Zoning: IX-3 w/ SHOD-2 Planner: Martha Lobo CAC: North Phone: (919) 996-2664 Drainage Basin: Perry Creek Acreage: 1.0 Applicant: Qomaq, Ahmed Sq. Ft.: 1,428 City of Raleigh Development Services Department Administrative One Exchange Plaza Raleigh, NC 27602 (919) 996-2495 Approval Action [email protected] SR-7-17 / Deme Motors www.raleighnc.gov Transaction # 500763, AA # 3818

LOCATION: This site is located on the west side of Becky Circle. The site is addressed at 7209 Becky Circle, which is inside .

REQUEST: Development of a 1.00 acre tract zoned IX-3 with SHOD-2 overlay into a general for commercial use with 1,800 SF of gross floor area.

DESIGN ADJUSTMENT(S)/ ALTERNATES, ETC: A Adjustment was approved for UDO Section 8.3.2 providing relief from block perimeter requirements.

FINDINGS: City Administration finds that this request, with the below conditions of approval being met, conforms to the Unified Development Ordinance. This approval is based on a preliminary plan submitted by Khaled Al-Zoubi of IC , Inc.

CONDITIONS OF APPROVAL and NEXT STEPS:

Note: This document must be applied to the second sheet of all future submittals with the exception of final .

PRIOR TO THE ISSUANCE OF ANY SITE PERMITS OR APPROVAL OF CONCURRENT REVIEW PROCESS, WHICHEVER IS APPLICABLE:

GENERAL

1. On the Concurrent Plans, plans shall be revised to show landscaped terminal parking islands will be provided for the southwestern row of parking to show compliance with UDO 7.1.7.D.3.

2. On the Concurrent Plans, landscape plans shall be revised to show details for all proposed landscape plantings and clearly demonstrate compliance with UDO 7.2.7.

3. On the Concurrent Plans, the elevation sheet(s) will be updated so the elevation profiles are labelled correctly with regards to the building façade being represented.

4. On the Concurrent Plans, transparency calculations will be provided for the street-facing building façade and will comply with UDO Section 3.2.5 and 1.5.9 design standards.

5. On the Concurrent Plans, landscape plans shall be revised to show the proposed BMP will meet screening requirements of UDO 7.2.6.

ENGINEERING

6. Next Step: A right-of-way obstruction permit must be obtained from Right-of-way Services prior to the commencement of any activities within the right-of-way.

SR-7-17 Deme Motors 1

City of Raleigh Development Services Department Administrative One Exchange Plaza Raleigh, NC 27602 (919) 996-2495 Approval Action [email protected] SR-7-17 / Deme Motors www.raleighnc.gov Transaction # 500763, AA # 3818

STORMWATER 7. Next Step: A control plan with a stormwater operations and maintenance manual and budget shall be approved by the Stormwater Engineer in compliance with Part 10A Chapter 9 of the Unified Development Ordinance.

8. Next Step: In accordance with Part 10A Section 9.4.4 of the Unified Development Ordinance, a surety equal to of the cost of clearing, grubbing and reseeding a site, shall be paid to the City.

9. Next Step: A payment equal to twenty-four percent (24%) of the estimated cost of constructing all stormwater control facilities shown on the development plans shall be paid by the developer to the City stormwater facility replacement fund.

10. Next Step: The flood prone areas, as approved by the City Stormwater Engineer and shown on the preliminary plan, shall be shown on all plans for permitting and on the recorded map.

PRIOR TO ISSUANCE OF BUILDING PERMITS:

GENERAL

11. A Final shall be recorded with the Wake Register of Deeds office for all Right Of Way and/or Easement Dedications, and Save Areas.

12. Provide fire flow analysis.

ENGINEERING

13. The required right of way for proposed and/or existing streets shall be dedicated to the City of Raleigh and be shown on a plat approved for recordation.

14. A 5’ general utility easement and associated deed of easement shall be approved by the City and the location of the easement shall be shown on the map approved for recordation. The deed of easement shall be recorded at Wake County Register of Deeds within one (1) day of recordation of the recorded plat. A recorded copy of these documents must be provided to the Development Services Department.

15. Next Step: A right-of-way obstruction permit shall be obtained from Right-of-way Services for any construction activity within the right-of-way.

