Ørsted in the UK 4

The UK has world-leading capabilities in offshore . By 2030, one third of British electricity is set to be produced by offshore and Ørsted is at the forefront of this green energy revolution, supporting the UK government’s commitment to reach net zero carbon emissions by 2050.

Yorkshire and the sits at the heart of our development strategy. If Hornsea Four is granted consent for development, the region will benefit from associated job creation, training opportunities and economic growth.

Globally, we have built enough We are committed to identifying offshore wind farms to power opportunities for local businesses 9.5 million people. By 2025, our to access the supply chain for ambition is to power 30 million Hornsea Four. people with offshore wind.

Westermost Rough Hornsea 1&2 Hornsea 3&4 We have invested £8 billion Race Bank We have established the building offshore wind farms in the Lincs world’s largest Operations and UK, and we are investing a further Maintenance base in Grimsby, our £4 billion by 2020. £14 million East Coast Hub. Over 350 jobs will be based here.

The offshore wind sector deal will Wind power in operation Operations and Maintenance Base We will work with the Humber see industry invest £250 million to Wind power under  office Local Enterprise Partnership develop the UK supply chain. Wind power in development and Humber Region (LEP), Local Authorities and local

East Coast Hub education providers to maximise access to job opportunities for Hornsea Four.

Ørsted Wilsthorpe

Fraisthorpe

Little Kelk

Barmston

Driffield

Wansford

Foston on the Wolds Skerne

Beeford

North Frodingham

Watton

Beswick Lund

Lockington Hornsea

Scorborough Leven

Etton OurCherry Burton onshore proposals Hornsea 4

Bishop Burton

Woodmansey

Walkington We have gained valuable feedback from engaging with local communities and stakeholders. This has helped us to refine Bentley our onshore proposals for our underground export cable corridor, onshore substation site and two landfall sites.

Little Weighton

GRID Hornsea Four NORTH Refinement of Landfall Area Wilsthorpe

GRID Key Wilsthorpe NORTH

Refined project boundary (PEIR August 2019) REV REMARK DATE Coordinate system: British National Grid Vertical reference: LAT Scoping Boundary (October 2018) ... First Issue 07/08/2019 Scale @ A2: 1:70000

Permanent Access Tracks A165 0 0,75 1,5 3 Kilometres Temporary Access Tracks Onshore Temporary Logistics Compounds 0 0,5 1 2 Nautical Miles 1 Landfall Fraisthorpe Onshore Export Cable Corridor 1 400kV Export Cable Corridor Area Hornsea Four Landfall Compound Options Onshore Cable Corridor Landfall Connection Works We are consulting on two landfall

Proposed Onshore Substation Permanent Site (15.5 hectares) Road BarmstonOnshore Cable Corridor sites assessed in our Preliminary Proposed Onshore Substation Temporary Works (13 hectares) Document no: HOW040271 Created by: JOHLE Environmental Information Report and Original Onshore Substation SearchDriffield Area (October 2018) Lissett Checked by: XDAOO Great Kelk Approved by: HUMLA located near Fraisthorpe, one of which Barmston

Sands Lane Coordinate system: British National Grid Scale@A2: 1:20.000will be taken forward as part of our DCO 0 0,225 0,45 0,9 Kilometres Wansford Ulrome 0 0,125 0,25 0,5 Nautical Miles Lissett REV REMARKapplication.DATE Foston on ... First Issue 06/08/2019 the Wolds Licenses: Refinement of Landfall Area Service Layer Credits: © OpenStreetMap (and) contributors, CC-BY-SA Document no: HOW040269 Skerne Esri, HERE, Garmin, (c) OpenStreetMap contributors, and the GIS user community. Created by: JOHLE Checked by: XDAOO Skipsea © Crown copyright and database rights [2019] Ordnance Survey 0100031673. All Approved by: HUMLA

Beeford Hornsea Four 2 $ Foston Logistics Compound

GRID North Drain Hutton Cranswick 32 Temporary logistics Nafferton Drain Bridge Refined 80m onshore export cable corridor compounds Watton

Onshore temporary logistics compounds Beswick Lund are required along the cable corridor to Lockington Brandesburton Hornsea store materials, plant and staff facilities and will be removed post-construction.

Coordinate system: British National Grid Scale@A2: 1:1.500

0 25 50 100 Meters Leven 0 87,5 175 350 Feet REV REMARK DATE ... First Issue 06/08/2019

Refinement of Foston Logistics Compound Licenses: Document no: HOW040270 Service Layer Credits: © OpenStreetMap (and) contributors, CC-BY-SA. Created by: JOHLE © Crown copyright and database rights [2019] Ordnance Survey 0100031673. All Checked by: XDAOO rights reserved. Approved by: HUMLA Etton Leconfield

Hornsea Four Refinement of OnSS Area

Cherry Burton GRID NORTH 3 Proposed onshore substation Beverley Skirlaugh

Bentley Beverley Road

A1079 We have selected a site within the original onshore substation search area, Original proposed onshore substation search area (October 2018) which was presented in October 2018.

Wanless Beck

Bentley Beck 3 Creyke Existing C A164 l Grid National Grid Substation The onshore substation and Energy

Coordinate system: British National Grid Scale@A3: 1:8.000Balancing Infrastructure could be up to 0 125 250 500 Meters

0 375 25m750 1.500 Feet in height and may require an area REV REMARK DATE Park Lane ... First Issue 06/08/2019 Road 2 Skidby Cottingham Parks of up to 155,000m (15.5 hectares). Refinement of OnSS Area Licenses: Document no: HOW040271 GRID Service Layer Credits: © OpenStreetMap (and) contributors, CC-BY-SA Created by: JOHLE Esri, HERE, Garmin, (c) OpenStreetMap contributors, and the GIS user community. Checked by: XDAOO NORTH © Crown copyright and database rights [2019] Ordnance Survey 0100031673. All Approved by: HUMLA

Refined project boundary (PEIR August 2019) REV REMARK DATE Coordinate system: British National Grid Vertical reference: LAT Scoping Boundary (October 2018) ... First Issue 07/08/2019 Scale @ A2: 1:70000 As partPermanent Accessof Tracksour DCO application, we will apply for an 80m wide onshore export cable 0 0,75 1,5 3 Kilometres corridor.Temporary AccessThe Tracks cables will run underground from our proposed landfall near Fraisthorpe Onshore Temporary Logistics Compounds 0 0,5 1 2 Nautical Miles for approximatelyOnshore Export Cable Corridor 40 km, before connecting into the existing Creyke Beck National Grid Substation.400kV Export Cable Corridor Area Hornsea Four Landfall Compound Options Onshore Cable Corridor Landfall Connection Works

Proposed Onshore Substation Permanent Site (15.5 hectares) Onshore Cable Corridor Proposed Onshore Substation Temporary Works (13 hectares) Document no: HOW040271 Created by: JOHLE Original Onshore Substation Search Area (October 2018) Checked by: XDAOO Approved by: HUMLA Ørsted