List of Refurbishment of Government Building Projects Proposed in 2021-22

Total Page:16

File Type:pdf, Size:1020Kb

List of Refurbishment of Government Building Projects Proposed in 2021-22 List of Refurbishment of Government Building Projects proposed in 2021-22 Rough Indication of Responsible Project Officer Item No.Project Description Cost (see remark) (RIC) Refurbishment of auditorium, toilets and dressing rooms in Shatin Town Property Services Manager/Project 001/21 25M-30M Hall Management 21 Refurbishment of sports playing surface to soccer pitch no.2 in Quarry Property Services Manager/Project 002/21 20M-25M Bay Park Management 14 Refurbishment of aviary cages no. A14-A15 in Hong Kong Zoological Property Services Manager/Project 003/21 20M-25M and Botanical Gardens Management 11 Refurbishment of running track, toilets and changing rooms in Sai Kung Property Services Manager/Project 004/21 20M-25M Tang Shiu Kin Sports Ground Management 21 Refurbishment of sports centre arena including roofing system, flooring Property Services Manager/Project 005/21 15M-20M system and internal finishes in Ap Lei Chau Municipal Services Building Management 14 Refurbishment of sports playing surface to soccer pitch in Kowloon Bay Property Services Manager/Project 006/21 15M-20M Park Management 22 Refurbishment of entrance lobby and roofing system in Government Property Services Manager/Project 007/21 15M-20M Flying Service Headquarters, Chek Lap Kok Management 12 Refurbishment of external wall and roofing system in Sha Tau Kok Property Services Manager/Project 008/21 15M-20M Market Management 31 Refurbishment of sports flooring system, safety padding, wall finishes Property Services Manager/Project 009/21 and roofing system at 6/F arena in Pei Ho Street Sports Centre, Sham 10M-15M Management 25N Shui Po Refurbishment of external walls, audience seats and floor finishes at Property Services Manager/Project 010/21 10M-15M auditorium in Yuen Long Theatre Management 34 Refurbishment of Peng Chau Wing On Side Street Public Toilet cum 012/21 10M-15M Property Services Manager/FEHD2 Bathhouse Property Services Manager/Project 013/21 Refurbishment of kitchen in Stanley Prison 10M-15M Management 14 Refurbishment to spectator seats, water play equipment, and floor Property Services Manager/Project 014/21 10M-15M finishes at carpark in Shing Mun Valley Swimming Pool, Tsuen Wan Management 24 015/21 Refurbishment of Pak Shing Street Public Toilet-cum-Bathhouse, Tai Po 10M-15M Property Services Manager/FEHD 1 Refurbishment of sports playing surface at soccer pitch cum rugby pitch Property Services Manager/Project 016/21 10M-15M in Tin Yip Road Park, Tin Shui Wai Management 34 Property Services Manager/Project 017/21 Refurbishment of Oil Street Refuse Collection Point, North Point 10M-15M Management 11 Refurbishment of running track, changing rooms and toilets in Wo Yi Property Services Manager/Project 018/21 10M-15M Hop Road Sports Ground, Kwai Chung Management 24 Refurbishment of underground water supply system in Hong Kong Property Services Manager/Project 019/21 10M-15M Police College, Wong Chuk Hang Management 14 Remark: Visitors are welcome to make requests via emails to "[email protected]" for obtaining more information on the above projects. Note: The list of projects are subject to change in the course of the year. List of Refurbishment of Government Building Projects proposed in 2021-22 Refurbishment of office areas at 1/F Main Block in APB Centre, Hung Property Services Manager/Project 020/21 5M-10M Hom Management 25N Refurbishment of spectator stand, external paving and fence of bowling Property Services Manager/Project 021/21 5M-10M greens in Tai Po Waterfront Park Management 31 Refurbishment of counselling rooms, conference room 2 at 1/F , special Property Services Manager/Project 022/21 room at 3/F and classrooms at 5/F and 6/F in Fanling Government 5M-10M Management 32 Primary School Refurbishment of sports playing