SENARAI PROJEK PPR DAN STATUS PELAKSANAAN DI SELURUH NEGARA SEHINGGA 31 DISEMBER 2011

JUMLAH KESELURUHAN PROJEK : 119 JUMLAH UNIT : 84,131

PPR DISEWA

JUMLAH PROJEK KESELURUHAN : 88 JUMLAH UNIT : 76,159

SENARAI PROJEK SIAP

JUMLAH PROJEK SIAP: 64 JUMLAH UNIT : 62,716

BIL PROJEK SIAP PPR DISEWA BERSEPADU (RMKE-8) BIL. UNIT KUALA LUMPUR 32,762 1 PPR SUNGAI BESI 632 2 PPR TAMAN WAHYU I 1,896 3 PPR TAMAN WAHYU II 948 4 PPR PEKAN BATU 632 5 PPR KG. BATU MUDA 2,132 6 PPR LEMBAH PANTAI KERINCHI 1,896 7 PPR PUDU ULU 948 8 PPR INTAN BAIDURI 1,834 9 PPR KL LINEAR CITY I 316 10 PPR KL LINEAR CITY II FASA I 1,264 11 PPR KL LINEAR CITY II FASA II 632 12 PPR SALAK SELATAN 632 13 PPR KG. SERI 632 14 PPR KG. MALAYSIA PERMAI 1,264 15 PPR SG. BONUS AIR JERNIH 2,212 16 PPR KG. BARU AIR PANAS TAMBAHAN 2,528 17 PPR KG. MUHIBBAH JALAN PUCHONG 2,844 18 PPR JLN. COACHRANE 1,620 19 PPR KG. LIMAU PANTAI DALAM 632 20 PPR AMPANG HILIR 948 21 PPR JLN. LAPANGAN TERBANG LAMA FASA 1 660 22 PPR JLN. LAPANGAN TERBANG LAMA FASA 2 920 23 PPR PEKAN KEPONG 948 BIL PROJEK SIAP PPR DISEWA RMKe-8 BIL. UNIT 6,868 1 PPR 2,000 2 PPR SRI 1,500 3 PPR PASIR PELANGI 960 4 PPR TAMPOI 2,252 5 PPR , 102 6 PPR FASA II, 54 SABAH 3,500 7 PPR JLN. SAGINDAI, KINARUT 500 PPR BATU 4 1/2 JALAN TENGAH NIPAH LAHAD 8 700 DATU 9 PPR GUM-GUM, SANDAKAN 500 10 PPR PEKAN BELURAN 400 11 PPR BATU 8, JALAN APAS, TAWAU 900 12 PPR BATU 7, JALAN ARMY CAMP, SANDAKAN 500 JUMLAH KESELURUHAN 10,368

BIL PROJEK SIAP PPR DISEWA RMKe-9 BIL. UNIT 500 1 PPR SEDUAN, 500 JUMLAH KESELURUHAN 500

DALAM PELAKSANAAN

JUMLAH PROJEK : 22 JUMLAH UNIT : 12,993 PROJEK DALAM PELAKSANAAN PPR BIL BIL UNIT BERSEPADU SABAH 1,000 1 PPR KG. KIANSOM BESAR, INANAM** 1,000 SARAWAK 500 2 PPR KG. , ,SARAWAK 500 JUMLAH KESELURUHAN 1,500

PROJEK DALAM PELAKSANAAN PPR DISEWA BIL BIL UNIT (PROJEK SAMBUNGAN RMK8)

SABAH 3,599 1 PPR BUKIT PADANG, KK 775 2 PPR JLN. UPPER, KUDAT 500 3 PPR PEKAN KINARUT 725 4 PPR KUNAK 400 5 PPR KENINGAU 300 6 PPR BT 2 1/2, BUBUL LAMA, SEMPORNA 832 7 PPR SELAGON 67 JUMLAH KESELURUHAN 3,599

