From: To: C.K.Ravichandran, The Member Secretary, S/o. C. Kulandaivel, State Environment Impact No.21 & 22, Bharathi Nagar Extension, Assessment Authority (SEIAA), Bharathidasan Nagar, Puthur, 3rd Floor, Panagal Maligai, Trichy District – 620 017 No.1 Jeenis Road, Saidapet, Mobile: 9443266043 – 15, Tamilnadu.

Sub: An application for obtaining Prior Environmental Clearance for our fresh application of Rough stone quarry project over an Extent of 3.05.0ha in S.F.Nos. 29/1, 29/3 (P), 29/4 (P), 33/1 & 33/2 (P) at Padalur (East) Village of Taluk, District. ******

Respected Sir, As per the EIA notification No. S.O. 1533 (E) Dated 14th September 2006 and amended thereafter, I am submitting herewith our application in the prescribed Form -1, Form -1 M, Pre-Feasibility Report, Baseline studies Report, Hydro Geological Report, Approved Mining Plan and Progressive Quarry Closure Plan etc., Mining plan was approved by the Deputy Director, Department of Geology and Mining, Perambalur vide Roc.No.95/G&M/2016 Dated: 16.04.2019. I have submitted all the relevant document in online for obtain Prior Environmental Clearance for our Rough stone quarry project (Patta Land/Minor Mineral/New Mine/ B2 Category, > 5Ha, Cluster category). I request that Prior Environmental Clearance for the above newly proposed Rough Stone quarry at Padalur (East) Village of Alathur Taluk, Perambalur District, may please be issued as early as possible please. I am submitting the following documents for obtaining Prior Environmental Clearance. 1. Demand Draft for Rs:20,000/- Kotak Mahindra Bank, DD No:725638, Dated:16.10.2019 2. Form-1 3. Form-1 M 4. Pre-Feasibility Report 5. Baseline studies 6. Hydro geological report 7. Approval letter and Approved Mining Plan & Mine closure plan 8. Cluster letter from Department of Geology and Mining (500m radius) 9. Quarry site photograph and Habitation details in 300m radius attested by VAO 10. Affidavit by the Project proponent 11. Blasting Agreement along with explosives license copy 12. Land Document 13. CD (Above said documents in PDF format) As all the reports and documents are submitted and soft copies of reports, plans etc are send to SEIAA-by Email. I request you to grant Environmental Clearance as early as possible. Thanking you Yours Faithfully,

C.K.Ravichandran, Place: Trichy Dated: 11.11.2019 Check List for Submission of Application for Environmental Clearance for Mining Projects

