CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011-2019* As of December 15, 2019

PARK YEAR PARK NAME NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS COMPLETE $ ABBOTT (ROBERT) 259 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012 ABBOTT (ROBERT) 259 SI Playground Plays! - new equipment COMPLETE 2013 ABBOTT (ROBERT) 259 FR Minor Rehab Misc. pool stairs COMPLETE 2015 ABBOTT (ROBERT) 259 FR Swimming Pool Pool - rehab COMPLETE 2016 ABBOTT (ROBERT) 259 SI Paving 2016 DW Paving COMPLETE 2017 ABBOTT (ROBERT) 259 SI Landscape Tree planting COMPLETE 2018 ABBOTT (ROBERT) 259 SI Site Improvement Park improvements COMPLETE 2018 ABBOTT (ROBERT) 259 FR Concrete Masonry Structural Field house - masonry PRE-DESIGN ADA (SAWYER GARRETT) 45 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012 ADA (SAWYER GARRETT) 45 FR Minor Rehab Entrance and washrooms COMPLETE 2012 ADA (SAWYER GARRETT) 45 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012 ADA (SAWYER GARRETT) 45 SI Paving Paving - playground COMPLETE 2012 ADA (SAWYER GARRETT) 45 SI Lighting Lighting - parking lot COMPLETE 2012 ADA (SAWYER GARRETT) 45 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013 ADA (SAWYER GARRETT) 45 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2013 ADA (SAWYER GARRETT) 45 FR Swimming Pool Misc. rehab COMPLETE 2015 ADA (SAWYER GARRETT) 45 FR Concrete Masonry Structural Field house - masonry and tuckpointing COMPLETE 2017 ADA (SAWYER GARRETT) 45 SI Athletic Field Athletic field - rehab COMPLETE 2018 * ADA (SAWYER GARRETT) 45 FR Minor Rehab Wheelchair Lift - new COMPLETE 2019 ADAMS (GEORGE & ADELE) 1019 SI Spray Pool Water feature - surfacing COMPLETE 2011 ADAMS (GEORGE & ADELE) 1019 SI Spray Pool Water feature - surfacing COMPLETE 2012 ADAMS (GEORGE & ADELE) 1019 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012 ADAMS (GEORGE & ADELE) 1019 SI Spray Pool Water play feature - major rehab COMPLETE 2018 * ADAMS (GEORGE & ADELE) 1019 FR Roof Roof and perimeter drainage PRE-DESIGN ADDAMS (JANE) 262 SI Lighting Lighting - exterior COMPLETE 2012 ADDAMS (JANE) 262 AD Park Development Site preparation COMPLETE 2018 ADDAMS (JANE) 262 AD New Construction Indoor Recreation Center CONSTRUCTION * ADDAMS (JANE) MEML. 1224 SI Site Improvement Ohio St. Underpass - artwork COMPLETE 2011 ADDAMS (JANE) MEML. 1224 FR Minor Rehab Misc. - lockers and drainage improvements COMPLETE 2014 ADDAMS (JANE) MEML. 1224 AD New Construction Navy Pier Flyover (CDOT) COMPLETE 2018 * ADDAMS (JANE) MEML. 1224 AD Planning Framework plan PLANNING ALTGELD (JOHN) 206 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012 ALTGELD (JOHN) 206 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012 ALTGELD (JOHN) 206 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 ALTGELD (JOHN) 206 SI Athletic Field Artificial turf athletic field - new COMPLETE 2012 * ALTGELD (JOHN) 206 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013 ALTGELD (JOHN) 206 FR Concrete Masonry Structural Chimney and entrance COMPLETE 2014 ALTGELD (JOHN) 206 SI Site Improvement Misc. -fencing, signage, lighting COMPLETE 2017

1 of 65 PARK CAPITAL PROJECTS 2011-2019* As of December 15, 2019

PARK YEAR PARK NAME NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS COMPLETE $ ALTGELD (JOHN) 206 FR Swimming Pool Pool - liner, gutter, filter COMPLETE 2017 ALTGELD (JOHN) 206 FR Minor Rehab Gym floor - rehabs COMPLETE 2018 ALTGELD (JOHN) 206 FR Swimming Pool Pool - valves CONSTRUCTION AMUNDSEN (ROALD) 129 FR Fitness Center Fitness center - upgrade COMPLETE 2011 AMUNDSEN (ROALD) 129 SI Paving Paving - paths COMPLETE 2013 AMUNDSEN (ROALD) 129 SI Athletic Field Artificial turf athletic field and track - new COMPLETE 2016 * AMUNDSEN (ROALD) 129 FR Roof Roof COMPLETE 2019 AMUNDSEN (ROALD) 129 SI Playground Playground - upgrade PLANNING ANDERSON (FRED) 561 AD Park Development Park development - 16th St. and Wabash Ave. COMPLETE 2014 * ANDERSON (FRED) 561 AD Acquisition 16th St. and Wabash Ave. COMPLETE 2015 ANDERSON (FRED) 561 SI Site Improvement Park improvements COMPLETE 2018 * ANDERSON (LOUIS) 1020 SI Playground Chicago Plays! - new equipment COMPLETE 2014 ANDERSON (LOUIS) 1020 SI Site Improvement Water main - new COMPLETE 2017 ANDERSONVILLE 1078 SI Playground Chicago Plays! - new equipment COMPLETE 2015 ARCHER (WILLIAM BEATTY) 250 SI Fencing Misc. - gates COMPLETE 2011 ARCHER (WILLIAM BEATTY) 250 SI Spray Pool Water feature - surfacing COMPLETE 2012 ARCHER (WILLIAM BEATTY) 250 FR Fitness Center Fitness center - upgrade COMPLETE 2012 ARCHER (WILLIAM BEATTY) 250 FR Fitness Center Fitness center - upgrade COMPLETE 2012 ARCHER (WILLIAM BEATTY) 250 SI Lighting Lighting - ballfield COMPLETE 2013 ARCHER (WILLIAM BEATTY) 250 SI Paving Paving - pathways COMPLETE 2015 ARCHER (WILLIAM BEATTY) 250 SI Courts Artificial Turf Court - rehab COMPLETE 2016 ARCHER (WILLIAM BEATTY) 250 SI Athletic Field Athletic field - scoreboard and bleachers COMPLETE 2017 * ARCHER (WILLIAM BEATTY) 250 FR Major Rehab Field house - major rehab COMPLETE 2018 * ARCHER (WILLIAM BEATTY) 250 SI Courts Mini-pitch Soccer Court - new COMPLETE 2018 * ARCHER (WILLIAM BEATTY) 250 SI Lighting Athletic field - lighting COMPLETE 2019 * ARCHER (WILLIAM BEATTY) 250 SI Landscape Ballfields - rehab PRE-DESIGN * ARMOUR (PHILIP) SQUARE 3 SI Paving Entrance - access paving COMPLETE 2011 ARMOUR (PHILIP) SQUARE 3 SI Athletic Field Ballfield - rehab COMPLETE 2012 ARMOUR (PHILIP) SQUARE 3 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012 ARMOUR (PHILIP) SQUARE 3 FR Minor Rehab Gym floor - restore or replace COMPLETE 2012 ARMOUR (PHILIP) SQUARE 3 FR Minor Rehab Field house - exterior painting COMPLETE 2012 ARMOUR (PHILIP) SQUARE 3 FR Major Rehab Transition plan - access improvements COMPLETE 2012 ARMOUR (PHILIP) SQUARE 3 SI Courts Court - conversion to roller hockey COMPLETE 2013 * ARMOUR (PHILIP) SQUARE 3 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013 * ARMOUR (PHILIP) SQUARE 3 FR Swimming Pool Pool - liner and filter COMPLETE 2015 ARMOUR (PHILIP) SQUARE 3 FR Swimming Pool ADA - pool stairs COMPLETE 2017 ARMOUR (PHILIP) SQUARE 3 SI Lighting Ballfield and walkway lighting CONSTRUCTION ARMSTRONG (LILLIAN HARDIN) 492 SI Site Improvement Misc. pathway lighting and paving COMPLETE 2013

