Hz 0.00 0

3.5 Between 49.50 Hz and 49.7 Hz 0.11 0.1

3.6 Between 49.70 Hz and 49.9 Hz 5.83 5.75

3.7 Between 49.9 Hz and 50.05 Hz 73.73 75.15

3.8 Between 50.05 Hz AND 51.5 Hz 20.32 19

3.9 Above 51.5 Hz 0.00 0.00

4 No. of times frquency touched 48.80 Hz 0 0

4.1 No. of times frquency touched 48.60 Hz 0 0

4.2 No. of times frquency touched 51.0 Hz 0 0

Minutes Of 54th OCCM Of MP 22 ANNEXURE - 2.3.4.i M.P POWER TRANSMISSION COMPANY LIMITED TRANSMISSION WORKS COMPLETED DURING 2016-17 (UP TO 30.09.2016) I EHV TRANSMISSION LINES CIRCUIT DATE OF DATE OF TYPE OF ROUTE S. NAME OF THE TRANSMISSION LINE / COMPL- COMMI- CIR CUITS LENGTH No. (FINANCED BY) KMS. ETION SSIONING A. 400 KV TRANSMISSION LINES NIL 0 0 B. 220 KV TRANSMISSION LINES 1 LILO of 220 KV Katni - Satna line at PGCIL, DCDS 0.7 1.40 April'16 09.04.2016 Satna LILO of one Ckt of 220kv DCDS Bhopal - Ashta 2 line at 220kv S/S Mugaliya chhap. (DCDS) DCDS 26.46 52.92 June'16 18.06.2016 (2x26.459) (JICA) LILO of 220KV line Indore 400 -Pithampur at 3 Pithampur-II 220Kv S/s in Indore (2x6.898) DCDS 6.90 13.80 June'16 10.06.2016 (PFCIIi) 220Kv DCDS line from 400Kv S/s Bina to plant of 4 M/s Bharat Oman Refinaries Ltd. Agasod, Bina DCDS 18.197 36.394 Aug'16 01.08.2016 (2x18.197) (Contr.Works) C. 132 KV TRANSMISSION LINES 2nd Circuit of 132 Kv Gudgaon - Kukru Wind 1 2nd ckt 22.5 22.50 Aprilo'16 07.04.2016 Power Ltd. Betul (Contributory work) LILO of one circuit of Mandideep - 2 Hoshangabad for 132 KV Sub-Station DCDS 1.686 3.37 Aprilo'16 30.04.2016 Tamot(2x1.686) (REC-I) 2nd Ckt. Of 132 Kv DCSS Gairatganj- Vidisha line 3 2nd ckt 48.27 48.27 May'16 10.05.2016 (48.30) ADB-III 132Kv 2phase 2wire S/c line from 132Kv s/s Amla 4 DCSS 23.29 23.29 May'16 06.05.2016 to GSS Bordehi of RVNL(1x23.5) Contrib 132Kv DCSS line from 132Kv S/s Madhotal to 5 11.5 MW Processing Plant of M/s Essel Jabalpur DCSS 2.52 2.515 May'16 02.05.2016 MSW Pvt.Ltd. at Kathonda Dist- Jabalpur Contrib. 2nd Ckt.of 132 KV Rewa - Mangawan line (Dist. Rewa ) (JICA) approch section of 6 2nd Ckt 8.829 15.066 June'16 27.06.2016 mangawan end (4x2.079+1x6.75) (JICA) (Balance work) 132 kv DCSS Datiya- Bhander line 7 DCSS 34.04 34.04 June'16 27.06.2016 (1x34.038)ADB-III 132 kv DCSS Ashoknagar - Kothiya line 8 DCSS 37.50 37.50 June'16 09.06.2016 (1x27.5+4x2.5) ADB-III 132 kv DCSS line from 132Kv S/s Lahar - 132Kv 9 DCSS 16.70 16.70 June'16 24.06.2016 S/s Seondha (1x15.5) PFC-III 10 2nd ckt of Betul - Gudgaon line (1X57) ADB-III 2nd ckt 57.00 57.00 June'16 24.06.2016 132 kv DCDS line - Katangi (2x29.471) 11 DCDS 29.47 58.94 JULY'16 04.07.2016 PFC-II 132 kv DCSS line from 132Kv S/s Porsa - 132Kv 12 DCDS 22.52 22.52 Aug'16 11.08.2016 S/s Ambah (1x22.524) PFC-III 2nd Ckt.of 132Kv DCSS Katangi tap line tapped to 13 one ckt. Of 132Kv -Seoni line DCDS 35.67 35.67 Aug'16 29.08.2016 (1x0.5+35.67) ADB-III 132 kv DCSS line Mehgaon - Pratappura 14 DCDS 29.74 29.74 Aug'16 31.08.2016 (1x29.74) ADB-III 132kv Jeerapur -Susner DCSS line (1x30.236) 15 DCSS 30.24 30 Sept'16 21.09.2016 (JICA) 2nd ckt of 132kv Bairagarh - Shyampur line 16 2nd ckt 19.04 19.04 Sept'16 28.09.2016 (1x0.5+4x1.9+19) (ADB-III) 132 kv Ashoknagar - Eshagarh DCSS line (1x37) 17 (Transco) DCSS 38.50 38.50 Sept'16 30.09.2016 (Est.Sanc.-0281dtd. 17.03.2015 for Rs.1895.67) 132KV DCDS line from 132KV S/s Pithampur (to 18 be upgrated) for Pithampur SEZ Phase-II of DCDS 0.54 1.08 Sept'16 10.09.2016 AKVN(2x0.54) (contr. work)

Minutes Of 54th OCCM Of MP 23 II. EHV SUB - STATIONS No.OF EFFECTIV VOLTAGE DATE OF DATE OF S. NAME OF SUBSTATION / (DISTRICT) / X-mer & E RATIO COMPL- COMMI- No. (FINANCED BY) Cap.(MV CAPACIT (KV) ETION SSIONING A) Y MVA A. 400 KV SUBSTATIONS 1x125 MVAR 400 Kv Bus Reactor at existing 1 400Kv Aug'16 09.08.2016 400Kv S/s Nagda ADB-III Nil 0.00 B. 220 KV SUBSTATIONS a. 220 KV NEW SUBSTATIONS 220kv switching S/s at Nagra Dist- Ratlam 220/132 1 0.00 0 May'16 30.05.2016 Contrib. KV Mugaliachhap(Bhopal) 220kv (New 220/132 2 1x160 160 June'16 20.06.2016 S/s)(1x160+40) (JICA) KV C. 132 KV SUBSTATIONS a. 132KV NEW SUBSTATIONS 12.04.2016 (fom 33 KV Pratappura 132 KV New S/s (1x40) ADB-III 1 132/33KV 1x40 40 April'16 side) & (Dist- Bhind) 31.08.2016 (132KV side) Tamot 132kv s/s (Distt. Raisen ) 1x50MVA 2 132/33KV 1x40 40 May'16 05.05.2016 (Transco) Bhander 132kv s/s (Distt. Datia) 1x63 3 132/33KV 1x63 63 June'16 28.06.2016 (ADB-II) Kothiya 132kv s/s (Distt. Guna ) 1x40 MVA 4 132/33KV 1x40 40 June'16 09.06.2016 (ADB-III) 28.06.2016 from 33kV Katangi 132kv s/s with 1 no. 132 kv feeder 5 132/33KV 1x40 40 June'16 & bay & 1x40 MVA (Distt. - Jabalpur) (PFC-III) 05.07.2016 from 132Kv Pithampur SEZ- II 132kv s/s 1x63 MVA 6 132/33KV 1x63 63 Sept'16 19.09.2016 (Distt.Dhar) (contr.work)

Minutes Of 54th OCCM Of MP 24 ANNEXURE - 2.3.4.ii

TRANSMISSION WORKS UNDER PROGRESS (AS ON 30.09.2016) Target PROGRES S. CKT. for NAME OF THE TRANSMISSION LINE S No. KMS. commis- IN % sioning A. 400 KV TRANSMISSION LINES 1 NIL 0 0% - B. 220 KV TRANSMISSION LINES 1 2nd Ckt of 220kv Satna - Chhatarpur line (152) 160 8% 2016-17 Upgradation of 132KV D/C Indore-II (Jaitpura) - Indore(N/Z) line on composite multi circuit monopole & LILO of one Ckt of 220kv 2 35.8 31% 2018-19 Indore-II (Jaitpura) - Indore(400KV) line at 220kv S/S Indore(N/Z) (2x0.5+2x4+4x6.7) 3 220Kv DCDS line from Gwalior(Malanpur)- Morena (2X29.25) 58.5 27% 2016-17 LILO of one Ckt of 220kv DCDS Ashta - Dewas line at 220kv S/S 4 66 3% 2017-18 Chapda (DCDS) (2x32.782) 5 220Kv DCDS line from Pithampur-Depalpur line (2X31) 62 37% 2017-18 220Kv FCFS line for LILO of both Ckt. Of Badnagar -Ratlam D/C 6 34 4% 2017-18 line at 400Kv S/s Badnawar (2x1+4x8) 7 220Kv DCDS Julwaniya- Kukshi (2X58) 116 16% 2017-18 8 220Kv DCSS Shujalpur- Narsinghgarh line (1X43.6) 44 15% 2017-18 C. 132 KV TRANSMISSION LINES 1 132kv Ichhawar -Sehore DCSS line (1x35.298) 35.298 33% 2017-18 2 132 kv DCDS Ujjain(220 kv) -Chandrawatiganj line (2x35.42) 70.84 79% 2016-17 3 132 kv DCSS Dewas-Barotha line (1x23) 23 60% 2016-17 4 132 kv DCSS Ghatabillod-Betama line (1x18) 18 29% 2016-17 5 132kv DCSS Gautampur -Depalpur line (1x19) 19 20% 2016-17 6 132kv Nagda(220kv)- Kachrod-Jaora DCSS line (1x64) 64 18% 2016-17 7 132kv DCSS Shujalpur( 220kv) -Pachhore DCSS line (1x35.5) 35.5 55% 2017-18 8 132kv Mugaliya Chaap - Sehore DCSS line (1x24) 24 9% 2016-17 132 kv DCSS line between 132Kv S/s Nasrullaganj & 220KV Itarsi 9 53.209 34% 2017-18 s/s(1x53.209) LILO of S/C ckt of 132 KV Seoni-Lakhnadon line at 220kv S/S 10 40 5% 2017-18 Seoni (2x20) 11 132 kv DCSS Guna-Eshagarh line (1x72) 72 32% 2017-18 132 kv DCSS Line from 220Kv S/s Shivpuri-132Kv Bairad 12 32.859 32% 2017-18 (1x32 859) 13 132 kv DCSS from 220Kv S/s Datiya-132kv S/s Indergarh (1x27.1) 27.1 49% 2017-18 14 132 kv DCSS line from 132Kv S/s -132Kv S/s Barhi (1x35) 35 4% 2017-18 15 132 kv Sirmour - Katra DCDS line (2x37.67) 75.34 18% 2017-18 132 kv DCSS line from220Kv S/s Chichli - 132Kv Karapgaon 16 31.059 3% 2017-18 (1x31.059) 17 132 kv Sagar-Rahatgarh DCSS line (1x55) 55 13% 2016-17 132Kv DCSS line from 220Kv S/s Rajgarh to 132Kv S/s Jhabua 18 50 23% 2016-17 (1x50) LILO of Both circuit of 132 kv DCDS Gwalior(Mahalgaon) - 19 55.09 36% 2016-17 Dabra/Karera line at 220 KV S/s Gwalior II) (2x2x7.87) 20 132 kv DCSS line Datiya - Dabra (1x30) 30 99% 2016-17 132Kv DCDS line for LILO of both circuit of 132Kv Banmore - 21 Morena/Hetampur DCDS line for 220Kv S/s 7.476 70% 2016-17 Morena(2x0.616+2x3.122)

