POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail [email protected] Corporate office: Madhya Pradesh Power Transmission Co. Ltd., Block No.2, Shakti Bhawan, Rampur, Jabalpur 482008, CIN-U40109MP2001SGC014880, Email-mdtransco.nic.co.in

No.07-05/SG-9B-II/2486 Jabalpur, dated:16.09.2019

To

As per distribution list

Sub: Agenda of 71st meeting of Operation and Coordination Committee of MP. …

The Agenda of 71st meeting of the Operation and Coordination Committee of MP

th scheduled on 20 September 2019 at Conference Hall, SLDC, MPPTCL, Jabalpur has been uploaded on the website of SLDC ‘www.sldcmpindia.com’ and can be downloaded.

(R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur Distribution List

1. The Chief Engineer (Works), MP Power Transmission Co. Limited, Shakti Bhawan, Jabalpur, email- [email protected]. 2. The Chief Engineer (T&C), MP Power Transmission Co. Limited, Jabalpur. Fax No- 0761-2665593, 2702710 Email- [email protected] 3. The Chief Engineer (Transmission-East Zone), MP Power Transmission Co. Limited, Shakti Bhawan, Jabalpur. Email- [email protected]. 4. The Chief Engineer (Transmission-West Zone), MP Power Transmission Co. Limited, . 5. The Chief Engineer (Transmission-Central Zone), MP Power Transmission Co. Limited, Bijlee Nagar, Govindpura, , email- [email protected].

6. The Chief Engineer (Plg & Des), MP Power Transmission Co. Limited, Jabalpur, Fax No- 0761-2660908 Email- [email protected]

7. The Chief Engineer (Procurement.), MP Power Transmission Co. Limited, Jabalpur, .Fax No- 0761-2660908 Email – [email protected] 8. The Chief Engineer(EHT:Const.), MP Power Transmission Co. Limited, Jabalpur. Fax-0761-2661618, E-mail- [email protected]. 9. The Chief Engineer(EHT:Maint&insp.), MP Power Transmission Co. Limited, Jabalpur. Fax-0761-2665593, E-mail- [email protected]. 10. The Executive Director (O & M:Gen), MP Power Generating Company Limited, Jabalpur. Fax No- 0761-2664749, Email- [email protected], Email- [email protected] 11. The Chief Engineer (O&M:Hydel), MP Power Generating Co. Ltd, Jabalpur, Fax No-0761-2664749. 12. The General Manager(PM), MPPMCL, Jabalpur Email – [email protected] [email protected] 13. The Superintending Engineer (GCC), MPPGCL, Jabalpur Email – [email protected] [email protected]. 14. The General Manger (DCC-EZ), DISCOM Control Centre, MP Poorva Kshetra Vidyut Vitaran Co.Limited, Jabalpur, Fax No- 0761-2668503, Email – [email protected]. 15. The Dy. General Manager (DCC –CZ), DISCOM Control Centre, MP Madhya Kshetra Vidyut Vitaran Co. Limited, Bhopal, Fax No-0755-2580611,Email- [email protected]. 16. The Executive Engineer (DCC-WZ), DISCOM Control Centre, MP Paschim Kshetra Vidyut Vitaran Co. Limited, Near Polo Ground, Jail Road, Indore, Fax No- 0731-2421554, Email- [email protected]. 17. The Executive Engineer, Sub Load Despatch Centre, MPPTCL, Indore, Fax No- 0731-2874515, Email – [email protected]. 18. The Executive Engineer, Sub Load Despatch Centre, MPPTCL, Bhopal, Fax No- 0755-2885220, Email – [email protected] 19. The General Manger(RO), MPPMCL, In front of Bhojpur Club, E-4, Arera Colony,Bhopal, Fax No-0755-2423046, [email protected]

20. The Chief Engineer (PM&C), Narmada Hydroelectric Development Corpn. Ltd, NHDC Parisar, Shamla Hills, Bhopal – 462013., Fax No- 0755-4030130,Email – [email protected] [email protected]

21. The Chief Electrical Distribution Engineer, West Central Railway (WCR), General Manager’s Office, Electrical Department, Jabalpur-482001 (MP), Fax: 0761-2627629, Email- [email protected], [email protected], M- 9752415312, Mr.Satyendra Kumar (Dy.CE), Mob.9752415301 (CEDE, WCR).

22. The General Manager, Indira Sagar Power Station, NHDC Office complex, PO : Narmada Nagar, Distt : Khandwa (MP) – 450 119, Fax No- 07323-284080, Email – [email protected]

23. The General Manager, Omkareshwar Power Station, Prashsnik Bhawan, Urja Vihar, Sidhwarkut, Distt : Khandwa (MP) – 450 554, FaxNo-07280-271703, Email- [email protected], [email protected], [email protected].

24. The Director (Projects), BLA Power Limited, At : Niwari, PO: Khorsipan, Tah : Gadarwara, Distt ; Narsinghpur 487 551, Fax No. 07791-243667 / 243669, Email – [email protected]

25. The Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Agasod, Post Office-Bina- 470113 Distt- Sagar, Fax No. 07580-277200, Email – [email protected] [email protected], 26. The Chief Executive Officer, Kalpataru Satpura Transco Pvt. Ltd., Satpura Colony, Betul Road, Old Itarsi, Distt. Hoshangabad, Email – [email protected] 27. M/s Ujaas Energy Ltd. 701, NRK Business park, Vijay Nagar Sqaure, Indore – 452010, Email id :[email protected]

28. M/s Suzlon Global Services Ltd., 1090, Scheme no. 114, Park-2, Ring Road, Universal Hospital Row, Email- [email protected], Indore – 452010, [email protected] AGENDA FOR 71st MEETING OF OPERATION & COORDINATION COMMITTEE OF MP TO BE HELD ON 20th SEPTEMBER 2019 AT 11:00 AM AT Conference Hall, SLDC, MPPTCL, Nayagaon, Jabalpur.

ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 70TH meeting of Operation & Coordination Committee of MP held on 09th July 2019 at Conference Hall, SLDC, MPPTCL, Nayagaon, Jabalpur were forwarded to the committee members vide No. 07-05/SG-9B-II/2432 Jabalpur dated 12.09.2019. No comments have been received. [OCC may confirm the minutes]

ITEM NO.2: REVIEW OF SYSTEM OPERATION DURING THE MONTHS JUNE 2019 TO AUGUST 2019.

2.1. Frequency Particulars: During JUNE 2019 the system frequency was below 49.90 Hz for 9.87% of time against 7.09% of time during JULY 2019. The system frequency was above 50.05 Hz for 19.79% of time during JUNE 2019 against 24.64 % of time during JULY 2019. The system frequency was within the IEGC range of 49.90-50.05 Hz for 70.34 % of the time during JUNE 2019 against 68.27 % of time during JULY 2019. The average monthly frequency was 50.00 Hz during month of JUNE 2019 and 50.00 Hz during month of JULY 2019.

The detailed frequency particulars for the month of JUNE 2019 and JULY 2019 are enclosed at Annexure-2.1. The brief detail of frequency profile is given here under:- Minimum Maximum Instantaneous Instantaneous Average Integrated integrated Month Minimum Maximum frequency frequency over frequency over an Frequency Frequency an hour hour JUNE 2019 50.00 Hz 49.80 Hz 50.23 Hz 49.63 Hz 50.31 Hz JULY 2019 50.01 Hz 49.83 Hz 50.16 Hz 49.64 Hz 50.32 Hz

[Committee may like to note] 2.2 Operational Matters

2.2.1 Operational Discipline : System operated in terms of frequency profile for the months JUNE 2019 & JULY 2019 is as given below for discussion by the committee : % of time % of time frequency % of time Frequency Average monthly Month Frequency within the permissible above 50.05 Hz frequency Below 49.90 Hz range of 49.90-50.05 Hz. JUNE 2019 9.87% 19.79% 70.34% 50.00 Hz JULY 2019 7.09% 24.64% 68.27% 50.00 Hz

[Committee JULY like to note]

2.2.2 Voltage Profile: During the months JUNE 2019, JULY 2019 & AUGUST 2019 the maximum and minimum voltage as recorded at following important 400 KV s/s in MP Grid:-

Name of Sr. JUNE 2019 JULY 2019 400 KV No. Max. Voltage Min. Voltage Max. Voltage Min. Voltage Substation Observed Observed Observed Observed

Agenda of 71st OCCM of MP 1 Volta Voltage Voltage Voltage ge Date Date Date Date KV KV KV KV

1 Indore 416 02-06-19 399 19-06-19 416 06-07-19 400 20-07-19 2 Bhopal 418 02-06-19 399 12-06-19 417 07-07-19 398 23-07-19 3 Nagda 419 13-06-19 402 07-06-19 420 28-07-19 403 20-07-19 4 Satpura 420 02-06-19 407 07-06-19 421 07-07-19 406 23-07-19 5 SGTPS 420 15-06-19 407 08-06-19 424 31-07-19 407 23-07-19 6 Bina 416 02-06-19 398 23-06-19 416 07-07-19 398 23-07-19 7 Pithampur 420 13-06-19 404 19-06-19 418 28-07-19 404 20-07-19 8 Ashta 423 26-06-19 407 12-06-19 425 07-07-19 406 23-07-19 Julwania 9 419 01-06-19 408 19-06-19 419 01-07-19 412 19-07-19 [Committee may please note & discuss]

2.2.3 Status of Capacitor Banks in sub-transmission system: The updated information of the status of capacitor banks in sub-transmission system as on 31th MAY 2019 as submitted by DISCOMs is detailed below:

Capacitor bank Capacitor Capacitor bank Require Requiremen Capacitor Balance installed in good Banks healthy installed but ment of t against banks already capacitor condition (No) but not in defective & are repair non- covered under banks to be service due to repairable (No) against repairable ADB T-V covered in DISCOM control ckt each capacitor other problem unit (No) banks schemes

600 1200 1500 600 1200 1500 600 1200 1500 No of 100 600 1200 600 1200 600 1500 KVAR KVAR KVAR KVA KVA KVA KVAR KVAR KVAR KVAR KVAR KVAR KVAR KVAR KVAR KVAR R R R Units required EZ 408 142 51 08 05 01 21 07 0 25 ------CZ 1 687 826 - - - 1 0 0 3 0 0 0 0 0 0

WZ 613 550 725 10 3 1 23 12 15 207 08 16 - - - 0 The details has not been provided by East Discom & Central Discom and the data mentioned in the above table is of 69th OCC. East Discom & Central Discom is requested to provide the updated details. The committee may like to discuss. [Action: MPPTCL, DISCOMS]

2.2.4 Status of Shunt Capacitor Banks installed at various EHV Transmission Substation: The updated information of the status of installed capacitor banks (in MVAR) in EHV transmission system as on 31.05.2019 as submitted by MPPTCL is given below:- Voltage Capacitor bank Capacity Added Capacitor banks TOTAL Capacitor Bank Class installed as on after Last OCC already covered CAPACITY AS Installed but 31.03.19(MVAR) Meeting (MVAR) under ADB T-V ON 31.05.19 defective & are not (MVAR) repairable (No & MVAR)

Agenda of 71st OCCM of MP 2 220 KV 100.00 0.00 - 100.00 All in Service 132 KV 1238.00 0.00 - 1238.00 33 KV 5315.50 24.00 - 5339.50 Total 6653.50 0.00 - 6677.50

The T&C has not provided updated data. [Action: MPPTCL]

2.2.5 Status of completion of ongoing Transmission Schemes being executed by MPPTCL: The various ongoing Transmission Schemes completed during the financial year 2019-2020 (up to MAY 2019) and plan for completion of various ongoing Transmission Schemes for the Year 2019-2020 is enclosed as Annexure 2.2.5(i) and 2.2.5(ii) respectively. [Action: MPPTCL]

2.2.6 U/F and df/dt Relay Operation

(i) U/F and df/dt Relay Operation: Frequency did not touch 49.20 Hz during JUNE 2019 and JULY 2019. There was no df/dt operation during the same period. MPPTCL informed that under Frequency Plan for all the stages have been implemented and in operation. [Action: MPPTCL]

(ii) Defective u/f, df/dt relays: MPPTCL has informed that all the df/dt and U/F relays are in operation, where the U/F relays are not available, the numerical relays programmed for under frequency operation. Defective df/dt relay at 220KV Sagar & 220KV S/S Chhatarpur have been replaced & at 132KV S/S Chapda the df/dt protection is provided through df/dt feature of DPR. All U/F stages are in good/ healthy & working condition. [Committee may like to note]

2.3 Power Cuts / Load restrictions/Differential Load Shedding by DISCOMS & group allocation to 33 KV feeders:

(i) Details of DISCOM wise Power supply given to various domestic categories during the period JUNE 2019 and JULY 2019 is enclosed at Annexure 2.3(i). [Committee may like to note]

(ii) Group Allocation to Newly Commissioned existing EHV substations:- The region wise list of 33 KV feeders emanating from various newly commissioned/existing EHV substations for which groups have not been allocated is given in Annexure 2.3 (ii). The DISCOM wise details of pending group allocation to 33 KV feeders is given below:-

SN DISCOM Region No of 33 KV feeders for which groups to be allocated 01 Jabalpur 17 02 Sagar 02 EAST 03 Rewa 02 04 Total 21 05 Indore 03 WEST 06 04

Agenda of 71st OCCM of MP 3 07 Total 09 08 Bhopal 23 09 CENTRAL 00 10 Total 23 TOTAL Grand Total 53

Discoms are requested to furnish the details as per list enclosed at Annexure-2.3(ii) in the meeting.

In view of the above it is requested that the order copy for which group have been allocated may please be submitted to P&D, MPPTCL under intimation to SLDC. [ACTION: DISCOMs]

ITEM NO. 3 : OPERATIONAL PLANNNING:

3.1 Generating Units under planned outage and proposed maintenance programme: The annual maintenance /outages of thermal generating units of MPPGCL for FY 2019-2020 as intimated by ED(O&M:Gen.) is NIL for the month OCT-19 to DEC-19. Details regarding hydel unit outage has not been provided byCE (O&M:Hydel), MPPGCL. [Committee May like to note]

3.2 Proposed shutdown programme of Transmission lines / Transformers: The proposed shutdown of transmission elements for the period 01.09.2019 to 31.12.2019 has not been submitted by T&C, MPPTCL. [Committee May like to discuss]

3.3 Long Outages of transmission elements and protections: The status submitted by MPPGCL /MPPTCL are given below:- Sr. Line/Transformer/ etc Outage date Reason Response from Utility No under long Outage X’mer was taken under for pre monsoon maintenance and testing work on MPPTCL informed that X’mer is 27.03.2019. being replaced by 50 MVA X’mer by 20MVA BHEL make X’mer 1. 27.03.2019 Shutdown is continue August-19. Latest status may please at 132KV S/S Khachrod. as the tan-delta be intimated by MPPTCL in the values of transformer meeting. windings are measured considerably high. MPPTCL informed that X’mer is under investigation & testing. Transformer is being replaced by 20MVA BBL X’mer at 220 X’mer tripped on 2 30.05.2019 another 20MVA transformer by Sept- KV S/s Rajgarh(Biora). differential indication 2019. Latest status may please be intimated by MPPTCL in the meeting.

Agenda of 71st OCCM of MP 4 Transformer tripped on differential trip indication with 33KV Multhan Discom feeder being replaced by X’mer Tripped on 3 100 MVA 220/33KV X’MER 21.06.2019 50MVA transformer by August-2019. differential trip indication. at 220KV S/S Badnagar Latest status may please be intimated by MPPTCL in the meeting. Transformer tripped on Differential 40 MVA BBL, 132/33KV X’mer tripped on trip indications, under investigation 4 07.07.2019 and testing.Sep-19. Latest status Transformer at 132KV S/S differential trip indication. Sagar may please be intimated by MPPTCL in the meeting. Transformer tripped on Differential 63 MVA GEC, 132/33KV X’mer tripped on trip indications, under investigation 5 10.07.2019 and testing. Sep-19. Latest status Transformer at 220KV S/S differential trip indication. Mahalgaon, Gwalior may please be intimated by MPPTCL in the meeting. B-Phase bushing & OLTC selector switch Latest status may please be 6 160MVA BHEL X’mer – 2 at 14.08.2019 intimated by MPPTCL in the failed due to heavy 220KV S/s . meeting. lightening. In 70th OCCM it was apprised to the committee that as decided, MPPGCL will purchase &provide 315MVA, 400/220KV ICT by Dec-19 against an order of MPPTCL, existing 3 no. feeders will be integrated through GIS& MPPTCL X’mer tripped at 21:55 will reroute remaining 3 no. feeders. Hrs. due to LA Burst. Thereafter STPS Ubit#6&7 will Emergency shutdown 500 MVA, 400/220 KV phase out. 7 19.04.2018 taken for 15 days from X’mer at STPS. MPPGCL informed that extension 21.04.18 to 05.05.18 for order for 1 no. 400/200KV, 315 MVA CPRI oil filtering and ICT has been placed by CE RLA testing work. Procurement MPPTCL, vide order No. 04-01/TR-68/2018/04725-7- Extn./SI/4512 dtd-07/08/2019 to M/s BHEL. The delivery at site upto June 2020. Latest status may also be intimated by MPPGCL/MPPTCL in the meeting. MPPGCL informed that NIT has been uploaded on dtd-20.08.2018 & enquiry has been opened on Under outage since 19.09.2018 and certain queries on 31.03.18 due to techno commercial issues have 50 MVAR (Make GE) Line concentration of been sought from M/s GE(T&D) 8 Reactor at 400KV Sarni- 31.03.2018 Acetylene gas. DGA test (OEM). Price bid opened on Asta Ckt-I. of transformer oil of 05.12.2018 & order was placed on reactor was carried out 01.03.2019. it is expected to bring by M/s CPRI, Bhopal. back the reactor in service after rainy season. Latest status may also be intimated by MPPGCL in the meeting.

Agenda of 71st OCCM of MP 5 Any transmission element/ EHV element under outage, which has not been intimated/included under aforesaid outage list, should be invariably intimated to SLDC. All entities are requested to ensure the same. The utility may submit the latest status. The T&C has not provided updated data. [Action:MPPGCL/MPPTCL]

ITEM NO. 4 : OPERATIONAL STATISTICS FOR THE MONTH OF JUNE 2019 AND JULY 2019:

The details of actual generation, Schedule from Central Sector, demand etc. are given in the following Annexures:

Annex. 4.1 Unit wise actual Generation of MPPGCL thermal Units and station wise Generation of MPPGCL & NHDC Hydel Units. Annex. 4.2 Power Supply Position(Energy Balance Sheet).

POWER SUPPLY POSITION FOR THE MONTH : Jun 19 All Fig in MW Max Dem Met on : 05- Average Average Average Average Particulars Jun-19 01-10 June 11-20 June 21-31 June Monthly AT : 07- 15 STATE PEAK DEMAND MET 9955 9011 8298 7388 8205 BREAKUP :- STATE THERMAL (Actual Gen) 2502 2471 2053 2187 2237 STATE THERMAL (RSD) Total 0 36 77 37 50 MW STATE HYDEL 475 296 174 121 197 IPP (STATE) 351 315 340 330 328 CENTRAL SECTOR (Schedule) 3164 2708 2960 3105 2924 CENTRAL SECTOR (Surrender) 302 537 528 510 525 IPP (INTER STATE) 2259 2295 2364 2252 2304 RAILWAY 241 231 227 235 231 RENEWABLE ENERGY 1272 1177 990 752 973 OTHERS -269 -107 -72 -137 -105 BANKING / PURCHASE / SALE 0 -321 -600 -784 -575 DEVIATION -39 -55 -137 -265 -152 Between Between Between Between DEVIATION (AVERAGE) (-871 to 467) (-1063 to 710) (-1338 to 372) (-1338 to 710) ENERGY SUPPLY STATE 2213.10 (LU)

Agenda of 71st OCCM of MP 6 POWER SUPPLY POSITION FOR THE MONTH : July 19 All Fig in MW Max Dem Met on : 19- Average Average Average Average Particulars Jul-19 01-10 July 11-20 July 21-31 July Monthly AT : 07- 00 STATE PEAK DEMAND MET 9845 6543 8235 7988 7601 BREAKUP :- STATE THERMAL (Actual Gen) 2620 2315 2523 2708 2522 STATE THERMAL (RSD) Total 0 96 38 228 124 MW STATE HYDEL 1243 143 372 276 264 IPP (STATE) 197 185 206 197 196 CENTRAL SECTOR (Schedule) 3011 2273 2906 3063 2757 CENTRAL SECTOR (Surrender) 200 618 319 470 469 IPP (INTER STATE) 2029 1878 1876 1878 1877 RAILWAY 241 231 234 236 234 RENEWABLE ENERGY 567 1002 1179 881 1016 OTHERS -12 -132 -98 -95 -108 BANKING / PURCHASE / SALE -548 -1273 -969 -888 -1038 DEVIATION 496 -79 28 -38 -30 Between Between Between Between DEVIATION (AVERAGE) (-1026 to (-899 to 943) (-690 to 871) (-1026 to 943) 917) ENERGY SUPPLY STATE 2125.58 (LU)

Annex. 4.3 Hourly Average of Availability and Demand. Annex. 4.4 Hourly average schedule Vs Drawal of DISCOMs. [Committee may like to note]

ITEM NO. 5 : SYSTEM DISTURBANCE IN MP DURING OF JUNE 2019 AND JULY 2019: The Grid Disturbances and Grid Incidents in MP during these months are given in Annexure 5.

