Proposed Slum Rehabilitation Scheme ‘Ovaripada’ FORM 1 by M/s Ashapura Housing Pvt. Ltd.

FORM-1 (I) Basic Information

Sr. Item Details No 1 Name of the Project Expansion of Residential cum Commercial - SRA Scheme for Shree Mahalaxmi CHS, Jai Mahakali CHS, Shivraya Sahakari CHS, Shree Sai Ganesh CHS in R/North Ward 2 S. No. in the Schedule 8(b) 3 Proposed capacity/area /length/tonnage to be Total plot area: 8556.10 Sq.m handled/command area/lease area/ number of FSI area 31882.334 Sq.m wells to be drilled Non FSI area 25737.406 Sq.m Total Construction area: 57619.74 Sq.m 4 New/Expansion/Modernization • Expansion project Previous EC received under letter vide no. SEAC- 2013/CR-414/TC-1 dtd. 30th March 2015

5 Existing Capacity/Area etc. In the plot area admeasuring 8556.10 Sq.m,4buildings with total construction area 57619.74 Sq.m with configuration are proposed: Buildings Configuration MCGM Basement + Stilt Rehab Bldg 1 +22 Floors Rehab Bldg 2 (Wing B +Gr + 23 floors A & B) Wing A- B + Gr + 23 floors Wing B- B + Gr + 23 floors Sale Bldg Wing C- B + Gr + 23 floors Wing D- B +Gr + 17 floors Wing E- B +Gr + 17 floors

6 Category of Project i.e. ‘A’ or ‘B’ ‘B’ 7 Does it attract the general condition? If Yes, Not Applicable Please specify 8 Does it attract the specific condition? If yes, Not applicable Please specify 9 Location Plot/Survey/Khasra No. CTS No. 1839, 1848, 1849,1850/1 to 11, 1851, 1852, 1853 Village East Tehsil District State 10 Nearest railway station/airport along with (1 km towards West)

1 Proposed Slum Rehabilitation Scheme ‘Ovaripada’ FORM 1 by M/s Ashapura Housing Pvt. Ltd.

distance in km. 11 Nearest Town, City, District Headquarters Mumbai along with distance in km. 12 Village Panchayats, ZillaParishad, Municipal Municipal Corporation of Greater Mumbai. Corporation, Local body (complete postal Municipal Head Office Building, Mahapalika Marg; addresses with telephone nos. to be given) Postal Code: 400 001; City: Mumbai 13 Name of the applicant M/s Ashapura Housing Pvt. Ltd. 14 Registered Address 901, 9th Floor, Hallmark Business Plaza, Gurunanak Hospital Road, East, Mumbai-51. 15 Address for correspondence: 901, 9th Floor, Hallmark Business Plaza, Gurunanak Hospital Road, Bandra East, Mumbai-51. Name Mr. Pravin Girish Patel Designation(Owner/Partner/CEO) Director Address as above Pin Code 400051 E-mail [email protected] Telephone No. 022-66499999 Fax No. 022-66499999 16 Details of Alternative Sites examined, If any. None Location of these sites should be shown on a topo sheet 17 Interlinked Projects No 18 Whether separate application of interlinked No project has been submitted? 19 If yes, date of submission Not Applicable 20 If no, reason Not Applicable 21 Whether the proposal involves approval/clearance under: if yes, details of the same and their status to be given. Not Applicable The Forest (Conservation) Act, 1980? The Wildlife (Protection) Act, 1972? The C.R.Z. Notification, 1991? 22 Whether there is any Government No Order/Policy relevant/relating to the site? 23 Forest land involved (hectares) No 24 Whether there is any litigation pending No against the project and/or land in which the project is propose to be set up? Name of the Court/ Case No./ Orders/directions of the Court, if any and its Relevance with the proposed project. * Capacity corresponding to sectorial activity (such as production capacity for manufacturing, mining lease area and production capacity for mineral production, area of

2

Proposed Slum Rehabilitation Scheme ‘Ovaripada’ FORM 1 by M/s Ashapura Housing Pvt. Ltd.

mineral exploration, length for linear transport infrastructure, generation capacity for power generation etc.)