Minutes Of 54th OCCM Of MP 25 22 2nd ckt of 132Kv Chhatarpur- Khajuraho line (1x0.5+33.2) 33.7 65% 2016-17 23 132 kv DCSS Dewas-Agrod line (1x20.76) 20.76 10% 2017-18 24 2nd Ckt. Of 132 Kv DCSS Tikamgarh- Budhera line (32.46) 32.46 90% 2016-17 25 132 kv DCSS Khurai- Khimlasa line (1x20.937) 20.937 19% 2017-18 LILO of 132Kv Mungaoli Traction feeder at 132Kv S/s Mungaoli 26 (4x7.8+2x0.7) Note: (4x7.8ckt.km line charged on 30.12.2015 by 32.6 96% 2017-18 tapping ) 27 LILO of 132Kv Vidisha- Bairasiya line at salamatpurr (2x0.162) 0.324 46% 2016-17 28 132 kv DCDS Line Chichli - Udaypura (2x47) (On 220Kv Tower) 94 28% 2018-19 29 132 kv DCSS Panagar - Patan line (1x22.749) 22.749 7% 2017-18 30 132 kv DCSS Badnagar - Chhayan Line (1x31) 31 17% 2016-17 31 2nd ckt of 132kv Kukshi - Alirajpur line (1x1+36) 37 89% 2018-19 32 132 kv DCSS Dhar - Teesgaon line (1x15.35) 15.35 16% 2017-18 LILO of 132 kv Chhegaon - Nepanagar Line at 132Kv S/s 33 Pandhana(2x1.895) (This line is proposed in place of Chhegaon - 3.79 60% 2016-17 Pandhana Estt. Sanc.no. 0121dtd.06.08.2014) LILO of 132 kv Manawar - Kukshi Line at 132Kv S/s 34 6.2 60% 2016-17 Singhana(2x3 1) LILO of Khargone - Julwaniya DP line(132Kv) at Talakpura (2x1.1+1x0.8)(This line is proposed in place of Julwaniya- 35 3 60% 2017-18 Talakpura line Rev. Estt. Sanc.no. 0245 dtd.15.01.2016 for Rs.185.40lac.) LILO of 132 kv Ratlam - Meghnagar line at 132Kv S/s Petlawad 36 14.8 2% (2x7.4) 37 132 kv DCDS Beragarh - Intkhedi (2x8.7+4x1.5) 23.4 43% 2017-18 38 132 kv DCSS Udaipura - Silvani line (1x25.8) 25.8 38% 2017-18 39 132 kv DCSS Narsinghpur - Devnagar (1x23) 23 13% 2017-18 40 132 kv DCSS Karakbel - Belkheda (1x24.445) 24.445 11% 2017-18 41 132 kv DCDS Narsinghpur - Karakbel line (2x23) 46 15% 2017-18 42 132KV DCSS Sabalgarh - Kelaras line (1x25) 25 4% 2016-17 43 132kv Birsinghpur -Shahdol DCSS line (1x48) 48 4% 2018-19 132 kv DCSS Line from 220Kv S/s Barwaha - 132Kv S/s 44 57.139 63% 2016-17 Kishangarh (1x57.139) 45 2nd ckt of 132kv RTS Mangliyagaon line 8.852 96% 132Kv 2 phase 2wire line from 132Kv s/s Semri-Harchan for PS 46 4.3 98% to RTS Bagra Tawa(1x4.3) 132Kv DCSS 2 phase 2wire line from 132Kv s/s Majhgawan for 47 0.19 89% PS to TSS Majhgawan(1x0.19) 132Kv DCSS 2 phase 2wire line from 132Kv s/s Rewa for PS to 48 0.4 73% TSS Rewa(1x0.4) 132Kv DCSS line from proposed 132Kv s/s Tamot to Sagar Yarn 49 3.1 30% plant of M/s Sagar Manufacturer (P) Ltd.(1x3.1) Target EFFECTIVE PROGRES S. for NAME OF THE SUBSTATION CAPACITY S No. commis- MVA IN % sioning A. 400 KV SUBSTATIONS 400 KV sub-station Balaghat/Kirnapur with 2x100MVA 1 200 9% 2017-18 400/220 kv x-MER+ 1X40 MVA X-mer (Distt.Balaghat) 400 KV sub-station Badnawar with 2x315MVA 400/220 KV 2 630 4% 2017-18 X-mer (Distt.Balaghat) Bhopal (Sukhi Sewaniya) 400/220 kv s/s Addl. 315 MVA X- 3 315 19% 2016-17 mer (Distt.Bhopal) Chhegaon 400/220 kv s/s Addl. 315 MVA X-mer 4 315 30% 2016-17 (Distt.Khandwa)

Minutes Of 54th OCCM Of MP 26 B. a 220 KV SUBSTATIONS Julwaniya 220/132kv S/s at 400kv s/s (Distt. Badwani) 1 320 79% 2016-17 (2x160+40 MVA) (1No. 160MVA Charged on 21.08.2015) Gwalior-II 220kv (New S/s)(2x160+40) (1x160 charged 2 160 95% 2016-17 on31.3.2015) Upgradation of Chapda 132Kv S/s to 220kv with 1x160MVA 3 160 2% 2017-18 (Distt. ) Upgradation of Depalpur 132Kv S/s to 220kv with 4 160 9% 2017-18 1x160MVA(Distt. ) 5 Adampur 220/33kv S/s 2x50MVA 100 6% 2017-18 Upgradation of Kukshi 132Kv S/s to 220kv with 1x160MVA 6 160 11% 2017-18 (Distt. ) Morena 220/132kv S/s 1x160 +1x63 MVA +2No.220Kv FB 7 160 66% 2016-17 +4No.132Kv FB+6No.33Kv FB+BC +Capacitor Bank C. 132 KV SUBSTATIONS (a) NEW SUBSTATIONS 1 Rahatgarh132kv s/s (Distt.Sagar) 40 58% 2016-17 2 Bairad 132kv s/s(Dist.-Shivpuri ) 40 13% 2017-18 3 Barahi 132kv s/s (Distt.Katni) 40 11% 2017-18 4 Karapgaon 132kv s/s (Distt-Narsinghpur) 40 14% 2017-18 5 Indergarh 132kv s/s (Distt.Datia) 40 25% 2017-18 6 Biston 132kv s/s (Distt. ) 1x40 MVA 40 24% 2017-18 7 Agrod 132kv s/s (Distt. ) 1x40 MVA 40 54% 2017-18 8 Chhayan 132kv s/s (Distt. ) 1x40 MVA 40 54% 2016-17 9 Teesgaon 132kv s/s (Distt. ) 1x40MVA 40 16% 2016-17 10 Pandhana 132kv s/s (Distt. ) 1x63 MVA 63 35% 2016-17 11 Singhana 132kv s/s (Distt. ) 1x40 MVA 40 46% 2016-17 12 Talakpura 132kv s/s (Distt. ) 1x40 MVA 40 47% 2017-18 13 132kv s/s (Distt.Balaghat ) 1x40 MVA 40 1% 2017-18 14 Devnagar 132kv s/s (Distt. Narsighpur) ) 1x40 MVA 40 33% 2017-18 15 Belkheda 132kv s/s (Distt. Jabalpur) ) 1x40 MVA 40 1% 2017-18 16 Khimlasa 132kv s/s (Distt. ) 1x40 MVA 40 3% 2017-18 17 Karakbel 132kv s/s (Distt. Narsinghpur) 1x40 MVA 40 17% 2017-18 18 Chinaur 132kv s/s (Distt. ) 1x40 MVA 40 28% 2016-17 19 Kelaras 132kv s/s with 1x63 MVA (Distt. ) 63 14% 2016-17 20 Narsinghgarh 132kv s/s with 1x40 MVA (Distt. ) 40 5% 2016-17 21 Salamatpur 132kv s/s with 1x40 MVA (Distt. ) 40 47% 2016-17 22 Intkhedi 132kv s/s (Distt. ) 1x63 MVA 63 69% 2017-18 23 Silvani 132kv s/s with 1x40 MVA (Distt. ) 40 12% 2017-18 24 Udaipura 132kv s/s with 1x40 MVA (Distt. ) 40 3% Kishangarh 132kv s/s with 1 no. 132 kv feeder bay & 1x40 25 40 77% 2016-17 MVA (Distt. Dewash)

Minutes Of 54th OCCM Of MP 27 Discoms wise Average Supply Hours

East Zone Central Zone PARTICULARS Aug-16 Sep-16 Aug-16 Sep-16

Commissinary HQ 23:45 23:50 23:42 23:42

District HQ 23:54 23:54 23:40 23:46

Tehsil HQ 23:48 23:49 23:28 22:39

Rural -Mixed 23:27 23:28 22:40 22:47

Rural -DLF 23:27 23:28 22:57 23:01

Rural -Irrigation 9:57 9:58 9:26 9:31

West Zone MP PARTICULARS Aug-16 Sep-16 Aug-16 Sep-16

Commissinary HQ 23:53 23:52 23:45 23:47

District HQ 23:51 23:46 23:49 23:50

Tehsil HQ 23:42 23:37 23:40 23:38

Rural -3Phase 23:09 23:20 23:05 23:10

Rural -1Phase 23:01 23:20 23:18 23:17

Total Rural 9:43 9:39 9:42 9:43

Minutes Of 54th OCCM Of MP 28 Annexure-2.4(ii) LIST OF 33KV FEEDERS UNDER MPPKVVCL, JABALPUR (For which group to be allocated) JABALPUR REGION

Date of commission-ing of Date of commission-ing of Name of EHV Substation Name of 33KV feeder Status feeder bay feeder

220KV 33KV Kundali 27.07.2015 21.11.2015 Group allocation done 220KV Chhindwara 33KV Bangaon 27.07.2015 ---- Group allocation done 132KV

132KV Borgaon 33KV FS-II 26.02.2013 12.04.2016 Group allocation done

LIST OF 33KV FEEDERS UNDER MPPKVVCL, INDORE (For which group to be allocated) INDORE REGION

Date of commission-ing of Date of commission-ing of Name of EHV Substation Name of 33KV feeder Status feeder bay feeder 220KV 220KV Indore (Jetpura)-II 33KV PGCIL-II feeder Uncharged 24.08.2014 220KV Nimrani 33KV Maral Overseas 08.06.2015 Group allocation done 132KV 33KV DLF-I 01.03.2014 Uncharged 132KV Raukhedi 33KV DLF-II 01.03.2014 33KV Exep.Panther-IV 09.07.2015 Group allocation done 33KV Feeder No.2 Uncharged 31.12.2014 132KV Chandrawatiganj 33KV Feeder No.3 31.12.2014 Group allocation done 33KV Feeder No.4 31.12.2014 Group allocation done 132KV Badgaon 33KV Discom Bay 29.11.2014 25.09.2015 132KV Anjad 33KV Discom Bay 08.12.2014 26.11.2015 Group allocation done

Minutes Of 54th OCCM Of MP 29 Annexure-2.4(ii) UJJAIN REGION

Date of commission-ing of Date of commission-ing of Name of EHV Substation Name of 33KV feeder feeder bay feeder 220KV 220KV Barod 33KV M&B-I&II 132KV 132KV Susner 33KV Evershine 21.05.2014 33KV Enercon-I 33KV Enercon-II 132KV Agar 33KV M&B-I 33KV M&B-II 33KV Kachnariya 132KV Nalkheda 33KV Lasuldiya Kelwa 132KV Sonkatch 33KV Industrial (MPAKVN) LIST OF 33KV FEEDERS UNDER MPPKVVCL,BHOPAL (For which group to be allocated) BHOPAL REGION

Name of EHV Substation Name of 33KV feeder Date of charging of feeder 220 KV 220 KV Betul 33 KV Industrial 13.06.2014 220 KV Vidisha 33 KV ISanchi 30.01.2015 132 KV 33 KV Barna 19.02.2014 132 KV Bareli 33 KV Boras 19.02.2014 33 KV Nagar Palika 09.03.2014 132 KV Biora 33 KV Water Works 09.03.2014 33 KV Jatkheda-I 07.05.2014 132 KV Shyampur 33 KV Jatkheda-II 07.05.2014 33 KV Runaha 15.04.2015 33 KV Nazirabad 18.09.2015 132 KV Runaha 33 KV Ramgarh 19.09.2015 33 KV Nayasamand 19.12.2015 132 KV MACT Bhopal 33 KV Bairagarh chichli-2 15.11.2014 132 KV Gopalpur 33 KV AE, PHE 27.02.2015 33 KV AIIMS Hospital 29.02.2016 132 KV Amrawad Khurd 33 KV AIIMS Residence 29.02.2016 33 KV C-21 Mall 01.06.2016 33 KV Katara Hills-II 01.06.2016 GWALIOR REGION

Name of EHV Substation Name of 33KV feeder Date of charging of feeder 220 KV 220 KV Sagalgarh 33 KV Mangrol 30.05.2014 132 KV 132 KV Datia 33 KV Karapura 17.05.2014 132 KV Ron 33 KV Mangarh 21.11.2013 33 KV Readymade 132 KV Morar 22.08.2014 Garment 132 KV Motizheel 33 KV Transport Nagar 30.05.2015