[Committee May like to discuss]

Agenda of 71st OCCM of MP 7 ITEM NO. 6.0 : IMPORTANT OPERATIONAL ISSUES:-

6.1 STATUS OF COMPLETION OF ONGOING SCHEMES FOR COMMISSIONING OF REACTORS / TRANSMISSION ELEMENTS:- The present status regarding schedule and commissioning of reactors / transmission elements is as below:-

S.No. 400 KV S/s Size MVAR Implementi Expected Date of Commissioning ng Agency as intimated in last OCC In 66th OCC MPPGCL informed that Line Reactor the price bid has to be opened and the 1. on 400 kV Sapura–ISP 50 MVAR MPPGCL reactor will be commissioned by June line at STPS 2019. Latest status may please be submitted by MPPGCL in the meeting. Work will be carried out under PSDF as intimated by MPPGCL in 62nd OCC in 66th OCC MPPGCL informed the committee that the drawing has been approved and reactor is expected to be commissioned by March 2019. In 68th OCC, MPPGCL informed the Bus Reactor at committee that reactor will be 2. 125 MVAR MPPGCL SSTPS commissioned by October 2019. MPPGCL was apprised that considering commissioning of unit 3 and 4 at SSTPS stage II, early commissioning of 125 MVA reactor is required to ensure secure operation of grid. Latest status may please be submitted by MPPGCL in the meeting.

The latest status may be submitted in the meeting. [Action: MPPGCL/NHDC] 6.2 FREQUENT TRIPPING OF 220 KV SATNA (PG)-KOTAR LINE IN FIRST TIME CHARGING:- 220 KV Satna (PG) Kotar line was first time charged at 00:00 hrs on 23.08.2019 after FTC approval of WRLDC, consequent upon bunching of 220 KV Satna-Satna (PG)-IV Circuit with 220 KV Satna- Kotar Circuit-II. However, line did not hold and declared faulty. The work permit has been issued to AE (TLM) with instructions to perform patrolling. This line was again charged three times as detailed below after receiving clearance on basis of patrolling done by EHT(Maint) team, but line did not hold: 1. 15:43 hrs 23.08.2019 2. 18:40 hrs 24.08.2019 (As reported at location No.104 & 122 top phase conductor found flagged over). 3. 17:18 hrs 25.08.2019 (As reported at location No. 67 & 64 disc insulators were found flagged over). Thereafter the line was charged multiple times but did not hold. The frequent failure of charging the line is not desirable for system safety point of view, as Satna is an important node. The frequent charging of faulty line may lead to system disturbance. The WRLDC has also viewed seriously regarding repeated tripping of line. The line was finally charged on dtd------at hrs after multiple trial charging. The EHT-Maintenance department may please comment on the matter and the same may be discussed in OCCM so that such occurrence of incidence may be avoided.

Agenda of 71st OCCM of MP 8 6.3 DELAY IN SUBMISSION OF OPERATIONAL DATA BY DCC, JABALPUR AND NON- FUNCTIONING ROUND THE CLOCK:-In the subject matter, it is mentioned that during recent past difficulties are being faced to get forecasted demand of East Discom from DCC Control Room which creates operational difficulties. In case of non-availability of accurate forecast demand, it is very difficult for SLDC to manage the grid in real time and it is also difficult to plan the schedule of availabilities. It is observed that the accurate data from Discom are not being furnished timely. It is gathered that no any official is present during Night Shift of DCC, Control Room, East Discom, Jabalpur, resulting operational difficulties. Moreover, it is also noticed that supply hours of East Discom also not being provided by DCC Control Room regularly. This data is a part of DPR which is required to be reported to Chairman, MDs and Energy Department regularly at morning hours. As Night Shift at DCC Control Room have been withdrawn, therefore the coordination with East Discom round the clock has been discontinued. This matter has been raised during 69th& 70th OCC meeting of MP and it has been pointed out that forecasting demand from Discom required to be submitted timely is mandatory. It has also been pointed out that supply hours of East Discom should have provided regularly within stipulated time so that same may be incorporated in consolidated DPR. However, inspite of regular reminders no action has been taken so far. The DCC Control Room may be instructed to provided desired operational data timely without fail and make necessary arrangement for manning the round the clock shift in East Discom DCC in line with other DCCs, so that coordination of SLDC with Discom may be ensured. The East Discom may kindly provide comments on the matter.

6.4 TRIPPING REPORT OF INCIDENCE TOOK PLACE ON DTD 26.06.2019 AND 27.06.2019 AT 400 KV SUB STATION ASTHA:- On dtd 26.06.2019 at 13:16 hrs. 315 MVA transformer No.II tripped without any indication at 400 KV substation Astha and the same was taken into service at 17:22 hrs on 26.06.2019. However, at 17:46 hrs on dtd 26.06.2019, 315 MVA transformer No I & II again tripped. The transformer No II & I was normalized at 18:14 hrs and 18:42 hrs respectively on the same day. On dtd 27.06.2019 at 17:24 Hrs., 315 MVA transformer No I & II tripped from 220 KV side without any indication. The transformers were normalized subsequently on the same day. The frequent trippings of 315 MVA ICT No. I & II is dangerous to system security and healthy system operation, which requires thorough investigations to rectify the cause. The T&C department may kindly comment on the matter so that the same may be discussed.

6.5 COLLAPSE / DAMAGE OF TOWERS AND RESTORATION THEREOF:- 400 KV Pithampur- SSTPS Ckt No. I & II tripped at 15:26 hrs on 02.06.2019. It is reported that 24 nos towers are found collapsed / damaged at different locations. It is desired that 400 KV Pithampur – SSTPS Ckt – I & II may be restored before ensuing rabi season positively. Similarly, one tower of 220 KV Narsinghpur-Jabalpur Ckt No. I & II damaged at 19:17 hrs on dtd 13.06.2019. It is requested that restoration plan of tower collapsed/ damaged may please be provided so that the same may be apprised to WRLDC. In the above context, it is also indicated that due to outage of 220 KV Narsinghpur Ckt - I&II, long outages in Narsinghpur Pipariya Corridor is not being permitted. Therefore a few work of tower shifting work is held up.

Agenda of 71st OCCM of MP 9 Therefore, it is also requested that damaged tower of 220 KV Narsinghpur-Jabalpur Ckt No I & II may be restored on top priority basis. Committee may discuss the matter. [Action: MPPTCL] 6.6 PROTECTION AUDIT IN MP:- As per the recommendations of Enquiry committee on Grid Disturbance of 30.06.2012, Protection Audit of all the substations is required to be carried out once in 5 year and the Protection Audit of newly commissioned substations be carried out within one year of its commissioning. In 38th meeting of WRPC held on 28.06.2019, it was decided that Second Phase of Third Party Protection Audit has become due for the substations of Western Grid and requested all the constituents to carry out the Protection Audit of substations at the earliest in compliance to CERC directives. In the meeting MP-SLDC has been entrusted with the responsibility of carrying out Protection Audit in the state of Madhya Pradesh. Thus, the MP-SLDC has planned to carry out Protection Audit of 220 KV Substations and Generating Stations by constituting the teams from various entities of the state grid in a phase manner. Thus, in order to comply with the directives of CERC, MP-SLDC has constituted 5 no. teams for carrying out Protection Audit of some of the 220 KV Substations/Generating Stations. Each team has been assigned 3 nos. of substations. The name of the substation and date on which Protection Audit is proposed to be carried out along with the team member details is enclosed as Annexure – 6.6. Further the format for protection audit has been e-mailed to the site offices of MPPTCL & MPPGCL where the protection is proposed to be conducted. Hence the concerned officials are requested to kindly ensure the availability of the data in the prescribed format to the protection audit team, so that the same may be verified and data may be authenticated during the protection audit. [Action: MPPGCL/MPPTCL/NHDC/JP BINA]

6.7 FREQUENT TRIPPING OF 132 KV VSTPS – CKT – I AND 132 KV VSTPS – WAIDHAN – MORWA CKT – II:- it has been gathered that 132 KV VSTPS – Waidhan Ckt – I & 132 KV VSTPS – Waidhan – Morwa Ckt – II is tripping frequently as detailed below:- NAME OF ELEMENT JUNE 2019 JULY 2019 18.49/08.06.19 10.32/02.07.19 06.12/14.06.19 15.32/06.07.19 02.38/22.06.19 14.44/18.07.19 02.38/25.06.19 15.18/18.07.19 132 KV VSTPS – WAIDHAN CKT – I 16.28/30.06.19 10.57/19.07.19 12.44/21.07.19 19.13/24.07.19 23.17/12.06.19 10.32/02.07.19 16.28/30.06.19 15.32/06.07.19 132 KV VSTPS – WAIDHAN – MORWA CKT – II 12.44/21.07.19 19.13/24.07.19

Agenda of 71st OCCM of MP 10 It is to intimate that the above mentioned circuits are inter-state circuits and frequent tripping of these circuits causes interruption Waidhan, Morwa &Rajmilan substations. MPPTCL is requested to kindly investigate the reason for frequent tripping of these circuits and address the issue so that the tripping of these circuits is not repeated in future. [Action: MPPTCL]

6.8 FREQUENT VARIATION IN SCHEDULING OF SSTPP UNIT BY MPPMCL:- ED(O&M) generation, MPPGCL, Jabalpur has intimated vide letter no: 1500 dtd-26.08.2019 that it has been seen that there is frequent backing down/up of scheduling is being given to SSTPS Units without giving reasonable time to stabilize the unit on particular load. There is cases where after ramp down upto TMM in a particular block the unit again schedule for ramped up in next block and vice-versa. The MPPGCL has mentioned that thermal units are not designed to vary load such frequently as the thermal units take time to stabilize the machine and to maintain the desired differential expansion and overall expansion with other parameter of unit after ramp-up and ramp-down for safe operation. the MPPGCL has requested to give 4 time block to run the machine on the same load. Matter may be discussed for remedial action. [Action: MPPMCL/MPPGCL] 6.9 REVIEW AND UPDATING LOAD DROPPING SCHEME/ SYSTEM PROTECTION SCHEMS (SPS) AT SUBSTATIONS IN M.P TO HANDLE EMERGENCY CONDITION: - Considering the integration of new transmission elements in the grid it is to bring to the notice that the existing load drop scheme shall also be reviewed and updated timely as per the updated network. It is also to bring to the notice that at 132 KV S/s Chambal on dtd- 28.05.2019 at 13:04 Hrs. 132 KV Chambal – North Zone Ckt – I & II tripped as Y-Phase conductor of ckt – II snapped resulting in overloading & tripping of 132 KV Indore SZ – Satsai Ckt & 132 Kv Indore SZ – E.Complex ckt even after operation of load drop scheme. Hence it can be gathered that after up gradation of 132 KV North Zone S/s to 220 KV S/s North Zone the load drop scheme has not been revise accordingly. It is also to intimate that the load drop scheme shall also be reviewed according to the increasing 33 KV load. MPPTCL is requested to review the existing load drop scheme (SPS) and to implement new load drop scheme as per requirement as per undated network and submit to SLDC. In view of the above it is requested that the complete details of all SPS commissioned in MP by MPPTCL along with load shed quantum, may be submitted to SLDC so that the copy of the same could be placed in Control room of SLDC and concerned substation / power station for reference & record and the same can also be submitted to WRLDC. [Action: MPPTCL/MPPGCL]

6.10 WRLDC TRIPPING PORTAL:- It is to inform that as intimated by WRLDC in 529th WR-OCCM, that WRLDC has started a tripping portal from 01.06.2019 for uploading FIR, DR/EL and other details related to the tripping of all 400KV elements, important grid elements, inter-state/inter-regional links and lines connected to PGCIL. Further details major Grid Disturbance resulting in significant load loss/generation loss is also required to be uploaded on the WR-Portal and as per IEGC 54.2(r), utilities need to submit the data within 24 hours of the event. The link (https://portal.wrldc.in/Trippingnew/Account/Login.aspx) , common user ID &

Agenda of 71st OCCM of MP 11 password for the entities of MP has been shared with all the entities vide this office letter No.07-05/RPC-51/ 18.06.2019. As advised in 529th WR-OCCM, all Utilities are requested to use and submit the data through the WRLDC tripping portal. Therefore, entities are requested to use and upload the FIR, DR/EL and other details related to the tripping of elements mentioned above, in the Tripping Monitoring System of WRLDC within stipulated time. [Action: MPPTCL/MPPGCL/NHDC/JP BINA]

6.11 PROTECTION COORDINATION DURING INTEGRATION OF NEW INTRA-STATE ELEMENTS:- In compliance to the IEGC & WRLDC operating procedure the protection coordination of the existing elements & adjacent substations shall be prior to integration of new intra state elements. All the concerned entities are requested to ensure/review the protection coordination of adjacent substations/elements and confirm the same along with the first time charging documents for intra state elements also. [Committee May Like To Discuss]

6.12 AVAILING SHUT DOWN ON NON-ISTS ELEMENTS (ELEMENTS FOR WHICH ONLY APPROVAL OF MP-SLDC IS REQUIRED) AND OUTAGE MODULE THEREOF:- The parallel run of the ABT, OA & MIS system is in progress and the outage module has already been initiated (link:- http://223.31.122.117:8080/EltrixPortal/login.jsp). Further it is to inform that the User ID and Password for all the circles/generating stations/EHT-M/EHT-C along with user manual of the outage module has already been provided vide this office e-mail dtd-14.01.2019. Also vide this office letter no. No No.07-05/174- B/Kalki/131 dtd-15.01.2019 all the concerned entities/authorities were requested to communicate the User ID/Password & issue necessary directives to the respective authorities to initiate the use of web based outage module. In view of the reliability and safe & secure grid operation entities are requested to follow the outage procedure and submit the outage request well in advance i.e., on D-3 basis by 17:00 Hrs. only the emergency shut down request shall be made on D-1 day or in real time. In view of the above all the concerned entities are again requested to submit/process the outage, tripping, generator outage, generator start/stop, new element charging request through web based outage module in addition to the existing practice. It is also to mention that from 01.04.2019 it will be mandatory to process the outage request through outage module only, hence all the entities shall approach for approval of shut down through outage module. In case of any queries/addition of element/etc the entities can write to us on e-mail:- [email protected], [email protected] and can coordinate with Shri. Manish Tamrakar, Mob. No. 7999535347 & Shri.G.Rakesh – 9606796709. It is also to mention that WRLDC has developed a separate portal for WR-OCCM approval of outage of ISTS elements which shall be discussed separately. [Action: MPPTCL/MPPGCL/DISCOM’S/NHDC/KALPTARU/JP BINA/BLA]

Agenda of 71st OCCM of MP 12 6.13 MAPPING OF FEEDERS:- As earlier, it has been requested to initiate the process of mapping of AUFLS feeders in SCADA system, however no any progress in this regard noticed so far. In 8th NPC, it has been decided that WRPC would submit the details / progress of feeder mapping to NPC Secretariat on regular basis (quarterly). In view of above, it is requested quarterly details/ progress of mapping of feeders may kindly be furnished so that same may be communicated to WRPC for onward communication. [Action: MPPTCL/DISCOM’S]

6.14 INSPECTION OF RELAYS OF AUTOMATIC UNDER FREQUENCY LOAD SHEDDING AND CERTIFICATION THEREOF: - It is desired that for safe & secure operation of integrated system, the under frequency relay should be connected in the system in healthy condition. Accordingly, WRPC is pressing hard to provide the self-certified status of healthiness of relays of Automatic Under Frequency Load Shedding (AUFLS) and periodic checking of the same. Vide this office various correspondence. The CE (T&C) and also SE(T&Cs) were requested to provide status of healthiness of relays of Automatic Under Frequency Load Shedding on priority basis to SLDC, so that same may be communicated to WRPC. Inspite of repeated request vide various correspondence, moreover the matter had been raised in OCC meeting of MP in time to time, however the desired information are still awaited from utilities. It is therefore desired that the above matter may be treated as urgent and status of healthiness of Automatic Under Frequency Relays may be provided to SLDC and also the under frequency may be tested periodically. In this context it is also mentioned that time to time WRPC official as well as SLDC official shall visit the sub-stations to ascertain the healthiness of under frequency relay. Committee may please discuss the matter. [Action: MPPTCL(T&C/P&D), Discoms]

6.15 PROVISION OF SYNCHRONIZATION FACILITY AT EHV SUB-STATIONS OF MPPTCL AND AT ALL POWER HOUSE: - As per Grid Code, the synchronization facility should be available at all the Power Stations, 400 KV Sub-stations, 220 KV Sub-stations and 132 KV sub-stations in the path of black start. In 60TH OCC meeting MPPTCL representative informed the committee that order for 69 no. synchronization trolleys has been placed and 1 no. synchronization trolley has been delivered for checking and testing purpose at 220KV S/S Barwaha. In subsequent meetings this issue has been discussed. However, no any fruitful progress has been observed so far. In the above context it is indicated that at Manikheda HPS and Rajghat HPS synchronization facility is not available. It is felt that every Hydel Power station should be equipped with synchronization facilities invariably for system reliability and Crises Management. Also at Manikheda HPS & Rajghat HPS single bus system exists, hence MPPGCL is requested to explore the possibility for commissioning of Double Main Transfer Bus system. Thus, MPPGCL is requested to provide synchronization facility at Manikheda HPS and Rajghat HPS and MPPGCL may kindly provide status of making synchronization facility in aforesaid HPS. The MPPTCL may kindly provide the status of installation and commissioning of synchronization trolleys at different substations. Further, is also requested to indicate, whether synchronization facility could be provided at Karera & Pichhore substation on priority basis. The

Agenda of 71st OCCM of MP 13 matter has been discussed with officers of T&C wing, it is conveyed that they are making arrangement for installation of synchronizing trolley at Pichhore S/s at the earliest. T&C may please update the position. The matter was discussed in the meeting. [Action: MPPTCL]

6.16 DELAY IN SUBMISSION OF DOCUMENTS FOR FIRST TIME CHARGING OF ELEMENTS:- As per procedure laid down by NLDC for integration of new EHV elements into the grid and issuance of certification thereof vide letter dtd-26.05.2014, wherein it is indicated that all transmission licensees intending to commission any transmission element belonging to them and which is a part of a interstate transmission system shall submit FTC document for approval of RLDC. Further WRLDC vide e-mail dtd-02.01.2019 intimated the launch of FTC Software along with the user manual. In view of the above it is to inform that, after registration the separate user id & password of MPPTCL & MPPGCL provided by WRLDC was forwarded to respective entities so that they can upload FTC documents through this new FTC portal (link-http://ftc.wrldc.in:8080/ftc_wrldc/). Hence all the respective entities are requested to apply for integration of any transmission element belonging to them and which is a part of a interstate transmission system through this FTC portal within the specified time limit (i.e., 10 days prior to anticipated date of first time charging). It is requested that licensee / utilities shall strictly adhere with time schedule for documentation of first time charging of new transmission elements of all interstate line and all EHV elements 400kv and above. It may also be ensured that FTC formalities should have completed before availing outage for integration of element. The authority submitted FTC document should ensure compliance of protection/ metering/Telemetry issue in coordination with T&C official. It is also desired that all necessary data should have made available to all adjacent s/s for relay coordination well before targeted date. The authority submitted FTC document should ensure all formalities have been completed otherwise it would be difficult to obtain clearance from WRLDC. In general, non-attachment of requisite papers/ SLD/ document of standing committee approval or approval of competent authority for intrastate elements /approval of Electrical inspector /noncompliance of relay coordination of adjacent s/s / providing information incorrectly caused delay in obtaining FTC approval. Therefore, it is desired that FTC document completed in all respect may be provided in stipulated time schedule so that FTC formalities could be completed within targeted date of charging. [Action: MPPTCL/MPPGCL/ISP/OSP/JP BINA/BLA/All State Entities]

ITEM NO. 7: BLACK-START MOCK DRILL OF HYDEL POWER STATIONS : Black Start mock drill of Hydel stations of MPPGCL:- During 2019-2020 the proposed / tentative dates for conducting black start mock drill at various Hydel power station of MP is detailed as mentioned below:- PROPOSED/TENTATIVE S.NO. NAME OF HPS DATE OF MOCK DRILL 1 ISP 2 OSP To be discussed. 3 TONS HPS

Agenda of 71st OCCM of MP 14 All the concerned entities are requested to review the proposed tentative dates for conducting black start mock drill and confirm the readiness in the meeting. It is also requested that the generators shall intimate the Unit No. and the Bus No. on which the mock drill is to be conducted. [Action : MPPGCL/NHDC]

ITEM NO. 08: AVAILABILITY BASED TARIFF (ABT) RELATED ISSUES:

8.1 TESTING &CALIBRATION OF METERS AND NON-RECEIPT OF TIMELY JMR DATA:

1. CE(T&C) office is requested to apprise the Committee about the statusof testing / calibration of interface meters installed at the Sub-Stations as per Regulations 10 and 18 of Central Electricity Authority (Installation and operation of meter) Regulation 2010.