(II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Sr. Information/Checklist Yes/No Details thereof (with approximate quantities/ rates, No. Confirmation wherever possible) with source of information data 1.1 Permanent or No • No change in land use. temporary change in • The developers have proposed residential Buildings. land use, land cover or The land use will be Residence being the area topography including developed as per DP of MCGM. • increase in intensity of There shall be green area development plan to provide beautification and natural environment to the land use (with respect site to local land use plan) 1.2 Clearance of existing This is an Expansion project for which previous EC has been land, vegetation and granted , so there is no other clearance of existing building No building? except stated during the earlier EC i.e demolition of existing industrial structures 1.3 Creation of new land No Not envisaged. uses 1.4 Pre-construction Yes Geo-Technical investigations have been carried out. investigations e.g. bore houses, soil testing? 1.5 Construction Works? Yes The project involves construction of a group housing complex, which will gain a maximum height of 69.90 m thus having a visual impact on the physical environment. The total built up area will be 57619.74 m2.As per previous EC received, Rehab Bldg 1 has been completed, Rehab bldg. 2 has been completed till 8th floors. Proposed construction: Buildings Configuration Rehab Bldg 1 MCGM Basement + Stilt +22 Floors Rehab Bldg 2 B +Gr + 23 floors (Wing A & B) Wing A- B + Gr + 23 floors Wing B- B + Gr + 23 floors Sale Bldg Wing C- B + Gr + 23 floors Wing D- B +Gr + 17 floors

Wing E- B +Gr + 17 floors 1.6 Démolition Works? No Not Applicable

3

Proposed Slum Rehabilitation Scheme ‘Ovaripada’ FORM 1 by M/s Ashapura Housing Pvt. Ltd.

Sr. Information/Checklist Yes/No Details thereof (with approximate quantities/ rates, No. Confirmation wherever possible) with source of information data 1.7 Temporary sites used Yes • During the construction phase, 100 Labors are for construction works provided with housing facilities which is of purely on or housing of temporary basis. construction workers? • The site has temporary store rooms and site office during construction phase, which will be later demolished. The demolition waste will be used within the site to the best possible extent. 1.8 Above ground Yes Proposed construction includes configuration: buildings, structures or Buildings Configuration earthworks including Rehab Bldg 1 MCGM Basement + Stilt +22 Floors linear structures, cut Rehab Bldg 2 B +Gr + 23 floors and fill or excavations. (Wing A & B) Wing A- B + Gr + 23 floors Wing B- B + Gr + 23 floors Sale Bldg Wing C- B + Gr + 23 floors Wing D- B +Gr + 17 floors Wing E- B +Gr + 17 floors

the maximum height of the building – 69.90 m 1.9 Underground works No Not Applicable including mining or tunneling? 1.10 Reclamation works? No Not envisaged 1.11 Dredging? No Not envisaged 1.12 Offshore structures? No Not envisaged 1.13 Production and No The proposal is for residential complex. Production and manufacturing manufacturing is not involved. Process? 1.14 Facilities for storage of Yes Separate raw material storage yard will be provided which goods or materials? will be temporary. Construction Phase: • Cement will be separately stored under cover in bales. • Sand will be stacked neatly under tarpaulin cover. • Bricks and steel will be laid in open. Operation Phase: Storage area for solid waste, Manure and Sludge will be provided. 1.15 Facilities for treatment Yes Construction Phase: or disposal of solid Solid waste generated during construction phase is majorly waste or liquid re-sable. effluents? Waste material like empty cement bags, scrap metal, etc. shall be sold to local vendors for recycling. Broken tiles shall be used as mosaic of terraces and skirting

4

Proposed Slum Rehabilitation Scheme ‘Ovaripada’ FORM 1 by M/s Ashapura Housing Pvt. Ltd.

Sr. Information/Checklist Yes/No Details thereof (with approximate quantities/ rates, No. Confirmation wherever possible) with source of information data purposes. During the construction phase modular STP will be provided treatment of wastewater generated from construction labours and other manpower. Temporary sanitary toilets will be provided.