2 of 65 CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011-2019* As of December 15, 2019

PARK YEAR PARK NAME NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS COMPLETE $ ARMSTRONG (LILLIAN HARDIN) 492 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013 ARMSTRONG (LILLIAN HARDIN) 492 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2013 ARMSTRONG (LILLIAN HARDIN) 492 SI Site Improvement Track and walkway - resurfacing COMPLETE 2016 * ARRIGO (VICTOR) 215 SI Paving Paving - pathways COMPLETE 2017 ASHMORE 427 SI Playground Chicago Plays! - new equipment COMPLETE 2015 ASPEN 321 SI Playground Chicago Plays! - new equipment COMPLETE 2016 ASTER 343 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013 ATHLETIC FIELD 80 FR HVAC and Energy Efficiency Field house - new boiler COMPLETE 2011 ATHLETIC FIELD 80 SI Athletic Field Ballfield - rehab COMPLETE 2014 ATHLETIC FIELD 80 SI Athletic Field Ballfield - rehab COMPLETE 2017 * ATHLETIC FIELD 80 SI Paving 2016 DW Paving -pathways COMPLETE 2017 ATHLETIC FIELD 80 FR Major Rehab Ceramic Building - major rehab COMPLETE 2018 * AUGUSTA (CARPENTER) 1021 SI Playground Playground - new COMPLETE 2011 * AUGUSTA (CARPENTER) 1021 FR Roof Roof - rehab COMPLETE 2019 AUSTIN (HENRY) 1204 SI Spray Pool Water play feature - rehab COMPLETE 2016 AUSTIN (HENRY) 1204 SI Playground Chicago Plays! - new equipment COMPLETE 2016 AUSTIN FOSTER 285 SI Playground Chicago Plays! - new equipment COMPLETE 2016 AUSTIN TOWN HALL 207 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2011 AUSTIN TOWN HALL 207 FR Fitness Center Fitness center - upgrade COMPLETE 2011 AUSTIN TOWN HALL 207 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012 AUSTIN TOWN HALL 207 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 AUSTIN TOWN HALL 207 FR Fitness Center Fitness center - upgrade COMPLETE 2013 AUSTIN TOWN HALL 207 SI Playground Chicago Plays! - new equipment COMPLETE 2014 AUSTIN TOWN HALL 207 FR Swimming Pool Pool - basin rehab COMPLETE 2019 AUSTIN TOWN HALL 207 FR Major Rehab Transition plan - access improvements COMPLETE 2019 * AUSTIN TOWN HALL 207 FR Major Rehab Cultural Center Initiative PLANNING AVALON 29 FR Swimming Pool Pool Retrofit -compliance COMPLETE 2012 AVALON 29 FR Major Rehab Transition plan - access improvements COMPLETE 2012 AVALON 29 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012 AVALON 29 SI Site Improvement Benches COMPLETE 2012 AVALON 29 SI Paving Track - surfacing COMPLETE 2012 AVALON 29 SI Fencing Misc. - traffic control gates COMPLETE 2013 AVALON 29 SI Spray Pool Pool - rehab COMPLETE 2015 AVALON 29 SI Playground Chicago Plays! - new equipment COMPLETE 2016 AVALON 29 SI Paving 2016 DW Paving COMPLETE 2016 AVALON 29 FR Concrete Masonry Structural Field house - tuckpointing COMPLETE 2017 AVALON 29 FR HVAC and Energy Efficiency Boilers - new COMPLETE 2018 AVALON 29 FR Swimming Pool Pool - controls COMPLETE 2018

3 of 65 CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011-2019* As of December 15, 2019