Minutes Of 54th OCCM Of MP 30 Minutes Of 54th OCCM Of MP 31 Unitwise / Stationwise Genration in MU A. Thermal Ann 4.1 Capacity Stn. Name UNIT No. MW Aug-16 Sep-16 3 120 0.00 0.00 4 120 0.00 0.00 PH II 240 0.00 0.00 5 210 14.25 92.98 PH III 210 14.25 92.98 AMARKANTAK TOT 210 14.25 92.98 6 200 8.07 6.56 7 210 13.78 39.89 PH II 410 21.84 46.44 8 210 0.00 38.77 9 210 0.00 20.71 PH III 420 0.00 59.47 SATPURA 10 250 0.00 7.88 11 250 0.00 98.08 PH IV 500 0.00 105.95 TOT 1330 21.84 211.87 1 210 0.00 16.12 2 210 29.35 108.83 PH I 420 29.35 124.95 3 210 5.89 104.89 4 210 0.00 72.22 PH II 420 5.89 177.11 5 500 310.73 328.50 SANJAY GANDHI PH III 500 310.73 328.50 TOT 1340 345.97 630.56 1 600 0.00 61.89 2 600 0.00 27.01

SSTPS PH1 1200 0.00 88.90 MPPGCL THERMAL 4080 382.06 1024.31 Note : 1. Amarkantak Thermal Power Station-II Unit # 4 De-commissioned wef 01-May-2014. 2. Amarkantak Thermal Power Station-II Unit # 3 De-commissioned wef 13-Jan-2015. B. Hydel Station Name Capacity MW Aug-16 Sep-16 GANDHISAGAR 115.0 23.45 13.00 R.P.SAGAR 172.0 54.99 19.06 J.SAGAR 99.0 45.61 14.56 CHAMBAL 386.0 124.05 46.62 M.P.CHAMBAL 193.0 62.03 23.31 PENCH 160.0 30.63 85.13 M.P.PENCH 107.0 20.42 56.75 BARGI 90.0 60.28 61.34 TONS 315.0 146.10 178.63 BIRSINGHPUR 20.0 14.31 10.18 B.SGR(DEOLONDH) 60.0 20.47 32.00 B.SGR(SILPARA) 30.0 0.52 10.01 RAJGHAT 45.0 12.18 0.00 M.P.RAJGHAT 22.5 6.09 0.00 B.SGR(JINHA) 20.0 1.23 10.98 MADIKHEDA 60.0 45.01 14.13 TOTAL HYDEL 1186.0 454.78 449.01 MPPGCL Hydel 915.0 354.18 415.39 MPSEB HYDEL Share 917.5 376.46 397.32

C. NHDC (Ex-Bus) Station Name Capacity MW Aug-16 Sep-16 Indira Sagar Hydel Project 1000 740.600 310.630 Omkareshwar Hydel Project 520 290.228 131.966

Minutes Of 54th OCCM Of MP 32 ENERGY BALANCE SHEET Year : 2016 - 17 All figures in Million Unit S No. Source Apr-16 May-16 Jun-16 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Total 30 31 30 31 31 30 0 0 0 0 0 0 183 A. M.P. Availability 1 Thermal 1534.26 1058.71 641.73 332.22 352.62 928.27 0.00 0.00 0.00 0.00 0.00 0.00 4847.81 2 Hydel 71.27 73.63 49.50 146.54 372.19 392.84 0.00 0.00 0.00 0.00 0.00 0.00 1105.98 3 Total 1605.53 1132.35 691.22 478.76 724.82 1321.11 0.00 0.00 0.00 0.00 0.00 0.00 5953.79 B. Exchange with other States / Systems 1 Indira Sagar 120.81 146.45 52.97 496.81 731.60 304.97 0.00 0.00 0.00 0.00 0.00 0.00 1853.61 2 Omkareshwar 65.89 75.81 31.09 215.83 290.23 131.97 0.00 0.00 0.00 0.00 0.00 0.00 810.82 3 MPPMCL Schedule from Central Sector of WR 1753.12 1394.10 1634.96 1127.74 933.38 1494.56 0.00 0.00 0.00 0.00 0.00 0.00 8337.86 4 MPPMCL Schedule from Central Sector ER 47.17 31.17 15.19 4.98 11.58 14.23 0.00 0.00 0.00 0.00 0.00 0.00 124.32 5 Total MPPMCL Schedule from Central Sector (WR+ER) 1800.29 1425.27 1650.15 1132.72 944.96 1508.79 0.00 0.00 0.00 0.00 0.00 0.00 8462.18 6 Deviation Energy of (WR+ER) -47.47 -70.17 -59.80 -88.60 -92.98 -73.79 0.00 0.00 0.00 0.00 0.00 0.00 -432.82 7 Schedule From DVC ER 232.92 202.40 229.04 111.04 8.12 57.86 0.00 0.00 0.00 0.00 0.00 0.00 841.39 8 Schedule From Sugen 0.00 0.00 0.00 4.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.80 9 LANCO Amk 195.30 186.44 187.18 144.74 54.50 140.13 0.00 0.00 0.00 0.00 0.00 0.00 908.29 10 SASAN 988.04 886.52 921.35 834.99 589.41 616.28 0.00 0.00 0.00 0.00 0.00 0.00 4836.58 11 ESSAR 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12 J P Nigri 278.92 323.20 295.64 250.95 308.17 318.10 0.00 0.00 0.00 0.00 0.00 0.00 1774.98 13 MB Power 63.53 131.56 84.34 18.07 14.29 43.26 0.00 0.00 0.00 0.00 0.00 0.00 355.06 14 JHABUA Power 0.00 20.41 3.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 23.71 15 STOA Schedule other than MPPMCL 0.00 0.00 64.44 75.76 80.19 19.73 0.00 0.00 0.00 0.00 0.00 0.00 240.12 16 Himachal Pradesh HYDAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 17 BARH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 18 Schedule from Sardar Sarovar 8.89 19.97 78.71 257.09 527.28 268.86 0.00 0.00 0.00 0.00 0.00 0.00 1160.80 19 SCH to Railway from RGPPL_ebid 144.00 148.02 143.44 158.36 161.40 161.67 0.00 0.00 0.00 0.00 0.00 0.00 916.89 20 Schedule from SEZ 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 21 Schedule from Rihand+Matatila 2.37 3.07 3.26 5.02 11.49 19.42 0.00 0.00 0.00 0.00 0.00 0.00 44.63 Medium Term Power Purchase from CSPDCL through PTC agaisnt PPA 22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 CSPDCCL dtd. 18.09.2012 Medium Term Power Purchase from Balco through PTC agaisnt PPA Balco dtd. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 23 18.09.2012 Including Short term purchase against MTOA 24 Additional Power Purchase 6.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.53 25 Energy Exchange 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 26 Banking of Energy -145.84 -11.74 -77.54 -210.04 -297.14 -149.27 0.00 0.00 0.00 0.00 0.00 0.00 -891.57 27 Sale of Power -321.72 -171.39 -105.78 -155.59 -512.51 -399.33 0.00 0.00 0.00 0.00 0.00 0.00 -1666.31 28 Total MP Schedule (Including Railway) 3253.22 3163.74 3477.52 2627.92 1890.17 2605.51 0.00 0.00 0.00 0.00 0.00 0.00 17018.09 29 Total MP Drawal (Including Railway) 3205.75 3093.57 3417.72 2539.32 1797.19 2531.71 0.00 0.00 0.00 0.00 0.00 0.00 16585.27 30 Wheeled Energy of Tawa HEG 0.00 0.00 0.00 6.87 11.38 8.33 0.00 0.00 0.00 0.00 0.00 0.00 26.58 31 Wheeled Energy of Wind Farm 18.13 9.25 25.91 19.94 12.96 6.17 0.00 0.00 0.00 0.00 0.00 0.00 92.36 32 Wheeled Energy of Solar Plant 16.07 15.81 13.19 8.67 8.05 12.82 0.00 0.00 0.00 0.00 0.00 0.00 74.62 33 Wheeled Energy of Ascent Hydro 1.39 1.16 0.67 0.05 0.13 0.98 0.00 0.00 0.00 0.00 0.00 0.00 4.38 34 POWER PURCHASE by MPPMCL from BLA Power + JP BINA (Intra State STOA) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 35 Deviation Energy of MPPGCL Thermal 11.36 0.36 -7.88 -10.24 -10.91 2.46 0.00 0.00 0.00 0.00 0.00 0.00 -14.86 36 Energy Purchased by MP from Wind Farm 227.92 447.95 437.76 435.03 496.33 279.71 0.00 0.00 0.00 0.00 0.00 0.00 2324.70 37 Energy Purchased by MP from Solar Plant 87.17 87.65 75.92 76.23 48.36 77.74 0.00 0.00 0.00 0.00 0.00 0.00 453.08 Firm / Infirm Energy of HEG Mandideep+Hindalco+HEG Tawa +Trimula Ind. 38 20.37 8.23 8.07 21.17 23.00 50.10 0.00 0.00 0.00 0.00 0.00 0.00 130.93 purchase by MP +Wheeled enrgy of CPP / IPP Purchased from ASN Biomass Katni + RDM Care Ind. Biogas Pariyat + Pragya Energy Pvt. Ltd. Biogas Richhai+ Arya Energy Kotma + Orient Green 39 10.35 8.46 9.39 6.14 8.23 8.82 0.00 0.00 0.00 0.00 0.00 0.00 51.40 Power Limited, Gadarawara Bio-Mass+Shaliwahna (CHH+Umariya) + JBP MSW 40 Deviation Energy of ISP 1.99 2.22 2.15 6.76 9.00 5.66 0.00 0.00 0.00 0.00 0.00 0.00 27.77 41 Schedule Energy of BLA Power against LTOA 7.85 1.92 2.76 1.09 0.16 1.69 0.00 0.00 0.00 0.00 0.00 0.00 15.45 42 Schedule Energy of JP BINA Power against LTOA 0.00 3.86 0.00 0.00 0.00 17.27 0.00 0.00 0.00 0.00 0.00 0.00 21.13 43 Import from bargi Left Bank Canal Power House + ISP NVDA 0.01 0.01 0.01 0.01 0.01 0.55 0.00 0.00 0.00 0.00 0.00 0.00 0.58 44 Chambal Complex Excess / less Overshare by MP -3.19 3.46 6.91 -6.51 -41.40 -14.62 0.00 0.00 0.00 0.00 0.00 0.00 -55.33 45 Rajghat Hydel Power Station Excess / Less Overshare by MP -0.03 0.01 -0.02 3.50 2.62 -0.02 0.00 0.00 0.00 0.00 0.00 0.00 6.06 46 State Supply (Ex-Power st. Bus) 5397.37 5038.53 4767.84 4299.45 4111.75 4747.43 0.00 0.00 0.00 0.00 0.00 0.00 28362.36 47 AVERAGE DAILY (Ex-Bus) 179.91 162.53 158.93 138.69 132.64 158.25 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 154.99 48 MINIMUM DAILY (MP Periphery) 167.37 137.08 134.68 107.18 92.82 135.71 0.00 0.00 0.00 0.00 0.00 0.00 92.82 49 MAXIMUM DAILY (MP Periphery) 177.75 174.97 166.73 144.25 142.69 177.30 0.00 0.00 0.00 0.00 0.00 0.00 177.75 50 State Supply (Ex-Power st. Bus):- YEAR : 2015-16 4281.50 4822.95 4090.97 4214.27 4371.53 5133.25 6395.72 6376.15 6847.93 6256.30 5773.75 5310.94 26914.48 51 Year ((16-17)-(15-16))*100/Year (15-16) 26.06 4.47 16.55 2.02 -5.94 -7.52 -100.00 -100.00 -100.00 -100.00 -100.00 -100.00 5.38 52 Unshedule L/S : Year-2016-17 0.00 5.37 0.00 0.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.64 53 Frequency Correction 3.92 1.95 2.34 1.38 1.52 1.86 0.00 0.00 0.00 0.00 0.00 0.00 12.97 54 Restricted Requirement : Year-2016-17 5401.30 5045.84 4770.18 4301.10 4113.27 4749.29 0.00 0.00 0.00 0.00 0.00 0.00 28380.98 55 Shedule L/S : Year-2016-17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 56 Un-Restricted Requirement : Year-2016-17 5401.30 5045.84 4770.18 4301.10 4113.27 4749.29 0.00 0.00 0.00 0.00 0.00 0.00 28380.98