2. CE(T&C) office was repeatedly requested in previous OCCMs to issue instructions to all circle offices for furnishing the JMR data in standard format enclosed herewith as Annexure-8.1 to SLDC on email id- [email protected] before 7thof every month. CE(T&C) office is again requested to issue instructions to circle officesfor furnishing the JMR data in standard format by 7thof every month at email [email protected].

[Action : CE(T&C) MPPTCL]

8.2 NON RECEIPT OF ABT METER DATA OF RAILWAY TSS THROUGH AMR SYSTEM:- SLDC has already requested in previousOCCM’sthat ABT meter data of following TSS of Railways is not being received through AMR system:

1. Railway TSS Mansakra. 2. Railway TSS Khirkiya 3. Railway TSS Bhitoni. 4. Railway TSS Narsinghpur. 5. Railway TSS Mungaoli.

Railway representative informed in the previous OCC meeting that Mansakra & Khirkiya TSS end problem regarding downloading of meter data shall be resolved within one week and meter data will be received by SLDC through AMR. However, meter data of above TSS points is not being received by SLDC through AMR. Railways is requested to apprise the Committee about the statusof meter data downloading through AMR. [Action :Railway]

8.3 AMR FACILITY FOR THE ABT METERS INSTALLED AT MPPGCL :- MPPGCL has provided AMR facility on 107 Nos ABT meters installed at the interface points and data is being downloaded through AMR system. However, every month data of around 35-40 Nos. meters do not received through AMR to SLDC. MPPGCL is requested to take up the matter with M/s Secure Meters Ltd. to resolve the problems related with non readability of meters integrated successfully and provide AMC of AMR facility installed at Power Houses to M/s Secure Meters Ltd. so that complete data of meters is received at SLDC. MPPGCL is requested to apprise the status of AMC.

SLDC has already requested in previous OCCMs to MPPGCL that 15 minutes blockwise data recorded in the meter no. XD435287 installed at GT of SSTPS PH-II unit-III do not match with midnight datai.e monthly injection data, SLDC vide letter No.07-05/SG-11/SEM/347dated 14.02.2019 has aleady requestedto take up the matter with M/s Secure Meters Ltd. for resolving the problem. The same problem is also observed in the meter no. XD435284 installed at GT of SSTPS PH-II unit-IV.MPPGCL is requesed to apprise the Committee about the mismatch in data. Futher, JMR data of meter no. XD435283 & XD435282 installed at 400KVSSTPS- Pithampur Ckt-3 &4 do not match with bloackwise data of meter. MPPGCL is requested to take up the matter with M/s Secure Meters Ltd. for resolving the problem. [Action : MPPGCL ]

Agenda of 71st OCCM of MP 15

8.4 TIME DRIFT IN ABT METER INSTALLED AT THE POOLING STATIONS OF WIND AND SOLAR GENERATING STATIONS AND SLIDING WINDOW PROBLEM:- The ABT meters installed at the following Pooling Stations of Solar Power Project has time drift and thus not recording the correct data. SLDC has requested to Generators with copy to concerned licensee vide letter no. 2353 dated 31/08/2019 for time synchronization of the ABT meters with GPS so that correct DSM account of these Wind and Solar Projects is issued by SLDC.

VOLTAGE Sr.No. FEEDER NAME LOCATION NAME Location Meter No LEVEL 1. 33 KV UJAS -2 ICHHAWAR 132KV S/S ICHHAWAR Grid S/s End 33 MPC59975 2. 33KV BHADRESH_SUSNER 132KV S/S SUSNER Grid S/s End 33 XB593639 3. UJAAS-1 AGAR 132KV S/S AGAR Grid S/s End 33 MPC59595 4. UJAAS-2 AGAR 132KV S/S AGAR Grid S/s End 33 MPC59596 5. 33 KV UJAAS 1 BERCHHA 132KV S/S BERCHHA Grid S/s End 33 XB571652 6. 33 KV UJAAS 1 SUSNER 132KV S/S SUSNER Grid S/s End 33 XB571653

The ABT meters installed at the following Wind and Solar Generating Stations are recording the 15 minutes block wise data on slinding window principal thus blockwise data do not match with midnight data. SLDC has requested to Generators with copy to concerned licensee vide letter no. 2353 dated31/08/2019 for immediate replacement of these ABT meters.

Sr.No Feeder Name Substation ABT Meter No. QCA NAME . 132 KV S/S XE479853 REConnect Energy Solution 1 33KV SUZLON-I SAILANA SAILANA Pvt Ltd

132 KV S/S 33KV SUZLON-II XE479854 REConnect Energy Solution 2 SAILANA SAILANA Pvt Ltd

132 KV S/S 33KV SUZLON-III XE479855 REConnect Energy Solution 3 SAILANA SAILANA Pvt Ltd

132KV S/S REConnect Energy Solution 4 33KV SUZLON-I RATLAM JAORA XE479856 Pvt Ltd

132KV S/S 33KV SUZLON- IV REConnect Energy Solution 5 JAORA XE479859 RATLAM Pvt Ltd

132KV S/S 33KV SUZLON- V REConnect Energy Solution 6 JAORA XE479860 RATLAM Pvt Ltd

132KV S/S REConnect Energy Solution 7 33KV SUZLON-IV AGAR AGAR XE479864 Pvt Ltd

132KV S/S 33KV SUZLON-V REConnect Energy Solution 8 SUSNER XE479867 (SUSNER-III) Pvt Ltd

132KV S/S 33KV SUZLON-III (AGAR- XE479863 REConnect Energy Solution 9 AGAR I), Pvt Ltd

220 KV S/s 33KV SUZLON BEHAPUR XE479862 REConnect Energy Solution 10 DALODA DALODA-I Pvt Ltd

Agenda of 71st OCCM of MP 16 220 KV S/s 33KV SUZLON BEHPUR XE479861 REConnect Energy Solution 11 DALODA DALODA-II Pvt Ltd

132KV S/S 33KV SUZLON I XE479866 REConnect Energy Solution 12 SUSNER (SUSNER-I), Pvt Ltd

132KV S/S 33KV SUZLON I XE479865 REConnect Energy Solution 13 SUSNER (SUSNER-II), Pvt Ltd

132KV S/S XD595991 33KV AVP POWER INFRA REConnect Energy Solution 14 SONKATCH XD595994 PVT LTD., Pvt Ltd

132KV S/S XD522128 33KV BADONI POWER REConnect Energy Solution 15 MAXI XD558031 PVT. LTD. Pvt Ltd

33 KV M P Wind Farm, 220 16 XE525393 Manikaran Analytics Ltd. Nagda Hill KVS/SDewas 33 KV Suzlon Gujrat Wind 220 KV S/S XD595984 17 Manikaran Analytics Ltd. Park , Barod Barod XD595980

DCC, Indore & Bhopal is requested to take-up the issue with concerned officials for time synchronization and replacement of ABT meters.

[Action : West & Central Discoms]

ITEM NO. 9: SCADA and E&T RELATED ISSUES: 9.1 ARRANGENEMENT OF TELEMETRY OF IMPORTANT 220KV SUB STATIONS & 132KV S/S HAVING INJECTION FROM RENEWABLES/CAPTIVE POWER PLANTS OR HAVING INTERDISCOM FEEDERS /TRACTION FEEDERS-

The telemetry of new 400KV S/s, 220KV S/s, important 132KV S/s having injection from renewable generating Stations, Captive Power Plant & Railway Traction feeders is to be provided before charging of the sub stations. However, telemetry of Four Sub Stations i.e. 132 KV Udaipura, 132 KV Nowgaon, 132 KV Khandwa & 132 KV VFJ is to be provided to SLDC.

Further 220KV Sheopurkalan S/s has been charged but telemetry of this sub stations is not yet provided. In last OCCM, SLDC requested MPPTCL to arrange for providing telemetry of this substation, however the telemetry is not yet provided. MPPTCL may please provide the plan for arranging telemetry of 220 KV Sheopurkalan S/s.

The telemetry of Birsingpur HPS and Zinna HPS is also not available and same needs to be provided by MPPGCL. In last OCCM, MPPGCL informed that order for RTU & cables has been placed & its delivery is expected in 150 days. MPPGCL is requested to provide the current progress in the matter.

The telemetry of these identified Sub Stations is urgently required for monitoring of grid. Hence the progress in the matter as well as further schedule of commissioning of telemetry may please be provided by MPPTCL & MPPGCL.

[Action: - CE (T&C)/CE (Procurement), MPPTCL, ED(O&M :Gen), MPPGCL]

9.2 TELEMETRY OF BUS VOLTAGE IN DFE RTUS :- In substations having DFE RTUs, the telemetry of Bus voltage is extended through MFM provided for transformer telemetry. This arrangement results in wrong Bus voltage at the time of outage of transformer & causes

Agenda of 71st OCCM of MP 17 inconvenience in grid monitoring & operation. In this reference, it is to mention that it is a standard practice to provide Bus voltage through separate MFM/transducer.

The matter has already been discussed in 69th & 70th OCC meeting in which T&C representatives agreed to arrange to provide separate telemetry of Bus voltage. The matter was also pursued by SLDC vide UO dtd.13.09.19 & 20.03.19. However no action in the matter has yet been initiated by MPPTCL. MPPTCL is requested to provide current progress in the matter. [Action: - MPPTCL]

9.3 PROVIDING TELEMETRY OF ISOLATORS OF 400 KV, 220 KV SUBSTATIONS & GENERATING STATIONS:-

The telemetry of isolators is required for real time grid monitoring as well as for better functioning of EMS system. NLDC & WRLDC are constantly requesting to provide the telemetry of isolators of 400 KV, 220 KV substations & Generating Stations; and reason for non-integration of telemetry of isolator status.

The matter was pursued with MPPTCL vide this office UO dtd. 11.09.19 & 20.03.19. CE(T&C) vide UO note dtd. 15.05.19 informed that suitable arrangements for integration of telemetry of isolators is being made & it shall be integrated to SCADA RTU through CMR. Further the matter was also discussed in 70th OCC meeting in which SLDC requested MPPTCL to initialize the process of telemetry integration of isolators of 400 KV S/s on highest priority & then move ahead for isolators of 220 KV S/s & MPPTCL agreed for the same. SLDC further requested MPPTCL to provide station wise schedule of isolator telemetry integration so that the same may be conveyed to NLDC & WRLDC. However no schedule has been provided by MPPTCL. MPPTCL is thus requested to arrange for providing telemetry of isolators of 400 KV & 220 KV substations in phased manner & also provide schedule of arranging telemetry of isolators.

The matter regarding providing telemetry of isolators of Generating Stations was pursued with MPPGCL vide this office UO dtd.12.09.19 & also discussed in 70th OCCM in which MPPGCL informed that telemetry of isolator status will be extended to SLDC SCADA system. Further the matter was also taken up by ED(O&M:Gen) with all the MPPGCL generating stations vide letter dtd.12.07.19. However no significant progress in the matter has been observed. MPPGCL is thus requested to kindly arrange for providing the telemetry of isolator to SLDC at the earliest.

In last OCCM, ISP informed that telemetry of isolators is available in their SCADA & the same will be extended to SLDC SCADA system. The matter was further pursued by SLDC vide this office letter dtd.12.09.19, however implementation of the same is still pending. ISP is thus requested to arrange for providing the telemetry of isolators & also provide schedule of arranging telemetry of isolators.

SLDC pursued the matter with JP Bina to provide the telemetry of isolators in which JP Bina informed that their SCADA upgradation is being carried out & the telemetry of isolators will be extended to SLDC after completion of upgradation of their SCADA. JP Bina is thus requested to provide the current status in the matter. [Action: - MPPTCL, MPPGCL, JP Bina, NHDC]

Agenda of 71st OCCM of MP 18 9.4 UPGRADATION OF EXISTING RTUS & DISCREPANCY IN TELEMETRERED VALUES RECEIVED FROM DIFFERENT EHV S/S & POWER STATIONS

The present status of telemetry discrepancy including upgradation requirement is enclosed herewith as Annexure-9.4. The list of major telemetry discrepancies is as given below :-

(a) MPPGCL Generating Substations :-

1. Satpura TPS :-

Sr.No. Description Unit Pending MPPGCL MPPGCL response in 70th OCC since response in meeting dtd.30.10.18 1 400 KV Satpura - MW 6 months - MPPGCL informed that shutdown will be Itarsi required for transducer replacement. 2 400 KV Satpura- MW 6 months - Shutdown approval was provided by SLDC Koradi & shutdown on 400 KV Satpura-Itarsi , 3 400 KV Satpura- MW 6 months - However the discrepancies still exists & Seoni status of transducer replacement is not provided by MPPGCL. 4. Gen-7 GT MVAR More than 1 - MPPGCL informed that the unit is to be year dismantled, so procurement of transducer is not possible. SLDC requested MPPGCL to utilize the spare transducers, if any, for replacement. SLDC informed that transducers may also be arranged from MPPTCL wherein some RTU having same transducres is replaced with Dongfeng RTUS. However no progress in the matter has been observed. 5. 400 KV Astha 1 & Line Commission MPPGCL informed MPPGCL informed that engineer of service 2 Reacto ing that signals of provider will visit the site & it will be r reactor are configured at the earliest. However despite configured in continuous pursuance, the telemetry is still database of not available to SLDC. Satpura SCADA system but values are not being conveyed to SLDC. NIT has been issued for configuration of point & it shall be completed within one month. 6. Gen-8,9 MW,M One week Generating VAR Transformer

2. SGTPS :-

Sr.No. Description Unit Pending MPPGCL response in meeting MPPGCL response in since dtd.30.10.18 70th OCC 1. STN TR 1 (220 CB More than MPPGCL informed that cabling work of MPPGCL informed that no KV) one year breaker upto RTU panel is required to work has been done.

Agenda of 71st OCCM of MP 19 be done & shall be done within one MPPGCL is requested to month. provide current progress in the matter. 2. 220/33 KV MW/MVA More than MPPGCL informed that it shall be MPPGCL informed that all Transformer R one year provided within one month. the discrepancies will be 3. 400 KV Bus 1 Freq More than MPPGCL informed that corrective rectified after procurement ten months action including testing of of transducers. MPPGCL transducer/arrangement of new is requested to provide the transducer shall be completed within a current progress in the month. matter. No response from 4. 220 KV Bus 2 Voltage More than MPPGCL informed that procurement of MPPGCL in the matter ten months transducer is under process & it shall from MPPGCL has been be commissioned by March-19. SLDC observed. informed that recently RTU of Rajghat & Devlond has been replaced, so transducers can be arranged from Rajghat & Devlond till procurement of new transducers. 3. Gandhi Sagar HPS :-

Sr.No. Description Unit Pending MPPGCL response in meeting MPPGCL response in since dtd.30.10.18 70th OCC 1. 33 KV MW/MVA Commission SLDC informed that the telemetry of MPPGCL informed that Rajasthan(KuakhR ing this feeder is of utmost importance as it these discrepancies shall eda) feeder is an inter-regional feeder. MPPGCL be rectified after informed that they will arrange for the upgradation of RTUs. telemetry of this feeder on priority. 2. 132 KV Bus 1 Voltage 2 months Wrong Values No response from MPPGCL 3. 132 KV Bus 2 Voltage 2 months Wrong Values No response from MPPGCL

4. Rajghat HPS :-

Sr.No. Description Unit Pending MPPGCL response in meeting MPPGCL response in 70th OCC since dtd.30.10.18 1. Gen-3 CB Commission MPPGCL informed that it shall ing of new be rectified at the earliest. RTU However the discrepancy still exists.

It is to mention that in order to sort out the above issues, in the last OCCM meeting; it was informed by MPPGCL representative that a separate meeting with MPPGCL power stations shall be arranged. However, no such meeting has been arranged since then.

(b) Transmission/ other Generating Substations :-

Sl Name of Substation Name of feeders/transformers No.

1.Telemetry of 125 MVAR Bus Reactor not available. 01 400 ISP 2.Telemetered values of 400 KV Nagda MW & MVAR is 10 times of actual value.

Agenda of 71st OCCM of MP 20

3. Telemetered values of 400 KV Indore-1 MW.

4. MVAR values of all generators

5. Non-current data of generators in OFF condition.

6. Digital telemetry including CB status, RGMO/FGMO & SOE is not available.

02 400 KV Bhopal 1. Wrong CB status 400 KV Damoh-1 Main CB 2. Wrong CB status of 400 KV Bina-1 Tie CB 3. Wrong CB status of 220 KV Bus Tie.

03 220 KV Rajgarh Biaora 220 KV TBC CB status

04 400 KV Chhegaon Wrong CB status of :- 1. 400 KV Transfer Bus Coupler 2. 160 MVA Xmer-3

05 400 KV Julwaniya This problem is persisting since last 8 months. No action in the matter has been taken.

1.All 132 KV CB status showing open. 1.CB of 220KV Sendhwa feeders is not available.

06 400 KV Katni Wrong CB status of 400 KV Damoh-1 & 125 MVAR Bus Reactor 07 220 KV Nimrani Telemetry of 33 KV Maral is to be provided

08 220 KV Indore East CB status of 220 KV Dewas

09 220 KV Sabalgarh Faulty CB status of 220 KV Bus Coupler

10 220 KV Kotar Faulty CB status of 220 KV Satna PG

11 220 KV Satna Faulty CB status of 132 KV Kymore

12 220 KV Panagar Faulty CB status of 220 KV Sukha

13 220 KV Ujjain Faulty CB status of 132 KV Bus Coupler

In last OCCM, ISP informed that all the telemetered values are available in their SCADA in response to which SLDC requested ISP to extend their SCADA values to SLDC SCADA system. ISP informed that same shall be completed by Sep-19; However its implementation is still pending. The present status may please be apprised by ISP.