PARK YEAR PARK NAME NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS COMPLETE $ AVALON 29 FR Swimming Pool Pool - liner PRE-DESIGN AVONDALE 81 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2011 AVONDALE 81 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013 AVONDALE 81 FR Concrete Masonry Structural Misc. balcony reconstruction COMPLETE 2014 AVONDALE 81 SI Paving 2016 DW Paving -pathways COMPLETE 2017 AVONDALE 81 SI Site Improvement Park improvements PLANNING AVONDALE 81 FR Major Rehab Field house - major restoration PRE-DESIGN * BACK OF THE YARDS 1063 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012 BACK OF THE YARDS 1063 SI Playground Chicago Plays! - new equipment COMPLETE 2016 BARAGA (FREDERICK) 295 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 BARAGA (FREDERICK) 295 SI Playground Chicago Plays! - new equipment COMPLETE 2014 BARBERRY 332 AD Acquisition Expansion COMPLETE 2012 BARNARD (AMY L.) 1205 SI Playground Chicago Plays! - new equipment COMPLETE 2014 BARRETT (CHARLES) 1022 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013 * BARTELME (MARY) 542 AD Acquisition Sangamon St. and Adams St. - expansion COMPLETE 2011 BAULER (MATHIAS) 365 SI Playground Chicago Plays! - new equipment COMPLETE 2016 * BEEHIVE 328 AD Acquisition Expansion COMPLETE 2014 * BEEHIVE 328 SI Playground Chicago Plays! - new equipment COMPLETE 2016 BEILFUSS (ALBERT W.) 1003 SI Playground Chicago Plays! - new equipment COMPLETE 2015 * BELL (GEORGE,JR.) 121 SI Playground Chicago Plays! - new equipment COMPLETE 2015 BELL (GEORGE,JR.) 121 SI Courts Tennis and Multi-Use Court- rehabs COMPLETE 2017 * BELL (GEORGE,JR.) 121 SI Spray Pool Water play feature - rehab COMPLETE 2018 * Beniac (John “Beans”) Greenway 499 AD Acquisition Expansion COMPLETE 2011 BERGER (ALBERT) 1255 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012 BERGER (ALBERT) 1255 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2013 BERGER (ALBERT) 1255 FR Concrete Masonry Structural All Buildings - concrete, structural, masonry COMPLETE 2015 BERGER (ALBERT) 1255 SI Landscape Historic landscape restoration COMPLETE 2016 * BERGER (ALBERT) 1255 FR Minor Rehab Park Improvements PLANNING * BERGER (ALBERT) 1255 FR Minor Rehab Cultural Center Initiative PLANNING BESSEMER (HENRY) 12 SI Fencing Misc. - gates COMPLETE 2011 BESSEMER (HENRY) 12 SI Paving Paving - driveway COMPLETE 2011 BESSEMER (HENRY) 12 FR Swimming Pool Pool Retrofit -compliance COMPLETE 2012 BESSEMER (HENRY) 12 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012 BESSEMER (HENRY) 12 FR Minor Rehab Field house - locker room improvements COMPLETE 2012 BESSEMER (HENRY) 12 FR Concrete Masonry Structural Chimney COMPLETE 2013 BESSEMER (HENRY) 12 FR Minor Rehab Misc. - washrooms COMPLETE 2013 BESSEMER (HENRY) 12 FR Minor Rehab Misc. Pool Stair renovation COMPLETE 2015 BESSEMER (HENRY) 12 SI Playground Chicago Plays! - new equipment COMPLETE 2016

4 of 65 CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011-2019* As of December 15, 2019

PARK YEAR PARK NAME NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS COMPLETE $ BESSEMER (HENRY) 12 SI Paving 2016 DW Paving COMPLETE 2016 BESSEMER (HENRY) 12 SI Courts Basketball Court - rehab COMPLETE 2016 BESSEMER (HENRY) 12 FR Swimming Pool Pool - filter COMPLETE 2017 BESSEMER (HENRY) 12 FR HVAC and Energy Efficiency Boiler - rehab COMPLETE 2017 BESSEMER (HENRY) 12 FR Minor Rehab Field house - interior rehab including kitchen, bathrooms COMPLETE 2018 * BESSEMER (HENRY) 12 SI Site Improvement Running track - resurface COMPLETE 2018 * BESSEMER (HENRY) 12 SI Site Improvement Artificial Turf Court - rehab PLANNING * BEVERLY 254 FR Sculpture and Monument Memorial Sculpture - new COMPLETE 2012 BEVERLY 254 SI Courts In-line hockey - new COMPLETE 2014 BEVERLY 254 SI Playground Playground - new COMPLETE 2018 * BIG MARSH 564 AD Planning Habitat Plan - Big Marsh COMPLETE 2015 * BIG MARSH 564 SI Site Improvement Big Marsh - water control structure COMPLETE 2015 * BIG MARSH 564 SI Landscape Big Marsh - wetland restoration COMPLETE 2016 * BIG MARSH 564 AD Park Development Park Development - Big Marsh COMPLETE 2016 * BIG MARSH 564 AD Acquisition Big Marsh - expansion COMPLETE 2017 BIG MARSH 564 SI Landscape Big Marsh - habitat restoration COMPLETE 2017 * BIG MARSH 564 SI Site Improvement Calumet Area - signage COMPLETE 2017 * BIG MARSH 564 SI Site Improvement Big Marsh - western access COMPLETE 2018 * BIG MARSH 564 SI Landscape Big Marsh - upland habitat COMPLETE 2018 * BIG MARSH 564 SI Site Improvement Big Marsh - east side trail expansion COMPLETE 2018 * BIG MARSH 564 SI Landscape Big Marsh - hydrology and riparian habitat COMPLETE 2019 * BIG MARSH 564 SI Site Improvement Park improvements PLANNING BIG MARSH 564 SI Site Improvement Big Marsh - trail improvements ONGOING BIG MARSH 564 AD Park Development Multi-use Trail System - design DESIGN BIG MARSH 564 AD New Construction Ford Calumet Environmental Center CONSTRUCTION * BIRCH 322 SI Playground Chicago Plays! - new equipment COMPLETE 2016 BIXLER (RAY) 1083 SI Playground Chicago Plays! - new equipment COMPLETE 2016 BIXLER (RAY) 1083 SI Site Improvement Chess Table - new COMPLETE 2018 * BLACKHAWK 122 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012 BLACKHAWK 122 SI Athletic Field Athletic field - rehab COMPLETE 2012 BLACKHAWK 122 FR Swimming Pool Pool - rehab COMPLETE 2013 BLACKHAWK 122 SI Playground Chicago Plays! - new equipment COMPLETE 2015 BLACKHAWK 122 SI Courts Tennis court - rehab and conversion to artificial turf COMPLETE 2016 * BLACKHAWK 122 SI Courts Basketball Court - rehab COMPLETE 2018 * BLACKHAWK 122 FR Swimming Pool Pool - valves CONSTRUCTION BLACKHAWK 122 FR Major Rehab Major Restoratoin PRE-DESIGN * BLACKWELDER (I.S., GERTRUDE) 373 AD Park Development Park development including new playground COMPLETE 2011 * BOGAN (WILLIAM) 264 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2013

