CURRICULUM VITAE

Position Title and No. Name of Expert: Djemil Fejzic Date of Birth: 25th August 1957 Country of Citizenship/Residence:

EDUCATION

Institution: Civil Engineering Faculty in Sarajevo Date from – Date to: 1976 - 1981 Degree(s) or Diploma(s) obtained: Bachelor Science Civil Engineer – Hydro- technical Branch (Diploma attached). Institution: Civil Engineering Faculty in Sarajevo Date from – Date to: 1999 - 2001 Degree(s) or Diploma(s) obtained: Master of Technical Science (Diploma attached).

EMPLOYMENT RECORD RELEVANT TO THE ASSIGNMENT

Period Employing Organization and Country Summary of activities title/position. Contact performed relevant to the information and reference Assignment From 1st SIEMENS AG, BO Bangladesh Bangladesh Main Engineer for Civil September Civil Construction Site - Construction Works. Civil 2016 – Manager Bheramara, Construction Site Manager on 31st Kushtia 2x500MW Back to Back For References - Project December Converter Station AC Manager Mr. Abdellah Chakir: 2017. 400kV/230kV– Bheramara [email protected] Bangladesh – SIEMENS BO Bangladesh – II Phase.

From 01st “Zavod za vodoprivredu” d.d. Bosnia and Manage of Projects financed Jun 2015 Sarajevo, Bosnia and Herzegovina by local and international – 1st Herzegovina (“institute of Sarajevo Investors like EBRD, EIB, KfW, September Water Management” WB, UNDP in the field of Water 2016 shareholding company, Managements. Sarajevo, B&H) General Manager For References – Human Resource Department Manager Mrs. Halima Obucina: [email protected] From 15th SIEMENS AG, BO Bangladesh Bangladesh Main Engineer for Civil February Civil Construction Site - Construction Works. Civil 2012 – Manager Bheramara, Construction Site Manager on 21st Kushtia 500MW Back to Back For References – Senior January Converter Station AC Project Manager Mr. Wolfgang 2014. 400kV/230kV– Bheramara Klaer: Bangladesh – SIEMENS BO [email protected] Bangladesh –I Phase. September Faculty of Civil Engineering Bosnia and Calculation of hydraulic 2011 - Sarajevo B&H Herzegovina characteristics of the small October Energoinvest Co. Sarajevo Sarajevo hydro power plant “Cajdras” 2011 Municipality Zenica Bosnia Expert Consultant and Herzegovina. Definition of work pressure range of the Pelton turbine. January Faculty of Civil Engineering Bosnia and Study of “Protection of potable 2011 – Sarajevo B&H Herzegovina water source Dusina in March Team Leader Sarajevo Municipality Novi Travnik – 2011 Bosnia and Herzegovina” financed by “ River Watershed Agency” Sar. B&H January Faculty of Civil Engineering Bosnia and Preliminary Design of Regional 2011 Sarajevo B&H and “IPSA” Herzegovina Sanitary Landfill Site Institute d.o.o. Co. Sarajevo Sarajevo “Tresnica” – Municipality Main Designer Gorazde B&H July 2010 Faculty of Civil Engineering Bosnia and Study of “Protection of potable – Sarajevo B&H and “OIKOS” Herzegovina water sources Žabljak, September d.o.o. Consulting Co. Sarajevo Makljenovac and Ularice in 2010 Sarajevo Municipality Usora” financed Team Leader by “Sava River Watershed Agency” Sarajevo B&H. December Faculty of Civil Engineering Bosnia and Study of “Protection of potable 2009. – Sarajevo B&H and “OIKOS” Herzegovina water source Bare in January d.o.o. Consulting Co. Sarajevo Municipality Domaljevac ” 2010 Sarajevo financed by “Sava River Team Leader Watershed Agency” Sarajevo B&H. October Faculty of Civil Engineering Bosnia and Study of “Protection of potable 2009. – Sarajevo B&H and “OIKOS” Herzegovina water source Slatinska vrela in November d.o.o. Consulting Co. Sarajevo Municipality Donji Vakuf” 2009 Sarajevo financed by “Sava River Team Leader Watershed Agency” Sarajevo B&H. January Faculty of Civil Engineering Bosnia and Sanitary Landfill’s Main design 2009. – Sarajevo B&H and Herzegovina and As Build documentation July 2009. Burgesteller Co. from Austria Sarajevo for “Treatment of new waste Main Designer and Designer’s for Mezdre-Vlaski do Location” Supervising near Bihac town Contract No. “BA-SWM-NCB-156-W-08- 3672-BOS/BI” financed by World Bank – Bosnia and Herzegovina. February Faculty of Civil Engineering Bosnia and Preliminary and Main design of 2008. – Sarajevo B&H and IGH Zagreb Herzegovina the Reconstruction the Jun 2008. (Croatia) branch Mostar Sarajevo Overflow and Evacuation Main Designer structures of the dam Zupica near Drvar town in Bosnia and Herzegovina. October Faculty of Civil Engineering Bosnia and Main design of the Water 2007. – Sarajevo B&H Herzegovina Supply Network and January Member of Designing Team Sarajevo