STORMWATER

16. Next Step: The developer shall pay to the City a stormwater facility replacement fund payment equal to twenty-four percent (24%) of the estimated cost of constructing all stormwater control facilities shown on the development plans.

17. Next Step: The flood prone areas, as approved by the City Stormwater Engineer, must be shown on the preliminary plan and shall be shown on the recorded map;

18. Next Step: The riparian buffers, in accordance with the preliminary plan and the of North Carolina , shall be shown on plats for recording along with a note stating: “The areas

SR-7-17 Deme Motors 2

City of Raleigh Development Services Department Administrative One Exchange Plaza Raleigh, NC 27602 (919) 996-2495 Approval Action [email protected] SR-7-17 / Deme Motors www.raleighnc.gov Transaction # 500763, AA # 3818

shown on the recorded plat identified as Neuse River Riparian Buffer shall be maintained in their natural or mitigated condition, No person or entity shall fill, grade, excavate, or perform any other land-disturbing activities; nor cut, remove, or harm any vegetation; nor construct any structures nor add any additional impervious surface, nor allow animal grazing or or any other agricultural use on such protected areas without written authorization from the state of North Carolina in accordance with the Riparian Buffer Protection Rules (15A NCAC 2B.0233 or .0259).”

19. Next Step: In accordance with Part 10A Section 9.2.2, a surety equal to 125% of the cost of the construction of a stormwater device shall be paid to the Engineering Services Department.

URBAN FORESTRY

20. A tree impact permit must be obtained for the approved streetscape tree installation in the right of way.

Prior to issuance of building occupancy permit:

1. All Water, Sanitary Sewer and Reuse facilities shall be installed, inspected, tested and accepted by the City of Raleigh Public Utilities Department for operations and maintenance.

2. Next Step: Required public right-of-way improvements shall be, at a minimum, sufficiently completed to provide the necessary, safe emergency and vehicular access.

3. Next Step: Required underground storm drainage improvements shall be completed and as-built plan(s) and certification(s) reviewed and accepted by the City of Raleigh Development Services – Development Engineering program.

4. Next Step: All street lights and street signs required as part of the development approval are installed.

5. Next Step: Copies of certified inspection reports for alleys and internal access ways are submitted to the City of Raleigh Development Services – Development Engineering program.

6. Next Step: As-built drawings and associated forms for all Stormwater devices are accepted by the Engineering Services Department

7. Next Step: Final inspection of all required Tree Conservation and right of way tree protection areas by Urban Forestry Staff.

SR-7-17 Deme Motors 3

BY DATE 04/28/17 REVISIONS COR TRC & DEME MOTORS 1 7 6 5 4 3 2 12/01/16 RTW ENGINEER OF RECORD KHALED AL-ZOUBI, PE PROJECT MANAGER RTW DRAWN BY SCALE:1"=30' FIRST ISSUE DATE 5121 KAPLAN DRIVE WWW.ICENGINEERINGINC.COM C-1316 RALEIGH NC 27606 (919) 271-0051 SR-7-17 #500763 PIN: 1727055295 DEME MOTORS - RALEIGH, NORTH CAROLINA

PROJECT NO.

DRAWING NAME: NOT FOR COVER CONSTRUCTION SHEET NO. 00 BY

LEGEND DATE 04/28/17 REVISIONS COR TRC & DEME MOTORS 7 6 5 4 3 2 1 12/01/16 --- ENGINEER OF RECORD KHALED AL-ZOUBI, PE PROJECT MANAGER RTW DRAWN BY SCALE FIRST ISSUE DATE

HANDICAP ACCESSIBLE SIGN MOUNTED ON

VAN ACCESSIBLE SPACE DETAIL 5121 KAPLAN DRIVE WWW.ICENGINEERINGINC.COM C-1316 RALEIGH NC 27606 (919) 271-0051

CL

5' CITY 69' PUBLIC R/W 5' CITY UTILITY UTILITY EASEMENT EASEMENT 14' 41' B-B 14'

2' 6' 6' 2.5' 6' 12' 12' 6' 2.5' 6' 6' 2' PARKING PARKING

2:1 MAX. GRADE POINT 1/4"/FT 1/4"/FT 2:1 MAX. 1/4"/FT 1/4"/FT 2:1 MAX.

2:1 MAX.