PROJEK DALAM PELAKSANAAN PPR DISEWA BIL BIL UNIT (PROJEK BARU RMK9) SABAH 3,196 1 PPR JALAN LABUK 1,000 2 PPR JALAN LINTAS SIBUGAR 500 3 PPR PEKAN MUHIBBAH 500 4 PPR KG. KETIAU, PUTATAN 696 5 PPR KG. MERUNTUM, PUTATAN 500 SARAWAK 1,000 6 PPR KEMENA 1,000 JOHOR 1,170 7 PPR SG. MELANA 1,170 NEGERI SEMBILAN 150 8 PPR LADANG SILIAU PORT DICKSON 150 PERAK 240 9 PPR BATU 2 1/2 TAIPING 240 MELAKA 336 10 PPR BATU BERENDAM 336 TERENGGANU 1,002 11 PPR PADANG HILIRAN 1,002 JUMLAH KESELURUHAN 7,094

PROJEK DALAM PELAKSANAAN PPR DISEWA BIL BIL UNIT (PROJEK BARU RMK10)

SELANGOR 300 1 PPR KG. HASSAN 300 SABAH 500 2 PPR BATU SAPI, SANDAKAN, SABAH 500 JUMLAH KESELURUHAN 800

PPR DIMILIKI

JUMLAH SEMUA PROJEK PPR DIMILIKI : 31 JUMLAH UNIT : 7,972

SENARAI PROJEK SIAP

JUMLAH PROJEK SIAP : 22 JUMLAH UNIT : 3,062

BIL PROJEK BIL.SIAP 1 , PEKAN 318 2 HINAI,PEKAN 150 3 TG. AGAS, PEKAN 150 4 PAMAH KASEH 150 5 JENGKA, 300 6 PADANG TENGKU, LIPIS 100 7 TG. PUTUS, RAUB 100 8 KG. HIJRAH, 150 9 KG. BARU, GAMBANG 150 10 BUKIT MENDI, BERA 150 11 KG. , ROMPIN 150 12 MUADZAM SHAH, ROMPIN 150 13 KERAMBIT, LIPIS 100 14 BATU 17, JLN. TERSANG, RAUB 150 15 BOLOK HILIR, TEMERLOH 150 16 TG. BATU, NENASI 150 17 TG. SELANGOR FASA 1, PEKAN 100 18 PAYA SOK, TEMERLOH 100 19 TG. SELANGOR FASA 2, PEKAN 62 20 LEBAN CHONDONG, ROMPIN, 100 21 IBOL TUNGGAL, 100 22 KUALA PAHANG FASA II, PEKAN 32 JUMLAH KESELURUHAN 3,062

DALAM PELAKSANAAN

JUMLAH PROJEK : 7 JUMLAH UNIT : 3,590

BIL PROJEK UNIT PAHANG 1 SIMPANG PELANGAI, KG 129 2 BANDAR BARU FASA II, JERANTUT 47 3 KG. PANDAN LUAR, PEKAN 164 4 KG. SERI JAYA, MARAN 150 JUMLAH KESELURUHAN 490

PROJEK DALAM PELAKSANAAN PPR DIMILIKI BIL BIL UNIT (PROJEK BARU RMK10) KELANTAN 1,000 1 PPR GUA MUSANG 1,000 WPKL 2,100 2 PPR KEPONG 1,600 3 PPR SENTUL 500 JUMLAH KESELURUHAN 3,100

DALAM PERANCANGAN

JUMLAH PROJEK : 2 JUMLAH UNIT : 1,320 PROJEK DALAM PERANCANGAN PPR DIMILIKI BIL BIL UNIT (PROJEK BARU RMK10) PAHANG 120 1 PPR KG. TEKEK, TIOMAN 120 SABAH 1,200 2 PPR INANAM, KOTA KINABALU 1,200 JUMLAH KESELURUHAN 1,320 SENARAI PERUMAHAN AWAM KOS RENDAH (PAKR)

Unit Bil. Bil. Jumlah Unit Unit Siap Jangka Nama Projek RMK- 8 & RMK- RMK-8 Siap RMK- (1) (2) 9 9

PERLIS 591 487 1,078 1 1 PAKR Kangar V 164 2 2 PAKR Berseri Paya III 92 3 3 PAKR Tambun Tulang 335 4 4 PAKR Wang Kelian 148 5 5 PAKR Santan II 339