Sewerage Drainage Network 2008. for Head Office Building of Braun Coal Mine Kakanj – Bosnia and Herzegovina. July 2007. Faculty of Civil Engineering Bosnia and Supervising of the – Sarajevo B&H Herzegovina Construction and Installation December Member of Supervising Team Sarajevo Works during building period 2008. of the “Bosnia Bank International – BBI Center – Sarajevo” – main Supervisor for hydro phase / drainage system, sewerage system (inside and outside), water supply system (inside and outside). May 2007 Faculty of Civil Engineering Bosnia and Main Design “External – July Sarajevo B&H Herzegovina Drainage System of the 2007. Main Designer Sarajevo underground water for the Bosnia Bank International – BBI Center – Sarajevo” - Bosnia and Herzegovina. January Faculty of Civil Engineering Bosnia and Main Design “Reconstruction 2007 – Sarajevo B&H and CONEX Co. Herzegovina of the Spillway Pool of the May 2007. Mostar, Bosnia and Sarajevo Base Outlet of hydro power Herzegovina Rama on river Rama” Bosnia Main Designer and Herzegovina August Faculty of Civil Engineering Bosnia and Revision and verification of 2006 – Sarajevo B&H and NGO Herzegovina the “Final design Sanitary December “CEEF” /Centre for Energy Sarajevo Landfill – Lukavacka rijeka – 2006. Efficiency/ Sarajevo B&H Region Tuzla, Bosnia and Team Member Herzegovina” within Project “Waste management in Bosnia and Herzegovina” financed by World Bank. May 2006 Faculty of Civil Engineering Bosnia and Preliminary Design “Hydro – Sarajevo B&H Herzegovina Power Plant (HPP) Dub on November Designing Team Member Sarajevo river Praca” Bosnia and 2006. Herzegovina, and Study “Environmental Impact Assessment for HPP Dub”. May 2006 Faculty of Civil Engineering Bosnia and Preliminary Design “Hydro – Sarajevo B&H Herzegovina Power Plant (HPP) Ustipraca November Designing Team Member Sarajevo on river Praca” Bosnia and 2006. Herzegovina, and Study “Environmental Impact Assessment for HPP Ustipraca”. March Faculty of Civil Engineering Bosnia and Preliminary Design 2006 – Sarajevo B&H and CONEX Co. Herzegovina “Reconstruction of the May 2006. Mostar, Bosnia and Sarajevo Spillway Pool of the Base Herzegovina Outlet of hydro power Rama Main Designer on river Rama” /hydraulics analysis and solution proposal/ B&H February Faculty of Civil Engineering Bosnia and Main Design of “Rehabilitation 2006 – Sarajevo B&H Herzegovina and Conversion of the Landfill June Main Designer Sarajevo Site Obodina in Trebinje 2006. municipality into a Sanitary Landfill Site” Bosnia and Herzegovina October Joint Venture of “C&E Bosnia and “Support to Improved Waste 2003 – Consulting und Engineering Herzegovina Management in Bosnia and October GmbH Chemnitz”, “SRP Sarajevo Herzegovina” CARDs Project 2005 Schneider & Partner GmbH” 2002 financed by European and “Faculty of Civil Commission Sarajevo Engineering Sarajevo B&H” Project Manager January Joint Venture Mitsubishi Bosnia and Bidding Document for 2002 – Materials Corporation & Herzegovina Construction of the Railway August Elektroforce Co. Sarajevo Sarajevo Track and the Bridge over 2003 Engineer Consultant (local River for Brown Coal consulting expert) for civil Mine Kakanj, Consulting works on behalf Japan Bank Service. Project has been for International Cooperation financed by JBIC (Japan Bank for International Cooperation) and performed under JBIC procedure. July 2002 Faculty of Civil Engineering Bosnia and Main design of the system for – August Sarajevo B&H Herzegovina wastewater collection and rain 2002 Designer Sarajevo water collection and system for water supply and fire protection for workshop of maintenance railway wagons of the Railway company of B&H. Project has been financed by European Investment Bank - EIB. February Parsons Brinkerhoff Hrvatska Reconstruction of Kostajnica 2001 – Infrastructure Ltd. /England/ Kostajnica – bridge destroyed during the January & Elektroforce – Sarajevo Croatia War in former Yugoslavia. 