surface at soccer pitch in Wu Shan Property Services Manager/Project 023/21 5M-10M Recreation Playground, Tuen Mun Management 33 Refurbishment of entrance deck, stair, ramp, railing and lighting system Property Services Manager/Project 025/21 5M-10M in Sun Yat Sen Memorial Park Swimming Pool, Sai Ying Pun Management 11 Refurbishment of arena, squash courts, dance room, activity room, Property Services Manager/Project 026/21 fitness room, lobby, toilets and changing room in Leung Tin Sports 5M-10M Management 33 Centre, Tuen Mun Refurbishment of external wall, boundary wall, staircases and lift lobbies Property Services Manager/Project 027/21 5M-10M in Lam Tin Polyclinic Management 23 Refurbishment of arena including sports hall flooring, acoustic wall Property Services Manager/Project 028/21 panel, safety padding and lighting system in Tin Fai Road Sports Centre, 5M-10M Management 34 Tin Shui Wai Refurbishment of arena at 4/F and lighting system at lobbies and Property Services Manager/Project 030/21 common areas in Cornwall Street Squash and Table Tennis Centre, 5M-10M Management 25N Kowloon Tong Building Services Engineer/Project 032/21 Refurbishment of air-conditioning system in Tai Po Ambulance Depot 5M-10M Management 3 Building Services Engineer/Project 033/21 Refurbishment of air-conditioning system in Tai Po Fire Station 5M-10M Management 3 Refurbishment of roofing system at customs and excise vehicle departure Property Services Manager/Project 034/21 5M-10M kiosks No. 1-12 in Lok Ma Chau Border Control Point Management 34 035/21 Refurbishment of Ngong Ping Road Public Toilet, Lantau Island 5M-10M Property Services Manager/FEHD2 Refurbishment of dog cages at Block 3 and Block 5, police dog Property Services Manager/Project 037/21 memorial garden, flag pole area and tensile fabric of the pavilion in 5M-10M Management 32 Police Dog Unit and Force Search Unit Training School, Sha Ling Refurbishment of toilet block, boundary fencing, surface channel covers Property Services Manager/Project 038/21 and external paving in Shek Wu Hui Jockey Club Playground, Sheung 5M-10M Management 32 Shui Refurbishment of assembly hall in Shau Kei Wan East Government Property Services Manager/Project 039/21 5M-10M Secondary School Management 14 Refurbishment of main lobby at G/F, back stage corridors and art studios Property Services Manager/Project 040/21 at 4/F, rehearsal room and dance practice room at 7/F in Sheung Wan 5M-10M Management 11 Civic Center Refurbishment of external paving, pavilions, railing, seating benches, Property Services Manager/Project 041/21 barrier free access and lighting system in Stone Nullah Lane Garden, 5M-10M Management 15 Wan Chai 042/21 Refurbishment of Tai Po Market MTR Station Public Toilet 5M-10M Property Services Manager/FEHD 1 Remark: Visitors are welcome to make requests via emails to "[email protected]" for obtaining more information on the above projects. Note: The list of projects are subject to change in the course of the year. List of Refurbishment of Government Building Projects proposed in 2021-22 Refurbishment of external wall, paving, surface channel covers, seating Property Services Manager/Project 043/21 bench, arbours, fencing, toilets and lighting system in Wu Shan Bowling 5M-10M Management 33 Green, Tuen Mun Refurbishment of basketball court, volleyball court and children Property Services Manager/Project 044/21 5M-10M playground in Sheung Tsuen Park, Yuen Long Management 34 Refurbishment of chemistry, integrated science, physics and biology Property Services Manager/Project 045/21 laboratories including preparation rooms at 4/F and 5/F in Tin Shui Wai 5M-10M Management 34 Government Secondary School Refurbishment of entrance lobby and staircases at G/F, 1/F and 2/F, Property Services Manager/Project 048/21 5M-10M covered walkway at G/F and 1/F in Shek Wu Hui Market, Sheung Shui Management 32 Refurbishment of toilets, pavilion, floor finishes and lighting system in Property