Sl Details Whether Page reference Remarks No enclosed or not 1 Name of the Proponent/Project (Name of the contact person with designation, Yes 8,27,47,110, Mobile No. Email) 2 Online receipt for the application submitted through online to obtain the Environmental clearance from the State Yes - Level Environment Impact Assessment Authority 3 Report for Compliance of conditions which are imposed in the existing No - Environmental clearance from the competent authority. (if applicable) 4 Whether there is any litigation, if yes latest orders of the court in original, have No to be attached. (such as stay, status of the petition etc.,) 5 Type of quarrying (Gravel/Rough Yes 7,26,47,50,111, Stone/sand / Granite) 6 Topo map for 5Km radius & 10 Km radius highlighting water bodies, catchment areas, forest areas, protected / Yes 165 Wild life areas & ecological sensitive area, airports, marine ecosystem. 7 Village, Town Panchayat / Panchayat Yes 7,26,47,50,111, Union in which situated 8 Taluk in which situated Yes 7,26,47,50,111, 9 District in which situated Yes 7,26,47,50,111, 10 Extent of quarry (in Ha) Yes 7,26,47,50,111, 11 New or existing quarry Yes 7,26,47,50, 12 If in case of existing Rough Stone/ Blue metal/ Granite quarry, The length, width and depth to which quarrying has already No - been done (below the ground level/ above the ground level) 13 If quarrying had been done below the ground level /above the ground level. The No - height of quarrying already done) 14 Name of the owner who had earlier undertaken the quarrying & a copy of No - mining lease issued with date, if he is different from the present applicant 15 Proof of land ownership. If owned patta copy. . 27,113,148, If not own patta land agreement/lease Yes copy entered with the owner (to be enclosed) details 16 Period of quarrying proposed Yes 7,110, 17 Production (Quarrying in m3) 7,55,104,105,116, Yes 1117,120, 18 Method of Mining Yes 56,118, 19 Top Soil/ Overburden in case of Rough Yes 119 Stone /Blue Metal 20 Quantity of rejects in M3 in case of No 119 Granite Mining. 21 Length, Width, Depth & Proposed Quarry Yes 124 in meters. 22 Land use pattern for a radius of 500m topo sheet around the quarry site such as Yes 167 Agriculture, Habitation etc., 23 Details of other quarries for a radius of Yes 182 1Km, around the quarry site 24 Aerial distance from the periphery of the site to the nearest habitation, Structures, Yes 167, Temples etc., 25 Aerial distance to the interstate borders, in case of Rough Stone/ Blue metal/ Granite No - quarry to be obtained from IRS, Anna University. 26 In case of Rough Stone/ Blue Metal/ Granite quarry no objection certificate from the concerned district Forest officer/

Wild Life Sanctuaries/ National No - Parks/HACA / Western Ghats region if the quarry site is within 10 KMS of these areas. 27 Aerial distance to the nearest eco- sensitive areas, CRZ, Forests, monuments Yes 22,35,44,65, etc., within 10 Kms of these areas. 28 Latitude and Longitude of all corners of Yes 7,50,113,163, the quarry site. 29 Topo Sheet No Yes 7,50,113,163, 30 Copy of explosives license and a consent letter / Agreement of competent recognized person who has agreed to Yes 189-194 handle explosive for the blasting, in case of Rough Stone/ Blue Metal/ Granite quarry. 31 Brief details of APC measures proposed to Yes 134 be proposed to be implemented. 32 Mine closure plan to be furnished in Yes 174-181, Mining Plan 33 Mining Plan prepared by (Xerox copy of Yes 162 certificate to be attached) 34 Precise area communication approved by Yes 142, the District Collector 35 Mining plan approved by the Deputy/ Yes 95, Assistant Director of the District. 36 Water requirement: a) Drinking & domestic purposes in KLD Yes 14,59, b) Dust suppression (in KLD) c) Green belt (in KLD) 37 Source of water Yes 14,59, 38 Ground water table Yes 26,113,140, 39 Project cost (excluding EMP cost) 27,70,137, Yes 138, 40 Break up details for the EMP. The EMP shall include the following for each subhead i. Cost of manpower ii. Capital investment iii. Consumables iv. Monitoring of environmental Yes 27,70,138 parameter And the environmental management plan/ programme should have two parts a) Part – I should indicate man power, tools and machineries, power requirement, solid waste management, water supply, storm water drain and environmental monitored. b) Part – II should indicate the cost of each sub head of part - I 41 Disclosure RQP Yes 219,220 42 Soft copy of the Form –I, Pre –feasibility report and mining plan in Yes 221 CD 43 Key map showing the approach roads to the site to be attested by the Deputy/ Yes 164 Assistant Director of Geology and Mining of the Concerned District. 44 Village map with S.F. Nos& Salient features such as vegetation, habitations Yes 167 etc., for a radius of 500m around the quarry site. 45 Section map for mining to be attested by the Deputy/ Assistant Director of Geology Yes 169 and Mining of the Concerned District. 46 Photograph of the proposed Mining site with S.Nos and break – up –details Yes 183 attested by VAO or a senior official 47 Form - I To be signed by applicant Yes 24 48 Pre –Feasibility Report to be signed by Yes 73 Both applicant and RQP. 49 First and last page and the page at which quantity of mining has been worked out to be signed by the Deputy/ Assistant Yes 141 Director of Geology and Mining of the concerned District. 50 Affidavit from the applicant that child lobour is not being employed in the Yes 185-188 mining activity. 51 Affidavit from the applicant regarding planting of trees around the quarry site in Yes 185-188 fulfillment of the Green belt commitment furnished. 52 Details (POD) Regarding communicating the proposal to the members of the - committee.