Minutes Of 54th OCCM Of MP 33 ENERGY BALANCE SHEET : Demand & Sypply Hours Year : 2016 - 17 S.NO. Apr-16 May-16 Jun-16 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Yr 16-17 C. MORNING PEAK (MAX) 1 DEMAND MET 7984 7347 7019 6147 6146 7909 0 0 0 0 0 0 7984 2 LOAD RELIEF 0 0 0 0 0 0 0 0 0 0 0 0 0 3 LOAD SHEDDING 0 0 0 0 0 0 0 0 0 0 0 0 0 D. EVENING PEAK (MAX) 1 DEMAND MET 8011 7902 7501 6903 6964 7963 0 0 0 0 0 0 8011 2 LOAD RELIEF 0 0 0 0 0 0 0 0 0 0 0 0 0 3 LOAD SHEDDING 0 0 0 0 0 0 0 0 0 0 0 0 0 F. REGISTERED MAXIMUM 8119 8045 7501 6903 6964 7963 0 0 0 0 0 0 8119 G. COMPUTED MAXIMUM DEMAND 8153 8050 7517 6913 6964 7978 0 0 0 0 0 0 8153 H. UNRESTRICTED MAXIMUM DEMAND 8153 8050 7517 6913 6964 7978 0 0 0 0 0 0 8153 I. Average Power Supply per day to 1. Div. Head Quarters 23:47 23:37 23:42 23:42 23:45 23:47 0:00 0:00 0:00 0:00 0:00 0:00 23:43 2. District Head Quarters 23:52 23:44 23:45 23:48 23:49 23:50 0:00 0:00 0:00 0:00 0:00 0:00 23:48 3. Tahsil Head Quarters 23:44 23:31 23:34 23:36 23:40 23:38 0:00 0:00 0:00 0:00 0:00 0:00 23:37 4. Rural -Mixed 23:25 22:52 22:54 22:56 23:05 23:10 0:00 0:00 0:00 0:00 0:00 0:00 23:04 5. Rural -DLF 23:32 23:09 23:06 23:12 23:18 23:17 0:00 0:00 0:00 0:00 0:00 0:00 23:16 6. Rural -Irrigation 9:51 9:37 9:37 9:39 9:42 9:43 0:00 0:00 0:00 0:00 0:00 0:00 9:42 J LOAD FACTOR % 92.33 79.51 82.87 78.80 74.42 78.89 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 81.14 FREQUENCY ANALYSIS YEAR 2016-17 S.N PARTICULARS Apr-16 May-16 Jun-16 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Yr 16-17 A. INTGRATED FREQUENCY 1 MAXIMUM 50.11 50.20 50.11 50.16 50.14 50.09 0.00 0.00 0.00 0.00 0.00 0.00 50.20 2 MINIMUM 49.80 49.78 49.82 49.82 49.67 49.85 0.00 0.00 0.00 0.00 0.00 0.00 49.67 B. INSTANTANEOUS FREQUENCY 1 MAXIMUM 50.32 50.44 50.37 50.35 50.35 50.24 0.00 0.00 0.00 0.00 0.00 0.00 50.44 2 MINIMUM 49.64 49.56 49.65 49.69 49.65 49.67 0.00 0.00 0.00 0.00 0.00 0.00 49.56 C. AVG FREQUENCY 49.98 50.00 50.00 50.01 50.00 50.00 0.00 0.00 0.00 0.00 0.00 0.00 50.00 D. % TIME WHEN FREQUENCY WAS 1 ABOVE 51.5 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 50.05 TO 51.5 Hz 16.98 23.12 18.28 23.65 20.32 19.00 0.00 0.00 0.00 0.00 0.00 0.00 20.26 3 49.9 TO 50.05 Hz 69.94 69.78 74.09 72.35 73.73 75.15 0.00 0.00 0.00 0.00 0.00 0.00 72.50 4 49.7 TO 49.9 Hz 12.92 6.96 7.50 3.90 5.83 5.75 0.00 0.00 0.00 0.00 0.00 0.00 7.12 5 49.5 TO 49.7 Hz 0.16 0.14 0.13 0.10 0.12 0.10 0.00 0.00 0.00 0.00 0.00 0.00 0.12 6 49.2 TO 49.5 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7 48.8 TO 49.2 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8 48.5 TO 48.8 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9 BELOW 48.5 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Minutes Of 54th OCCM Of MP 34 Hourly Average Own Generation, Schedule Drawal , Actual Drawal & Demand Month :- August 2016 FIGURES IN MW

Own Generation Schedule from Load Shedding

Intra UNRES Riha REST. SCH Total nd+ Tot Act. State DEMAN T. Hrs. FREQ. THER. THER. Total Total Jhabu Deviation DEMAN IPPs CPPs DVC JP MB to MTO STO Mata Avl. Drl STO D MET UN DEMA Incl Excl HYD. ISP OSP Total CSS Sugen Lanco Sasan Essar a SSP SEZ Banking Sale Pur Total SCH TOTAL D Injecti Injecti ER Nigri Power Railw A A tila- A SCH ND Aux Aux Power on on ay at MP Rajg hat

1:00 49.99 506 460 455 993 393 26 529 2857 1192 4 0 73 767 0 395 21 0 885 218 0 -223 -858 0 0 63 10 2547 5404 2494 -53 0 5351 0 0 0 5354 5354

2:00 50.01 507 462 449 987 393 26 528 2844 1092 0 0 64 728 0 386 16 0 873 218 0 -223 -757 0 0 75 10 2483 5327 2404 -79 0 5248 0 0 0 5249 5249

3:00 50.01 505 460 430 988 394 26 517 2816 1031 3 0 64 732 0 386 9 0 869 218 0 -223 -684 0 0 81 10 2496 5312 2378 -118 0 5193 0 0 0 5195 5195

4:00 50.01 506 460 434 990 394 26 511 2815 1049 4 0 64 709 0 392 6 0 861 218 0 -223 -785 0 0 86 10 2392 5207 2324 -68 0 5139 0 0 0 5141 5141

5:00 49.98 506 461 433 990 394 26 503 2805 1023 4 0 61 692 0 387 11 0 848 218 0 -223 -683 0 0 98 10 2446 5251 2336 -110 0 5141 0 0 0 5144 5144

6:00 50.01 502 457 452 989 394 26 510 2828 1091 0 0 64 743 0 392 10 0 655 218 0 -224 -630 0 0 98 10 2427 5256 2427 -1 0 5255 0 0 0 5257 5257

7:00 50.00 508 462 480 986 394 26 532 2880 1258 0 0 64 810 0 392 2 0 536 218 0 -598 -410 0 0 156 10 2440 5320 2455 15 0 5335 0 0 0 5337 5337

8:00 50.04 506 460 463 977 395 26 595 2918 1311 0 0 64 807 0 392 10 0 557 218 0 -598 -431 0 0 146 10 2486 5403 2417 -68 0 5335 0 0 0 5336 5336

9:00 50.01 512 466 466 983 395 26 667 3003 1365 0 0 68 830 0 393 16 0 387 218 0 -598 -448 0 0 127 10 2368 5371 2329 -39 0 5331 0 0 0 5333 5333

10:00 50.00 497 452 473 984 393 26 717 3046 1333 12 0 72 831 0 393 15 0 340 218 0 -598 -501 0 0 103 10 2228 5275 2175 -53 0 5222 0 0 0 5224 5224

11:00 50.01 503 458 470 985 393 26 758 3091 1327 17 0 80 809 0 393 23 0 343 218 0 -597 -550 0 0 84 10 2156 5247 2007 -150 0 5098 0 0 0 5099 5099

12:00 50.01 496 451 468 987 393 26 782 3107 1321 15 0 71 768 0 393 25 0 358 218 0 -597 -727 0 0 51 10 1906 5014 1757 -149 0 4865 0 0 0 4867 4867

13:00 50.02 493 448 451 988 393 26 787 3093 1218 15 0 71 746 0 393 18 0 538 218 0 -619 -844 0 0 84 10 1849 4942 1752 -97 0 4845 0 0 0 4846 4846

14:00 50.00 502 457 436 989 393 26 770 3071 1146 13 0 64 716 0 389 18 0 537 218 0 -620 -797 0 0 97 10 1794 4865 1690 -103 0 4762 0 0 0 4763 4763

15:00 49.99 511 465 441 993 394 26 745 3064 1150 7 0 64 710 0 385 11 0 618 218 0 -616 -933 0 0 86 10 1710 4774 1662 -48 0 4726 0 0 0 4729 4729

16:00 50.01 501 456 450 985 395 26 671 2983 1070 4 0 64 710 0 378 6 0 720 218 0 -615 -901 0 0 110 10 1775 4758 1777 2 0 4760 0 0 0 4761 4761

17:00 49.99 506 460 438 988 394 26 599 2906 945 0 0 64 695 0 384 0 0 865 218 0 -617 -749 0 0 134 10 1950 4856 1970 19 0 4876 0 0 0 4878 4878

18:00 50.01 513 467 448 991 394 26 503 2829 871 0 0 61 657 0 403 0 0 1102 218 0 -616 -608 0 0 159 10 2258 5086 2200 -57 0 5029 0 0 0 5031 5031

19:00 49.97 534 486 490 998 393 27 461 2856 1326 23 0 85 786 0 427 25 0 756 214 0 -30 -1026 0 0 104 10 2701 5557 2836 135 0 5692 0 0 0 5698 5698

20:00 49.98 545 496 512 986 392 27 460 2873 1618 65 0 91 805 0 432 64 0 691 214 0 -90 -634 0 0 48 10 3315 6189 3216 -99 0 6089 0 0 0 6095 6095

21:00 50.00 541 492 480 988 393 27 451 2829 1585 49 0 85 798 0 423 56 0 697 214 0 -87 -623 0 0 47 10 3254 6084 3132 -123 0 5961 0 0 0 5965 5965

22:00 50.04 538 489 479 986 395 27 464 2840 1456 30 0 85 791 0 424 40 0 716 214 0 -79 -634 0 0 63 10 3117 5957 2958 -159 0 5798 0 0 0 5799 5799

23:00 50.02 528 481 472 985 393 26 489 2846 1344 4 0 75 785 0 424 23 0 806 214 0 -61 -603 0 0 36 10 3058 5904 2850 -208 0 5696 0 0 0 5697 5697

24:00 50.02 522 475 478 980 393 26 506 2858 1328 9 0 78 795 0 413 12 0 893 216 0 -600 -441 0 0 54 10 2767 5625 2617 -150 0 5476 0 0 0 5477 5477

Avg. 50.01 512 466 460 987 394 26 586 2919 1227 12 0 71 759 0 399 18 0 685 217 0 -399 -677 0 0 91 10 2413 5333 2340 -73 0 5259 0 0 0 5261 5261

00 TO 06 50.00 505 460 442 990 394 26 516 2828 1080 3 0 65 728 0 390 12 0 832 218 0 -223 -733 0 0 83 10 2465 5293 2394 -71 0 5221 0 0 0 5223 5223 HRS.

06 TO 12 50.01 504 458 470 984 394 26 675 3008 1319 7 0 70 809 0 393 15 0 420 218 0 -597 -511 0 0 111 10 2264 5272 2190 -74 0 5198 0 0 0 5199 5199 HRS.

12 TO 18 50.00 504 459 444 989 394 26 679 2991 1067 7 0 65 706 0 389 9 0 730 218 0 -617 -805 0 0 112 10 1889 4880 1842 -47 0 4833 0 0 0 4835 4835 HRS.

06TO 18 50.01 504 459 457 986 394 26 677 2999 1193 7 0 67 758 0 391 12 0 575 218 0 -607 -658 0 0 111 10 2077 5076 2016 -61 0 5015 0 0 0 5017 5017 HRS.

18 TO 24 50.01 535 487 485 987 393 27 472 2851 1443 30 0 83 793 0 424 37 0 760 215 0 -158 -660 0 0 59 10 3035 5886 2935 -101 0 5785 0 0 0 5788 5788 HRS.