Operation Phase: Total solid wastes 2135 Kg/Day Biodegradable waste 1298 Kg/Day Non- Biodegradable waste 865 Kg/Day

Treatment & Disposal : As per SWM Rule - 2016 • The biodegradable waste will be treated in an OWC Manure obtained shall be used as manure for landscaping. • Non- Biodegradable waste will be handed over to local recyclers. • Sewage sludge will be used as manure for gardening. • Wastewater (525 KLD) will be treated in STP of capacity 550 KLD. Treated water (473 KLD) meeting the discharge norms of CPCB after reuse for flushing & gardening as follows; Flushing 195 KLD Gardening 7 KLD

1.16 Facilities for long term No Not Applicable housing of operational workers? 1.17 New road, rail or sea No Access through 18.30 m wide D.P. road. There will be no traffic during new road and rail proposed at this juncture. construction of operation? 1.18 New road, rail, air, No No new Rail proposal is with government as of now. Road waterborne or other infrastructure already exists. However it will be augmented transport infrastructure time to time to meet the need of the time including new or altered routes and stations, ports, airports etc.? 1.19 Closure or diversion of No There will be no diversion or closure of the existing transport existing transport routes and infrastructure.

5

Proposed Slum Rehabilitation Scheme ‘Ovaripada’ FORM 1 by M/s Ashapura Housing Pvt. Ltd.

Sr. Information/Checklist Yes/No Details thereof (with approximate quantities/ rates, No. Confirmation wherever possible) with source of information data routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted No Not Applicable transmission lines or pipelines? 1.21 Impoundment, No No impoundment, damming, culverting, realignment or other damming, culverting, changes to the hydrology of surface water courses is realignment or other envisaged. changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No Not Applicable 1.23 Abstraction or transfers No Water requirement in construction phase will be supplied of water from ground from tanker (10 KLD). Total water requirement of 584 KLD or surface waters? will be met from MCGM/ recycled water. 1.24 Changes in water No The project location is in well-developed urbanized area. bodies or the land SWD network is available around the project. SWD network surface affecting designed for project shall be connected to the SWD provided drainage or run-off. by corporation. This will be in line with the natural drainage pattern of area and the same shall be approved by corporation. There is no change in the present drainage course of water body. 1.25 Transport of personnel No 18.30 m wide D.P. road will be utilized for the transportation or materials for of material. Workers required for construction activity are construction, operation provided with labor quarters. Any additional demand for peak or decommissioning? time will be deployed from local or nearby area. The material will be transported through the vehicles fulfilling the PUC norms & fitness renewal certificates. 1.26 Long-term dismantling No Not Applicable or decommissioning or restoration works? 1.27 Ongoing activity No Not Applicable during decommissioning which could have an impact on the environment? 1.28 Influx of people to an Yes Construction Phase: area in either Around 100 labors will come to site during peak construction

6

Proposed Slum Rehabilitation Scheme ‘Ovaripada’ FORM 1 by M/s Ashapura Housing Pvt. Ltd.

Sr. Information/Checklist Yes/No Details thereof (with approximate quantities/ rates, No. Confirmation wherever possible) with source of information data temporarily or phase. 50 shall be provided with temporary housing facilities. permanently? Operation Phase: On completion of the project, there will be regular movement of residents, visitors, staff and related personals. Total population is expected to be 4325 nos. 1.29 Introduction of alien No Native species will be planted. species? 1.30 Loss of native species No Not applicable. or genetic diversity? 1.31 Any other actions? No Not applicable

2. Use of Natural resources for construction or operation of project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply).

Sr. Information/Checklist Yes/No Details thereof (with approximate quantities/ rates, No. Confirmation wherever possible) with source of information data 2.1 Land specially No Agricultural land not involved. undeveloped or The land use as per MCGM is residential. agricultural land (ha) 2.2 Water (expected source Yes Construction Phase: Around 100 labors will come to site & competing users) during peak construction phase. 50 shall be provided with unit KLD temporary housing facilities. The water demand will be met by water tankers. Operation Phase Total water demand of the project is expected to be 584 KLD; Particulars Quantity Source Domestic 389 KLD MCGM Flushing 195 KLD From treated Gardening 7 KLD water of STP

2.3 Minerals (MT) Yes Minerals used for the construction project are - Cement, Sand, Stone, Aluminum or Iron for windows frames. Cement/Gypsum for plastering etc. 2.4 Construction material – Yes The construction materials will be procured from local stone, aggregates, dealer. and/soil (expected source-MT) 2.5 Forests and timber Yes Certified Timber will be purchased from nearby markets. (source-MT)

7

Proposed Slum Rehabilitation Scheme ‘Ovaripada’ FORM 1 by M/s Ashapura Housing Pvt. Ltd.

