STATE: STATE: KERALA DETAILS OF ONGOING PROJECTS IN KERALA (P-7) DETAILS OF ONGOING PROJECTS IN KERALA (P-7) Expenditur Revised e for Cumulative Impleme Date of Target date of State/U Mode of NHDP Name of the Project NH No Old / Date of Original/ San. Cost Length Cumlv Physical Cost/Anticipa Current Financial Rev / Date of Actual Date of Name of NH Division / Name of the contractor Sl No nting Length (km) Job No. Agreement/Com completion as per T Delivery Ph/Sch New Revised Sanction Rs . in Cr Completed prog % ted cost in Financial progress Completion Completion Executive Enginee /PH No. Agency mencement contract Rs. crore Year in Rs. (Rs. Crore) crore

FS/Detailed Engineering

Consultancy services for preparation of feasibility report Muvattupuzha/ KERA KERAL Item cum Detailed Project Report (DPR) for widening to two 03.02.2016/ M/s C.V Kand 1 NH(O) 220/183 30.30 31.12.2015 850 0.85 NA 80% 0.85 0.42 0.42 14.08.2016 Smt.P.K.Rema - LA A PWD Rate lane with paved shoulder from km 106/700 to km 137/00 15.03.2016 ConsultantsPvt Ltd 08086395223 (Kottayam to Mundakkayam) on NH 220(New NH-183)

Consultancy services for preparation of feasibility report cum Detailed Project Report (DPR) for widening to two Malappuram/ M/S Dhruv KERA KERAL Item 10.02.2016/ 03.03.2016/ 2 NH(O) lane with paved shoulder from km 87/000 to km 213/966 53.96 852 1.52 NA 85% 1.52 0.45 0.45 31.08.2016 Sri Gokul Das - Consultancy Services LA A PWD Rate 05.04.2016 15.03.2016 140/960(Nattukal to Chandra Nagar in Palakkad) on NH 08086395238 Pvt Ltd 966(Old NH 213)

Consultancy services for preparation of feasibility report / KERA KERAL Item cum Detailed Project Report (DPR) for widening to two 28.03.2016/ 3 NH(O) 208/744 36 04.03.2016 854 0.7344 NA 90% 0.7344 0.072 0.072 19.09.2016 Smt.Cini.A- M/s KITCO LA A PWD Rate lane with paved shoulder from km 45/0 to km 81/0(Punalur 20.04.2016 08086395216 to Kottavasal) on NH 744(Old NH 208)

Consultancy services for preparation of feasibility report Kollam/ KERA KERAL Item cum Detailed Project Report (DPR) for widening to two 07.04.2016/ M/s Mukesh 4 NH(O) 220/183 45 04.03.2016 853 1.1103 NA 90% 1.1103 0.11 0.11 26.09.2016 Smt.Cini.A- LA A PWD Rate lane with paved shoulder from km0/000 to km 45/000 27.04.2016 &Associates 08086395216 (Kollam to Punalur ) on NH 744(Old NH 208)

Being prepared Consultancy services for preparation of feasibility report KERA KERAL Item by NHAI as 5 NH(O) cum Detailed Project Report (DPR) for four lane Thalassery- 17/66 12.00 31.12.2015 851 0.34 03.03.2016/ NA 0.34 0.034 0.034 14.08.2016 M/s KITCO LA A PWD Rate stand alone Mahe bypass on NH 17(New NH 66) project

Widening to 2 lane

Improvement of safety by way of widening of existing 5.5mintermediate lane to 7.0m two lane with geometric Muvattupuzha/ M/s Reji Mathew KERA KERAL Item 15.05.2015 / 14.05.2016 6 NH(O) improvement of Hill track along with signages,road 220/183 5.72 23.12.2014 835 12.34 5.72 100% 12.04 9.65 11.89 30.06.2016 30.06.2016 Smt.P.K.Rema - &Co.Pamplaniyil, LA A PWD Rate 23.05.2015 marking,retaining wall,construction of drains etc.from km 08086395223 Bharananganam 205/180 to km 210/900 on NH-220(New NH-183)

Improvement of Riding Quality (IRQP)