Minutes Of 54th OCCM Of MP 35 Hourly Average Own Generation, Schedule Drawal , Actual Drawal & Demand Month :- September 2016 FIGURES IN MW

Own Generation Schedule from Load Shedding

Intra UNRES Riha REST. SCH Total nd+ Tot Act. State DEMAN T. Hrs. FREQ. THER. THER. Total Total Jhabu Deviation DEMAN IPPs CPPs DVC JP MB to MTO STO Mata Avl. Drl STO D MET UN DEMA Incl Excl HYD. ISP OSP Total CSS Sugen Lanco Sasan Essar a SSP SEZ Banking Sale Pur Total SCH TOTAL D Injecti Injecti ER Nigri Power Railw A A tila- A SCH ND Aux Aux Power on on ay at MP Rajg hat

1:00 50.00 1404 1278 560 451 197 91 392 2969 2135 63 0 185 847 0 430 54 0 438 212 0 -226 -603 0 0 2 26 3562 6531 3555 -7 0 6524 0 0 0 6526 6526

2:00 50.01 1381 1256 540 420 181 91 407 2895 2069 67 0 185 850 0 423 51 0 458 212 0 -224 -524 0 0 6 26 3599 6494 3489 -110 0 6384 0 0 0 6384 6384

3:00 50.00 1375 1251 515 393 176 90 410 2835 1986 56 0 185 851 0 423 50 0 447 211 0 -223 -490 0 0 9 26 3531 6367 3504 -27 0 6340 0 0 0 6342 6342

4:00 50.02 1386 1261 523 400 168 93 411 2856 1962 68 0 181 844 0 423 50 0 440 212 0 -225 -481 0 0 3 26 3504 6360 3442 -62 0 6298 0 0 0 6299 6299

5:00 49.97 1392 1267 510 415 169 93 383 2838 1970 66 0 185 845 0 423 52 0 419 212 0 -229 -465 0 0 6 26 3510 6348 3451 -59 0 6289 0 0 0 6295 6295

6:00 49.99 1397 1271 548 419 182 96 363 2879 2003 68 0 190 844 0 423 49 0 346 210 0 -236 -397 0 0 3 26 3527 6406 3502 -25 0 6381 0 0 0 6385 6385

7:00 50.00 1398 1273 569 437 188 96 366 2928 1971 67 0 194 838 0 422 34 0 256 212 0 -250 -269 0 0 49 26 3550 6477 3568 18 0 6495 0 0 0 6497 6497

8:00 50.03 1388 1263 533 435 190 95 426 2942 2003 68 0 194 842 0 421 34 0 261 212 0 -216 -243 0 0 30 26 3632 6574 3536 -96 0 6478 0 0 0 6479 6479

9:00 50.02 1390 1265 535 429 182 96 539 3045 2013 73 0 190 835 0 422 43 0 263 213 0 -214 -315 0 0 3 26 3552 6597 3407 -145 0 6452 0 0 0 6453 6453

10:00 50.01 1401 1275 514 425 183 96 619 3111 2035 81 0 190 835 0 423 50 0 262 214 0 -209 -566 0 0 -21 26 3321 6432 3221 -100 0 6332 0 0 0 6334 6334

11:00 50.02 1400 1274 499 427 179 95 649 3123 2012 82 0 186 822 0 427 50 0 268 213 0 -206 -636 0 0 -38 26 3207 6330 3127 -80 0 6250 0 0 0 6251 6251

12:00 50.01 1395 1269 502 410 179 94 658 3112 1977 77 0 186 809 0 428 52 0 277 210 0 -194 -714 0 0 -51 26 3083 6195 2842 -241 0 5954 0 0 0 5955 5955

13:00 50.00 1370 1247 478 393 170 92 660 3039 1884 73 0 183 803 0 427 55 0 344 208 0 -194 -791 0 0 -48 26 2970 6009 2981 11 0 6020 0 0 0 6022 6022

14:00 50.00 1366 1243 479 396 170 93 648 3029 1861 75 0 183 803 0 427 48 0 320 209 0 -193 -750 0 0 -35 26 2974 6002 2925 -49 0 5954 0 0 0 5957 5957

15:00 49.98 1365 1242 489 399 175 93 638 3035 1867 75 0 184 790 0 427 44 0 340 212 0 -187 -825 0 0 -29 26 2923 5958 2911 -12 0 5946 0 0 0 5951 5951

16:00 49.99 1374 1250 475 392 166 92 567 2943 1869 77 0 184 790 0 427 47 0 368 211 0 -197 -816 0 0 -9 26 2977 5920 2900 -77 0 5843 0 0 0 5847 5847

17:00 49.98 1370 1247 505 395 172 94 452 2864 1859 78 0 185 780 0 413 58 0 430 210 0 -189 -858 0 0 11 26 3004 5868 3034 31 0 5899 0 0 0 5903 5903

18:00 49.98 1421 1293 566 414 187 95 309 2863 1956 82 0 185 789 0 423 59 0 488 214 0 -195 -904 0 0 32 26 3155 6018 3114 -41 0 5977 0 0 0 5983 5983

19:00 49.95 1519 1383 637 521 234 101 290 3166 2203 123 0 194 815 0 432 88 0 377 214 0 -239 -557 0 0 40 26 3715 6881 3753 38 0 6919 0 0 0 6929 6929

20:00 50.03 1554 1414 606 503 241 107 314 3184 2314 139 0 194 823 0 434 113 0 377 215 0 -242 -392 0 0 12 26 4012 7197 3891 -121 0 7076 0 0 0 7076 7076

21:00 50.01 1515 1379 590 472 209 107 323 3080 2244 94 0 194 824 0 431 94 0 371 215 0 -220 -372 0 0 12 26 3913 6993 3817 -97 0 6897 0 0 0 6898 6898

22:00 50.05 1482 1349 560 443 199 105 342 2997 2209 90 0 194 822 0 433 77 0 378 213 0 -214 -383 0 0 28 26 3873 6870 3783 -89 0 6781 0 0 0 6781 6781

23:00 50.02 1459 1327 584 429 189 101 361 2991 2188 85 0 197 824 0 440 66 0 389 214 0 -200 -333 0 0 -3 26 3894 6885 3866 -29 0 6857 0 0 0 6857 6857

24:00 50.03 1460 1328 552 405 192 97 374 2948 2142 86 0 194 827 0 441 67 0 415 211 0 -206 -340 0 0 -2 26 3860 6808 3737 -124 0 6685 0 0 0 6685 6685

Avg. 50.01 1415 1288 536 426 187 96 454 2986 2031 80 0 188 823 0 427 58 0 364 212 0 -214 -543 0 0 0 26 3452 6438 3390 -62 0 6376 0 0 0 6379 6379

00 TO 06 50.00 1389 1264 533 416 179 92 394 2879 2021 64 0 185 847 0 424 51 0 425 212 0 -227 -493 0 0 5 26 3539 6418 3490 -48 0 6369 0 0 0 6372 6372 HRS.

06 TO 12 50.01 1395 1270 525 427 184 95 543 3044 2002 75 0 190 830 0 424 44 0 264 212 0 -215 -457 0 0 -5 26 3391 6434 3283 -108 0 6327 0 0 0 6328 6328 HRS.

12 TO 18 49.99 1378 1254 498 398 173 93 546 2962 1883 77 0 184 793 0 424 52 0 382 211 0 -193 -824 0 0 -13 26 3000 5963 2978 -23 0 5940 0 0 0 5944 5944 HRS.

06TO 18 50.00 1386 1262 512 413 178 94 544 3003 1942 76 0 187 812 0 424 48 0 323 211 0 -204 -641 0 0 -9 26 3196 6199 3130 -65 0 6133 0 0 0 6136 6136 HRS.

18 TO 24 50.02 1498 1363 588 462 211 103 334 3061 2217 103 0 194 822 0 435 84 0 384 214 0 -220 -396 0 0 14 26 3878 6939 3808 -70 0 6869 0 0 0 6871 6871 HRS.

Minutes Of 54th OCCM Of MP 36 Discomwise Hourly Average Schedule Drawal , Actual Drawal &Over(+)/Under(-) Drawal Month :- August 2016 FIGURES IN MW EZONE CZONE WZONE Railway

Hrs. FREQ. Restricte Unrestrict Restricte Unrestrict Restricte Unrestrict Demand O/U SCH Unsch Demand O/U SCH Unsch Demand O/U SCH Unsch Total SCH d ed SCH d ed SCH d ed Total Sch Met DRL LS LS Met DRL LS LS Met DRL LS LS Drawal Demand Demand Demand Demand Demand Demand

1:00 49.99 1914 1829 -85 0 0 1830 1830 1802 1748 -54 0 0 1749 1749 1803 1571 -232 0 0 1572 1572 218 203

2:00 50.01 1838 1803 -35 0 0 1803 1803 1719 1700 -19 0 0 1700 1700 1786 1545 -241 0 0 1545 1545 218 200

3:00 50.01 1827 1784 -43 0 0 1784 1784 1695 1675 -20 0 0 1675 1675 1787 1538 -249 0 0 1538 1538 218 197

4:00 50.01 1789 1757 -31 0 0 1758 1758 1653 1645 -9 0 0 1645 1645 1751 1535 -216 0 0 1536 1536 218 202

5:00 49.98 1775 1744 -32 0 0 1745 1745 1641 1640 -1 0 0 1641 1641 1765 1559 -206 0 0 1560 1560 218 199

6:00 50.01 1771 1702 -69 0 0 1702 1702 1646 1667 20 0 0 1667 1667 1827 1689 -138 0 0 1690 1690 218 197

7:00 50.00 1690 1646 -44 0 0 1647 1647 1647 1649 2 0 0 1650 1650 1933 1839 -94 0 0 1839 1839 218 201

8:00 50.04 1687 1612 -74 0 0 1613 1613 1671 1671 0 0 0 1671 1671 1945 1844 -101 0 0 1844 1844 218 207

9:00 50.01 1681 1585 -96 0 0 1585 1585 1698 1683 -15 0 0 1683 1683 1946 1852 -94 0 0 1853 1853 218 212

10:00 50.00 1653 1563 -90 0 0 1563 1563 1674 1662 -13 0 0 1662 1662 1910 1785 -125 0 0 1786 1786 218 212

11:00 50.01 1663 1553 -110 0 0 1554 1554 1681 1627 -53 0 0 1628 1628 1893 1717 -175 0 0 1718 1718 218 200

12:00 50.01 1630 1503 -127 0 0 1503 1503 1625 1559 -65 0 0 1560 1560 1799 1619 -180 0 0 1619 1619 218 184

13:00 50.02 1592 1507 -86 0 0 1507 1507 1587 1541 -46 0 0 1542 1542 1766 1615 -151 0 0 1616 1616 218 182

14:00 50.00 1538 1482 -56 0 0 1483 1483 1550 1540 -10 0 0 1541 1541 1739 1563 -176 0 0 1563 1563 218 177

15:00 49.99 1514 1463 -51 0 0 1464 1464 1511 1509 -2 0 0 1509 1509 1774 1579 -195 0 0 1580 1580 218 175

16:00 50.01 1497 1464 -33 0 0 1464 1464 1495 1500 5 0 0 1500 1500 1776 1603 -173 0 0 1603 1603 218 193

17:00 49.99 1511 1460 -52 0 0 1460 1460 1518 1538 20 0 0 1539 1539 1835 1679 -156 0 0 1679 1679 218 199

18:00 50.01 1546 1512 -34 0 0 1512 1512 1565 1563 -2 0 0 1564 1564 1885 1742 -142 0 0 1743 1743 218 212

19:00 49.97 1736 1847 111 0 0 1849 1849 1577 1741 164 0 0 1743 1743 1886 1891 5 0 0 1893 1893 214 213

20:00 49.98 2058 2046 -13 0 0 2048 2048 1811 1907 96 0 0 1909 1909 1992 1923 -69 0 0 1925 1925 214 213

21:00 50.00 2125 2036 -89 0 0 2037 2037 1838 1886 48 0 0 1887 1887 1950 1831 -119 0 0 1832 1832 214 209

22:00 50.04 2133 1975 -157 0 0 1976 1976 1838 1846 8 0 0 1847 1847 1925 1768 -158 0 0 1768 1768 214 209

23:00 50.02 2117 1929 -188 0 0 1929 1929 1875 1847 -28 0 0 1847 1847 1925 1711 -213 0 0 1712 1712 214 209

24:00 50.02 1980 1868 -112 0 0 1868 1868 1774 1783 9 0 0 1783 1783 1820 1619 -201 0 0 1619 1619 216 206

Avg. 50.01 1761 1695 -66 0 0 1695 1695 1670 1672 2 0 0 1673 1673 1851 1692 -158 0 0 1693 1693 217 200

00 TO 06 50.00 1819 1770 -49 0 0 1770 1770 1693 1679 -14 0 0 1680 1680 1787 1573 -214 0 0 1573 1573 218 200 HRS. 06 TO 12 50.01 1667 1577 -90 0 0 1578 1578 1666 1642 -24 0 0 1642 1642 1904 1776 -128 0 0 1777 1777 218 203 HRS. 12 TO 18 50.00 1533 1481 -52 0 0 1482 1482 1538 1532 -6 0 0 1532 1532 1796 1630 -165 0 0 1631 1631 218 190 HRS. 06TO 18 50.01 1600 1529 -71 0 0 1530 1530 1602 1587 -15 0 0 1587 1587 1850 1703 -147 0 0 1704 1704 218 196 HRS. 18 TO 24 50.01 2025 1950 -75 0 0 1951 1951 1785 1835 50 0 0 1836 1836 1916 1790 -126 0 0 1791 1791 215 210 HRS.