Services Manager/Project 049/21 5M-10M Tsing Shan Children Playground, Tuen Mun Management 33 Refurbishment of external wall, interior finishes, roofing system and Property Services Manager/Project 050/21 5M-10M lighting system in Pillar Point Fire Station, Tuen Mun Management 33 Refurbishment of torpedo station and coastal-line promenade in Hong Property Services Manager/Project 057/21 5M-10M Kong Museum of Coastal Defence Management 14 Refurbishment of G/F arrival hall and departure hall, 1/F male changing Property Services Manager/Project 058/21 room and female changing room, general office and air-conditioning 5M-10M Management 31 plant room in Man Kam To Control Point Refurbishment of floor finishes, boundary fence wall and arbours in Property Services Manager/Project 059/21 5M-10M Cheung Fai Road Promenade, Tsing Yi Management 24 Property Services Manager/Kowloon 060/21 Refurbishment of offices at 1/F Bold Block in APB Centre, Hung Hom 5M-10M City - South Refurbishment of hall at G/F including lighting and air conditioning Building Services Engineer/Project 061/21 5M-10M system in Hoi Pa Street Government Primary School, Tsuen Wan Management 2 Refurbishment of external wall and common areas in Wu York Yu Property Services Manager/Project 062/21 5M-10M Health Center, Wong Tai Sin Management 22 063/21 Refurbishment of Hang Mei Tsuen Public Toilet, Yuen Long 5M-10M Property Services Manager/FEHD 1 Refurbishment of laboratories at 4/F-6/F in Sheung Shui Government Property Services Manager/Project 064/21 5M-10M Secondary School Management 32 Refurbishment of toilet block, external paving and metal fencing in Kau Property Services Manager/Project 065/21 5M-10M U Fong Children's Playground, Central Management 11 Refurbishment of metal roofing system and spectator stand in King's Property Services
Recommended publications
  • Authorization for Edi Submission of Dutiable Commodities Ordinance, Chapter
    AUTHORIZATION FOR EDI SUBMISSION OF APPLICATION FOR REMOVAL PERMIT FOR DUTY-PAID GOODS under DUTIABLE COMMODITIES ORDINANCE, CHAPTER 109 (PLEASE COMPLETE THE FORM IN BLOCK LETTER) Contact Tel No. Licence No. Commodity Categories* FOR INTERNAL USE ONLY Contact Fax No. Denatured Spirits # Mobile Phone No. (For Emergency Contact) ❑ Yes (tick as appropriate) (For Commodity Categories "Liquor 3", Email Address (For Emergency Contact) "Liquor 5"' or "Methyl Alcohol" ONLY) The Import Carrier info (located in Grey area) is applicable For Duty Assessment # Yes / No for Dutiable Commodities removed from Import Carrier Exemption Type : (tick as appropriate) ONLY, Dutiable Commodities removed from Warehouse / ❑ Consulate Agent Local Manufacturer is NOT applicable. ❑ Destruction ❑ Duty not Prescribe Import Transport Mode # Carrier No. ❑ Tar and Nicotine Testing Sea / Rail / Road / Air / Others ❑ Others (pls. specify) _______________________ Goods Removed From - Import Carrier Name Consulate ID Goods Removed From # – Manufacturer (local) / Warehouse (local) Licence No. & address Via (GBW/Control Point Office/Public Cargo Working area) * Origin Country / Territory Name Goods Removed To # – Local Manufacturer / Place & address Licence No. Origin Port Name Carrier Arrival Date (YYYY/MM/DD) BL/AWB/PO No. Voyage No. Removal Start Date & Time (YYYY/MM/DD HH24 : MI) Import Container No. Removal End Date & Time (YYYY/MM/DD HH24 : MI) House Air Waybill No. (For transport mode “Air” only) Transport Type for local transportation: (tick as appropriate) ❑ Lighter & Lorry ❑ Lorry ❑ Container Truck ❑ Vessel ❑ Others (pls specify) ___________________________ Name & address of Import Shipping Agent Dutiable Item Cost & Personal Consumption Marks of Goods Dutiable Commodity Code Declared Strength Sample Quantity Currency Code* Reference No. Return Sample Dutiable Item Other Cost Supplier No.
    [Show full text]
  • YOUNG PLANNERS GROUP NEWSLETTER Hong Kong Institute of Planners ISSUE 4 | November.2012 TOP STORY - the YPGC 2012 Is Formed!
