Environmental Monitoring Report

Project Number: 45509-002 August–December 2018 January 2019

People’s Republic of : Urban -Rural Infrastructure Development Demonstration Project II — External Environmental Monitoring Report㸦No.7㸧

Prepared by the Halcrow (Chongqing) Engineering Consulting Co. Ltd for the People’s Republic of China and the Asian Development Bank (ADB) The views expressed herein are those of the consultant and do not necessarily represent those of ADB’s members, Board of Directors, Management, or staff, and may be preliminary in nature.

.

This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the terms of use section of this website.

In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

PRC: ADB Financed Chongqing Urban -Rural Infrastructure Development Demonstration Project II

External Environmental Monitoring ReportNo.7

August 2018-- December 2018

Halcrow (Chongqing) Engineering Consulting Co.Ltd.

January 2019

ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II- External Environmental Monitoring Report

Content

1 PROJECT OBJECTIVES AND BASIC INFORMATION ...... 1 2 PROJECT PROFILE ...... 1 3 PROFILE OF THE SEMIANNUAL REPORT ...... 4 3.1 Project Profile ...... 4 3.2 Environment Management Organization ...... 9 3.3 Project Progress and Environmental Sensitive Sites and Environmental Standards ...... 15 3.4 Implementation Situations of the Mitigation Measures ...... 22 3.5 Monitoring Results ...... 43 3.5.1 External Monitoring...... 43 3.5.2 Internal Monitoring ...... 64 3.6 Training Records and Public Information Consultation ...... 67 3.7 Grievance Redress Mechanism ...... 71 4 CONCLUSION AND RECOMMENDATION ...... 100 4.1 Conclusion ...... 100 4.2 Recommendations ...... 102 5 PICTURES ...... 103 6 APPENDIX ...... 111

I ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

1 PROJECT OBJECTIVES AND BASIC INFORMATION

The environment monitoring report is prepared by Halcrow (Chongqing) Engineering Consulting Co. Ltd. for the ADB-financed Chongqing Urban-rural Infrastructure

Development II Project (referred to as the Project). It is the sixth environment monitoring report (EMR) of this phase II project, covering the environment protection status of all subprojects from August to December 2018.

The report described the project implementation progress, establishment of organizations relevant to the environment management plan, supervision and monitoring, environment monitoring results, project readiness assessment, training and consulting activities, and assessment of the implementation situation of the environment impact mitigation measures conducted by the contractors in the project sites and their surrounding

areas located in cities affected by the project.

2 PROJECT PROFILE

In September 2013, the Chongqing Urban-rural Infrastructure Development Phase II Project, financed by the ADB with USD 150 million, was approved. The Project Agreement and The Loan Agreement were signed on November 20th, 2013. After effectiveness of the loan on January 10th, 2014, the project started to be implemented, so did the preparation of the preliminary designs and the detailed designs of the subprojects, the recruitment of the consultants to strengthen the project management and capacity building and conduct independent monitoring. The intended project completion date and the intended financial closing date is respectively June 30th, 2018 and December 31th, 2018, and the updated financial closing date is 31 Dec 2020.

1 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

Loan Number 3022 –PRC Project Name Chongqing Urban-rural Infrastructure Development Project Phase II Borrower Chongqing Municipal Government Rongchang Government, Wulong County Government, Government, Government, Shizhu Executing Agencies County Government, Government

Approval Date by the Board 2013.9.20 Signing Date of the Loan Agreement 2013.11.20

Loan Effectiveness 2014.1.10 Intended Completion Date 2018.6.30 Planed Closing Date 2018.12.31 Updated Closing Date 2020. 12. 31

Date of the Last ADB mission 2017.12.30 Rongchang Hongyu Wate0r Resources Development Co., Ltd.,

Chongqing Wulong County Urban and Rural Development (Group) Co., Ltd., Chengkou Transportation Development Co., Ltd., Fuling Project Implementation Units District Zhonglong Communications Construction Co., Ltd., Shizhu Communications Construction Corporation, Wanzhou Water Company

The total investment was $307.43 million, among which 51% is the Project Investment and Funding Plan counterpart funds from six subproject county governments and 49% will be from the ADB.

Note : Youyang Subproject has quit the ADB loan.

2 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

This project is a demonstration project of ADB-financed Chongqing Urban-rural Infrastructure Development Projects, aiming to achieve social harmony and balanced economic growth through coordinating urban and rural development. Due to the social and economic development differences caused by the unbalanced development in urban and rural areas, this project will selectively enhance the development potentials of the small and medium-sized towns and counties: (1) urban water supply system; (2) the flood risk management of various scales of rivers; (3) improving the urban and rural road links.

The total estimate cost of the proposed project is $307.43 million, among which $150 million is funded from the ADB loan. The project includes three investment parts: (1) Investment in the flood management; (2) investment in the water supply; (3) investment in the road network improvement. There are six subprojects in these three investment areas, including two flood management subprojects, three road network improvement subprojects and one water supply subproject, which are:(i) Rongchang Rongfeng River Water Supply Subproject (constructions of a 6.7-kilometer-long levee, a bridge and 8.5 kilometers sewage conduits, greening facilities and rainfall and flood level monitoring facilities);

(ii)Wulong Wujiang River Flood Management Subproject (constructions of a 2.6-kilometer-long levee and flood level monitoring facilities); (iii) Chengkou County

Urban-rural Road Network Improvement Subproject (reconstructions of 10.2 kilometers roads and the relevant infrastructures, including 2 bridges, 1.5 kilometers tunnels, 20.4 kilometers drainage ditches and greening facilities); (iv) Fuling District Urban-rural Road

Network Improvement Subproject (reconstructions of 16.2 kilometers roads and the relevant infrastructures, including 14 bridges and 32.4kilometers drainage ditches and greening facilities); (v) Shizhu County Urban-rural Road Network Improvement Subproject reconstructions of 25.3 kilometers roads and the relevant infrastructures, including 8 bridges and 50.6 kilometers drainage ditches and greening facilities); (vi) Wanzhou District Yangliu Water Supply Subproject (This subproject includes two phases, of which the total designed water supply capacity is 35,000m3/d. In the 1st phase, a water treatment plant with 20,000m3/d water supply capacity will be built, Including water treatment facilities, water quality monitoring facilities, power supply and distribution system, offices and other plant supporting facilities).

At present, all subprojects have been commenced and constructed (in which, the

3 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report Youyang Subproject has quit ADB loan). The detailed progress status can be seen in the Table 3.

3 PROFILE OF THE SEMIANNUAL REPORT

The main scope of this report includes the environment protection status of the constructing Rongchang Rongfeng River Flood Management Subproject, Wulong Wujiang Flood Management Subproject and Wanzhou District Yangliu Water Supply Subproject, Fuling District Urban-rural Road Network Improvement Subproject and Shizhu County Urban-rural Road Network Improvement Subproject and Chengkou County Urban-Rural Road Network Improvement Subproject during their civil works construction period.

3.1 Project Profile

The civil engineering of the constructing Rongchang Rongfeng River Flood Management Subproject, Wulong Wujiang Flood Management Subproject, Wanzhou District Yangliu Water Supply Subproject, Fuling District Urban-rural Road Network Improvement Subproject and Shizhu County Urban-rural Road Network Improvement

Subproject and Chengkou County Urban-Rural Road Network Improvement Subproject is shown in Table 1.

4 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

Table 1The Civil Engineering Profile of the Subprojects under Construction

Subproject Subproject Name Construction Site and Civil Commencement Date Category Designed Scale Main Civil Engineering Note Engineering Contract Investment This subproject has 4 civil engineering Flood Rongchang The construction site is (i) 7.3 km dike The designed The commencement contract packages. Management Rongfeng River from the Bingmatan (ii) 8.9 km sewage estimate date of the 1st civil The Contractor: Subproject Flood Highway Bridge to the pipeline investment in engineering contract is C01: Zhongcheng Coal Management Donghu Reservoir in the (iii) Landscaping the civil May16th, 2015. Construction (Group) Co., Ltd.; C02: Subproject upper stream. The (iv) Rainfall and engineering Sichuan Lixin Construction Co., Ltd engineering management flood water works is C03: covers 4,805m river way, monitoring CNY92.5561 Landscape Greening Co., Ltd. of which the total length equipment million. C04: of the revetments on both (v) Special vehicle Date of Contract signing: sides is 7,382.8m for flood control C01: 2015.4.21; (3,882.8m on the left and and maintenance C02:2016.9.16. 3,500m on the right). trucks C03:2016.12.24 (vi) Inspection boat C04: (vii)Office Estimated Date of Completion: C01: equipment Completed 2016.10 C02:2018.3 C03:2018.7 C04:2018. The Supervision Unit: Chongqing Hongyu Water Conservancy Consultative Co., Ltd.; Jingjia Construction CO. The construction site (i) 2.6 km dike The designed The formal The project is divided into 3 civil Wulong Wujiang locates in the Wulong (ii) Special vehicle estimate commencement date of engineering contract packages. Flood county. It is the for flood control investment in the 1st section civil Contractor: Management downstream of Wujiang, and maintenance the civil engineering is June C01:Gezhouba Group Fifth Subproject The construction site is trucks engineering 30,2015. Engineering Co., Ltd.

5 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

from Wulong PFPC the (iii)Office works is CNY C02: Water Conservancy 319 national road. It will equipment 299.76 million. Development Co., Ltd. build 2.6km dike, which C03:. Yancheng Water will connect with the Conservancy Construction Co. WB project. Date of contract signing : C01:2015.6.17 C02:2015.6.17 C03:2015.6.17

Estimated Date of completion: C01-C03:2018.12; Supervision Agent: Chongqing Jianghe Engineering Construction Supervision Co. Wanzhou District This subproject includes (i) 200,000 m3/day The designed The formal 3 civil engineering contract packages. Water Supply Yangliu Water two phases, of which the WTP estimate commencement date of The Contractor: Subproject Supply Subproject total designed water (ii) Sludge investment in the 1st section civil C01:Xin Jiang Water Conservancy and supply capacity is treatment facility the civil engineering is May Hydropower Engineering Ltd. and 35,000m3/d. In the 1st (iii) Electric engineering 10th, 2015. Shanxi Metallurgical Geotechnical phase, the designed systems and plant works is CNY Engineering Survey General Co. Ltd. water supply capacity is ancillary equipment 34.125 million. C02:Guangxi Construction 20,000m3/d. The (iv)Transportation Engineering Group Fifth Construction construction site of the and maintenance Engineering Co. Ltd. water treatment plant is equipment C03:Guangxi Construction on the inner side of the (v)Office Engineering Group Fifth Construction Yangliu Bridge of equipment Engineering Co. Ltd. Shuanghekou in Wanzhou Date of Contract signing: District. C01:2014.12.12 C02:2016.9.25 C04:2017.1.17 Estimated Date of Completion: C01: completed 2016.5. C02:2018.8 C03:2018.8

6 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

Supervision Agent: Changjiang Engineering Supervision Consulting Ltd. .; Fuling District The project Starts from (i) 8.8 km of The estimated The formal 2 Civil Contracts. Contractor : Road network Urban-rural Road from Jiaoshizhen town, upgraded roads project commencement date is C01: Chongqing improvement Network along the Juandongchang (ii) 5 bridges investment is December 25th, 2015 Qunzhou Entity (Group) Co., Ltd. subproject Improvement site, and ended at (iii)Public 273.775 million C02:China Water Conservancy and Subproject Damuxiang county, with transportation yuan ( the Hydropower Sixth Engineering Bureau a total length of 14.4 facilities investment in A Co.ltd kilometers (section A is (iv)17.6 km storm section is 37.77 funded by Fuling district water drainage million yuan) Date of contract signing: financial department). ditch C01: Feb.25, 2015 Section A starts from (v) Landscaping C02:Apr.18,2017 Jiaoshizhen town in (vi)Road Estimated Date of Completion: Fuling district and ended maintenance C01Dec.31, 2017 at Juandongchang site, vehicles C02:: Dec 2019 with a length of 5.592 (vii) Office The Supervision kilometers. The road equipment Agent: level is level II, with a Chongqing Fuling width of 10 meters, the Road Engineering length of carriage way is Supervising Co., Ltd. 8.5 meters; section B starts from Jaundongchang and ended at Damuxiang, with a total length of 80809 meters, the road level is level III, the width of subgrade is 8.5 meters, with a carriageway width of 7 meters, the road is made of asphalt concrete. Shizhu District Starting from Huangshui (i) 19.7 km of the first bidding The first bidding 2 civil contracts :

7 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

Urban-rural Road Township, ended at upgraded roads section is section is at Dec. 9th, Contractor A: Modern Road & Network Yuelaizhen county, the (ii) 2 bridges 47.778 million 2015 Bridge Engineering Group Co., Ltd. Improvement route length is of 19.694 (iii)Public yuan; The Date of contract signing: Oct. 8th, 2015 Subproject kilometers, t is designed transportation second bidding Estimated Date of Completion: as the class III highway, facilities section is May.,2019 with the roadbed width (iv) 39.4 km storm 39.108 million Contract B Foreign of 7.5 meters. water drainage yuan Construction Group Co., Ltd. ditch Date of contract signingJan 29, 2016 (v) Landscaping Estimated date of completion: Dec. (vi)Road 2018 Supervising Agent: Chongqing maintenance Traffic Engineering Consulting Co., vehicles Ltd. (vii)Office equipment Chengkou County Contract C01 Starts from (i) 7.4 km of roads The estimated 10 Nov, 2016 2 Contractor : Urban-Rural Road Yanhe Township, ended (ii) 3 bridges investment of C01: Jiangxi Road Bridge and Network at Yinghong Township, (iii) 1.8 km tunnel contract A: Tunnel Engineering Co, ltd. Improvement the route length is of 4.6 (iv) Public 17.57million C02:Heilongjiang Hualong Subproject km, it is designed as the transportation RMB Construction Co. Ltd. level IV, with the facilities Contract B: Date of contract roadbed width of 6.5 (v) 14.8 km storm C01:June 30, 2016 meters with asphalt water drainage C02: July 25,2017 concrete pavement ditch Estimated date of completion: (vi) Landscaping May 2019 Contract C02: (vii) Emergency Supervising Agent: Chongqing Traffic tunnel:1875m machines and Engineering Consulting Co., Ltd. Road : 0.925 km vehicles (viii)Office equipment

8 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

3.2 Environment Management Organization

The Rongchang Rongfeng River Flood Management Subproject, Wulong Wujiang Flood Management Subproject and Wanzhou District Yangliu Water Supply Subproject, Fuling District Urban-rural Road Network Improvement Subproject, Shizhu and Chengkou County Urban-rural Road Network Improvement Subproject have established complete environment management organizations, which are responsible for their own environment management during their civil engineering construction periods. The specific information of the relevant environment management organizations is available in Table 2.

9 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

Table 2: The Profile of the Environment Management Organizations and Staff of Construction

Name of the Environment Name of Person Main Duties Management Organization in Charge Title Contact Supervise and overall manage so as to ensure smooth implementation of project; supervise and manage local project management office’s work performance; ensure environmental

consultants and external environment monitoring units to assist in CPMO monitoring and managing during implementation phase; pack up He Mengna CPMO’s the prepared environmental monitoring reports of all subprojects officer 15802396227 and submit them to the ADB; establish a GRM with a specialized PCCU; set up LPMOs and supervise its activities.

Team Leader Liao Li Follow and make report according to EMP’s implementation of all 13882056616 consultant expert team sub-projects. Environment Wang Zhe al expert 15620800703 external monitoring unit: Yin Jian Halcrow (Chongqing) Supervise and manage conformity between external environmental Team Leader 13971437581 Engineering Consulting Co., monitoring and EMP. Chen Qiuwen Environment Ltd al expert 15365151717

Rongchang Rongfeng River Flood Management Subprojects, hereafter referred to as RCRF

Supervise implementation of environmental protection measures

Huang during construction and collect environmental materials submitted Division 15922989718 Rongchang County PMO Anxiang by owner unit. Director

Rongchang County Hongyu Be responsible for environmental protection management and General 13883556806 Water Resource Yu Chilong supervision during construction; ensure environmental protection manager Development Co., Ltd Hu You fund to be put in place; collect related environmental materials Senior engineer 13509474713

10 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

submitted by contractor and supervisor Project Sichuan Zhongcheng Coal Being responsible for implementing the environment protection Manager of Construction (Group) Co., measures and accepting the monitoring and management of the Xu Weijun the 13883706999 Ltd owner unit and supervision unit. Constructor

Chongqing Hongyu Water Conservancy Chongqing Supervising the implementation situation of the environment Zhang Project Hongyu Water Control protection measures and the conservation of water and soil of the Zhiwei Supervisor 1868090032 Consultative Co., Ltd. implementation unit and compiling the supervision monthly report.

