SWABI IRRIGATION DIVISION-I SWABI GOVT: of KHYBER PAKHTUNKHWA IRRIGATION DEPARTMENT NOTICE INVITING RE-E-BIDDING (Single Stage Single Envelop)
Total Page:16
File Type:pdf, Size:1020Kb
SWABI IRRIGATION DIVISION-I SWABI GOVT: OF KHYBER PAKHTUNKHWA IRRIGATION DEPARTMENT NOTICE INVITING RE-E-BIDDING (Single Stage Single envelop) Swabi Irrigation Division-I Government of Khyber Pakhtunkhwa invites electronic bids from eligible Firms/ bidders in accordance with KPPRA rules 2014 on single stage single envelop procedure for the following works. Work Works Name E/Cost 2% PEC field of Last date and Date / time Period of No. Rs: in E/Money specialization time for of opening completion (M) of E/Cost receipt of E- bids A CONSTRUCTION OF SMALL BRIDGES, IRRIGATION CHANNELS, FLOOD PROTECTION WORKS AND CANAL PETROL ROAD IN U/C MACHAI, BAZAR, RUSTAM, CHARGULI, PALODHERI, KATAKHAT, JAMAL GARHI, SAWAL DHER, KATLANG-I, KATLANG-II & CONSTRUCTION OF FLOOD PROTECTION WORK IN MATHRA KANDA (PASAND KOTEY) & VILLAGE LANDI DISTRICT MARDAN ADP 1329/190477 Sub work Construction of CPR along Machai branch from RD: 180800-190000 in reaches i/c As per 1 90.00 1.80 VR: bridges and Rehabilitation of Ismaila Disty and its sub system with VR CE-01 12.08.2020 Same day work order bridges on various Nullahs/Khwarrs in U/C’s of PK-49 CE-02 12.30 Noon Sub work Rehabilitation / Improvement of Canal Patrol Road along Mado Branch Minor 2 45.30 0.906 from head to tail in reaches and Rehabilitation / Reconstruction of Irrigation CE-01 --do-- --do-- --do-- infrastructure. Sub-work Construction of flood protection work along Rustam Khwar, Naranji 3 Nullah, Muqam Nullah and their sub system in Union Councils of PK-49 77.847 1.556 CE-04 --do-- --do-- --do-- B Rehabilitation/ Improvement of Irrigation facilities i/c revamping of drainage system in Union Councils Shahbaz Garhi, Baghicha Dheri, Garhi Daulatzai, Kot Daulatzai, Kot Ismailzai, Gujrat Buxali District Mardan ADP No.1332/190526 Sub work Construction/ extension of flood protection work i/c revamping of drains at Rustam 12.08.2020 As per 1 10.00 0.20 Same day Khwar/sub system for the protection of agriculture land and village abadies. CE-04 12.30 Noon work order Sub work 2 Rehabilitation / Improvement of Canal Patrol Road along Buxali Disty RD 21800- 65.00 1.30 CE-01 40200 in reaches i/c rehabilitation of Irrigation infrastructures. --do-- --do-- --do-- Sub work Rehabilitation/ Construction of canal patrol road in reaches along Muqam Flow Irr: 3 50.00 1.00 System i/c rehabilitation of canals and augmentation Tube Wells. CE-01 --do-- --do-- --do-- IMPROVEMENT & CONSTRUCTION OF IRRIGATION FACILITIS I/C FLOOD PROTECTION WORKS, CANAL PATROL ROADS, DRAINS IN C UNIOUN COUNCIL CHAKNODAH, SHEIKH JANA, KARNAL SHER KILLI, ASOTA, PARMULI, SHEWA, NARANJI, KALU KHAN, ADINA, TURLANDI AND TARAKAI DISTT: SWABI ADP NO.1327/190474 Sub work Revamping and construction/ improvement of flood protection work along Naranji Nullah & its tributaries for the protection of agricultural lands and 1 65.55 1.311 village abadies at U/C Naranji, Parmuli, vill: Sheikh Jana and U/C Shewa Distt: CE-04 --do-- --do-- --do-- Swabi Sub work Revamping and construction/ improvement of flood protection work for 2 the protection of agricultural lands and village abadies along Naranji Nullah and its 75.00 1.50 CE-04 tributaries at Village Ismaila U/C Adina, U/C Karnal Sher Killi District Swabi. --do-- --do-- --do-- Sub work Revamping and construction/ improvement of flood protection work for the protection of agricultural lands and village abadies along Naranji Nullah and its 3 45.00 0.90 tributaries at U/Cs Asota,, Ahad Khan Khwarr, Gul Bahar Hamza Dher Kanda at CE-04 --do-- --do-- --do-- U/C Chaknoda and U/C Kalu Khan Distt: Swabi. Sub work Revamping and construction/ improvement of flood protection work for the protection of agricultural lands and village abadies along Shagai Nulalh and its 12.08.2020 Same day As per 4 80.00 1.60 tributaries U/C Turlandi, Village Dagai, Village Yar Hussain and Village