    YOUNG PLANNERS GROUP NEWSLETTER Hong Kong Institute of Planners ISSUE 4 | November.2012 TOP STORY - The YPGC 2012 is formed! young planners group T he Hong Kong Institute of Planner s Young Planners Group (YPG) is a group of energetic and ambitious young planners who care and want to plan for the future. Here we are glad to present to you our fourth newsletter. Time flies, the new YPG Committee 2012 is formed! More information of our committees will be shared in the Top Story section. RECENT ACTIVITIES 2: INTERVIEW WITH STEVEN & DANIEL - ‘Top 10 APC candidates’ Top Story - 2012 YPGC is formed! 3: HKIP PLANNING WEEK 2012 4: PLACE MAKING WORKSHOP 5: YPG EDUCATIONAL EVENTS - Little Town Planners 6. YPG EVENTS - 7. YPG EVENTS - 8. YPG EVENTS - 9. ANNUAL NATIONAL PLANNING CONFERENCE 2012 - Visit to Yim Tin Tsai Visit to Hong Kong Airport Visit to EKE Office Diversity and Tolerance & NEXT >> YPG 2012 Standard Chartered Hong Kong Marathon 2013 10. NENT New Development Areas - 11. Kai Tak Development - Planning and Engineering Study Hey, Sports Hub or more Housing YPG Kid’’s Christmas Party 2012 Stage 3 Public Engagement Blocks at Kai Tak YPG NEWSLETTER | HKIP Page 2 | ISSUE 4 | NOVEMBER.2012 Top Story - 2012 YPGC formed! The handover! A B C D E F G H I J K L M N O Time flies. The service period of Young Planners Group Committee 2010 to 2012 has come to an end. On 6 Novermber 2012, an AGM of YPGC was held and the new YPGC serving 2012-2013 is formed.
    [Show full text]
  • For Discussion on 11 June 2009 Legislative Council Panel On
    CB(1)1823/08-09(01) For discussion on 11 June 2009 Legislative Council Panel on Development Subcommittee on Harbourfront Planning Harbourfront Enhancement Initiatives and Related Issues Purpose This paper provides information on the following as requested by Members: (a) the Administration’s views on issues discussed by District Councils; (b) existing arrangements for planning and implementation of harbourfront enhancement works and management of harbourfront facilities; (c) connectivity of pedestrian access to harbourfront areas; and (d) public cargo working areas. Issues Discussed by District Councils 2. The Administration’s response on harbourfront planning issues discussed by the following District Councils (DCs) and updated information on those issues are at Annex A: (a) Central and Western DC; (b) Wan Chai DC (c) Eastern DC; (d) Kwun Tong DC; (e) Kowloon City DC; (f) Yau Tsim Mong DC; and - 2 - (g) Tsuen Wan DC. Existing Arrangements for Planning and Implementation of Harbourfront Enhancement Works and Management of Harbourfront Facilities 3. On 1 April 2009, we established a new, dedicated Harbour Unit in the Planning and Lands Branch of Development Bureau. The main functions of the new Harbour Unit are, among other things - (a) to coordinate inter-departmental efforts on harbourfront planning; (b) to identify and implement short, medium and long term enhancement projects; and (c) to strengthen engagement of Harbour-front Enhancement Committee (HEC), DCs, harbour concern groups and the public in identifying and implement harbourfront enhancement projects. 4. Since the setting up of this new dedicated unit, we have been able to conduct more liaison and consultation with relevant parties and stakeholders, and speed up discussions and internal consultation process within the Government.
    [Show full text]
  • TFHK/01/2021 on 17 May 2021
    Task Force on Harbourfront Developments on Hong Kong Island For discussion TFHK/01/2021 on 17 May 2021 Boardwalk underneath Island Eastern Corridor PURPOSE The purpose of this paper is to brief the Task Force on the latest architectural and landscaping design of the proposed Boardwalk underneath Island Eastern Corridor (IEC) (Boardwalk). The paper will also update the Task Force on the latest progress, works area requirements and proposed management arrangement of the Boardwalk. BACKGROUND 2. The proposed Boardwalk is a major harbourfront enhancement initiative on Hong Kong Island. Successful implementation of the proposed Boardwalk could set a role model for the forth-coming promenade projects, especially those coastal areas which cannot be developed into a promenade due to various reasons. 3. The proposed Boardwalk is approximately 2.2 kilometres (km) long and maintains a width of at least 10 metres (m) wide throughout and comprises a western and eastern section. The western section will run from Oil Street to Tong Shui Road (approximately 0.7 km long), while the eastern section will run from Tin Chiu Street to Hoi Yu Street (approximately 1.1 km long). These two sections will be connected by the North Point Promenade (approximately 0.4 km long). Upon completion, the proposed Boardwalk will connect the existing or planned promenade at Shek Tong Tsui in Western District and Aldrich Bay in Shau Kei Wan, providing a continuous promenade of some 12 km long for public enjoyment. 4. Both the Task Force and the Eastern District Council (EDC) have been closely engaged in the planning of the Boardwalk project over the past few years.
