Representatives of the North West Alliance

Mike Young Managing Director of BC Iron Limited

Mike Young graduated from Queens University, Canada and after two years of uranium and gold exploration and mining in Canada, he immigrated to in 1987. Since then Mike has worked for Dominion Mining Limited, Mining and Resource Technology, which became part of Golder Associates, and Cazaly Resources. Mr Young’s experience has a strong focus on exploration, resource definition and development.

Wayne Richards Managing Director of Brockman Resources Limited

Wayne Richards has over 20 years experience in the mining and mineral processing industry, with extensive experience in the development and operation of nickel/cobalt and iron ore businesses. He commenced his career at Queensland Nickel Pty Ltd in 1985 and moved to in 1997 as the Refinery Manager of the Murrin Murrin Nickel-Cobalt Project. He has been involved in the design, construction, commissioning and ramp-up of several significant brownfield and greenfield projects within Australia. Mr Richards recently fulfilled senior executive roles Megan Anwyl within BHP Billiton Iron Ore, and joined Brockman Resources in Our Members Chair – North West Iron Ore Alliance August 2007.

Megan Anwyl was appointed Chair of the North West Iron Ore David Turvey Limited 100%-owned Marillana Project, located 100km north of Alliance in December 2007. She is the former Member for Managing Director of FerrAus Limited www.atlasiron.com.au Newman in the , where the total Mineral Resource Kalgoorlie (1996-2001) and was a Shadow Minister on Geoff Atlas Iron (ASX: AGO) has one of the largest land holdings now exceeds 1.1 billion tonnes of iron ore, and the Company is Gallop’s front bench, giving her a unique insight and special David Turvey is a geologist and founding director of Equant in the Pilbara region covering over 600km2. The Company is aggressively targeting iron ore production by 2009. Brockman expertise in the political and bureaucratic processes of the Resources Pty Ltd, a resource consulting company that provides preparing to commence production of direct shipping grade has recently completed a Scoping Study on a proposed 10Mtpa Western Australian Government. After leaving Parliament, Megan technical evaluation and business development studies of global iron ore (DSO) resources from Pardoo Project, 75km from the iron ore project and is conducting a Feasibility Study based was appointed as Director of lobbying firm, Hawker Britton, mineral projects. Prior to 1998, Mr Turvey worked with companies public access port at Port Hedland, in the second half of 2008. on its expanded resource base which is due for completion in where she acted as a government relations consultant focusing including Normandy Mining Ltd, Chevron Corporation, and CSR Ltd Targeting production of 1 million tonnes per annum in its first early 2009. particularly on major infrastructure projects. managing successful mineral exploration programs and business year of operation, Atlas is forecasting its production at Pardoo development teams. His 24 years experience in the mineral For ten years before entering Parliament, Megan practised as a will grow to 3 million tonnes per annum by 2010 with further FerrAus Limited industry has included seven years in expatriate management roles lawyer and maintains strong links to the justice, indigenous and substantial growth expected on the basis of its aggressive www.ferraus.com in South East Asia. community sectors. She holds a Bachelor of Laws and Bachelor of ongoing exploration effort. Atlas has recently upgraded its FerrAus is an emerging developer of iron ore and other ferrous Arts in Criminology and is a Justice of the Peace. exploration target to 120-180 million tonnes. raw materials. Its wholly owned, strategic foothold in the Matthew Rimes Managing Director of Iron Ore Holdings Limited under-explored, highly prospective new iron ore sub-province David Flanagan BC Iron Limited 2 in the East Pilbara region encompasses over 560km with a Managing Director of Atlas Iron Limited Matthew Rimes is a mining engineer with over thirty years www.bciron.com.au potential strike length of 30-40km. The priority project is experience in a range of commodities including gold, copper, David Flanagan is a geologist with extensive experience in BC Iron (ASX: BCI) is focused on the exploration and Roberston Range where continuous drilling and evaluation nickel and iron ore. He was with North Ltd from 1989, and then mining operations, exploration and project development in development of channel iron deposits within its Nullagine campaigns since late 2005 have yielded a significant resource subsequently with the group following the takeover Western Australia, Indonesia and West Africa. He has held senior Project in the Pilbara. A major exploration program with the expectation of continued expansion as a result of of North Ltd in 2000. Over the last ten years he has been with management roles with Resource Service Group and Gindalbie commenced in April 2007 over the Bonnie Creek and Nullagine further planned drilling programmes. Robe River, holding senior operational positions at both of Robe’s Gold NL. Whilst with RSG he was seconded to Glencor’s Bogosu River CIDs, and, in March 2008, BC Iron announced a Channel operations at Pannawonica and West Angelas. Prior to joining the operation as Chief Exploration Geologist, and under his leadership Iron Deposit resource of 47.2Mt at 53.6% Fe (61.5% CaFe) at Iron Ore Holdings Limited board of Iron Ore Holdings he was Managing Director of Echelon the Bogosu exploration team discovered and developed the Chujah Nullagine, including a high-grade DSO resource of 28.0Mt www.ironoreholdings.com Resources Ltd. deposits totalling 500,000 ounces of gold. grading 57.4% Fe (65.1% CaFe). The Company is conducting a Iron Ore Holdings Ltd (ASX: IOH) was established in December Scoping Study on an initial 3Mtpa DSO operation at the Bonnie 2003 and successfully listed on the ASX in May 2005. The Creek CID Project. Company’s strategy is to prove up and mine commercial quantities of Direct Shipping Ore (DSO) on its tenements, Brockman Resources adjacent to BHP Billiton’s and Hamersley Iron’s Yandi and www.brockmanresources.com.au Yandicoogina mines in the Pilbara region. Exploration to For more information on the North West Iron Ore Alliance, our strategies and objectives, email [email protected] Brockman Resources Limited (formerly Yilgarn Mining date has been very successful with the identification of an Limited) is focused on the exploration and development of its additional 16 new exposed channel iron deposits. T: (08) 9214 3836 Level 29, 221 St Georges Terrace WA 6000 PO Box 7505 Cloisters Square WA 6850 A New Iron Ore Generation in the Pilbara