Sr. Information/Checklist Yes/No Details thereof (with approximate quantities/ rates, No. Confirmation wherever possible) with source of information data 2.6 Energy including Yes • Operation Phase : electricity and fuels Connected load:3346 KW (source, competing Maximum Demand: 2244 KW users) Unit: fuel (MT), 2 nos. of 180 KVA, 1 no. of 250 KVA, DG set are energy (KW) proposed as backup during power failure. HSD will be used as fuel to run standby D.G. sets. 2.7 Any other natural No No other natural resources will be used. resources (use appropriate standard units)

1. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health Sr. Information/Checklist Yes/No Details thereof (with approximate quantities/ rates, No. Confirmation wherever possible) with source of information data 3.1 Use of substances or No Discarded containers of paints, solvents etc. during materials, which are construction phase. They will be stored separately and will hazardous (as per be handed over only to authorized processor for the facility. MSIHC rules) to human health or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence No Regular Pest control and adequate fumigation will be done of disease or affect will be done. disease vectors (e.g. Precautions to avoid formations of water ponds to avoid insect or water borne any water bound diseases. diseases) 3.3 Affect the welfare of No The living conditions of the people are expected to be people e.g. by changing improved. living conditions? 3.4 Vulnerable groups of No There are school and other infrastructures within 500 m people who could be radius area of the project. However traffic planning and affected by the project waste management during construction and operation phase e.g. hospital patients, shall mitigate the adverse effect, if any. children, the elderly etc., 3.5 Any other causes No Not Applicable

8

Proposed Slum Rehabilitation Scheme ‘Ovaripada’ FORM 1 by M/s Ashapura Housing Pvt. Ltd.

4 Production of solid wastes during construction or operation or decommissioning (MT/month) Sr. Information/Checklist Yes/No Details thereof (with approximate quantities/ rates, No. Confirmation wherever possible) with source of information data 4.1 Spoil, overburden or No Not Applicable. mine wastes 4.2 Municipal waste Yes Quantity (Kg/Day) (domestic and or Biodegradable waste 1298 commercial wastes) Non-Biodegradable waste 865 Total Solid waste 2163

4.3 Hazardous wastes (as No Not Applicable per hazardous waste management rules) 4.4 Other industrial process No Not Applicable wastes 4.5 Surplus product No Not Applicable 4.6 Sewage sludge or other Yes Dried sludge from STP will be used as manure for the sludge from effluent plants. treatment 4.7 Construction or Yes Construction waste will be used within project only. demolition wastes Unusable and excess construction debris will be disposed at designated places as per local permission.

WASTE QTY MANAGEMENT

Cement Empty bags to be handed over 25000 bags Bags to recycler Paint container 675 nos. To be handed over to recycler (@20L) Scrap metal 12 MT 100 % to be sold for recycling generated Waste tiles to be used for Broken skirting. Broken pieces to be 201 sq.mt Tiles used for china mosaic waterproofing terrace. Excavated earth shall be reused Excavated 200 cum for plinth filling & leveling of earth plot.

4.8 Redundant machinery No Not Applicable or equipment

9

Proposed Slum Rehabilitation Scheme ‘Ovaripada’ FORM 1 by M/s Ashapura Housing Pvt. Ltd.

Sr. Information/Checklist Yes/No Details thereof (with approximate quantities/ rates, No. Confirmation wherever possible) with source of information data 4.9 Contaminated soils or Yes During painting, spillage of oil, diesel. Any such spillage other materials shall be mitigated immediately once observed by isolating the area and removing spilled material.

5.Release of pollutants or any hazardous, toxic or noxious substances to air (kg/hr)

Sr. Information/Checklist Yes/No Details thereof (with approximate quantities/ rates, No. Confirmation wherever possible) with source of information data 5.1 Emissions from Yes • Emission will be generated from vehicular transport to the combustion of fossil project. But same will be within the prescribed limit as fuels from stationary or vehicles with possessed PUC. mobile sources 5.2 Emission from No Not Applicable production processes 5.3 Emissions from Yes • Emissions will be generated while handling and materials handling transportation of materials like cement, sand etc. to site including storage or and will be temporary in nature. transport • RMC shall be used preferably to reduce fugitive emissions due to material handling. • Regular water sprinkling shall be done to reduce dust generation • Transportation shall be done in covered trucks. 5.4 Emissions from Yes The project may cause rise in dust level during construction construction activities phase. Precautions will be taken to reduce dust generation including plant and during construction phase. equipment • RMC use will eliminate the handling of cement, sand and concrete; thus dust emission will be minimized. • Tarpaulins will be used to cover trucks carrying materials. • Water sprinkling will be done at regular intervals to reduce dust generation. • Net lawn will be used during construction. 5.5 Dust or odors from Yes Dust generation will be controlled as described above handling of materials proper ventilation will be provided around STP including construction During operation phase, municipal solid waste shall be materials, sewage and treated in OWC to produce manure. waste Sewage shall be treated in established technology like MBBR. 5.6 Emissions from No Not Applicable