Wulong Wujiang Flood Management Subprojects, hereafter referred to as WLWJ

Supervise implementation of environmental protection measures Division Hui during construction and collect environmental data submitted by Wulong County PMO Director 13896689358 owner unit. Be responsible for environmental protection management and

supervision during construction; ensure environmental protection Wulong Urban-Rural General 15330557766 Development Group Chen Bin fund to be put in place; collect related environmental data submitted Manager by contractor and supervisor Gezhouba 5 Construction (Group) Co., Ltd.; Yan Bing 0717-6711042 Project Anhui Hydrological Being responsible for implementing the environment protection Manager of Development Co.,Ltd.; Zheng Bishui measures and accepting the monitoring and management of the 023-67735119 the owner unit and supervision unit. Jiangsu Yancheng Constructor Hydrological Zhang 0515-88335420 Construction Co., Ltd. Hongyu Chongqing Jianghe Supervising the implementation situation of the environment Engineering Project Construction Supervision Xiao Wei protection measures and the conservation of water and soil of the Manager of 13996939442 Co., Ltd.; implementation unit and compiling the supervision monthly report. the

11 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

Supervisor

Wanzhou Yangliu Water Supply Subproject, hereafter referred to as WZYL

Monitoring the implementation situation of each environment

Wanzhou District Project protection measure during the construction period and collecting Section Jing Li relevant materials related to the environment submitted by the 18996513299 Management Office Chief owner u Being responsible for the environment protection management and Manager at the monitoring during the construction period, implementing the Project Site of Wanzhou Water Company Li environment protection funds and collecting the relevant materials the Owner 13658217778 (the owner unit) Chunsheng related to environment submitted by the contractor and the Unit supervision unit. Xinjiang Corps Water Conservancy and

Hydropower Engineering Project

Co., Ltd and Shanxi Manager of Be responsible for implementing environmental protection Metallurgical Construction Cao Furong measures; accept supervision from owner unit and supervision unit 13883738766 geotechnical engineering Unit corporation Hubei Changjiang On-site supervision of the implementation of engineering measures such Project Engineering Supervision Peng Jianfeng as environmental protection and soil and water conservation of the Manager of the 13886100805 Consulting Ltd. construction unit, and the preparation of the supervision monthly report. Supervisor

Fuling District Urban-rural Road Network Improvement Subproject, in short FLLW

ADB experts

Monitoring the implementation of environmental protection environmenta Fuling District Project measures during the construction period, and collecting relevant l 023-72288242 Shi Bo Management Office information about the environment submitted by unit owners. management training

12 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

Responsible for work related to environmental management and ADB experts

Zhonglong Traffic supervision of construction work, ensuring the environmental environmenta Construction Co., Ltd. In Yin Fulin protection funds, collecting the relevant information on l management 13896729903 Fuling district Tang Xizhi environment submitted by contractors and supervision units training 18183011997

construction Responsible for the implementation of environmental protection SINO HYDRO and Lin Bin measures, and accepting the supervision and management of the BUREAU 6 Co., Ltd. environmental 15948575666 owners and supervision units management Site supervision for the implementation of the engineering Chongqing Fuling Chief measures on construction unit environmental protection and water District Road Engineering supervisory Zhang Meng and soil conservation and responsible for monthly supervising 13996936733 Supervision Co., Ltd. engineer report

Shizhu county Urban-rural Road Network Improvement Subproject, in short SZLW

Monitoring the implementation of environmental protection measures during the construction period, and collecting Shizhu County PMO Liu Fuding relevant information about the environment submitted by unit Manager 13908279910 owners.

Responsible for work related to environmental management and site supervision of construction work, implementation of the Shizhu Traffic environmental protection funds, collection of the relevant responsible Construction Co., Ltd. Cui Jianfeng information on environment submitted by contractors and person of the 13452259101 supervision units owner’s unit Jiangxi modern Road and Project Bridge Engineering Group Gong Wen Responsible for the implementation of environmental manager in 13072838878 Co., Ltd. protection measures, and accepting the supervision and constructio Human Foreign management of the owners and supervision units n unit Construction Co., Ltd. Yang Song 18225264345

Chong Qing Traffic Site supervision for the implementation of the Project Li Xiaosong engineering measures on construction unit environmental 17783809964

13 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

Engineering Supervision protection and water and soil conservation and responsible for Supervisor of Consulting Co., Ltd. preparing monthly supervising report the Supervising Agent

Cheng Kou County Urban-Rural Road Network Improvement Subproject, in short CKLW Monitoring the implementation of environmental protection measures Chengkou PMO Tian Hao during the construction period, and collecting relevant information Section chief 15023852310 about the environment submitted by unit owners. Urban Transportation Responsible for work related to environmental management and supervision of construction work, implementation of the Committee Road site responsible environmental protection funds, collection of the relevant 17749990988 Zhao Ran person of IA Construction First Project information on environment submitted by contractors and Department supervision units Jiangxi Road Bridge Responsible for the implementation of environmental protection Project manager and Tunnel Co, Ltd. Zhao Qun measures, and accepting the supervision and management of the in construction 18052072351 owners and supervision units unit

Chongqing Traffic Site supervision for the implementation of the engineering Engineering Hu Jiping measures on construction unit environmental protection and water Supervisor 15310507892 Consulting Co., Ltd. and soil conservation and responsible for monthly supervision

14 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

3.3 Project Progress and Environmental Sensitive Sites and Environmental Standards

The civil engineering progress, environmental sensitive sites and environment standards for Rongchang

Rongfeng River Flood Management Subproject, Wulong Wujiang Flood Management Subproject and

Wanzhou District Yangliu Water Supply Subproject, Fuling District Urban-rural Road Network

Improvement Subproject, Shizhu County Urban-rural Road Network Improvement Subproject and

Chengkou County Urban-rural Road Network Improvement Subproject are in Table 3.

15 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

Table 3: The Profile of the Project Progress and Environmental Sensitive Sites and Environmental Standards of the Started Subprojects Project The Profile of the Civil Engineering Construction Progress Environmental Sensitive Sites and Name Notes During This Reporting Environmental Standards Prior to This Reporting Period Period C01,C02and C03 have been Sensitive Sites: Donghu Reservoir Rongchang completed; segment in the Rongfeng River section Rongfeng About 85.9% of the upstream Dong lake reservoir section 1, dust control measures: mainly River Flood C04 greening package is still and downstream section; Domestic through sprinkler, set up vehicle Management greening projects in C04 under construction, 50%.of works sewage implement III category water washing facilities in construction area Subproject have been completed. has been finished. quality standards inGB8978-1996 entrances and exits; 2, waste water treatment facilities, no The surface water conforms to the III 2. The new contract after category water quality standards in construction waste at this stage, the mid-term adjustment GB3838-2002; The ambient office camp rented near the residential commenced construction atmosphere conforms to the second house, use of domestic wastewater on November 28, 2018, class ambient atmosphere standards in collection facilities; 3, GB 3095-1996 and its revision list; The on-site material storage and centralized and is currently in the acoustic environment conforms to the 2 storage, coverage; process of table-clearing, category standard of environmental 4, the construction area is far from which has been completed noise in GB3096-2008 and the the residential area, and no night about 20%. Emission Standard of Environment construction Noise for Boundary of Construction Site (GB 125232011). Sensitive Sites: downstream of the WU-C01 accounts for 80.16% of construction site; Wulong 2nd 1. dust control measures: mainly the contract volume; primary school; through sprinkler, set up vehicle WU-C02 accounts for 85.80% of domestic sewage implement III level washing facilities in construction area the contract volume; WU-C01 completed 113% water quality standards in entrances and exits; Wulong WU-C03 accounts for 84.82% of of the contract volume; GB8978-1996 2. waste water treatment facilities: Wujiang the contract volume. WU-C02 completed 91% of The surface water conforms to the III sedimental tank has been set up for Flood The anchor cable anti-sliding wall the contract volume; level water quality standards in concrete mixing station. no Management and reinforced earth wall are WU-C03 completed 86% of GB3838-2002; construction waste at this survey, the Subproject under construction. Due to the The ambient atmosphere conforms to local resident`s house is rented as the rising price of raw materials such the contract volume. the second class ambient atmosphere site office., The domestic wastewater as steel bars and sandstone, the standards in GB 3095-2012; was collected by collection facilities; construction progress is going The acoustic environment conforms to 3. on-site material storage and slowly, and the contractor is the 2 category standard of centralized storage, coverage

16 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

actively negotiating with the environmental noise in GB3096-2008 4. due to the hot weather in summer, owner to seek a better solutions. and the Emission Standard of construction time changed to Environment Noise for Boundary of 7:00~10:00 and 18:00~21:00; no Construction Site (GB 125232011) overnight construction 5. Environmental sensitive point: Wulong experimental primary school is about 150m distance from the construction site 6. during construction of anchor cable anti-sliding wall, it was founded that the extra grouting liquid was discharged into Wu river without sedimentation processing. The contractor has set up a small sedimentation tank. 1. due to the completion of the main project, there will not be a large Sensitive Sites: Chongqing Economics number of construction dust. A small and Business School and Chongqing amount of dust produced by the Wanzhou Senior Technical School near decoration process can be completely the construction site; controlled by sprinkling dust. Domestic sewage implement III level 2. No heavy vehicles are entering the The plant civil works had been water quality standards in site except the vehicles for the completed, GB8978-1996 The interior decoration works and transport of decorative materials. And Equipment commissioning The surface water conforms to the III Wanzhou install of main water pipeline had the main construction has been and plant greening are category water quality standards in District been completed. under way. Trial operation GB3838-2002; completed, so there is no noise impact Yangliu The equipment is under The ambient atmosphere conforms to on the environment sensitive spots. Water Supply commissioning is expected to start in the second class ambient atmosphere 3. The waste water from the Subproject March 2019. standards in GB 3095-2012; construction site is discharged into the

The acoustic environment conforms to stream below the site through box

the 2 category standard of culvert. The domestic sewage environmental noise in GB3096-2008 generated by the camp is deposited by and the Emission Standard of sedimentation tank and discharged into Environment Noise for Boundary of municipal pipe network. Construction Site ( GB 125232011) 4. Decorative materials are environmentally friendly materials, storage and stacking will not have any

17 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

impact on the environment. 1. Spoil disposal: dump was set in the wasteland, 4.5km far from the right side of BK0+000. Soil compaction is conducted according to the Specifications, the surface soil layer of backfill is not less than 80 cm, finally seeding. 2. the soil and water conservation measures: the, the environmental By August 2018, the progress of protection scheme has been C02: approved,, drainages for soil dump has completed the excavation of Sensitive point: Maxi River, the section been constructed, Ditch has been set 3 92,060 m , Due to engineering between Shaniudong and Damu up on the slope platform. Slope rate of the stone excavation of 100,600 variation and other (located in the big wood nature reserve, dumping ground is set at 1:2. After m3, the roadbed filling of 45,100 3 reasons, the construction experimentation area) and the waste soil dumping, the seeding, Fuling m , the manual digging of 2700 residence of the road distribution; planting can be implemented. District m3, the stone concrete retaining progress is going very sewage executive (GB8978-1996) in 3. the construction dust, the impact of Urban-rural wall of 24050 m3, the artificial slowly since July 2018, so grade III standard, implementation; environmental air and control Road digging of the bridge pile by 154 the project completion % surface water (GB3838 - 2002) in the measures: closed transportation for Network m, the culvert of 64 m, and the has no remarkable change Improvement total completion is RMB 12 class III water quality standards; vehicles, and sprinkler along the way to compared with the last Environmental air executive (GB3095 control dust. Subproject million, accounting for 15% of monitoring period. The the contract value. -2012 in the grade two of ambient air 4. the road laying material source, total completion % is about standards; implementation of sound construction site protection measures: Due to material price raising, 17%. environment (GB3096-2008) in the 2 asphalt concrete direct purchase. The construction progresses slowly. types of environmental noise standard. protection measures for K4+740 construction material yard are to construct retaining walls on the south side of the material yard, set up the separation wall, and set up drainage ditches around it. 5. Construction staff camp settings and construction site wastewater treatment: local resident house has been rented for construction staff's accommodatio, garbage and waste water has been discharged by treatment facilities.

18 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

6. the influence of noise on environment sensitive points and measures: the main construction site is far away from residential areas, which does not affect the normal life of the residents, control measures of noise near the individual residential lots is in strict accordance with the time stipulated by the government for overtime work; the overtime work must be approved first, prior to operating (existing schemes). 7. the establishment of the complaint mechanism: has been established, each of the complaints department telephone one-to-one correspondence. By August 2018, progress is 1. C01 Completion : 1. the disposal of abandoned soil: dump very slow. site set up, the vehicle transported the 1.C01 has completed the roadbed By December 2018, 84.67% Sensitive Sites: Yuelai river, residential waste soil to the dump. of 121.43%, 82.92% of bridges places along the road; of the project has been 2. the soil and water conservation and culverts, accounting for 70% Domestic sewage implement III measures: slope protection: completed, including category water quality standards in of the total contract volume, the the protection net can play the role to 87.49% of the roadbed, GB8978-1996; greening completed on 19 May. prevent soil erosion, slope rock falling 2. C02 49.20% of the pavement The surface water conforms to the III Shizhu and collapse; grow the grass on the 3 category water quality standards in County Excavation 535,500 m ; Filling and 97.48% of the bridges slope; repair mortar rubble slope 3 GB3838-2002; Urban-rural 369,500 m ; excavation waste soil and culverts. protection. 14734.16 m3; side ditch 7735 m; The ambient atmosphere conforms to Road 2. C02 Completion 3. the construction of dust, the impact replacement fill stone 15240.56 the second class ambient atmosphere Network 3 of environmental air and control m3; foot protection 4786 m3; (1)544,400m of excavation standards in GB 3095-2012; Improvement 3 (total 411,468.4 m ) The acoustic environment conforms to measures: use of sprinkler dust. Subproject retaining wall by M7.5 mortar 25800 m3; retaining wall by C20 (2)Filling 333,000 m3 (Total the 2 category standard of 4. the use of purchased products, direct stone concrete 44675.17 m3; 329,835.2 m3) environmental noise in GB3096-2008 laying, no asphalt mixing station. 5. the impact of noise on environmental culverts 39; base course 4500m; (3)Excavation inapplicable and the “Emission Standard of sensitive points and remediation C20 stone concrete shoulder 2750 material is 17161m3; (total Environment Noise for Boundary of m3. Construction Site” ( GB 12523 measures: the site is in the mountains 1320m3) 2011). area, only a few residents, construction 3. A roadbed landslide occurred (4).Edge ditch 11700m; works only during the daytime, no in C01 and C02, and the newly (total 8405m) night working, noise will be reduced to

19 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

added permanent land was about (5). Replacement of flake the minimum. 35mu. The rectification measures stone 14506 m3 (total 725 6. the establishment of the complaint have not been finalized. m3) mechanism has been set up. (6).M7.5 retaining wall 5686.81 m3 (total 26479 m3) (7).C20 stone concrete retaining wall 43900m3; (total 18454m3) (8) 31 culverts (total 32) (9)Longjingwan landslide retaining wall 5900m3; (total 6500m3) (10)Double-hole culvert with dark slab has a total width of 19.5m. (Total 19.5m); (11)Pavement Graded Macadam layer 58000m2. (Total 60450m2) (12) Complete 31 prefabricated bridge beams and slabs; (total 31 beams) (13) Complete 49500 m2 of water-stabilized base; (45%) (14) K9 + 793.5 culvert completed 100%. (64.5 meters in length) ChengKou C01 completion: C01 completion: Sensitive Sites: Zhongxi River, original 1. dump ground and waste soil: 1 dump County 1) excavation 117114m3 Up to Dec 2018, 91% of the plant along the road; ground for C01 and 2 dump grounds Urban- Rural Domestic sewage implement III for C02, 600m far from the site, waste 2) filling work 68574 m3 Road project had been category water quality standards in disposal by vehicles. Most of waste

20 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

Network 3) retaining wall 38722 m3 completed. GB8978-1996; stone will be produced into graded Improvement 4) culvert 13 sets C02 completion: The surface water conforms to the III broken stone for concrete utilization or Subproject 5) bridge 1 set The length of the category water quality standards in subgrade replacement. 6) gutter 5235.5 m GB3838-2002; 2. the soil and water conservation Jianganliang tunnel is measures: 7) side ditch 4585.5 m The ambient atmosphere conforms to 1875m, 700m of the the class II ambient atmosphere Slope protection: adopting concrete 8) cement stabilized macadam second lining is completed, standards in GB 3095-2012; lattice beams to prevent soil erosion, base course 30464.98m2 the inverted arch is The acoustic environment conforms to slope rock falling and collapse; 9) asphalt concrete 30464.98m2 the category II standard of planting the grass on the slopes; mortar completed of 1330m, the environmental noise in GB3096-2008. rubble slope protection. C02 completion: roadbed protection is 1000 3 3. Construction dust, the impact of 1) initial support 1231 m, 65.6% m , and 3 culverts are environmental air and control of contract volume; completed. The lower measures: closed transportation for 2) inverted arch 895m, 47.7% of structure, the upper vehicles, and sprinkler along the way to contract volume; structure and the ancillary control dust. 3) secondary lining 421m, 22.4% 4. use purchased products, direct laying of contract volume; works of the Shanshuliang Bridge are completed. pavement, no asphalt mixing station. 4) 2 culverts 66.7% of contract There are waste sedimentation tank in volume. 67% of the total civil concrete mixing stations for waste 1 resident house within 50 m works have been water treatment before discharge. blasting area in C01 has been completed. 5. the impact of noise on environmental moved to other place. sensitive points and remediation measures: the site is in the mountains 5 resident houses affected by area, only a few residents, construction landslide have been relocated and works only during the daytime, no compensated in C02. night working, noise will be reduced to the minimum. 6. the resident house safety and blasting: 1 house in C01 within 50m blasting area has been relocated. 7. the establishment of the complaint mechanism has been set up.