KEDAH 2,034 0 2,034 6 1 PAKR Bandar Baharu 194 7 2 PAKR Selama, Bandar Baharu 108 8 3 PAKR Lubuk Buntar, Bandar Baharu 392 9 4 PAKR Penempatan Nelayan K. Kedah 700 PAKR Penempatan Setinggan A. 640 10 5 Setar

PULAU PINANG 0 864 864 11 1 PAKR Kg. Besar, Mukim 12 429 12 2 PAKR Pdg. Cempedak, Mukim 13 435

PERAK 348 104 452 13 1 PAKR Sayong, Kuala Kangsar 144 14 2 PAKR Pengkalan Hulu IV 65 15 3 PAKR Grik III, Fasa II 139 16 4 PAKR Jalan Bemban II, Fasa III 104

NEGERI SEMBILAN 605 0 605 17 1 PAKR Kg. Halacara Baru, Gemas 300 18 2 PAKR Kg. Air Hitam, Jempol 160 19 3 PAKR Pengkalan Durian, Fasa II 145

MELAKA 3,564 0 3,564 20 1 PAKR Bukit Larang 400 21 2 PAKR Padang Sebang, Alor Gajah 365 22 3 PAKR Tg. Dahan II, Alor Gajah 542 23 4 PAKR Kuala Sg. Baru VI, Alor Gajah 328 24 5 PAKR Paya Datuk III, Alor Gajah 494 25 6 PAKR Pulai, Jasin 402 26 7 PAKR Chinchin, Jasin 420 27 8 PAKR Beringin, Alor Gajah 305 28 9 PAKR Kelubi, Jasin 308

JOHOR 742 0 742 29 1 PAKR Bandar II 267 30 2 PAKR Jln. Mohd. Yassin, Keluang 125 31 3 PAKR Bukit Siput III, Segamat 120 32 4 PAKR , , 156 PAKR Kg. Melayu Kangar Pulai, Fasa 74 33 5 II

PAHANG 4,178 0 4,178 34 1 PAKR Bukit Goh, Kuantan 1,446 35 2 PAKR Kerayong, Bera 200 36 3 PAKR Ketapang, Pekan 150 37 4 PAKR Batu Embun, Fasa II 38 38 5 PAKR Sg. Pandan, Kuantan 2,000 39 6 PAKR , Termeloh 197 40 7 PAKR Luit, Maran 147

TERENGGANU 2,194 156 2,350 41 1 PAKR Kg. Buluh Permaisuri 108 42 2 PAKR Kerteh II 260 43 3 PAKR Mak Kemas, Marang 239 44 4 PAKR Mengabang Lekor 250 45 5 PAKR Pulai Serai, Dungun 156 46 6 PAKR Sg. Kerak, Marang 245 47 7 PAKR Kg. Anak Ikan Jabi, Besut 204 48 8 PAKR Kg. Gong Tengah, Besut 160 49 9 PAKR Kg. Lak Lok, Besut 140 50 10 PAKR Banggol Peradong 238 51 11 PAKR Pasir Gajah, Kemaman 150 52 12 PAKR Kg. Padang Setengge 200

SABAH 208 180 388 53 1 PAKR Kota Kinabatangan, Sandakan 208 54 2 PAKR Kunak Fasa I, Lahad Datu 180

SARAWAK 9,333 1,344 10,677 55 1 PAKR Bt. 13, Jln /Serian 1,006 56 2 PAKR III, Limbang 404 57 3 PAKR Matang (Kot 12946) 510 58 4 PAKR Matang Batu 6 900 59 5 PAKR Matang Batu 8 978 60 6 PAKR Matang Batu 9 512 61 7 PAKR 2, Kuching 312 62 8 PAKR 2B, Sri Aman 288 63 9 PAKR Kota Semarahan, Kuching 396 64 10 PAKR Samariang, Kuching 2,200 PAKR Sibu Baru (II-IV), Sibu 1,680 65 11 Tambahan 66 12 PAKR Ladeh, Kuching 459 67 13 PAKR , 235 68 14 PAKR Kuala Baram (Lutong), 500 69 15 PAKR Marudi, Miri (Batu Kitang) 297 JUMLAH 23,797 3,135 26,932