Muvattupuzha/ M/s Antech KERA KERAL Item IRQP from km 0/000 to km 16/000 of NH 185(newly 30.05.2016/ 7 NH(O) 185 16.00 04.03.2016 855 12.25 16.00 95% 12.25 6.13 6.13 06.03.2017 Smt.P.K.Rema - Construction LA A PWD Rate declared) 07.06.2016 08086395223 Company

Selection Kollam/ KERA KERAL Item IRQP from km 0/000 to km 16/100 of NH 183A(newly 8 NH(O) 183A 16.10 04.03.2016 856 13.68 0.00 Notice issued 13.68 0 0 NA Smt.Cini.A- M/S Metaguard LA A PWD Rate declared) on 20.12.2016 08086395216

C:\Users\User\Downloads\Progress report NH 1 NH(O)

REPORT‐V [ending Jan2017] REPORT‐V [ending Jan2017]

STATE: KERALA STATE: KERALA DETAILS OF ONGOING PROJECTS IN KERALA (P-7) DETAILS OF ONGOING PROJECTS IN KERALA (P-7) Expenditur Revised e for Cumulative Impleme Date of Target date of State/U Mode of NHDP Name of the Project NH No Old / Date of Original/ San. Cost Length Cumlv Physical Cost/Anticipa Current Financial Rev / Date of Actual Date of Name of NH Division / Name of the contractor Sl No nting Length (km) Job No. Agreement/Com completion as per T Delivery Ph/Sch New Revised Sanction Rs . in Cr Completed prog % ted cost in Financial progress Completion Completion Executive Enginee /PH No. Agency mencement contract Rs. crore Year in Rs. (Rs. Crore) crore

M/s. Raji Mathew & Muvattupuzha/ KERA KERAL Item IRQP including geometric improvements from km 73/200 30.05.2016/ Co. 9 NH(O) 185 22.80 04.03.2016 857 18.56 5.00 40% 18.56 5.27 5.27 06.03.2017 Sri.Issac Varghese - LA A PWD Rate to km 96/000 of NH 185(newly declared) 07.06.2016 Pamplaniyil, 08086395223 Bharananganam

M/s. Raji Mathew & Muvattupuzha/ KERA KERAL Item IRQP from km 41/500 to 55/250 of NH 185 (Newly 01.03.16/ Co. 10 NH(O) 185 13.75 30.12.2015 848 8.92 13.75 100% 9.06 5.01 5.01 02.11.2016 15.01.2017 Sri.Issac Varghese - LA A PWD Rate declared) 03.03.16 Pamplaniyil, 08086395223 Bharananganam

KERA Kollam/ Shri Abdul Faizy, KERA Item IRQP from km 482/000 to 520/400 of NH47 (new NH66) 03.10.2015/ 11 LA PBFF 47/66 38.40 17.02.2015 839 30.58 38.40 100% 31.15 12.42 15.60 18.06.2016 01-12-2016 Smt.Cini.A- M/s. Tarmac LA Rate in State of Kerala under PBFF 19.12.15 PWD 08086395216 Builders ()

Kannur/ KERA KERAL Item 20.06.2015 / Shri Moideen kutty 12 NH(O) IRQP from Km 63/000 to 94/000 of NH 17(NH-66) 17/66 31.00 24.03.2015 842 15.34 31.00 100% 16.6604 12.1 16.64 24.06.2016 NA 24.06.2016 Smt.Mini.P.K - LA A PWD Rate 25.06.2015 Haji 08086395242

Submitted to state Alappuzha/ KERA KERAL Item government for 13 NH(O) Improvement from km 390/570 to km 406/600 on NH 47 47/66 16.03 17.10.2016 866 17.00 0.00 17.00 0 Sri Ajith Kumar.V.V- LA A PWD Rate [PBFF] tender 08086395220 approval on Jan 2017

Construction of Bypasses 154.08 104.15

50:50 Cost Construction of 6.80 km 2 lane with paved shoulders sharin Alappuzha bypass on NH47 (New NH 66) from km Alappuzha/ KERA KERAL g of 11.02.2015 / 14 EPC 408/100 to 414/900 in the State of Kerala on EPC basis 47/66 6.80 17-01-2014 817 255.75 0.00 49% 348.43 46.07 95.08 15.09.2017 NA NA Sri Ajith Kumar.V.V- M/s RDS-CVCC (JV) LA A PWD State 16.03.2015 with 50:50 cost sharing between and 08086395220 & (MORTH) MOR TH

