West CNA - Employment Space Delivery incl contribution from site allocations F.19 Industrial Office (sqm) (sqm) Local Plan Target for West Penwith CNA 16083 16083

Completions 2010 - 2017 from sites within the / DPD area Net Completions 1017 -6061

Extant Planning Permissions / Under Construction from sites within the Penzance/Newlyn DPD area Application name PP ref. Parish Full or outline Former cattle market and bus depot (plots 5 and 7) Long Rock Industrial estate, Poniou Road PA10/06329 Ludgvan Full EOT 850 5346 Trinity House, National lighthouse centre, Wharf Road PA14/10954 Penzance Full 732 Long Rock Depot, Penzance PA15/07736 Ludgvan Prior Notification 360 2680 Questmap Business Park Phase 3: Plot 3b Poniou Way W1/09-1348 Ludgvan Full 584 Units 13 And 14 Long Rock Industrial Estate Long Rock PA15/02822 Ludgvan Full 634 Other Small sites (under 500sqm) & Employment Space Losses - - - -1403 -1802 Net Extant PP / UC 1123 6858

Site Allocations that will support delivery of the CNA target

Land Available / Potentially Available

Name DPD Ref Designation Potential sqm Potential sqm Ha of Office of Industrial development development

Safeguarded Long Rock Industrial Estate (ELR) PZ-E1 - - - : Strategic Sandy Cove PZ-E3 Allocation 1.6 6,000 Harbour Car Park PZ-M1 Allocation 3.4 2,000 Coinagehall PZ-M2 Allocation 0.3 1,000 Wherry Town PZ-M3 Allocation 0.7 500 500 Longrock (east) PZ-E4 Allocation 3.2 8,600 4,200 Stable Hobba Extension PZ-E2 Allocation 1.3 5,120 12,100 15,820

TOTAL of Comps / Permissions / Allocations 14240 16617

Surplus / Deficit against CNA Target 1843 -534

Aditional Considerations: The table above highlghts a small deficit of provision for office space against the CNA target (1843sqm) The residual provision can be made up through various measures: 1. Work commissioned by the Town Council to identify development sites for workspace and housing in and around Penzance Town Centre, has highlighted various opportunities, which could further support delivery of the employment space targets. 2. The ELR (doc ref E3) identifies an additional 13 small rural employment sites within the West Penwith CNA, which can contribute towards any residual target for the CAN. Site identified within the ELR set out below

Notes: a. The figures relating to employment space yield for each allocation is set out in the Penzance Employment Evidence document (D15.2 - Section 6) b. The figures for total permissions & completions correspond with the summary information submitted (CC.S3.4) c. The floorspace targets for the allocations have been calculated based upon 40% of the site area (unless otherwise stated) - which is in line with national guidance, as set out within the Employment Land Review (E3 - para 8.19) d. An error was identified within Long Rock East allocation, where the yield from the site was underestimated; the corrected figure (set out in the table above) has also been included within the Schedule of Modifications - Version 2 & St Ives CNA - Employment Space Delivery incl contribution from site allocations

Office Industrial (sqm) (sqm) Local Plan Target 19083 19083

Completions 2010 - 2017 Net Completions 1902 2256

Extant Planning Permissions / Under Construction Application name PP ref. Parish Full or outline The Old Pattern Shop and Plantation Store, Foundry Lane PA12/10000 Hayle Full 1280 Hayle Harbour North Quay (residual outline) W1/08-0613 Hayle Outline 5380 195 see notes Gwinear- 41 Praze Road, Leedstown PA14/10411 Gwithian Full 677 Other Small sites (under 500sqm) & Employment Space Losses - - - 83 -81 Net Extant PP / UC 6743 791

Site Allocations that will support delivery of the CNA target Land Available / Potentially Available Potential Potential Name DPD Ref Designation sqm of Ha sqm of Office Industrial development development Safeguarded: 0.6 808 1640 Marsh Lane Industrial Estate (ELR) H-E1 Strategic Hayle Harbour H-E3 Allocation 3 1500 3860 East Quay H-EM1 Allocation 1 800 3200 St Erth H-E2 Allocation 5.9 7000 16500 Allocation - Trevassack Urban Extension H-UE1 Mixed Use 6.7 9000 14000 19108 39200