Minutes Of 54th OCCM Of MP 37 Discomwise Hourly Average Schedule Drawal , Actual Drawal &Over(+)/Under(-) Drawal Month :- September 2016 FIGURES IN MW EZONE CZONE WZONE Railway

Hrs. FREQ. Restricte Unrestrict Restricte Unrestrict Restricte Unrestrict Demand O/U SCH Unsch Demand O/U SCH Unsch Demand O/U SCH Unsch Total SCH d ed SCH d ed SCH d ed Total Sch Met DRL LS LS Met DRL LS LS Met DRL LS LS Drawal Demand Demand Demand Demand Demand Demand

1:00 50.00 2206 2142 -64 0 0 2143 2143 2318 2310 -7 0 0 2311 2311 2037 1867 -170 0 0 1868 1868 212 204

2:00 50.01 2159 2112 -47 0 0 2112 2112 2230 2256 26 0 0 2256 2256 1986 1814 -172 0 0 1814 1814 212 202

3:00 50.00 2111 2094 -16 0 0 2095 2095 2173 2228 56 0 0 2229 2229 1956 1818 -137 0 0 1819 1819 211 198

4:00 50.02 2096 2081 -15 0 0 2082 2082 2144 2201 57 0 0 2201 2201 1972 1810 -161 0 0 1811 1811 212 205

5:00 49.97 2085 2078 -7 0 0 2080 2080 2135 2174 39 0 0 2176 2176 1992 1835 -158 0 0 1836 1836 212 202

6:00 49.99 2075 2046 -28 0 0 2048 2048 2125 2161 36 0 0 2162 2162 2116 1974 -142 0 0 1975 1975 210 199

7:00 50.00 1984 1992 8 0 0 1993 1993 2067 2115 47 0 0 2115 2115 2222 2184 -38 0 0 2185 2185 212 204

8:00 50.03 1970 1941 -28 0 0 1942 1942 2074 2108 34 0 0 2108 2108 2274 2220 -54 0 0 2220 2220 212 208

9:00 50.02 1975 1905 -70 0 0 1905 1905 2106 2143 37 0 0 2143 2143 2309 2195 -115 0 0 2195 2195 213 210

10:00 50.01 1916 1890 -26 0 0 1890 1890 2072 2108 36 0 0 2109 2109 2233 2117 -115 0 0 2118 2118 214 217

11:00 50.02 1906 1878 -29 0 0 1878 1878 2052 2102 50 0 0 2102 2102 2167 2066 -102 0 0 2066 2066 213 205

12:00 50.01 1881 1811 -70 0 0 1812 1812 2024 2014 -10 0 0 2015 2015 2084 1940 -144 0 0 1940 1940 210 188

13:00 50.00 1823 1830 7 0 0 1830 1830 1956 2017 61 0 0 2017 2017 2052 1998 -54 0 0 1998 1998 208 176

14:00 50.00 1807 1772 -35 0 0 1773 1773 1949 2010 61 0 0 2011 2011 2072 1997 -75 0 0 1998 1998 209 175

15:00 49.98 1800 1753 -47 0 0 1755 1755 1943 1995 52 0 0 1997 1997 2107 2011 -96 0 0 2012 2012 212 187

16:00 49.99 1773 1702 -71 0 0 1703 1703 1932 1951 19 0 0 1953 1953 2117 1997 -120 0 0 1999 1999 211 193

17:00 49.98 1753 1700 -53 0 0 1702 1702 1906 1942 36 0 0 1944 1944 2139 2057 -81 0 0 2059 2059 210 199

18:00 49.98 1803 1770 -33 0 0 1771 1771 1916 1960 44 0 0 1962 1962 2127 2035 -91 0 0 2037 2037 214 212

19:00 49.95 2075 2249 175 0 0 2253 2253 2005 2237 232 0 0 2240 2240 2227 2222 -5 0 0 2225 2225 214 210

20:00 50.03 2347 2306 -41 0 0 2306 2306 2319 2384 66 0 0 2385 2385 2287 2168 -119 0 0 2168 2168 215 217

21:00 50.01 2338 2285 -53 0 0 2286 2286 2316 2352 36 0 0 2353 2353 2179 2048 -131 0 0 2048 2048 215 212

22:00 50.05 2319 2242 -77 0 0 2242 2242 2314 2334 20 0 0 2334 2334 2145 1989 -156 0 0 1989 1989 213 215

23:00 50.02 2291 2231 -60 0 0 2232 2232 2344 2426 82 0 0 2426 2426 2112 1988 -124 0 0 1988 1988 214 211

24:00 50.03 2268 2190 -78 0 0 2190 2190 2352 2371 19 0 0 2371 2371 2086 1919 -167 0 0 1920 1920 211 204

Avg. 50.01 2032 2000 -32 0 0 2001 2001 2116 2163 47 0 0 2163 2163 2125 2011 -114 0 0 2012 2012 212 202

00 TO 06 50.00 2122 2092 -29 0 0 2093 2093 2187 2222 35 0 0 2223 2223 2010 1853 -157 0 0 1854 1854 212 202 HRS. 06 TO 12 50.01 1939 1903 -36 0 0 1903 1903 2066 2098 32 0 0 2099 2099 2215 2120 -95 0 0 2121 2121 212 205 HRS. 12 TO 18 49.99 1793 1754 -39 0 0 1756 1756 1934 1979 45 0 0 1980 1980 2102 2016 -86 0 0 2017 2017 211 190 HRS. 06TO 18 50.00 1866 1829 -37 0 0 1829 1829 2000 2039 39 0 0 2040 2040 2159 2068 -91 0 0 2069 2069 211 198 HRS. 18 TO 24 50.02 2273 2251 -22 0 0 2251 2251 2275 2351 76 0 0 2352 2352 2173 2056 -117 0 0 2056 2056 214 212 HRS.

Minutes Of 54th OCCM Of MP 38 ANNEXURE-5.0 System Disturbance / System Incidence

1. System Disturbance on 03.08.2016 at 220 KV S/s Satna: On dated 03.08.2016 at around 17:20 Hrs. M.P system was normal and frequency of National Grid was 49.98 Hz. At around 17:22 Hrs. 132 KV Satna Interconnector – I tripped from 132 KV S/s Satna end. Due to non- tripping of 132 KV Satna Interconnector – I from 220 KV S/s Satna, the fault was fed from 160 MVA X’mer – I & II at 220 KV S/s Satna, resulting in tripping of both 160 MVA X’mer at 220 KV S/s Satna. Consequently 132 KV Supply failed at 220 KV S/s Satna, 132 KV S/s Satna, 132 KV S/s Panna, 132 KV S/s Pawai, 132 KV S/s Nagod & 132 KV S/s Majhgawan 32 KV Satna Cement & 132 KV Prism Cement industrial feeders. The complete system was normalized by 18:00 Hrs. At around 18:02 Hrs. while test charging 132 KV Satna Interconnector – I from 220 KV S/s Satna end, the feeder did not hold and again tripped from 132 KV S/s Satna end only and fault was fed through 160 MVA X’mer – I & II at 220 KV S/s Satna. Consequently 220/132 KV, 160 MVA X’mer – I & II tripped at 220 KV S/s Satna resulting in interruption at 220 KV S/s Satna, 132 KV S/s Satna, 132 KV S/s Panna, 132 KV S/s Pawai, 132 KV S/s Nagod & 132 KV S/s Majhgawan and 132 KV Satna Cement & 132 KV Prism Cement industrial feeders. Thereafter 132 KV Satna Interconnector – I was declared faulty and on patrolling top string disc at Loc No. 17 was found failed and also the DPR of 132 KV Satna Interconnector – I at 220 KV S/s Satna was defective and was not operating which resulted in above tripping. Due to the above tripping there was load loss of about 43.51 MW. There was no generation loss and System was normalized in due course of time.

2. System Disturbance on 04.08.2016 at 220 KV S/s Rewa & 220 KV S/s Sidhi: On dated 04.08.2016 at around 12:10 Hrs. M.P system was normal and frequency of National Grid was 50.04 Hz. Prior to fault, to avail S/d on 220 KV Satna – Satna (PGCIL) Interconnector – I for attending hot point and maintenance, 132 KV Satna – Rampur Bhagalen Ckt was opened – at 11:04 Hrs., 220 Rewa – Tons Ckt – II was opened – at 11:20 Hrs. and 220 KV Rewa – Tons Ckt – I was opened – at 11:30 Hrs. After making the above arrangements complete load of 220 KV S/s Rewa & 220 KV S/s Sidhi was fed through 220 KV Rewa – SGTPS Ckt & 220 KV Sidhi – Amarkantak Ckt. Thereafter 220 KV Satna – Satna (PGCIL) Interconnector – I was opened at 11:44 Hrs. 9425806842 pyasi At 12:04 Hrs. on 04.08.2016, 220 KV Birsinghpur (SGTPS) – Rewa Ckt tripped on transient fault from both end. Simultaneously 132 KV Amarpatan – Maihar Ckt tripped due to overloading. Consequently complete load of 220 KV S/s Rewa & 220 KV Sidhi shifted on 220 KV Amarkantak – Sidhi Ckt, resulting in over loading and tripping of 220 KV Amarkantak – Sidhi Ckt at 12:16 Hrs. and interruptin occurred at 220 KV S/s Rewa, 220 KV S/s Sidhi, 132 KV S/s Rewa, 132 KV S/s Sidhi, 132 KV S/s Deosar, 132 KV S/s Mauganj, 132 KV S/s Katra, 132 KV S/s Mangawan, 132 KV S/s Rewa II (Sagra/Paharia), 132 KV S/s Rampur Naikin, 132 KV Beohari, 132 KV S/s Amarpatan, Jhinna HPS, Silpara HPS, Devlond HPS, 220 KV Hindalco (Industary). Due to the above tripping there was load loss of about 240MW. There was no generation loss and System was normalized in due course of time.

Minutes Of 54th OCCM Of MP 39 3. System Disturbance on 05.08.2016 at 400 KV S/s Indore: On dated 05.08.2016 at around 19:20 Hrs. M.P system was normal and frequency of National Grid was 50.10 Hz. At around 19:24 Hrs. bird fault occurred on 400 KV ‘B’- Phase, 400 KV ICT of 400/220 KV, 315 MVA ICT – IV resulting in tripping of 400/220 KV, 315 MVA ICT – IV, 400 KV Indore – ISP Ckt – II, 400 KV Indore – Indore (PGCIL) Ckt – I and 220 KV Indore – South Zone Ckt – I. Due to the above tripping there was no interruption in any area and hence no load loss. There was no generation loss and System was normalized in due course of time.

4. System Disturbance on 29.08.2016 at 220 KV S/s Mehgaon: On dated 29.08.2016 at around 01:20 Hrs. M.P system was normal and frequency of National Grid was 50.01 Hz. Prior to fault 220 KV Malanpur – Mehgaon Ckt tripped at 21:19 Hrs. on 28.08.2016 and was declared faulty due to top string disc failure at Loc. No. 102. At around 01:27 Hrs., on 29.08.2016, Bus Bar Protection at Auriya (U.P) operated resulting in tripping of 220 KV Mehgaon – Auraiya Ckt and 220 KV Malanpur – Auraiya Ckt. Simultaneously 132 KV Malanpur – Mehgaon Clt tripped due to overloading and interruption occurred at 220 KV S/s Mehgaon, 132 KV S/s Bhind, 132 KV S/s Porsa, 132 KV S/s Ron, 132 KV S/s Lahar, 132 KV S/s Seondha. Due to the above tripping there was load loss of about 83.2 MW occurred. There was no generation loss and System was normalized in due course of time.

5. System Disturbance on 14.09.2016 at 220 KV S/s Maihar: On dated 14.09.2016 at around 17:20 Hrs. M.P system was normal and frequency of National Grid was 50.04 Hz. Prior to fault 220 KV Satna (PG)– Maihar Ckt, 132 KV Satna – Maihar Ckt & 132 KV Amarpatan – Jhinna Ckt was kept open for load management. At around 17:27 Hrs. 132 KV, R-Phase CT of 132/33 KV, 40 MVA X’mer burst at 220 KV S/s Maihar resulting in 132 KV Bus Fault at 220 KV S/s Maihar and tripping of 132 KV Maihar – Kymore Ckt & 132 KV Maihar – Amarpatan Ckt from far end. Simultaneously 220 KV Katni – Maihar Ckt tripped from 400 KV S/s Katni. Consequently interruption occurred at 220 KV S/s Maihar, 132 KV S/s Amarpatan, 132 KV KJS (industrial feeder), 132 KV Reliance Cement (industrial feeder) & 132 KV Maihar Cement (industrial feeder). Due to the above tripping there was load loss of about 25MW. There was no generation loss and System was normalized in due course of time. 6. System Disturbance on 14.09.2016 at 220 KV S/s Mehgaon: On dated 14.09.2016 at around 16:15 Hrs. M.P system was normal and frequency of National Grid was 49.99 Hz. At 16:20 Hrs. 220/132 KV, 160 MVa X’mer – II tripped on B-phase, O/C indication. Simultaneously heavy sparking was observed on 132 KV B-phase isolator of 220/132 KV, 160 MVA X’mer – I, hence X’mer – I was handtripped. Consequently 132 KV Malanpur – Mehgaon Ckt tripped due to overloading and interruption occurred at 220 KV S/s Mehgaon, 132 KV S/s Ron, Porsa, Bhind & Lahar. Later at around 16:56 Hrs. while charging 220/132 KV, 160 MVA X’mer – II, 220 KV ‘B’-phase CT of X’mer – II failed resulting in 220 KV Bus fault and operation of 220 KV Bus Bar protection at 220 KV S/s Mehgaon. Consequently 220 KV Malanpur – Mehgaon Ckt & 220 KV Mehgaon – Auriya Ckt tripped. Due to the above tripping there was load loss of about 142.2MW. There was no generation loss and System was normalized in due course of time. 7. System Disturbance on 20.09.2016 at 220 KV S/s Jabalpur: On dated 20.09.2016 at around 15:50 Hrs. M.P system was normal and frequency of National Grid was 50.00 Hz. At around 15:57 Hrs. transient fault occurred on 220 KV Jabalpur – Birsinghpur Ckt – II and Ckt

Minutes Of 54th OCCM Of MP 40 tripped from 220 KV S/s Birsinghpur end only and main breaker at 220 KV S/s Jabalpur end did not trip resulting in operation of LBB protection and Bus Bar Protection of 220 KV Main Bus – II operated at 220 KV S/s Jabalpur. Consequently 220 KV Jabalpur – Amarkantak Ckt – II, 220 KV Jabalpur – Narsinghpur Ckt – II, 220 KV Jabalpur – Sukha Ckt – II, 220 KV Bus Tie tripped. At around 16:33 Hrs. while charging the 220 KV Bus Tie, one of its breaker pole did not close and resulting in 220 KV Bus Fault. Consequently Bus Bar Protection of 220 KV Main Bus – II operated at 220 KV S/s Jabalpur, resulting in tripping of all 220 KV Feeders connected to 220 KV Main Bus – I & II. Due to the above tripping there was no interruption in any area and hence no load loss. There was no generation loss and System was normalized in due course of time.

