Central District BMAP Status

Est Date BMAP to Basin Group District BMAP Status Working Groups Working Groups Core Stakeholders Secretary

SJRWMD, Lake County Water Authority, Lake County, Orange County, Marion County, Leesburg, Tavares, Mt. Dora, Eustis, Winter Garden, Ocoee, BMAP Adopted August 2007. Upper Ocklawaha Apopka, Groveland, Clermont, Fruitland Park, FWC, FDOT, FDACS, DEP-CD, 1 CD Biannual meetings to followup N/A Upper Basin Working Group Basin Lady Lake, Alliance for Protection of Water Resources, Oklawaha Valley on implementation activities Audubon Society, private citizens, Agriculture interest, WAV, Minneola, Polk County

BMAP Adopted August 2007. All members invited to participate. Core that regularly attends are Orange Upper Ocklawaha 1 CD Biannual meetings to followup N/A Upper Ocklawaha Basin Technical Discussions County, Lake County, SJRWMD, Mt. Dora, Clermont,Ocoee, Winter Garden, Basin on implementation activities FDOT, DEP CD, Ocklawaha Valley Audubon

BMAP Adopted August 2007. Upper Ocklawaha Public Education which is becoming an LID sub- WAV, Leesburg, citizen interests, consultants, Lake County, Orange County, 1 CD Biannual meetings to followup N/A Basin committee Oklawaha Valley Audobon, Alliance for Protection of Water Resources on implementation activities

Middle St. Johns , Crane Strand, Crane Strand Drain, and Cities: Altamonte Springs, Casselberry, Eatonville, Lake Mary, Longwood, (Lakes, Creeks, & SJR 2 CD Lake Jesup BMAP in progress Oct-09 Long Branch Technical Discussions (Non-Sunshine Maitland, Orlando, Oviedo, Sanford, Winter Park, Winter Springs; Counties: Mainstem) group) & Basin Working Group (Sunshine group) Orange & Seminole; SJRWMD; DACS; Friends of Lake Jesup

Middle St. Johns Long Branch BMAP adopted (Lakes, Creeks, & SJR 2 CD N/A Informal Orange County and DACS April 2008 Mainstem) Middle St. Johns Crane Strand/Crane Strand (Lakes, Creeks, & SJR 2 CD Drain; No implementation N/A Informal Orange Co, Seminole Co, Casselberry, Winter Park, DOT, & Orlando Mainstem) action anticipated

SJRWMD, Cities (Altamonte Springs, Astor, Casselberry, DeBary, DeLane, CD , Monroe, & SJR Deltona, Eatonville, Fairview Shores, Fern Park, Geneva, Goldenrod, Middle St. Johns (Primary)/ Mainstem TMDLs in progress; Heathrow, Lake Mack-Forest Hills, Lake Mary, Longwood, Maitland, Midway, (Lakes, Creeks, & SJR 2 NED 2011 Not yet established to be proposed in 2009. No Orange City, Orlando, Oviedo, Pierson, Pine Lakes, Sanford, Wekiwa Springs, Mainstem) (Lake TMDL for . Welaka, Winter Park, Winter Springs); Counties (Putnam, Volusia, Lake, George) Seminole, Orange)

All estimated dates need to be verified with Watershed Planning and Coordination Section Basin Coordinator 7/6/2009 Central District BMAP Status

Est Date BMAP to Basin Group District BMAP Status Working Groups Working Groups Core Stakeholders Secretary

Cities: Altamonte Springs, Apopka, Astatula, Eustis, Maitland, Moutn Dora, Oakland, Ocoee, Orlando, Tavares, Winter Garden; Counties: Lake, Marion, Middle St. Johns BMAP in Progress (kick-off Orange, & Seminole; County Helath Departments: Lake, Marion, Orange, & 2 CD Early 2011 Established April 2009 (Wekiva) held 4/15/09) Seminole; Transportation: DOT, Expressway, Turnpike; Friends of the Wekiva; FDACS-OAWP; SJRWMD; FDEP Wekiva Springs State Park & Aquatic Preserve; Wastewater Facilities: Utilities Inc., Altamonte WWTP, etc. TMDLs due 2009; Late 2010, if BMAP Upper St. Johns 3 CD Determination of BMAP need Not yet established Not yet identified is needed pending Northern Kissimmee. Kickoff Northern Kissimmee Basin working group will consist of the DEP District staff, CD / SWD Kissimmee 4 in spring 2009 - pending TBD Northern Kissimmee Basin Working Group SFWMD, the Cities in and around Orlando, Kissimmee / St. Cloud, the RCID / SD completion of TMDLs and Orange, Osceola and Polk Counties.