TOTAL of Comps / Permissions / Allocations 27753 42247

Surplus / Deficit against CNA Target -8670 -23164

Aditional Considerations: The table above highlghts that the combination of completions, permissions and allocations will more than provide for the CNA office and industrial targets

It should be recognised that the town of St Ives is also located within the CNA and its adopted Neighbourhood Plan (policies LED2 LED4 LED5) are all supportive of delivering office and/or industrial development within the Plan area.

Note: Hayle Harbour's original permission was for 13,330sqm of employment space, of which 2,395sqm has been provided as part of a Marine Renewables Business Park, leaving 10,935sqm (6,880sqm office /4,055sqm industrial), as set out within the permissions above. The Hayle Harbour Employment allocation (H-E3), only represents part of the application area, and in turn is only expected to provide part of this remaining requirements (estimated at up to 5,360sqm of space), which will further support the developed Marine Renewables Business Park, which has enterprise zone status.

Notes: a. The figures relating to employment space yield for each allocation is set out in the Hayle Employment Evidence document (D11.2) b. The figures for total permissions & completions correspond with the summary information submitted (CC.S3.4) c. The floorspace targets for the allocations have been calculated based upon 40% of the site area (unless otherwise stated) - which is in line with national guidance, as set out within the Employment Land Review (E3 - para 8.19) CNA - Employment Space Delivery incl. contribution from site allocations

Office Industrial (sqm) (sqm) Local Plan Target for Helston CNA 12417 17000

Completions 2010 - 2017 Net Completions 1020 3665

Extant Planning Permissions / Under Construction Application name PP ref. Parish Full or outline Helston Business Park, Clodgey LaneW2/90/01272/O Helston Outline 6317 6996 * Other Small sites (under 500sqm) & Employment Space Losses - - - 0.2 -40 Net Extant PP / UC 6318 6955

Site Allocations that will support delivery of the CNA target Land Available / Potentially Available Potential Potential Name DPD Ref Designation sqm of Ha sqm of Office Industrial development development Safeguarded Water-ma-Trout H-E1 : Strategic - 0 0 Helston Business Park H-E3 Allocation 7.4 0 0 * Tresprison Ind Park Expansion H-E2 Allocation 0.8 1200 1200 1200 1200

TOTAL of Comps / Permissions / Allocations 8538 11820

Surplus / Deficit against CNA Target 3879 5180

* Helston Business Park allocation is permitted development (W2/90/01272/O), so the office & industrial figures are set out in the permissions (6318sqm office / 6996sqm industrial)

Aditional Considerations: The table above highlghts a deficit of provision for office space and industrial space against the CNA target. The residual provision can be made up through various measures within the remainder of the CNA:

1. The residual CNA area contained Goonhilly Earth Station, which forms part of the Aerohub Enterprise Zone. It represents an emerging high-tech business cluster, building on Goonhilly's international satellite communications and data centre services to become a centre of space-focused high-tech businesses, supporting 400 jobs. This represents a strategic employment project for . £8m of funding was secured this year, to progress the project.

2. The ELR (doc ref E3) identifies an additional 9 smaller (under 5ha) rural employment sites within the Helston CNA, which can contribute towards any residual target for the CNA. In particular, an existing industrial estate (Bochym, Cury) has 2.6ha of vacant land, which is well located just off of the main north-south vehciular route through the CNA. The vacant land could accommodation a significant level of employment space (est. at approx 10,400sqm)

Notes: a. The figures relating to employment space yield for each allocation is set out in the Helston Employment Evidence Base Report (D12.2) b. The figures for total permissions & completions correspond with the summary information submitted (CC.S3.4) c. The floorspace targets for the allocations have been calculated based upon 40% of the site area (unless otherwise stated) - which is in line with national guidance, as set out within the Employment Land Review (E3 - para 8.19) CPIR CNA - Employment Space Delivery incl. contribution from site allocations

