CONSTRUCTION OF THE PIPELINE DISTRIBUTION SYSTEM AND DISTRIBUTION OF GAS IN THE MUNICIPALITIES OF TRAVNIK, NOVI TRAVNIK, VITEZ AND BUSOVAČA
MINISTRY OF ECONOMY, CENTRAL BOSNIAN CANTON
Travnik, september 2013
Construction of the pipeline distribution system and distribution of gas
INTRODUCTION
• Gasification project is of interest for the Canton,
• According to the project the forecasted construction of the distribution network for the 4 municipalities,
• The cantonal government has prepared feasibility study,
• The study was done and the preliminary design of the distribution network,
• There are technical possibilities of connection to the transmission pipeline Zenica - Travnik, whose construction will be completed in the year of 2013,
• The concession is awarded through public tender published by the Ministry of Economy SBK.
page 3
Construction of the pipeline distribution system and distribution of gas
CENTRAL BOSNIAN CANTON
page 5
MUNICIPALITY TRAVNIK
Construction of the pipeline distribution system and distribution of gas
MUNICIPALITY VITEZ
page 7
Gasification project of individual municipalities takes place in three stages:
Phase I - works to perform in the first year of the project,
Phase II – works to perform in the second year of the project,
Phase III – works to perform in the third year of the project.
Construction of the pipeline distribution system and distribution of gas
In preparing the study for the degree of efficiency of gasification 3 different assumptions were taken into account:
Optimistic - the gas network will connect 75% of the housing units,
Medium - the gas network will connect 50% of the housing units,
Pessimistic - the gas network will connect 25% of the housing units.
Two different variants were taken in consideration for heating housing units:
Variant I - heat the dwelling, or 90 m2,
Variant II - heat half of the area, or 45 m2.
Overview of 6 gasification scenarios
page 9
CONSUMPTION OF NATURAL GAS (Sm3)
TOTAL CONSTRUCTION COSTS (KM):
Construction of the pipeline distribution system and distribution of gas
JUSTIFICATION OF INEVESTMENTS
Municipality Travnik
Municipalities Novi Travnik, Vitez and Busovača
page 11
Construction of the pipeline distribution system and distribution of gas
CONCLUSION
The concession is awarded through public tender for 30 years under the system DBOT (Design, Build, Operate, Transfer).
Right of participation have all legally registered companies in accordance with the specific laws of the Federation of Bosnia and Herzegovina for the activity that is the subject of the concession,(companies owned with / out foreign legally registered company).
Tenders must be submitted in one of the official languages of the country and all rates and charges must be expressed in convertible marks (KM).
page 13
Bosna i Hercegovina Federacija Bosne i Hercegovine Srednjobosanski kanton Ministarstvo privrede Stanična 43 72270 Travnik Tel: +387 (0)30 511 217 Fax: +387 (0)30 511 729 e-mail: [email protected] www.sbk-ksb.gov.ba