[Action: - MPPTCL, MPPGCL,NHDC]

Agenda of 71st OCCM of MP 21 9.5 EXTENSION OF RGMO/FGMO SIGNAL TO SLDC/WRLDC :-The extension of RGMO/FGMO signal of following generating units is still pending:-

S.No. Name of Generating Unit.No. MPPGCL response in last OCC Station 1 SGTPS 1,2,3,4,5 MPPGCL informed in last three OCC meetings that it is under tendering process & telemetry integration of RGMO/FGMO signal shall be completed within 3-4 months. However no progress in the matter has been observed even after lapse of 8 month period.

2 BARGI HPS 1,2 MPPGCL informed in last three OCC meetings that integration of RGMO/FGMO signal shall be done during AOH of units in 2019. However the AOH of Bargi HPS units has been done but the integration of RGMO/FGMO signal is still pending.

Wrong RGMO/FGMO signal status :-

S.No. Name of Generating Unit.No. Remarks Station 1 TONS 1,2,3 Incorrect RGMO/FGMO status of Tons HPS units is being frequently observed. The matter was discussed in OCC in which MPPGCL informed that problem is due to requirement of manual intervention for ON operation status of RGMO/FGMO. SLDC requested MPPGCL to arrange for automatic operation of RGMO/FGMO signal status through its OEM, however no response from MPPGCL in the matter has been observed.

2 ISP All units RGMO/FGMO signal is not available. The matter has been pursued by SLDC, however the RGMO/FGMO signal is still not available.

MPPGCL is thus requested to kindly arrange for integration/restoration of telemetry of RGMO/FGMO in RTU installed at power stations on topmost priority.

9.5(A) NON AVAILABILITY/ UNRELIABLE TELEMETRY OF HYDEL POWER STATIONS :-

The telemetry of Hydel Power Stations is very unreliable & frequent long outage with abnormal delay in restoration of same is observed. The RTU availability of MPPGCL HPS is as detailed here under :-

RTU AVAILABILITY JULY AVAILABILITY AUGUST RAJGHAT HPS 90 81 BARGI HPS 86 85 MADIKHEDA HPS 84 80

Agenda of 71st OCCM of MP 22 GANDHI SAGAR HPS 87 99 PENC HPS 98 99 DEOLOND HPS 84 79 TONS HPS 82 80

Regarding procedure for RTU availability, as requested by CE(O&M:Hydel) vide letter dated 08- 07-2019, it is to mention that the same is workout on the basis of availability of data in SLDC SCADA system. Further, regarding availability of telemetry /effect of STU sub stations on availability, it is to clarify that as per grid code, providing reliable telemetry upto the SLDC is the responsibility of concern user and any coordination with intermediate Sub Station is required to be arranged by MPPGCL.

It is to mention that as per CERC communication regulation 2017, availability of telemetry is required to be ensured more than 99.9% but as indicated above the telemetry availability of Hydel Power Stations is very low.

SLDC has constantly pursued the matter in last various OCC meetings regarding arrangement of RTU/PLCC spares, measuring instruments & adequate trained manpower at MPPGCL stations. However MPPGCL has not taken any actions regarding this matter.

MPPGCL is thus again requested to take following measures to ensure round the clock availability of real time data to SLDC:-

1. Arrangement of essential spares at power stations and one set of all spares at centralized location with intimation to all power stations 2. Arrangement of training to persons looking after telemetry work. 3. Arrangement of measuring instruments like level meters wherever not available. 4. Ensuring availability of RTU configuration at all power stations. [ Action :- ED(O&M:Gen),MPPGCL]

9.5 (B) NON AVAILABILITY/ UNRELIABLE VOICE COMMUNICATION BETWEEN SLDC TO THERMAL/ HYDEL POWER STATIONS :-It is to inform that as per CERC communication regulation 2017, availability of communication channel is required to be ensured more than 99.9%. However, despite constant pursuance, presently most of the PLCC voice communication of various power stations to SLDC is out since long time and detailed of non-availability as here under:-

Sr.No Name of 2 wire PLCC MPPGCL response in meeting Remark HPS/TPS channel dtd.30.10.18

PLCC voice Mr.Vinay, AE, Tons HPS informed Restoration of PLCC 1. Bansagar- IV communication is not that he will visit Bansagar-IV for channel is still established restoration of voice communication of pending.NO action in Bansagar-IV at the earliest. the matter is initiated by MPPGCL.

2. Madikheda PLCC voice channel Restoration of PLCC is not working since channel is still pending. last two and half In last two OCCM, years. MPPTCL was requested to arrange for extension of voice channel utilizing Mahalgaon wideband node in coordination

Agenda of 71st OCCM of MP 23 with Madikheda HPS.

PLCC voice channel AE Birsinghpur informed that Restoration of voice 3 Birsinghpur HPS is not working since presently voice communication channel is still pending. /TPS long time due to faulty between SLDC to thermal power PLCC exchange at house is proper & the commissioning Birsinghpur. of EPAX at site is under progress. AE Birsinghpur assured that the voice channel of Birsinghpur HPS shall be restored within one month. PLCC voice channel AE Satpura informed that faulty card Repair/replacement of is not working since shall be repaired at the earliest. Exchange & Card of last one and half PLCC equipment at 4. Satpura TPS years. Satpura TPS side is still pending.

The matter regarding Non Availability/ Unreliable voice communication Between SLDC to Thermal/ Hydel Power Stations was discussed in various OCC meeting & special meeting on 30.10.18, however 2 wire voice facility extension of Singhaji 1 & 2 TPS, Madikheda HPS, is still pending.

[ Action :- ED(O&M:Gen),MPPGCL Action :- GM, NHDC] 9.5 (C) REPLACEMENT OF RTUS IN THERMAL POWER STATIONS:-

Large no. of discrepancies pertaining to MPPGCL Thermal Power Station are pending since long time. The various discrepancies are due to non-availability of desired spares, non renewal of AMC contract of RTUs, Modems, PLCC equipments. The replacement of RTUS in thermal power stations is required to be arranged to ensure round the clock availability of telemetry. SLDC has requested earlier to arrange the replacement of RTUs. However, no feedback in the matter is provided to SLDC. SLDC has also pursued the matter vide UO dtd.12.09.19. MPPGCL is thus requested to arrange for replacement of RTUs in Thermal Power Stations.

9.6 DUAL DATA CHANNEL CONNECTIVITY FOR POWER STATIONS:

Presently of most of the MPPGCL power stations to SLDC/Backup SLDC is functioning through single channel. In view of the poor availability of telemetry, importance of telemetry of power stations and recently implemented CERC new DSM regulation w.e.f. 1st January, 2019 it is required that each Power Station shall have dual data channel to avoid any outage/discrepancy in real time data of Generation Station. Therefore to reduce outage due to single data channel failure, MPPGCL & IPPS are being continuously requested to arrange / ensure dual data channel from each Power Stations so that continuity of real time data to SLDC/Backup SLDC SCADA all the time may be achieved. In last OCCM, MPPGCL informed that the matter shall be discussed in a separate meeting with MPPGCL field offices. However no such meeting has been arranged. SLDC further pursued the matter vide UO dtd. 12.09.19 but no response in the matter has been received from MPPGCL. MPPGCL is thus requested to provide the current status in the matter. [Action: - MPPGCL]

9.7 NON AVAILABLITY & WRONG TIME STAMPING OF SOE AT SLDC SCADA

The proper receipt of Sequence of events (SOE) in SLDC SCADA system from field RTUs is an important feature required for analysis of grid incidents. However, on some instances, it has been observed that the SOE was not received in SCADA system and accordingly, the matter was taken up with field for verification for proper configuration /connections of SOE data in RTUs.

Agenda of 71st OCCM of MP 24

After long pursuance, the matter was investigated and it was found that the settings “inf code 2” & “inf code 4” were not correct in Dongfeng make RTUs. These settings have now verified and changed in some of the RTUs and SOE with correct time stamping from RTUS where settings were modified is now receipt in SLDC SCADA/EMS system. However, the verification of the same in most of the RTUs is still pending. The matter regarding verification of SOE in all Dongfeng make RTUS was also discussed in last three OCCM meetings and it was confirmed to arrange the same by end of August 2018. However no significant progress in the matter has been observed.

Out of 175 RTUs, SOE verification of 165 RTUs has been completed & the list of RTUs where SOE verification is pending is enclosed herewith as Annexure-9.7. MPPTCL is requested to provide schedule of SOE verification and arrange SOE verification of balance RTUs on top most priority. [Action: - MPPTCL, MPPGCL,NHDC]

9.8 UTILIZATION OF W.B NODE AT BIRSINGHPUR TPS

In last various OCC, SLDC informed that the W.B node at Birsinghpur TPS has already been commissioned in 2016. However, despite constant pursuance utilization of node is still pending since last two years due to pending work of laying of cable form W.B node location to PLCC room, Exchange room and RTU. It was informed by SLDC that complete scheme to extend wideband facility upto RTU was prepared by SLDC and forwarded to SGTPS around two years back. The matter is pursued by SLDC constantly. However, required converter and laying of fiber optic cable is still pending. In last OCCM, MPPGCL informed that the procurement of optical cable & modem is under tendering process & it will be completed by end of July-19. However no progress in the matter has been observed since then.

MPPGCL is requested to provide current progress in the matter.

9.9 MAINTENANCE OF OPGW NETWORK :-

Under the project MP portion of Master Telecom project executed by PGCIL,36 No. of wideband nodes has commissioned. As per agreement between MPPTCL and PGCIL, the subsequent maintenance of these links is to be looked after by MPPTCL. While execution of the project, it was informed by PGCIL that the AMC of the terminal equipments is covered under the equipments contract. However, modalities for AMC payment is to be finalised by MPPTCL with PGCIL. The draft agreement for maintenace of equipments has already been forwarded by PGCIL. Further, separate arrangement towards maintenance of OPGW cable (upto FODP) involving OPGW restoration, OPGW LILO work, OTDR testing, OPGW shifting during line diversion etc is to be made by MPPTCL.

Further, it is also to mention that some of the nodes installed under agreement between MPPTCL and PGCIL is not utilized properly. The telemetry of 132KV Pichore is shifted to PLCC in place of restoration of problem in wideband node. Similarly, as per the permission provided by MPPTCL for Chindwara repeater station, PGCIL to arrange shifting of equipments from Chindwara to Daloda. However, the same is not done by PGCIL. In last OCCM, MPPTCL (T&C) informed that the matter shall be taken in a separate meeting with all the other departments of MPPTCL. MPPTCL is thus requested to provide the current status in the matter. [Action: - MPPTCL]

9.10 LONG OUTAGE OF RTUS, PROBLEM IN DATA AND VOICE CHANNELS & INTERMITTENT TELEMETRY DUE TO NOISE IN COMMUNICATION CHANNEL :-

The long outage of telemetry & substations having intermittent telemetry due to heavy noise in communication channel is discussed in detail:- Sl No. Name of Sub Station Out from /Remark

Agenda of 71st OCCM of MP 25 01 220 KV Narsinghpur

02 220 KV Chichli

Out since last 3 months due to outage in 03 132 KV Gadarwara 220 KV Jabalpur-Narsinghpur Ckt 1 & 2

04 132 KV Pondar

05 BLA TPS

06 220 KV Chhatarpur Out since 1 month

08 220KV Very intermittent

09 220 KV Very intermittent

10 220KV Very intermittent

11 132 KV Waidhan S/s Very intermittent

MPERC vide Letter dated 09-08-2017 has directed to submit reason for long outage for RTU & also directed to ensure proper functioning of RTUs.

MPPTCL, MPPGCL are requested to sort out rectification of above RTU/data channel on top most priority & arrange for alignment of PLCC Channel & identify/replace the outdoor equipments which injects the noise in the channel/system. [Action :- MPPGCL, MPPTCL]

9.11 TELEMETRY OF RAILWAY TSS SUB STATIONS:-

The telemetry of existing 38 Nos railway Traction Sub Stations & upcoming 25 new railway TSS is required to be provided by railway for monitoring of drawl by each TSS and also monitoring of demand of railway in MP.

In last OCCM, SLDC informed that testing of telemetry for 1 Railway TSS has been done in SLDC SCADA, however it is currently offline since testing. Railways informed that telemetry integration of 24 Railway TSS shall be done within 2 months. However no progress in the matter has been observed. Railways is requested to expedite the matter on priority & also inform the current progress in the matter.

9.12 ENSURING AVAILABILITY OF AIR CONDITIONER AT WIDE BAND NODES:-

The availability of air conditioner is essentially required in wide band communication rooms. Accordingly, SLDC is taking up the matter continuously for ensuring proper functioning of air conditioners in wideband communication rooms. In last two OCCM, it was also informed regarding non-availability of air conditioner at 220 KV Betul. MPPTCL informed that civil work in 220 KV S/s Betul is under progress and the installation of air conditioner shall be done shortly. However no progress in the matter has been observed.

Agenda of 71st OCCM of MP 26 MPPTCL & MPPGCL are thus again requested to ensure availability & running condition of Air Conditioner at following wide band nodes already commissioned :-

MPPTCL Substations MPPGCL Substations 220 KV S/s Satna Birsinghpur TPH 220 KV S/s Katni Gandhi Sagar HPS 400 KV S/s Bhopal Pench HPS 400 KV S/s Bina 220 KV S/s Jabalpur 220 KV S/s Itarsi 400 KV S/s Indore 220 KV Chhindwara 220 KV Ratlam 220 KV Shivpuri 220 KV Indore (SZ) 220 KV Shujalpur 220 KV Neemuch 220 KV Gwalior 220 KV Bina 400 KV Pithampur 220 KV Barwaha 0 KV Seoni 220 KV Damoh 400 KV Nagda 400 KV Chhegaon 220 KV Bhopal 220 KV Rajgarh 220 KV Malanpur 220 KV Pithampur Indore chambal Indore SubLDC 132 KV Pichhore 220 KV Betul

[Action :- MPPTCL, MPPGCL]

ITEM NO 10 : DATE AND VENUE OF NEXT OCC MEETING : As discussed in 66th OCCM & confirmed by entities the schedule & host of upcoming Operation and Coordination Committee meeting of MP is detailed as below:- OCC MEETING TENTATIVE S.NO. HOSTING ENTITY OF MP DATE 1. 72nd MP-OCCM DISCOM(EZ) 20.12.2019 2. 73rd MP-OCCM MPPGCL 22.04.2020 In view of the above hosting entity of 72nd OCCM may confirm the same in the meeting. The venue of the 72nd OCC meeting will be intimated later. [Action :- All the concerned entities]

***********

Agenda of 71st OCCM of MP 27 Annexure-2.1

FREQUENCY PARTICULARS

S. No. Particulars Jun-18 Jul-19

1 INTEGRATED OVER AN-HOUR

Between 09.00 Between 13.00 hrs 1.1 Maximum Frequency 50.23 Hz hrs & 10.00 Hrs 50.16 Hz & 14.00 Hrs on on 16.06.19 07.07.19

Between 22.00 Between 00.00 hrs 1.2 Minimum Frequency 49.8 Hz hrs & 23.00 Hrs 49.83 Hz & 01.00 Hrs on on 10.06.19 04.07.19

1.3 Average Frequency 50 Hz 50.01 Hz

2 INSTANTANEOUS FREQUENCY AT 09.49.20 AT 15.50:50 HRS 2.1 Maximum Frequency 50.31 Hz HRS ON 50.32 Hz ON 15.07.19 16.06.19 AT 22.10:50 AT 00.06:50. HRS 2.2 Minimum Frequency 49.63 Hz HRS ON 49.64 Hz ON 04.07.19 11.06.19 3 Percentage of time when frequency was :-

%age of time when frequency was Jun-18 Jul-19

3.1 Below 48.5 Hz 0.00 0

3.2 Between 48.50 Hz and 48.8 Hz 0.00 0

3.3 Between 48.80 Hz and 49.2 Hz 0.00 0

3.4 Between 49.20 Hz and 49.5 Hz 0.00 0

3.5 Between 49.50 Hz and 49.7 Hz 0.00 0

3.6 Between 49.70 Hz and 49.9 Hz 9.87 7.09

3.7 Between 49.9 Hz and 50.05 Hz 70.34 68.27

3.8 Between 50.05 Hz AND 51.5 Hz 19.79 24.64

3.9 Above 51.5 Hz 0.00 0.00

4 No. of times frquency touched 48.80 Hz 0 0

4.1 No. of times frquency touched 48.60 Hz 0 0

4.2 No. of times frquency touched 51.0 Hz 0 0

Agenda of 71st OCCM of MP 28 ANNEXURE - 2.2.5.i M.P POWER TRANSMISSION COMPANY LIMITED TRANSMISSION WORKS COMPLETED DURING 2019-20 (UP TO 31.08.2019) I EHV TRANSMISSION LINES S. TYPE OF ROUTE CIRCUIT MONTH OF DATE OF No. NAME OF THE TRANSMISSION LINE / CIRCUITS LENGTH KMS. COMPLETI COMMI- (FINANCED BY) ON SSIONING

1 2 3 4 5 6 7 A. 400 KV TRANSMISSION LINES 1 Nill B. 220 KV TRANSMISSION LINES Test charged 220kV DCDS line from Betul 220kV S/s - Gudgaon 1 DCDS 46.77 93.542 June'2019 on 220kV S/s (2x46.771) (GEC) 12.06.2019 2nd Ckt of 220kv Satna - Chhatarpur line (152) charged on 2 2nd ckt 160.00 160 Aug'2019 (JICA-I) 29.08.2019 C. 132 KV TRANSMISSION LINES 132 KV 2 phase 2 wire DCSS line for PS to 132/25 charged on 1 KV 5 MVA RTS at Sausar from 132 KV S/s DCSS 17.413 17.413 May'2019 25.05.2019 Boregaon (RTS) 132 KV Shyampur - Pilukhedi DCSS line charged on 2 DCSS 22.83 22.834 June'2019 (1x22.834) (UBI) 28.06.2019

2nd ckt of 132 KV Sheopur- Baroda line & LILO of 5.131 cktkm its both ckt at 220 KV S/s Sheopur for 132 KV 3 DCDS 5.13 5.131 June'2019 charged on interconnection of 132 KV S/s Sheopur & 220 KV 29.06.2019 S/s Sheopur. (2nd ckt- 34 cktkm+2x1+4x5) (UBI)

132 kv DCSS Karakbel - Belkheda (1x24.93) (ADB- charged on 4 DCSS 24.93 24.93 June'2019 III) 30.06.2019 LILO of 2ND CIRCUIT OF 132KV Gwalior- Pichhore at 132Kv S/s Dabra (2X0.108) (ADB-III) comm on 5 DCDS 0.11 0.216 June'2019 (balance work) (Note: LILO at Chinour 27.364 03.06.2019 cktkm charged on 04.08.2017)(ADB-III) 132 KV line 2 phase 2 wire Nainpur - RTS Nainpur 6 DCSS 4.176 4.176 June'2019 12.06.2019 line (4.176) (CCW) LILO of 132kV Betul - Gudgaon at 220kV S/s Gudgaon (2x9.825)(132kV interconnector 2nd ckt 7 between Gudgaon 220 kV S/s & Gudgaon 132kV DCDS 4.73 9.466 June'2019 charged on S/s (Note:LILO 1st ckt(2x5.092) charged on 20.06.2019 24.01.2019)(2nd ckt 2x4.733) (GEC)

LILO of Satna 220kV-Kymore 132kV DCSS line comm on 8 DCDS 1.8 3.60 July'2019 for Uchehara (2x1.8) (JICA-II) 18.07.2019 132Kv DCSS line from GWSTPP to upcoming comm on 9 Make up Water Pump House river Narmada (Line- DCSS 24.52 24.515 July'2019 11.07.2019 II)(1x24.515) (CCW) LILO of Both circuit of 132 kv DCDS Gwalior(Mahalgaon) - Dabra/Karera line at 220 charged on 10 DCDS 7.26 26.472 Aug'2019 KV S/s Gwalior II) (2x2x5.95+2x1.278) 29.08.2019 (Transco/UBI)

2nd ckt of 132 KV Sheopur- Baroda line & LILO of its both ckt at 220 KV S/s Sheopur for 132 KV interconnection of 132 KV S/s Sheopur & 220 KV 2nd charged on 11 38.54 45.011 Aug'2019 S/s Sheopur. (2nd ckt- 33.410 cktkm +1x1.896 ckt+DCDS 24.08.2019 +3x3.235) (Note- 5.131 cktkm charged on 29.06.2019) (UBI)