5 of 65 CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011-2019* As of December 15, 2019

PARK YEAR PARK NAME NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS COMPLETE $ BOGAN (WILLIAM) 264 SI Playground Chicago Plays! - new equipment COMPLETE 2015 BOGAN (WILLIAM) 264 SI Paving 2016 DW Paving COMPLETE 2016 BOGAN (WILLIAM) 264 SI Landscape Tree planting COMPLETE 2019 BOLER (LEO ROSCOE, SR.) 496 SI Site Improvement Misc. site improvements COMPLETE 2015 BOLER (LEO ROSCOE, SR.) 496 SI Playground Chicago Plays! - new equipment COMPLETE 2016 BOSLEY (WILLIAM) 1024 SI Athletic Field Athletic field - rehab COMPLETE 2015 BOSLEY (WILLIAM) 1024 FR Roof Roof COMPLETE 2016 BOSLEY (WILLIAM) 1024 SI Site Improvement Park improvements including playground, spray, turf field DESIGN * BOSWELL (ARNITA YOUNG) 340 SI Playground Chicago Plays! - new equipment COMPLETE 2016 BRADLEY (JOSEPHINE) 1004 SI Playground Playground - Concept Design COMPLETE 2013 BRADLEY (JOSEPHINE) 1004 SI Playground Chicago Plays! - new equipment COMPLETE 2014 BRADLEY (JOSEPHINE) 1004 FR Major Rehab Field House - fire damage COMPLETE 2016 BRADLEY (JOSEPHINE) 1004 FR Minor Rehab Field house - rehab PRE-DESIGN BRAINERD 177 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012 BRAINERD 177 FR HVAC and Energy Efficiency Roof HVAC units - new PRE-DESIGN BRAINERD 177 FR Sculpture and Monument Monument - restoration PRE-DESIGN BRANDS 187 SI Athletic Field Ballfield - rehab COMPLETE 2015 BRANDS 187 FR HVAC and Energy Efficiency HVAC -rehab COMPLETE 2019 BRANDS 187 FR Roof Field house - roof COMPLETE 2019 BRIGHTON 426 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012 BROADWAY ARMORY 462 FR Major Rehab Field house - rehab - phase II COMPLETE 2012 * BROADWAY ARMORY 462 AD Planning Indoor track - feasibility study COMPLETE 2012 BROADWAY ARMORY 462 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012 BROADWAY ARMORY 462 FR HVAC and Energy Efficiency HVAC - rehab COMPLETE 2013 BROADWAY ARMORY 462 FR Roof Boiler room - rehab COMPLETE 2013 BROADWAY ARMORY 462 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2014 BROADWAY ARMORY 462 FR Major Rehab Misc. fire escape rehab COMPLETE 2015 BROADWAY ARMORY 462 FR Minor Rehab Misc. elevator COMPLETE 2016 BROADWAY ARMORY 462 FR Minor Rehab Teen Center - new COMPLETE 2018 BROADWAY ARMORY 462 FR Concrete Masonry Structural Facility Rehab - masonry and parapet PRE-DESIGN BROOKS (GWENDOLYN) 362 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013 BROOKS (GWENDOLYN) 362 SI Courts Court conversion to pickleball COMPLETE 2018 * BROOKS (OSCAR) 61 SI Site Improvement Tennis court - rehab COMPLETE 2012 BROOKS (OSCAR) 61 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012 BROOKS (OSCAR) 61 SI Athletic Field Athletic field - rehab COMPLETE 2013 BROOKS (OSCAR) 61 SI Playground Chicago Plays! - new equipment COMPLETE 2014 * BROWN (SIDNEY) MEML. 289 SI Playground Chicago Plays! - new equipment COMPLETE 2014 BROWN (SIDNEY) MEML. 289 SI Athletic Field Athletic field - rehab COMPLETE 2016

6 of 65 CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011-2019* As of December 15, 2019

PARK YEAR PARK NAME NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS COMPLETE $ BROWN (SIDNEY) MEML. 289 SI Landscape Tree planting COMPLETE 2018 BROWN (SIDNEY) MEML. 289 AD Park Development Park expansion - site improvements COMPLETE 2019 * BRYNFORD 1141 SI Playground Chicago Plays! - new equipment COMPLETE 2014 BUENA CIRCLE 1084 SI Playground Chicago Plays! - new equipment COMPLETE 2016 BURNHAM (DANIEL) 27 FR Roof 39th St. Trade Yard - roof COMPLETE 2011 BURNHAM (DANIEL) 27 SI Playground Soldier Field - Playground Expansion - Study COMPLETE 2011 BURNHAM (DANIEL) 27 SI Paving Museum Campus - permeable paving COMPLETE 2013 BURNHAM (DANIEL) 27 SI Lighting Exterior - pathways COMPLETE 2013 BURNHAM (DANIEL) 27 FR Minor Rehab Misc. improvements COMPLETE 2013