21 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

3.4 Implementation Situations of the Mitigation Measures

During construction, potential impacts include soil erosion, noise and vibration, fugitive dust, solid wastes, and community and occupational health and safety risks. The main anticipated environmental impacts and risks include indirect and induced impacts of roads (soil erosion, earthwork, and downstream effects of flood control measures). Occupational and community health and safety from construction activities and operation, sustainability of exploitation of water resources for water supply, and potential risks to physical cultural resources and legally protected sites (nature reserves) will also need to be addressed. Overall, construction-related impacts are localized, short term, and can be effectively mitigated through the application of good construction and housekeeping practices and implementation of construction phase community and occupational health and safety plans. To ensure that construction contractors are able to implement the mitigation measures, the implementation unit (IU) makes the following arrangement:(i) environmental specifications will be included in the bidding documents to contractors; (ii) Identify responsibilities and use environmental standards as indicators of assessment; (iii) In the contract, the waste site, material transportation line, pit location and waste disposal are clearly defined (iv) Define the environmental management plan and monitoring plan in the contract. The project construction unit has established an environmental, safety and health emergency plan, and has filed and approved the project in the project management office. In the process of the construction, the environmental management team of the implementation unit enhanced on-site supervision, management and evaluation, and dealt with the problems found. Increased training for environmental protection and developed follow-up training programs. The reasonable environmental management measures adopted by the contractor reduce the impact of the construction on the environment. 1. Road subprojects The following potential impact and mitigation measures represents the prevailing construction impact of all road subprojects. Earthwork, soil stable, dust and noise controlling, machinery operation, building material transportation and national labor requirement impact management in the process of road construction. Most of the projects will purchase premixed asphalt to pave the road, which will cause remit smoke when heat and mixed. The density of smoke remitted from Chinese modern asphalt mix machine is 22.7mg/m3, which meet the emission standard of asphalt (80-150 mg/m3) of air pollutants (GB16297-1996) and ambient air quality standard (GB3095-2012) with the benzopyrene emission density is 0.01µg/m. EMP has additional restriction for the use of the machine. In addition, the asphalt mixture station shall be built beyond 500m from

22 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report the residential area. 2. Spoil disposal: Road subprojects will make maximum use of spoil from construction earthworks through balancing cut and fill, the construction of berms for noise and wind protection of plants and facilities and earthworks for landscaping. The area’s most vulnerable to erosion include borrow pits, spoil sites, temporary construction sites, and other areas where surface soil will be disturbed. The most effective erosion control will be interception drainage to protect disturbed surfaces from surface flows. Construction plans will include erosion control prescriptions for construction work areas, including (i) constructing intercepting ditches and drains to prevent runoff entering construction sites, and diverting runoff from sites to existing drainage; (ii) limiting construction and material handling during periods of rains and high winds; and (iii) stabilizing all cut slopes, embankments, and other erosion-prone working areas while works are going on. All earthwork disturbance areas shall be stabilized within 30 days after earthworks have ceased at the sites.

3. Construction wastewater: Construction wastewater is produced from the maintenance and cleaning of mechanical equipment and vehicles, maintenance water for mixing and curing concrete, cooling water, and lost water and soil during the construction period which is discharged as pollutants. The effluent, comprised mainly of inorganic wastewater, commonly contains no poisonous and harmful substance, except suspended solid, but, if discharged in an improper manner, still has the potential to impact existing water bodies. Some oil-containing wastewater can arise from machinery repairs. Construction wastewater will not be discharged unto the surrounding soil or into surface water systems. Sedimentation tanks will be built, and after settling out of solids the upper clear liquid will be recycled for spraying the construction site (dust control), and the waste residue in the tank will be cleared and transported to designated landfills. Oil-containing wastewater will require the installation of oil-water separators before the sedimentation tank. 4. Gaseous air pollution: Construction machinery on all sites will consume petrol and diesel, releasing gaseous SO2, CO, and NOx. Equipment will be maintained to a high standard to ensure efficient running and fuel-burning. High-horsepower equipment will be provided with tail gas purifiers. Atmospheric monitoring will be carried out during the construction period. All vehicle emissions will be in compliance with relevant PRC emission standards.

5. Dust: Road construction sites will potentially produce fugitive dust from material storage areas, dump sites, concrete mixing, excavation and general site usage especially under windy

conditions. Material stockpiles and concrete mixing equipment will be equipped with dust shrouds.

23 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

The operators will regularly maintain the shrouds to ensure their effective operation. For both construction sites and construction roads, water spraying for the suppression of dust and maintenance of driving surfaces will be standard site management practice. Vehicles carrying soil, sand, or other fine materials to and from the construction sites will be covered.

6. Noise: Noise can be expected during construction due to construction machinery operation and transport activities. Construction activities will involve bulldozers, graders, excavators, concrete-mixing plants, rollers, and other heavy machinery. Noise intensity from these large machines operating is typically in the range of 80–98 decibels at the site (5m from operating

machinery). The transport of material, aggregate, concrete and waste material to and from sites will also cause noise impacts along the haulage routes. Activities with intensive noise levels will not only have an impact on the residents, but may also cause injury to construction workers operating the equipment.

7. Cultural relics: additionally, construction activities have the potential to disturb unknown underground cultural relics. Special attention should be paid and strict procedures should be established so that underground cultural sites can be identified and protected if they are discovered

during construction. The mitigation measures will include immediate suspension of construction activities if any archaeological or other cultural relics are encountered. The municipal cultural relic protection authorities, as well as the LPMOs, will be promptly notified, and construction will resume only after thorough investigation and with the permission of the appropriate authority. Among the projects, Rongchang Rongfeng River Flood Management Subproject (hereafter referred to as RCRF), Wulong Wujiang Flood Management Subproject (hereafter referred to as

WLWJ) Wanzhou Yangliu Water Supply Subproject (hereafter referred to as WZYL), Fuling

Urban-Rural Road Network Improvement Subproject (hereafter referred to as FLLW), Shizhu

County Urban-Rural Road Network Improvement Subproject (hereafter referred to as SZLW)

Chengkou County Urban-Rural Road Network Improvement Subproject (hereafter referred to as

CKLW) The implementation of adverse environmental impact mitigation measures in project construction period is shown in table 4..

24 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

Table 4: Summary of the Potential Environment Impacts and the Implementation Situations of the Mitigation Measures

during the Construction Period (2017.7-2017.12)

Item/ Rongchang Rongfeng River Flood Management Subproject (hereafter referred to as RCRF), Wanzhou Media Yangliu Water Supply Subproject (hereafter referred to as Flood management, road network improvement and water supply subprojects WZYL), Wulong Wujiang Flood Management Subproject (WLWJ), Fuling District Urban-rural Road Network Improvement Subproject FLLW , Shizhu County Urban-rural Road Network Improvement Subproject SZLW Potential Mitigation Impacts and/or Measures defined Who Implements Who Supervises Implementation Status and compliance with EMP Issues in the EMP Wastewater from Latrines and seepage WZYL: Xinjiang WZYL: Wanzhou Water WZYL: the waste water from the construction site is construction pits will be Corps Water Company; Wanzhou District discharged into the stream below the site through box camps installed in any Resources and Environmental Protection culvert. The domestic sewage generated by the camp is camps. After Hydropower Bureau; deposited by sedimentation tank and discharged into project completion, Engineering Group RCRFH: Rongchang Hongyu municipal pipe network; the sites will be Co., Ltd. and Shanxi Water Resources Development RCRFH: wastewater treatment facilities, no on-site

vacated only after Metallurgical Co., Ltd.; Rongchang construction waste water at this survey, the office camp waste has been Rock-Soil Engineering Environmental Protection water rented is near the residential house, the domestic effectively treated or Reconnaissance Bureau. wastewater was collected by facilities after use; removed. General Company; WLWJ: Wulong Urban-Rural WLWJ: wastewater treatment facilities, no on-site Settling ponds, RCRFH: Sichuan Development group Co.,Ltd.; Construction construction waste water at this survey due to construction oil-water separators. Zhongcheng Coal Wulong County Environmental wastewater from suspension, the office camp rented is near the house, the Recycled water will Construction(Group) Protection Bureau; washing domestic wastewater was collected by facilities after use; be used to spray for Co., Ltd.; SZLW:Shizhu Transportation aggregates, During construction of anchor cable anti-sliding wall, it dust control. Residue WLWJ: Gezhouba Construction Corporation, pouring and will be removed from 5Construction (Group) Shizhu County Environmental was founded that the extra grouting liquid was discharged curing concrete, site and disposed in Co., Ltd.; Anhui Protection Bureau. into Wu river without sedimentation processing. The machinery repairs municipal landfills. Hydrological FLLW:Fuling Zhonglong contractor has set up the small sedimentation pools as A detailed geological Development Co.,Ltd.; Transportation Construction Co, rectification. Groundwater investigation shall be SZLW: Anhui Water ltd; Chongqing Fuling SZLW: soil and water conservation measures adopted: leakage caused conducted before the Conservancy transportation supervisor slope protection: the protection net can play the role to by tunneling start of the Development Co., construction Co.,Ltd., prevent soil erosion, slope rock falling and collapse; construction. A Ltd.;Jiangsu Yancheng CKLW: Chengkou County planting grass on the slope; building mortar rubble slope

25 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

detailed plan must be Water Construction Transportation Committee, protection. made in advance for Co.,Ltd. Chengkou County FLLW:the soil and water conservation measures: the the prevention and FLLW:Chongqing Environmental Protection project has not started, the environmental protection control of water Qunzhou Industry Bureau project approval has been completed, dump into poor leakage and grouting Group Co., Ltd. drainage construction drainage ditch, slope platform set cut method will be used CKLW: Jiangxi ditch. Slope of side slope of dumping ground is set to deal with water Roada and Bridge according to 1:2. After the completion of dump, the seepage. Tunnel Engineering seeding, planting can be implemented. The wastewater will Co., Ltd. Construction personnel camp settings and construction site be stored in the grit wastewater treatment: the contractor rented the local chamber, impounding Wastewater in houses for construction staff's accommodation, garbage reservoir and the the earth filter tank in order to and waste water treatment facilities. Construction waste caused by get rid of the mud and water has been processed via sediment tanks. tunneling oil, and reuse when CKLW: the sediment tanks have been well set up in C02 evacuating the tunnel. for tunnel waste water processing; there is no much ground Wastewater from water leakage from tunnel excavation so far. Construction tunneling will be wastewater from washing aggregates, casting and curing collected in sediment concrete, machinery repairs have been processed via Silt-rich tanks, retention sediment tank. wastewater from ponds, and filter tanks tunneling to remove silts and oil, and then be reused for the tunnel operations. i. A construction materials handling and disposal protocol that includes spill responses will be a part of the Site Handling of Environmental hazardous and Management harmful materials Supervision Manual and will be applied to prevent soil and surface/ground water pollution. ii.Construction of

26 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report storage facilities (including fuel and oil storage), with bund and clean-up equipment. Fuel supplier is properly licensed and follows the proper protocol for transferring of fuel and in compliance with JT 3145-88 (Transportation, Loading and Unloading of Dangerous or Harmful Goods). iv.Vehicles and equipment are properly parked in designated areas to prevent contamination of soil and surface water. v.Vehicle, machinery, and equipment maintenance and refueling will be carried out so that spilled materials do not seep into the soil or into water bodies. vi.Fuel storage and refilling areas will be located at least 300 m from drainage structures and important water bodies.

27 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

vii. Oil traps will be provided for service areas and parking areas. Culvert and bridge pier constructions Hydrological will be conducted impacts and during the dry season flooding at (from October to next bridge/culvert May), and construction sites construction during the rainy season shall be prohibited. In-water operations Water Bodies are all designed for Affected by dry seasons, and all Embankment and in-water work areas Soil Removal will be segregated Operations with cofferdams. Vehicles carrying WZYL: Xinjiang WZYL: Wanzhou Water WZYL: Due to the completion of the main project, soil, sand or other Corps Water Company (the owner unit) there will not be a large number of construction dust. A

fine materials to and Resources and Wanzhou District Environmental small amount of dust produced by the decoration process from the sites must be Hydropower Protection Bureau can be completely controlled by sprinkling dust. air covered. Materials Engineering Group WLWJ: Wulong Urban-ruran SZLW: construction dust production, the impact of storage sites must be Co., Ltd. and Shanxi Development Group; environmental air and control measures: use sprinkler to 300 m from Metallurgical Environmental Protection reduce dust in construction. The finished product is laid residential areas and Rock-Soil Engineering Bureau; directly and no mixing station is provided. covered or sprayed Reconnaissance Generation of dust RCRF: Rongchang Hongyu WLWJ: dust control measures: mainly through sprinkler with water. General Company; by construction Water Resources Development to reduce dust at the scene, the construction area entrances Water will be RCRFH:Sichuan activities Co., Ltd.; Rongchang regularly sprayed on Zhongcheng Coal and exits equipped with vehicle washing facilities; Site Environmental Protection construction sites and Construction (Group) material storage adopted centralized storage for coverage; Bureau; access roads. Co., Ltd.; RCRFH: dust control measures: mainly through sprinkler SZLWShizhu Transportation All roads and tracks WLWJ: Gezhouba 5 to reduce dust, the construction area entrances and exits Construction Corporation, the used by vehicles of Construction (Group) equipped with vehicle washing facilities; the contractors or any Co., Ltd.; Anhui Environmental Protection FLLW: the construction of dust, the impact of subcontractors or Hydrological Bureau environmental air and control measures: the construction Fuling Zhonglong supplier will be kept Development FLLW: of dust control, adopted transport vehicles for closed Transportation Construction Co, clean and clear of all Co.,Ltd.;Jiangsu transportation, arrange sprinkler along the way to control

28 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

dust, mud, or Yancheng Water ltd; Chongqing Fuling dust. extraneous materials Construction CO.,Ltd. transportation supervisor The sources of road laying materials and protective dropped by their SZLW Hunan construction Co, ltd, measures for construction site: direct purchase of Lek construction vehicles. Foreign Construction CKLW: Chengkou County concrete. The protection measures for K4+740 i. Vehicle emissions Group Co., Ltd. Transportation Committee; construction material yard are to construct retaining walls must be in FLLW: Fuling Chengkou County on the south side of the material yard, set up the separation compliance with Qunzhou Group Co, Environmental Protection wall, and set up drainage ditches around it. PRC-GB18352-20 ltd,. Bureau CKLW: mainly through sprinkler to reduce dust at the site. 05, CKLW: Jiangxi Road, In tunnel site, a tunnel ventilation system has been set up GB17691-2005, Bridge and Tunnel to improve the air quality of construction site. The GB 11340-2005, Engineering Co., Ltd. contractors C01 and C02 will use business asphalt GB3847-2005, and concrete, do not build asphalt mixing station on site. GB182852005. ii. Equipment and machinery will be maintained to a high standard to Air emission from ensure efficient vehicles and running and equipment fuel-burning. High-horsepower equipment will be installed with tail gas purifier to ensure emissions be in compliance with PRC-GB16297-19 96. iii. regular inspection and certification system must be initiated. i.Use modern equipment which Generation of complies with the asphalt flue gas asphalt flue gas standard of GB16297-1966