The North West Iron Ore Alliance in 2007/08 and collectively would rank companies are set to make a significant and alongside some of the more significant “Collectively, these companies have dynamic contribution to the Pilbara iron recent and new iron ore developments ore industry, which has played a vital role currently planned in Australia. the potential to develop long-term in the region’s development since the 1960s iron ore production and export and accounts for over 95% of Australia’s These include BHP Billiton’s Rapid Growth iron ore exports. 3 Project, Rio Tinto’s Hamersley expansion, businesses capable of delivering Fortesecue Metal Group’s Chichester Current development and production Project and several new projects planned up to 50 million tonnes of iron ore plans could see the five existing NWIOA for the Mid West region of Western per annum by 2014…generating members produce up to 50 million tonnes Australia. per annum of iron ore by 2014 – a level of more than A$165 million per production that would generate more than The growth of the Chinese economy over annum in royalties and significant A$165 million in royalties annually and the past decade and the surging demand significant new employment, growth and from its steel industry for additional new employment, growth and economic opportunities. supplies of high-quality iron ore has fuelled economic opportunities…” increased investment in exploration for This level of production is equivalent to new iron ore deposits in the Pilbara region, approximately 15% of Australia’s forecast both amongst the majors and a group of iron ore production of 322 million tonnes dynamic junior iron ore companies. About the North West Iron Ore Alliance

