Type of Consenting Sector Consenting Regime Decision (or Development Authority eg. Local Measurable output of Local planning Application Date decision made Decision subject to Appeal decision (if Project Name Status e.g. Electricity (from Annex A word Description of proposal Unit eg. MW, KM, ha Site location/address Applicant EIA development whether a decision Application fee Additional Information / Comments Links e.g. Onshore planning authority, infrastrucutre proposal authority area submission date (if applicable) appeal (if applicable) applicable) Infrastructure doc) has been made) Generating Station Welsh government

https://www.ecotrici f) Consents to Heckington Fen Wind Farm granted consent by BEIS in 2013. This The scheme proposes the ty.co.uk/our-green- construct and application relates to a variation to the existing consent under Section 36 Secretary of State for development of 22 turbines on energy/our-green- Heckington Fen Wind Application 1A Onshore 1. Electricity operate generating County Six Hundred Farm, East to amend the wording of Condition 4 and 8 (2) to extend the date before Business, Energy and agricultural land to the North of 66 MW Ecotricity EIA Development 02/02/2018 Pending TBC N/A N/A electricity/from-the- Farm submitted Generating Station infrastructure stations under s.36 Council Heckington, Lincolnshire which the development shall be commenced from 5 to 10 years. Variation Industrial Strategy the A17 near Heckington in wind/wind-parks- of the Electricity Act application submitted 02-02-2018 and BEIS requested further information Lincolnshire. gallery/heckington- 1989 23-02-2018 fen-north-kesteven

http://www.lostockp This facility will recover energy f) Consents to ower.co.uk/ from the residual waste left over construct and Lostock Energy-from-Waste facility granted consent under Section 36 of http://www.lostockp Lostock Sustainable Secretary of State for after re-usable and recyclable On former land of Lockstock Application 1A Onshore 1. Electricity operate generating West & Tata Chemicals the Electricity Act 1989 in 2012. This application relates to a variation to ower.co.uk/media/1 Energy Plant (Energy Business, Energy and material has been remobed. It will 90 MW Power Station, Northwich, EIA Development 21/06/2018 Pending TBC N/A N/A submitted Generating Station infrastructure stations under s.36 Cheshire Council Europe the existing Section 26 consent by increasaing the power output from 017/doc-1-covering- from Waste) Industrial Strategy divert this away from landfill and Cheshire of the Electricity Act 60MW to 90MW. letter-to-dbeis-21- generate non-intermittent 1989 june-2018.pdf renewable electricity.

Planning This project invovles upgrading Inspectorate website from a single to dual carriageway https://infrastructure (14km) -including construction of a .planninginspectorat 12.5km new off line section, new e.gov.uk/projects/so grade separated junctions at uth-west/a30- Chiverton and Carland Cross and e) Development chiverton-to-carland- A30 Chiverton to Chybucca. The majority of the West Borough Consent Orders Secretary of State for Junction between Chiverton Note this is an English scheme therefore does not meet study threshold as cross-scheme/ Carland Cross Pre-Examination 3A Highways 3. Transport existing A30 will be retained as a 14 km Council and South Highways EIA Development 30/08/2018 TBC TBC TBC TBC under s.31 of the Transport and Carland Cross outlined in Annex A but included for reference/comparison https://infrastructure Scheme local route. The application also Hams District Council Planning Act 2008; .planninginspectorat includes the replacement of e.gov.uk/wp- existing roundabout at Carland content/ipc/uploads/ Cross with a 2 level motorway projects/TR010026/T style junction and new bridges and R010026-000131- accesses across the new road and 1.3%20APPLICATION the old road. %20FORM.pdf

Application to construct, operate https://www.gov.uk/ and maintain a new railway (3.4km Track would run between government/publicat Rother Valley c) Orders under s.1 section of the former & East Station Road Robertsbridge ions/bodiam-to- Railway (Bodiam to Application or s.3 of the Secretary of State for County of East Rother Valley Note this is an English scheme therefore does not meet study threshold as 3B Railways 3. Transport Railway) and to operate and 3.4 km and the limit of the kent and EIA Development 19/04/2018 TBC TBC TBC TBC robertsbridge- Robertsbridge submitted Transport and Works Transport Sussex Railway Limited outlined in Annex A but included for reference/comparison maintain two existing railways Railway at junction-order- Junction) Act 1992 between a junction at Bodiam and Bodiam transport-and-works- a terminus at Robertsbridge. act-order