132Kv DCSS 2 phase 2wire line from 132Kv s/s charged on 12 Prithvipur to RTS Niwadi for p/s to RTS Niwadi DCSS 22.71 22.712 Aug'2019 09.08.2019 (1x22.712) (RTS)

Agenda of 71st OCCM of MP 29 1 2 3 4 5 6 7 II. EHV SUB - STATIONS No.OF VOLTAGE EFFECTIVE MONTH OF DATE OF S. NAME OF SUBSTATION / (DISTRICT) / X-mer & RATIO CAPACITY COMPL- COMMI- No. (FINANCED BY) Cap. (KV) MVA ETION SSIONING (MVA) A. 400 KV SUBSTATIONS 1 Nill B. 220 KV SUBSTATIONS a. 220 KV NEW SUBSTATIONS 1 Nill C. 132 KV SUBSTATIONS a. 132KV NEW SUBSTATIONS charged on 1 Bada malehra 132kv s/s 1x40MVA (ADB-III) 132/33 kV 1x40 40 May'2019 30.05.2019 charged on 2 Pilukhedi 132kV S/s with 1x50 MVA (UBI) 132/33 kV 1x50 50 June'2019 28.06.2019 Karakbel 132kv s/s1x40 MVA (Dist. comm on 3 132/33 kV 1x40 40 July'2019 Narsinghpur) (ADB-III) 25.07.2019 Belkheda 132kv s/s 1x40 MVA (Dist- comm on 4 132/33 kV 1x40 40 July'2019 Jabalpur)(ADB-III) 04.07.2019

Agenda of 71st OCCM of MP 30 Annexure-2.2.5.ii

EHV TRANSMISSION WORKS UNDER PROGRESS AS ON 31.08.2019 CKT. PROGRESS IN % S. No. NAME OF THE TRANSMISSION LINE KMS. (Aug'2019) A. 400 KV TRANSMISSION LINES 1 400 kV DCDS line from Nagda 400 kV S/s to Mandsaur 400 kV S/s 137.32 58 400 kV DCDS line for LILO of one ckt of Satna(PGCIL) - Bina(PGCIL) 400 kV at 2 56 85 Sagar 400 kV S/s 3 400 kV DCDS line from Ashta 400 kV S/s to Ujjain 400 kV S/s 179.474 42 4 400 kV DCDS line from Indore (PGCIL) 765 kV S/s to Ujjain 400 kV S/s 84.528 85 5 400 kV DCDS line from Nagda 400 kV S/s to Ujjain 400 kV S/s 53.2 56 6 LILO of one ckt of 400 KV Khandwa - Rajgarh PGCIL line at Chhegaon 400 kV S/s 3.78 8 B. 220 KV TRANSMISSION LINES LILO of one Ckt of 220kv DCDS Ashta - Dewas line at 220kv S/S Chapda (DCDS) 1 66 51 (2x32.782) 2 220Kv DCDS line from Pithampur-Depalpur line (2X31) 62 71 220Kv FCFS line for LILO of both Ckt. Of Badnagar -Ratlam D/C line at 400Kv S/s 3 27.55 95 Badnawar (2x1.453+4x6.161) 4 220Kv DCDS Julwaniya- Kukshi (2X58) 116 21 5 220Kv DCSS Shujalpur- Narsinghgarh line (1X43.6) 44 42 6 LILO of one circuit of Bhopal-Hoshangabad DC line at 220kV S/s Adampur 5.84 28 Part (b).LILO of 220kV Sarni - Pandhurna at 220kV S/s Betul (2x38.864) (Note: 7 77.728 60 Betul220 & Betul400 I/C line 3.76 cktkm. charged on 21.07.2017) 8 220kV DCDS line from Kanwan 220kV S/s - Dhar 220kV S/s 62.78 90 LILO of both ckt Nagda - Neemuch 220kV line at 400Kv S/s Mandsore(Sitamau) 9 101.136 53 (2x22.787+4x2.229+2x23.323) 220kV DCDS line from Mandsaure(Sitamau) 400kV S/s - Maruti Shakti Pool 220kV 10 92.294 51 S/s 11 220kV DCDS line from Neemuch 220kV S/s to Ratangarh 400kV S/s 85.016 76 12 2nd circuiting of Ratlam switching - Daloda 220kV DCSS line 72 84 13 LILO of Ratlam - Daloda 220kV line at 220Kv S/s Jaora (2x3.51) 7.02 69

14 LILO of both ckt of Ujjain - Badod 220 kV line at Ujjain 400 Kv S/s (2x6.4+2x5.691) 24.182 57

15 LILO of both ckt of Ujjain - Nagda 220 kV line at Ujjain 400 Kv S/s (2x2x11.766) 47.064 56 16 220kV DCDS line from Ujjain 400kV S/s to Susner (Nalkheda) 220kV S/s 156.00 7 17 220kV DCDS line from Badod 220kV S/s to Susner (Nalkheda) 220kV S/s 104.55 18 18 220kV DCDS line from Rajgarh(B) 220kV S/s to Susner (Nalkheda) 220kV S/s 124.00 7 19 220 kV Sabalgarh - Sheopur line (2x110) 220 61 20 220kV Chhatarpur-Tikamgarh DCSS line 110 8 21 Rewa RUMS-Rewa 53.416 0 22 Rewa Rums-Sidhi 114.998 6 220Kv DCDS line from 220kV Pooling S/s RUMS at Goojarkhedi, Suwasara (For 86.852 23 interconnection of Solar PV Plant of RUMS) (2X43.426) b) Tap point to 400 kV S/s Sitamau (2x34.613) 69.226 93 100% 220kV DCDS Badwar (220kV Pooling S/s) - 400kV Grid S/s PGCIL line) (2X1.134) 24 2.268 2nd ckt comm on (ckt-I charged on 28.03.2019) 04.07.2019 132 KV TRANSMISSION LINES 1 132kv DCSS Gautampur -Depalpur line (1x19) 19 98 2 132kv Nagda(220kv)- Kachrod-Jaora DCSS line (1x64) 64 56

3 132 kv DCSS line between 132Kv S/s Nasrullaganj & 220KV Itarsi s/s (1x53.209) 53.209 82

4 LILO of S/C ckt of 132 KV Seoni-Lakhnadon line at 220kv S/S Seoni (2x20) 40 88 5 132 kv DCSS Guna-Eshagarh line (1x72) 72 41 LILO of one circuit of 132 kv Neemuch220 - Ratangarh DCDS line at 132 KV S/s 6 2 52 Morwan (2x1) 7 132 kv Sirmour - Katra DCDS line (2x37.67) 75.34 76 8 LILO of 132 kv Jaora - Khachrod line at Bhesola 132 KV S/s (2x0.729) 1.458 100

Agenda of 71st OCCM of MP 31 9 132 kV DCSS line from 132kV Mandla - Bichhiya (1x43.54) 43.54 3 10 132 kV DCSS line from 132kV Dindori - Gorakhpur 132kv S/s (1x49.4) 49.4 7

Agenda of 71st OCCM of MP 32 11 132 KV Gourjhamar - Deori DCSS line (1x27.493) 27.493 66 132kV DCDS line from 400 kV Ujjain to 132KV Vikram Udyogpuri (Narwar) 12 42.86 95 (2x21.43) 13 133 KV Datiya- Bhitarwar DCSS line (1x35.296) 35.296 84 14 132 kv DCSS Khurai- Khimlasa line (1x20.937) 20.937 99 15 132 kv DCSS Panagar - Patan line (1x22.749) 22.749 32 132 kv DCSS Badnagar - Chhayan Line (1x28.26) ADB-III 16 28.26 95 (Part line 20.969 ckt charged on 05.11.2018 by tapping arrangement) 17 132 kv DCSS Dhar - Teesgaon line (1x15.35) 15.35 95 18 LILO of 132 kv Ratlam - Meghnagar line at 132Kv S/s Petlawad (2x7.4) 14.8 77 19 132 kv DCSS Narsinghpur - Devnagar (1x23) 23 94 20 132 kv DCDS Narsinghpur - Karakbel line (2x23) 46 89 21 LILO of 132 kv Bhikangaon Khargone line at Biston 132 KV S/s (2x18.997) 38 96 132kV DCSS line Chichli - Palohabada (1x25.606) (Note:charged Part line 10.776 22 25.606 97 on 28.03.2019) LILO of 132 kv Satna- line at Satna-II S/s (2x11.047)(ADB-III Saving) (Part 23 22.094 29 line 0.50 CktKm charged on 05.12.2018) 24 132kv DCDS line Guna-Bhonra (2x21.394) 21 84 25 132kV DCDS line from Sendhwa 220 kV S/s - Pansemal 132kV line 95.69 70 26 2nd ckt of 132kV Rajgarh(Dhar)220 kV S/s - Jhabua 132kV line 68.8 86 LILO of both ckt of 132kV Neemuch - Mandsore at Mandsore(Sitamau) 400 kV S/s 27 142.928 49 (2x71.464) 2nd Circuiting of Sidhi 220 132 kV DCSS line (new line 6 km 28 52 33 involved)(2x8.285+ 35.922 ckm 2nd ckt) (Note:35.922 charged on 27.03.2019) LILO of both ckt. of 132kV Neemuch - Ratangarh DCDS line at 220kV S/s 29 Ratangarh (2x3.094)(132kV interconnector between Ratangarh 400 kV S/s & 6.188 11 Ratangarh 132kV S/s 30 2nd circuiting of Sabalgarh - Vijaypur 132KV DCSS line (31.39) 31.39 79 31 2nd circuiting of Ashta - Ichhawar 132KV DCSS line (34.64) 34.64 27 32 2nd circuiting of Nalkheda - Moman Badodiya 132KV DCSS line (28.34) 28.34 78 33 LILO of both ckt of Ujjain - Tarana 132KV line at Ujjain 400 KV S/s (4x0.198) 0.792 39 34 LILO of Susner - Jeerapur 132kV line at Susner (Nalkheda) 34.922 12 35 2nd Circuiting of Susner - Jeerapur 132 kV DCSS line (30.256) 30.256 35 LILO of both ckt of Ujjain 220 KV - Agar 132kV line at Makdon 132KV S/s 36 120.208 23 (2x2x30.052) 37 2nd circuiting of Agar-Susner 132kV DCSS line 31.603 60 38 2nd circuiting of Tarana-Makdon 132kV DCSS line 23.05 69 39 132kV DCDS Alot-Zarda line 49.92 44 LILO of one circuit of Susner 132 KV - Agar 132KV line at Susner (Nalkheda) 220kV 40 34 6 (2x18) 41 2nd ckt of 132 KV shahdol 220 - Dindori132 line (2nd ckt-61.71) 61.71 35 42 2nd ckt of 132 KV Gorabazar 220 - Maneri 132 line (2nd ckt-21.175) 21.75 70 132kV Julwaniya400 - Shahpura DCSS line (2nd ckt-28 + 1x47.008) 43 74.866 99 (Note:1x47.008 charged on 29.03.2019) 2nd ckt of 220 KV Mandideep to 132 KV Mandideep line & LILO for HEG (2nd ckt- 11.5 50 44 6.5 + 2x2.5) 45 2nd ckt of 132 KV Birsingpur - Umariya line (2nd ckt-35.50) 35.5 78 46 Julwania 400kV-Pati(Silawad) 132kV DCSS line 40.69 7 47 Panagar 220kV-Dheemarkheda 132kV DCSS line 62.50 31 48 132kV Prithvipur-Orchha DCSS line 33.50 25 49 132kV Udaipura-Tendukheda DCSS line 36.78 56 50 132 kV Gohad - Gormi DCSS line (1x21.187) 21.187 3 51 132kV Narsinghgarh-Suthaliya DCSSline 29.05 31 52 Mugaliyachhap 220 kV - Mahawadia 132KV DCDS line(2x7.661) 15.32 1 53 132kV Sirmour-Atraila DCDSline 70.50 5 54 132kV Sidhi-Sinhawal DCSS line 58.47 7 55 132kV Manera-Mandla DCSS line 77.59 3

Agenda of 71st OCCM of MP 33 132Kv DCSS 2 phase 2wire line from 220Kv s/s KOtar for PS to RTS 56 26.938 63 kaima1x26.938) 57 132kV DCSS Sirmore - RTS Dabhaura line (1x56.1) 56.1 93 132Kv DCSS 2 phase 2wire line from 132Kv s/s for PS to RTS Beohari 58 20.278 97 (1x20.278) 132Kv DCSS 2 phase 2wire line from 220Kv s/s Sidhi for PS to RTS 59 51.341 78 Marwasgram(1x51.341) 132Kv DCSS 2 phase 2wire line from 132Kv s/s Dongrital for PS to RTS Gajra 60 17.435 25 Bahara (1x17.435) 132kV 2Phase 2Wire Lalbarra-Samnapur RTS line. (Earlier 132kV 2 Phase 2 wire 61 Kirnapur-RTS Hatta Road line ) 18.643 31

132Kv DCSS 2 phase 2wire line from 132 Kv s/s Nowgaon for PS to RTS Harpalpur 62 49.851 84 (1x49.851) 63 132 KV line from Seoni 220 KV S/s - Nainpur 132 KV S/s 82.659 97 64 132Kv DCSS 2 phase 2wire line NainpurRTs - Ghansor line (1x34.413) 34.413 19 65 132Kv 2ph 2 wire DCSS Neemuch - RTS Neemuch line 12.188 59 132 KV 2 phase 2wire DCSS line from 132 KV S/s Malhargarh to RTS Sindpan 66 14.86 55 (earliar 132 KV 2 phase 2wire DCSS Mandsore - RTS Mandsore (Sindpan) line) 67 132Kv 2ph 2 wire line from 220KV S/s - Mandla - RTS Mandla Fort 8.102 39 EFFECTIVE S. NAME OF THE SUBSTATION CAPACITY No. MVA A. 400 KV SUBSTATIONS

Badnawar 400 KV sub-station with 2x315MVA 400/220 KV X-mer (1x315MVA 1 630 85 charged on 07.03.2019 & 1x125MVAR Bus reactor charged on 11.03.2019)

2 Mandsore 400 KV sub-station with 2x315MVA 400/220 KV X-mer + 2x160 MVA 630 24

78% 2nd unit 315 MVA 3 Sagar 400 KV sub-station with 2x315MVA 400/220 KV X-mer 630 charged on 25.08.2019 from 220 kv side

4 Ujjain 400 KV sub-station with 2x315MVA 400/220 KV X-mer+ 2x160 630 49 B. a 220 KV SUBSTATIONS 1 Gorabazar 220/132kv with 1x160MVA + 40MVA 160 10 2 Chapda 220 Kv S/s (Upgradation) with 1x160MVA 160 40 3 Upgradation of Depalpur 132Kv S/s to 220kv with 1x160MVA 160 60 4 Adampur 220/33kv S/s 2x50MVA 100 54 5 Kukshi 220 Kv S/s Upgradation)with 1x160MVA 160 45 Sailana 220/132kV S/s (2x160MVA + 1x63) (Note:63 MVA charged on 6 320 65 12.03.2019) 79% 1st 160 MVA Jaora 220/132kV S/s (Upgradation) (2x160MVA + 1x40) (Note:40 MVA X-mer 7 320 charged on charged on 17.02.2019) 14.08.2019 from 132 KV side Gudgaon 220/132kV S/s (1x160MVA + 1x63) (Note:63 MVA charged on 8 160 70 24.01.2019) 9 Ratangarh 220/132kV S/s (2x160MVA + 1x63) 320 46 10 Nalkheda 220/132kV S/s (2x160MVA + 1x63) 320 4 11 North Zone Substation at Indore to 220kV (Upgradation ) 320 77 38% 63 Mva charged on 12 Sheopurkala 220kv S/s with 2x160MVA+ 1x63MVA 320 30.06.2019 & CB charged on 10.07.2019

13 Upgradation of 220 kV S/s at Udaipura 160 7

Agenda of 71st OCCM of MP 34 100% 14 33/220kV Pooling Sub-station at Ramnagar 3x100 (1st & 2nd X-mer charged) 300 3rd charged on 25.04.2019 1st 100 MVA charged on 15 33/220kV Pooling Sub-station at Badwar (3x100) (1st charged) 300 29.03.2019 & 2nd on 04.07.2019 C. 132 KV SUBSTATIONS (a) NEW SUBSTATIONS 1 Biston 132kv s/s1x40 MVA 40 60 2 Khimlasa 132kv s/s 1x40 MVA 40 59 3 Narsinghgarh 132kv s/s with 1x40 MVA 40 23 100% charged on 4 Devnagar 132kv s/s 1x40 MVA (Dist- Narsighpur) (ADB-III) 40 30.03.2019 from 33 KV

5 Bhesola 132kV S/s with 1x50 MVA 50 52 6 Deori 132kV S/s with 1x50 MVA 50 57 7 Vikram Udyogpuri 132kV S/s with 1x63 MVA 63 58 8 Bhitarwar 132kV S/s with 1x50 MVA 50 59 9 Morwan 132kV S/s with 1x40 MVA 40 58 10 Orchha 132kV S/s with 1x50 MVA 50 7 11 Madwas 132kV S/s with 1x50 MVA 50 1 12 Unchehera 132kV S/s with 1x50 MVA 50 39 13 Tendukheda 132kV S/s with 1x50 MVA 50 3

Agenda of 71st OCCM of MP 35 Annexure-2.3(i)

Discoms wise Average Supply Hours

East Zone Central Zone PARTICULARS Jun-19 Jul-19 Jun-19 Jul-19

Commissinary HQ 23:50 23:52 23:43 23:42

District HQ 23:49 23:49 23:42 23:44

Tehsil HQ 23:45 23:49 23:38 23:34

Rural -Mixed 23:39 23:42 23:28 23:13

Rural -DLF 23:40 23:42 23:27 23:17

Rural -Irrigation 9:54 9:57 9:55 9:53

West Zone MP PARTICULARS Jun-19 Jul-19 Jun-19 Jul-19

Commissinary HQ 23:51 23:53 23:48 23:48

District HQ 23:50 23:51 23:48 23:48

Tehsil HQ 23:44 23:47 23:43 23:44

Rural -3Phase - - 23:34 23:29

Rural -1Phase 23:37 23:41 23:35 23:34

Total Rural 9:49 9:49 9:53 9:53

Agenda of 71st OCCM of MP 36

Annexure-2.3.ii

LIST OF 33KV FEEDERS UNDER MPPKVVCL, JABALPUR (For which group to be allocated) JABALPUR REGION

Date of Date of Name of EHV commission- commission Name of 33KV feeder Substation ing of feeder -ing of bay feeder 220KV 220 KV Panagar 33 KV Industrial Sihora 31.12.2014 10.05.2018

24.02.2018 23.01.2019 220 KV Chichli 33 KV Imaliya-II

132KV 132 KV Marotal 33 KV Discom bay 28.02.2018 - 33 KV Belkheda 06.12.2018 06.12.2018 132 KV Ponder 33 KV Salichouka 07.12.2018 07.12.2018 33 KV NSPL 19.01.2018 19.01.2018 33 KV Barhi 20.01.2018 20.01.2018 33 KV Kuwa 20.01.2018 20.01.2018 132 KV Barhi 33 KV Pipariya 20.01.2018 20.03.2018 33 KV Gertalai 20.01.2018 20.03.2018 33 KV Bilthari 01.04.2019 01.04.2019 132 KV 33 KV Sadumar 02.04.2019 02.04.2019 Palohabada

132 KV 02.11.2018 33 KV Nagar Palika 28.02.2018 Narsinghpur

33 KV Karapgaon 29.12.2017 24.02.2018 132 KV 33 KV Bansadehi 29.12.2017 27.01.2018 Karapgaon 33 KV Kareli 29.12.2017 27.01.2018 33 KV Aamgaon 29.12.2017 28.01.2018

REWA REGION

Date of Date of Name of EHV commission- commission- Name of 33KV feeder Substation ing of feeder ing of feeder bay 220KV Nil 132KV 33KV Discom Bay-I (Dhera) 31.03.2018 31.03.2018 132 KV Mauganj 33KV Discom Bay-II (Khatkhari) 31.03.2018 31.03.2018