The southern Kissimmee Basin working group will consist of the DEP District Southern Kissimmee. Kickoff CD / SWD staff, SFWMD & SWFWMD & FDACS, the Cities of Avon Park, Sebring and Kissimmee 4 in spring 2009 - pending TBD Southern Kissimmee Basin Basin Working Group / SD Lake Placid, the Spring Lake Improvement District and the Sebring Airport completion of TMDLs Authority, and Polk, Highlands and Okeechobee Counties.

Lakes Cypress and Kissimmee to be addressed Cities: Altamonte Springs, Casselberry, Eatonville, Lake Mary, Longwood, CD / SWD Kissimmee 4 by Kissimmee Chain of Lakes TBD TBD Maitland, Orlando, Oviedo, Sanford, Winter Park, Winter Springs; Counties: / SD Long Term Management Orange & Seminole; SJRWMD; DACS; Friends of Lake Jesup Plan, sponsored by SFWMD.

Natural Estuary Policy Board, DEP Central District, Orange County, Brevard BMAP Kick Off Meeting June Identifying Core Stakeholders in Basin; BMAP Kickoff County, County, SJRWMD, City of Melborne, City of Cocoa 5 CD Spring 2011 2009. Meeting June 2009 Beach, Cape Canaveral, City of Rockledge, City of Titusville, Sattelite Beach, City of Palm Bay, NASA, Patrick AFB, Port Canaveral Eau Gallie & Crane Creek Fecal Coliform TMDLs Late 2010, if BMAP Indian River Lagoon 5 CD Not yet established Identification in progress adopted. Determination of is needed BMAP need pending

All estimated dates need to be verified with Watershed Planning and Coordination Section Basin Coordinator 7/6/2009 Northeastern District BMAP Status Est Date BMAP to Basin Group District BMAP Status Working Groups Working Groups Core Stakeholders Secretary Partnership, Springs Groups, SRWMD, FDEP NED, Alachua Suwannee 1 NED BMAP in progress 2011 Not yet established County,FDOTD2, DACs

Alachua County, Alachua County Environmental Protection Advisory Com, BMAP Adopted May 2008. Orange Creek Basin Working Group Gainesville, Gainesville Water Man. Committee, FWC, UF, FDOT, FDACS, Paynes Orange Creek Biannual meetings to Subcommittees: Public Education and 1 NED N/A Prairie Preserve, GRU, DEP NED, DEP Aquatic Plant Management, Women for (Ocklawaha) followup on Outreach, Monitoring, Lakes/Forestry, Bacteria Wise Growth, Sustainable Alachua County, Sierra Club, Plum Creek and Rayonier, implementation activities Hot Spots) Div. of Forestry, Marion County, Alachua County DOH

SJRWMD, Lake County Water Authority, Lake County, Orange County, Marion BMAP Adopted August Upper County, Leesburg, Tavares, Mt. Dora, Eustis, Winter Garden, Ocoee, Apopka, 2007. Biannual meetings Ocklawaha 1 CD N/A Upper Ocklawaha River Basin Working Group Groveland, Clermont, Fruitland Park, FWC, FDOT, FDACS, DEP-CD, Lady Lake, to followup on Basin Alliance for Protection of Water Resources, Oklawaha Valley Audubon Society, implementation activities private citizens, Agriculture interest, WAV, Minneola, Polk County