53 Disclosure of consultant as per MoEF OM Dt.04.08.2009 and Accreditation certificate issued by QCI/NABET Yes 5 Processing Fee of RS. 20,000 in the form of DD taken in favour of Member Secretary, SEIAA Payable at Chennai. 54 Local body / Panchayat / Panchayat Union Yes 7,26,47,50,111, with full address

As authorized signatory of this project I am aware that I can be prosecuted under relevant Act and Rules, if I am not ensuring the adherence of the above commitments.

Date : 11.11.2019 Place : Trichy

1. Signature of the applicant

C.K.Ravichandran,

2. Signature of the Qualified Person

Dr. P. Thangaraju, M.Sc., Ph.D., Checklist for Mining of Minor Mineral 0 - 4.99 Ha for B2 Category mines & Cluster of Mines within 25 Ha fallen within 500m radius

S.No Details of the proposal : Data furnished Page No 1. Name of the owner/Firm : C.K.Ravichandran, 8,27,47,110, Correspondence Address S/o. C. Kulandaivel, No.21 & 22, Bharathi Nagar Extension, 2. with Pin Code : Bharathidasan Nagar, Puthur, Trichy District – 620 017 Mobile Number and Aadhaar 9443266043 8,47, 3. : Number 8626 4734 8602 4. Email : [email protected] 8,47, Type of quarrying It is a Rough stone Quarry project in Padalur (East) 7,26,47,50, 5. (Earth/ Rough stone and : Village. 111, Gravel/Sand/Granite) S.F. No of the Quarry site S.F.Nos. 29/1, 29/3 (P), 29/4 (P), 33/1 & 33/2 (P) 7,26,47,50, 6. : 111, Village , Town Panchayat/ Village :Padalur (East) 7,26,47,50, 7. Municipality in which the : Panchayat Union :Alathur 111, village is situated Taluk in which situated Alathur Taluk 7,26,47,50, 8. : 111, District in which situated Perambalur District 7,26,47,50, 9. : 111, Extent of quarry (in Ha) 3.05.0ha 7,26,47,50, 10. : 111, New or existing quarry It is a fresh application of Rough stone Quarry project in 7,26,47,50, 11. : Padalur (East) Village. If in case of existing Rough It is a fresh application of Rough stone Quarry project in 7,26,47,50, stone and Gravel/ Blue Padalur (East) Village. Metal/ Granite Quarry, the 12. length, width and depth to : which quarrying has already been done (below the ground level/ above the ground level) If quarrying had been done It is a fresh application of Rough stone Quarry project in 7,26,47,50, below the ground level/above : Padalur (East) Village. 13. the Ground level, the height of quarrying Name of the owner who had It is a fresh application 7,26,47,50, earlier undertaken the 14. quarrying & a copy of : mining lease issued with date

Proof of land ownership. Land Details: 27,113,148, If owned patta copy. ‹ It is a Patta land If not own patta land ‹ The land is registered in the name of the applicant 15. : agreement/ lease copy Tmt.Umadevi, Tmt.Mohana, Thiru.Rajan & Thiru. Ravichandran. entered with the owner (to be ‹ The applicant has got surface rights to the quarry enclosed) lease applied area please refer Annexure – IV. 16. Period of quarrying : Five years 7,110, Production (quantity in m3) 7,55,104,105, 3 Rough stone = 4,11,000m (or) 68,500 Lorry Loads 116,1117, 3 Top soil = 7,074m (or) 12,267 Lorry loads 120, Proposed depth= 28m [3m Topsoil + 25m Rough stone] Lease period = Five years