29 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

Locate asphalt mixing stations at least 500m from residences. Noise and Noise from i. Noise levels from WZYL: Xinjiang WZYL: Wanzhou Water WZYL, WLWJ and CKLW: there is no heavy vehicle Vehicles and equipment and Corps Water Company (the owner entering except for the transport of decorative materials. Vibration construction machinery to conform Resources and unit),Wanzhou District And the project will not be built, so there is no noise machinery to PRCGB12523-90. Hydropower Environmental Protection impact on the environment sensitive spots. ii. Install portable Engineering Group Bureau SZLW: the impact of noise on environmental sensitive noise shields near Co., Ltd. and Shanxi WLWJ: Wulong Urban-rural spots and remediation measures: the site is in the sensitive receptors Metallurgical Development Group; mountains, only the basic tenants, and only during the day such as schools and Rock-Soil Engineering Environmental Protection construction, construction at night, the noise will be residential areas. Reconnaissance Bureau; reduced to the minimum. iii. At construction General Company; RCRFH: Rongchang Hongyu RCRFH:The construction site is far from the residential sites, RCRFH: Sichuan Water Resources Development community, and no wrok at night. noise-generating Zhongcheng Coal Co., Ltd.; Rongchang construction work Construction (Group) Environmental Protection WLWJ: No construction noise due to suspension of will be stopped Co., Ltd.; Bureau; construction in this survey; between 2000 and WLWJ: Gezhouba 5 SZLWShizhu Transportation FLLW: the construction of dust, the impact of 6000 Construction Construction Corporation, the environmental air and control measures: the construction iiii. Under (Group)Co., Ltd.; Environmental Protection of dust control, adopted transport vehicles for closed unexpected Anhui Hydrological FLLW: Chongqing Fuling transportation, arrange sprinkler along the way to control circumstances, if the Development Co.,Ltd.; District Zhong Long dust. building construction Jiangsu Yancheng Transportation Construction Co., The sources of road laying materials and protective noise continues until Water Construction Ltd. measures for construction site: direct purchase of business the night, the Co., Ltd. CKLW: Chengkou County asphalt concrete product. The protection measures for construction unit SZLWHunan Foreign Transportation Committee; K4+740 construction material yard are to construct must reach an Construction Group Chengkou County retaining walls on the south side of the material yard, set agreement with the Co., Ltd. Environmental Protection up the separation wall, and set up drainage ditches around APs and provide FLLW: Chong Qing it. compensation. Qun Zhou Industry CKLW: the safety distance and measures of blasting have 1. The construction Group Co., Ltd. been well considered, the specified team conducted unit must consider the CKLW: Jiangxi Road blasting. One resident house within 50m blasting distance safe distance from the Bridge and Tunnel has been relocated in C01. Tunnel blasting shot point to people, Co., Ltd. and road cutting inhabited buildings No cultural relics are founded. blasting impacts and other sensitive receivers in need of protection and exercise strict control

30 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

over explosive load and type to avoid accidental impacts. 2. Prohibit blasting in road sections near cultural relics WZYL: Xinjiang Corps Water To avoid any false Resources and claims, contractors Hydropower will document Engineering Group cultural relics in the Co., Ltd. and Shanxi project area of Metallurgical, WZYL: Wanzhou Water Rock-Soil Engineering influence prior to Company (the owner unit), start of construction Reconnaissance Wanzhou PMO to ensure that a true General Company; WLWJ: Wulong Urban-ruran Cultural Heritage record of their Development Group; Wulong Protection Bureau of pre-construction PMO; condition is kept; Wanzhou District RCRF: Rongchang Hongyu Protection of Install vibration RCRFH: Sichuan Water Resources Development Zhongcheng Coal physical cultural monitoring Co., Ltd.; Rongchang PMO; relics from equipment at cultural Construction (Group) SZLW vibration and relic sites along Co., Ltd.;Cultural other construction Shizhu road Heritage Protection Shizhu Transportation Construction Corporation, impacts subproject; Local Bureau of Rongchang Shizhu PMO; cultural relic County protection staff to WLWJ: Gezhouba 5 FLLW:Fuling Zhonglong inspect all phases of Construction (Group) Transportation Construction Co, work in Shizhu road Co., Ltd.; Anhui ltd; Chongqing; Fuling PMO Chengkou County and Youyang flood Hydrological CKLW: management Development Co., Transportation Committee, subprojects and Ltd.; Jiangsu Chengkou PMO advise on on-site Yancheng Water impact mitigation Construction Co., Ltd. measures; Establish Wu Long County chance-finds Cultural Heritage Protection Bureau SZLW Hunan

31 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

Foreign Construction Group Co., Ltd. FLLW: Fuling Qunzhou Group Co ltd,. CKLW: Jiang xi Road, Bridge and Tunnel Engineering Co., Ltd. Solid The contractors will provide appropriate WZYL: the timely collection of garbage, and transported WZYL:Xinjiang Corps wastes waste storage WZYL:Wanzhou Water to the provisions of the local sanitation department Water Resources and containers; Company (the owner unit) location; contractor and contaminant leakage emergency Hydropower Trash collection bins Wanzhou District Environmental disposal institutions agreed, and the related staff training; Engineering Group will be regularly Protection Bureau; the hazardous materials and waste in a safe and reasonable Co., Ltd.Shanxi sprayed with RCRFH :Rongchang Hongyu for the protection of local site material storage; Metallurgical pesticides to reduce Water Resources Development concentrated storage and coverage; Rock-Soil Engineering flies; Co., Ltd.; SZLW: the disposal of abandoned soil: dump site, the Reconnaissance i Wastes will be WLWJ:Wulong Urban-ruran vehicle transported to the scene. General Company; stored away from Development Group; WLWJ, RCRFH: site material storage and centralized Domestic waste RCRFH: Sichuan water bodies and will Environmental Protection storage and coverage; from construction Zhongcheng Coal be regularly hauled to Bureau; camps Construction (Group) FLLWwaste soil and disposal: a suitable landfill or SZLW Shizhu Transportation Co., Ltd.; Anhui Dump was set in the wasteland in the right side of designated dumping Construction Corporation, Hydrological BK0+000 about 4.5 kilometers. Soil compaction is site; Shizhu Development Co.,Ltd.; iv.Agreements will be according to the specification, the surface layer of backfill Jiangsu Yancheng Environmental Protection, signed with local is not less than 80 cm soil, finally seeding. Water Construction FLLW: Chongqing Fuling authorities for waste the road laying material source, construction site Co., Ltd. District Zhong Long disposal, where Transportation Construction Co., protection measures: purchase Lek concrete direct SZLW: Hunan Foreign appropriate, through purchase. The protection measures for K4+740 Construction Group Ltd., Fuling Road Supervising local facilities and to construction material yard are to construct retaining walls Co., Ltd. Engineering Co., Ltd. Fuling approved disposal Environmental Bureau; on the south side of the material yard, set up the separation FLLW: Chong Qing sites. CKLW: Chengkou County wall, and set up drainage ditches around it. Qun Zhou Industry Construction wastes Transportation Committee; CKLW: most of waste stone was utilized to make graded Construction Group Co., Ltd. that cannot be reused Chengkou County macadam as concrete aggregate or subgrade replacement wastes could have CKLW: Jiangxi Road will be regularly Environmental Protection materials. The others are ordered by local government for adverse impacts Bridge and Tunnel transported off-site Bureau on surrounding Co., Ltd. other projects. for disposal, and not environments. allowed to

32 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

accumulate on site over long periods. Soil The following WZYL, WLWJ, RCRFH, SZLW, CKLW: a safeguards will be conservation plan for soil erosion was developed and erosion implemented for all WZYL: Xinjiang approved before construction; Slope protection, vegetation construction related WZYL:Wanzhou Water restoration and other measures are adopted to prevent soil and Corps Water earthworks: Construct Resources and Company (the owner unit); erosion. And limit the construction and material interception ditches Hydropower Wanzhou District Environmental transportation in rainy or windy days to prevent soil stability Protection Bureau;Forest Bureau and drains to prevent Engineering Group erosion. runoff entering Co., Ltd. and Shanxi of Wanzhou WZYL, WLWJ, RCRFH: construction units and construction sites, Metallurgical District; supervision units of cultivated land protection particularly and divert runoff Rock-Soil Engineering RCRFH: Rongchang Hongyu attach importance to it, before the approach of construction Water Resources Development from sites to existing Reconnaissance and design departments, the owner unit technical personnel Co., Ltd.; Rongchang drainage; Limit RCRFH: Sichuan to survey the construction site, construction scale, the construction and Zhongcheng Coal Environmental Protection town, the administrative department for approval by the material handling Construction (Group) Bureau; department of homeland, after having confirmed to Forest Bureau of Rongchang; during periods of Co., Ltd.; construction, and will strictly control the covering range as WLWJ: Wulong Urban-rural Erosion from rains and WLWJ: Gezhouba 5 a system and one of the important indicators of assessment construction sites high winds; Stabilize Construction (Group) Development Group;Wulong and rewards and punishment, so as not to cause social all cut slopes, Co., Ltd.; Anhui EPB, Forest Bureau of Wulong disputes; The project is to minimize the purpose of the embankments, and Hydrological District; cultivated land, to build a retaining wall and to reduce the other erosion-prone Development Co., SZLWShizhu Transportation occupation of cultivated land. working areas while Ltd.; An Hui Water Construction Corporation, the In addition, the soil (residue) site as far as possible to works are going on; Development Co., Environmental Protection avoid the cultivated land (RCRFH: outside the scope of All earthwork Ltd., Jiangsu Bureau, Forest Bureau; construction line, next to the empty is located in the left disturbance areas Yancheng Water FLLW: Chongqing Fuling bank (pile number left K1 + 350 + 900 ~ K2, K3 + 330 ~ shall be stabilized Construction Co., Ltd. District Zhong Long K2 + 56), outside the scope of the right bank in within 30 days after SZLW Hunan Transportation Construction Co., construction line next to the empty is located in the (pile earthworks have Ltd. Fu Ling EPB; Fu Ling right K2 + 350 ~ K4 + 050 section), are all paid temporary Foreign Construction ceased at the sites; space, urban construction and the embankment on both Group Co., Ltd. Foresty Bureau v. Preserve existing CKLW: Chengkou County sides of the Taiwan backfill, used for backfill; WZYL: the FLLW: Fuling vegetation where no Transportation Committee; project is not abandoned, and there is no abandoned soil Qunzhou Group, Co, construction activity Chengkou County (slag) field; WLWJ: the slagging field is located about 1.5 ltd. is planned. Environmental Protection kilometers inside the inner part of the big Mugou bridge, CKLWJiangxi Road i. Strip and stockpile Bureau; Chengkou Forest and is 3 kilometers away from the section A. 2 km from Erosion from spoil topsoil from new Bridge and Tunnel Bureau the B section; It is 1 km from the C section. disposal sites and sites; Engineering Co., Ltd WZYL, WLWJ: the rainy season should be avoided operation of ii. Provide temporary during the construction work time ; The abandoned soil borrow pits detention ponds or and discard stones should be transported in time, the

33 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

containment to backfill of the earth and stone should be dealt with by control silt runoff; measures such as lamination; When the trench excavation iii. Construct is carried out, a section should be dug and a paragraph intercepting should be filled in. In the area where the collapse is prone, ditches and drains the retaining wall, slope protection and drainage ditch shall to prevent outside be built in a timely manner so as to prevent the occurrence runoff entering of soil erosion. In the process of trench excavation, the soil disposal sites, and should be stacked in layers, and the layers should be divert runoff from backfilled to prevent damage to the structure of topsoil and sites; reduce the capacity of water retention and fertilizer iv. Rehabilitate conservation. In the process of laying, the ecological terrain contours environment should be protected to prevent soil erosion. and vegetate borrow Since the project has not been completed, the restoration pits at completion of and greening of the construction site will be implemented use. in the later stage of construction. i. Embankment and WLWJ: there are mud sedimentation tanks at the pier constructions construction site, and the waste mud is discharged after during the dry season precipitation. only; RCRFH: the river bed piling during the Rongchang sub ii. Slopes on both project was cancelled because of the optimization and sides of bridges and design changes during construction. culverts will be FLLW: the cutting and filling are basically in balance. protected through the The main waste soil is the topsoil produced by the red line Erosion of banks iii. Planting of grass table. All the topsoil is transported to the designated waste and sedimentation and stabilizing dump, and the retaining wall is built to ensure the stability of vegetation; of the spoil site. watercourses iv. Slurry from pile CKLW: Two spoil discharge grounds have been set up during bridge drilling will be near tunnel portals 600m away. But most of waste stone construction pumped to shore and will be reused as concrete aggregates or roadbed properly disposed of; replacement materials, which will has no negative impact Pier construction in on environment. Some small sediment pools have been set the water bodies will up on site during bridge pile construction to process slurry. be planned and

laid out to WLWJ: the small sediment pools are used to process ensure adequate opening for water slurry from anchor cable pile driving before discharging flow. into Wu River. Spoil from tunnel i. Spoil disposal sites construction near tunnel portals

34 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

will be identified and approved before tunneling commences; Sites will be operated according to EMP spoil disposal site prescriptions and on completion will be re-contoured and vegetated. Confirm quality Handling and of sludge disposal of dredge against GB4284-84 spoil and GB15618-95 to ensure safe disposal. Slurry will be Pollution from detained in sediment-rich settlement ponds. slurry from pile Water will be driving in river recycled and silt beds tested for quality for reuse or disposal. Social and All affected persons WZYL:Xinjiang WZYLWanzhou PMO WZYL, WLWJ, RCRFH, SZLW, FLLW will be resettled in Corps Water RCRFHRongchang PMO The specific information is available in the external Cultural Resettlement of a timely and adequate Resources and WLWJWulong county pmo resettlement monitoring report. affected persons manner, in Hydropower SZLWShizhu County PMO accordance with the Engineering Group CKLW: Chengkou PMO Resettlement Plan. Co., Ltd. and Shanxi All affected persons Metallurgical WZYL: Wanzhou Water will be compensated Rock-Soil Engineering Company , Wanzhou District Compensation of in a timely and Reconnaissance Traffic authorities; lost assets adequate manner, in General Company; RCRFH:Rongchang Hongyu accordance with the RCRFH: Sichuan Water Resources Development Resettlement Plan. Zhongcheng Coal Co., Ltd.; Rongchang County Traffic Take the route to Construction (Group) Traffic authorities WZYL、WLWJ、RCRFH、SZLW, FLLW, CKLW management --all reduce the impact on Co., Ltd.; WLWJ: WLWJ: Wulong Urban-rural

35 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report projects normal traffic. Gezhouba 5 Development Group; A traffic control and organization plan (how to divert To disperse or limit Construction (Group) SZLWShizhu Transportation or dispatch the traffic to avoid the rush engineering vehicles Co., Ltd.; Anhui Construction Corporation, hours in the mornings and in the during rush hours. Hydrological Shizhu County Transportation afternoons, how to adjust the traffic at Development Co., Bureau; intersections, how to build temporary roads, how to Ltd.; Jiangsu FLLW: Chongqing Fuling choose transport routes to avoid disturbing Yancheng Water District Zhong Long the normal traffic and how to restore the Construction Co., Ltd. Transportation Construction Co., traffic immediately after the completion of SZLW Hunan Ltd. Fu Ling EPB; Fuling the project) was made and approved by the Foreign Construction Transportation Bureau; local traffic management department before the Group Co., Ltd. CKLW: Chengkou construction starts to make sure that the Select and manage WLWJ: Gezhouba 5 Transportation Committee; construction and social vehicles can go through. temporary tracks to Construction (Group) avoid traffic Co., Ltd.; Anhui problems. Hydrological Traffic The project is Development Co., management – completed, closed Ltd.; Jiangsu road subprojects and restored to a Yancheng Water temporary orbit, Construction Co., Ltd. restored to its original SZLW Hunan state. Foreign Construction Group Co., Ltd. FLLW: Chong Qing Qun Zhou Group Co., Ltd. CKLW: Jiangxi Road Bridge and Tunnel Engineering Co., LTD. Advance notice of WZYL, RCRFH, SZLW, FLLW, CKLW: erect construction will be construction bulletin board at each construction site, published before the including construction content, construction arrangement, construction through responsible person and complaint telephone number. The radio and TV; construction site shall strengthen the supervision and Community safety Construction management of environmental hygiene, and the water billboards, which barrel shall be tightly capped to prevent the pollution of include construction dust and mosquitoes and flies. The workers are equipped contents, schedule, with basic labor hygiene and safety precautions, such as responsible person work clothes, helmet, canvas gloves and masks. Up to

36 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

and complaint phone now, no labor accidents and safety accidents have number, will be occurred; Handle in the municipal project has support, erected at each actively carry out AIDS prevention publicity activities, and construction site. in accordance with the "prevention first, publicity and education to give priority to, mobilize the whole society to participate in and implement comprehensive management" strategy for prevention and control of AIDS. WLWJ: erect construction bulletin board at each construction site, including construction content, construction arrangement, responsible person and complaint telephone number. Project is still in the stage before construction, but still attach great importance to production safety and environmental protection work, strict implementation of national and local relevant laws and regulations, the construction unit with all the contractors to sign the safety production responsibility of civilization, regulate the behavior of construction from the system, to ensure the construction safety and environmental hygiene. i. Contractors will be WZYL: Wanzhou Water required to safeguard Company, Wanzhou District environmental Traffic authorities; hygiene in the WLWJ: Wulong Urban-rural construction camps, Development Group; Wulong including the quality Traffic authorities; of water supplies; RCRF: Rongchang Hongyu ii. All construction Water Resources Development sites must provide the Co., Ltd.; Rongchang County Work camp health necessary personal Traffic authorities and hygiene protective equipment SZLWShizhu Transportation and other resources to Construction Corporation, create a safe working Shizhu County Transportation environment; Bureau; iii. Construction site CKLW: Chengkou operations must Transportation Committee; comply with PRC‘s State Administration of Worker Safety Laws and