BURNHAM (DANIEL) 27 AD New Construction Shoreline Protection with U.S. Army Corps (43rd St. - 45th St.) COMPLETE 2013 * BURNHAM (DANIEL) 27 AD New Construction New Harbor Development - 31st St. COMPLETE 2014 BURNHAM (DANIEL) 27 FR Concrete Masonry Structural Promontory Point - Concrete and structural COMPLETE 2014 BURNHAM (DANIEL) 27 SI Site Improvement Judd Goldman Sailing Center - shade structure COMPLETE 2015 BURNHAM (DANIEL) 27 AD Planning Morgan Shoal - concept planning COMPLETE 2015 * BURNHAM (DANIEL) 27 SI Site Improvement 31st St. Harbor - Special Event Deck COMPLETE 2015 BURNHAM (DANIEL) 27 AD New Construction Promontory Point - shoreline revetment COMPLETE 2015 BURNHAM (DANIEL) 27 SI Playground Chicago Plays! - new equipment COMPLETE 2015 BURNHAM (DANIEL) 27 SI Landscape Burnham Wildlife Corridor - improvements COMPLETE 2016 * BURNHAM (DANIEL) 27 FR Fitness Center 39th St. Beach - Outdoor Fitness Course COMPLETE 2016 * BURNHAM (DANIEL) 27 AD Planning 18th St. Parking Garage - new COMPLETE 2016 BURNHAM (DANIEL) 27 SI Playground Chicago Plays! - new equipment at 47th St. COMPLETE 2016 BURNHAM (DANIEL) 27 SI Site Improvement Lakefront Trail Separation - 31st St. to 35th St. COMPLETE 2016 BURNHAM (DANIEL) 27 FR Sculpture and Monument "David Wallach Memorial Fountain" - restoration COMPLETE 2016 * BURNHAM (DANIEL) 27 FR Concrete Masonry Structural 39th Street Trades Yard - emergency rehab COMPLETE 2017 BURNHAM (DANIEL) 27 SI Landscape Natural Area - Burnham Wildlife Corridor (31st St to 47th St) COMPLETE 2017 * BURNHAM (DANIEL) 27 AD New Construction CDOT Bridge - new park access at 35th St. COMPLETE 2017 * BURNHAM (DANIEL) 27 SI Paving 31st St. Parking Lot - expansion (west lot) COMPLETE 2017 BURNHAM (DANIEL) 27 SI Site Improvement Misc. - brick wall rehab COMPLETE 2017 BURNHAM (DANIEL) 27 SI Site Improvement Lakefront Trail Separation - 35th St. to 41st St. COMPLETE 2017 * BURNHAM (DANIEL) 27 SI Landscape Tree planting COMPLETE 2018 BURNHAM (DANIEL) 27 AD New Construction CDOT Bridge - new park access at 41st St. COMPLETE 2018 * BURNHAM (DANIEL) 27 AD New Construction CDOT Bridge - new park access at 39th St. COMPLETE 2018 BURNHAM (DANIEL) 27 SI Paving Landscape yard - paving COMPLETE 2018 BURNHAM (DANIEL) 27 SI Site Improvement Lakefront Trail Separation - 41st St. to 55th St. COMPLETE 2018 * BURNHAM (DANIEL) 27 FR Minor Rehab Promontory Point - new flooring COMPLETE 2018 BURNHAM (DANIEL) 27 SI Site Improvement Lakefront Trail Separation - Roosevelt Rd. to 31st St. COMPLETE 2018 * BURNHAM (DANIEL) 27 SI Site Improvement Memorial Plaza at 43rd St. -new COMPLETE 2019 *

7 of 65 CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011-2019* As of December 15, 2019

PARK YEAR PARK NAME NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS COMPLETE $ BURNHAM (DANIEL) 27 SI Paving Parking lot at 55th St - rehab COMPLETE 2019 BURNHAM (DANIEL) 27 FR HVAC and Energy Efficiency 39th St. Trades Yard - furnace COMPLETE 2019 BURNHAM (DANIEL) 27 AD Planning 31st St. Framework Plan DESIGN BURNHAM (DANIEL) 27 FR Concrete Masonry Structural Promontory Point - masonry PRE-DESIGN BURNHAM (DANIEL) 27 FR Roof Judd Goldman Sailing - new roof PRE-DESIGN BURNHAM (DANIEL) 27 SI Site Improvement Burnham Harbor - dock replacement CONSTRUCTION BURNHAM (DANIEL) 27 AD New Construction CDOT Bridge - new park access at 43rd St. CONSTRUCTION * BURNSIDE (AMBROSE) 363 SI Playground Chicago Plays! - new equipment COMPLETE 2014 BURNSIDE (AMBROSE) 363 SI Courts Basketball Court - rehab PLANNING BUTTERCUP 385 SI Playground Playground - new COMPLETE 2013 * BUTTERNUT 1272 SI Playground Chicago Plays! - new equipment COMPLETE 2016 BYRNES (MARIAN) 562 AD Acquisition Van Vlissingen - 1735-37 E. 96th St. COMPLETE 2012 BYRNES (MARIAN) 562 SI Landscape Van Vlissingen - habitat creation COMPLETE 2015 * BYRNES (MARIAN) 562 SI Landscape Van Vlissingen - Habitat enhancement COMPLETE 2018 * BYRNES (MARIAN) 562 SI Landscape Van Vlissingen - costal woodland restoration COMPLETE 2019 * BYRNES (MARIAN) 562 SI Landscape Van Vlissingen - wetland bird habitat COMPLETE 2019 * BYRNES (MARIAN) 562 SI Site Improvement Multi-use trail system - new CONSTRUCTION * BYRNES (MARIAN) 562 AD Park Development Park Development - Van Vlissingen CONSTRUCTION * CALIFORNIA 189 FR HVAC and Energy Efficiency Ice rink - compressor COMPLETE 2011 CALIFORNIA 189 SI Paving Parking lot - rehab COMPLETE 2011 CALIFORNIA 189 FR Roof Roof - rehab COMPLETE 2012 CALIFORNIA 189 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012