3 17. Rough stone Top soil in m Description in m3 Geological Resources 7,63,200 91,584 Available Mineable reserves 4,11,000 73,602 Five years plan period As in the 4,11,000 73,602 approved mining plan

The quarrying operation will be carried out by 56,118, Method of Mining Mechanized Opencast Method mining with 5.0 meter vertical bench with a bench width is not less than the 18. : bench height. Using Jack hammer drilling and blasting, hydraulic excavation, loading the Rough stone from pithead to the needy crushers. Top soil/ Overburden in case The overburden in the form of top soil formation is 119, of Rough stone and Gravel/ 73,602m3 up to depth for 3m below ground level is 19. : Blue Metal dumped along the lease boundary as top soil en bund and used for the plantation purpose. Quantity of rejects in m3 in There is no rejects 119, 20. : case of Granite Mining. Length, Width, Depth & Width (Max) 124 Length (Max) (m) Depth (Max) (m) 21. Proposed Quarry in meters. : (m) 174 141 28.0(max)

Land use pattern for a radius Land use pattern 167, of 1Km around the quarry Trees – 18% Barren land – 38% 22. site such as Agriculture, : Road – 04% Habitation etc., Quarry pit – 12% Seasonal Agricultural land – 28% Details of other quarries for a There are following quarries located within the radius of 182, radius of 1Km, around the 500m from the proposed project site. Details – 23. : quarry site. Existing Quarries – Nil Expired and Abandoned Quarries– 1No (5.36.5Ha) Proposed Quarry – 2Nos (5.07.0Ha) The total extent of the Proposed Quarry within the radius of 500m is 5.07.0Ha. The project area falls under the cluster situation. Aerial distance from Therani village – 1.5Km-South eastern side 22,66,134, 24. periphery of the site to the : nearest habitation Aerial distance to the There is no Interstate boundary within the radius of 22,44,65, interstate borders, in case of 10Km. Rough stone and Gravel/ 25. : Blue Metal/ Granite quarry to be obtained from IRS, Anna University. In case of Rough stone and There is no NOC is enclosed - Gravel/ Blue Metal/ Granite quarry no objection certificate from the concerned district Forest 26. : Officer/ Wild Life Sanctuaries/ National Parks/ HACA/ Western Ghats region if the quarry site is within 10Kms of these areas. Aerial distance to the nearest There is no eco-sensitive areas, CRZ, Monuments within 22,35,44,65, eco-sensitive areas, CRZ, the radius of 10Km 27. Forests, Monuments etc., : Reserve forest within 10Kms of these areas. ‹ Naranamangalam R.F–3.5Km –North western side. ‹ Velur R.F – 5.5Km – North western side. Latitude and Longitude of all Latitude between: 11°07’04.33''N to 11°07’10.78''N 7,50,113,163, 28. : corners of the quarry site. Longitude between: 78°51’11.17''E to 78°51’16.82''E 29. Topo Sheet No. : Topo sheet No: 58 –I/16 7,50,113,163, Copy of explosives license 189-194 and a consent letter/ A copy of agreement is enclosed. agreement of competent recognized person who has 30. : agreed to handle explosive for the blasting, in case of Rough stone and Gravel/ Blue Metal/ Granite quarry. Brief details of APC The Air quality will be affected during the quarrying 134 measures proposed to be period due to blasting and jackhammer drilling, which proposed to be implemented. will be within prescribed limits. Air quality will be 31. : monitored periodically as per norms and Mitigation measures will be carried out to prevent dust and air propagation in to air. Mist water spraying will be carried out to suppress dust and also wet drilling practiced. Mine Closure Plan to be There is no proposal for back filling, reclamation and 174-181, furnished in Mining plan. rehabilitation. The quarry pit will be fenced by barbed wire to prevent inherent entry of public and cattle. The 32. : quarried out pit will be allowed to collect rain and seepage water which will act as a reservoir for storage. This water storage will enhance the static level and ground water recharge on nearby wells. Mining plan prepared by RQP certificate with validity is enclosed as Annexure 162, 33. (Xerox copy of certificate to : No: V be attached) Precise area communication The precise area Communication letter was received from 142, 34. approved by the District : the District Collector, Perambalur vide Rc.No. Collector 95/G&M/2016 Dated. 08.03.2019. Mining plan approved by the The Mining Plan was got approval by the Deputy 95, Deputy/ Assistant Director of Director (i/c) Department of Geology and Mining, 35. : the District. Perambalur vide Rc.No. 95/G&M/2016 Dated: 16.04.2019. Water requirement : Drinking Water - 0.50KLD 14,59, a) Drinking & domestic & Domestic purpose purposes in KLD. Dust Suppression -3.15KLD 36. : b) Dust suppression (in Green belt - 1.0KLD KLD) Total -4.65KLD c) Green belt (in KLD)