10

Proposed Slum Rehabilitation Scheme ‘Ovaripada’ FORM 1 by M/s Ashapura Housing Pvt. Ltd.

Sr. Information/Checklist Yes/No Details thereof (with approximate quantities/ rates, No. Confirmation wherever possible) with source of information data incineration of waste 5.7 Emissions from burning No Not Applicable of waste in open air (e.g. slash materials, construction debris) 5.8 Emissions from any No Not Applicable other sources

6 Generation of Noise and vibration, and emissions of Light and heat.

Sr. Information/Checklist Yes/No Details thereof (with approximate quantities/ rates, No. Confirmation wherever possible) with source of information data 6.1 From operation of Yes Noise generation from construction equipment’s used for equipment e.g. engines, drilling, cutting operations. ventilation plant, During Operation Phase, Noise will be generated due to crushers operation of DG sets. For control of noise following measures shall be adopted: • Equipment’s used shall be conforming to the present norms to meet the noise standards • Equipment’s shall be regularly maintained • Any high noise generating construction activities would be carried out only during day time with all necessary precaution with noise barriers along the project activity. • Personal Protective Equipment’s (PPE) shall be provided to construction workers. • Acoustic enclosure for DG Set with stack height as per norm will be provided. • Noise level will be monitored and enhancement in the mitigation measure will be taken if required.. 6.2 From industrial or No Not Applicable similar processes 6.3 From construction or Yes The construction activities will include the following noise demolition generating activities; 1. Excavation activities etc. 2. Concreting and mixing. 3. Heavy vehicle movement. Following precautions shall be taken to control noise pollution : • High noise generating activities shall be carried out during day time only.

11

Proposed Slum Rehabilitation Scheme ‘Ovaripada’ FORM 1 by M/s Ashapura Housing Pvt. Ltd.

Sr. Information/Checklist Yes/No Details thereof (with approximate quantities/ rates, No. Confirmation wherever possible) with source of information data • Workers working near high noise machinery would be provided with ear muffs/ear plugs. 6.4 From blasting or piling Yes Only during piling work. 6.5 From construction or Yes During Construction Phase: operational traffic There will be transport of materials for construction work. Precautions will be taken to reduce the impacts of the vehicular movement such as vehicular trips will be at peak traffic hours. All vehicles used will be meeting the statutory requirements of operation and maintenance.

During Operation Phase: The vehicular parking will be restricted only in the adequate parking area provided, which would help in reducing noise pollution due to traffic congestion. Adequate tree plantation will also help to reduce the noise level and enhance air quality 6.6 From lighting or cooling No Not Applicable systems 6.7 From any other sources No Not Applicable

7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea Sr. Information/Checklist Yes/No Details thereof (with approximate quantities/ rates, No. Confirmation wherever possible) with source of information data 7.1 From handling, storage, Yes Negligible quantity use or spillage of hazardous materials 7.2 From discharge of Yes The total wastewater generated (525 KLD) from the sewage or other effluents buildings will be treated in STP of capacity of 550 KLD and to water or the land the Recycled water (201 KLD) will be utilized for landscaping and flushing purpose. Excess treated water will (expected mode and be send to existing municipal drain. place of discharge) 7.3 By deposition of No Dust will be generated during construction phase from pollutants emitted to air earthworks and movement of vehicles. Appropriate fugitive into the land or into dust control measures, including water sprinkling of exposed areas and dust covers for trucks, will be provided to water minimize any impacts. During Operation Phase, DG exhaust will be discharged at stipulated height by providing adequate stack height. 7.4 From any other sources No Not Applicable 7.5 Is there a risk of long No Not Applicable term buildup of pollutants in the

12

Proposed Slum Rehabilitation Scheme ‘Ovaripada’ FORM 1 by M/s Ashapura Housing Pvt. Ltd.