CALIFORNIA 189 FR HVAC and Energy Efficiency McFetridge - major rehab including HVAC energy management COMPLETE 2012 CALIFORNIA 189 SI Courts Softball court - rehab COMPLETE 2012 CALIFORNIA 189 SI Courts Courts - rehab including drainage COMPLETE 2012 CALIFORNIA 189 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 CALIFORNIA 189 SI Fencing Fencing COMPLETE 2014 CALIFORNIA 189 FR Minor Rehab Misc. interior rehab - McFetridge COMPLETE 2015 CALIFORNIA 189 FR Swimming Pool Pool - filter COMPLETE 2017 CALIFORNIA 189 SI Playground Chicago Plays! - new equipment and water play feature COMPLETE 2017 * CALIFORNIA 189 AD New Construction McFetridge -Ice Rink Expansion COMPLETE 2018 CALIFORNIA 189 AD New Construction 312 RiverRun Bridge (CDOT) COMPLETE 2019 * CALIFORNIA 189 AD Acquisition Park expansion COMPLETE 2019 CALIFORNIA 189 SI Courts Courts - tennis and basketball COMPLETE 2019 CALUMET 11 FR Minor Rehab Misc. - bathroom improvements COMPLETE 2011 CALUMET 11 FR Minor Rehab Landscape Yard - rehab COMPLETE 2011 CALUMET 11 FR Minor Rehab Lobby - rehab COMPLETE 2011 *

8 of 65 CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011-2019* As of December 15, 2019

PARK YEAR PARK NAME NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS COMPLETE $ CALUMET 11 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012 * CALUMET 11 SI Athletic Field Athletic field - rehab COMPLETE 2012 CALUMET 11 FR Concrete Masonry Structural Power house - chimney COMPLETE 2013 CALUMET 11 FR Concrete Masonry Structural Field house - major rehab COMPLETE 2014 CALUMET 11 FR Roof Roof - rehab COMPLETE 2014 CALUMET 11 SI Lighting Lighting - exterior COMPLETE 2014 CALUMET 11 SI Playground Chicago Plays! - new equipment COMPLETE 2015 CALUMET 11 SI Athletic Field Athletic field - rehab COMPLETE 2015 CALUMET 11 SI Site Improvement Outdoor fitness station - new COMPLETE 2016 * CALUMET 11 SI Site Improvement Dog Friendly Area - new COMPLETE 2018 * CALUMET 11 SI Landscape Tree planting COMPLETE 2019 CALUMET 11 FR Minor Rehab Field House - rehab BID/AWARD CALUMET 11 FR Minor Rehab Cultural Center Initiative PLANNING CALUMET 11 FR Roof Landscape Yard - roof and masonry PRE-DESIGN CARMEN 1085 SI Playground Chicago Plays! - new equipment COMPLETE 2016 CARPENTER (PHILO) 1086 SI Playground Chicago Plays! - new equipment COMPLETE 2014 CARVER (GEORGE WASHINGTON) 255 FR Swimming Pool Pool - filter system COMPLETE 2011 CARVER (GEORGE WASHINGTON) 255 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012 CARVER (GEORGE WASHINGTON) 255 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012 CARVER (GEORGE WASHINGTON) 255 FR HVAC and Energy Efficiency Misc. - exhaust fans COMPLETE 2013 CARVER (GEORGE WASHINGTON) 255 SI Playground Chicago Plays! - new equipment COMPLETE 2014 CARVER (GEORGE WASHINGTON) 255 FR Roof Roof COMPLETE 2014 CARVER (GEORGE WASHINGTON) 255 FR Minor Rehab Teen Fitness Center - new COMPLETE 2015 * CARVER (GEORGE WASHINGTON) 255 FR HVAC and Energy Efficiency Pool boiler - rehab COMPLETE 2017 CARVER (GEORGE WASHINGTON) 255 SI Landscape Tree planting COMPLETE 2018 CARVER (GEORGE WASHINGTON) 255 FR Swimming Pool Pool - rehab COMPLETE 2018 CARVER (GEORGE WASHINGTON) 255 SI Athletic Field Batting cage and scoreboard - new COMPLETE 2018 * CATALPA 372 SI Playground Chicago Plays! - new equipment COMPLETE 2015 CEDAR 1279 SI Playground Playground -rehab COMPLETE 2018 * CENTENNIAL 1238 SI Site Improvement Identity signage COMPLETE 2019 * CENTRAL 1087 SI Playground Chicago Plays! - new equipment COMPLETE 2014 CHALLENGER 488 SI Lighting Lighting - parking lot COMPLETE 2013 * CHASE (SALMON) 103 FR HVAC and Energy Efficiency Boiler and insulation COMPLETE 2011 CHASE (SALMON) 103 FR Swimming Pool Pool Retrofit - compliance and liner COMPLETE 2012 CHASE (SALMON) 103 FR Major Rehab Field house - mural COMPLETE 2012 * CHASE (SALMON) 103 FR Swimming Pool Pool - filter COMPLETE 2014 CHASE (SALMON) 103 FR Minor Rehab Misc. Pool Stair renovation COMPLETE 2015 CHASE (SALMON) 103 FR Minor Rehab Field house - assessment COMPLETE 2018

9 of 65 CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011-2019* As of December 15, 2019