Source of water 14,59, Purpose Sources Drinking & From Existing bore wells and drinking Domestic water will be sourced from Approved 37. : Purpose Water vendors. Dust suppression From Existing bore wells from nearby area Green belt From Existing bore wells from nearby development area Ground water table The Ground water is about 75-70mdepth from ground 26,113,140, 38. : level. Project Cost (excluding EMP The Project cost: 27,70,137, Cost) A. Project cost = Rs. 21,60,000/- 138, B. Machinery cost = Rs. 20,00,000/- 39. : C. EMP cost = Rs. 6,80,000/- Total project cost = Rs. 48,40,000/- CER Cost (2.0%) = Rs. 97,000/- 40. EMP Cost : The total EMP cost is around Rs. 6,80,000/- 27,70,138 Disclosure RQP Dr. P. Thangaraju, M.Sc., Ph.D., 219,220 41. : Qualified Person Soft copy of the Form–1, There is enclosed Soft copy for form –1, Pre – feasibility 221, 42. Pre –feasibility report and : report and mining plan in CD. Mining plan in CD. Key map showing the The Key map showing with approach roads to the site is 164 approach roads to the site to enclosed. Plate No. II be attested by the Deputy/ 43. : Assistant Director of Geology and Mining of the concerned District. Village map with S.F. Nos& Village map with S.F.No and Salient features such as 167, salient features such as vegetation, habitation etc., for 500mt radius is enclosed as 44. vegetation, habitations etc., : plate no. V. for a radius of 500m around the quarry site. If lakes, Ponds, river, nallah, Water bodies: 22,35,44,65, odai etc are situated near the ‹ Nanthai River – 4.5Km –South western side 45. quarry site permission from ‹ Nakkambadi Lake – 6.5Km- South side. the concerned PWD ‹ Chettikulam Lake – 7.30Km- western side authorities for mining Section map for mining to be The Geological Plan and section in 1:1000 & 1:500 scales 169, attested by the Deputy/ is enclosed. 46. Assistant Director of : Geology and Mining of the concerned District. Photograph of the proposed The Photo of the Mines site is enclosed. 183, 47. Mining site with S.F.No and : attested by at least VAO. Form –1 To be signed by I am hereby signed. 24 48. : applicant Pre- Feasibility Report to be Pre-feasibility report has been signed by the applicant and 73 49. signed by Both applicant and : RQP RQP. First and last page and the First page and last page and the quantity proposed in the 141 page at which quantity of plan have been signed by the Deputy Director of Geology mining has been worked out and Mining. 50. to be signed by the : Deputy/Assistant Director of Geology and Mining of the concerned District. Affidavit from the applicant It is been ensured that the labor will not be employed less 185-188 that child labour is not being than 18 years, No child labour will engaged or entertained 51. employed in the mining : for any kind of quarrying operations. All the labour activity. engaged for quarrying operations will be insured during the quarry lease period. Affidavit from the applicant Affidavit from the applicant regarding the proposal for 185-188 regarding planting of trees planting trees around the quarry and fulfillment of 52. around the quarry site in : greenbelt commitment is enclosed. fulfillment of the Green belt commitment furnished. Details (POD) Regarding communicating the proposal 53. : to the members of the committee.