Tarakai 12.30 AM work order CE-04 adjoining areas of Distt: Swabi. Sub work Revamping and construction/ improvement of flood protection work for the protection of agricultural lands and village abadies along Shagai Nulalh, Bullar 5 Nullah and its tributaries at Village Dobian, Village Sard Cheena, U/C Sudher and 34.05 0.681 improvement/ rehabilitation of different canals and drains in PK-46 & PK-47 Distt: --do-- --do-- --do-- CE-04 Swabi. PSDP No. 1015 (2019-20) Construction and Improvement of Irrigation D infrastructure including FPW, Channels, Roads, Tube Wells and crossing facilities in District Swabi Sub work Construction / Improvement of Flood Protection Bund on Tutalay 1 Kanda for the protection of Abadies and agricultural lands in Swabi area in District 49.75 0.9950 CE-04 Swabi --do-- --do-- --do-- Sub work Construction / Improvement of Flood protection Bund on Badri Nullah 2 49.99 0.9998 for the protection of Abadies and agricultural lands in Swabi area District Swabi CE-04 --do-- --do-- --do-- Sub work Construction / Improvement of Flood Protection Bund on Zanday 3 Nullah for the protection of Abadies and agricultural lands in Swabi area in District 34.48 0.6896 Swabi CE-04 --do-- --do-- --do-- TERMS AND CONDITIONS: 1. Bid Solicitation documents including Instructions to Bidders can be downloaded from Irrigation website http://www.irrigation.gkp.pk/as well as KPPRA website http://www.kppra.gov.pk/ otherwise bids submitted without these documents (Duly filled) will be considered non-responsive. 2. Bid Solicitation documents contains mandatory requirements to be fulfilled in order for bidder to be eligible to participate otherwise their bids will be rejected. 3. Venue of Bids Opening is Swabi Irrigation Division - I, Swabi. 4. The bidders are required to quote their rates above or below on BOQ both on MRS as well as non MRS components. 5. Two percent (02%) Bid Security/Earnest Money of the Estimated cost from the account of firm/ bidder/ contractor who submits the bid must be accompanied with the tender document / Quotation through any scheduled bank in favor of Executive Engineer, Swabi Irrigation Division - I, Swabi. Failure to submit the 2% CDR will lead to rejection of the bid 6. The procuring entity may disqualify a contractor if it finds, at any time, that the information submitted by him concerning his qualification as contractor was false and materially inaccurate or incomplete 7. In case of bid/rate quoted by the bidder more than 10% below Engineer estimate, the additional bid security shall be sought from the successful bidder only to the extent of bid more than 10% below the Engineer estimate in form of percentage. The amount of bid security shall be equal to the impact of financial difference occurring in the quoted rates beyond 10% below Engineer estimate. 8. The successful bidder shall be bound to produce the additional bid security within 03 working days after issuance of letter of acceptance, failing which the procuring entity shall forfeit the bid security of the successful bidder and may also initiate legal proceedings against the bidder who repudiated the contract under KPPRA Procurement Rules. 9. If the evaluated electronic bid costs of two or more than two bidders are equal then the successful bid will be declared through draw. 10. The employer has the authority to reject any bid or all the bids assigning cogent reasons. 11. Bid security of the 1st, 2nd and 3rd lowest Electronic Bidder for the specific work will be retained by the Department for one week after issuance of letter of acceptance to the successful bidder. 12. All the bidders / Firms must be register with the Khyber Pakhtunkhwa Revenue Authority. 13. All the prevailing KPPRA Acts/Rules & other government notification will be applicable issued from time to time. 14. Pre-bid meeting will be held on 05.08.2020 in the office of the Executive Engineer, Swabi Irrigation Division - I, Swabi EXECUTIVE ENGINEER SWABI IRRIGATION DIVISION-I SWABI. Ph:# 0938-530484 Email [email protected] .