SAGAR REGION

Date of Date of Name of EHV commission- commission- Name of 33KV feeder Substation ing of feeder ing of feeder bay 220KV 220 KV 09.09.2018 29.09.2018 33KV Dharari Chhatarpur 132KV 132 KV 33KV Sehora 03.10.2017 14.03.2018 Rahatgarh

Agenda of 71st OCCM of MP 37 LIST OF 33KV FEEDERS UNDER MPPKVVCL, INDORE (For which group to be allocated) INDORE REGION Name of EHV Name of 33KV feeder Date of Date of Substation commissioning commissioning of feeder bay of feeder 220KV 220KV Pithampur 33KV SRF 03.09.2013 03.09.2013 (Sec-III) 132KV

132KV Chandrawatiganj 33KV Chandrawatiganj 27.04.2015 27.04.2015

132KV Electronic 33KV AKVN (Namkeen 31.03.2016 31.03.2016 Cluster) UJJAIN REGION Name of EHV Name of 33KV feeder Date of Date of Substation commissioning Charging of feeder bay of feeder 220KV 220KV Barnagar 33KV Bangred 23.10.2017 20.10.2018

132KV

132KV Agar 33KV Agar Town-II 03.12.2012 24.05.2018

132KV Arniyakalan 33KV Designco 01.05.2018 01.05.2018 Manufacture & Exporter (5MW Solar Power Plant) 132KV Agrod 33KV Madhopur 30.06.2018 26.07.2018

LIST OF 33KV FEEDERS UNDER MPPKVVCL, BHOPAL (For which group to be allocated)

BHOPAL REGION

Date of Date of Name of EHV charging charging of Name of 33KV feeder Substation of feeder feeder bay 220 KV 220 KV Ganjbasoda 03.11.2016 03.11.2016 33 KV Simcon-I 31.08.2017 09.09.2017 33 KV Simcon-II 220 KV Pipariya 33 KV Food Park (AKVN) 19.06.2017 25.06.2017

220 KV Rajgarh 33 KV WRD 07.12.2018 09.01.2018

132 KV 132 KV Tamot 33 KV Obedullaganj 05.05.2016 02.02.2017 33 KV AKVN-1 05.10.2016 05.10.2016 33 KV AKVN-2 05.10.2016 05.10.2016

132 KV Lateri 33 KV Aligarh Kotra 28.08.2017 20.12.2017 33 KV Madankhedi 27.06.2017 05.01.2018 33 KV Anantpura 15.06.2017 22.05.2018

132 KV Salamatpur 33 KV Dewanganj 04.12.2017 04.12.2017 33 KV Aamkheda 04.12.2014 04.12.2017 33 KV Salamatpur Industrial 25.11.2017 10.01.2019

132 KV Udaipura 33 KV Thaladigawan 26.04.2018 04.06.2018 33 KV Boras 04.06.2018 06.06.2018 33 KV Udaipura 04.06.2018 07.01.2019

132 KV Ayodhya Nagar 33 KV Maholi 30.10.2018 30.10.2018

132 KV Nasrullaganj 33 KV Kankariya 15.05.2004 15.09.2017

132 KV Gopalpur 33 KV AE PHE 26.02.2015 26.02.2015

Agenda of 71st OCCM of MP 38 132 KV Sironj 33 KV Bhairo Baba 14.09.2012 08.10.2018

132 KV Runaha 33 KV Sawansi 31.03.2015 14.10.2018

132 KV Khirkiya 33 KV Killod 07.12.2017 10.01.2018

132 KV Bilquisganj 33 KV Uljhawan 07.01.2018 20.07.2018

Agenda of 71st OCCM of MP 39 Unitwise / Stationwise Genration in MU A. Thermal Ann 4.1 Capacity Stn. Name UNIT No. MW June-19 July-19 5 210 145.89 95.30 PH III 210 145.89 95.30

AMARKAN TOT 210 145.89 95.30 6 200 50.73 89.39 7 210 0.00 56.12 PH II 410 50.73 145.51 8 210 106.69 96.28 9 210 72.12 99.93 PH III 420 178.81 196.21 SATPURA 10 250 0.00 135.97 11 250 163.67 23.49 PH IV 500 163.67 159.46 TOT 1330 393.21 501.17 1 210 33.41 62.24 2 210 66.44 51.70 PH I 420 99.85 113.94 3 210 109.44 100.14 4 210 77.49 93.07 PH II 420 186.92 193.21 5 500 315.16 297.03 SANJAY GANDHI PH III 500 315.16 297.03 TOT 1340 601.94 604.18 1 600 46.38 29.19 2 600 248.97 258.18 PH1 1200 295.35 287.37 3 660 119.65 282.04

SSTPS 4 660 210.34 291.27 PH II 1320 329.98 573.32 TOT 1860 625.33 860.69 MPPGCL THERMAL 4740 1766.37 2061.33 Note : 1. Thermal Power Station-II Unit # 4 De-commissioned wef 01-May-2014. 2. Amarkantak Thermal Power Station-II Unit # 3 De-commissioned wef 13-Jan-2015. B. Hydel Station Name Capacity MW June-19 July-19 GANDHISAGAR 115.0 4.63 0.00 R.P.SAGAR 172.0 0.01 0.01 J.SAGAR 99.0 1.16 6.35 CHAMBAL 386.0 5.80 6.36 M.P.CHAMBAL 193.0 2.90 3.18 PENCH 160.0 0.03 0.00 M.P.PENCH 107.0 0.02 0.00 BARGI 90.0 8.72 15.78 TONS 315.0 35.70 14.79 BIRSINGHPUR 20.0 0.89 5.15 B.SGR(DEOLONDH) 60.0 26.86 30.25 B.SGR(SILPARA) 30.0 3.02 0.00 RAJGHAT 45.0 0.00 0.00 M.P.RAJGHAT 22.5 0.00 0.00 B.SGR(JINHA) 20.0 2.75 0.00 MADIKHEDA 60.0 0.00 0.00 TOTAL HYDEL 1186.0 83.76 72.33 MPPGCL Hydel 915.0 82.60 65.97 MPSEB HYDEL Share 917.5 80.86 69.15

C. NHDC (Ex-Bus) Station Name Capacity MW June-19 July-19 Indira Sagar Hydel Project 1000 43.73 80.25 Omkareshwar Hydel Project 520 17.74 51.33

Agenda of 71st OCCM of MP 40 ENERGY BALANCE SHEET Year : 2019 - 20 All figures in Million Unit S No. Source Apr-19 May-19 Jun-19 Jul-19 Aug-19 Sep-19 Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Total 30 31 30 31 31 0 0 0 0 0 0 0 153 A. M.P. Availability 1 Thermal 2278.56 1929.45 1635.59 1915.93 1213.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8973.22 2 Hydel 125.69 135.30 79.20 66.15 263.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00 669.98 3 Total 2404.26 2064.75 1714.78 1982.08 1477.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9643.20 B. Exchange with other States / Systems 1 Indira Sagar 81.66 94.10 42.03 78.42 507.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 803.57 2 Omkareshwar 43.59 43.18 17.74 51.33 212.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 368.57 3 MPPMCL Schedule from Central Sector of WR 1777.61 1845.11 1849.93 1786.51 1529.83 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8789.00 4 MPPMCL Schedule from Central Sector ER 31.16 30.60 38.99 34.68 32.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 167.44 5 Total MPPMCL Schedule from Central Sector (WR+ER) 1808.77 1875.71 1888.92 1821.19 1561.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8956.44 6 Deviation Energy of (WR+ER) -23.86 1.07 -25.22 -21.74 -103.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -173.43 7 NET NR ISGS POWER SCH to MP 26.28 60.97 70.71 81.98 41.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 281.43 8 RUMS SOLAR REWA (Scheduled Energy) 89.06 83.32 82.07 66.59 78.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 399.16 9 Schedule From Sugen 0.00 0.24 5.07 13.80 2.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 21.19 10 LANCO Amk 162.90 174.72 166.39 124.22 131.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 759.38 11 SASAN 962.78 1016.20 944.63 880.82 794.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4598.85 12 ESSAR (STOA against LTA) 0.00 6.16 5.47 4.46 3.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 19.72 13 J P Nigri 315.28 324.01 311.95 162.24 145.83 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1259.32 14 MB Power 215.07 230.68 202.23 179.76 142.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 970.05 15 JHABUA Power 70.02 86.00 80.24 77.37 32.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 346.42 16 Other Open Access Schedule other than MPPMCL Incl. Seci -188.35 -93.64 -71.91 -76.23 -165.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -595.13 17 Himachal Pradesh HYDAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 18 BARH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 19 Schedule from Sardar Sarovar 14.26 11.94 13.14 26.13 398.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 464.22 20 SCH to Railway from RGPPL_ebid 176.29 183.11 173.39 180.41 168.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00 881.90 21 Schedule from SEZ 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22 Schedule from Rihand+Matatila 3.86 2.81 2.58 6.00 3.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 18.50 23 MTOA / STOA FROM RAJASTHAN 0.00 41.28 41.54 43.06 44.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 170.43 Medium Term Power Purchase from CSPDCL through PTC agaisnt PPA 24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 CSPDCCL dtd. 18.09.2012 Medium Term Power Purchase from Balco through PTC agaisnt PPA Balco dtd. 25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 18.09.2012 Including Short term purchase against MTOA 26 Additional Power Purchase 0.00 0.00 0.00 32.40 0.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 32.44 27 Energy Exchange 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 28 Banking of Energy -393.14 -468.76 -393.51 -593.40 -564.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -2412.85 29 Sale of Power -469.81 -61.02 -40.63 -215.50 -239.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -1026.10 30 Total MP Schedule (Including Railway) 2793.28 3473.75 3482.28 2815.30 2580.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15145.37 31 Total MP Drawal (Including Railway) 2769.41 3474.82 3457.06 2793.56 2477.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 14971.94 32 Wheeled Energy of Tawa HEG 0.00 0.00 0.00 0.00 6.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.48 33 Wheeled Energy of Wind Farm 10.15 11.63 9.91 13.63 6.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00 52.27 34 Wheeled Energy of Solar Plant 67.16 64.39 55.62 28.72 35.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00 251.63 35 Wheeled Energy of Bio-Mass 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 36 Wheeled Energy of Ascent Hydro +SAS Hydel Hatta 1.34 1.27 1.02 2.49 2.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.62 37 Export to MSEB (Nepa-Dharni) Wheeling -7.23 -6.99 -5.77 -4.96 -4.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -29.43 38 Deviation Energy of MPPGCL Thermal + Infirm Energy of Singajil -30.89 -38.40 -35.05 -25.15 -29.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -159.41 39 Energy Purchased by MP from Wind Farm 403.98 579.40 555.30 644.20 490.23 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2673.11 40 Energy Purchased by MP from Solar Plant 163.30 166.07 135.61 109.56 85.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00 660.17 Firm / Infirm Energy of HEG Mandideep+Hindalco+HEG Tawa +Trimula Ind. 41 187.15 101.90 86.30 87.04 176.83 0.00 0.00 0.00 0.00 0.00 0.00 0.00 639.21 purchase by MP +Wheeled enrgy of CPP / IPP Purchased from ASN Biomass Katni + RDM Care Ind. Biogas Pariyat + Pragya Energy Pvt. Ltd. Biogas Richhai+ Arya Energy Kotma + Orient Green 42 2.66 2.98 3.06 1.59 0.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11.20 Power Limited, Gadarawara Bio-Mass+Shaliwahna (CHH+Umariya) + JBP MSW 43 Deviation Energy of ISP 1.41 1.64 1.70 1.83 2.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9.43 44 Schedule Energy of BLA Power against LTOA 0.66 4.45 2.27 4.30 1.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.82 45 Schedule Energy of JP BINA Power against LTOA 34.61 150.56 147.57 54.21 54.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 441.79 46 Import from bargi Left Bank Canal Power House + ISP NVDA 0.59 -0.01 0.00 0.00 1.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.93 47 Chambal Complex Excess / less Overshare by MP -1.17 -1.09 1.27 -1.96 -1.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -4.02 48 Rajghat Hydel Power Station Excess / Less Overshare by MP -0.03 0.00 -0.02 -0.02 2.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.07 49 State Supply (Ex-Power stn. Bus) 6132.61 6714.64 6190.39 5820.86 5506.63 0.00 0.00 0.00 0.00 0.00 0.00 0.00 30365.15 50 AVERAGE DAILY (Ex-Bus) 204.42 216.60 206.35 187.77 177.63 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 198.47 51 MINIMUM DAILY (MP Periphery) 147.90 194.22 166.40 149.59 136.89 0.00 0.00 0.00 0.00 0.00 0.00 0.00 136.89 52 MAXIMUM DAILY (MP Periphery) 214.82 221.89 221.88 223.94 190.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 223.94 53 State Supply (Ex-Power st. Bus):- YEAR : 2018-19 5518.85 5998.45 5155.78 5068.96 5412.65 5474.68 7466.55 7895.66 7889.18 7601.20 6356.67 6508.26 27154.70 54 Year ((19-20)-(18-19))*100/Year (18-19) 11.12 11.94 20.07 14.83 1.74 -100.00 -100.00 -100.00 -100.00 -100.00 -100.00 -100.00 11.82 55 Unshedule L/S : Year-2019-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 56 Frequency Correction 2.76 3.66 3.72 2.48 2.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15.05 57 Restricted Requirement : Year-2019-20 6135.38 6718.30 6194.11 5823.34 5509.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 30380.20 58 Shedule L/S : Year-2019-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Agenda of 71st OCCM of MP 41 59 Un-Restricted Requirement : Year-2019-20 6135.38 6718.30 6194.11 5823.34 5509.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 30380.20

Agenda of 71st OCCM of MP 42 ENERGY BALANCE SHEET : Demand & Sypply Hours Year : 2019 - 20 S.NO. Apr-19 May-19 Jun-19 Jul-19 Aug-19 Sep-19 Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Yr 19-20 C. MORNING PEAK (MAX) 1 DEMAND MET 9738 9880 9955 9845 8606 0 0 0 0 0 0 0 9955 2 LOAD RELIEF 0 0 0 0 0 0 0 0 0 0 0 0 0 3 LOAD SHEDDING 0 0 0 0 0 0 0 0 0 0 0 0 0 D. EVENING PEAK (MAX) 1 DEMAND MET 9235 9475 9480 9746 8526 0 0 0 0 0 0 0 9746 2 LOAD RELIEF 0 0 0 0 0 0 0 0 0 0 0 0 0 3 LOAD SHEDDING 0 0 0 0 0 0 0 0 0 0 0 0 0 F. REGISTERED MAXIMUM 9738 9880 9955 9845 8606 0 0 0 0 0 0 0 9955 G. COMPUTED MAXIMUM DEMAND 9738 9891 9961 9845 8606 0 0 0 0 0 0 0 9961 H. UNRESTRICTED MAXIMUM DEMAND 9738 9891 9955 9845 8606 0 0 0 0 0 0 0 9955 I. Average Power Supply per day to 1. Div. Head Quarters 23:52 23:54 23:48 23:48 23:51 0:00 0:00 0:00 0:00 0:00 0:00 0:00 23:51 2. District Head Quarters 23:54 23:55 23:48 23:48 23:47 0:00 0:00 0:00 0:00 0:00 0:00 0:00 23:50 3. Tahsil Head Quarters 23:50 23:53 23:43 23:44 23:48 0:00 0:00 0:00 0:00 0:00 0:00 0:00 23:47 4. Rural -Mixed 23:36 23:46 23:34 23:29 23:40 0:00 0:00 0:00 0:00 0:00 0:00 0:00 23:37 5. Rural -DLF 23:40 23:48 23:35 23:34 23:40 0:00 0:00 0:00 0:00 0:00 0:00 0:00 23:39 6. Rural -Irrigation 9:54 9:57 9:53 9:53 9:53 0:00 0:00 0:00 0:00 0:00 0:00 0:00 9:54 J LOAD FACTOR % 87.47 91.35 86.37 79.47 86.00 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 86.13 FREQUENCY ANALYSIS YEAR 2019-20 S.N PARTICULARS Apr-19 May-19 Jun-19 Jul-19 Aug-19 Sep-19 Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Yr 19-20 A. INTGRATED FREQUENCY 1 MAXIMUM 50.21 50.16 50.23 50.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 50.23 2 MINIMUM 49.81 49.81 49.80 49.83 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 B. INSTANTANEOUS FREQUENCY 1 MAXIMUM 50.29 50.33 50.31 50.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 50.33 2 MINIMUM 49.65 49.65 49.63 49.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 C. AVG FREQUENCY 50.00 50.00 50.00 50.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 40.00 D. % TIME WHEN FREQUENCY WAS 1 ABOVE 51.5 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 50.05 TO 51.5 Hz 20.14 19.14 19.79 24.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 16.70 3 49.9 TO 50.05 Hz 72.76 72.60 70.34 68.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 56.60 4 49.7 TO 49.9 Hz 7.10 8.26 9.87 7.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.44 5 49.5 TO 49.7 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 49.2 TO 49.5 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7 48.8 TO 49.2 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8 48.5 TO 48.8 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9 BELOW 48.5 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Agenda of 71st OCCM of MP 43 Hourly Average Own Generation, Schedule Drawal , Actual Drawal & Demand Month :- June 2019 FIGURES IN MW

Own Generation Schedule from Load Shedding

Rih RUMS DEMA REST. (SOL and MTOA / Tot Act. Devia Export to UNREST. Hrs. FREQ. Total Total Jhabu SCH DEMAN THER. THER. Net AR) +Ma STOA ND IPPs CPPs Suge Essa JP MB a to STO Avl. Drl -tion MS UN DEMAND Incl Excl HYD. ISP OSP Total CSS NR to Lanco Sasan REW SSP SEZ Banking Sale Pur tatil FROM Total MET SCH TOTAL D Injecti Injectio n r Nigri Power Powe Railw A SCH Aux Aux MP A TO a- RAJAS on n r ay MPPM Raj THAN CL ghat

1:00 50.00 2454 2243 109 114 33 328 940 3768 2788 124 22 240 1256 13 431 0 319 133 19 255 0 -910 -27 0 12 4 58 4739 8508 4742 3 -8 8502 0 0 0 8506 8506

2:00 50.02 2455 2244 104 33 17 325 1009 3731 2799 149 14 248 1264 13 421 0 321 133 19 232 0 -918 -21 0 5 4 58 4740 8471 4613 -127 -8 8337 0 0 0 8339 8339

3:00 50.03 2448 2237 102 11 9 324 1008 3691 2724 154 15 240 1271 13 419 0 318 131 18 212 0 -921 -9 0 5 4 58 4651 8342 4654 4 -7 8339 0 0 0 8340 8340

4:00 50.03 2451 2240 91 18 9 330 974 3661 2682 153 7 244 1310 13 416 0 316 133 18 231 0 -902 0 0 -29 4 58 4653 8313 4630 -23 -7 8283 0 0 0 8285 8285

5:00 50.01 2462 2250 91 14 11 328 946 3640 2661 175 5 240 1285 13 414 0 309 126 18 229 0 -814 0 0 -34 4 58 4687 8327 4641 -46 -7 8274 0 0 0 8278 8278

6:00 49.98 2477 2264 115 63 17 323 889 3671 2625 186 2 235 1284 10 406 18 295 112 17 251 0 -687 -4 0 -39 4 58 4771 8442 4772 1 -8 8435 0 0 0 8443 8443

7:00 50.02 2510 2294 136 36 19 322 931 3739 2732 171 2 237 1293 8 406 20 309 129 17 238 0 -485 -4 0 -57 4 58 5076 8815 4938 -139 -8 8669 0 0 0 8671 8671

8:00 50.08 2455 2243 127 33 13 309 1109 3834 2526 109 0 219 1294 4 404 116 276 103 17 205 0 -346 -4 0 -106 4 58 4878 8712 4696 -182 -8 8522 0 0 0 8523 8523

9:00 50.03 2390 2184 135 26 17 310 1226 3898 2273 56 0 192 1291 1 404 252 216 74 18 236 0 -353 -3 0 -189 4 58 4530 8428 4441 -89 -8 8331 0 0 0 8332 8332

