ILOILO CITY C I T Y O F L O V E
SOTOGRANDE ILOILO RESIDENTIAL TOWER 2 Iloilo City–capital of the province of Iloilo–is a highly urbanized city on the southeastern tip of Panay island in the Philippines. It is the center of the Iloilo-Guimaras Metropolitan Area, as well as the regional center and primate city of the Western Visayas region. STRATEGIC LOCATION
Iloilo City is bordered by the towns of Oton in the west, Pavia in the north and Leganes in the northeast. Just across the Iloilo Strait in its eastern and southern coastlines are the towns of Buenavista and Jordan in the island-province of Guimaras. THE MOST BUSINESS-FRIENDLY CITY • In October 2019, Iloilo is awarded by the Philippine Chamber of Commerce and Industry (PCCI) the Most Business-Friendly Highly Urbanized City in the country. • This is due to influx of BPO firms, real estate developments, infrastructure projects, and MICE programs.
https://www.sunstar.com.ph/article/1828605 DINAGYANG FESTIVAL Among the biggest religious and cultural feasts in the Philippines in honor of the Holy Child Jesus or Sto. Niño. Celebrated annually on the 4th Sunday of January, Dingayan is recognized as a world-class festival. Ati Tribe Competition, Kasadyahan Cultural Competition and the Miss Iloilo Dinagyang are some of the competitions being held during the festival. The festival showcases impressive choreography with colorful tribal costumes and striking props to depict life in Panay before the Spanish colonization and the advent of Catholicism in the country.
http://dinagyangsailoilo.com/gallery/http://dinagyangsailoilo.com/dinagyang/ TOURIST ARRIVAL
January to June 2019 418, 079 Tourists Iloilo City was second to Aklan in tourist arrivals with 1,103,334 visitors
Big festivals like Dinagyang in MICE accounted 50 percent January and Paraw Regatta in of the 1.2 million annual tourist February, and guests attending arrivals in the city MICE events are the biggest contributors
https://www.sunstar.com.ph/article/1822812 PANAY-GUIMARAS-NEGROS LINK F U T U R E D E V E L O P M E N T
• The Iloilo-Guimaras-Negros Island Bridge is among the Department of Public Works and Highway (DPWH) pipeline of projects eyed for Chinese funding. • As of SEPT 2019, the project is under feasibility study and is expected to cost PHP 27.15 Billion. • The first phase of the project would link Iloilo to Guimaras. While phase two (2) would connect the latter to Negros Island. • The Panay-Guimaras-Negros Bridge network is expected to provide increase inter-connectivity in the provinces of Western and Central Visayas, as well as to boost the economy in said regions. • Target start of construction by Q2 2021
https://www.pna.gov.ph/articles/1075538 https://www.panaynews.net/iloilo-guimaras-bridge-complete-by-2023/ JARO, ILOILO
Jaro is the largest of all districts of Iloilo City. Its also known as ‘The City Within a City’ and ‘The Mestizo Town of Iloilo’. The district is notable for its large nineteenth-century architecture–such as Jaro Cathedral and the Palasyo, the Archbishop's residence. CULTURE
JARO METROPOLITAN LIZARES MANSION LOPEZ MANSION Jaro, CATHEDRAL Jaro, Iloilo City Iloilo City 10 MINS. / 5.4 KM 15 MINS / 5.7 KM 22 MINS / 8.1 KM