CITY OF RALEIGH PAVEMENT DESIGN ROADWAY DATA PUBLIC WORKS DEPARTMENT WALKWAY TYPE BOTH SIDES 3" S9.5B REVISIONS DATE: 9/1/13 NOT TO SCALE PLANTING TYPE TREE/ 3" I19.0B TREE SPACING 40' O.C. AVG 8" ABC INDUSTRIAL STREET PARKING TYPE PARALLEL ON 2 SIDES

T-10.21

5' CITY UTILITY EASEMENT

2:1 MAX. SITE PLAN SR-7-17 #500763 PIN: 1727055295 - RALEIGH, NORTH CAROLINA DEME MOTORS

2:1 MAX. PROJECT NO.

DRAWING NAME:-----

PROPOSAL FOR (EXISTING R/W) BECKY CIRCLE SECTION @ 7209 BUILDING SHEET NO. C-1.00 LEGEND ’ ’ ¾” ” ” ’ ’ ’ ’ ’ ” ’ ” ’ ’ ’ ’ ’ ” ” ’

SHEET NO. DRAWING NAME: PROJECT NO. ENGINEER OF RECORD 7 DEME MOTORS KHALED AL-ZOUBI, PE 6 PROJECT MANAGER

C-4.00 ----- 5 -PIN: 1727055295 RTW RALEIGH, NORTH CAROLINA 4 3 5121 KAPLAN DRIVE DRAWN BY --- 2 UTILITY PLAN RALEIGH NC 27606 (919) 271-0051 1 COR TRC & DEME MOTORS 04/28/17 SR-7-17 #500763 WWW.ICENGINEERINGINC.COM SCALE FIRST ISSUE DATE C-1316 12/01/16 REVISIONS DATE BY 1. IT IS RECOMMEND THAT THE PHOENIX DESIGN BE USED HORIZONTALLY. REFERENCE NUMBER 048-090 NOTES: 5. DO NOT SCALE DRAWINGS. 7. CONTRACTOR'S NOTE: FENCE MAY BE CONSTRUCTED OF WOOD OR EQUIVALENT MATERIAL. 6. CONTRACTOR'S NOTE: FOR PRODUCT AND COMPANY INFORMATION VISIT WEBSITE 3. ALL DIMENSIONS ARE CONSIDERED TRUE AND REFLECT MANUFACTURER'S SPECIFICATIONS. 4. AMETCO'S ALUMINUM FENCING SYSTEM IS 100% MANUFACTURED IN THE . 2. INSTALLATION TO BE COMPLETED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. PHOENIX ALUMINUM FENCE DESIGN SYSTEM ALUMINUM FENCE SYSTEMS Dig and turn the soil No more than 1" of 1- Shrubs shall be of quality prescribed in the root observations detail and specifications. Notes: 2- See specifications for further requirements related to this detail. compaction to the recompacted soil. Root ball rests on 4" layer of mulch. specifications for mulch on top of area and depth Finished grade. Loosened soil. root ball. (See Slope sides of loosened soil. to reduce the existing or www.ametco.com FAX: (440) 951-2542 PHONE: (440) 951-4300 TOLL FREE: 1-800-321-7042 WILLOUGHBY, OHIO 44096 4326 HAMANN PARKWAY P.O. BOX 1210 AMETCO mulch). shown. Shrub. SHRUB - UNMODIFIED SOIL 3x's widest dimension of root ball. SECTION VIEW .CONTRACTOR IS RESPONSIBLE FOR 1. NOTES: .ELECTRICAL OUTLETS AND OTHER UTILITIES A TREE IMPACT PERMIT IS REQUIRED. 6. 5. STREET MUST BE 3" CALIPER AT 3. ADHERE TO STANDARDS IN THE CITY TREE 2. .PLANTING SEASON OCTOBER - APRIL. 4. IMMEDIATELY SURROUNDING THE TREE. INSTALLATION WITH A 5' MINIMUM FIRST BRANCH HEIGHT. MANUAL. (POSITIVE DRAINAGE AWAY FROM PIT) ARE PROHIBITED IN THE PLANTING AREA ADEQUATE DRAINAGE OF ALL PLANTING PITS. ROOTBALL DIAMETER' 3 X Existing soil. Prior to mulching, lightly tamp soil Berm shall begin at root ball periphery. Rootball. planting hole has been backfilled, pour berm above root ball surface shall be around the root ball in 6" lifts to brace constructed around the root ball. soil. shrub. Do not over compact. When the 4" high x 8" wide round - topped soil water around the root ball to settle pdet_shrub_unmodified soil URBAN TREE FOUNDATION OPEN SOURCE FREE TO USE FLEXIBLE TUBING. ALLOW FLEXIBILITY IN STRAPS DEAD OR UNHEALTHY BRANCHES DO NOT PRUNE LEADER. OR CUT ONLY FROM PLANTING. BUCKLE AND WARNING FLAGS. REMOVE ALL PROVIDED, PROTECT TREE WITH BROAD STRAP OR PROVIDE STAKING IF SPECIFIED. IS STAKING AND ACCESSORIES WITHIN ONE YEAR TO DEVELOP TRUNK TAPER. PROVIDE TURN PLUMB BELOW GRADE. REMOVE EXCESS SOIL TO EXPOSE NO HIGHER THAN 2" ABOVE GRADE, AND NEVER THE ROOT FLARE AT GRADE. TREE SHALL BE SET THE ROOT FLARE SHALL BE PLANTED AT GRADE, HOLE LACING AND WIRE BASKET DISCARD FROM COMPLETELY REMOVE TOP HALF OF BURLAP, WATER SAUCER SHALL BE NO MORE THAN 3" ABOVE GRADE ROOT BALL ONLY. ROOT BALL SHALL BE PLACED DIRECTLY ON HIGH QUALITY SOIL MIX AS SPECIFIED FLARE AND DO NOT CONTACT STEM COMPACTED SUBGRADE. HANDLE TREE BY THE MULCH DEPTH 3". KEEP 3" FROM ROOT DEPARTMENT URBAN FORESTER: CITY OF RALEIGH , AND CULTURAL CONTACT INFORMATION: WWW.RALEIGHNC.GOV [email protected]