Office Industrial (sqm) (sqm) Local Plan Target 80,833 41,417

Completions 2010 - 2017 Net Completions 16,347 16,831

Extant Planning Permissions / Under Construction Application name PP ref. Parish Full or outline Land at Tolgus, PA12/09717 Redruth Outline 2000 Land Tolvaddon Energy Park Tolvaddon PA16/10623 Illogan Full 1609 Redruth Brewery & Plumbase sites, Foundry Row, Chapel Street PA13/07918 Redruth Outline 1168 504 Trevenson Park North - Land between Trevenson Road and Church Road W2/PA10/00156/O Carn Brea Outline 1500 Part Plot 4 Wheal Harmony, Treleigh Industrial Estate PA12/10103 Redruth Outline 1022 4090 Land At Tuckingmill/Church View FarmPA15/02623 RM 1700 Rodda's Creamery, North Downs PA11/10929 Redruth Full 500 Candela House 44 Cardrew Industrial Estate Cardrew Way Redruth PA15/00773 Redruth Full 1700 Former Camborne Fire Station Weeth Lane Camborne PA16/09584 Camborne Full 615 615 Herniss Business Park Halvasso PA16/04033 Outline 711 677 Unit 17 Barncoose Industrial Estate Barncoose Redruth PA16/01342 Carn Brea Full 1100 Merlin Cornwall College Trevenson Road Pool PA16/02690 Carn Brea Full 1110 In Steel United Downs Industrial Park St Day PA16/10816 Gwennap Full 584 Other Small sites (under 500sqm) & Employment Space Losses - - - 61 -8808 Net Extant PP / UC 11,496 962

Sites to deliver net target Land Available / Potentially Available Potential Potential Name DPD Ref Designation sqm of Ha sqm of Office Industrial development development Barncoose Industrial Estate (ELR: Safeguarded CPIR-E2 0.0 - - Pool Industrial Estate) : Strategic Barncoose Industrial Estate (ELR: Safeguarded as above 0.5 700 1,420 Carn Brea Business Park) : Strategic Barncoose Industrial Estate (ELR: Safeguarded as above 1.8 2,396 4,864 Barncoose) : Strategic Safeguarded Treleigh Industrial Estate CPIR-E3 0.0 - - : Strategic Safeguarded Cardrew Industrial Estate CPIR-E4 1.0 1,100 1,100 : Strategic Safeguarded United Downs C-E1 1.7 - 6,680 : Strategic Tolvaddon Industrial Estate CPIR-E1 Allocation 8.7 11,000 17,000 Dudnance Lane CPIR-E5 Allocation 2.8 6,000 - Tolgus CPIR-UE1 Allocation - 2,000 1,000 Station Road CPIR-E7 Allocation 5.1 15,000 - 38,195 32,065 TOTAL of Comps / Permissions / Allocations 66039 49858

Surplus / Deficit against CNA Target 14794 -8441

Aditional Considerations: The table above highlights a deficit of provision for office space against the CNA target. As set out within the Allocations DPD (para 5.22), this represents an intentional position by the Council, as we want to promote the delivery of the allocations within the exsting urban area, before seeking to allocate future sites on the edge of the settlement. This will in turn support the wider regeneration ambitions set out within the SADPD and the LPSP. This supports the LPSP CNA chapter: CNA Ojective 1 (Regeneration); Para 5.4 'maximising the opportunity to continue the regeneration of CPIR'; Para 5.4 'With Pool sitting at the heart of the CPIR conurbation, together with the fact that it containsa signifi cant amount of underused and derelict brownfi eld land; it represents both a regeneration priority and an opportunity to create a natural strategic hub for CPIR. As a result, Pool should deliver employment space...' Para 5.7 'Pool represents CPIR’s primary opportunity to create a hub for high quality offi ce accommodation'

Furthermore, the permitted development, together with the eixsting permissions offer a significant level of supply that will provide for demand for a considerable proportion of the Plan period.

Finally, the residual provision can also be supported through permissions in the wider CNA area. In particular, the ELR (doc ref E3) identifies an additional 8 smaller (under 5ha) employment sites within the CPIR CNA, which can contribute towards any residual target for the CNA.