50:50 Cost Construction of 13.0 km 2 lane with paved shoulders sharin Kollam bypass on NH47 (New NH 66) from km 486/500 to Kollam/ KERA KERAL g of 11.02.2015 / 15 EPC 499/500 in the State of Kerala on EPC basis with 50:50 47/66 13.00 17-01-2014 818 267.16 0.00 52% 352.05 52.50 121.84 26.11.2017 NA NA Smt.Cini.A- M/s RDS-CVCC (JV) LA A PWD State 27.05.2015 cost sharing between Government of Kerala and 08086395216 & Government of India (MORTH) MOR TH

Construction of balance portion of service road left out Time extension up KERA from km 402/500 to 404/580, Extension of Box culvert at to 6 months or Kodungalloor/ Shri Abdul Faizy, KERA Item NH(O 14.11.2014 / 16 LA km 402/810, Construction of 3.08km CCdrain, 47/66 2.00 07.08.2014 832 15.13 0.00 95% 15.13 2.68 12.09 19.05.2016 subject to the NA Smt.Sreemala - M/s. Tarmac LA Rate ) 20.11.2014 PWD Construction of 225m retaining wall and road safety decision of DRE 08086395228 Builders (India) works on Kodungallur By-pass on NH -17 (New NH-66) whichever is earlier

Total Length 512.94 Major Bridges

C:\Users\User\Downloads\Progress report NH 2 NH(O)

REPORT‐V [ending Jan2017] REPORT‐V [ending Jan2017]

STATE: KERALA STATE: KERALA DETAILS OF ONGOING PROJECTS IN KERALA (P-7) DETAILS OF ONGOING PROJECTS IN KERALA (P-7) Expenditur Revised e for Cumulative Impleme Date of Target date of State/U Mode of NHDP Name of the Project NH No Old / Date of Original/ San. Cost Length Cumlv Physical Cost/Anticipa Current Financial Rev / Date of Actual Date of Name of NH Division / Name of the contractor Sl No nting Length (km) Job No. Agreement/Com completion as per T Delivery Ph/Sch New Revised Sanction Rs . in Cr Completed prog % ted cost in Financial progress Completion Completion Executive Enginee /PH No. Agency mencement contract Rs. crore Year in Rs. (Rs. Crore) crore

Kodungalloor/ KERA KERAL Item Rehabilitation of existing bridge - Special repair to 08.05.2013 / M/s. Padmaja 17 NH(O) 17/66 89 15.01.2013 3.34 NA 100% 5.18 0.48 4.62 28.02.2014 30.04.2016 30.04.2016 Smt.Sreemala - LA A PWD Rate Chettuva Bridge at Km 369/600 of NH17 01.06.2013 Specialities 08086395228 001-Kerala-2012-13

Kodungalloor/ KERA KERAL Item Rehabilitation of existing bridge - Special repair to 05.04.2013 / M/s. Padmaja 18 NH(O) 17/66 15.01.2013 2.59 NA 100% 4.28 0.96 3.36 26.01.2014 31.05.2016 31.05.2016 Smt.Sreemala - LA A PWD Rate Puduponnani Bridge at Km 342/400 of NH17 27.04.2013 Specialities 08086395228 002-Kerala-2012-13

30.07.2016 Delay due to Muvattupuzha/ KERA KERAL Construction of Vandiperiyar bridge at km 200/850 06.01.2015 / M/s. Akshaya 19 EPC NH(O) 220/183 12.02.2014 820 9.51 NA 100% 9.51 3.04 5.46 EOT granted enroachment on the NA Smt.P.K.Rema - LA A PWD (EPC Mode) 20.01.2015 Builders till 13.12.2016 proposed alignment 08086395223

KERA Kannur/ KERA Item NH(O Rehabilitation of Valapattanam Bridge near km 147/250 10.04.2015 Work completed on M/s.Padmaja 20 LA 17/66 05.03.2014 828 4.36 NA 100% 4.36 1.99 2.6 17.04.16 NA Smt.Mini.P.K - LA Rate ) in NH17 /18.04.2015 17.12.2016 Specialities PWD 08086395242