The North West Iron Ore Alliance (NWIOA) Collectively, these companies have the Scoping Studies through Feasibility Studies was formed in 2007, bringing together a potential to develop long-term iron ore to production. First iron ore production from The Alliance’s Objectives group of emerging iron ore companies production and export businesses capable a North West Iron Ore Alliance company is with a shared interest in promoting the of delivering up to 50 million tonnes of iron scheduled to commence in October 2008. The key objective of the North West Iron Ore Alliance is to bring junior companies development of a vibrant and successful ore per annum by 2014. Alliance members together to fast-track and streamline the development of a successful and dynamic new new iron ore mining and export industry in have delineated combined high-grade The Alliance members have agreed to work iron ore industry in the Pilbara region of Western Australia. the world-class Pilbara region of hematite, Channel Iron Deposit and detrital together to enhance and accelerate the Western Australia. resources totalling approximately 1.6 billion development of a brand new junior iron Our key initial focal points are: tonnes and magnetite resources totalling ore sector to take advantage of the current The members of the NWIOA are: some 1.5 billion tonnes. strong growth cycle in the global iron ore • To secure commitment from the Western »» Provide diversity to the State’s industry. Key areas of focus for the Alliance Australian State Government for a new iron ore industry. • Atlas Iron Limited The Alliance companies are majority owned include infrastructure access, economic and junior iron ore industry within the • To help find new solutions to • BC Iron Limited by Australian shareholders, and have social development, statutory approvals, Pilbara region approvals issues • Brockman Resources Limited already made a substantial contribution stakeholder relations and building strong • To advocate for public policy • FerrAus Limited to the Pilbara regional economy, having partnerships with communities in the • To be employers of choice in the settings that: • Iron Ore Holdings Limited raised almost A$160 million in capital Pilbara. iron ore industry since 2004 to underpin aggressive iron »» Consider the needs of junior iron • To simplify and enhance the way our ore exploration, evaluation and feasibility By working together, North West Iron companies in regards to the planned member companies contribute to programs. Ore Alliance members have the potential expansion of social and economic education and employment opportunities to generate significant employment and infrastructure at Port Hedland for our workers and their families Between them, the five Alliance members business opportunities in the Pilbara and »» Consider the needs of junior iron ore • To foster partnerships and training already employ approximately 200 people, Perth, while increasing the diversity, depth companies when determining access to and employment opportunities with both directly and indirectly, and this and sustainability of the multi-billion dollar rail and other transport infrastructure indigenous Australians. figure is expected to increase rapidly in iron ore sector. »» Assist Federal and State Governments the months ahead as they progress from to provide sustainable social and economic infrastructure for the Pilbara that will mean true regional development A New Iron Ore Generation in the Pilbara

The North West Iron Ore Alliance in 2007/08 and collectively would rank companies are set to make a significant and alongside some of the more significant “Collectively, these companies have dynamic contribution to the Pilbara iron recent and new iron ore developments ore industry, which has played a vital role currently planned in Australia. the potential to develop long-term in the region’s development since the 1960s iron ore production and export and accounts for over 95% of Australia’s These include BHP Billiton’s Rapid Growth iron ore exports. 