BMAP Adopted August Upper All members invited to participate. Core that regularly attends are Orange County, 2007. Biannual meetings Upper Ocklawaha Basin Technical Ocklawaha 1 CD N/A Lake County, SJRWMD, Mt. Dora, Clermont,Ocoee, Winter Garden, FDOT, DEP to followup on Discussions Basin CD, Ocklawaha Valley Audubon implementation activities BMAP Adopted August Upper 2007. Biannual meetings Public Education which is becoming an LID WAV, Leesburg, citizen interests, consultants, Lake County, Orange County, Ocklawaha 1 CD N/A to followup on sub-committee Oklawaha Valley Audobon, Alliance for Protection of Water Resources Basin implementation activities

Lower St. Johns Nutrient BMAP Adopted 2 NED N/A Mainstem Executive Committee Mainstem Executive Committee Mainstem October 2008

Lower St. Johns Nutrient BMAP Adopted LSJ Mainstem Technical Basin Working 2 NED N/A LSJ Mainstem Technical Basin Working Group Mainstem October 2008 Group

Lower St. Johns Nutrient BMAP Adopted 2 NED N/A Natural Resource Monitoring Subcommittee FDEP, SJRWMD, COJ, JEA, CCUA, Beach Communities Mainstem October 2008

Fecal Coliform BMAP Adoption Process First BMAP Lower St. Johns City of Jacksonville, JEA, FDEP NED, District 2 DOT, Duval County Department of 2 NED beginning in Aug 2009; 9/01/2009-Second TAT Initative Tributaries Health Second BMAP for 15 BMAP 5/01/2010 Tribs begin Sept 2009.

All estimated dates need to be confirmed with Watershed Planning and Coordination Section Basin Coordinator 7/6/2009 Northeastern District BMAP Status Est Date BMAP to Basin Group District BMAP Status Working Groups Working Groups Core Stakeholders Secretary Fecal Coliform BMAP Adoption Process First BMAP Lower St. Johns 2 NED beginning in Aug 2009; 9/01/2009-Second Basin Working Group Duval County Department of Health, City of Jacksonville, JEA, DOT District 2 Tributaries Second BMAP for 15 BMAP 5/01/2010 Tribs begin Sept 2009. Fecal Coliform BMAP Adoption Process First BMAP JEA, COJ, DEP NED, DOT, DOH, Riverkeeper, University of North , Lower St. Johns 2 NED beginning in Aug 2009; 9/01/2009-Second Technical Meeting Participants Jacksonville University, ETM, CDM, PBS&J, BCI, CPAC, SRG, City of Neptune Tributaries Second BMAP for 15 BMAP 5/01/2010 Beach, WSEA Tribs begin Sept 2009.

N/A (for Lake NED (Lake Lake George not verified George; other N/A (for Lake George; other BMAPs in Middle St. Johns George); N/A (for Lake George; other BMAPs in progress within the CD portion of the MSJ 2 in Cycle 2; no BMAPs in progress progress within the CD portion of the MSJ (Lake George) remainder of Basin) TMDL/BMAP within the CD portion Basin) basin in CD of the MSJ Basin)

TMDL implementation Nassau/St 4 NED proceeding with DACS; N/A None established DACS, St. Marys River Management Committee Mary's BMAP not needed Upper East Determination of BMAP Early 2010, if BMAP 5 NED None established Not yet identified Coast pending is needed

All estimated dates need to be confirmed with Watershed Planning and Coordination Section Basin Coordinator 7/6/2009 Northwest District BMAP Status

Est Date Working Groups Core Basin Group District BMAP Status BMAP to Working Groups Stakeholders Secretary TMDLs adopted for Juniper Creek, Swamp Creek, and Munson Slough (fecal coliforms); Juniper Include but not limited to FDACS & Creek (dissolved oxygen) in July 2008. Munson Slough & Gadsden SWCD representing Formal working group not yet established; Ochlockonee-St. Lake Munson (nutrients, dissolved oxygen, unionized agricultural interests; City of 1 NWD TBD preliminary list of stakeholders has been Marks ammonia and turbidity) TMDL is being revised per public Tallahassee/Leon County/FDOT compiled for Group 1 Basin. comments. BMAP development for Lake Munson and District 3, NWFWMD and the Lake Munson Slough is anticipated in summer 2009; other Munson Neighborhood Association BMAPs pending determination.