Kannur/ KERA KERAL Item 02.08.2014 / M/s.Padmaja 21 NH(O) Rehabilitation of Mahe Bridge near km 184/600 of NH17 17/66 05.03.2014 830 1.07 NA 100% 1.1694 0.62 1.14 25.02.2015 31.05.2016 31.05.2016 Smt.Mini.P.K - LA A PWD Rate 22.08.2014 Specialities 08086395242

Construction of 2-lane bridge over Ponnani Cochin Canal Kodungalloor/ KERA KERAL (Canoli canal) and its approaches in aggregate length of 21.05.2015 / M/s. EKK & 22 EPC NH(O) 17/66 31.03.2014 831 40.62 NA 83% 46.5 8.77 25.69 03.06.2017 NA NA Smt.Sreemala - LA A PWD 1.54 km of NH17 from km 332/650 to km 333/900 (on 04.06.15 Company. 08086395228 EPC mode)

Rehabiltation of Ambalapuzha ROB at km 425/000 and 4 minor bridges in between km 366/905 and km 387/300 Alappuzha/ KERA KERAL Item 22.06.16/ M/s Nath 23 NH(O) namely Chandiroor Bridge at km 370/915,Kuthiathodu 47/66 04.03.2016 862 2.96 NA 95% 3.4081 0 0 26.09.16 Applied for EOT Sri Ajith Kumar.V.V- LA A PWD Rate 27.06.16 Construction bridge at km 376/392,Ponnamveli bridge at km 382/315 & 08086395220 Puthenthodu bridge at km 385/920 on NH-66 (old NH-47)

C:\Users\User\Downloads\Progress report NH 3 NH(O)

REPORT‐V [ending Jan2017] REPORT‐V [ending Jan2017]

STATE: KERALA STATE: KERALA DETAILS OF ONGOING PROJECTS IN KERALA (P-7) DETAILS OF ONGOING PROJECTS IN KERALA (P-7) Expenditur Revised e for Cumulative Impleme Date of Target date of State/U Mode of NHDP Name of the Project NH No Old / Date of Original/ San. Cost Length Cumlv Physical Cost/Anticipa Current Financial Rev / Date of Actual Date of Name of NH Division / Name of the contractor Sl No nting Length (km) Job No. Agreement/Com completion as per T Delivery Ph/Sch New Revised Sanction Rs . in Cr Completed prog % ted cost in Financial progress Completion Completion Executive Enginee /PH No. Agency mencement contract Rs. crore Year in Rs. (Rs. Crore) crore

Kozhikkode/ KERA KERAL Item Construction of Pathiri bridge at km 89/400 on NH 766 23.01.2017/ Agreement 24 NH(O) 212/766 17.10.2016 865 5.23 5.23 22.01.2018 Shri.Vinayaraj.K - Sri. Rajeev LA A PWD Rate (Old NH 212) … executed. 08086395234

Technical Bid Kozhikkode/ KERA KERAL Item Reconstruction of Karimpannpalam bridge and approaches opened and is 25 NH(O) 17/66 06.12.2016 868 12.71 12.71 Shri.Vinayaraj.K - LA A PWD Rate from km 200/000 to km 201/000 of NH 66 under 08086395234 evaluation

Technical Bid Kozhikkode/ KERA KERAL Item Reconstruction of Palolipalam bridge and approaches from opened and is 26 NH(O) 17/66 07.12.2016 867 12.33 12.33 Shri.Vinayaraj.K - LA A PWD Rate km 201/000 to km 202/000 of NH 66 under 08086395234 evaluation

C:\Users\User\Downloads\Progress report NH 4 NH(O)

REPORT‐V [ending Jan2017] REPORT‐V [ending Jan2017]

STATE: KERALA STATE: KERALA DETAILS OF ONGOING PROJECTS IN KERALA (P-7) DETAILS OF ONGOING PROJECTS IN KERALA (P-7) Expenditur Revised e for Cumulative Impleme Date of Target date of State/U Mode of NHDP Name of the Project NH No Old / Date of Original/ San. Cost Length Cumlv Physical Cost/Anticipa Current Financial Rev / Date of Actual Date of Name of NH Division / Name of the contractor Sl No nting Length (km) Job No. Agreement/Com completion as per T Delivery Ph/Sch New Revised Sanction Rs . in Cr Completed prog % ted cost in Financial progress Completion Completion Executive Enginee /PH No. Agency mencement contract Rs. crore Year in Rs. (Rs. Crore) crore