37 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

Regulations. iv.An education program for HIV/AIDS Responsibility of the WZYL: Wanzhou Water contractor: i.At all Company (the owner unit) times during Wanzhou District Environmental construction, the Protection Bureau contractor will RCRFH: Rongchang Hongyu provide safe and Water Resources Development convenient passages Co., Ltd.; Rongchang for vehicles, Environmental Protection pedestrians, and Bureau; WLWJ:Wulong livestock to and from Urban-rural Development side roads. Group; Environmental ii.The Contractor's Protection Bureau; responsibilities SZLWShizhu Transportation include the protection Construction Corporation, the of every person and Environmental Protection nearby property from CKLW: Chengkou County construction Construction site Transportation Committee; accidents. The safety Contractor shall be responsible for complying with all national and local safety requirements and any other measures necessary to avoid accidents; iii. Provide personal protective equipment and clothing (goggles, gloves, respirators, dust masks, hard hats, steel-toed boots) for construction workers and enforce their use;

38 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

iv.During heavy rains or emergencies of any kind, suspend all work; v. Brace electrical and mechanical equipment to withstand seismic events during the construction. vi. Present details regarding maximum permissible vehicular speed on each section of road; vii.Establish safe sight distance in both construction areas and construction camp sites; viii. Place signs around the construction areas to facilitate traffic movement, provide directions to various components of the works, and provide safety advice and warnings. i. Protect cultural WZYL: Wanzhou Water WZYL, WLWJ, RCRFH, SZLW,FLLW, CKLW heritages of which the Company; Culural Relics Under the direction of CPMO and the project management values has been Preservation Office of Wanzhou protection for established and no District office, the construction unit had made regulations on cultural heritage, protection of the suspected cultural relic before the one is allowed to RCRF:Rongchang Hongyu material and construction team entered the site. The regulations are: destroy, stain, hide Water Resources Development natural heritage when there is an unidentified object found during or damage them in Co., Ltd.; Cultural Relics earth-rock construction process, stop the construction other ways Preservation Office of immediately, protect the site and report to the construction according to the law Rongchang County

39 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

of China; WLWJ:Wu long County project management office, which will organize the ii. If the excavation urban-rural development Co., protection work immediately and report to the local on important sites has Ltd. Cultural Relics Preservation cultural relics bureau; the construction can continue when started, the Office of Wulong County the cultural relics bureau permit it after identifying the excavation must stop SZLWShizhu Transportation suspected cultural relic; during the protection period of the and the construction Construction Corporation, suspected cultural relic, the construction unit can arrange unit should report it Cultural Relics Preservation other work which will not affect the protection and to the district, county Office of Shizhu County identification of the suspected cultural relic. Up to now, or city to seek for FLLW: Fuling Zhonglong there is no suspected cultural relic found in the proper treatment Transportation, Construction construction site. approaches. Co., Cultural Relics Preservation Office of Fuling County CKLW: Chengkou County Transportation Committee, Cultural Relics Preservation Office of Chengkou Ecology In the construction of WZYL: Xinjiang WZYL: There is no natural protection zone around. The the road section in Corps Water project has been completed, the vegetation recovery and value Fuling District near Resources and green should has been finished; the related protected the Damu Nature Hydropower measures has been taken to the plant around the project Reserve, the Engineering Group site. contractor must Co., Ltd. and Shanxi WLWJ、RCRFH、SZLW、CKLW there is no natural proceed in Metallurgical protection zones around; the project is under construction, close consultation Rock-Soil Engineering In all the projects, only Fuling the vegetation recovery and green should be implemented with the Nature Reconnaissance urban and rural road in the later stage of the project; the measures taken should Reserve Management Protection of RCRF: Sichuan improvement subproject is strengthen the protection of the surrounding vegetation Office to ensure Nature Reserve Zhongcheng Coal located in the natural protection WLWJ、RCRFH the construction of banks will result in that day-to-day values Construction (Group) zone (Damu natural protection activities do not the losses of the original vegetation around the rivers, but Co., Ltd.; reserves management office, impact the dam design is for the protection of the vegetation in WLWJ: Gezhouba 5 local project management office) on important flora grids, after the completion of the project, the original Construction (Group) vegetation can realize the basic recovery and fauna values. Development Co., i. Minimize FLLW: The National Forest Protection and Fire Ltd.; Anhui Water construction area; Prevention regulations and rules will be highly concerned Development Co., Ltd. Environmental during the construction. It is to strengthen fire prevention Jiangsu Yancheng training especially and forestry protection policy, and forbid to have no Water Construction fire lighting in construction. It will not be allowed to cut tree Co., Ltd. SZLW prevention training and forest without indication from authority.

40 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

should be provided Hunan Foreign to construction Construction Group workers; Co., Ltd. No tree is allowed to SZLW Hunan be cut out of ROW; Foreign Construction No borrow and spoil Group Co., Ltd. is allowed within FLLW:Chongqing the NR area; Qunzhou Industy i.In compliance with Group Co. Ltd. WZYL: Wanzhou Water the PRC Forestry CKLW:Jiangxi Road Company (the owner unit) Law, IU will Bridge and Tunnel Co. Wanzhou EPB undertake Ltd; Heilongjiang RCRF: Rongchang Hongyu compensatory Hualong Construction Water Resources Development planting of an Co., Ltd Co., Ltd.; Rongchang EPB equivalent or larger WLWJ: Wulong Urban-ruran area of affected forest Development Group; Wulong trees. EPB; ii. The re-vegetation SZLWShizhu Transportation Replacement of will comprise a Construction Corporation, lost vegetation selection of species Shizhu EPB that are suitable for FLLW Fuling Zhonglong this area and have the Transportation Construction Co, most appropriate ltd.;Fuling EPB; attributes to survive CKLW:Chengkou and serve their Transpoartation Committee; designated functions. Chengkou EPB iii. New plantings will be maintained during the operation period.

41 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

It can be seen in Table 4 that the environment impacts mitigation measures in the construction sites of the Rongchang Rongfeng River Flood Management Subproject, Wulong Wujiang Flood Management Subproject, Wanzhou Yangliu Water Supply Subproject, Shizhu urban and rural road network improvement Subproject, Chengkou urban and rural road network improvement Subproject are implemented effectively in environment impact mitigation measurement and the environment management in the construction site are in order.

The results of the site investigation and monitoring of the environment supervisors arethe downstream receiving water quality of the Rongchang Rongfeng River Flood Management Subproject, Wulong Wujiang Flood Management Subproject and Wanzhou District Yangliu Water Supply Subproject, Fuling district urban and rural road network improvement subproject and Shizhu county urban and rural road network improvement subproject, Chengkou urban and rural road network improvement subproject conform to the category III water quality standards; the above subprojects have taken corresponding measures to minimize the noise generated during the construction and there is no complaint so far. The noise generated has very little impact on the environment sensitive sites in the neighborhood and has not disturbed the residents; the waste earth and rocks excavated in the above subprojects have been backfilled nearby or reused so that the waste earth and rocks and pits are thoroughly used, meanwhile it has prevented the environment impacts and ecological damages caused by choosing another earth disposal site and reduced the load of the existing waste disposal areas in town or the district.

Up to the report period, Rongchang Rongfeng river flood management sub-project dredge detection report has been submitted by the third party testing unit. In Wulong subproject, anchor cable anti-sliding wall construction was the newly added variation work and conducted between March and May 2018. It was found that the over grouting mortar by anchor construction discharged directly to river bank or Wu River. The contractors have rectified timely and set up small sediment pools to process the slurry and the solid waste was moved to waste dump. In this EMT survey, the construction of anchor cable anti-sliding walls is in suspension because the new prices of BOQ have not been agreed by IA and ADB. No illegal discharging was found on site. In general, all of above projects conform with the requirements of local regulations,

comprehensive prevention and treatment, practical and beautiful in Developing and

Construction Project Water and Soil Conservation Technical Regulation (GB50433-2008).

42 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

Meanwhile, the above projects have taken proper measures and have no negative impact on

the surrounding ecology environment and society.

3.5 Monitoring Results

3.5.1 External Monitoring

The environment external monitoring contract of the ADB-financed Chongqing Urban-rural Infrastructure Development Demonstration Project Phase was signed in February 2015. The independent EEM unit is Halcrow (Chongqing) Engineering Consulting Co., Ltd and the qualified testing company is Chongqing Guohuan Environmental Monitoring Co., Ltd. The team composition of the companies in the environment external monitoring is available in Table 5. Table 5 the Team Composition in the Environment External Monitoring

Company Staff Duties Yin Jian Team Leader Chen Qiuwen Monitoring and report preparation Halcrow (Chongqing) and Chongqing Guohuan Wang Hong Coordinating and report preparation Song Nan, Hu Yushu, Yan Guangcong Site survey Zeng Shaoqiang, Xian Qihong, Ke Kuai Site testing, data collection and investigation

43 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

Monitoring plan in EMP sees Table 6 and Table 7.

Table 6 Environmental Monitoring Plan Flood Management Project

Implementation Supervise Monitoring Item Parameters Location Agency Agency frequency

pH, SS, DO, TP Environmental Sewage NH3-N, BOD5, monitoring at designated Twice every year CODCr ,oil construction site Escherichia coli,

SS, DO, NH3-N, TP, Upstream one point downstream Four times every Surface water , BOD5, COD two point year All construction sites Three consecutive at least one point at both days for monitoring, Air TSP, PM10, twice each day, four NOx upwind and downwindsensitive times each year during construction Construction point nearby Qualified environmental Local EPB period monitoring company Two consecutive days for monitoring, Daily Boundaries at each construction once each morning sites, sensitive point nearby and evening, four Noise average value times during construction Wastes in work shed and

Visual inspection at each work Twice each year Solid waste construction wastes at shed and construction site construction site At least twice each

44 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

Water and Water and soil Visual inspection spoil ground year and once after soil erosion erosion intensity and construction site construction completion and and vegetation vegetation restoration restoration

Table 7 Environmental Monitoring Plan (Road and Water Supply Project)

Implementation Monitoring Spot Item Parameter Location Supervise Monitor frequency Agency Agency

pH, SS, DO, Environmental monitoring at Carrying out Environmental sewage NH3-N, TP, Twice each year Construction period designated monitoring at selected sites BOD5,CODCr, Escherichia, oli, oil construction site

All construction sites (at Three consecutive days for least one point at both Sensitive points near each site monitoring, twice each day, air TSP, PM10, NOx upwind and Qualified (at least one point upwind, at four least one point downwind) times each year during Downwind) sensitive environmental point nearby construction monitoring Local EPB Two consecutive days for Boundaries at each company Boundary of each site, monitoring, once each noise Daily mean value construction sites, sensitive points nearby morning and evening, four sensitive point nearby times during construction

Wastes in work Visual inspection spoil Visual inspection in shed and Solid waste ground and construction various work sheds and Twice each year construction wastes site construction sites at construction site

45 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

Water and Water and soil soil erosion Visual inspection spoil At least twice each year and erosion intensity Visual inspection of spoil and ground and construction once after construction and vegetation grounds and construction sites vegetation site completion restoration restoration Note: the above information refers to EMP, monitoring plan.

The analysis methods of the monitoring parameters and the detection limits are available in Table 8

Table 8 Monitoring Methods for Ambient Atmosphere, Noise and Water

Monitoring Item Method (Standard Number) Limit of Detection TSP (mg/m3) Gravimetric Method (GB/T15432-1995) 0.009 PM10 (mg/m3) Gravimetric Method HJ618-2011 0.008 ) NO2 (mg/m3) Saltzman Method (Spectrophotometric Method, GB/T15432-1995) 0.001 Considerable Continuous A Standard of environmental noise emission in construction field Class Sound (Leq,dB) / (GB 12523-2011) pH value Glass Electrode Method (GB6920-86) 0.01 SS (mg/L) The weight method of the water quality suspension 4 (GB11901-89) DO (mg/L) Iodometry (GB7489-87) 0.2 Total PhosphorusTP Ammonium Molybdate Spectrophotometric MethodGB11893-89 0.01 (mg/L)

CODCr(mg/L) Dichromate MethodGB11914-89 5

NH3-N(mg/L) Salicylic Acid Spectrophotometric Method 0.01 HJ 536—2009

BOD5(mg/L) Dilution and Inoculation Method (GB7488-87) 2

Fecal Coliforms(each / L) Multi-tube Zymolytic Method, Filter Membrane Method / (HJ 347-2007)) Petroleum (mg/L) Infrared Spectrophotometric Method (HJ 637-2012) 0.01

46 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

Table 9~Table 28 are the external monitoring results and brief analysis of the environments around the construction sites of the Rongchang Rongfeng River Flood Management Subproject, Wulong Wujiang Flood Management Subproject and Wanzhou District Yangliu Water Supply Subproject, Fuling district urban and rural road network improvement subproject, Shizhu county urban and rural road network improvement subproject and Chengkou county urban and rural road network improvement subproject.

47 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

Rongchang

Table 9: The Domestic Sewage Environment External Monitoring Results of the Rongchang Rongfeng River Flood Management Subproject

during the Construction

Monitoring Monitoring Results Monitoring Monitoring Sample Type Sampling Unit Time Parameters Spot/Section 20180918W-0201 Reference limit PH / 7.60 6~9

DO mg/L 5.8 5 ☆W140m away SS mg/L 4L 70 from NH3-N mg/L 0.212 1 December Surface water construction site 17 ,2018 at the Rongfeng CODCr mg/L 17 20 River BOD5 mg/L 5.2 4 downstream section Total Phosphorus TP mg/L 0.37 0.2

It conforms to the water quality standard of category III in Surface Water Environment Quality Standard (GB3838-2002), in which Reference SS meets the I category water quality standards in The Integrated wastewater discharge standard( GB8978-1996).

1. Sample status: liquid, colorless, clearer, odorless. Remarks 2. “L” means not detected, and the detection result is indicated by the detection limit plus “L”.

48 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

Table 10: The Surface Water Environment External Monitoring Results of the Rongchang Rongfeng River Flood Management Project during Construction

Monitoring Monitoring Results Monitoring Monitoring Sample Type Sampling Unit Time Parameters Spot/Section 20180918W-0301 Reference limit

PH / 7.48 6~9 DO mg/L 6.4 5 SS mg/L 4 70 ☆W2 Under the December Rongfeng River NH3-N mg/L 1.22 1 Surface water 17 ,2018 Railway CODCr mg/L 28 20 Bridge BOD5 mg/L 8.4 4 Total Phosphorus mg/L 0.22 0.2 TP

It conforms to the water quality standard of category III in Surface Water Environment Quality Standard (GB3838-2002), in which Reference SS meets the I category water quality standards in The Integrated wastewater discharge standard( GB8978-1996).

1. Sample status: liquid, colorless, clearer, odorless. Remarks 2. “L” means not detected, and the detection result is indicated by the detection limit plus “L”.

Note: The monitoring value of pH is dimensionless.

49 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

Table 11: The Atmosphere Environment External Monitoring Results of the Rongchang Rongfeng River Flood Management Subproject during the Construction

Monitoring Monitoring Results Monitoring Monitoring Sample Type Sampling Unit Time Parameters Spot/Section 20180918G-0101 Reference limit 3 ●G145m away SO2 mg/m 0.019 0.15 from the December NO mg/m3 0.044 0.08 construction site 2 The Atmosphere 17,2018 near the Heting TSP μg/m3 34 300 Environment Daily Hotel on the right mean value bank of Rongfeng PM10 μg/m3 22 150 River

Reference The Class II standard in “The Ambient Atmosphere Quality Standard”GB3095-2012

Remarks “L” means not detected, and the detection result is indicated by the detection limit plus “L”.