3 Project, Rio Tinto’s Hamersley expansion, businesses capable of delivering Fortesecue Metal Group’s Chichester Current development and production Project and several new projects planned up to 50 million tonnes of iron ore plans could see the five existing NWIOA for the Mid West region of Western per annum by 2014…generating members produce up to 50 million tonnes Australia. per annum of iron ore by 2014 – a level of more than A$165 million per production that would generate more than The growth of the Chinese economy over annum in royalties and significant A$165 million in royalties annually and the past decade and the surging demand significant new employment, growth and from its steel industry for additional new employment, growth and economic opportunities. supplies of high-quality iron ore has fuelled economic opportunities…” increased investment in exploration for This level of production is equivalent to new iron ore deposits in the Pilbara region, approximately 15% of Australia’s forecast both amongst the majors and a group of iron ore production of 322 million tonnes dynamic junior iron ore companies. About the North West Iron Ore Alliance

The North West Iron Ore Alliance (NWIOA) Collectively, these companies have the Scoping Studies through Feasibility Studies was formed in 2007, bringing together a potential to develop long-term iron ore to production. First iron ore production from The Alliance’s Objectives group of emerging iron ore companies production and export businesses capable a North West Iron Ore Alliance company is with a shared interest in promoting the of delivering up to 50 million tonnes of iron scheduled to commence in October 2008. The key objective of the North West Iron Ore Alliance is to bring junior companies development of a vibrant and successful ore per annum by 2014. Alliance members together to fast-track and streamline the development of a successful and dynamic new new iron ore mining and export industry in have delineated combined high-grade The Alliance members have agreed to work iron ore industry in the Pilbara region of Western Australia. the world-class Pilbara region of hematite, Channel Iron Deposit and detrital together to enhance and accelerate the Western Australia. resources totalling approximately 1.6 billion development of a brand new junior iron Our key initial focal points are: tonnes and magnetite resources totalling ore sector to take advantage of the current The members of the NWIOA are: some 1.5 billion tonnes. strong growth cycle in the global iron ore • To secure commitment from the Western »» Provide diversity to the State’s industry. Key areas of focus for the Alliance Australian State Government for a new iron ore industry. • Atlas Iron Limited The Alliance companies are majority owned include infrastructure access, economic and junior iron ore industry within the • To help find new solutions to • BC Iron Limited by Australian shareholders, and have social development, statutory approvals, Pilbara region approvals issues • Brockman Resources Limited already made a substantial contribution stakeholder relations and building strong • To advocate for public policy • FerrAus Limited to the Pilbara regional economy, having partnerships with communities in the • To be employers of choice in the settings that: • Iron Ore Holdings Limited raised almost A$160 million in capital Pilbara. iron ore industry since 2004 to underpin aggressive iron »» Consider the needs of junior iron • To simplify and enhance the way our ore exploration, evaluation and feasibility By working together, North West Iron companies in regards to the planned member companies contribute to programs. Ore Alliance members have the potential expansion of social and economic education and employment opportunities to generate significant employment and infrastructure at Port Hedland for our workers and their families Between them, the five Alliance members business opportunities in the Pilbara and »» Consider the needs of junior iron ore • To foster partnerships and training already employ approximately 200 people, Perth, while increasing the diversity, depth companies when determining access to and employment opportunities with both directly and indirectly, and this and sustainability of the multi-billion dollar rail and other transport infrastructure indigenous Australians. figure is expected to increase rapidly in iron ore sector. »» Assist Federal and State Governments the months ahead as they progress from to provide sustainable social and economic infrastructure for the Pilbara that will mean true regional development A New Iron Ore Generation in the Pilbara