https://www.gov.uk/ A- Track from Barking East Construction of a 5.5km section on government/publicat Junction to end of track at railway and remodelling of existing ions/london- Barking Riverside station. B- c) Orders under s.1 tracks which form part of Network overground-barking- London Overground construction of the station or s.3 of the Secretary of State for Rail's Thameside Line. London Borough of Note this is an English scheme therefore does not meet study threshold as riverside-extension- (Barking Riverside Decision Issued 3B Railways 3. Transport 5.5 km at Barking Riverside. C- Transport for London EIA Development 31/03/2016 Approved 04/08/2017 N/A N/A Transport and Works Transport The 4km railway which extends the Barking & Dagenham outlined in Annex A but included for reference/comparison order-decision extension) highway works at Renwick Act 1992 Barking to Gospel Oak London http://content.tfl.gov Road and Choats Road. D- Overground line to a new station .uk/bre-a4-planning- other works of the use of Barking Riverside. direction- land at Barking East Junction application.pdf

https://www.gov.uk/ Transport for Greater Machester government/publicat have been authorised to construct, c) Orders under s.1 ions/transport-for- Light rapid transit operate and maintain an extension Trafford Metrolink TPL from Note this is an English scheme therefore does not meet study threshold as or s.3 of the Secretary of State for Transport for greater-manchester- system Trafford Park Decision Issued 3B Railways 3. Transport to the Manchester Metrolink Tram N/A N/A Metropolitan Wharfside to Trafford EIA Development 11/10/2014 Approved 03/11/2016 N/A N/A outlined in Annex A but included for reference/comparison. Also - this is a Transport and Works Transport Greater Manchester light-rapid-transit- extension System, from Pomona through Borough Council Centre light rapid transit not a railway. Act 1992 system-trafford-park- Tranfford Park to the Trafford extension-order- Centre. decision-letter https://www.gov.uk/ Authorises Centro to construct, government/publicat Midland Metro c) Orders under s.1 operate and maintain an extension West Midlands Note this is an English scheme therefore does not meet study threshold as ions/the-midland- (Wolverhampton or s.3 of the Secretary of State for Wolverhampton City Dudley Street, West Decision Issued 3B Railways 3. Transport to the Midland Metro tramway N/A N/A Passenger Transport EIA Development 27/05/2014 Approved 12/07/2016 N/A N/A outlined in Annex A but included for reference/comparison. Also - this is a metro- City Centre Transport and Works Transport Council Bromwich system in Wolverhampton city Executive light rapid transit not a railway. wolverhampton-city- Extension) Act 1992 centre. centre-extension- order-decision-letter

Involves linking the railway and the Supertram networks at Tinsley so that trams and trains can run between Sheffield Catherdral Tramstop and a new station at Parkgate Shopping Centre. https://www.gov.uk/ c) Orders under s.1 Note this is an English scheme therefore does not meet study threshold as The order and planning direction government/publicat or s.3 of the Secretary of State for outlined in Annex A but included for reference/comparison. This scheme is Tinsley Chord Decision Issued 3B Railways 3. Transport would authorise either NR or the N/A N/A Sheffield City Council Tinsley Network Rail EIA Development 13/03/2015 Approved 12/11/2015 N/A N/A ions/network-rail- Transport and Works Transport a connection of the Sheffield Supertram with the Sheffield to Rotherham South Passenger tinsley-chord- Act 1992 railway at Tinsley. Transport executive or both to decision-letter constrcut and operate a 170m length of track at Tinsley , South Yorkshire to connect the Executives Sheffield supertram system with NR Sheffield to Rotherham railway

Construction of reservoir including erection of two water pumping stations, ecological and infrastructure works, car parking and access, demolition of two residential properties and a) Planning associated temporary construction https://www.sedgem Land surrounding and to the permission under works; Outline Application for oor.gov.uk/planning_ 4A Dams and Sedgemoor District South and East of, Cheddar Cheddar Reservoir 2 Decision Issued 4. Water s.57(1) of the Town LPA development including the erection 210 ha Bristol Water PLC EIA Development 20/12/2013 Approved 10/11/2014 N/A N/A online/(S(tja2jqc5gnv Reservoirs Council Reservoir, Wedmore Road, and Country Planning of visitors centre (use class D1 with 1v1ptsdpbxpkk))/Det Cheddar, BS27 3EH Act 1990; ancillary A1, A3 and A5 uses) and ails.aspx associated landscaping, inlet and draw-off towers, replacement footbridge and works to River Cheddar Yeo (as amended by revised details submitted on 2nd May 2014)