Minutes Of 54th OCCM Of MP 41

Annexure-6.12-A

FORMAT-I Intimation by Transmission Licensee regarding anticipated charging of new elements

Name of the transmission element :

Type of Transmission Element : Transmission Line / ICT / Bus Reactor / Line Reactor / Bus / Bay/Series Capacitor/Series Reactor

Voltage Level : AC/DC kV

Owner of the Transmission Asset :

Likely Date a n d time of Charging :

Likely Date and time of start of Trial Operation :

Place:

Date:

(Name and Designation of the authorized person with official seal)

Minutes Of 54th OCCM Of MP 42 Annexure 6.12-B

Format II

List of elements to be charged and Element Rating details

I. List of Elements to be charged:

II. Element Ratings a. Transmission Line

1 From Substation 2 To Substation 3 Voltage Level (kV) 4 Line Length (km) 5 Conductor Type 6 No of sub Conductors

b. ICT

1 Voltage (HV kV / LV kV) 2 Capacity (MVA) 3 Transformer Vector group 4 Total no of taps 5 Nominal Tap Position 6 Present Tap Position 9 Tertiary Winding Rating and Ratio 10 % Impedance

c. Shunt / Series Reactor

1 Substation Name / Line Name 2 Voltage 3 MVAR Rating 4 Switchable / Non Switchable 5 In case of Bus Reactor, whether it can be taken as line reactor

(Name and Designation of the authorized person with official seal)

Minutes Of 54th OCCM Of MP 43 Annexure-6.12.C

Format III

< Name and Address of Transmission Licensee>

Undertaking by Transmission Licensee in respect of Telemetry and communication

The following transmission element is proposed to be charged on tentatively around hours. S no and Name of transmission element: The list of data points that would be made available to RLDC in real time had been indicated vide communication dated _. It is certified that the following data points have been mapped and real time data would flow to RLDC immediately as the element is charged and commissioned.

S Name Data point (analog as well Point to point Data would be Remarks no of substation as digital) identified in checking available at RLDC (path may be earlier done jointly (Y/N) specified) Communication dated with RLDC (Y/N) 1 Sending end Analog Digital SoE Main Channel Standby Channel Voice Communication (Specify: ) 2 Receiving end Analog Digital SoE Main Channel Standby Channel Voice Communication (Specify: )

It is also certified that the data through main channel is made available to RLDC as well as alternate communication channel is available for data transfer to RLDC to ensure reliable and redundant data as per IEGC (as amended from time to time). Also, Voice communication is established as per IEGC. The arrangements are of permanent nature. In case of any interruption in data in real time, the undersigned undertakes to get the same restored at the earliest. Place: Date: (Name and Designation of the authorized person with official seal)

Minutes Of 54th OCCM Of MP 44 Annexure-9.1 List of interface points / meters having problem at site

Present Meter Sr. No Modem No Circle Name Div Name Sub Station Name Name of Interface Point Problem At Site No Meter Replaced details 1 MOD70208 MPE53472 BHOPAL Testing Division -I Bhopal 132KV S/S KURAWAR 33KV KHOKRAKALA FEEDER (CZ TO WZ) not furnished. 2 MOD70547 MPE51896 UJJAIN Testing Division - Ujjain 132KV AGAR 33KV Suzlon-II Meter defective 3 MOD70445 MPE53491 400KV BINA Testing Division Guna 132KV S/S MAKSUDANGARH 40MVA MAKE BBL SN 5033/14 Meter defective 4 MOD70473 MPE51930 GWALIOR Testing Division- Shivpuri 132KV S/S SHIVPURI 40MVA,BBL Meter defective 5 MOD70471 MPE51923 GWALIOR Testing Division- Shivpuri 132KV S/S SHIVPURI 40MVA, BHEL Meter defective

6 MOD70418 MPE53498 GWALIOR Testing Division -II Gwalior 132KV S/S DATIA 40 MVA MAKE EMCO SN HT-12510 Meter defective

7 MOD70304 MPC58763 Satna Testing Division - Rewa 132KV S/S MORWA 132 KV Bina Meter defective 8 MOD70339 MPE51744 Satna Testing Division - Satna 220KV S/S SATNA 63 MVA XMER Meter defective 9 MOD70310 APMB2639 SATNA Testing Division - Satna 220 KV S/S KOTAR 132KV JP Bhilai feeder Modem Brunt 10 MOD70128 MSP44327 BHOPAL Testing Division -II Bhopal 132KV S/S GOPALPUR 40MVA TRANSFORMER PC0100096 T&R Network Problem 11 MOD70575 MPP28454 400KV Indore 440 KV Testing Division- Indore 132KV S/S JAMLI 63MVA BBL MAKE SN 5032/15 Network Problem 12 MOD70381 MPP28538 SAGAR Testing Division -II Sagar 132KV S/S HATTA 63MVA MAKE Network Problem 13 MOD70502 MPP28447 UJJAIN Testing Division - Dewas 132KV S/S BNP DEWAS 40MVA MAKE CGL SN 47292 Network Problem

14 MOD70602 MPP28500 INDORE Testing Division - I Indore 132KV S/S GAUTAMPURA 20 MVA EMCO MAKE SN 1197/11213 Network weak

15 MOD70289 MPP28328 SATNA Testing Division - Satna 132 KV S/S AMARPATAN 40 MVA X-mer-1 (33 kv side) Network weak 40MVA 132/33KV XMER NGEF S.NO. 16 MOD70562 GEC08911 INDORE Testing Division - II Indore 132KV S/S GHATA BILLOD Sim defective 2500051108 17 MOD70413 MPE51932 GWALIOR Testing Division -II Gwalior 132KV S/S DABRA 40MVA MAKE IMP SN TT-6724 Sim defective 18 MOD70465 MPE53503 GWALIOR Testing Division- Shivpuri 132KV S/S PICHORE 12.5MVA,CGL Time Drift

19 MOD70705 MPP28623 UJJAIN Testing Division - Ratlam 220KV S/S RATLAM 40MVA MAKE BHEL SN 2014006 Time Drift

20 MOD70686 MPE51880 UJJAIN Testing Division - Ratlam 132KV S/S JAORA 63MVA MAKE BBL SN 4909/2 Time Drift

21 MOD70651 MPE22178 INDORE Testing Division - KHANDWA 132KV S/s BAHADURPUR 63 MVA ABB SN 12018-005 Time Drift / NABT

22 MOD70508 MPE51824 UJJAIN Testing Division - Shujalpur 132KV S/S ARNIAKALA 40MVA MAKE ABB SN 12020-018 Time Drift

23 MOD70451 MPE53482 400KV BINA Testing Division Guna 132KV S/S ARON 40MVA,EMCO Time Drift 24 NO MODEM MPU02676 GWALIOR Testing Division -II Gwalior 132KV S/S MORENA 40 MVA BBL SN.5423/3 Non ABT Meter 25 NO MODEM 05246422 BHOPAL Testing Division -I Bhopal 132 KV S/s JEERAPUR 20MVA NGEF ELSTER METER

Minutes Of 54th OCCM Of MP 45 Annexure 10.2 SATPURA T P S 1 GEN 6 GT MW/MVAR 76/4 0 2 GEN 7 GT MW/MVAR 152/4 0 3 GEN 6 GT CB FAULTY OPEN 4 GEN 7 GT CB FAULTY OPEN 5 220 KV TRB CB FAULTY CLOSE

A T P S T P S 1 220 KV SGTPS 3 CB TRANSIT CLOSE 2 220 KV SGTPS 3 MW 456 50 SINGHA JI S T P S 1 400/220 KV TR 1 & 2 (315MVA ) OLTC N/C S G T P S 1 400/220 KV ICT CB FAULTY CLOSE 2 400 KV DAMOH 1 CB FAULTY CLOSE 3 4004 KV DAMOH 2 CB FAULTY CLOSE 4 220 KV GEN 4 CB FAULTY OPEN RAJGHAT H P S RTU OUT

TONS H P S 1 220 KV SIRMORE MVAR 494 5 2 221 KV SIRMORE MVAR 685 5 3 220 KV Satna Feeder CB close open

TELEMETRY DISCRIPIENCY I SP H P S Sr.no. DESCRIPTION Status telemetry value at SLDC actual value at site 1 GEN 7 MVAR 125 5 2 GEN 3 MVAR 125 5 3 400 KV INDORE 2 MVAR 256 25 O S P H P S Sr.no. DESCRIPTION Status telemetry value at SLDC actual value at site FOR 220 KV BUS VOLTAGE & FREQUENCY , LINE PT IS USED BUT ACTUALLY BUS PT IS REQUIRED

Minutes Of 54th OCCM Of MP 46 Annexure 10.2 JULWANIA 400 KV S/S 132 KV JULWANIA-NIMRANI 1 CKT I CB/SOE N/C 132 KV JULWANIA-NIMRANI PROCESSES CONNECTION/ 2 CKT II CB/SOE N/C CONFIGURATION REQUIRED 3 132 KV JULWANIA-ANJAD CKT CB/SOE N/C 4 132 KV JULWANIA- I/C I CB/SOE N/C 5 132 KV JULWANIA- I/C II CB/SOE N/C 6 400KV BUS 2 KV N/C 7 400KV BUS 2 HZ N/C 8 132/33 KV 40 MVA TR CB FAULTY JULWANIA 220 KV S/S 1 220/132 KV TR OLTC N/A 2 132/33 KV TR I CB/OLTC FAULTY 3 132/33 KV TR II OLTC N/A PROCESSES CONNECTION REQUIRED 4 132 KV NIMRANI CB FAULTY CLOSE SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED BARWAHA 220 KV S/S 1 220/132 TR2 160MVA OLTC N/A 2 220/132 TR 1 4*40 MVA OLTC N/A 3 220/132 TR2 160MVA MW Direction wrong 4 220/132 TR 1 4*40 MVA MW Direction wrong Need to be reverse from field SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED NEPANAGAR 220 KV S/S 1 220 KV BUS COUPLER CB FAULTY CLOSE 220/132 KV TR 160 MVA 2 (PRIMARY) CB FAULTY CLOSE SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED DEWAS 220 KV S/S 1 220/132 KV TR3 160 MVA MW,MVAR,OLTC N/A 2 220 KV BUS 1 MW,HZ N/A 3 220kv BUS COUPLER CB FAULTY CLOSE 4 132 KV CHAPDA 1 CB/MW/MVAR N/A PROCESSES CONNECTION REQUIRED 5 132 KV CHAPDA 2 CB/MW/MVAR N/A PROCESSES CONNECTION REQUIRED 6 132 KV SHANKARGARH 1 CB/MW/MVAR N/A PROCESSES CONNECTION REQUIRED 7 132 KV GAMESHA FATANPUR CB/MW/MVAR N/A SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED INDORE 400 KV S/S 1 220 KV BADNAGAR CB FAULTY CLOSE 2 220 KV BUD I & II FREQ NOT SHOWING 3 400 KV ISP II MW SHOWING 10 MW IN OPEN CONDITION 4 220 KV INDORE EAST MW SHOWING 04 MW IN OPEN CONDITION CHEGAON 400 KV S/S