    [Show full text]
  • Voter Turnout Rates for 2019 Rural Ordinary Election(Open in New
    141 Appendix VIII(B) (Page 1/17) Voter Turnout Rates for 2019 Rural Ordinary Election Polling Date: 6 January 2019 (Sunday) (1) Resident Representative Elections Cumulative Turnout (Actual Number of Electors) Rural Committee District Electorate Cumulative Turnout Rate (%) (Village Concerned) 13:00 15:00 17:00 19:00 13 24 27 27 Lamma Island (North) 51 (Tai Wan San Tsuen) 25.49% 47.06% 52.94% 52.94% Lamma Island (South) 20 42 58 66 (Mo Tat) 119 (Sok Kwu Wan) 16.81% 35.29% 48.74% 55.46% 97 191 233 327 Islands Mui Wo 636 (Chung Hau (South)) 15.25% 30.03% 36.64% 51.42% South Lantao (Ham Tin) 91 192 270 319 (Pui O Lo Uk Tsuen) 420 (Pui O Lo Wai) 21.67% 45.71% 64.29% 75.95% (Shui Hau) Sha Tau Kok District (Sha Tau Kok Market (East)) (Sha Tau Kok Market 195 417 535 655 North (West Lower)) 1 207 (Tam Shui Hang) 16.16% 34.55% 44.32% 54.27% (Wu Kau Tang) (Yim Tso Ha and Pok Tau Ha) 142 Appendix VIII(B) (Page 2/17) Cumulative Turnout (Actual Number of Rural Committee Electors) District Electorate (Village Concerned) Cumulative Turnout Rate (%) 13:00 15:00 17:00 19:00 Ta Kwu Ling District (Lei Uk) (Lo Wu) 126 264 344 416 North (Muk Wu) 645 (Con’t) (Nga Yiu) 19.53% 40.93% 53.33% 64.50% (Ping Yeung) (Tai Po Tin) (Tong Fong) Hang Hau (Pan Long Wan) 122 261 352 440 Sai Kung (Po Toi O) 809 (Sheung Sze Wan) 15.08% 32.26% 43.51% 54.39% (Tai Po Tsai) Sha Tin (Ha Keng Hau) (Ha Wo Che) 122 232 342 466 Sha Tin (Sha Tin Tau and Lee 838 Uk) 14.56% 27.68% 40.81% 55.61% (Tai Shui Hang) (Wo Liu Hang) Tai Po (Chai Kek) (Kau Lung Hang) (Lai Chi Shan) (Lung Mei) (Po
    [Show full text]
  • List of Access Officer (For Publication)
    List of Access Officer (for Publication) - (Hong Kong Police Force) District (by District Council Contact Telephone Venue/Premise/FacilityAddress Post Title of Access Officer Contact Email Conact Fax Number Boundaries) Number Western District Headquarters No.280, Des Voeux Road Assistant Divisional Commander, 3660 6616 [email protected] 2858 9102 & Western Police Station West Administration, Western Division Sub-Divisional Commander, Peak Peak Police Station No.92, Peak Road 3660 9501 [email protected] 2849 4156 Sub-Division Central District Headquarters Chief Inspector, Administration, No.2, Chung Kong Road 3660 1106 [email protected] 2200 4511 & Central Police Station Central District Central District Police Service G/F, No.149, Queen's Road District Executive Officer, Central 3660 1105 [email protected] 3660 1298 Central and Western Centre Central District Shop 347, 3/F, Shun Tak District Executive Officer, Central Shun Tak Centre NPO 3660 1105 [email protected] 3660 1298 Centre District 2/F, Chinachem Hollywood District Executive Officer, Central Central JPC Club House Centre, No.13, Hollywood 3660 1105 [email protected] 3660 1298 District Road POD, Western Garden, No.83, Police Community Relations Western JPC Club House 2546 9192 [email protected] 2915 2493 2nd Street Officer, Western District Police Headquarters - Certificate of No Criminal Conviction Office Building & Facilities Manager, - Licensing office Arsenal Street 2860 2171 [email protected] 2200 4329 Police Headquarters - Shroff Office - Central Traffic Prosecutions Enquiry Counter Hong Kong Island Regional Headquarters & Complaint Superintendent, Administration, Arsenal Street 2860 1007 [email protected] 2200 4430 Against Police Office (Report Hong Kong Island Room) Police Museum No.27, Coombe Road Force Curator 2849 8012 [email protected] 2849 4573 Inspector/Senior Inspector, EOD Range & Magazine MT.