Notes: a. The figures relating to employment space yield for each allocation is set out in the CPIR Employment Evidence Base Report (D8.2) b. The figures for total permissions & completions correspond with the summary information submitted (CC.S3.4) c. The floorspace targets for the allocations have been calculated based upon 40% of the site area (unless otherwise stated) - which is in line with national guidance, as set out within the Employment Land Review (E3 - para 8.19) Falmouth & Penryn CNA - Employment Space Delivery incl. contribution from site allocations

Office Industrial (sqm) (sqm) Local Plan Target 25,750 21,667

Completions 2010 - 2017 Net Completions 13711 1467

Extant Planning Permissions / Under Construction Application name PP ref. Parish Full or outline Phases 2&3 Site CP2, Tremough PlotCampus 11 units 11A-12, Falmouth PA13/06866 Mabe Full 2026 Business Park, Bickland Water Road C1/PA02/0580/07/M Falmouth Full 1556 Plot 36, Tregoniggie Industrial Estate, Bickland Water Road PA13/07913 Falmouth Full 1166 W C Rowe, Land Adjacent unit 1 Bickland Industrial Park PA11/09595 Falmouth Full 3973 Kernow Coatings Ltd 42 Parkengue Penryn PA15/03900 Penryn Full 615 Unit 9, Bickland Industrial Park, PA14/07706 Falmouth Full 700 580 AIR Building Penryn Campus PA17/00533 Penryn Full 1680

Other Small sites (under 500sqm) & Employment Space Losses - - - -55 48 Net Extant PP / UC 7073 5216

Sites to deliver net target Additional Land Available Potential sqm Potential sqm Name DPD ref Designation Ha of Office of Industrial development development Safeguarded Falmouth Docks FP-E6 - 1008 23801 : Strategic Safeguarded Falmouth Wharves FP-E5 - 0 0 : Strategic Safeguarded Ponsharden FP-E4 - 0 0 : Strategic Safeguarded Tregoniggie Industrial Estate FP-E3 - 0 0 : Strategic Safeguarded Bickland Industrial Park FP-E2 - 0 0 : Strategic Kernick Road Industrial Estate (Note: Reduce site area from ELR FP-E1 Safeguarded - 0 0 due to housing allocation) : Strategic Kernick FP-M1 Allocation 3.3 2000 0 Parkengue FP-M2 Allocation 1.7 1000 1000 Treliever FP-M3 Allocation 19.8 18000 6000 22008 30801

TOTAL of Comps / Permissions / Allocations 42792 37484

Surplus / Deficit against CNA Target -17042 -15817

Aditional Considerations: The table above highlights that all of the employment space target for the CNA could be delivered through completions, permissions and allocations within the SADPD. Although this won't preclude appropraite permissions coming forward in the remainder of the CNA.

It should be noted that the Parkengue (FP-M2) allocation seeks the delivery of 2000sqm of employment space, which is reflected within the table; but the complete redevelopment of the site will result in the loss of approx 5,100sqm of existing space, representing a net loss (of 3,100sqm).

The focus for delivery relates to opportunities relating to the Falmouth Docks / Marine industries and the University, in line with the LPSP CNA document (Objective 2: Encourage employment opportunities, particularly in relation to the Universities at Falmouth and Penryn, Falmouth Docks / Port of Falmouth and tourism)

Notes: a. The figures relating to employment space yield for each allocation is set out in the Falmouth & Penryn Employment Evidence Base Report (D10.2) b. The figures for total permissions & completions correspond with the summary information submitted (CC.S3.4) c. The floorspace targets for the allocations have been calculated based upon 40% of the site area (unless otherwise stated) - which is in line with national guidance, as set out within the Employment Land Review (E3 - para 8.19) CNA - Employment Space Delivery incl. contribution from site allocations