50 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

Table 12: The Noise Environment External Monitoring Results of the Rongchang Rongfeng River Flood Management Subproject during Construction

Monitoring Results L [dB(A)] Main sound source Monitoring Sampling Spot Monitoring Time eq Daytime Nighttime Daytime Nighttime December NO obvious sound △N Beside the Heting hotel 49.7 48.6 NO obvious sound source 1 17 ,2018 source

December △N the breeding farm of Left 2 51.0 50.4 Vehicles, Social life Vehicles , Social life bank 17 ,2018

Reference limit Daytime60,Nighttime50 The Class II standard inEnvironmental quality standard for noiseGB3096-2008; Emission limit value of Table Reference 1 of Environmental Noise Emission Standard for Construction Site Boundary (GB12523-2011) Not Note: During this survey, the construction workers live in nearby residential areas, and the domestic wastewater generated is discharged into the municipal pipe network. Therefore, this domestic wastewater monitoring is not included in the monitoring plan. It can be seen that DO, BOD5 and TP in the surface water in the upper reaches of Rongfeng River exceed the standard, while DO, NH3-N, CODCr, BOD5 and TP in the surface water under the railway bridge in the lower reaches exceed the standard. According to the observation of the EMT and the inquiry of the Rongchang IA, the enterprises in the upper reaches of Rongfeng River and in the upper and lower reaches of the monitored area have stolen discharge behavior, which causes the monitoring index to exceed the standard. C01, C02, C03 have been completed, C04 is planting without any discharge, and the new C05 after the mid-term adjustment started on 28 November 2018, is currently doing the field clearance. There are no construction and domestic wastewater discharges. Therefore, the monitoring index exceeding the standard has nothing to do with the ADB project.

51 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

Wulong

Table 13: The Domestic Sewage Environment External Monitoring Results of the Wulong Wujiang Flood Management Project during

Construction

Monitoring Monitoring Results Monitoring Monitoring Sample Type Sampling Unit Time Parameters Spot/Section 20180918W-0201 Reference limit PH / 7.80 6~9 DO mg/L 6.18 ≥5 SS mg/L 3 ≤70 ☆W150 meters December NH3-N mg/L 0.121 ≤1 Surface water upstream of 20 ,2018 COD mg/L 8 ≤20 Damu Bridge Cr BOD5 mg/L 2.5 ≤4 Total Phosphorus mg/L 0.15 ≤0.2 TP

It conforms to the water quality standard of category III in Surface Water Environment Quality Standard (GB3838-2002), in which Reference SS meets the I category water quality standards in The Integrated wastewater discharge standard( GB8978-1996).

Remarks Sample status: liquid, colorless, clearer, odorless..

52 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

Table 14: The Surface Water Environment External Monitoring Results of the Wulong Wujiang Flood Management Subproject during the Construction

Monitoring Results Monitoring Monitoring Monitoring Sample Type Sampling Unit Time Parameters Spot/Section 20180919W-0201 Reference limit

PH / 7.86 6~9

DO mg/L 6.15 ≥5

SS mg/L 7 ≤70

☆W2Under December Surface water Damu NH3-N mg/L 0.142 ≤1 20 ,2018 the Bridge CODCr mg/L 6 ≤20

BOD5 mg/L 2.8 ≤4

Total Phosphorus mg/L 0.16 ≤0.2 TP

It conforms to the water quality standard of category III in Surface Water Environment Quality Standard (GB3838-2002), in which SS Reference meets the I category water quality standards in The Integrated wastewater discharge standard ( GB8978-1996).

Remarks Sample status: liquid, colorless, clearer, odorless..

Note: The monitoring value of pH is dimensionless

53 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

Table 15: The Atmosphere Environment External Monitoring Results of the Wulong Flood Management Subproject during the Construction Monitoring Monitoring Results Monitoring Monitoring Sample Type Sampling Unit Time Parameters Spot/Section 20180918G-0101 Reference limit 3 December SO2 mg/m 0.020 ≤0.15 ●G1Wulong 3 The Atmosphere 20 ,2018 NO2 mg/m 0.032 ≤0.08 Secondary Primary Environment Daily 3 School Gate TSP µg/m 69 ≤300 mean value 3 PM10 µg/m 47.8 ≤150 Reference The Class II standard in “The Ambient Atmosphere Quality Standard”GB3095-2012 Notes “L” means not detected, and the detection result is indicated by the detection limit plus “L”.

54 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

Table 16: The Noise Environment External Monitoring Results of the Wulong Flood Management Subproject during the Construction

Monitoring Results Leq[dB(A)] Main sound source Monitoring Sampling Spot Monitoring Time Daytime Nighttime Daytime Nighttime December

△N1At the gate of the Wulong 20 ,2018 50.2 45.1 Vehicles Nature secondary primary school

December △N 30m far away from the end Of 2 59.6 48.9 Vehicles Nature Wujiang No.3 Bridge 20 ,2018

Reference limit Daytime≤60,Nighttime50 Reference The Class II standard inEnvironmental quality standard for noiseGB3096-2008 Note / Note: During the survey period, due to the suspension of construction of the project, no construction personnel were stationed and no domestic wastewater was discharged. Therefore, this monitoring does not include domestic wastewater monitoring.

55 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

Wanzhou Table 17: The Domestic Sewage External Monitoring Results of the Wanzhou District Yangliu Water Supply Subproject

Monitoring Sampling Monitoring Monitoring Results Sample Type Monitoring Time Unit Spot/Section Parameters 20180920W-0101 Reference limit PH / 7.87 6~9 DO mg/L 8.46 5 SS mg/L 4 70

NH3-N mg/L 0.143 1

The Domestic December ☆W1At the Construction camp CODC mg/L 10 20

Sewage 22 ,2018 drain BOD5 mg/L 4.0 4 r Total Phosphorus mg/L 0.14 0.2 (TP Petroleum mg/L 0.04L ≤0.05 Fecal coliforms MPN/L 7.0x10 3 ≤10000

It conforms to the water quality standard of category III in Surface Water Environment Quality Standard (GB3838-2002), in which SS meets the Reference I category water quality standards in The Integrated wastewater discharge standard( GB8978-1996).

1. Sample status: liquid, yellowish, slightly sputum, odorless. Notes 2. “L” means not detected, and the detection result is indicated by the detection limit plus “L”. Note: The monitoring value of pH is dimensionless

56 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

Table 18: The Atmosphere Environment External Monitoring Results of the Wanzhou District Yangliu Water Supply Subproject

Monitoring Monitoring Results Monitoring Monitoring Sample Type Sampling Unit Time Parameters Spot/Section 20180920G-0101 Reference limit SO mg/m3 0.021 0.15 December ●G1At the 2 Chongqing 3 The Atmosphere 22 ,2018 NO2 mg/m 0.048 0.08 Economic and Environment 3 Daily Trade School Gate TSP µg/m 72 300 mean value 3 School Gate PM10 µg/m 32.2 150

Reference The Class II standard in “The Ambient Atmosphere Quality Standard”GB3095-2012

Notes “L” means not detected, and the detection result is indicated by the detection limit plus “L”.

Table 19: Environment External Monitoring Results of Wanzhou Yangliu Subproject during the Construction

Monitoring Results Leq[dB(A)] Main sound source Monitoring Sampling Spot Monitoring Time Daytime Nighttime Daytime Nighttime

△N1Next to the teaching building December of Chongqing Economic and Trade 22 ,2018 55.3 44.2 Vehicles No obvious sound source School December △N2Northeast of project 22,2018 58.9 48.1 Vehicles No obvious sound source

Reference limit Daytime≤60,Nighttime50 Reference The Class II standard inEnvironmental quality standard for noiseGB3096-2008 Note /

57 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

Fuling Table 20: The Domestic Sewage Environment External Monitoring Results of the Fuling road Subproject during the Construction

Monitoring Results Monitoring Monitoring Monitoring Sample Type Sampling Unit Time Parameters Spot/Section 20180921W-0101 Reference limit

PH / 7.95 6~9

DO mg/L 8.6 ≥5 SS mg/L 5 ≤70

NH3-N mg/L 0.152 ≤1 The Domestic December ☆W1Maxi COD mg/L 8 ≤20 Sewage 19 ,2018 river Cr BOD5 mg/L 2.6 ≤4 Total Phosphorus TP mg/L 0.20 ≤0.2 Petroleum mg/L 0.04L ≤0.05 Fecal coliforms MPN/L 1.10x103 ≤10000

It conforms to the water quality standard of category III in Surface Water Environment Quality Standard (GB3838-2002), in which Reference SS meets the I category water quality standards in The Integrated wastewater discharge standard( GB8978-1996).

1. Sample status: liquid, colorless, clearer, odorless. Remarks 2. “L” means not detected, and the detection result is indicated by the detection limit plus “L”.

58 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

Table 21: The Atmosphere Environment External Monitoring Results of Fuling Subproject during the Construction

Monitoring Monitoring Sampling Monitoring Monitoring Results Sample Type Unit Time Spot/Section Parameters 20180920G-0101 Reference limit 3 December SO2 mg/m 0.020 ≤0.15

19 ,2018 ●G1Group2 in Yingxin 3 Daily mean Village NO2 mg/m 0.037 ≤0.08 The value Atmosphere 3 Environment December TSP µg/m 63 ≤300 19 ,2018 ●G1Group2 in Yingxin 3 Daily mean Village PM10 µg/m 44.4 ≤150 value

Reference The Class II standard in “The Ambient Atmosphere Quality Standard”GB3095-2012

Notes

Table 22: The Noise Environment External Monitoring Results of Fuling Subproject during the Construction

Monitoring Results Leq[dB(A)] Monitoring Monitoring Sampling Spot Measured Background Correction Report Reference limit Main sound source Time value values value result December 19 ,2018 / / / 45.7 / Nature △N1Construction site Day time beside Yingxin Village December 19 ,2018 / / / 41.8 / Nature Night time Reference limit Daytime60,Nighttime50 Reference The Class II standard inEnvironmental quality standard for noiseGB3096-2008 Note

59 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

Shizhu

Table 23: The Domestic Sewage Environment External Monitoring Results of the Shizhu road Subproject during the Construction Monitoring Monitoring Sampling Monitoring Monitoring Results Sample Type Unit Time Spot/Section Parameters 20180922W-0101 Reference limit PH / 7.46 6~9

DO mg/L 7.75 ≥5

SS mg/L 3 ≤70

NH3-N mg/L 0.120 ≤1 The Domestic December ☆W1300 m downstream CODCr mg/L 6 ≤20 Sewage 23 ,2018 of the project

BOD5 mg/L 2.6 ≤4

Total Phosphorus mg/L 0.04L ≤0.2 TP Petroleum mg/L 0.03 ≤0.05

3 Fecal coliforms MPN/L 1.40x10 ≤10000

It conforms to the water quality standard of category III in Surface Water Environment Quality Standard (GB3838-2002), in which SS Reference meets the I category water quality standards in The Integrated wastewater discharge standard( GB8978-1996).

Remarks 1、Sample status: liquid, colorless, clearer, odorless 2、“L” means not detected, and the detection result is indicated by the detection limit plus “L”. Note: The monitoring value of pH is dimensionless.

Table 24: The Atmosphere Environment External Monitoring Results of Shizhu Road Subproject during the Construction

60 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

Monitoring Monitoring Results Monitoring Sample Type Sampling Monitoring Time Unit Reference Parameters 20180920G-0101 Spot/Section limit SO mg/m3 0.016 ≤0.15 Residential 2 The 3 area near the December 23,2018 NO2 mg/m 0.044 ≤0.08 Atmosphere construction 3 Environment Daily mean value TSP µg/m 87 ≤300 road 3 PM10 µg/m 47.0 ≤150

Reference The Class II standard in “The Ambient Atmosphere Quality Standard”GB3095-2012

Notes

Table 25: The Noise Environment External Monitoring Results of Shizhu Subproject during the Construction

Monitoring Monitoring Results Leq[dB(A)] Main sound source Monitoring Sampling Spot Time Measured value Correction value Day time Night time December △N Residents on the west No obvious sound 1 55.9 48.1 Social life side of the road 23 ,2018 source

Daytime60,Nighttime50 Reference limit

Reference The Class II standard inEnvironmental quality standard for noiseGB3096-2008 Note /

61 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

Chengkou

Table 26: The Domestic Sewage Environment External Monitoring Results of the Chengkou road Subproject during the Construction

Monitoring Sampling Monitoring Monitoring Results Sample Type Monitoring Time Unit Spot/Section Parameters 20180923W-0101 Reference limit PH / 8.16 6~9 DO mg/L 7.36 ≥5 SS mg/L 10 ≤70

NH3-N mg/L 0.150 ≤1 ☆W1500 m The Domestic December COD mg/L 7 ≤20 downstream of the Cr Sewage 21 ,2018 project BOD5 mg/L 1.8 ≤4 Total Phosphorus (TP mg/L 0.04L ≤0.2 Petroleum mg/L 0.06 ≤0.05 Fecal coliforms MPN/L 1.70x103 ≤10000

It conforms to the water quality standard of category III in Surface Water Environment Quality Standard (GB3838-2002), in which SS Reference meets the I category water quality standards in The Integrated wastewater discharge standard ( GB8978-1996).

1、Sample status: liquid, colorless, clearer, odorless. Note 2、“L” means not detected, and the detection result is indicated by the detection limit plus “L”. Note: The monitoring value of pH is dimensionless

62 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

Table 27: The Atmosphere Environment External Monitoring Results of Chengkou Road Subproject during the Construction Monitoring Monitoring Results Monitoring Sample Type Sampling Monitoring Time Unit Referenc Parameters 20180923G-0101 Spot/Section e limit 3 SO2 mg/m 0.018 ≤0.15 G1(Residential The December 21 ,2018 3 area near the NO2 mg/m 0.039 ≤0.08 Atmosphere Daily mean value construction TSP µg/m3 94 ≤300 Environment road) 3 PM10 µg/m 51 ≤150

Reference The Class II standard in “The Ambient Atmosphere Quality Standard”GB3095-2012

Notes

Table 28: The Noise Environment External Monitoring Results of Shizhu Subproject during the Construction

Monitoring Sampling Monitoring Monitoring Results Leq[dB(A)] Main sound source Spot Time Day time Night time Day time Night time December △N Residents on the No obvious 1 56.8 47.2 Daily life west side of the road 21 ,2018 sound source

Daytime60,Nighttime50 Reference limit

Reference The Class II standard in (Environmental quality standard for noise)GB3096-2008 Note /

63 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

After visits and visual inspection on construction site, investigation on contractor or supervisory company’s daily record book and monitoring of all parameters of corresponding monitoring point locations at construction sites (table 9-28), the report finds out (1) The Wulong Wujiang Flood Management Subproject, the Yangliu Water Supply Subproject in Wanzhou District, the Fuling Urban-Rural Road Network Improvement

Subproject, the Shizhu County Urban-Rural Road Network Improvement Subproject and

the Chengkou County Urban-Rural Road Network Improvement Subproject all meet the

environmental standards of the relevant functional areas.

(2) The surface water monitoring indexes of Rongfeng River flood management sub-project in Rongchang exceed the standard, but because C01, C02, C03 have been

completed, C04 completed 90% of green planting, and there is no discharge at site. The new C05 is conducting field clearance, and there is no construction and domestic sewage

discharge. Therefore, the index exceeding the standard is not caused by the ADB project.

According to the inquiry from EMT to the IA, some enterprises in the upper reaches of Rongfeng River and the surface water sampling area are currently engaged in sewage

evacuation, which results in some surface water indicators exceeding the standard.

(3) After visual inspection on construction on site of subproject under construction, solid

wastes such as work shed’s wastes and construction wastes are all collected and disposed (regularly transport to local sewage disposal site). Thus it can be seen that implementation measures which are formulated by all subprojects EMP to alleviate pollution are well-done. All subprojects’ constructions have little impact on environment.

3.5.2 Internal Monitoring

Sort out contents according to contractor and supervisor’s supervising monthly report submitted to owner. Brief description of internal monitoring of project under construction sees Table 29.