The North West Iron Ore Alliance in 2007/08 and collectively would rank companies are set to make a significant and alongside some of the more significant “Collectively, these companies have dynamic contribution to the Pilbara iron recent and new iron ore developments ore industry, which has played a vital role currently planned in Australia. the potential to develop long-term in the region’s development since the 1960s iron ore production and export and accounts for over 95% of Australia’s These include BHP Billiton’s Rapid Growth iron ore exports. 3 Project, Rio Tinto’s Hamersley expansion, businesses capable of delivering Fortesecue Metal Group’s Chichester Current development and production Project and several new projects planned up to 50 million tonnes of iron ore plans could see the five existing NWIOA for the Mid West region of Western per annum by 2014…generating members produce up to 50 million tonnes Australia. per annum of iron ore by 2014 – a level of more than A$165 million per production that would generate more than The growth of the Chinese economy over annum in royalties and significant A$165 million in royalties annually and the past decade and the surging demand significant new employment, growth and from its steel industry for additional new employment, growth and economic opportunities. supplies of high-quality iron ore has fuelled economic opportunities…” increased investment in exploration for This level of production is equivalent to new iron ore deposits in the Pilbara region, approximately 15% of Australia’s forecast both amongst the majors and a group of iron ore production of 322 million tonnes dynamic junior iron ore companies. About the North West Iron Ore Alliance

The North West Iron Ore Alliance (NWIOA) Collectively, these companies have the Scoping Studies through Feasibility Studies was formed in 2007, bringing together a potential to develop long-term iron ore to production. First iron ore production from The Alliance’s Objectives group of emerging iron ore companies production and export businesses capable a North West Iron Ore Alliance company is with a shared interest in promoting the of delivering up to 50 million tonnes of iron scheduled to commence in October 2008. The key objective of the North West Iron Ore Alliance is to bring junior companies development of a vibrant and successful ore per annum by 2014. Alliance members together to fast-track and streamline the development of a successful and dynamic new new iron ore mining and export industry in have delineated combined high-grade The Alliance members have agreed to work iron ore industry in the Pilbara region of Western Australia. the world-class Pilbara region of hematite, Channel Iron Deposit and detrital together to enhance and accelerate the Western Australia. resources totalling approximately 1.6 billion development of a brand new junior iron Our key initial focal points are: tonnes and magnetite resources totalling ore sector to take advantage of the current The members of the NWIOA are: some 1.5 billion tonnes. strong growth cycle in the global iron ore • To secure commitment from the Western »» Provide diversity to the State’s industry. Key areas of focus for the Alliance Australian State Government for a new iron ore industry. • Atlas Iron Limited The Alliance companies are majority owned include infrastructure access, economic and junior iron ore industry within the • To help find new solutions to • BC Iron Limited by Australian shareholders, and have social development, statutory approvals, Pilbara region approvals issues • Brockman Resources Limited already made a substantial contribution stakeholder relations and building strong • To advocate for public policy • FerrAus Limited to the Pilbara regional economy, having partnerships with communities in the • To be employers of choice in the settings that: • Iron Ore Holdings Limited raised almost A$160 million in capital Pilbara. iron ore industry since 2004 to underpin aggressive iron »» Consider the needs of junior iron • To simplify and enhance the way our ore exploration, evaluation and feasibility By working together, North West Iron companies in regards to the planned member companies contribute to programs. Ore Alliance members have the potential expansion of social and economic education and employment opportunities to generate significant employment and infrastructure at Port Hedland for our workers and their families Between them, the five Alliance members business opportunities in the Pilbara and »» Consider the needs of junior iron ore • To foster partnerships and training already employ approximately 200 people, Perth, while increasing the diversity, depth companies when determining access to and employment opportunities with both directly and indirectly, and this and sustainability of the multi-billion dollar rail and other transport infrastructure indigenous Australians. figure is expected to increase rapidly in iron ore sector. »» Assist Federal and State Governments the months ahead as they progress from to provide sustainable social and economic infrastructure for the Pilbara that will mean true regional development Representatives of the North West Iron Ore Alliance