    [Show full text]
  • Replies to Initial Written Questions Raised by Finance Committee Members in Examining the Estimates of Expenditure 2012-13
    Index page Director of Bureau: Secretary for Transport and Housing Session No. : 7 File name : THB(T)-1-e1.doc Reply Question Reply Question Reply Question Serial No. Serial No. Serial No. Serial No. Serial No. Serial No. THB(T)001 0104 THB(T)024 1038 THB(T)047 1129 THB(T)002 2844 THB(T)025 1329 THB(T)048 1130 THB(T)003 2845 THB(T)026 0654 THB(T)049 1131 THB(T)004 2846 THB(T)027 2352 THB(T)050 1132 THB(T)005 3150 THB(T)028 1351 THB(T)051 2073 THB(T)006 3151 THB(T)029 2014 THB(T)052 2538 THB(T)007 3152 THB(T)030 1330 THB(T)053 0105 THB(T)008 1377 THB(T)031 1331 THB(T)054 0124 THB(T)009 0686 THB(T)032 0370 THB(T)055 0566 THB(T)010 1327 THB(T)033 0027 THB(T)056 3153 THB(T)011 1106 THB(T)034 0028 THB(T)057 3154 THB(T)012 1108 THB(T)035 0395 THB(T)058 3155 THB(T)013 1109 THB(T)036 0396 THB(T)059 3156 THB(T)014 1110 THB(T)037 2368 THB(T)060 3157 THB(T)015 1111 THB(T)038 2529 THB(T)061 3158 THB(T)016 1112 THB(T)039 2530 THB(T)062 3159 THB(T)017 1113 THB(T)040 2531 THB(T)063 3160 THB(T)018 0278 THB(T)041 2532 THB(T)064 2013 THB(T)019 0279 THB(T)042 2533 THB(T)065 0075 THB(T)020 0650 THB(T)043 2534 THB(T)066 0414 THB(T)021 0651 THB(T)044 3487 THB(T)067 0415 THB(T)022 2020 THB(T)045 3490 THB(T)068 0416 THB(T)023 1486 THB(T)046 1128 THB(T)069 0417 Reply Question Reply Question Reply Question Serial No.
    [Show full text]
  • New Service Arrangements for NWFB Routes 18, 43X and 720A
    New Service Arrangements for NWFB Routes 18, 43X and 720A (14 October 2011, Hong Kong )Effective 17 October 2011 (Monday), New World First Bus (“NWFB”) will implement new service arrangements for Routes 18, 43X and 720A. Details are as follows: Route 18 Departures from Kennedy Town (Belcher Bay) of Route 18 will divert via Tim Mei Avenue, Lung Wui Road, Fenwick Pier Street, Harbour Road and Fleming Road after Harcourt Road, then resume its original routeing to North Point (Healthy Street Central). New bus stops will be located opposite to CITIC Tower of Lung Wui Road and outside Hong Kong Convention and Exhibition Centre of Harbour Road while the original bus stops outside The Hong Kong Academy for Performing Arts and Immigration Tower of Gloucester Road will be cancelled. Route 43X Departures from Wah Kwai Estate of Route 43X, after 9:10am on Mondays to Saturdays and all the departures on Sundays and public holidays, will divert via Tim Mei Avenue, Lung Wui Road, Fenwick Pier Street, Harbour Road, Fleming Road and Convention Avenue after Harcourt Road, then run via Fenwick Pier Street, flyover and Harcourt Road, and resume its original routeing to Wah Kwai Estate. New bus stops will be located opposite to CITIC Tower of Lung Wui Road and outside Hong Kong Convention and Exhibition Centre of Harbour Road while the original bus stops outside The Hong Kong Academy for Performing Arts of Gloucester Road, Central Plaza and Shui On Centre of Harbour Road will be cancelled. Route 720A All the departures from Grand Promenade of Route 720A will divert via Harcourt Road, Tim Mei Avenue, Performing Arts Avenue, Fenwick Pier Street and Gloucester Road after Admiralty Centre, then resume its original routeing to Grand Promenade.