PARK YEAR PARK NAME NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS COMPLETE $ CHASE (SALMON) 103 FR Swimming Pool Pool - liner rehab CONSTRUCTION CHASE (SALMON) 103 SI Athletic Field Artificial turf athletic field - new DESIGN * CHASE (SALMON) 103 FR Roof Roof CONSTRUCTION * CHESTNUT 1275 SI Playground Chicago Plays! - new equipment COMPLETE 2016 CHICAGO WOMEN'S PARK AND GARDENS 550 FR Sculpture and Monument "Helping Hands" - installation COMPLETE 2011 CHICAGO WOMEN'S PARK AND GARDENS 550 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012 CHICAGO WOMEN'S PARK AND GARDENS 550 FR Major Rehab Field house - major rehab COMPLETE 2014 * CHICAGO WOMEN'S PARK AND GARDENS 550 FR Minor Rehab Park improvements COMPLETE 2017 * CHICAGO WOMEN'S PARK AND GARDENS 550 FR HVAC and Energy Efficiency HVAC improvement COMPLETE 2018 CHICAGO WOMEN'S PARK AND GARDENS 550 SI Site Improvement Park drainage COMPLETE 2019 CHIPPEWA 167 SI Playground Chicago Plays! - new equipment COMPLETE 2014 CHIPPEWA 167 FR Concrete Masonry Structural Chimney and tuckpointing COMPLETE 2015 CHOPIN (FREDERIC) 146 SI Site Improvement Drainage improvements COMPLETE 2013 CHOPIN (FREDERIC) 146 SI Site Improvement Park improvements COMPLETE 2013 CHOPIN (FREDERIC) 146 SI Playground Chicago Plays! - new equipment COMPLETE 2014 CHOPIN (FREDERIC) 146 SI Courts Tennis court - rehab COMPLETE 2018 CHOPIN (FREDERIC) 146 SI Courts Mini-pitch Soccer Court - new COMPLETE 2018 * CHOPIN (FREDERIC) 146 FR Roof Field house - roof, masonry, interior PRE-DESIGN * CHRISTIANA 1089 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 CHRISTIANA 1089 SI Playground Chicago Plays! - new equipment COMPLETE 2014 CHRISTIANA 1089 SI Site Improvement Expansion - site improvements COMPLETE 2019 * CHURCHILL FIELD 412 SI Site Improvement Misc. - drainage COMPLETE 2016 CHURCHILL FIELD 412 SI Athletic Field Athletic field - rehab COMPLETE 2016 CLAREMONT 400 SI Playground Misc. park improvement COMPLETE 2011 CLAREMONT 400 SI Site Improvement Landscape and site improvement COMPLETE 2012 CLAREMONT 400 SI Playground Playground - new COMPLETE 2012 * CLARENDON COMM. CTR. 1002 SI Lighting Lighting - ballfield COMPLETE 2012 CLARENDON COMM. CTR. 1002 SI Site Improvement Dog friendly area - new COMPLETE 2012 * CLARENDON COMM. CTR. 1002 SI Fencing Misc. rehab COMPLETE 2013 CLARENDON COMM. CTR. 1002 FR Major Rehab Field house - major rehab COMPLETE 2015 * CLARENDON COMM. CTR. 1002 SI Courts Basketball Court - rehab COMPLETE 2016 CLARENDON COMM. CTR. 1002 AD New Construction Field house - study COMPLETE 2016 CLARENDON COMM. CTR. 1002 FR HVAC and Energy Efficiency Boiler - new COMPLETE 2018 CLARENDON COMM. CTR. 1002 SI Athletic Field Athletic field - rehab COMPLETE 2019 CLARENDON COMM. CTR. 1002 FR Major Rehab Field house - major restoration DESIGN * CLARK (JOHN) 1026 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012 CLARK (JOHN) 1026 SI Playground Chicago Plays! - new equipment COMPLETE 2014 CLARK (JOHN) 1026 FR Swimming Pool Emergency restoration COMPLETE 2019

10 of 65 CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011-2019* As of December 15, 2019

PARK YEAR PARK NAME NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS COMPLETE $ CLARK (JOHN) 1026 FR Swimming Pool Outdoor pool - rehab (TBD) PRE-DESIGN CLARK (RICHARD) 457 FR Major Rehab Lane Tech Stadium - interior COMPLETE 2011 CLARK (RICHARD) 457 AD New Construction New Boat House COMPLETE 2013 * CLARK (RICHARD) 457 AD New Construction Kerry Wood Cubs Field - new stadium COMPLETE 2015 * CLARK (RICHARD) 457 SI Athletic Field Artificial Turf Athletic Field - new COMPLETE 2017 CLARK (RICHARD) 457 SI Athletic Field Kerry Wood's Cubs Field - field rehab COMPLETE 2019 * CLARK (RICHARD) 457 SI Paving Parking lot - accessibility COMPLETE 2019 CLARK (RICHARD) 457 AD New Construction 312 RiverRun -Riverview Bridge (CDOT) COMPLETE 2019 * CLOVER 1277 SI Playground Chicago Plays! - new equipment COMPLETE 2016 CLYBOURN (ARCHIBALD) 1091 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013 CLYBOURN (ARCHIBALD) 1091 SI Courts Basketball court - rehab COMPLETE 2016 * COCHRAN (JOHN) 420 SI Playground Playground - rehab - surfacing COMPLETE 2014 COLE (NAT KING) 270 AD Park Development Park development - including playground COMPLETE 2011 COLE (NAT KING) 270 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 COLEMAN (BESSIE) 292 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013 COLISEUM 507 SI Lighting Lighting - exterior COMPLETE 2013 COLISEUM 507 SI Site Improvement Misc. - site improvements COMPLETE 2013 * COLUMBUS (CHRISTOPHER) 209 FR Windows and Doors Field house - doors COMPLETE 2011 COLUMBUS (CHRISTOPHER) 209 FR Minor Rehab Misc. - sump pump COMPLETE 2011 COLUMBUS (CHRISTOPHER) 209 FR Fitness Center Fitness center - upgrade COMPLETE 2011 COLUMBUS (CHRISTOPHER) 209 FR Concrete Masonry Structural Chimney COMPLETE 2012 COLUMBUS (CHRISTOPHER) 209 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012 COLUMBUS (CHRISTOPHER) 209 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2013 COLUMBUS (CHRISTOPHER) 209 SI Athletic Field Artificial Turf Athletic Field - new COMPLETE 2013 * COLUMBUS (CHRISTOPHER) 209 SI Site Improvement Lagoon and drainage COMPLETE 2013 COLUMBUS (CHRISTOPHER) 209 SI Playground Chicago Plays! - new equipment COMPLETE 2015 COLUMBUS (CHRISTOPHER) 209 SI Paving Paving - refectory entrance COMPLETE 2016 COLUMBUS (CHRISTOPHER) 209 SI Athletic Field Athletic Field - scoreboard COMPLETE 2016 COLUMBUS (CHRISTOPHER) 209 FR Minor Rehab Refectory - remediation COMPLETE 2016 COLUMBUS (CHRISTOPHER) 209 FR HVAC and Energy Efficiency Gymnasium - heaters COMPLETE 2017 COLUMBUS (CHRISTOPHER) 209 FR Swimming Pool Pool - sump pumps and filter COMPLETE 2017 COLUMBUS (CHRISTOPHER) 209 FR Minor Rehab Refectory - column restoration COMPLETE 2018 COLUMBUS (CHRISTOPHER) 209 FR Swimming Pool Pool - controls, water line COMPLETE 2018 COLUMBUS (CHRISTOPHER) 209 SI Site Improvement Water main - emergency rehab CONSTRUCTION COLUMBUS (CHRISTOPHER) 209 FR Minor Rehab Gymnasium - renovation PRE-DESIGN * COLUMBUS (CHRISTOPHER) 209 FR Major Rehab Field house and Refectory - Major Rehab CONSTRUCTION * COMMERCIAL CLUB PGD. of CHICAGO 1006 FR Concrete Masonry Structural Field house - chimney PRE-DESIGN COMMERCIAL CLUB PGD. of CHICAGO 1006 FR Windows and Doors Field house - windows and doors PRE-DESIGN