Date : 11.11.2019 Place : Trichy

1. Signature of the applicant

C.K.Ravichandran,

2. Signature of the Qualified Person

Dr. P. Thangaraju, M.Sc., Ph.D.,

PROPOSAL FOR PRIOR ENVIRONMENTAL CLEARANCE FOR PADALUR (EAST) ROUGH STONE QUARRY PROJECT

OF C.K.RAVICHANDRAN,

SUBMITTED TO STATE ENVIRONMENT IMPACT ASSESSMENT AUTHORITY (SEIAA),

CHENNAI, TAMILNADU, SUBMISSION OF (Form -1, Form -1M, Pre-Feasibility Report, Baseline studies Report, Hydro Geological Report, Approved Mining Plan and Progressive Quarry Closure Plan) (PROJECT CATEGORY-“B2” / PATTA LAND) (LEASE PERIOD = FIVE YEARS)

LOCATION OF THE PROJECT AREA PROPOSED BY Extent : 3.05.0ha C.K.Ravichandran, S.F.Nos : 29/1, 29/3 (P), 29/4 S/o. C. Kulandaivel, (P), 33/1 & 33/2 (P) No.21 & 22, Bharathi Nagar Village : Padalur (East) Extension, Taluk : Alathur Bharathidasan Nagar, Puthur, District : Perambalur Trichy District – 620 017 State :

PREPARED BY Dr. P. Thangaraju, M.Sc., Ph.D., Qualified Person

INDEX FILE

S.No DESCRIPTION Page Nos. 1-3 1 Environmental Clearance Format

2 Declaration Letter 4 3 Demand Draft 5

4 Form 1 6- 24

5 Form-1 M 25 - 39

6 Pre Feasibility Report 40 - 73

7 Baseline Studies 74- 83

8 Hydro geological Report 84-94

ANNEXURES Annexure DESCRIPTION Page Nos No

I Mining plan approval Letter 95-96

Approved Mining Plan along with Mine Closure II 97-181 Plan Cluster letter from Department of Geology and III 182 Mining (500m Radius) Quarry site Photograph attested by Village IV 183 Administrative officer (VAO) Habitations and Nearby Features details in 300m V Radius attested by Village Administrative officer 184 (VAO) Affidavit by the Project proponent VI (500m Radius quarries details and CER 185-188 Proposals included) Blasting Agreement along with Explosives VII 189-194 License copy VIII Land Document 195-218

IX Disclosure of RQP 219-220

Attachments Consolidated Above Document in PDF Format (DVD)-221 PADALUR (EAST) ROUGH STONE QUARRY LEASE APPLIED AREA (3.05.0Ha) The proponent Mr. C.K.Ravichandran has applied for Environmental clearance for the proposed quarry Rough stone for over an extent of 3.05.0ha in S.F.Nos. 29/1, 29/3 (P), 29/4 (P), 33/1 & 33/2 (P) of Padalur (East) Village, Alathur Taluk, Perambalur District. Salient features of the proposal are as follows:

S.No Details of the proposal : Data furnished Page No 1. Name of the Owner + : C.K.Ravichandran, 8,27,47,110, Firm S/o. C. Kulandaivel, No.21 & 22, Bharathi Nagar Extension, Bharathidasan Nagar, Puthur, Trichy District – 620 017 Mobile: 9443266043 2. Location of the quarry- : S.F.Nos. 29/1, 29/3 (P), 29/4 (P), 33/1 & 33/2 (P) of 7,26,47,50, S.F.No. Padalur (East) Village, Alathur Taluk, Perambalur 111, District. 3. Purpose of Application : It is a fresh application of Rough stone Quarry project 7,26,47,50, in Padalur (East) Village. 4. Extent of quarry in Ha- : 3.05.0ha 7,26,47,50, 111, 5. Land use planning 10,62,133, a) Mining Area at the end of 170, Present area b) Storage of Topsoil Description this quarrying in (Ha) over burden period (Ha) c) Infrastructure Road Quarrying pit Nil 2.45.0 d) Utilized Area Infrastructure Nil 0.01.0 Total Roads Nil 0.01.0 Green belt Nil 0.20.0 Unutilized area 3.05.0 0.38.0 Grand Total 3.05.0 3.05.0

6. Production (quantity in m3) : 7,55,104,105 Rough stone = 4,11,000m3 (or) 68,500 Lorry Loads ,116,1117, Top soil = 73,602m3 (or) 12,267 Lorry loads 120, Proposed depth = 28m [3m Topsoil + 25m Rough stone] Lease period = Five years

Rough stone Top soil in m3 Description in m3 Geological Resources 7,63,200 91,584 Available Mineable reserves 4,11,000 73,602 Five years plan period As in the 4,11,000 73,602 approved mining plan 7. Top soil & overburden : The overburden in the form of top soil formation is 119, (quantity in m3) 73,602m3 up to depth for 3m below ground level is dumped along the lease boundary as top soil en bund and used for the plantation purpose. 8. Method of Mining : The quarrying operation will be carried out by 56,118, Mechanized Opencast Method mining with 5.0 meter vertical bench with a bench width is not less than the bench height. The quarry operation involves Jack hammer drilling and blasting, hydraulic excavation, loading the Rough stone from pithead to the needy crushers. 9. Life of Mine as per : Five years 7,110, approved mining plan 10. Height / width of the : Height 5.0 m & Width 5.0 m. 56,119, bench 11. Source of water / Quantity required (in litres) / Source 14,59, quantity required Total 4.65KLD a. Drinking & 0.50KLD - From existing bore wells and drinking water will be Domestic Purpose sourced from approved water vendors. b. Dust Suppression 3.15KLD- From Existing bore wells from nearby area c. Green belt 1.00KLD- From Existing bore wells from nearby area development 12. Waste water There is no waste water. 16, Sewage water : The septic tank is constructed on semi- permanent structure with in the quarry lease area. Mode of disposal : To local Panchyat Authority 13. APC Measures : 1.Mist Spray using water tankers, 2. Enclosed covered system. (Tarpaulin) for 17, transportation.