Include but not limited to Apalachicola National Estuarine Formal working group not yet established; Apalachicola/Chipo TMDL for Huckleberry Creek for fecal Research Reserve, the 2 NWD TBD preliminary list of stakeholders for Group 2 la coliform; BMAP process pending further review. Apalachicola Bay River Keeper, Basin has been developed Franklin County, NWFWMD and Partnership Include but not limited to: Friends of Formal working group not yet established; Choctawhatchee/St Total and Fecal Coliform TMDL St. Andrews Bay, BEST, Inc., 3 NWD TBD preliminary list of stakeholders for Group 3 . Andrew Bay adopted in Cycle 1; BMAP process pending further review Choctawhatchee Bay Alliance, Basin has been developed TNC, and NWFWMD Include but not limited to: Bayou Basin working group has been established Chico Association, ECUA, Bayou Chico Fecal Coliform TMDL was adopted in Cycle Pensacola Bay 4 NWD Winter 2010 and will be meeting bi-monthly beginning Escambia County, City of 1; BMAP process kick-offed in February 2009. June 2009 to further BMAP development Pensacola, FDOT, BARC, NWFWMD and DOH Include but not limited to: Eleven-Mile Creek and Ten-Mile Creek Fecal Coliforms Formal working group not yet established; International Paper Company, Perdido Bay 5 NWD TMDL adopted in Cycle 1; BMAP development pending TBD preliminary list of stakeholders for Group 5 ECUA, Escambia County, BARC further review. Basin has been developed and NWFWMD

All estimated dates need to be verified with Watershed Planning and Coordination Section Basin Coordinator 7/6/2009 South District BMAP Status

Est Date BMAP Basin Group District BMAP Status Working Groups Working Groups Core Stakeholders to Secretary

DEP District Staff, the SFWMD, Collier and Lee Counties, Cities of Naples, Bonita Springs, Ft. TMDLs generated for seven WBIDs. BMAP kickoff in July West Coast TMDL Everglades West Coast 1 SD TBD Myers Beach, CAMA, Audubon Society, the National Park Service, the US Fish and Wildlife 2009 Technical Working Group Service, and the CHNEP staff. Charlotte Harbor National Estuary DEP District Staff, the SFWMD and SWFWMD, Lee, Charlotte and Sarasota Counties, Cities of Charlotte Harbor 2 SD No current BMAP work; TMDLs due 2009 TBD Program - Technical Advisory Venice, Englewood, Cape Coral and Punta Gorda. CAMA, the US Fish and Wildlife Service, the Committee Fla. Fish and Wildlife Conservation Commission and the CHNEP staff.

Caloosahatchee TMDL Technical DEP District Staff, the SFWMD, FDACS, Lee, and Collier Counties, Cities of Ft. Myers, North Fort Caloosahatchee 3 SD TMDL close to final adoption. BMAP kick-off July 2009 TBD Working Group Myers, Cape Coral, the US Fish and Wildlife Service and the CHNEP staff.

Fisheating Creek 4 SD N/A TBD Unknown at this time. No stakeholder group indentified at this time. DEP District Staff, State Parks and CAMA, SFWMD, the Cities of Key West, Marathon, Layton, Under the Florida Keys Reasonable Assurance Islamorada and Key Colony Beach, Monroe County, Keys Aqueduct Authority, Key Largo Waste Florida Keys 5 SD Documentation plan, which will be submitted in early 2009 and N/A FKRAD Stakeholder Group. Water Improvement District, the Key West Naval Air Station, FIU and the Fla. Keys National Marine must be formally submitted to EPA for review. Sanctuary.

Sarasota Shell, Prairie & Joshua Creeks Reasonable Assurance Plan 3 SWD / SD N/A N/A DEP, SWFWMD, agricultural community Bay/Peace/Myakka accepted 2005

CD / Northern Kissimmee. Kickoff later 2009 - pending completion Northern Kissimmee Basin Northern Kissimmee Basin working group will consist of the DEP District staff, SFWMD, the Cities Kissimmee 4 TBD SWD / SD of TMDLs Working Group in and around Orlando, Kissimmee / St. Cloud, the RCID and Orange, Osceola and Polk Counties.