PROJECT Boasting another six- BRIEF SOTOGRANDE storey tower, this will ILOILO still be poised to rise within Green RESIDENTIAL Meadows Iloilo, a TOWER 2 master-planned is Sta. Lucia Land’s community located second project in Brgy. Ungka 1, following the series Pavia and Brgy. of Sotogrande Tacas, Jaro, and condominiums in also dubbed as Iloilo. “Iloilo’s first lake community”. ITEM DESCRIPTION Type of Project RESIDENTIAL CONDOMINIUM Total Number of Units 118 UNITS Studio Floor Area (in sqm.) 24.50 – 34.70 1-Bedroom Floor Area (in sqm.) 40.25 – 49.00 2-Bedroom Floor Area (in sqm.) 49.00 – 56.00 Proof of Ownership CCT Unit delivery FULLY-FINISHED Turn over date 2nd QUARTER OF 2022
PROJECT DETAILS UNIT NO. OF FLOOR STUDIO 1-BEDROOM 2-BEDROOM ORIENTATION UNITS GROUND 22 18 2 2 FLOOR SECOND 24 18 4 2 FLOOR THIRD 18 6 10 2 FLOOR FOURTH 18 6 10 2 FLOOR FIFTH 18 6 10 2 FLOOR SIXTH 18 6 10 2 FLOOR
TOTAL 118 UNITS 60 46 12 SOTOGRANDE ILOILO
PROJECT LOCATION GREEN MEADOWS Located within Green Meadows, Along Iloilo Circumferential Rd., Jaro, Iloilo City
12 MINS AWAY FROM ILOILO INTL AIRPORT HOW TO GET THERE
21 MINS (13.8 KM) 25 MINS (12.4 KM) FROM ILOILO INTERNATIONAL FROM ILOILO PROVINCIAL AIRPORT: CAPITOL:
Head to Iloilo Airport Access Road. Turn right onto Bonifacio Drive. Turn right to Kahilwayan Avenue. Take Luna & E. Lopez Streets to Turn left on Circumferential Road. Burgos-Seminario Streets in Jaro. Continue on Diversion Road to Green Turn left to Green Meadows Avenue. Meadows. Turn right to Green Meadows Avenue. SITE DEVELOPMENT PLAN
TOURIST SPOTS
ILOILO MUSEUM OF CALLE REAL GUIMARAS ISLAND CONTEMPORARY ART JM Basa St., Iloilo 30 MINS TO ILOILO Mandurriao, Ilolilo City City Proper PORT 20 MINS BOAT RIDE TO 15 MINS / 6.6 KM 25 MINS. / 14.6 KM GUIMARAS BUSINESS HUBS
AYALA TECHNOHUB ILOILO ILOILO BUSINESS PARK Mandurriao, Iloilo Enterprise Rd., Mandurriao 20 MINS / 8.6 KM 16 MINS / 7.1 KM SHOPPING AND LEISURE
CASINO FILIPINO ILOILO SM CITY ILOILO Danao, Iloilo CIty Mandurriao, Iloilo City 25 MINS / 13.9 KM 11 MINS. / 6.2 KM
FESTIVE WALK MALL ILOILO GOLF AND SHOPS AT ATRIA COUNTRY CLUB Donato Pison Ave, Donato Pison Ave, Mandurriao Santa Barbara, Iloilo Mandurriao 14 MINS / 6.6 KM 12 MINS / 8.6 KM 19 MINS. / 8.1 KM MEDICAL FACILITIES
EDUCATIONAL METRO ILOILO HOSPITAL AND MEDICAL CENTER INSTITUTIONS Metropolis Ave., Jaro, Iloilo 9 MINS. / 5.4 KM UNIVERSITY OF SAN AGUSTIN – HIGH ILOILO MISSION HOSPITAL SCHOOL CAMPUS Jaro, iloilo 5 MINS. / 3.0 KM 16 MINS. / 6.8 KM
THE MEDICAL CITY – ILOILO CENTRAL PHILIPPINE UNIVERSITY Locsin St. Molo, Iloilo 10 MINS. / 5.1 KM 20 MINS. / 8.8 KM LAKE VICTORIA CLUBHOUSE GREEN MEADOWS AVE
LOWER GROUND FLOOR FLOOR PLANS
21 PARKING LOTS LAKE VICTORIA CLUBHOUSE GREEN MEADOWS AVE
UPPER GROUND FLOOR FLOOR PLANS
TOTAL NO. OF UNITS STUDIO 1-BR 2-BR 22 18 2 2 LAKE VICTORIA CLUBHOUSE GREEN MEADOWS AVE
SECOND FLOOR FLOOR PLANS
TOTAL NO. OF UNITS STUDIO 1-BR 2-BR 24 18 4 2 LAKE VICTORIA CLUBHOUSE GREEN MEADOWS AVE
THIRD FLOOR FLOOR PLANS
TOTAL NO. OF UNITS PER FLOOR STUDIO UNITS PER FLOOR 1-BR PER FLOOR 2-BR PER FLOOR 18 6 10 2 LAKE VICTORIA CLUBHOUSE GREEN MEADOWS AVE
FOURTH FLOOR FLOOR PLANS
TOTAL NO. OF UNITS PER FLOOR STUDIO UNITS PER FLOOR 1-BR PER FLOOR 2-BR PER FLOOR 18 6 10 2 LAKE VICTORIA CLUBHOUSE GREEN MEADOWS AVE
FIFTH FLOOR FLOOR PLANS
TOTAL NO. OF UNITS PER FLOOR STUDIO UNITS PER FLOOR 1-BR PER FLOOR 2-BR PER FLOOR 18 6 10 2 LAKE VICTORIA CLUBHOUSE GREEN MEADOWS AVE
SIXTH FLOOR FLOOR PLANS
TOTAL NO. OF UNITS PER FLOOR STUDIO UNITS PER FLOOR 1-BR PER FLOOR 2-BR PER FLOOR 18 6 10 2 TIMETABLE OF CONSTRUCTION AND DELIVERY SOTOGRANDE ILOILO TOWER 2
START OF CONSTRUCTION 2018 Q3
TARGET YEAR OF COMPLETION/ 2022 TURNOVER (plus 6 months grace period)