64 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

.Table 29: A Brief Description of the Internal Monitoring of project under construction

Responsible Item Monitor parameter Monitor PT Monitor frequency Monitor result entity

Flood Management Project: Rongchang Rongfeng River Flood Management sub-projectRCRF, Wulong Flood Management subproject (WLWJ) Spot check to RCRFH: Sichuan pH, SS, DO, NH3-N, TP, Drainage areas of all drainage sites of Zhongcheng Coal construction sites and All sewage BOD5, CODCr, escherichia domestic sewage at Construction (Group) domestic sewage parameters Constructio coli, oil least once a month ’ monitoring Co., Ltd.; Rongchang n period result meet County Hongyu Water Once a month Resource Development SS, DO, NH3-N, TP, BOD5, Upstream one point, corresponding Surface water COD downstream two Once a month standard CO., Ltd, points WLWJ: Gezhouba 5 Construction (Group) Floating dust alleviation Co., Ltd.; Anhui measures watering, vehicle Visual inspection on Once a week Hydrological air all construction sites covering vehicle and device Development Co., Ltd.; Jiangsu Yancheng maintenance Hydrological Two consecutive days Construction Co., for monitoring, once Ltd.(EA) All construction sites’ each morning and Chong Qing Wulong noise Daily mean value boundaries ,nearby evening, four times sensitive points during construction Urban-Rural Development(Group) Work shed waste and Visual inspection at Co., Ltd. (supervising Solid waste construction waste all construction sites Once a week and work sheds unit) Water and soil Water and soil erosion intensity Visual inspection spoil Internal monitor: erosion and and vegetation restoration ground and construction spot check after vegetation site restoration raining rainfall>50mm

65 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

Work shed sanitation and Check at all Occupati safety, clean water, construction sits and Once each month onal health contingency plan work sheds and safety

Road and Water Supply Project;Yangliu Water Supply Sub-project at Wanzhou DistrictWZYL, Fuling district urban and rural road network improvement subproject (FLLW), Shizhu county urban and rural road network improvement subproject(SZLW), Chengkou County Urban-rural Road Network improvement (CKLW) Spot check to drainage All parameters’ WZYL: Xinjiang sewage pH, SS, DO, NH3-N, TP, Drainage areas of all sites of domestic monitoring result Corps Water Resources construction sites BOD5, CODCr, escherichia sewage at least once a meet corresponding and Hydropower coli, oil and domestic month standard Engineering Group sewage Co., Ltd., Shanxi Floating dust alleviation Visual inspection on Metallurgical Construction measures(watering, vehicle all construction sites Rock-Soil Engineering period Once a week Reconnaissance air covering vehicle and device General maintenance Company(EA); All construction sites’ Two consecutive days Wanzhou Tap Water noise Daily mean value boundaries, nearby for monitoring, once Company (SU)LTD. sensitive points each morning and FLLW: Chongqing evening, four times Qunzhou Industry during construction Group Co., Ltd (EA); Fuling Zhonglong Work shed waste and Visual inspection at Transportation Co., Solid construction waste all construction sites Once a week waste Ltd.(SU) and work sheds CKLW: Visual inspection Chengkou Water and Internal monitor: spot spoil ground and Transportation soil erosion Water and soil erosion check after raining intensity and vegetation construction site Committee. and rainfall>50mm vegetation restoration

restoration Work shed sanitation and Check at all Occupational safety, clean water, construction sites Once each month health and contingency plan and work sheds safety

66 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

According to Table 29 and the supervising monthly report submitted by contractor and supervisor to owner, Internal monitoring of project under construction meet EMP’s internal monitoring requirement.

3.6 Training Records and Public Information Consultation

1Capacity Building and Training Chongqing ADB office usually trains the staff of the contractors and the supervision units by explaining in the construction site and exchanging information so as to strengthen their environment protection awareness and practical work ability. The details are shown in Table 30.

. Table 30 Capacity Building and Trainings apacity Building and Training requirement in Environmental Actual training performance Assessment Report time Participants Training content Time Place Organizer Participants Training content

Before PMOs, Owner, Environment law and 2015.8.20-8.21 Chongqing CPMO Advisory Expert Environmental construction operator, regulation, Banshan Group, project contractors environmental policy Huayuan Development and management and plan( including Holiday Hotel Reform training, ADB Safeguard Policy Commission in construction each sub-county, contract Statement );basic the person in charge management environmental of each subproject training, management, (Contact) resettlement and Emergency social training preparedness and response Before PMOs, Owner, construction operator, public complaint department contractors, connection site for GRM

67 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

Before Owner, operator, Environmental event, 2015.10.16 Wulong WRB Wulong WRB Wulong IA Safety,fire knowledge training construction contractor risk control and ,supervisor management measures; ,responsible person of emergency response, the construction unit team, procedure and and Professional security action personnel of the construction Before Owner and Environmental health construction facility operator and safety of subproject development; protective practices and equipment; safe working environment; community safety. Before CPMO, PMOs, Responsibility of 2016.5.19 Wulong Urban and Wulong Urban Wulong IA, Fire safety training construction IA, IU environment Rural Development and Rural supervisor, IU, safety and during the management during the (Group) Co, ltd. Development officer construction construction (Group) Co, ltd. Before IA and IU of selection of the 2016.5.19 Wulong Urban and Wulong Urban Wulong IA, Fire safety training construction road subprojects transportation outing; Rural Development and Rural supervisor, IU, safety and during the conduct the construction (Group) Co, ltd. Development officer construction arrangement based on the (Group) Co, meet of local community ltd.

Before COMO, PMOs, The environment 2016.5.19 Wulong Urban and Wulong Urban Wulong IA, Fire safety training construction IA, IU healthy safety; Rural Development and Rural supervisor, IU, safety and during the community safety; (Group) Co, ltd. Development officer construction safe environment (Group) Co, surroundings; ltd. preventive measurement

68 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

Before IA and the The environment 2016.5.19 Wu Long County Wu Long Owner, manager of Fire safety knowledge training construction operation agency healthy safety; Urban-Rural County supervising unit, and during the community safety; Development(Group Urban-Rural safety officer construction safe environment ) Co., Ltd. Development( surroundings; Group) Co., preventive Ltd. measurement

Before IA and IU of safety operation rules; 2016.12.13 Wu Long County Wu Long Owner, manager of Fire safety knowledge training construction water supply environment Urban-Rural County supervising unit, and during the subproject management; Development(Group Urban-Rural safety officer construction emergency preparation ) Co., Ltd. Development( and procedure Group) Co., Ltd. Before The leaders of 1. Organize the project County traffic County traffic 1. Measures for construction construction county traffic contractors to implement project department committee committee, safety and during the committee, safety prevention terms in 20-21August, and construction site development and 2. Emergency plans of fire construction proprietor the construction process; 2016 reform commission, safety; representatives, 2. Make solutions for the construction 3. Implement environmental technical environmental impact in department principals, management responsibility. directors of the construction process safety supervisors, contractors, 3. Establishment of contactors supervision safety principals, complaint mechanism; representatives. supervision company representatives Before 1. Organize the project 5 Sept 2017 IAs, PMO staffs 1. Measures for construction construction contractors to implement CPMO & Contractors, safety and during the safety prevention terms in Chongqing consultants Supervisors, 2. Emergency plans construction the construction process; 3. Implement environmental 2. Make solutions for the management plans environmental impact in 4. ADB safeguards the construction process environmental policies. 3. Establishment of complaint mechanism

69 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

Before Environmental event, risk 16-20 April construction control and management 2018 Shanxi CPMO & IAs, PMO staffs Site environmental management and during the measures; consultants and implementation of EMP construction emergency response, team, procedure and action Before Environmental event, risk construction control and management 6-11 May 2018 Jilin CPMO & IAs, PMO staffs Site environmental management and during the measures; consultants and implementation of EMP construction emergency response, team, procedure and action

70 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

2Public Information and Consultation

According to the ADB public information consultation requirement of pre-informing the public of major construction activities, the profile of the public consultation activities of the subprojects during the construction period is shown in Table 31.

Table 31 Public Consultation Brief Summary Public Project Public Consultation Form Public Consultation Effects Name Consultation Scope Under the guidance of RCRF The public affected EPB departments shall respond to the public’s by construction local EPA have public suggestion and advice & dealt with them without delay. WLWJ notification on EPA All projects’ constructions are in good order and make WZYL, period and website; have symposium progress according to the plan. The public consultation FLLW, operation period of regularly, have SZLW all sub-projects questionnaire survey; effect is obvious. Conclusion: subprojects’ CKLW set up construction developments and operation are fully supported and notification before are expected to be completed as soon as possible to construction starts. benefit more areas and people.

According to table 31, three methods listed above are mainly applied to carry out public consultation in all projects. It turns out that the public support the implementation of projects and they expect that the projects can be completed as soon as possible to benefit more areas and people.

3.7 Grievance Redress Mechanism

A grievance redress mechanism (GRM) was established in each project city/county incompliance with ADB´s SPS (2009) requirement to prevent and address community concerns and assist the project to maximize environmental and social benefits. In addition to serving as a platform to resolve grievances, the GRM has been designed to help achieve the following objectives: (i) open channels for effective communication, including the identification of new environmental issues of concern arising from the project; (ii) prevent and mitigate any adverse environmental impacts on communities caused by project implementation and operations; (iii) improve mutual trust and respect and promote productive relationships with local communities; and (iv) build community acceptance of the project.

The GRM is accessible to diverse members of the community, including more vulnerable groups such as women and youth. Multiple of entry, including face-to-face meetings, written complaints, telephone conversations, or e-mail, will be available. Opportunities for confidentiality and privacy for complainants will be honored where this is seen as important.

71 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

There are something related to GRM procedure and time frame in the following Matrix.

Oral or Oral or Solution written complaint written complaint

Stage 1 Inform if solved ; Forward if not solved

Record complaints and assess rationality, and inform ADB and other relevant shareholders.

Consulting LIEC,CPMO,IU,LPMO and contractors to propose Solution not found solution and obtain approve of APs. Stage 3

Find Solution multi -stakeholder meeting (contractor, CPMO , IU, LPMO, complainant,EPB, LIEC), identify solution and action plan. Stage 2

Implement Solution

In Implementation period In operation

Contractors Contractors

72 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

Stage 1: If a concern arises during construction, the affected person or group will submit a written or oral complaint to the contractor (or the contractor‘s environment health and safety officer or any on site construction personnel). Whenever possible, the contractor will resolve the issue directly with the affected person. The contractor will give a clear reply within one week. If successful, the contractor will inform the concerned IU, LPMO and the PPCC accordingly.

(i) Stage 2: If no appropriate solution can be found, the contractor has the obligation to forward the complaint to the PPCU within five (5) working days. The complainant may also decide to submit a written or oral complaint to the PPCU, either directly or via one of the GRM entry points (IU,

LPMO, local EPB). For an oral complaint, proper written records must be made. The PPCU will assess the eligibility of the complaint, identify the solution and provide a clear reply for the complaint within five (5) working days. The environment consultants of the loan implementation consultancy service will assist the PPCU in replying to the affected person, if requested to do so. The PPCU will also inform the ADB project team and submit all relevant documents. Meanwhile, the PPCU will timely convey the complaint/grievance and suggested solution to the contractors or operators of facilities as well as the complainant. The contractors during construction and the operators during operation will implement the agreed upon redress solution and report the outcome to the PPCU within seven (7) working days.

(ii) Stage 3: In case no solution can be identified by the PPCU, or the complainant is not satisfied with the proposed solution, the PPCU will organize, within two weeks, a multi-stakeholder hearing (meeting) involving all relevant stakeholders (including the complainant, contractor, facility operator, local EPBs, CPMO, IU). The hearing shall identify a solution acceptable to all, and formulate an action plan. The contractors during construction and the operator during operation will implement the agreed-upon redress solution and report the outcome to the PPCU. The PPCU shall accept complaints free of charge. Any cost incurred should be covered by the contingency of the project. The grievance procedures will remain valid throughout the duration of project construction and until project closure. The started subprojects have within the agreed upon time frame established multilevel appeal and complaint mechanism (contractor –owner unit -LEPB-CPMO) and set up complaints hot lines. The specific information is in Table 32.

73 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

Table 32: The General Situation of the Grievance Redress Mechanism Established by the Started Subprojects

Staff Qualification or Had Environment Institution Name Name Title Management (Supervision) Training or Not Contact

Chong Qing ADB PMO He Trained by the ADB expert of environment Mengna ADB Project Officer management 15802396227 Rongchang Rongfeng River Flood Management Subproject, referred to as RCRF Rongchang County Jiang Environmental Senior Engineer Environment Supervision and Management 18996100166 Protection Bureau Zhongcai

Rongchang County Huang Trained by the ADB expert of environment Project Management Section Chief 15922989718 Office Anxiang management

Rongchang Hongyu Trained by the ADB expert of environment Water Resources Hu You Senior Engineer 13509474713 Development Co., Ltd. management Sichuan Zhongcheng Coal Construction Xu Weijun Project Manager Construction and Environment Management 13883706999 (Group) Co., Ltd. Chongqing Hongyu Water Conservancy Li Kai Project Director Supervising Engineer 13594536918 Consultative Co., Ltd.

Wulong Wujiang Flood Management Subproject, referred to as WLWJ Wulong Environment Buruea Zeng Fang Section Chief Environment Supervision and Management 13896509995 Trained by the ADB expert of environment Wulong PMO Qin Hui Section Chief management 13896689358 Wulong Urban-Rural Trained by the ADB expert of environment Development Group Chen Bin General Manager management 15330557766

74 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

Gezhouba 5 Construction (Group) Project Manager of 0717-6711042 Co., Ltd.; Yan Bing the Constructor Construction and Environment Management

Anhui Hydrological Zheng Project Manager of Development Co.,Ltd.; Bishui the Constructor Construction and Environment Management 023-67735119

Jiangsu Yancheng Zhang Project Manager of the Construction and Environment Management Hydrological Hongyu Constructor Construction Co.,Ltd. 0515-88335420

Chongqing Jianghe Xiao Wei Engeneering Supervising Engineer Construction Project Supervisor 13996939442 Supervision Co., Ltd.;

Wanzhou District Yangliu Water Supply Subproject, referred to as WZYL Wanzhou District Environmental Liu Feng Section Chief Environment Supervision and Management 13983506758 Protection Bureau

Wanzhou District Jing Li Section Chief Trained by the ADB expert of environment 18996513299 Project Management Office management Chen Person in Charge at Wanzhou Water Trained by the ADB expert of environment Guangming the Project Site of 13709439712 Company the Owner Unit management

75 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

Xinjiang Corps Water Resources and Hydropower Engineering

Group Co., Ltd.and Shanxi Metallurgical Rock-Soil Cao Project Manager of Engineering Furong the Construction Construction and Environment Management Reconnaissance General 13883738766 Unit Company Hubei Changjiang Peng Project Supervisor Project Supervision & Chief Supervising Engineer 13886100805 Consultancy Co.,Ltd. Jianfeng of the Supervision Unit

Fuling Road Subproject, referred to as FLLW

Fuling EPB Fu Xiaochi Director Environment Supervision and Management 023-72899936

Fuling Zhonglong Shi Bo Section director Trained by the ADB expert of environment management 023-72288242 Transportation Co,ltd Chongqing Qunzhou Yin Fulin Deputy manager Trained by the ADB expert of environment management 13896729903 Group Co,ltd Wang Fuling Transportaion Project manger Construction and Environment Management 13996729672 Chonggang construction Supervisor Supervising Co,ltd Zhang Meng representative Chief Supervising Engineer 13996936733 Shizhu Road subproject, referred to as SZLW

Shizhu County EPB Chen Xiaobo Section director Environment Supervision and Management 15520120001

Shizhu PMO Liu Fudi Section director Trained by the ADB expert of environment management 13908279910

Shizhu Transportation Cui Jianfeng Section director Trained by the ADB expert of environment management 13452259101 construction general Co. Ltd,.

76 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

Jiangxi Modern road bridge Gong Wen Engineering Group Co., Ltd. 13072838878 Project manager Construction and Environment Management Hunan Foreign Construction Yang Song 18225264345 Group Co. , Ltd.

Chong Qing Transportation Supervising Consulting Co., Li Xiaosong General supervisor Chief Supervising Engineer 17783809964 Ltd.

Chengkou County Road Network Improvement Subproject, referred to as CKLW

Chengkou County EPB Li Xingzhong Section director Environment Supervision and Management 023-59221458

Chengkou PMO Tian Hao Section director Trained by the ADB expert of environment management 15023852310

Urban traffic road construction I project Ran Zhao Representative Trained by the ADB expert of environment management 17749990988 department

Jiangxi Road Bridge and Zhao Qun Project manager Construction and Environment Management 18052072351 Tunnel Engineering Co., LTD

Heilongjiang Hualong Chen Bin Project manager Construction and Environment Management 13708304808 Construction Co., Ltd

Chong Qing traffic engineering supervising Hu Jiping General supervisor Chief Supervising Engineer 15310507892 consulting Co., Ltd.

77 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

Table 33 Complaints and handling during the reporting period

Count Date Complain Respond y 1. Buying tiles to help farmers repair their 1. Road construction and blasting cracked the roofs July-Dec roof tiles of peasant households' houses. 2. After the slope excavation is completed, the Shizhu ember Owners demanded compensation. cultivated land will be restored and the 2018 2. Slope excavation to damage cultivated temporary land occupation compensation will land, owners claim compensation be given to farmers. The commission, the township government, the owner, the design and supervision units jointly survey the site,under the help and coordination of the Damu town government, the agreement was reached after consultation with the households. Negotiation results: Cash compensation or the construction of a At the right side of K6+560, a second floor of connecting ramp for household. However, June a house is equal to the height of the roadbed, there is no specific implementation yet 2018 Causing inconvenience for residents to travel because the Contractor stopped the site work till the end of Dec 2018. The subgrade Fuling elevation along this section has been reduced by about 2 m--3 m to match up the yard elevation, so the road has no negative influence on the life of the family currently. The cutting earth has been utilized for filling work nearby. There is no impact on the environment. During the foundation excavation of In the upstream of the construction, reinstalled BK3+100-BK3+800 section retaining wall the water pipe to the other side of the river to August construction, because the foundation is in the avoid the construction area. The water pipe 2018 Maxi River, the excavation process affects repair work was completed in early December the drinking water source of some residents 2018. in Yuelai Town.

