Green Initiatives

1. LED lighting has been provided at all Railway stations under the jurisdiction of P a r l i a m e n t a r y c o n s t i t u e n c y t o w a r d s Environmental conservation measures.

Bhongir Parliamentary Constituency Passenger Amenities Shri Narendra Modi Provision of Passenger Amenities and facilities, and its improvements at Railway Stations Hon’ble Prime Minister is one of the most important aspect Railway Services.

Station Amenity Amount Status Ramannapet Extension of Platform ` 0.40 crore In Progress RAIL DEVELOPMENTAL WORKS Ramannapet Development of ` 0.27 crore Completed Circulating Area Bhongir Parliamentary Constituency Jurisdiction Ramannapet Yard Remodeling ` 0.27 crore Completed Aler ATVM ` 1.5 lakh Installed Bhongir ATVM ` 1.5 lakh Installed ATVM ` 1.5 lakh Installed South Central Railway Ramannapet Toilets ` 0.10 crore Completed serving the entire state of Jangaon Toilets ` 0.10 crore Completed Passenger Train Services , major portion Raigir Toilets ` 0.10 crore Completed of and Details of New Trains/ Special Trains/ Raigir Extension of Platform ` 1.30 crore Proposed considerable portion of Wangapalli Extension of Platform ` 1.26 crore Proposed SOUTH CENTRAL Provision of Stoppages/ Extension/ , Maharastra Increase in the frequency of Trains in Nagireddipalli Extension of Platform ` 1.63 crore Proposed ` states and small parts Bhongir Parliamentary Constituency Extension of Platform 1.32 crore Proposed RAILWAY Jangaon Waiting Room ` 0.06 crore In Progress of Tamilnadu and Jurisdiction. 7 Stations Wi-Fi ` 10 lakh Provided Madhya Pradesh.

Stoppages Provided Extension of Trains Bhongir Parliamentary 1. T.No.12705 Guntur-Secunderabad Intercity 1. T.No. 12749/12750 Machilipatnam – Secunderabad up Constituency falls under Express at Bhongir to Bidar Telangana State. Entire 2. T.No.12703/12704 Secunderabad-Howrah 2. T.No. 11303/11304 Express up to Falaknuma Express at Ramannapet Railway network 3. T.No.12713/12714 Vijayawada – Secunderabad 3. T.No. 12737/12738 Kakinada Port – Secunderabad of this constituency Express at Jangaon Express up to Lingampalli is being served by 4. T.No. 12733/12734 Tirupati – Secunderabad Express up South Central Railway. to Lingampalli ASSEMBLY SEGMENTS Safety – The First Priority Safety is the priority on SCR, to ensure safety of the Rail users, Proposed FOBs Foot over Bridges (FoBs)/ Road under/over Bridges are Ibrahimpatnam constructed / proposed for construction at various stations/ Station Cost in ` Crore locations in Bhongir Parliamentary Constituency Jurisdiction. Pemberthi 1.85 Munugode Raigir 4.85 Bhongir Ramannapet 1.33 Nagireddipalli 1.33 Nakrekal

Thungathurthi

Alair

Jangoan

RAIL DEVELOPMENTAL WORKS Road Over / Under Bridges Bhongir Parliamentary Constituency Jurisdiction With a view to strengthen safety at Level Crossing gates and to avoid untoward incidents and also to provide seamless journey to road traffic, the following Road under /over Bridges (RuB/RoB) are constructed / proposed for construction under Bhongir Parliamentary constituency. Infrastructural Development Road Over Bridges New Railway Line Works 1. RoB in lieu of level crossing No 37 between Wangapalli–Aler Constructed and Commissioned with a sanctioned cost of ` 18.98 crore Proposed for construction of MMTS-Phase II project up to Yadadri for a distance of 33 kms with an estimated cost of 2. RoB in lieu of level crossing No.22 between Ghatkesar– Constructed and Commissioned with a ` `412 crore proposed for construction. sanctioned Cost of 22.05 crore Electrification of Railway Lines 3. RoB in lieu of level crossing No.28 between –Bhongir Constructed and Commissioned with a sanctioned Cost of ` 26.67 crore Electrification work of Pagidipalli – Nallapadu Railway line for a distance of 285 Kms is completed with the cost of 4. Proposed for construction of 2-lane RoB & limited height subway in lieu of level crossing No.33 between Raigir-Wangapalli with an estimated cost of ` 32.017 crore `296.31 crore 5. Proposed for widening of existing RoB at LC No.32 between Bhongir – Raigir Stations Capacity Enhancement Bommaipalli Railway Station has been developed as New Road Under Bridge Crossing Station with a cost of `6.00 crore towards traffic 1. Subway in lieu of Manned LC no.10 between Nagireddipalli -Valigonda Stations with an estimated facility. cost of ` 2.48 crore is in progress 2. Subway in lieu of Manned LC no. 8between Pagidipalli –Nagireddipalli stations with an estimated cost of ` 2.48 crore is in progress 3. Subway in lieu of Manned LC no. 23between Ramannapet–Chityala Stations with an estimated cost of `2.48 crore is in progress 4. Construction of RuB in lieu of LC No 36 (M) in Secunderabad - Kazipet section with an estimated cost of ` 2.50 crore is in progress 5. All unmanned level crossing gates in Bhongir parliamentary jurisdiction are eliminated through construction of RuBs/Limited Height Subways