14. Ariel distance of 22,66,134, Approximate distance nearest habitation S. Name of the Approximate & Direction from lease No Village population applied area 1. Therani 1.5Km – SE 1000 2. Thiruvilakuruchy 1.5Km – SW 500 3. Therani Palayam 3.0Km – SE 200 4. Nedungur 5.0Km –SW 200 15. Ariel distance from : Reserve forest 22,35,44,65, Reserve forest, ‹ Naranamangalam R.F–3.5Km –North western Sensitive areas, Forest, side. Bird sanctuaries, Wild ‹ Velur R.F – 5.5Km – North western side. Wildlife sanctuary – Nil life sanctuaries, Bird Sanctuaries – Nil National parks, National Park – Nil Monuments etc., Monuments – Nil within 10km 16. Land owner ship : Land Details: 27,113,148, document : ‹ It is a Patta land Own patta land : ‹ The land is registered in the name of the Lease applicant Tmt.Umadevi, Tmt.Mohana, Thiru.Rajan & Thiru. Ravichandran. Govt. Poramboke ‹ The applicant has got surface rights to the quarry lease applied area please refer Annexure – IV. 17. Land use classification : The lease applied area is exhibits almost plain 113, topography. The area has gentle sloping towards South eastern side. The altitude of the area is 119.0m above Mean sea level. The non agricultural land. 18. Mining plan R. Rajasekar. M.sc., 162, Prepared by : Recognized Qualified person RQP/CNN/264/2015/A 19. Precise area statement : The precise area Communication letter was received 142, Approved by from the District Collector, Perambalur vide Rc.No. 95/G&M/2016 Dated. 08.03.2019. 20. Approved by : The Mining Plan was got approval by the Deputy 95, Director (i/c) Department of Geology and Mining, Perambalur vide Rc.No. 95/G&M/2016 Dated: 16.04.2019. 21. Nearby quarries : There are following quarries located within the radius 182, of 500m from the proposed project site. Details – Existing Quarries – Nil Expired and Abandoned Quarries – 1No (5.36.5Ha) Proposed Quarry – 2Nos (5.07.0Ha) The total extent of the Proposed Quarry within the radius of 500m is 5.07.0Ha. The project area falls under the cluster situation. 22. Nearby lake / river/ : Water bodies: 22,35,44,65, odai / channel etc. ‹ Nanthai River – 4.5Km –South western side ‹ Nakkambadi Lake – 6.5Km- South side ‹ Chettikulam Lake – 7.30Km- western side 23. Latitude / Longitude : Latitude between: 11°07’04.33''N to 11°07’10.78''N 7,50,113,163 Longitude between: 78°51’11.17''E to 78°51’16.82''E , 24. Topo Sheet No. : Topo sheet No: 58 –I/16 7,50,113,163 , 25. Total Project cost : The Project cost: 27,70,137, (Operational Cost + A. Project cost = Rs. 21,60,000/- 138, EMP cost) B. Machinery cost = Rs. 20,00,000/- C. EMP cost = Rs. 6,80,000/- Total project cost = Rs. 48,40,000/- CER Cost (2.0%) = Rs. 97,000/- 26. EMP cost : The total EMP cost is around Rs. 6,80,000/- 27,70,138 27. Water table : The Ground water is about 75-70m depth from ground 26,113,140, level. 28. Interstate boundary : There is no interstate boundary with in 10Km radius 22,44,65, 29. Western Ghats : There is no Western Ghats with in 10Km radius. 22,44,65,

From: C.K.Ravichandran, S/o. C. Kulandaivel, No.21 & 22, Bharathi Nagar Extension, Bharathidasan Nagar, Puthur, Trichy District – 620 017 Mobile: 9443266043 To: The Member Secretary, State Environment Impact Assessment Authority (SEIAA), 3rd Floor, Panagal Maligai, No.1 Jeenis Road, Saidapet, Chennai – 15, Tamilnadu

Sub: Submission of Form -1, Form -1M, Pre-Feasibility Report, Baseline studies Report, Hydro Geological Report, Approved Mining Plan and Progressive Quarry Closure Plan and other relevant document for obtaining Environment Clearance for our Padalur (East) Rough stone Quarry Project - Reg.,

Ref: The Mining plan was approved by the Deputy Director (i/c), Department of Geology and Mining, Perambalur vide Rc. No. 95/G&M/2016 Dated: 16.04.2019. ***** Sir, I am here by submitting the processing fee in the form of Demand Draft for Rupees twenty Thousand along with Form-1, Form-1 M, Pre-feasibility Report and Approved mining plan to your good office for obtaining clearance from SEIAA, Chennai, for our Padalur (East) Rough Stone Quarry project over an extent of 3.05.0ha in S.F.Nos. 29/1, 29/3 (P), 29/4 (P), 33/1 & 33/2 (P) of Padalur (East) Village, Alathur Taluk, Perambalur District. I have submitted all the relevant documents to your good office to the best of our knowledge. If any clarifications are required, I am ready to submit the same to your office at your convenient time. Also I am ready to present regards this quarry project in front of the committee. Hence I request your good office to kindly process my application and allow me to present our project at the earliest. Thanking you yours sincerely

Place: Trichy C.K.Ravichandran, Date: 11.11.2019 4