The southern Kissimmee Basin working group will consist of the DEP District staff, SFWMD & CD / Southern Kissimmee. Kickoff in later 2009 - pending Southern Kissimmee Basin Basin SWFWMD & FDACS, the Cities of Avon Park, Sebring and Lake Placid, the Spring 4 TBD SWD / SD completion of TMDLs Working Group Improvement District and the Sebring Airport Authority, and Polk, Highlands and Okeechobee Counties.

Lakes Cypress and Kissimmee to be addressed by Lakes Cypress and Kissimmee to be addressed by the Kissimmee Chain of Lakes Long Term CD / Kissimmee 4 Kissimmee Chain of Lakes Long Term Management Plan, TBD TBD Management Plan Technical Working Group which sponsored by the SFWMD with agency and SWD / SD sponsored by SFWMD. local government input.

All estimated dates need to be verified with Watershed Planning and Coordination Section Basin Coordinator 7/6/2009 Southeast District BMAP Status

Est Date BMAP Basin Group District BMAP Status Working Groups Working Groups Core Stakeholders to Secretary Protection Lake Okeechobee 1 SED Plan adopted. BMAP unlikely, N/A Not yet established Not yet established but decision pending. SFWMD, St. Lucie & Martin Counites, Cities of Port St. Lucie & TMDL Adopted (spring 2009); St. Lucie Basin Stuart, St. Lucie Rivers Coalition, Department of Agriculture - St. Lucie Estuary 2 SED BMAP kick-off anticipated July End of 2010 TMDL Technical Office of Water Policy; Indian River Lagoon Nat'l Estuary 2009 Working Group Program (possible) No current BMAP work; TMDLs Loxahatchee 2 SED TBD Not yet established Not yet identified due 2010 No current BMAP work; End of Palm Beach County, City of West Palm Beach, SFWMD, LWL LWL/PBC 3 SED Verified Period June 2009- N/A Not yet established Executive Committee TMDLs due 2010

Southeast Wagner Creek Coliform TMDL Dec 2009, if City of Miami & Miami-Dade County Environmental Resource Coast/Biscayne 4 SED adopted, Decision on BMAP Not yet established BMAP needed Management Bay Development Pending

Pompano Canal Nutrient TMDL Southeast Adopted. Collection of Programs Sept 2009, if Coast/Biscayne 4 SED Technical Meetings Broward County, City of Pompano Beach and Activities Previously BMAP needed Bay Implemented underway.

Everglades 5 SED Uncertain Uncertain Not yet established Not yet identified

All estimated dates need to be verified with Watershed Planning and Coordination Section Basin Coordinator 7/6/2009 Southwest District BMAP Status

Est Date Basin Group District BMAP Status BMAP to Working Groups Working Groups Core Stakeholders Secretary

Nitrogen Management DEP District staff, Tampa Bay NEP, Tampa Bay Nitrogen Tampa Bay 1 SWD Reasonable Assurance Plan proposed adoption July 2009. N/A Consortium Consortium

Tampa Bay Fecal coliform BMAP for Hillsborough River & Tributaries in progress (Blackwater Creek, New River, Hillsborough River DEP District staff, SWFWMD, Tampa Bay NEP, Hillsborough 2 SWD Jun-09 Tributaries Spartman Branch, Baker Creek, Flint Creek, Lwr Hillsborough River) Basin Working Group County, City of Tampa & other cities, Polk County

Hillsborough River Tampa Bay Basin Working Group to DEP District staff, SWFWMD, Tampa Bay NEP, Hillsborough 2 SWD Nutrient TMDLs scheduled for development in 2009. TBD Tributaries be expanded to include County, City of Tampa & other cities, Polk County others Tampa Bay Lake Hunter TMDL developed, and adopted. BMAP development in progress (lake process study 2 SWD 2010 Not yet established DEP, SWFWMD, Polk County, City of Lakeland Tributaries underway). Sarasota DEP District staff, SWFWMD, Sarasota County, City of Bay/Peace/Myak 3 SWD Roberts Bay and West Clark Lake decision on developing BMAP pending TBD Not yet established Sarasota ka 3 SWD / SD Shell, Prairie & Joshua Creeks Reasonable Assurance Plan accepted 2005 N/A N/A DEP, SWFWMD, agricultural community