Mike Young Managing Director of BC Iron Limited

Mike Young graduated from Queens University, Canada and after two years of uranium and gold exploration and mining in Canada, he immigrated to Australia in 1987. Since then Mike has worked for Dominion Mining Limited, Mining and Resource Technology, which became part of Golder Associates, and Cazaly Resources. Mr Young’s experience has a strong focus on exploration, resource definition and development.

Wayne Richards Managing Director of Brockman Resources Limited

Wayne Richards has over 20 years experience in the mining and mineral processing industry, with extensive experience in the development and operation of nickel/cobalt and iron ore businesses. He commenced his career at Queensland Nickel Pty Ltd in 1985 and moved to Western Australia in 1997 as the Refinery Manager of the Murrin Murrin Nickel-Cobalt Project. He has been involved in the design, construction, commissioning and ramp-up of several significant brownfield and greenfield projects within Australia. Mr Richards recently fulfilled senior executive roles Megan Anwyl within BHP Billiton Iron Ore, and joined Brockman Resources in Our Members Chair – North West Iron Ore Alliance August 2007.

Megan Anwyl was appointed Chair of the North West Iron Ore David Turvey Atlas Iron Limited 100%-owned Marillana Project, located 100km north of Alliance in December 2007. She is the former Member for Managing Director of FerrAus Limited www.atlasiron.com.au Newman in the Pilbara, where the total Mineral Resource Kalgoorlie (1996-2001) and was a Shadow Minister on Geoff Atlas Iron (ASX: AGO) has one of the largest land holdings now exceeds 1.1 billion tonnes of iron ore, and the Company is Gallop’s front bench, giving her a unique insight and special David Turvey is a geologist and founding director of Equant in the Pilbara region covering over 600km2. The Company is aggressively targeting iron ore production by 2009. Brockman expertise in the political and bureaucratic processes of the Resources Pty Ltd, a resource consulting company that provides preparing to commence production of direct shipping grade has recently completed a Scoping Study on a proposed 10Mtpa Western Australian Government. After leaving Parliament, Megan technical evaluation and business development studies of global iron ore (DSO) resources from Pardoo Project, 75km from the iron ore project and is conducting a Feasibility Study based was appointed as Director of lobbying firm, Hawker Britton, mineral projects. Prior to 1998, Mr Turvey worked with companies public access port at Port Hedland, in the second half of 2008. on its expanded resource base which is due for completion in where she acted as a government relations consultant focusing including Normandy Mining Ltd, Chevron Corporation, and CSR Ltd Targeting production of 1 million tonnes per annum in its first early 2009. particularly on major infrastructure projects. managing successful mineral exploration programs and business year of operation, Atlas is forecasting its production at Pardoo development teams. His 24 years experience in the mineral For ten years before entering Parliament, Megan practised as a will grow to 3 million tonnes per annum by 2010 with further FerrAus Limited industry has included seven years in expatriate management roles lawyer and maintains strong links to the justice, indigenous and substantial growth expected on the basis of its aggressive www.ferraus.com in South East Asia. community sectors. She holds a Bachelor of Laws and Bachelor of ongoing exploration effort. Atlas has recently upgraded its FerrAus is an emerging developer of iron ore and other ferrous Arts in Criminology and is a Justice of the Peace. exploration target to 120-180 million tonnes. raw materials. Its wholly owned, strategic foothold in the Matthew Rimes Managing Director of Iron Ore Holdings Limited under-explored, highly prospective new iron ore sub-province David Flanagan BC Iron Limited 2 in the East Pilbara region encompasses over 560km with a Managing Director of Atlas Iron Limited Matthew Rimes is a mining engineer with over thirty years www.bciron.com.au potential strike length of 30-40km. The priority project is experience in a range of commodities including gold, copper, David Flanagan is a geologist with extensive experience in BC Iron (ASX: BCI) is focused on the exploration and Roberston Range where continuous drilling and evaluation nickel and iron ore. He was with North Ltd from 1989, and then mining operations, exploration and project development in development of channel iron deposits within its Nullagine campaigns since late 2005 have yielded a significant resource subsequently with the Rio Tinto group following the takeover Western Australia, Indonesia and West Africa. He has held senior Project in the Pilbara. A major exploration program with the expectation of continued expansion as a result of of North Ltd in 2000. Over the last ten years he has been with management roles with Resource Service Group and Gindalbie commenced in April 2007 over the Bonnie Creek and Nullagine further planned drilling programmes. Robe River, holding senior operational positions at both of Robe’s Gold NL. Whilst with RSG he was seconded to Glencor’s Bogosu River CIDs, and, in March 2008, BC Iron announced a Channel operations at Pannawonica and West Angelas. Prior to joining the operation as Chief Exploration Geologist, and under his leadership Iron Deposit resource of 47.2Mt at 53.6% Fe (61.5% CaFe) at Iron Ore Holdings Limited board of Iron Ore Holdings he was Managing Director of Echelon the Bogosu exploration team discovered and developed the Chujah Nullagine, including a high-grade DSO resource of 28.0Mt www.ironoreholdings.com Resources Ltd. deposits totalling 500,000 ounces of gold. grading 57.4% Fe (65.1% CaFe). The Company is conducting a Iron Ore Holdings Ltd (ASX: IOH) was established in December Scoping Study on an initial 3Mtpa DSO operation at the Bonnie 2003 and successfully listed on the ASX in May 2005. The Creek CID Project. Company’s strategy is to prove up and mine commercial quantities of Direct Shipping Ore (DSO) on its tenements, Brockman Resources adjacent to BHP Billiton’s and Hamersley Iron’s Yandi and www.brockmanresources.com.au Yandicoogina mines in the Pilbara region. Exploration to For more information on the North West Iron Ore Alliance, our strategies and objectives, email [email protected] Brockman Resources Limited (formerly Yilgarn Mining date has been very successful with the identification of an Limited) is focused on the exploration and development of its additional 16 new exposed channel iron deposits. T: (08) 9214 3836 Level 29, 221 St Georges Terrace Perth WA 6000 PO Box 7505 Cloisters Square WA 6850 Representatives of the North West Iron Ore Alliance

Mike Young Managing Director of BC Iron Limited

Mike Young graduated from Queens University, Canada and after two years of uranium and gold exploration and mining in Canada, he immigrated to Australia in 1987. Since then Mike has worked for Dominion Mining Limited, Mining and Resource Technology, which became part of Golder Associates, and Cazaly Resources. Mr Young’s experience has a strong focus on exploration, resource definition and development.