Industrial Office (sqm) (sqm) Local Plan Target 27750 30250

Completions 2010 - 2017 Net Completions 2424 2326

Extant Planning Permissions / Under Construction Application name PP ref. Parish Full or outline Land off West Road, Quintrell Downs PA12/06566 Colan Full 4600 3782 Land Off Quintrell Road Newquay PA12/09350 Newquay Outline 11280 11280 Land East of Treloggan Road PA11/06679 Colan Full 1476 Prow Park Treloggan Industrial Estate Newquay PA16/02487 Newquay Outline 5217 Southern Hangar 4 Aerohub Cornwall Airport Newquay PA16/07495 St Mawgan Full 603 5106 Phase 2-3 Newquay Growth Area/Land at Quintrell Road PA13/08874 Newquay RM 1272

Other Small sites (under 500sqm) & Employment Space Losses - - - 327 -1502 Net Extant PP / UC 16810 26631

Sites to deliver net target Additional Land Available

Potential sqm Potential sqm Name DPD ref Designation Ha of Office of Industrial development development

Safeguarded: Treloggan Industrial Estate NQ-E1 0.3 0 0 Strategic Business Park Safeguarded: C-E2 0 0 0 (North) Strategic St Columb Major Business Park Safeguarded: C-E3 0.65 2600 (South) Strategic Station Quarter NQ-M1 Allocation 3.54 1000 0 Hendra- Nansledan NQ-M2 Allocation 12.5 2606 6080

Enterprise Aerohub Business Park - Zone / LDO 21.4 20797 59094 24403 67774

TOTAL of Comps / Permissions / Allocations 43636 96731

Surplus / Deficit against CNA Target -43636 -96731

Aditional Considerations: The table above highlights that completions, permissions and allocations provide for the vast majority of the CNA office and industrial targets, but when adding in the Aerohub Business Park (which has enterprize zone status, with an LDO in place) there are opportunities to deliver significantly more than the CNA target

Notes: a. The figures relating to employment space yield for each allocation is set out in the Newquay Employment Evidence Base Report (D14.2) b. The figures for total permissions & completions correspond with the summary information submitted (CC.S3.4) c. The floorspace targets for the allocations have been calculated based upon 40% of the site area (unless otherwise stated) - which is in line with national guidance, as set out within the Employment Land Review (E3 - para 8.19) CNA - Employment Space Delivery incl. contribution from site allocations

Industrial Office (sqm) (sqm) Local Plan Target 9,750 12,500

Completions 2010 - 2017 Net Completions -1765 2432

Extant Planning Permissions / Under Construction Application name PP ref. Parish Full or outline Duporth Holiday Village C2/06/02039 St Austell Bay Full 1000 Land West of Porthpean Road PA13/00956 St Austell Full 585 UD3: Former Laboratories, Pentewan Road PA12/06049 St Austell Outline 467 746 19a Moorland Road, PA12/10784 St Austell Full 210 438 Other Small sites (under 500sqm) & Employment Space Losses - - - -649 643 Net Extant PP / UC 1614 1827

DPD Employment / Mixed Use Sites Additional Land Available Potential sqm Potential sqm Name DPD ref Designation Ha of Office of Industrial development development Safeguarded: Holmbush Industrial Estate STA-E1 0 0 0 Strategic Par Moor STA-E3 Allocation 7.7 4000 19100 Pentewan Rd STA-M1 Allocation 5.9 2000 0 Edgcumbe STA-M2 Allocation 109 1000 0 7000 19100

TOTAL of Comps / Permissions / Allocations 6849 23359

Surplus / Deficit against CNA Target 2902 -10859

Aditional Considerations: The table above highlights that completions, permissions and allocations provide for the vast majority of the CNA office and industrial targets, with a small deficit in relation to office space. However, the split of space being delivered from Par Moor only represents an officer estimate, so the split could easily change, which would address the deficit

Furthermore, it is recognised that the West Carclaze allocation, although within the China Clay CNA, it is located very close to St Austell, so realisticially the employment space (including the permitted 3150sqm office / 5150sqm industrial) will offer employment opportunities for residents in both the St Austell and China Clay CNAs. Plus the China Clay CNA.