    [Show full text]
  • HENG on to KWUN TONG
    L. S. NO. 2 TO GAZETTE NO. 50/2004L.N. 203 of 2004 B1865 Air-Conditioned New Territories Route No. 89C Heng On—Kwun Tong (Tsui Ping Road) HENG ON to KWUN TONG (TSUI PING ROAD): via Hang Kam Street, Hang Hong Street, Sai Sha Road, Hang Fai Street, Ning Tai Road, Po Tai Street, Ning Tai Road, Hang Tai Road, Hang Shun Street, Chevalier Garden Bus Terminus, Hang Shun Street, A Kung Kok Street, Shek Mun Interchange, Tai Chung Kiu Road, Siu Lek Yuen Road, Tate’s Cairn Highway, Tate’s Cairn Tunnel, Hammer Hill Road, roundabout, Hammer Hill Road, Choi Hung Road, roundabout, Choi Hung Estate access road, Prince Edward Road East, Kwun Tong Road and Tsui Ping Road. Special trips operated from Heng On to Kwun Tong (Tsui Ping Road) omitting Tai Chung Kiu Road, Siu Lek Yuen Road, Hammer Hill Road, Choi Hung Estate access road and Prince Edward Road. KWUN TONG (TSUI PING ROAD) to HENG ON: via Tsui Ping Road, Lei Yue Mun Road, Wai Fat Road, Cha Kwo Ling Road, Lei Yue Mun Road, Kwun Tong Road, Lung Cheung Road, Tate’s Cairn Tunnel, Tate’s Cairn Highway, Sha Tin Wai Road, Siu Lek Yuen Road, Tai Chung Kiu Road, Shek Mun Interchange, A Kung Kok Street, Hang Shun Street, Chevalier Garden Bus Terminus, Hang Shun Street, Hang Tai Road, Ning Tai Road, Hang Fai Street, Sai Sha Road, Hang Hong Street and Hang Kam Street. Special trips operated from Kwun Tong (Tsui Ping Road) to Heng On omitting Sha Tin Wai Road, Siu Lek Yuen Road and Tai Chung Kiu Road.
    [Show full text]
  • OFFICIAL RECORD of PROCEEDINGS Wednesday, 11
    LEGISLATIVE COUNCIL ─ 11 May 2011 10073 OFFICIAL RECORD OF PROCEEDINGS Wednesday, 11 May 2011 The Council met at Eleven o'clock MEMBERS PRESENT: THE PRESIDENT THE HONOURABLE JASPER TSANG YOK-SING, G.B.S., J.P. THE HONOURABLE ALBERT HO CHUN-YAN IR DR THE HONOURABLE RAYMOND HO CHUNG-TAI, S.B.S., S.B.ST.J., J.P. DR THE HONOURABLE DAVID LI KWOK-PO, G.B.M., G.B.S., J.P. THE HONOURABLE FRED LI WAH-MING, S.B.S., J.P. DR THE HONOURABLE MARGARET NG THE HONOURABLE JAMES TO KUN-SUN THE HONOURABLE CHEUNG MAN-KWONG THE HONOURABLE CHAN KAM-LAM, S.B.S., J.P. THE HONOURABLE MRS SOPHIE LEUNG LAU YAU-FUN, G.B.S., J.P. THE HONOURABLE LEUNG YIU-CHUNG DR THE HONOURABLE PHILIP WONG YU-HONG, G.B.S. THE HONOURABLE WONG YUNG-KAN, S.B.S., J.P. 10074 LEGISLATIVE COUNCIL ─ 11 May 2011 THE HONOURABLE LAU KONG-WAH, J.P. THE HONOURABLE LAU WONG-FAT, G.B.M., G.B.S., J.P. THE HONOURABLE MIRIAM LAU KIN-YEE, G.B.S., J.P. THE HONOURABLE EMILY LAU WAI-HING, J.P. THE HONOURABLE ANDREW CHENG KAR-FOO THE HONOURABLE TAM YIU-CHUNG, G.B.S., J.P. THE HONOURABLE LI FUNG-YING, S.B.S., J.P. THE HONOURABLE TOMMY CHEUNG YU-YAN, S.B.S., J.P. THE HONOURABLE FREDERICK FUNG KIN-KEE, S.B.S., J.P. THE HONOURABLE AUDREY EU YUET-MEE, S.C., J.P. THE HONOURABLE VINCENT FANG KANG, S.B.S., J.P.