Minor Bridges

Rehabilitation of Shiriya Bridge at km 36/100, Kumbala Kannur/ KERA KERAL Item 30.05.2016/ 27 NH(O) Bridge at km 38/525 and Nileswaram bridge at km 93/320 66/17 04.03.2016 863 3.0774 40% 3.0774 0.05 0.05 08.03.17 Smt.Mini.P.K - P.K Sulphikar LA A PWD Rate 09.06.2016 of NH 66(Old NH 17) 08086395242

01.09.2016 Muvattupuzha/ KERA KERAL Construction of parallel bridge to iron bridge at km 174/000 02.03.2015 / Appointed date Delay in demolishion 28 EPC NH(O) 49/85 10.02.2014 822 5.904 NA 90% 5.904 0 0.27 NA Smt.P.K.Rema - M/s.Akshya Builders LA A PWD (Kallar Bridge) (EPC Mode) 07.03.2015 extended upto of shed by KSEB 08086395223 December 2016

KERA Kollam/ KERA Item NH(O Reconstruction of Kazhuthurutty Bridge at km 69/960 of EOT applied till Sri. KN 29 LA 208/744 31.03.2015 843 3.35 16.09.2015/ NA 5% 3.35 0.004 0.004 15-06-2016 NA Smt.Cini.A- LA Rate ) NH-744 10.07.2017 Madusoothanan PWD 08086395216

KERA Kollam/ KERA Item NH(O Reconstruction of Muruganpanchal Bridge at km 76/00 EOT applied till Sri. KN 30 LA 208/744 31.03.2015 844 3.25 16.09.2015/ NA 5% 3.25 0015-06-2016 NA Smt.Cini.A- LA Rate ) of NH-744 10.07.2017 Madusoothanan PWD 08086395216

Road Safety Works

Providing traffic Safety measures including improvement of Muvattupuzha/ KERA KERAL Item junctions,construction of drains,extension of 26.05.2016/ 31 NH(O) 183/220 04.03.2016 860 6.32 NA 52% 6.32 1.54 1.54 31.01.2017 Smt.P.K.Rema - M/s.Akshya Builders LA A PWD Rate culvert,retaining wall and traffic sign boards in between km 01.06.2016 08086395223 137/200 to 172/700 on Nh 183(Old NH 220)

Providing road Safety measures between km 104/000 to 126/000 of NH 17(New NH 66) including easing of Kannur/ KERA KERAL Item curves,widening of junction from km 114/750 to km 04.07.16/ 32 NH(O) 66/17 04.03.2016 861 6.68 NA 20% 6.68 0.00 0 13.04.17 Smt.Mini.P.K - P.K Sulphikar LA A PWD Rate 115/300 &widening of existing carriage way in selected 14.07.2016 08086395242 reaches,construction of drain , extension of culvert,construction of retaining wall etc

Providing road Safety measures between km151/270 to km 184/600 including easing of curves, construction of drain, Kannur/ KERA KERAL Item 04.07.16/ 33 NH(O) extension of culvert, construction of retaining wall and 66/17 04.03.2016 859 18.90 NA 10% 18.90 0.00 0 13.04.17 Smt.Mini.P.K - P.K Sulphikar LA A PWD Rate 14.07.2016 renewal of surface from km 151/270 to km 157/000 and 08086395242 from km 174/000 to 184/600 of NH17

Providing following traffic safety measures between km 264/100 to km 267/500, km 271/700 to km275/950, km Malappuram/ KERA KERAL Item 07.06.16/ 34 NH(O) 276/750 to km277/400,km282/400 to km287/200,km 66/17 04.03.2016 858 15.64 NA 80% 15.64 5.14 5.14 16.06.2017 Sri Gokul Das - M/s Malabar Tech LA A PWD Rate 17.06.16 295/00 to 305/500 and km 312/000 to km316/500 of NH 08086395238 66(Old NH 17)