Finally, there are two other sites identified within the Employment Land Review (E3) highlights two other employment sites (West of White Pyramid and West of Trewoon), which contain vacant land (over 11ha) that could also provide opportunities to deliver employment space

Notes: a. The figures relating to employment space yield for each allocation is set out in the St Austell Employment Evidence Base Report (D17.2) b. The figures for total permissions & completions correspond with the summary information submitted (CC.S3.4) c. The floorspace targets for the allocations have been calculated based upon 40% of the site area (unless otherwise stated) - which is in line with national guidance, as set out within the Employment Land Review (E3 - para 8.19) CNA - Employment Space Delivery incl. contribution from site allocations

Industrial Office (sqm) (sqm) Local Plan Target 22833 24667

Completions 2010 - 2017 Net Completions 5927 -6751

Extant Planning Permissions / Under Construction Application name PP ref. Parish Full or outline Moon & Benny Ltd, Land to the north of Dunmere Road Industrial Estate, Midway Road PA12/09109 Bodmin Full 1200 7 Bodmin Business Park PA14/12101 Bodmin Full 1750 Unit 5 Cooklands Industrial Estate PA14/04779 Bodmin Full 606 St Lawrences Hospital Boundary Road St Lawrence Bodmin PA14/09274 Bodmin Outline 3600 2 Normandy Way Bodmin PA16/10863 Bodmin Full 612 JDS Self Storage Unit 10 Callywith Gate Industrial Estate Bodmin PA16/10787 Bodmin Full 501 Other Small sites (under 500sqm) & Employment Space Losses - - - -876 1600 Net Extant PP / UC 2724 6269

DPD Employment / Mixed Use Sites Additional Land Available

Potential sqm Potential sqm Name DPD ref Designation Ha of Office of Industrial development development

Safeguarded: Walker Lines Industrial Estate Bd-E2 0 Strategic 0 0 Safeguarded: Bodmin Business Park Bd-E3 0 Strategic 0 0 Safeguarded: Cooklands Industrial Estate Bd-E4 0 Strategic 0 0 Safeguarded: Callywith Gate Bd-E5 0 Strategic 0 0 Allocation Beacon Technology Park Bd-E1 2.81 (Employment) 3600 0 Allocation Castle Street Bd-M1 1.5 (Mixed Use) 3000 3000 Allocation Bd-UE4 6.5 Callywith Urban Village (Mixed Use) 9100 16900 15700 19900

TOTAL of Comps / Permissions / Allocations 24351 19418

Surplus / Deficit against CNA Target -1518 5249

Aditional Considerations: The table above highlights that completions, permissions and allocations provide for the vast majority of the CNA office and industrial targets, with a small deficit in relation to industrial space. However, the split of space being delivered from the Callywith Urban Village allocation only represents an officer estimate, so the split could easily change, which could reduce the deficit

Furthermore, within the remainder of the CNA there is Trewithan Dairy which represents a significant industrial farming operation. The farm, since 1/4/17 secured permission for 891sqm of industrial space (PA17/04711); plus they have a currently live applications (PA17/09187) to deliver a further 990sqm of industrial space on site. The Council is also in discussions with Trewithan Dairy regarding the development of an LDO which would support the ambitions to further develop their business. Finally, the proposals/ambitions for Trewithan Dairy relate well to the Bodmin ambitions relating to developing a hub relating to the Agri-food industry (SADPD para 11.17)

Notes: a. The figures relating to employment space yield for each allocation is set out in the Bodmin Employment Evidence Base Report (D7.2) b. The figures for total permissions & completions correspond with the summary information submitted (CC.S3.4) c. The floorspace targets for the allocations have been calculated based upon 40% of the site area (unless otherwise stated) - which is in line with national guidance, as set out within the Employment Land Review (E3 - para 8.19) Cornwall Gateway () CNA - Employment Space Delivery incl. contribution from site allocations