    [Show full text]
  • Fhb(Fe)132 Controlling Officer’S Reply
    Examination of Estimates of Expenditure 2021-22 Reply Serial No. FHB(FE)132 CONTROLLING OFFICER’S REPLY (Question Serial No. 1888) Head: (49) Food and Environmental Hygiene Department Subhead (No. & title): (-) Not specified Programme: (2) Environmental Hygiene and Related Services Controlling Officer: Director of Food and Environmental Hygiene (Miss Diane WONG) Director of Bureau: Secretary for Food and Health Question: With regard to the financial provision of $600 million earmarked in the 2019-20 Budget to implement the Enhanced Public Toilet Refurbishment Programme, please set out: 1. the names of the public toilets which have completed and commenced refurbishment works since the implementation of the programme, with their commencement and completion dates of the works concerned as well as the expenditure involved for each of the works; and 2. the names of the public toilets which are expected to be refurbished in this financial year, with their commencement and completion dates of the works concerned as well as the expenditure to be involved for each of the works. Asked by: Hon LAU Ip-keung, Kenneth (LegCo internal reference no.: 58) Reply: 1. It was announced in the 2019-20 Budget that the Government would make an additional allocation of over $600 million to implement the Enhanced Public Toilet Refurbishment Programme, under which the Food and Environmental Hygiene Department (FEHD) would roll out the refurbishment or facelifting works for about 240 public toilets under its management by phases in 5 years starting from 2019-20, so as to improve toilet facilities and the level of hygiene. FEHD has been working closely with the Architectural Services Department.
    [Show full text]
  • G.N. RURAL REPRESENTATIVE ELECTION ORDINANCE (Chapter
    G.N. 7762 G.N. RURAL REPRESENTATIVE ELECTION ORDINANCE (Chapter 576) (Section 54) APPOINTMENT OF RETURNING OFFICERS It is hereby notified that, in exercise of the powers conferred by section 54 of the Rural Representative Election Ordinance (Cap. 576), the Electoral Affairs Commission has appointed the persons who for the time being hold, or may from time to time hold, the offices specified below to be the Returning Officers for the purpose of the 2019 Rural Ordinary Election (Indigenous Inhabitant Representative Election) to be held on the dates specified below: Polling Date Name of Name of Office Address of Rural Indigenous Village and Returning Officer Committee Composite Indigenous Village 6 January 2019 Lamma Island Ko Long Assistant 20th floor, Harbour (Sun) (North) Rural Lo Tik Wan District Building, 38 Pier Committee Pak Kok Kau Tsuen Officer Road, Central, Pak Kok San Tsuen (Islands)1 Hong Kong Sha Po Tai Peng Tsuen Tai Wan Kau Tsuen Tai Wan San Tsuen Tai Yuen Wang Long Yung Shue Long Yung Shue Wan A total of 12 Villages Lamma Island Lo So Shing Assistant 20th floor, Harbour (South) Rural Luk Chau District Building, 38 Pier Committee Mo Tat Officer Road, Central, Mo Tat Wan (Islands)2 Hong Kong Po Toi Sok Kwu Wan Tung O Yung Shue Ha A total of 8 Villages Mui Wo Rural Luk Tei Tong District 20th floor, Harbour Committee Man Kok Tsui Officer Building, 38 Pier Ngau Kwu Long (Islands) Road, Central, Pak Mong Hong Kong Pak Ngan Heung Tai Ho Tai Tei Tong A total of 7 Villages South Lantao Cheung Sha Lower Village District 20th floor,
    [Show full text]