Sr. Information/Checklist Yes/No Details thereof (with approximate quantities/ rates, No. Confirmation wherever possible) with source of information data environment from these sources?

8. Risk of accidents during construction or operation of the project, which could affect human health or the environment Sr. Information/Checklist Yes/No Details thereof (with approximate quantities/ rates, No. Confirmation wherever possible) with source of information data 8.1 From explosions, No During construction all construction workers will be spillages, fires etc from provided with suitable Personal Protective Equipment as storage, handling, use or required under the health & safety norms. Suitable production of hazardous firefighting measures will be provided to reduce damage due substances to fire-accidents. 8.2 From any other causes No Not envisaged 8.3 Could the project be Yes This area falls under seismic zone –III according to Indian affected by natural Standard Seismic zoning map. disasters causing environmental damage (e.g. floods, earthquakes, landslides, could burst etc)?

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality Sr. Information/Checklist Yes/No Details thereof (with approximate quantities/ rates, No. Confirmation wherever possible) with source of information data 9.1 Lead to development of supporting, utilities, ancillary development or development stimulated Yes Supporting and ancillary development will take place by the project which could have impact on the environment e.g.:

Supporting infrastructure Yes Internal Roads, Rainwater Harvesting, STP etc. will be (roads, power supply, provided. waste or waste water treatment, etc) Housing development Yes The project provides a well-designed residential housing Extractive industries No area for the occupants. Supply industries No Other No 9.2 Lead to after use of the No Not Applicable site, which could have

13

Proposed Slum Rehabilitation Scheme ‘Ovaripada’ FORM 1 by M/s Ashapura Housing Pvt. Ltd.

Sr. Information/Checklist Yes/No Details thereof (with approximate quantities/ rates, No. Confirmation wherever possible) with source of information data an impact on the environment 9.3 Set a precedent for later Yes This will create job opportunity for support staff like developments security, maintenance, household workers etc. 9.4 Have cumulative effects Yes The project proposed is in the residential zone of MBMC. due to proximity to other As per approved DP of MBMC, the provision of adequate existing or planned water, Storm Water Drainage, availability of electricity, projects with similar Traffic management and mitigation are the component of effects considered in the approved DCR

(iii) Environmental Sensitivity

Sr. Areas Name/ Aerial distance (with 15 km) Proposed project location No. Identity boundary 1 Areas protected under Yes Sanjay Gandhi National Park (0.68 km) international conventions, national or local legislation for their ecological, landscape, cultural or other related value 2 Areas which are Yes Sanjay Gandhi National Park (0.68 km) important or sensitive of ManoriCreek (4.12 km) ecological reasons – (0.70 km) Creek (9.11 km) wetlands, water courses creek (4.64 km) or other water bodies, coastal zone, biospheres, mountains, forests 3 Areas used by protected, Yes Sanjay Gandhi National Park (0.68 km) important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration. 4 Inland, coastal, marine or Yes ManoriCreek (4.12 km) underground waters Dahisar River (0.70 km) Vasai Creek (9.11 km) Gorai creek (4.64 km) 5 State, national No The project is located within Municipal limits- MCGM boundaries 6 Routes or facilities used Yes Water Kingdom (5.93 km) by the public for access Essel World (6.10 km)

14

Proposed Slum Rehabilitation Scheme ‘Ovaripada’ FORM 1 by M/s Ashapura Housing Pvt. Ltd.

Sr. Areas Name/ Aerial distance (with 15 km) Proposed project location No. Identity boundary to recreation or other Global Vipassana Pagoda (6.18 km) tourist, pilgrim areas 7 Defense installations No Not Applicable 8 Densely populated or Yes Residential, Commercial and Industrial area all around built-up area the site. 9 Areas occupied by Yes 1)Nearest Hospital:- sensitive man made land • Elite Hospital - 400 m towards West (Aerial uses (hospitals, schools, Distance) places of worship, community facilities) 2)Nearest School:- • Shailendra Vidyalaya– 600 m towards North ( Aerial Distance ) 10 Areas containing No Not Applicable important, high quality or scarce resources (ground water resource, surface resources, forestry, agriculture, fisheries, tourism, minerals) 11 Areas already subjected No Not Applicable to pollution or environmental damage. (those where existing legal environmental standards are exceeded) 12 Areas susceptible to No This area falls under seismic zone –III according to natural hazard which Indian Standard Seismic zoning map. could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions)

15