3.8 Focused Issues in the Current Period

3.8.1 Construction Environmental Protection Implementation in Fuling Damu Nature

Reserve Area

On January 19, 2019, the EMT (Wang Hong, Yan Guangcong and Yin Jian ), together with

Pang Kaiwen, the representative of the project construction unit, carried out a special

environmental protection inspection on the construction site of Fuling Damu rural road

sub-project. During the inspection, the construction unit introduced the implementation of the

project and the existing problems. The EMT inspected the construction starting point of the road,

the construction section of H-steel reinforced Pile-retaining wall, the section of Jiayu Mining

78 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

Road, the section of retaining wall along Maxi River, the end of the road and the temporary dump along the road, the environment expert gave on-site guidance to the environmental protection work of the construction unit, and put forward suggestions and rectifications for the existing problems. I. Site Inspection

At present, the construction progress of JuanDa road is lagging behind the original schedule. Approaching Spring Festival, most of the construction sites have been stopped. 1. Road Starting Point JuanDa road start point is located about 60 meters above the opposite bank of Maxi River, and only a few earthwork and retaining walls have been conducted. Field observation shows that the forest outside the roadbed of near maxi River is seriously damaged due to waste spoil dumping, and the slope is not treated by slope repair, which is very easy to cause soil erosion. According to the introduction of the IA Mr Pang, the contractor has been seriously criticized, requiring its rectification, strengthening the construction management and random destruction of trees is not permitted any more in the future.

JuanDa road is located on the opposite bank of Maxi River

2. H-steel reinforced pile slab retaining wall construction The section is adjacent to Maxi River, and there are small hydropower stations to be demolished below. Considering the characteristics of bedrock beneath the slope, H steel reinforced piles are used in the construction of pile-slab retaining wall. The disturbance to surrounding environment at the construction site is smaller and the site management meets the requirements, which has no effect on the vegetation and the Maxi River below.

79 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

. Construction site of H steel reinforced pile-slab wall 3. Jiayu Mining Section Jiayu Mining is a closed small pyrite mine. Its production office buildings and ore unloading facilities are located on both sides of JuanDa road, close to Maxi River. The slope of this section is steeper, runoff is larger in rainy days, and erosion is serious. Field observation found that the production of office buildings and other facilities are unattended, production has been suspended for a long time, surrounding and pavement scattered with cinder, slag sludge, pavement water and runoff can be visually detected a small amount of oil stains, roadside ditches seriously damaged, rainwater and sediment spilled into the Maxi River. At present, there is no road construction in this section.

Maxi River and damaged roadside ditches along Jiayu Mining Road

80 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report 4. Construction Section of Pile-slab Retaining Wall along Maxi River In the steep slope section above Jiayu Mining Section, along the side of Maxi River, there are hundreds of meters long piled-slab wall which will act as slope protection and river bank protection. At present, the basic foundation construction has been completed, and the construction formwork has not yet been dismantled. According to the site inspection, there is no construction camp on the site, and there are construction ramps on the river side, which have been leveled out, the site management is in order. There is no obvious sign of out-of-road disturbance and environmental damage. The IA manager said, in the rainy season of 2018, mountain flood broke out in this section. Because of the sudden and rapid onset of mountain flood, some gravel and materials on the river side were washed away, and the rural water pipeline near the downstream was damaged, resulting in complaints, which had been compensated after the flood. The damaged water pipeline had been repaired and moved to the opposite side of the river where it was originally located, and the water supply had not been affected after the restoration.

Retaining wall and bank protection section

5. Temporary dump

There is a temporary storage yard at K5 where excavation waste generated by construction are stored. Site inspection found that the temporary storage site is located in the hilly plain, the terrain is relatively flat; the soil has been leveled, the height is low, the slope is gentle, there is no safety risk, serious erosion and soil erosion signs; but the dump site has not set up the necessary environmental protection facilities such as effective protection and interception drainage ditches, sedimentation tanks and so on. There are a small number of

81 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report construction boards and dry latrines beside the existing highway. The IA indicates that a small amount of domestic sewage is transported to nearby villages for agricultural fertilizer.

Because it is located in Damu Nature Reserve and secondary water source reserve, the temporary dump site does not meet the requirements of relevant laws and regulations, and should be closed as soon as possible. According to contractor manager, the temporary discarded crushed stone and spoil can be used for subsequent road construction filling.

Temporary dump site 6. End of JuanDa Road The terminal of this project is connected to Damu Township. Some existing rural roads are seriously damaged. The construction has started, but it is only at the early stage of construction. There is no construction blocking, drainage interception and sedimentation measures are set up on site.

Terminal Site of the Project

82 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report II. Main Problems Existing and Suggestions for Rectification

Based on the on-site inspection and the analysis of the communication between the EMT and the IA and contractor, the following findings and problems can be summarized, and some suggestions and rectification measures are put forward. Some suggestions have been directly fed back to the representatives of the contractor on site.

1. Project progress:

Due to land acquisition, alignment changes and other reasons, the current construction progress is seriously lagging behind. Most of the construction personnel have been evacuated from the construction site due to approaching Spring Festival. The % of completion is about

17 %,

2. Environmental management and training:

Contractor has a clear understanding of the work background of the project, which is located in nature reserves and highly sensitive to the environment, but overall, there are many deficiencies in environmental protection training and environmental management system in the pre-construction stage of the project, they need more comprehensive environmental protection training. The environmental management system and full-time and part-time personnel are not perfect, and the environmental protection requirements and signs on site are not good.

It is suggested that comprehensive environmental protection training should be carried out as soon as possible after the start of follow-up construction, and all participating units should be urged to establish and improve the environmental management system, clarify their responsibilities and ensure that relevant management work is in place. Environmental protection management system and personnel responsibilities should be issued through official documents and paper and electronic documents should be retained.

Each participating unit shall set up environmental protection record, and keep the image data comparison before and after the project, the quantity record of completed environmental protection facilities and the text and image record of main facilities on the site. Environmental accidents and complaints arising in the construction process should be dealt with in time, and complete incident records should be kept. The contractor should improve the civilized construction and environmental protection signs.

83 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

3. Environmental sensitive zone protection:

JuanDa Road is not only located in the experimental area of nature reserve, but also part of the road section crosses the scope of drinking water secondary water source protection area. According to relevant laws and regulations, environmental impact assessment and EMP regulations, no dump sites are allowed in the sections crossing nature reserve and water source protection area, and sewage discharge is strictly prohibited in the water source protection area. The contractor must strictly implement relevant regulations and carry out comprehensive rectification. The local administrative department of environmental protection should be consulted as soon as possible for the protection of water resources protection zones.

The temporary dump site in the protected area should be relocated or used in filling as soon as possible. The environmental protection measures such as construction blocking, drainage ditch interception, sand sink, etc. should be set up. The waste water generated by the construction should be treated and reused for sprinkling water, dust removal, greening, etc. It should not be discharged out. The construction solid waste must be transported and disposed, and the discharge of sewage and waste into Maxi River must be strictly prohibited. Considering the irregularities of damaging trees outside the roadbed in the previous construction, the protection of plants must be emphasized in the follow-up construction, and the damage of trees outside the red line of road and temporary land must be strictly prohibited. 4. Coordination and management with related parties and facilities: (1) Coordination with Jiayu Mining Industry The houses and production facilities of Jiayu Mining are adjacent to JuanDa road. In addition to economic compensation, the houses and production facilities must be demolished for road expansion. The building waste, scrap metal, slag and oil pollution generated by demolition may cause pollution to the nearby Maxi River. It must be properly handled and transported out in time for disposal. (2) Coordination of reservoir diversion project

There is a Shuangjiang Reservoir diversion project near Damu town section of JuanDa road ( IA please check its construction schedule) implemented at the same time. Some of its construction sites are close to the ADB JuanDa road, which may overlap with JuanDa road construction behavior.. It might be difficult to distinguish the ecological damage and

84 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report environmental pollution caused by the two projects. Therefore, the contractor should coordinate with other project implemented at the same time as possible, minimize the adverse environmental impact in the same construction area, and clarify their respective responsibilities. In actual construction, it is particularly important to clarify the scope of construction sites, especially temporary land. When conditions permit, temporary land for construction can also be shared, but it is necessary to clarify their respective environmental protection responsibilities.

3.8.2 Detection of Heavy Metals in Sediment of Rongfeng River in Rongchang

During the implementation of the Rongfeng River flood management sub-project, after drying, most of the river bottom silt removed was backfilled into the greening area of C03 of the project, and a few of the silt could not be used, which was transported by garbage trucks to the designated garbage dump in for landfill treatment in August 2017.

The detection report of the sediment of Rongfeng River is attached as AppendixI.

3.8.3 Water Source of Wanzhou Yangliu Waterworks Since the new water source transmission tunnel of Yangliu Waterworks has not been put into construction yet, the water source of Ganning Reservoir is being used temporarily at present, which is also the water source of existing Wanzhou Jiangbei Water Supply. The water quality monitoring report and records of Ganning Reservoir in 2017 and 2018 is as follows figures. It can be seen that the management of Ganning water resource is in order and complies with the national regulations.

85 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

86 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

Water Quality Monitoring Report of Ganning Reservoir in 2017

87 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

Table 34 Water Quality Monitoring Report of Ganning Reservoir in 2018

Monitoring results water temperature ℃pH Dimensionless othermg/L Sample Sample name Analysis time water dissolved Permanganate ammonia total number PH value BOD5 copper temperature oxygen index nitrogen phosphorus / 8.47 9.60 2.62 2.41 0.501 0.048 <0.005 Chromium Source zinc fluoride selenium arsenic mercury cadmium lead WS20 (hexavalent) Water of 2018.12.6- 1812 <0.005 0.271 0.0006 <0.0002 <0.00001 <0.005 <0.004 <0.02 Jiangbei 12.18 026 Waterworks Volatile Nitrate cyanide sulfate chloride iron manganese phenol nitrogen <0.004 <0.0003 25.0 / 1.22 <0.03 <0.01

88 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

Relevant Documents of Chongqing Municipal Government:

89 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report Ganning Reservoir Cleaning and Drifting Records:

90 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report Records of on-site monitoring of environmental protection:

91 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report Ganning Reservoir Patrol Records:

92 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report Ganning Reservoir Drinking Water Source:

Overview of Drinking Water Source of Ganning Reservoir

Ganning Reservoir Drinking Water Source Intake

93 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report Relevant identification marks:

Signs of Class I and II Water Source Protection Zone of Ganning Reservoir

Identification mark

Announcement on Water Environmental Protection and Control of Ganning Reservoir

Protected Area Signs

94 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

Brief Introduction of Water Source Protection Project of Ganning Reservoir Ganning Reservoir Primary Protected Area Isolation Network

Water intake sign

Boundary Stele of Water Source First and Second Protected Areas of Ganning Reservoir

Water Source Protection System of Ganning Reservoir Inspection System of Water Resources Protected

95 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report Areas

Duties of Ganning Reservoir Floats cleaner

96 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report Relevant equipment and operation:

Video surveillance equipment in Ganning Reservoir Class I Protected Area On-line monitoring equipment for water quality of Ganning Reservoir

Floats cleaning ship Ganning Lake No.7 and No.8

97 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

Floats cleaning operation Garbage handling operation

Effect of Pre-dam cleaning Effect of Cleaning Up the Tail of the Reservoir

Dissuade fishermen

98 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

Emergency drill of water pollution in Ganning Reservoir

Publicity slogans for water source protection of Ganning Reservoir

99 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

4 CONCLUSION AND RECOMMENDATION

4.1 Conclusion

According to the above content, it can be seen that the environment management plans of the Rongchang Rongfeng River Flood Management Subproject, Wulong Wujiang Flood Management Subproject and Wanzhou District Yangliu Water Supply Subproject, Fuling and Shizhu road subproject and Chengkou County Urban-rural Road Network Improvement Subproject, during the civil engineering construction, have been basically implemented, which can be primarily presented by: 1. Institutional responsibility: all sub-projects have set up integrated environmental management institutions in accordance with EMP and clarified respective responsibilities and followed environmental management throughout the whole process; 2. Contractor’s obligation and performance: contractor accepts proprietor unit’s and supervising unit’s management during the construction; contractor and supervisor carry out internal monitoring regularly in accordance with requirements and submit supervising monthly report to proprietor; at the same time, strictly implement environmental alleviation measures according to EMP and continually improve and develop corresponding environmental alleviation measures. 3. Implementation of alleviation measures: according to site inspection, among all sub-projects under construction, WZYL, RCRF, WLWJ, CKLW adopted corresponding environmental alleviation measures according to EMP. Because FLLW just started, some environmental alleviation measures were not conducted good enough as required by EMP. 4. Monitoring plan and result: for subprojects under construction, WZYL carried out monitoring of all parameters in accordance with plan listed in EMP and results all meet related standards. Only monitoring of air environment did not implement in accordance with plan (only undertook monitoring at nearby sensitive points around construction sites); RCRF undertook monitoring of all parameters in accordance with plan listed in EMP to a large degree and its results all meet related standards while monitoring of air environment and surface water environment did not implement in accordance with the plan( air environment: only undertook monitoring at nearby sensitive points around construction sites; surface water: only select a monitoring point at downstream) 5. Training: during the reporting period, no intensive trainings were conducted by CPMO and

100 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

Consultants for IAs and PMO staff. It is emphasized that Fuling road contractor should strength the implementation of EMP. 6. Public Consultation and Complaints: after the notice of environmental impact assessment was conducted to the subprojects on the website of environmental protection agency during the early construction period, complaint organization and hotline were established in the primary department in the villages and towns of projects. Due to the restrictions, different forms of public consultations were conducted to the subprojects (such as Wanzhou, Wulong and Chengkou because subprojects were in the towns for construction where population was dense. Contractors would organize the neighboring residents to have an informal discussion occasionally and have notice about the construction situation of at the construction site and department of project. However, the population of subprojects along Shizhu and Fuling was relatively less. Thus, notice was only conducted to the construction site and project department). Complaint hotline was established in the primary government of subprojects. It was strictly conducted according to the requirement to deal with the complaint. From the current feedback result, the public of subprojects had supportive attitude to the implementation of projects. It was expected to finish the project as soon as possible so as to enlarge the beneficiary range. 7. Wulong subproject contractors of anchor cable anti-sliding wall has rectified the slurry discharge by setting up small sediment pools and further conveying solid waste to spoil ground. Shizhu contractors will remove the waste soil generated by roadbed land sliding ASAP from the valley to spoil ground. Fuling water transmission pipe damaged has been rebuilt in time in August 2018. Urge the IAs and PIUs to enhance the inspection on environmental management measures. In general, EMP and adverse environmental mitigation measures formulated at early stage have been implemented effectively and yielded good results. Most of the construction camps and construction sites are minimized from waste water, construction dust, smoke dust and noise disturbance and solid waste is discarded or discharged orderly. Construction sites and its surrounding environment are in good quality and complaints have not been received so far in terms of environmental pollution.

101 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

4.2 Recommendations

(1) Fuling Road Project is located in the nature reserve, while is adjacent to the Maxi River which is the secondary water source. The Fuling owners and environmental consultants should strengthen the training of the contractor on environmental protection policies and mitigation measures to ensure that the construction process in the next stage can be carried out in accordance with EMP. At present, the progress of the Fuling project is slow, only 17%. It is expected that after the Spring Festival of 2019, the large-scale construction of the retaining walls and bridges along the river will be fully carried out. At that time, environmental protection measures will be the key monitoring indicators. (2) Some indexes of surface water monitoring of Rongfeng River in Rongchang exceed the standard. Even it is nothing to do with ADB Rongchang subproject, but we hope that Rongchang IA could report this to Rongchang Government to take necessary action. (3) Some sub-projects materials are scattered and uncovered. It is suggested that site management be strengthened.

102 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

5 PICTURES

The following pictures are the pictures of implementation progress and environment protection on the field of Rongchang Rongfeng River Flood Management Subproject, Wulong Wujiang

Flood Management Subproject and Wanzhou District Yangliu Water Supply Subproject, Fuling and Shizhu road subproject and Chengkou County Urban-rural Road Network Improvement

Subproject

103 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

Rongchang RongFeng River Comprehensive Flood Control Subproject

104 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

Wanzhou Water Supply Subproject

Construction progress

105 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

Wulong River Flood Control Project

106 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

107 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

Fuling Urban and Rural Road Network Reconstruction Project

108 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

Shizhu County Urban and Rural Road Network Reconstruction Project

109 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

Chengkou County Urban and Rural Road Reconstruction Project

110 ADB Chongqing Urban-rural Infrastructure Development Demonstration Project II - External Environmental Monitoring Report

6 APPENDIX

Appendix I: Rongchang Rongfeng River Silt Test Report

Appendix II: External Monitoring Test Report by Qualified Third Party

111