Wayne Richards Managing Director of Brockman Resources Limited

Wayne Richards has over 20 years experience in the mining and mineral processing industry, with extensive experience in the development and operation of nickel/cobalt and iron ore businesses. He commenced his career at Queensland Nickel Pty Ltd in 1985 and moved to Western Australia in 1997 as the Refinery Manager of the Murrin Murrin Nickel-Cobalt Project. He has been Our Members involved in the design, construction, commissioning and ramp-up of several significant brownfield and greenfield projects within Australia. Mr Richards recently fulfilled senior executive roles Atlas Iron Limited 100%-owned Marillana Project, located 100km north of Megan Anwyl within BHP Billiton Iron Ore, and joined Brockman Resources in www.atlasiron.com.au Newman in the Pilbara, where the total Mineral Resource Chair – North West Iron Ore Alliance August 2007. Atlas Iron (ASX: AGO) has one of the largest land holdings now exceeds 1.1 billion tonnes of iron ore, and the Company is 2 Megan Anwyl was appointed Chair of the North West Iron Ore in the Pilbara region covering over 600km . The Company is aggressively targeting iron ore production by 2009. Brockman David Turvey preparing to commence production of direct shipping grade has recently completed a Scoping Study on a proposed 10Mtpa Alliance in December 2007. She is the former Member for Managing Director of FerrAus Limited iron ore (DSO) resources from Pardoo Project, 75km from the iron ore project and is conducting a Feasibility Study based Kalgoorlie (1996-2001) and was a Shadow Minister on Geoff public access port at Port Hedland, in the second half of 2008. on its expanded resource base which is due for completion in Gallop’s front bench, giving her a unique insight and special David Turvey is a geologist and founding director of Equant Targeting production of 1 million tonnes per annum in its first early 2009. expertise in the political and bureaucratic processes of the Resources Pty Ltd, a resource consulting company that provides year of operation, Atlas is forecasting its production at Pardoo Western Australian Government. After leaving Parliament, Megan technical evaluation and business development studies of global will grow to 3 million tonnes per annum by 2010 with further FerrAus Limited was appointed as Director of lobbying firm, Hawker Britton, mineral projects. Prior to 1998, Mr Turvey worked with companies substantial growth expected on the basis of its aggressive www.ferraus.com where she acted as a government relations consultant focusing including Normandy Mining Ltd, Chevron Corporation, and CSR Ltd particularly on major infrastructure projects. managing successful mineral exploration programs and business ongoing exploration effort. Atlas has recently upgraded its FerrAus is an emerging developer of iron ore and other ferrous development teams. His 24 years experience in the mineral exploration target to 120-180 million tonnes. raw materials. Its wholly owned, strategic foothold in the For ten years before entering Parliament, Megan practised as a industry has included seven years in expatriate management roles under-explored, highly prospective new iron ore sub-province lawyer and maintains strong links to the justice, indigenous and in South East Asia. BC Iron Limited in the East Pilbara region encompasses over 560km2 with a community sectors. She holds a Bachelor of Laws and Bachelor of www.bciron.com.au potential strike length of 30-40km. The priority project is Arts in Criminology and is a Justice of the Peace. Matthew Rimes BC Iron (ASX: BCI) is focused on the exploration and Roberston Range where continuous drilling and evaluation Managing Director of Iron Ore Holdings Limited development of channel iron deposits within its Nullagine campaigns since late 2005 have yielded a significant resource David Flanagan Project in the Pilbara. A major exploration program with the expectation of continued expansion as a result of Managing Director of Atlas Iron Limited Matthew Rimes is a mining engineer with over thirty years commenced in April 2007 over the Bonnie Creek and Nullagine further planned drilling programmes. experience in a range of commodities including gold, copper, David Flanagan is a geologist with extensive experience in River CIDs, and, in March 2008, BC Iron announced a Channel nickel and iron ore. He was with North Ltd from 1989, and then mining operations, exploration and project development in Iron Deposit resource of 47.2Mt at 53.6% Fe (61.5% CaFe) at Iron Ore Holdings Limited subsequently with the Rio Tinto group following the takeover Western Australia, Indonesia and West Africa. He has held senior Nullagine, including a high-grade DSO resource of 28.0Mt www.ironoreholdings.com of North Ltd in 2000. Over the last ten years he has been with management roles with Resource Service Group and Gindalbie grading 57.4% Fe (65.1% CaFe). The Company is conducting a Robe River, holding senior operational positions at both of Robe’s Iron Ore Holdings Ltd (ASX: IOH) was established in December Gold NL. Whilst with RSG he was seconded to Glencor’s Bogosu Scoping Study on an initial 3Mtpa DSO operation at the Bonnie operations at Pannawonica and West Angelas. Prior to joining the 2003 and successfully listed on the ASX in May 2005. The operation as Chief Exploration Geologist, and under his leadership Creek CID Project. board of Iron Ore Holdings he was Managing Director of Echelon Company’s strategy is to prove up and mine commercial the Bogosu exploration team discovered and developed the Chujah Resources Ltd. quantities of Direct Shipping Ore (DSO) on its tenements, deposits totalling 500,000 ounces of gold. Brockman Resources adjacent to BHP Billiton’s and Hamersley Iron’s Yandi and www.brockmanresources.com.au Yandicoogina mines in the Pilbara region. Exploration to Brockman Resources Limited (formerly Yilgarn Mining date has been very successful with the identification of an For more information on the North West Iron Ore Alliance, our strategies and objectives, email [email protected] Limited) is focused on the exploration and development of its additional 16 new exposed channel iron deposits. T: (08) 9214 3836 Level 29, 221 St Georges Terrace Perth WA 6000 PO Box 7505 Cloisters Square WA 6850