Upper Peace Basin Working Group not yet TMDLs for Fecal Coliform Bacteria have been adopted for Peace Creek Drainage Canal, established; working DEP District Staff, the SWFWMD, FDACS, the Cities of Winter Peace 3 SWD TBD above Bowlegs Creek and the Wahneta Farms Drain Canal. Decision on BMAP development pending with technical review Haven, Bartow, Lake Wales, and Polk County. team to assess BMAP development plans

TMDLs for Nutrients for Winter Haven Southern Chain has been adopted, but no nutrient TMDLs were proposed for the northern chain because of modeling limitations performed by SWFWMD. PBS&J completed the FDEP-funded Phase I study of how the entire Winter Haven Chain of Lakes behaves in Upper Peace Basin response to nutrient loading inputs. The Phase II Study (jointly funded by the city of Winter Haven and Working Group not yet DEP District Staff, the SWFWMD, the Cities of Lakeland, SWFWMD) is a comprehensive watershed management master plan being developed for the Winter established; working Peace 3 SWD TBD Winter Haven, Bartow, Lake Wales, Polk County and FDACS. Haven Chain of Lakes, from which FDEP hopes to develop TMDLs for the northern chain of lakes. This with technical review study is scheduled for completion in late summer. Both studies are needed prior to finalizing the team to assess BMAP TMDLs and beginning BMAP development for both the northern and southern chains. FDEP will use development plans the revised models to develop TMDLs for the northern chain and revise the TMDLs for the lakes in the southern chain if necessary based on this information. Decision on BMAP start date is pending.

Withlacoochee 4 SWD No BMAP activity to date TBD Not yet established Not yet established

All estimated dates need to be verified with Watershed Planning and Coordination Section Basin Coordinator 7/6/2009 Southwest District BMAP Status

Est Date Basin Group District BMAP Status BMAP to Working Groups Working Groups Core Stakeholders Secretary

Northern Kissimmee Basin working group will consist of the CD / SWD / Northern Kissimmee DEP District staff, SFWMD, the Cities in and around Orlando, Kissimmee 4 Northern Kissimmee. Kickoff in spring 2009 - pending completion of TMDLs TBD SD Basin Working Group Kissimmee / St. Cloud, the RCID and Orange, Osceola and Polk Counties. The southern Kissimmee Basin working group will consist of Southern Kissimmee the DEP District staff, SFWMD & SWFWMD & FDACS, the CD / SWD / Kissimmee 4 Southern Kissimmee. Kickoff in spring 2009 - pending completion of TMDLs TBD Basin Basin Working Cities of Avon Park, Sebring and Lake Placid, the Spring Lake SD Group Improvement District and the Sebring Airport Authority, and Polk, Highlands and Okeechobee Counties. Lakes Cypress and Kissimmee to be addressed by the CD / SWD / Lakes Cypress and Kissimmee to be addressed by Kissimmee Chain of Lakes Long Term Management Kissimmee Chain of Lakes Long Term Management Plan Kissimmee 4 TBD TBD SD Plan, sponsored by SFWMD. Technical Working Group which sponsored by the SFWMD with agency and local government input. Pinellas Gulf Coastal Tributaries (Klosterman Bayou, St. Joe Creek, Stevenson Creek) TMDLs DEP District staff,SWFWMD, Pinellas County, Cities of Springs Coast 5 SWD TBD Not yet established developed, decision on BMAP development anticipated in 2009. Clearwater, Pinellas Park, St. Petersburg DEP, SWFWMD, Pinellas County, Cities of Seminole and Springs Coast 5 SWD Reasonable Assurance Plan accepted 2007 N/A N/A Largo

All estimated dates need to be verified with Watershed Planning and Coordination Section Basin Coordinator 7/6/2009