2002 /B&H/ Removal debris of destroyed Engineer Representative on bridge in Jasenovac from the Behalf European Commission river deck. – supervisor Contract has been performed under FIDIC’s conditions. September Hydro-Engineering Institute – Hydro-power Increasing capacity of the 1999 – Sarajevo plant “Una water transport through January Leader of the expert team Kostela” incoming tunnel – testing 2000 near Bihac capacity in site, hydraulics’ town – design proposal for increasing Bosnia and Herzegovina October Camp Dresser & McKee inc. Tuzla, Institution Strengthening of 1998 – (USAD) – Hydro-Engineering Brcko, Banja the Water Municipality into September Institute – Sarajevo Luka – Federation of Bosnia and 1999. Engineer consultant – local Bosnia and Herzegovina – Ten pilot Water expert Herzegovina Utilities – Project has been financed by European Commission in Bosnia and Herzegovina February Plancentar Ltd. (Finland); Zenica, Water Sector Institution 1998 – BCEOM (France); Hydro- Bihac i Livno Strengthening Project of October Engineering Institute – – Bosnia and Federation Bosnia and 1998 Sarajevo Herzegovina Herzegovina – Project has Local consulting expert been financed by European responsible for supporting Commission in Bosnia and International Consultant in Herzegovina drafting water resources management strategy and institutional capacity building September Hydro-Engineering Institute – Vogosca – Final Relocation design of the 1997 – Sarajevo Sarajevo – Water Treatment Plant for February Designer and designer’s Bosnia and potable water /which has been 1998 supervision during the Herzegovina used through period of the erection period War in Bosnia and Herzegovina / from old location Bentbasa to the new location Vogosca May 1997 Hydro-Engineering Institute – Tuzla – Feasibility Study for the – August Sarajevo Sarajevo – urgent water supply of Tuzla 1997 Member of the Designer’s Bosnia and City – Alternative with water Team Herzegovina intake from Modrac lake and processing 250 + 250 l/s on the Water Treatment Plant at Thermo Power Plant (TPP) Tuzla 1994 - Hidrogradnja Co. – Sarajevo, Tripoli - Preliminary and final design of 1996 Branch in Libya, Department Libya water supply system for the for Civil Engineering Design in Towns Sirt and Adjudabija in Tripoli town Libya (secondary water supply Designer and designer’s network – connection on the supervision during erection “Great River”). period 1991 - Joint Venture of the National Tripoli - Construction of steel 1994 Company for Construction and Libya structures, civil works and Maintenance of Municipality pipelines for the treatment Works (Libya) and plant of the sewerage water Energoinvest – Sarajevo – and waste water for Tripoli Bosnia and Herzegovina - JV town. of NCC M.M.W. & EI Head Site Engineer for civil works 1989 – Joint venture of Electric El Khoms - Supervision over construction 1991 Company (Libya) and Libya works at substation “El Khoms Energoinvest – Sarajevo – 220/60/30 kV” , “Navy Base Bosnia and Herzegovina – 30 kV” and ”Refitting Yard 30 E.L.P.C.O. kV” – concrete and steel Supervision Engineer structure. 1986 - Energoinvest – Bosnia and Training and designing on 1989 Higrainzinjering - Sarajevo. Herzegovina Computer Vision 3D System Development sector - Sarajevo engineer 1986 Energoinvest – Bosnia and Final design of the sewerage Higrainzinjering – Sarajevo Herzegovina network of the thermo power Designer Sarajevo plant Kakanj – Section IV 1983 – Energoinvest – Bosnia and Final design of the sewerage 1985 Higrainzinjering – Sarajevo Herzegovina network for chemical waste Designer Sarajevo water for chemical plant MIO in Libya. 1981 – Institute for Hydrotechnics – Bosnia and Hydraulic model testing of: 1983 Faculty of Civil Engineering Herzegovina  Hydro-power Plant Sarajevo Sarajevo Salakovac on the river Independent researcher ,  Hydro-power Plant Foca on the river .

MEMBERSHIP IN PROFESSIONAL ASSOCIATIONS AND PUBLICATIONS: No

LANGUAGE SKILLS: Bosnian – mother tongue; English – advanced communication

ADEQUACY FOR THE ASSIGNMENT:

Detailed Tasks Assigned on Consultant’s Reference to Prior Work/Assignments that Team of Experts: Best Assigned Illustrates Capability to Handle the Assigned Tasks As you may see, our expert has extensive international experience in the civil sector, in particular in applied hydraulics and water management systems design and operation, and have worked with a wide variety of stakeholders across cross- cutting projects. He is versatile in working both in office and site environments and have senior management experience as well.

Expert’s contact information: (e-mail: [email protected] phone: 00387 61 487 471)

Certification: I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly describes myself, my qualifications, and my experience, and I am available, as and when necessary, to undertake the assignment in case of an award. I understand that any misstatement or misrepresentation described herein may lead to my disqualification or dismissal by the Client, and/or sanctions by the Bank.

Djemil Fejzic 2019 February Name of Expert Signature Date {day/month/year}