10:00 50.05 2347 2144 134 19 13 309 1294 3912 2166 65 0 180 1273 1 404 344 186 52 18 236 0 -357 0 0 -227 4 58 4402 8315 4353 -50 -8 8257 0 0 0 8258 8258

11:00 50.01 2328 2126 111 4 13 305 1303 3863 2180 57 0 180 1264 1 405 394 177 54 18 245 0 -357 -7 0 -253 4 58 4420 8282 4390 -30 -8 8245 0 0 0 8247 8247

12:00 49.99 2352 2149 119 4 11 306 1266 3854 2172 44 0 187 1239 1 405 411 190 52 17 235 0 -357 -21 0 -257 4 58 4379 8233 4334 -45 -7 8180 0 0 0 8187 8187

13:00 49.98 2403 2196 116 11 11 311 1214 3859 2309 58 0 203 1250 1 405 387 210 68 17 208 0 -387 -9 0 -235 4 58 4547 8406 4608 61 -8 8459 0 0 0 8470 8470

14:00 49.97 2443 2232 109 11 13 314 1083 3761 2404 87 0 218 1242 2 406 336 237 86 17 227 0 -387 -66 0 -205 4 58 4666 8427 4697 31 -8 8451 0 0 0 8461 8461

15:00 49.99 2456 2244 110 19 11 324 1021 3728 2515 74 0 225 1251 3 409 261 256 98 18 232 0 -389 -120 0 -172 4 58 4722 8450 4743 21 -7 8463 0 0 0 8470 8470

16:00 50.00 2457 2245 105 19 21 321 943 3654 2563 100 7 226 1254 4 416 158 270 104 18 249 0 -389 -99 0 -149 4 58 4793 8448 4660 -133 -8 8307 0 0 0 8312 8312

17:00 50.01 2442 2232 98 25 26 328 838 3547 2509 70 10 225 1254 4 418 44 261 110 19 231 0 -389 -69 0 -128 4 58 4629 8176 4595 -34 -8 8134 0 0 0 8139 8139

18:00 50.02 2429 2220 90 26 17 322 762 3437 2398 77 10 215 1255 3 420 5 249 96 19 209 0 -360 -35 0 -125 4 58 4498 7934 4399 -99 -9 7827 0 0 0 7828 7828

19:00 50.01 2457 2246 104 67 22 324 702 3464 2480 90 5 218 1263 3 431 2 245 94 19 236 0 -337 -189 0 -49 4 58 4571 8036 4399 -172 -9 7855 0 0 0 7859 7859

20:00 49.96 2505 2290 140 211 65 367 727 3801 2654 63 15 237 1294 13 441 0 299 139 19 232 0 -594 -191 0 -25 4 58 4658 8459 4707 49 -9 8499 0 0 0 8512 8512

21:00 49.97 2514 2298 130 161 54 368 727 3738 2640 46 17 230 1273 15 444 0 298 137 19 250 0 -582 -124 0 -25 4 58 4699 8437 4667 -32 -9 8396 0 0 0 8406 8406

22:00 50.00 2507 2292 119 151 44 374 755 3734 2611 50 10 226 1275 15 444 0 302 139 19 226 0 -602 -151 0 -26 4 58 4599 8333 4542 -56 -9 8267 0 0 0 8273 8273

23:00 49.98 2506 2290 122 216 67 378 814 3888 2729 53 15 244 1269 16 443 0 318 150 18 205 0 -601 -150 0 -29 4 58 4742 8629 4776 35 -8 8656 0 0 0 8666 8666

24:00 50.00 2494 2279 108 133 50 329 870 3769 2628 53 11 244 1251 15 443 0 307 139 18 235 0 -459 -84 0 11 4 58 4872 8641 4768 -104 -8 8529 0 0 0 8535 8535

Avg. 50.01 2448 2237 114 59 24 328 973 3735 2532 94 7 223 1269 8 419 114 270 108 18 231 0 -537 -58 0 -97 4 58 4663 8399 4615 -48 -8 8342 0 0 0 8347 8347

00 TO 06 50.01 2458 2246 102 42 16 327 961 3694 2713 157 11 241 1278 12 418 3 313 128 18 235 0 -859 -10 0 -13 4 58 4707 8401 4675 -31 -8 8362 0 0 0 8365 8365 HRS.

06 TO 12 50.03 2397 2190 127 20 14 310 1188 3850 2341 84 0 199 1276 3 405 256 226 77 18 232 0 -376 -7 0 -182 4 58 4614 8464 4525 -89 -8 8367 0 0 0 8370 8370 HRS.

12 TO 18 50.00 2438 2228 105 18 16 320 977 3664 2449 78 4 219 1251 3 412 198 247 94 18 226 0 -383 -66 0 -169 4 58 4642 8307 4617 -25 -8 8273 0 0 0 8280 8280 HRS.

06TO 18 50.01 2418 2209 116 19 15 315 1082 3757 2395 81 2 209 1263 3 409 227 236 86 18 229 0 -380 -36 0 -175 4 58 4628 8386 4571 -57 -8 8320 0 0 0 8325 8325 HRS.

18 TO 24 49.99 2497 2282 120 156 50 357 766 3732 2624 59 12 233 1271 13 441 0 295 133 19 231 0 -529 -148 0 -24 4 58 4690 8422 4643 -47 -9 8367 0 0 0 8375 8375 HRS.

Agenda of 71st OCCM of MP 44 Hourly Average Own Generation, Schedule Drawal , Actual Drawal & Demand Month :- July 2019 FIGURES IN MW

Own Generation Schedule from Load Shedding

RUMS UNREST Riha Expor REST. (SOLA MTOA / Tot Act. Devia - DEMAN . Hrs. FREQ. Total Total Jhabu SCH nd+ THER. THER. Net R) STOA t to DEMAN IPPs CPPs Sug Essa JP MB a to STO Matat Avl. Drl tion D MET UN DEMAN Incl Excl HYD. ISP OSP Total CSS NR to Lanco Sasan REW SSP SEZ Banking Sale Pur FROM Total MS SCH TOTAL D Injectio Injectio en r Nigri Power Powe Railw A ila- SCH D Aux Aux MP A TO RAJAS n n r ay Rajg MPPM THAN CL hat

1:00 50.02 2793 2550 82 172 89 192 899 3984 2581 175 28 161 1161 10 219 0 269 128 38 254 0 -1197 -155 70 -30 8 58 3778 7762 3761 -17 -7 7738 0 0 0 7740 7740

2:00 50.04 2759 2519 77 146 77 190 926 3935 2521 203 24 163 1162 9 213 0 273 114 34 239 0 -1223 -121 70 -44 8 58 3701 7636 3670 -32 -7 7598 0 0 0 7599 7599

3:00 50.03 2762 2521 73 108 64 189 950 3905 2542 208 24 161 1175 7 212 0 272 100 34 209 0 -1256 -93 70 -44 8 58 3686 7591 3686 0 -7 7584 0 0 0 7586 7586

4:00 50.03 2756 2515 74 105 64 186 963 3907 2545 234 19 163 1192 7 209 0 276 102 32 232 0 -1265 -125 70 -66 8 58 3690 7596 3603 -86 -7 7503 0 0 0 7505 7505

5:00 50.01 2740 2501 73 97 66 183 984 3905 2446 195 17 158 1186 7 208 0 254 92 32 232 0 -1120 -120 70 -66 8 58 3656 7561 3615 -41 -7 7514 0 0 0 7516 7516

6:00 49.97 2764 2523 78 79 65 184 939 3868 2375 137 17 153 1176 4 203 13 219 87 31 253 0 -695 -169 70 -71 8 58 3870 7738 3900 29 -7 7760 0 0 0 7770 7770

7:00 50.01 2778 2536 102 97 64 185 979 3964 2463 142 17 157 1182 4 203 25 245 98 31 239 0 -554 -215 70 -80 8 58 4093 8057 4082 -11 -7 8039 0 0 0 8041 8041

8:00 50.07 2768 2527 105 50 53 185 1172 4091 2381 130 17 153 1169 3 203 99 222 91 31 209 0 -553 -125 70 -100 8 58 4066 8157 3822 -245 -7 7906 0 0 0 7906 7906

9:00 50.04 2711 2474 92 22 35 183 1331 4136 2167 93 9 152 1179 3 203 191 172 70 30 239 0 -546 -114 75 -145 8 58 3843 7980 3611 -233 -6 7741 0 0 0 7741 7741

10:00 50.03 2674 2441 86 22 27 180 1404 4159 2092 47 9 150 1156 3 203 254 142 55 31 238 0 -609 -297 31 -160 8 58 3411 7571 3381 -30 -6 7534 0 0 0 7536 7536

11:00 50.03 2658 2425 80 11 29 181 1417 4143 2046 25 7 150 1134 2 203 297 148 55 33 254 0 -608 -338 31 -173 8 58 3331 7474 3209 -121 -6 7347 0 0 0 7349 7349

12:00 50.02 2654 2422 70 22 33 184 1397 4128 1948 39 7 150 1084 2 203 315 151 55 33 237 0 -606 -361 25 -185 8 58 3165 7293 3057 -108 -6 7179 0 0 0 7182 7182

13:00 50.02 2653 2421 68 7 35 186 1355 4073 1960 72 12 150 1083 2 205 304 158 55 34 209 0 -670 -310 29 -186 8 58 3172 7245 3156 -16 -6 7223 0 0 0 7226 7226

14:00 50.01 2660 2427 66 11 33 189 1320 4045 1967 66 12 150 1103 2 206 267 155 59 33 229 0 -669 -287 30 -179 8 58 3209 7255 3157 -52 -6 7197 0 0 0 7200 7200

15:00 49.99 2674 2440 73 48 45 186 1243 4035 2196 69 12 150 1093 3 207 206 182 74 33 231 0 -669 -626 25 -169 8 58 3084 7119 3232 148 -5 7262 0 0 0 7266 7266

16:00 50.01 2681 2447 82 54 53 186 1158 3980 2315 65 14 153 1117 3 209 124 204 82 34 254 0 -668 -528 25 -148 8 58 3321 7301 3315 -6 -6 7289 0 0 0 7294 7294

17:00 49.99 2707 2470 73 54 53 189 1007 3846 2341 81 14 161 1138 3 210 49 243 94 37 234 0 -675 -457 25 -133 8 58 3429 7275 3467 39 -6 7307 0 0 0 7312 7312

18:00 50.00 2742 2503 77 50 55 191 808 3683 2280 67 12 164 1171 3 212 13 213 89 42 209 0 -507 -355 30 -117 8 58 3592 7275 3642 50 -7 7318 0 0 0 7323 7323

19:00 50.00 2837 2590 99 94 65 207 645 3701 2494 90 14 175 1164 6 220 1 247 114 42 237 0 -513 -432 30 -81 8 58 3874 7575 3816 -58 -7 7509 0 0 0 7514 7514

20:00 49.98 2906 2653 142 310 125 240 599 4068 2686 80 26 186 1140 13 223 0 316 165 42 239 0 -921 -370 25 -53 8 58 3863 7932 4037 174 -8 8098 0 0 0 8106 8106

21:00 49.99 2916 2662 119 305 143 244 618 4090 2685 86 31 179 1139 13 223 0 319 173 42 253 0 -882 -407 25 -54 8 58 3892 7982 3880 -12 -8 7962 0 0 0 7970 7970

22:00 50.03 2923 2669 100 256 139 239 682 4084 2641 86 35 183 1136 13 223 0 314 172 42 232 0 -894 -417 25 -54 8 58 3804 7888 3805 1 -8 7881 0 0 0 7883 7883

23:00 50.01 2915 2662 99 263 142 223 768 4156 2658 89 35 179 1149 12 223 0 309 163 42 209 0 -864 -384 25 -47 8 58 3865 8021 3917 52 -7 8066 0 0 0 8069 8069

24:00 50.04 2875 2625 93 193 120 197 822 4049 2564 85 24 167 1142 11 223 1 280 138 42 240 0 -692 -305 25 -45 8 58 3967 8016 3831 -136 -7 7873 0 0 0 7875 7875

Avg. 50.02 2763 2522 87 107 70 196 1016 3997 2371 107 18 161 1147 6 211 90 233 101 36 234 0 -786 -296 44 -101 8 58 3640 7638 3610 -30 -7 7601 0 0 0 7605 7605

00 TO 06 50.02 2762 2521 76 118 71 187 944 3917 2502 192 21 160 1175 7 211 2 261 104 33 237 0 -1126 -131 70 -53 8 58 3730 7647 3706 -24 -7 7616 0 0 0 7619 7619 HRS.

06 TO 12 50.03 2707 2471 89 37 40 183 1283 4104 2183 79 11 152 1151 3 203 197 180 71 31 236 0 -579 -242 50 -140 8 58 3652 7755 3527 -125 -6 7624 0 0 0 7626 7626 HRS.

12 TO 18 50.00 2686 2451 73 37 46 188 1148 3944 2176 70 13 155 1117 3 208 160 192 75 35 228 0 -643 -427 28 -155 8 58 3301 7245 3328 27 -6 7266 0 0 0 7270 7270 HRS.

06TO 18 50.02 2697 2461 81 37 43 185 1216 4024 2180 75 12 153 1134 3 206 179 186 73 33 232 0 -611 -334 39 -148 8 58 3476 7500 3428 -49 -6 7445 0 0 0 7448 7448 HRS.

18 TO 24 50.01 2895 2643 109 237 122 225 689 4025 2621 86 28 178 1145 11 223 0 298 154 42 235 0 -794 -386 26 -55 8 58 3878 7902 3881 3 -8 7898 0 0 0 7903 7903 HRS.

Agenda of 71st OCCM of MP 45 Discomwise Hourly Average Schedule Drawal , Actual Drawal &Over(+)/Under(-) Drawal Month :- June 2019 FIGURES IN MW EZONE CZONE WZONE Railway

Hrs. FREQ. Restricte Unrestrict Restricte Unrestrict Restricte Unrestrict Demand O/U SCH Unsch Demand O/U SCH Unsch Demand O/U SCH Unsch Total SCH d ed SCH d ed SCH d ed Total Sch Met DRL LS LS Met DRL LS LS Met DRL LS LS Drawal Demand Demand Demand Demand Demand Demand

1:00 50.00 2819 2850 32 0 0 2851 2851 2779 2895 115 0 0 2896 2896 959 2519 1560 0 0 2520 2520 255 238

2:00 50.02 2808 2714 -94 0 0 2715 2715 2746 2840 94 0 0 2841 2841 873 2536 1663 0 0 2537 2537 232 247

3:00 50.03 2744 2745 1 0 0 2745 2745 2695 2794 99 0 0 2794 2794 869 2564 1696 0 0 2565 2565 212 236

4:00 50.03 2727 2726 -1 0 0 2727 2727 2681 2760 79 0 0 2760 2760 940 2564 1624 0 0 2565 2565 231 233

5:00 50.01 2720 2705 -15 0 0 2706 2706 2651 2741 90 0 0 2742 2742 1040 2589 1549 0 0 2590 2590 229 239

6:00 49.98 2626 2545 -80 0 0 2548 2548 2683 2881 198 0 0 2884 2884 1300 2763 1464 0 0 2766 2766 251 245

7:00 50.02 2688 2613 -75 0 0 2613 2613 2732 2879 147 0 0 2880 2880 1511 2922 1411 0 0 2923 2923 238 254

8:00 50.08 2627 2528 -98 0 0 2528 2528 2674 2746 72 0 0 2746 2746 1254 2997 1743 0 0 2997 2997 205 250

9:00 50.03 2490 2484 -6 0 0 2485 2485 2485 2628 143 0 0 2628 2628 1009 2977 1968 0 0 2978 2978 236 241

10:00 50.05 2524 2514 -10 0 0 2514 2514 2329 2519 190 0 0 2519 2519 891 2982 2091 0 0 2982 2982 236 242

11:00 50.01 2543 2561 18 0 0 2562 2562 2237 2484 247 0 0 2485 2485 865 2965 2100 0 0 2966 2966 245 234

12:00 49.99 2568 2468 -100 0 0 2470 2470 2222 2497 274 0 0 2499 2499 921 2974 2053 0 0 2976 2976 235 242

13:00 49.98 2580 2598 18 0 0 2602 2602 2238 2533 295 0 0 2536 2536 1149 3097 1948 0 0 3101 3101 208 231

14:00 49.97 2559 2568 9 0 0 2571 2571 2334 2567 234 0 0 2571 2571 1339 3079 1740 0 0 3083 3083 227 236

15:00 49.99 2550 2558 8 0 0 2560 2560 2390 2595 205 0 0 2597 2597 1439 3071 1632 0 0 3074 3074 232 239

16:00 50.00 2515 2470 -46 0 0 2471 2471 2472 2610 138 0 0 2612 2612 1549 2986 1437 0 0 2988 2988 249 241

17:00 50.01 2437 2394 -43 0 0 2395 2395 2503 2636 132 0 0 2637 2637 1567 2858 1291 0 0 2860 2860 231 247

18:00 50.02 2375 2253 -122 0 0 2254 2254 2546 2627 81 0 0 2628 2628 1500 2704 1204 0 0 2705 2705 209 242

19:00 50.01 2424 2419 -5 0 0 2420 2420 2568 2616 47 0 0 2617 2617 1560 2571 1011 0 0 2572 2572 236 249

20:00 49.96 2720 2748 28 0 0 2753 2753 2701 2879 178 0 0 2884 2884 1533 2621 1088 0 0 2625 2625 232 250

21:00 49.97 2748 2773 24 0 0 2776 2776 2740 2847 107 0 0 2850 2850 1410 2543 1133 0 0 2546 2546 250 234

22:00 50.00 2736 2730 -6 0 0 2732 2732 2697 2828 131 0 0 2830 2830 1276 2482 1206 0 0 2484 2484 226 227

23:00 49.98 2857 2899 42 0 0 2903 2903 2793 2971 178 0 0 2975 2975 1259 2565 1306 0 0 2568 2568 205 220

24:00 50.00 2880 2853 -28 0 0 2855 2855 2791 2915 124 0 0 2917 2917 1132 2510 1378 0 0 2511 2511 235 252

Avg. 50.01 2636 2613 -23 0 0 2615 2615 2570 2720 150 0 0 2722 2722 1214 2768 1554 0 0 2770 2770 231 240

00 TO 06 50.01 2741 2714 -26 0 0 2715 2715 2706 2818 113 0 0 2820 2820 997 2589 1592 0 0 2590 2590 235 240 HRS. 06 TO 12 50.03 2573 2528 -45 0 0 2529 2529 2447 2626 179 0 0 2626 2626 1075 2970 1894 0 0 2970 2970 232 244 HRS. 12 TO 18 50.00 2503 2473 -29 0 0 2475 2475 2414 2595 181 0 0 2597 2597 1424 2966 1542 0 0 2968 2968 226 239 HRS. 06TO 18 50.01 2538 2501 -37 0 0 2502 2502 2430 2610 180 0 0 2612 2612 1249 2968 1718 0 0 2969 2969 229 242 HRS. 18 TO 24 49.99 2728 2737 9 0 0 2740 2740 2715 2843 128 0 0 2845 2845 1362 2549 1187 0 0 2551 2551 231 239 HRS.

