EXISTING TRAILS SAUVIE ISLAND FUNDED TRAIL PROPOSED ALIGNMENT R E KELLEY POINT BIKE / WALK I V PARK R EXISTING SIDEWALK T E E T N M C MAX STATION A O L L VIEW POINT L U I M B PARKING W I A R BIKE ROUTES Columbia Slough I V 35 GREELEY Rivergate segment E R 44 MOCKS CREST Marine Drive
Trail segment LEGEND 72 KILLINGSWORTH/82ND 75 39TH AVE/LOMBARD 85 SWAN ISLAND
C O APPROXIMATELY 1 MILE L U M EXISTING TRAILS B I FUNDED TRAIL Columbia Slough / A
PROPOSED ALIGNMENT Landll Segment B Y B E E L A K E R I BIKE / WALK V E N EXISTING SIDEWALK R MAX STATION
VIEW POINT
PARKING BIKE ROUTES Bike/Pedestrian Bridge 35 GREELEY
44 MOCK’S CREST between Chimney Park 72 KILLINGSWORTH/82ND and Pier Park LEGEND 85 SWAN ISLAND S M I T H L A K E To Vancouver, WA
W
I U HAYDEN L N co l D L um E ISLAND bi R A a s lou S gh T M U D C Y E O T L Baltimore Woods U T co M lu E m Connectivity Corridor b ia B slo ug I R h Columbia Slough A
I R V Trail segment I V E E R R
BES Lab & Cathedral ST. JOHNS
Park segment with CENTRAL BRIDGETON Baltimore St. access Edgewater Trail ST JOHNS BRIDGE access route WILLAMETTE IDA CATHEDRAL C O Lampros Steel L PARK LOMBARD U BUCHANAN M segment B I A S EAST Peninsula Crossing Trail L O COLUMBIA Willamette Cove segment U extension access route G H Metro property CAREY WALL PORTSMOUTH
Burlington Northern Santa Fe WILLIS UNIVERSITY LOMBARD EDGEWATER Expo RR bridge crossing PARK Center Station
VAN HOUTEN PL
PORTSMOUTH McCormick-Baxter segment Portsmouth Trail Railroad alignment and/or access route WOOLSEY Riverside alignment CHATAQUA KENTON University of Portland River Campus UNIVERSITY WILLAMETTE WABASH segment Railroad alignment and/or OF PORTLAND Waud Blu Trail LOMBARD FATHOM Delta Park/ Vanport TC Riverside alignment Station access route BRYANT
CURTIS (2010) DELAWARE DENVER Waud Blu Waterfront BASIN trail segment ENSIGN Basin Avenue / Lagoon segment SWAN ISLAND Possible easement on top of LEVERMAN BES Portsmouth Force Main npGREENWAY Vision INDUSTRIAL PARK ROSA PARKS PIEDMONT Shipyards Spur ARBOR LODGE LAGOON DOLPHIN npGREENWAY envisions a trail system providing with viewpoint Overlook Bowl Trail
Kenton/N Denver access route Station COMMERCE EMERSON access to and along the Willamette River enveloping McCarthy Park AINSWORTH barge launch River to Lagoon segment BALLAST with existing viewpoint
the north riverfront from the Steel Bridge in downtown BASIN viewpoint CHANNEL SUMNER WILLAMETTE Portland to Kelley Point Park on the Columbia River. KILLINGSWORTH Greenway Trail N Lombard TC Station
OVERLOOK INTERSTATE on Swan Island ‘Going’ to the River Our goal is to link north Portland neighborhoods with the GOING access route Willamette river for recreation and access to jobs. This Ports ‘O’ Call Gap SKIDMORE ALBINA
GREELEY expansion of the Willamette Greenway will include a network SHAVER N Portland Blvd/ Rosa Parks Way Swan Island 2nd Access Station of trails used for activities such as walking, running, cycling, Segment A mostly paved OVERLOOK route currently on in-line skating, skateboarding, shing, boating and wildlife viewing. private Union Pacic RR
MISSISSIPPI
property Posted BOISE N Killingsworth Station The North Portland Greenway Trail will connect with the existing ‘No Trespassing’ Willamette River trail system serving residents and visitors throughout Russell Street streetscape improvements the region.
ALBINA River Street Segment N Prescott St. FREMONT BRIDGE Station np GREENWAY will work collaboratively with community stakeholders with access via Tillamook St. rail overpass ELIOT
to realize this goal. LARRABEE
Join us online at www.npgreenway.org VANCOUVER
WILLIAMS DOWNTOWN BROADWAY Overlook Park Station Updated April 2009 npgreenway.blogspot.com PORTLAND BROADWAY BR. ROSE TO PEARL DISTRICT twitter.com/npgreenway Rose Quarter QUARTER Northern Terminus Segment of Eastbank Esplanade
NE 7th Ave Station
STEEL BRIDGE Lloyd Center/ TO DOWNTOWN NE 11th Ave Station L LOY D
Albina/Mississippi Station
Interstate/ Rose Quarter Station
Steel Bridge to Kelley Point Park • npGreenway.org