2 220/132 TR 3 P CB FAULTY 3 400 KV REACTOR CB FAULTY 4 400 KV BUS COUPLER CB FAULTY OPEN 5 63 MVA TR CB FAULTY CLOSE

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED NEEMUCH 220 KV S/S 1 132 KV I/C 2 MW N/C 2 220 KV B/C CB FAULTY 3 132 KV RATANGARH II MW/MVAR/CB N/C

Minutes Of 54th OCCM Of MP 47 SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED SHUJALPUR 220 KV S/S 1 220KV BUS COUPLER CB FAULTY CLOSE 2 132 KV BUS COUPLER CB FAULTY OPEN 3 132 KV SARANGPUR II CB FAULTY CLOSE 4 132 KV CAPECITOR BANK CB FAULTY CLOSE 5 132 KV KURAWAR CB FAULTY CLOSE 6 132 IC-1 MW,MVAR N/A PROCESSES CONNECTION REQUIRED 7 132 IC-2 MW,MVAR N/A PROCESSES CONNECTION REQUIRED SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED BADOD 220 KV S/S 220/132 KV TR (160 MVA) 2 1 SECONDARY CB FAULTY CLOSE 2 132 KV BUS COUPLER CB FAULTY CLOSE 3 220/132 KV TR (160 MVA) 2 SEC CB N/A CLOSE SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED NAGDA 220 KV S/S 1 132 KV BUS COUPLER CB FAULTY CLOSE 2 132 KV GRASIM CB FAULTY CLOSE 3 132 KV MAHIDPUR -2 MW,MVAR N/A 4 132 KV CAP BANK MVAR N/C SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED NAGDA 400 KV S/S 1 400KV BUS TIE CB FAULTY CLOSE 2 400 KV RAJGRAH 1 CB FAULTY CLOSE 3 400 KV DEHGAON LINE REACTO MVAR N/A 4 400 KV ISP LINE REACTOR MVAR FUTURE FUTURE 5 400 KV SHUJALPUR I MVAR N/A 6 220 KV BUS II KV/FREQ N/A SHAJAPUR 220 KV S/S 1 132 KV SIDTUBE CB /MW/MVAR N/A 2 132 KV INOX CKT (RE) CB /MW/MVAR N/A 8 ALL BREAKERS OF 132 SIDE ARE FAULTY EXCEPT 220/132 KV X-MAR II (HV DIDE) SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED INDORE EAST 220 KV S/S 1 220 KV BUSCOUPLER CB FAULTY CLOSE 2 220 KV INDORE CB FAULTY CLOSE NIMRANI 220 KV S/S 2 220/132 TR 1 & 2 OLTC N/A 3 132/33 TR CB/OLTC N/A SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED RAJGRAH (DHAR) 220 KV S/S 1 220 KV BUS -1 KV,HZ N/A 2 220KV RAJGARH (PG) CB FAULTY CLOSE 2 220/132 KV TR 2 SEC CB FAULTY CLOSE 3 220KV BUSTIE CB FAULTY CLOSE 4 220KV BUS COUPLER CB FAULTY CLOSE 5 132 KV BUS COUPLER CB FAULTY CLOSE 6 132KV JHABUA CB FAULTY CLOSE 7 220/132 TR 1 &2 OLTC N/A SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED PITAMPUR 220 KV S/S 1 220 KV MAHESHWAR 2 CB FAULTY OPEN 2 220/132 TR1 OLTC N/C MW/MVAR/CB/OL 3 132/33 TR3 TC N/C

Minutes Of 54th OCCM Of MP 48 SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

UJJAIN 220 KV S/S 1 220 KV NAGDA I CB OPEN CLOSE 2 220 KV MAXI CB OPEN CLOSE 3 220/132 TR1 OLTC N/C 4 220/132 TR2 OLTC N/C 5 132 KV B/C CB FAULTY 6 132 KV TARANA I CB FAULTY 7 132/33 TR3 OLTC N/C SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED INDORE SZ 220KV S/S 1 220/132 TR1 & TR2 OLTC N/C 2 220/132 TR2(SECONDARY SIDE) CB FAULTY 2 132KV BUS COUPLER CB FAULTY CLOSE SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED INDORE NZ (JETPURA) 220KV S/S SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

SANWER 132KV S/S 1 CAP BANK MVAR -33.1 -16.5 2 CAP BANK MVAR -33.1 -16.5 3 132/33 TR1 OLTC,MW,MVAR NOT COMING 4 132/33 TR2 OLTC,MW,MVAR NOT COMING SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED DEPALPUR 132 KV S/S 1 132/33 KV TR-1 40 MVA MVAR NOT COMING 2 132 KV MAIN BUS KV,HZ NOT COMING SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED DEWAS BNP 132 KV S/S SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED GHOSLA 132 KV S/S 1 CAP BANK MVAR N/C 10.66 SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED 132 KV S/S AGAR TELEMETRY IS YET TO BE COMMISSIONED, PLCC LINK HAS ESTABLISHED INGORIA 132 KV S/S TELEMETRY IS YET TO BE COMMISSIONED & PLCC LINK IS ALSO TO BE ESTABLISHED

Minutes Of 54th OCCM Of MP 49 Annexure 10.2 LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER RAJGRAH (B) 220 KV S/S 1 132 KV RAGHOGRAH CB,MW/MVAR N/C PROCESSES CONNECTION 2 132 KV MAQSUDANGRAH CB,MW/MVAR N/C REQUIRED 3 220 KV BUS TIE CB FAULTY OPEN PROCESSES CONNECTION 4 220/132 KV TR S 2 MW /MVAR /CB N/C REQUIRED 5 220/132 KV TR S 1 MW /MVAR Non-current 6 220 KV & 132 Kv BUS MAIN BUS 1 & 2 VOLTAGE N/C 7 220 KV Shujalpur-1 (PG) MW /MVAR Non-current SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED ASHTA 400 KV S/S 1 400 KV BUS 2 VOLTAGE/FREQ N/C 2 400/220 Kv Xmer-2 CB faulty. SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED HANDIA 220 KV S/S 1 132 Kv Harda-1 CB FAULTY 2 132 Kv bus-coupler CB FAULTY 3 132 kv KANNOD-1 CB FAULTY 4 132 KV KHATEGAON CB FAULTY VIDHISHA 220 KV S/S 1 220 KV BPL MW /MVAR N/C SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED GUNA 220 KV S/S 1 132/33 KV TR CB FAULTY CLOSE 2 132 KVBUSCOUPLER CB FAULTY CLOSE 3 220 KV BUS COUPLER CB FAULTY CLOSE SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED GWALIOR 220 KV S/S 1 132 KV BUS COUPLER CB FAULTY 2 220/132 TR 3(160MVA 2) OLTC MW/MVAR INCORRECT VALUES. BHOPAL 400 KV S/S 1 BPL400-BDTL 765 1 & 2 TIE CB FAULTY 2 80 MVAR REACTOR CB FAULTY 3 400/220 ICT 1 & 3 CB FAULTY SARNI 220 KV S/S 1 132 KV TRACTION-2 CB FAULTY SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED BAIRAGRAH 220 KV S/S 1 160 MVA XMER-1&2 OLTC Non-current 2 132 KV BUS-COUPLER CB FAULTY 220 KB BUS-2 FREQUENCY Non-current 50 MVA XMER CB & OLTC FAULTY 132 KV SHYAMPUR-2 CB Non-current 20 MVA XMER OLTC FAULTY

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED ASTHA 132 KV S/S 1 132 KV BUS FREQUENCY Non-current 2 132 KV I / C 2 CB FAULTY MALANPUR 220 KV S/S 1 220 KV BUS FREQUENCY N/A 160 MVA XMER-1&2 OLTC Non-current 160 MVA -1(132 KV SIDE) CB FAULTY 132 KV BUS VOLTAGE,FREQUENCY INCORRECT/NON CURRENT 10 PICHORE 132 KV S/S 1 132 KV DATIA CB FAULTY CLOSE 2 132 KV RAJGHAT CB FAULTY CLOSE 3 132/33 KV TR NGEF CB FAULTY CLOSE MANDIDEEP 220 KV S/S 1 220 KV BUS-COUPLER CB FAULTY 2 220 KV BUS-2 VOLTAGE,FREQUENCY Non-current

Minutes Of 54th OCCM Of MP 50 HARDA 132 KV S/S ALL CB FAULTY EXCEPT HANDIA1 ITARSI 220 KV S/S 220 KV BUS-2 VOLTAGE,FREQUENCY INCORRECT/NON CURRENT 1 132/33 TR 4 CB FAULTY CLOSE PIPARIA 220 KV S/S 1 132 KV GADARWARA CB MW/MVAR TRANSIT/NON CURRENT CLOSE 2 220 KV CHICHLI MW /MVAR /CB 0 110/10 3 220/132 KV TR 2 (160 MVA) CB,MW/MVAR/OLTC N/A PROCESSES CONNECTION BETUL 220 KV S/S 1 220/132 KV TR MW/MVAR 0/0 40/10 2 ALL 220KV &132KV CB NON CURRENT CLOSE SHIVPURI 220 KV S/S 1 220/132 KV TR 2 MW/MVAR/CB N/A REQUIRED 220 KV BUS-COUPLER CB FAULTY 220 KV BUS-2 VOLTAGE,FREQUENCY Non-current 132 KC XMER-1 CB FAULTY ASHOKNAGAR 220 KV S/S 220 KV BINA MW/MVAR/CB Non-current/FAULTY VIJAYPUR 132 KV S/S 40 MVA XMER CB Non-current DATIA 220 KV S/S 132 KV BUS COUPLER CB FAULTY Open GANJBASODA 220 KV S/S 132 KV TRACTION-1 MW/MVAR Non-current ALL 220KV &132KV CB NON CURRENT CLOSE MANDIDEEP 132 KV S/S 132 KV BUS VOLTAGE,FREQUENCY Non-current ALL 132 KV CB NON CURRENT CLOSE KHILCHIPUR 132 KV S/S NON- CURRENT DUE TO MODEM PROBLEM. RAISEN 132 KV S/S NON- CURRENT DUE TO MODEM PROBLEM.

Minutes Of 54th OCCM Of MP 51 Annexure 10.2 DATA OUT FROM LONG TIME 1 WAIDHAN 132KV S/S 2 MORWA 132 KV S/S 3 BEOHARI 132 KV S/S OBSERVATION DURING MOCK DRILL AT TONS HPS 1 220 KV SATNA - TONS CKT CB CLOSE OPEN LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER Sr.no. DESCRIPTION Status telemetry value at SLDC actual value at site BIRSINGHPUR 220 KV S/S 1 220 KV INTERCONNECTOR 1 & 4 MW/MVAR N/C 115/15 SATNA220 KV S/S 1 220 KV KOTOR CB FAULTY CLOSE 2 220 KV CHATARPUR CB FAULTY CLOSE 1 220 KV B/C CB FAULTY CLOSE BINA 400 KV S/S 1 400/200/33 KV TERTIARY REACTOR 1 &MVAR N/A DAMOH 220 KV S/S 2 220 KV PGCIL 2 CB FAULTY CLOSE TIKAMGRAH 220 KV S/S 1 220 KV BUS TIE CB FAULTY CLOSE SIDHI 220 KV S/S 2 220 KV REWA MW/MVAR N/C 3 220 KV HINDALCO MW/MVAR N/C REWA 220 KV S/S 1 132 KV JP NIGRI CB/MW/MVAR N/C PROCESSES CONNECTION REQUIRED 2 220/132 TR 2 SEC CB N/C PROCESSES CONNECTION REQUIRED KOTAR 220 KV S/S 1 220 KV TONS PH MW /MVAR 0 45/5 1 220 KV SATNA MW /MVAR 0 15/5 ANUPPUR 220 KV S/S 1 132 KV KOTMA CB N/A 220/132 KV TR 2 (160 MVA) PRI & 2 SEC CB N/A CLOSE 3 132 KV SHAHDOL CB ,MW,MVAR N/A PROCESSES CONNECTION 4 132 KV KOTMA 2 CB ,MW,MVAR N/A REQUIRED PANDURNA 220 KV S/S

1 220 KV SATPURA T P S CB /MW/MVAR N/C PROCESSES CONNECTION REQUIRED BINA 220 KV S/S 1 132 KV ASHOK NAGAR CB /MW/MVAR N/C PROCESSES CONNECTION REQUIRED CHINDWARA 220 KV S/S

1 220/132 KV TR 1 (160 MVA) SEC CB FAULTY CLOSE 220/132 KV TR 2 (160 MVA) PRI & 2 SEC CB N/A CLOSE KOTMA 132 KV S/S

1 132 KV ANUPPUR 2 CB /MW/MVAR FAULTY PROCESSES CONNECTION REQUIRED MAIHAR 220 KV S/S 1 220 KV PGCIL SATNA MW 0 MFM PROBLUM