Industrial Office (sqm) (sqm) Local Plan Target 6917 10583

Completions 2010 - 2017 Net Completions 872 1120

Extant Planning Permissions / Under Construction Application name PP ref. Parish Full or outline Land Adjacent To Unit 1F Long Acre Carkeel Saltash PA15/03014 Saltash Full 465 929 14 Trevol Business Park Trevol Road PA17/00935 Torpoint Full 1767 Land ESE Of Eales Bungalow Carkeel PA16/00049 Saltash Full 1500 Other Small sites (under 500sqm) & Employment Space Losses - - - -365 781 Net Extant PP / UC 100 4977

DPD Employment / Mixed Use Sites Additional Land Available

Potential sqm Potential sqm Name DPD ref Designation Ha of Office of Industrial development development

Safeguarded Saltash Parkway SLT-E3 0.59 2360 : Strategic Safeguarded Moorlands Trading Estate SLT-E4 0.374 1496 : Strategic Safeguarded Saltash Industrial Estate SLT-E5 - : Strategic Safeguarded Tamar View SLT-E1 - : Strategic Stoketon Cross C-E8 Allocation 8.5 8500 25500 Trevol Business Safeguarded Trevol Business Park 2.254 0 9016 Park : Strategic 8500 38372

TOTAL of Comps / Permissions / Allocations 9472 44469

Surplus / Deficit against CNA Target -2555 -33886

Aditional Considerations: The table above highlights that completions, permissions and allocations provide for the CNA targets

Notes: a. The figures relating to employment space yield for each allocation is set out in the Saltash Employment Evidence Base Report (D16.2) b. The figures for total permissions & completions correspond with the summary information submitted (CC.S3.4) c. The floorspace targets for the allocations have been calculated based upon 40% of the site area (unless otherwise stated) - which is in line with national guidance, as set out within the Employment Land Review (E3 - para 8.19) Launceston CNA - Employment Space Delivery incl. contribution from site allocations

Industrial Office (sqm) (sqm) Local Plan Target 14083 28167

Completions 2010 - 2017 Net Completions -366 12711

Extant Planning Permissions / Under Construction Application name PP ref. Parish Full or outline Units 1 & 2, Millford Park, Pipers Close, Pennygillam Industrial Estate PA12/11620 South PetherwinFull 543 Units 6-7 Pennygillam Way, Pennygillam Industrial Estate PA14/06677 South PetherwinFull 827 Treburley Abattoir Treburley Industrial Estate Treburley Launceston PA16/03450 Lezant Full 1430 Land South East Of Scarne Mill Industrial Estate Scarne Mill Industrial Estate Launceston PA16/11812 Launceston Full 945 M & M Plant Ltd Land East Of Trethorne Business Park Kennards House Launceston PA16/06019 St Thomas Full 659

Other Small sites (under 500sqm) & Employment Space Losses - - - 527 -1919 Net Extant PP / UC 527 2485

DPD Employment / Mixed Use Sites Additional Land Available

Potential sqm Potential sqm Name DPD ref Designation Ha of Office of Industrial development development

Safeguarded: Scarne Industrial Estate LAU-E3 - 0 0 Strategic Safeguarded: Pennygillam Industrial Estate LAU-E4 - 0 0 Strategic Safeguarded: Newport Industrial Estate LAU-E5 - 0 0 Strategic Badash LAU-E2 Allocation 5.8 14000 10000 14000 10000

Allocation - Future Landlake Road LAU-E1 7.5 15000 15000 Direction of Growth

TOTAL of Comps / Permissions / Allocations 29161 40196

Surplus / Deficit against CNA Target -15078 -12029

Aditional Considerations: The table above highlights that completions, permissions and allocations provide for almost the entire CNA employment targets; but when incorporating the Future Direction of Growth, the combination of sources of supply provide for more than the CNA requirement.

Furthermore, the Employment Land Review (doc ref. E3) highlights that there are 3 other employment sites within the remainder of the CNA

Notes: a. The figures relating to employment space yield for each allocation is set out in the Launceston Employment Evidence Base Report (D13.2) b. The figures for total permissions & completions correspond with the summary information submitted (CC.S3.4) c. The floorspace targets for the allocations have been calculated based upon 40% of the site area (unless otherwise stated) - which is in line with national guidance, as set out within the Employment Land Review (E3 - para 8.19)