© 2014

REVISIONS

PARKS, RECREATION AND CULTURAL RESOURCES DEPT

DATE: 9/1/13 CITY OF RALEIGH TREE PLANTING DETAIL

PRCR-03 NOT TO SCALE

SHEET NO. DRAWING NAME: PROJECT NO. ENGINEER OF RECORD 7 DEME MOTORS KHALED AL-ZOUBI, PE 6 PROJECT MANAGER 5 C-5.00 ------PIN: 1727055295 RTW RALEIGH, NORTH CAROLINA 4 3 5121 KAPLAN DRIVE DRAWN BY RALEIGH NC 27606 --- 2 LANDSCAPING PLAN (919) 271-0051 1 COR TRC & DEME MOTORS 04/28/17 SR-7-17 #500763 WWW.ICENGINEERINGINC.COM SCALE FIRST ISSUE DATE C-1316 VARIES 12/01/16 REVISIONS DATE BY BY DATE 04/28/17 REVISIONS COR TRC & DEME MOTORS 1 6 5 4 3 2 7 8 1/2" " 1 2

Roof 1'-9 12' - 0" 12/01/16 4'-0" --- 8'-0" ENGINEER OF RECORD KHALED AL-ZOUBI, PE PROJECT MANAGER RTW DRAWN BY SCALE FIRST ISSUE DATE 12'-0" 12'-0" 12'-0" 8'-0" 7'-0"

Level 1 3'-0" F.F.L 298.5' EXIST CURBLEVEL298.5' 0' - 0" 3'-0" 10'-0" 2'-8" 10'-0" 2'-6" 10'-0" 0'-7 1/2" 10'-0" 10'-1/2" 1'-2"

60'-0" 5121 KAPLAN DRIVE WWW.ICENGINEERINGINC.COM C-1316 RALEIGH NC 27606 (919) 271-0051 " 1 0'-8 1/2" 2 TRANSPARENCY

1'-9 Roof 10.67X8+5.5X8+3.08X11=(163.24)SF 12' - 0" 163.24/(30X12)=0.45 8'-0" 8'-0" 12'-00"

4'-5 1/2" 10'-8" 3'-0" 4'-9 1/2" 3'-1" 5'-6" 1'-6" Level 1 0' - 0" SR-7-17 #500763 - RALEIGH, NORTH CAROLINA PIN: 1727055295 DEME MOTORS BUILDING FLOOR PLAN NOT FOR PROJECT NO.

CONSTRUCTION DRAWING NAME: BUILDING

SHEET NO. B-1.00