Agenda of 71st OCCM of MP 46 Discomwise Hourly Average Schedule Drawal , Actual Drawal &Over(+)/Under(-) Drawal Month :- July 2019 FIGURES IN MW EZONE CZONE WZONE Railway

Hrs. FREQ. Restricte Unrestrict Restricte Unrestrict Restricte Unrestrict Demand O/U SCH Unsch Demand O/U SCH Unsch Demand O/U SCH Unsch Total SCH d ed SCH d ed SCH d ed Total Sch Met DRL LS LS Met DRL LS LS Met DRL LS LS Drawal Demand Demand Demand Demand Demand Demand

1:00 50.02 2629 2563 -66 0 0 2564 2564 2744 2820 76 0 0 2821 2821 2194 2117 -77 0 0 2118 2118 254 238

2:00 50.04 2578 2471 -107 0 0 2471 2471 2694 2784 90 0 0 2784 2784 2157 2100 -57 0 0 2101 2101 239 242

3:00 50.03 2572 2501 -71 0 0 2502 2502 2660 2740 81 0 0 2741 2741 2163 2107 -56 0 0 2108 2108 209 235

4:00 50.03 2583 2493 -90 0 0 2494 2494 2662 2705 43 0 0 2706 2706 2133 2076 -57 0 0 2076 2076 232 230

5:00 50.01 2560 2472 -88 0 0 2473 2473 2638 2695 57 0 0 2696 2696 2180 2119 -61 0 0 2119 2119 232 228

6:00 49.97 2481 2372 -109 0 0 2374 2374 2657 2801 144 0 0 2804 2804 2341 2347 6 0 0 2350 2350 253 241

7:00 50.01 2499 2418 -80 0 0 2419 2419 2779 2874 96 0 0 2875 2875 2542 2497 -46 0 0 2497 2497 239 249

8:00 50.07 2516 2366 -150 0 0 2366 2366 2897 2816 -82 0 0 2816 2816 2524 2480 -44 0 0 2480 2480 209 245

9:00 50.04 2441 2339 -102 0 0 2339 2339 2809 2769 -39 0 0 2770 2770 2451 2394 -56 0 0 2395 2395 239 238

10:00 50.03 2369 2293 -76 0 0 2293 2293 2654 2701 47 0 0 2702 2702 2302 2305 3 0 0 2306 2306 238 235

11:00 50.03 2363 2265 -99 0 0 2265 2265 2606 2622 16 0 0 2623 2623 2272 2230 -42 0 0 2231 2231 254 230

12:00 50.02 2356 2183 -172 0 0 2184 2184 2527 2575 48 0 0 2576 2576 2204 2186 -17 0 0 2187 2187 237 235

13:00 50.02 2335 2227 -108 0 0 2228 2228 2506 2577 71 0 0 2578 2578 2245 2197 -47 0 0 2198 2198 209 221

14:00 50.01 2277 2171 -106 0 0 2172 2172 2511 2585 74 0 0 2586 2586 2251 2218 -33 0 0 2219 2219 229 223

15:00 49.99 2199 2172 -27 0 0 2173 2173 2491 2604 113 0 0 2606 2606 2243 2257 15 0 0 2259 2259 231 228

16:00 50.01 2220 2160 -60 0 0 2161 2161 2542 2608 66 0 0 2610 2610 2348 2288 -60 0 0 2289 2289 254 233

17:00 49.99 2150 2132 -18 0 0 2133 2133 2543 2624 81 0 0 2626 2626 2332 2320 -12 0 0 2321 2321 234 231

18:00 50.00 2168 2104 -64 0 0 2105 2105 2567 2634 67 0 0 2635 2635 2308 2345 38 0 0 2347 2347 209 235

19:00 50.00 2318 2326 8 0 0 2328 2328 2562 2555 -7 0 0 2557 2557 2455 2387 -68 0 0 2389 2389 237 241

20:00 49.98 2607 2622 15 0 0 2624 2624 2664 2780 116 0 0 2783 2783 2467 2439 -28 0 0 2442 2442 239 257

21:00 49.99 2629 2645 15 0 0 2648 2648 2708 2752 44 0 0 2755 2755 2388 2332 -56 0 0 2334 2334 253 234

22:00 50.03 2637 2604 -33 0 0 2605 2605 2684 2767 83 0 0 2767 2767 2341 2283 -57 0 0 2284 2284 232 227

23:00 50.01 2697 2659 -38 0 0 2660 2660 2807 2940 133 0 0 2942 2942 2298 2248 -50 0 0 2249 2249 209 218

24:00 50.04 2675 2604 -71 0 0 2605 2605 2823 2865 42 0 0 2865 2865 2232 2148 -85 0 0 2148 2148 240 256

Avg. 50.02 2453 2382 -71 0 0 2383 2383 2656 2716 61 0 0 2718 2718 2307 2268 -40 0 0 2269 2269 234 235

00 TO 06 50.02 2567 2479 -89 0 0 2480 2480 2676 2757 82 0 0 2758 2758 2195 2144 -50 0 0 2145 2145 237 236 HRS. 06 TO 12 50.03 2424 2311 -113 0 0 2311 2311 2712 2726 14 0 0 2727 2727 2383 2349 -34 0 0 2349 2349 236 239 HRS. 12 TO 18 50.00 2225 2161 -64 0 0 2162 2162 2527 2606 79 0 0 2607 2607 2288 2271 -17 0 0 2272 2272 228 229 HRS. 06TO 18 50.02 2324 2236 -89 0 0 2237 2237 2619 2666 47 0 0 2667 2667 2335 2310 -25 0 0 2311 2311 232 234 HRS. 18 TO 24 50.01 2594 2577 -17 0 0 2578 2578 2708 2776 68 0 0 2778 2778 2364 2306 -57 0 0 2308 2308 235 239 HRS.

Agenda of 71st OCCM of MP 47 Annexure-5

1. System Disturbance on 02.06.2019 at 220kv s/s Sarni: On dated 02.06.19 at 04.30 hrs. M.P system was normal and frequency of National Grid was 50.05 Hz,at 04.33hrs,B Ph. CT of 220kv Sarni-Betulckt failed due to Insulation failure at 220KV S/s Sarni ,leading to the Bus Bar protection operation, resulting into the tripping of following elements :- 220KV Sarni-Betulckt 220KV Sarni-Pandhurnackt 220KV Sarni-STPScktNo 1 &2 160MVA Xmer&100MVA Xmer No any system and areas affected as load managed by other 132kv feeders at 220KV S/s Sarni.There was no load loss and no generation loss.

2. System Disturbance on 13.06.2019 in 220KV S/sJabalpur: On dated 13-06-2019 M.P system was facing Bad weather, heavy thunder storm , rains &lightning and frequency of National Grid was 50.03 Hz, at around 16.00 Hrs, Due to Extreme bad weather conditions one tower of 220kv Jabalpur-Narsinghpurckt 1 & 2 collapsed of loc no 11/1 ,at 16.02hrs subsequently followingelements tripped at 220kv s/s Jabalpur : 220kv Jabalpur-Birsinghpurckt 160 MVA X-mer( BHEL) 160 MVA X-mer( BBL) 160 MVA X-mer( GEC) 3X40 MVA X-mer( MITSU) 132KV Jabalpur-Madhotalckt 132KV Jabalpur-Panagarckt 132KV Jabalpur-TejgarhtapPatanckt

3 4 no of s/s interrupted i.e 220kv Jabalpur s/s, 132kv Maneri s/s , 132kv VFJ s/s & 132kv Vinobabhave s/s affected by the trippingalthough load remain managed in remaining s/s of that region.There was a load loss 232MW and no generation loss. System Normalized by charging 160 MVA X-mer( BHEL) at 16.15 hrs and the other elements gradually. 220kv Jabalpur-Narsinghpurckt 1 & 2 are still out.

3. System Disturbance on 02.06.2019 in SSTPS-Pihampur Area: On dated 02-06-2019 at 15.20 Hrs. M.P system at Indore area was stormy and frequency of National Grid was 50.06 Hz, at 15.26 Hrs, following elements tripped : 400kv SSTPS-Pithampurckt I & II 400kv SSTPS-Pithampurckt III During the event , 400kv SSTPS-Pithampurckt IV was under shutdown, as SSTPS generation was low at that time , no overloading happened. No any system and areas affected as load remain managed at that region by other ckts.There was no load loss and no generation loss. 24 no of towers collapsed of 400kv SSTPS-Pithampurckt I & II. 400kv SSTPS-Pithampurckt I & II are still out. 400kv SSTPS-Pithampurckt III charged at 18.35 hrs.

4. System Disturbance on 12.06.2019 in Rajgarh area: On dated 12-06-2019 at 20.00 Hrs, frequency of National Grid was 50.07 Hz, MP system was very stormy , 20.03 hrs due to extremely bad weather and stormy conditions, few towers of 400kv Rajgarh-SSP ckt I & II demaged/collapsed at different locations. There was no load loss and no generation loss. 400kv Rajgarh-SSP ckt I& II are still out.

5. System Disturbance on 26.06.2019 in 220KV S/sBirsinghpur(pali)-On dated 26-06- 2019 at 01.50 Hrs. M.P system was normal and frequency of National Grid was 49.98 Hz,

Agenda of 71st OCCM of MP 48 at 01.55 Hrs, 220kv Bus fault occurred at 220KV S/s Birsinghpur ,resulting in the tripping of followingelements : 220kv Birsinghpur-Birsinghpurckt I, II , III , IV 220kv Birsinghpur-Jabalpur ckt I & II 220kv Birsinghpur-Traction ckt I & II 220kv Birsinghpur-Hydelckt 220kv Bus tie 160 MVA x-mer No any system and areas affected as load remain managed by other 132kv feeders at 220KV S/s Birsinghpur.There was no load loss and no generation loss.

6. System Disturbance on 07.07.2019 at Satna area: On dated 07.07.19 at 18.30 hrs. M.P system was normal with the little stormy weather at satna area and frequency of National Grid was 50.00 Hz,at 18.47 hrs, 220kv Satna(PG)-Chhatarpurckttripped with heavy fault current at Satna(PG) end,ckt didn’t hold at first charge.

On patrolling, a tower at loc no 12 found collapsed.

No any system and areas affected as load managed by other 132kv Bijawar – Chhatarpurckt. There was no load loss and no generation loss.ERS tower installed at the loc no 12 and line charged through it on 15.07.19

Presently the ckt is on ERS tower.

Agenda of 71st OCCM of MP 49 Annexure-6.6

PERIOD OF GROUP NAME OF SUBSTATION TEAM MEMBERS NAME / DESIGNATION DEPARTMENT CONTACT NO. E-MAIL ID PROTECTION AUDIT

1. Er. Cinderella Felix, Assistant Engineer O/o. CE, SLDC MPPTCL, Jabalpur 9425802661 [email protected]

220 KV S/S PITHAMPUR SEC-III 18-09-2019 2. Er. P.S.RAGHAV, Executive Engineer Testing Dn. Bhopal, MPPTCL. 9425804998 [email protected] GROUP-I 220 KV S/S PITHAMPUR SEC-II 19-09-2019 220 KV S/S DHAR 20-09-2019 3. Er. Rajendra Agrawal, Executive Engineer O/o. CE(Gen), SSTPS, Khandwa 9425808834 [email protected] , [email protected]

9424025167/ 4. B.K.Sahu, Manager (Electrical) ISP, NHDC [email protected] , [email protected] 7389806167

1. Er. S.Chakraborty, Executive Engineer O/o. CE, SLDC MPPTCL, Jabalpur 9425805249 [email protected]

1. 220 KV MAIHAR 25-09-2019 2. Er. R.K AGRAWAL, Executive Engineer Testing Dn.-II, Jabalpur. 9425805061 [email protected] GROUP-II 2. 220 KV S/S SATNA 26-09-2019 3. 220 KV S/S KOTAR 27-09-2019 3. Er. Irshad Khan, Executive Engineer O/o. ED(Engg.), Jabalpur 9425806563 [email protected] , [email protected]

9424025167/ 4. B.K.Sahu, Manager (Electrical) ISP, NHDC [email protected] , [email protected] 7389806167

1. Er. Shikhar Nema, Assistant Engineer O/o. CE, SLDC MPPTCL, Jabalpur 9425805299 [email protected]

220 KV TONS HPS 03-10-2019 2. Er. C.B.KUSHWAHA, Assistant Engineer Testing Dn., Katni. 9425805293 [email protected] , [email protected] GROUP-III 220 KV S/S SIRMOUR 04-10-2019 220 KV S/S REWA 05-10-2019 3. Er. P.K.Shrivastava, Executive Engineer O/o. CE(O&M:Hydel), Jabalpur 9425806636 [email protected]

4. Dhananjay Ram, Assistant Manager (Electrical) OSP, NHDC 9424078528 [email protected] , [email protected]

1. Er. S.Chakraborty, Executive Engineer O/o. CE, SLDC MPPTCL, Jabalpur 9425805249 [email protected]

400 KV SGTPS 15-10-2019 2. Er. R.K AGRAWAL, Executive Engineer Testing Dn.-II, Jabalpur. 9425805061 [email protected] GROUP-IV 220 KV AMARKANTAK 16-10-2019 220 KV S/S ANUPPUR 17-10-2019 3. Er. Harpreet Bumrah, Assistant Engineer O/o. CE(O&M:Gen), Jabalpur 9425808578 [email protected] ,

4. Er. Sailesh Tripathi Plant Engineer, JP Bina 8349997025 [email protected] , [email protected]

1. Er. Shikhar Nema, Assistant Engineer O/o. CE, SLDC MPPTCL, Jabalpur 9425805299 [email protected]

220 KV S/S BINA 22-10-2019 2. Er. R.K AGRAWAL, Executive Engineer Testing Dn.-II, Jabalpur. 9425805061 [email protected] GROUP-V 220 KV S/S GUNA 23-10-2019 220 KV S/S ASHOKNAGAR 24-10-2019 3. Er. Anshuman Choudhary, Assistant Engineer O/o. CE(Gen), STPA, Sarni 9425611155 [email protected]

4. Er. Arman Ali Senior Engineer, JP Bina 8719899556 [email protected]

Agenda of 71st OCCM of MP 50 Annexure-8.1 M.P. POWER TRANSMISSION COMPANY LTD NAME OF T & C CIRCLE :- 132KV/33KV INPUT/OUTPUT AT TRANSFORMERS - (ACTIVE ENERGY IN MWH) MONTH:- IMPORT EXPORT NAME OF 132/33 KV METER PREVIOUS PRESENT MF ASSESEME CONSUMPTION PREVIOUS PRESENT MF ASSESEMENT CONSU- MPTION Sl. No. DETAILS OF TRANSFORMERS REMARKS SUBSTATION SIDE SERIAL NO. READING WITH READING WITH NT (MWH) READING READING WITH (MWH) TIME & DATE TIME & DATE WITH TIME & TIME & DATE DATE 132KV 1 1 33KV 132KV 2 2 33KV 132KV 3 1 33KV 132KV 4 2 33KV 132KV 5 3 33KV

NOTE:- New Transformer add in substation please marke Below

Agenda of 71st OCCM of MP 51 LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER SATNA CIRCLE KOTAR 220 KV S/S 1 220 KV SATNA PGCIL CB FAULTY CLOSE SATNA 220 1 132KV KYMORE CB FAULTY CLOSE BEOHARI 132 1 132KV RAMPUR NIKEN CB FAULTY CLOSE KOTMA 132 1 132/33 KV XMER (PRI) CB FAULTY CLOSE UMARIYA 132 1 ALL ANALOG SHOWING 0 PROBLEM IN PT SUPPLY

LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER KATNI 400 KV S/S 1 125 MVAR BUS REACTOR CB N/A Process connection required 2 400 KV DAMOH CB OPEN CLOSE PANAGAR 220 KV S/S 1 220 KV SUKHA 1 CB FAULTY CLOSE

LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER KIRNAPUR 132 KV S/S Sr.no. DESCRIPTION Status Telemetry value at SLDC Actual value at site 1 132 KV BUS BALAGHAT 1 & 2 MW/MVAR 26/16 ;-40/20

Agenda of 71st OCCM of MP 52 sr.no. Name of Element sldc side Field INDORE 400 KV S/S 2 220 Kv TBC Bus Coupler Open Faulty INDORE EAST 220 KV S/S 1 220kv dewas CB close faulty

INDORE 400 KV S/S 1 400kv Singhaji malwa Ckt -4 CB close Faulty

PITAMPUR 220 KV S/S Sector-III 1 132 Kv PRASRAM PURIYA CB open close

RAJGRAH (DHAR) 220 KV S/S 1 220 kv all breakers suspected 2 220kv bus voltag-1 wrong 3 132kv all brekers suspected 220KV S/s JULWANIA 1 22/132Xmer HV and LV Side MW 17 27 NOTE:- All 132 Kv Side brekaer is open Actually closed

132 kV S/s Khachrod NOTE:- All 132 Kv Side brekaer is open Actually closed 132 KV S/S MALHARGAR ALL 132 KV SIDE BREAKER NOT COMING

132 KV S/S Polykalan 1 NIL

220 KV S/S RATLAM Not 2 220 Kv TBC CB Coming open 400 KV S/s JULWANIA Not 1 220 KV SENDHWA 1 CB Coming Close Not 2 221 KV SENDHWA 12 CB/MW/MVAR Coming Close 3 220 KV BUSCOUPLER CB FAULTY CLOSED

LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER 03-09-2019 KHATEGAON 132 KV S/S 1 132 KV BUS-COUPLER CB FAULTY NON- 2 132/33KV 40MVA-XMER-2 MW/MVAR CURRENT

UJJAIN 220 KV S/S 1 132KV BUS COUPLER CB FOULTY OPEN

132 KV S/S AGAR 1 132kV Buscoupler CB Faulty Close Kannod 132 KV S/S All 132 Kv side BC and 33 kv side BC not coming

Agenda of 71st OCCM of MP 53 LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER 03-09-2019

ASTHA 400 KV S/S 1 400 KV BUS-COUPLER CB FAULTY 2 132 KV BUS-COUPLER CB FAULTY

RAJGARH 220 KV S/S NON 1 220 KV MAIN BUS FREQUENCYCURRENT

SARNI 220 KV S/S 1 160 MVA XMER(LV SIDE) CB FAULTY CLOSE

HARDA 132 KV S/S NON 1 132 KV KHIRKIYA CB CURRENT CLOSE 2 KV CHANNERA(TAP KHIRKIYA RLY TRC CB FAULTY CLOSE 3 132 KV KHIRKIYA RLY TRCN-1 CB FAULTY

ZEERAPUR 132 KV S/S NON 1 132 KV BUS AGE/FREQU CURRENT NON 2 132 KV BUS-COUPLER MW/MVAR CURRENT

LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER 03-09-2019

BHOPAL 400 KV S/s 1 400 KV DAMOH-1 PG CB OPEN CLOSE 2 400 KV BINA-1 TIE-CB OPEN CLOSE 3 220 KV BUS TIE CB OPEN CLOSE

LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER 03-09-2019

SHOEPURKALAN 132 KV S/S 1 132 KV SABALGARH-2 CB FAULTY CLOSE MW,MVA 2 132 KV SABALGARH-1 & 2 R WRONG DIRECTION MW,MVA 3 132 KV BARODA R WRONG DIRECTION MW,MVA 4 132/33KV 63MVAX-MER-2(HV) R WRONG VALUES

Agenda of 71st OCCM of MP 54 Name at SLDC end at site end SATPURA T P S 1 400 KV AASTHA 1 & 2 LINE REACTOR N/A 2 400 KV SEONI MW 99 85

SINGHA JI phase 2 S T P S 1 GEN NO 3 & 4 RGMO N/A S G T P S 1 220 /33 KV TR MW/MVAR NA 2 400 KV BUS 1 FREQ 49.79 49.98 3 220 KV BUS 2 VOLTAGE 264 230 4 GEN NO.1,2,3,4 RGMO N/A RAJGHAT H P S 1 GEN 1 CB FAULTY OPEN BARGI 1 GEN NO 1 ,2 RGMO N/A ALL CB SUSPECTED GANDHI SAGAR H P S 1 132 KV BUS 1 KV 127 131 2 33 KV Rajisthan feeder MW/MVAR N/A 3 132 KV BUS 2 KV 122 132 ATPS 1 220 KV SIDHI CB TRANSMIT CLOSE

ISP Sr.No Parameter Field value Scada value /status 1 ISP –INDORE 400 KV Feeder 1 ( 91 908 2 ISP –NAGDA 400 KV Feeder (MV 94 938 3 GENERATOR 5 & 6 MAVR 5 N /A 4 GENERATOR (OFF CONDITION) N/C

Agenda of 71st OCCM of MP 55 ANNEXURE-9.7 SOE VERIFICATION PENDING 220 KV Mugaliyachhap 400 KV Astha 132 KV Astha 132 KV Icchwar 132 KV Sheopur Kalan 132 KV Harda 132 KV Picchore 132 KV Sehore 132 KV Ayodhya Nagar 132 KV Kurawar

Agenda of 71st OCCM of MP 56