Kozhikkode/ KERA KERAL Item Providing following road safety measures between km 15/0 29.02.2016/ 35 NH(O) 212/766 19.10.2015 846 19.7468 NA 70% 20.12 0 3.05 03.03.17 Shri.Vinayaraj.K - M/s. K Ravindran LA A PWD Rate to 57/0 of Calicut Kollangal road of NH 766(Old NH 212) 04.03.16 08086395234

C:\Users\User\Downloads\Progress report NH 5 NH(O)

REPORT‐V [ending Jan2017] REPORT‐V [ending Jan2017]

STATE: KERALA STATE: KERALA DETAILS OF ONGOING PROJECTS IN KERALA (P-7) DETAILS OF ONGOING PROJECTS IN KERALA (P-7) Expenditur Revised e for Cumulative Impleme Date of Target date of State/U Mode of NHDP Name of the Project NH No Old / Date of Original/ San. Cost Length Cumlv Physical Cost/Anticipa Current Financial Rev / Date of Actual Date of Name of NH Division / Name of the contractor Sl No nting Length (km) Job No. Agreement/Com completion as per T Delivery Ph/Sch New Revised Sanction Rs . in Cr Completed prog % ted cost in Financial progress Completion Completion Executive Enginee /PH No. Agency mencement contract Rs. crore Year in Rs. (Rs. Crore) crore

Providing following road safety measures between km Muvattupuzha/ KERA KERAL Item 26.02.2016/ Work completed on M/S Madathil 36 NH(O) 169/700 to km 170/700 and from km170/800 to 172/200 on 49/85 19.10.2015 845 6.645 NA 100% 6.65 4.06 4.06 26.12.16 Smt.P.K.Rema - LA A PWD Rate 26.02.16 25.12.2016 Enterprises NH -85(Old NH-49) 08086395223

Design drawing to be Awarded on approved. 03.03.2016.Agr Construction of gabion wall with necessary road safety Permission Kollam/ KERA KERAL Item eement 37 NH(O) measures from km 45/700 to km 46/100 on NH 208(New 208/744 03.12.2015 847 2.39 NA from railway 2.39 0 0 _ _ Smt.Cini.A- M/S Akshaya Builders LA A PWD Rate executed on NH-744) expected to be 08086395216 04.03.2016 obtained by 1st week of Nov 2016

Providing traffic Safety measures including geometric Muvattupuzha/ KERA KERAL Item improvement to carriage way, providing crash barrier and 01.03.2016/ Work completed M/s. Raji Mathew & 38 NH(O) 49/85 30.12.2015 849 2.08 NA 100% 2.08 1.57 1.57 02.07.16 Smt.P.K.Rema - LA A PWD Rate traffic safety measures from km 174/000 to 183/000 of NH 03.03.16 on 27.06.2016 Co. 08086395223 49

EOT granted till KERA Providing traffic safety measures at various Black spots Trivandrum/ M/s. Metaguard KERA Item NH(O 12.03.15/ 22.05.2016 39 LA and accident prone location b/w km 520/400 to 544/000 47/66 04.02.2015 837 8.25 NA 90% 8.25 0.01 0.01 12.03.2016 - Smt. Bindhu.R- Engineers LA Rate ) 23.12.2015 applied for EOT PWD of NH 66(Old NH-47) 08086395212 upto 30.1.2017

KERA Extension of 14 Nos of culverts from km 164/000 to km Muvattupuzha/ M/s. Antech KERA Item NH(O 21.05.2015 / Work completed 40 LA 167/300 and construction of retaining walls(aggregate 49/85 17.02.2015 840 3.57 NA 100% 3.56 2.48 3.47 24.02.2016 Smt.P.K.Rema - Construction LA Rate ) 25.05.2015 on 07.10.2016 PWD length of 730m) in NH 49 08086395223 Company

Providing traffic safety measures including KERA Muvattupuzha/ KERA Item NH(O reconstruction of damaged culverts and construction of 26.06.2015 M/s. Akshaya 41 LA 220/183 20.03.2015 841 11.72 NA 100% 11.72 2.51 6.00 28.06.2016 NA Smt.P.K.Rema - LA Rate ) drains from Km 106/700 to Km 215/485 of NH-183(Old /29.06.2015 Builders PWD 08086395223 NH-220)

C:\Users\User\Downloads\Progress report NH 6