11 of 65 CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011-2019* As of December 15, 2019

PARK YEAR PARK NAME NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS COMPLETE $ CONNORS (WILLIAM) 1200 SI Site Improvement Misc. - fencing COMPLETE 2013 CONNORS (WILLIAM) 1200 AD New Construction Concession building - new COMPLETE 2013 COOPER (JACK) 287 SI Paving Paving COMPLETE 2011 COOPER (JACK) 287 SI Courts Sport court - installation CONSTRUCTION CORNELL (PAUL) SQUARE 5 SI Athletic Field Artificial turf athletic field - new COMPLETE 2011 * CORNELL (PAUL) SQUARE 5 FR Roof Roof COMPLETE 2011 CORNELL (PAUL) SQUARE 5 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012 CORNELL (PAUL) SQUARE 5 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012 CORNELL (PAUL) SQUARE 5 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 CORNELL (PAUL) SQUARE 5 SI Playground Playground new with water feature - new COMPLETE 2014 * CORNELL (PAUL) SQUARE 5 FR HVAC and Energy Efficiency Boiler - new COMPLETE 2014 CORNELL (PAUL) SQUARE 5 SI Landscape Historic landscape restoration COMPLETE 2016 * CORNELL (PAUL) SQUARE 5 FR Major Rehab Field house - Major Rehab DESIGN CORNELL (PAUL) SQUARE 5 FR Swimming Pool Pool - filter PRE-DESIGN COSME (MARGARET) 176 SI Playground Chicago Plays! - new equipment COMPLETE 2014 COSME (MARGARET) 176 SI Courts Tennis court - rehab COMPLETE 2018 * COTTON TAIL 480 SI Site Improvement Misc. - benches and fencing COMPLETE 2012 COTTON TAIL 480 SI Lighting Exterior - lighting COMPLETE 2013 COTTONWOOD 416 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013 CRAGIN 131 SI Courts Court - conversion to sport court COMPLETE 2014 CRAGIN 131 SI Playground Chicago Plays! - new equipment COMPLETE 2014 CRAWFORD (PETER) 359 SI Playground Chicago Plays! - new equipment COMPLETE 2016 CRESCENT 47 SI Courts Tennis court - rehab COMPLETE 2018 DAVIS (DR. NATHAN) SQUARE 14 FR Roof Roof COMPLETE 2011 DAVIS (DR. NATHAN) SQUARE 14 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012 DAVIS (DR. NATHAN) SQUARE 14 FR Concrete Masonry Structural Field house - concrete and masonry COMPLETE 2012 DAVIS (DR. NATHAN) SQUARE 14 SI Athletic Field Artificial turf athletic field - new COMPLETE 2012 * DAVIS (DR. NATHAN) SQUARE 14 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012 DAVIS (DR. NATHAN) SQUARE 14 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012 DAVIS (DR. NATHAN) SQUARE 14 FR Concrete Masonry Structural Chimney COMPLETE 2013 DAVIS (DR. NATHAN) SQUARE 14 SI Lighting Lighting - interior gym COMPLETE 2013 DAVIS (DR. NATHAN) SQUARE 14 SI Playground Chicago Plays! - new equipment COMPLETE 2014 DAVIS (DR. NATHAN) SQUARE 14 SI Site Improvement Misc. bleachers and scoreboards COMPLETE 2016 * DAVIS (DR. NATHAN) SQUARE 14 FR Roof Pool Building - roof COMPLETE 2016 DAVIS (DR. NATHAN) SQUARE 14 SI Courts Mini-pitch Soccer Court - 4 new COMPLETE 2018 * DAVIS (DR. NATHAN) SQUARE 14 SI Landscape Tree Planting COMPLETE 2019 DAVIS (DR. NATHAN) SQUARE 14 FR Swimming Pool Pool - filter and controls PRE-DESIGN DAVIS (MARGARET) 1092 FR Fitness Center Fitness center - accessibility equipment COMPLETE 2011

12 of 65 CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011-2019* As of December 15, 2019

PARK YEAR PARK NAME NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS COMPLETE $ DAVIS (MARGARET) 1092 SI Playground Chicago Plays! - new equipment COMPLETE 2014 * DAWES (CHARLES G.) 239 FR Roof Roof COMPLETE 2012 DAWES (CHARLES G.) 239 SI Playground Chicago Plays! - new equipment COMPLETE 2014 DAWES (CHARLES G.) 239 SI Athletic Field Athletic field - rehab COMPLETE 2015 * DAWES (CHARLES G.) 239 SI Paving 2016 DW Paving COMPLETE 2016 DAWES (CHARLES G.) 239 SI Courts Basketball Court - rehab COMPLETE 2016 DAWES (CHARLES G.) 239 SI Spray Pool Spray feature - rehab COMPLETE 2017 * DAWES (CHARLES G.) 239 SI Landscape Tree planting COMPLETE 2018 DAWES (CHARLES G.) 239 SI Athletic Field Athletic field - rehab COMPLETE 2018 * De Burgos (Julia) 554 AD Acquisition Bloomingdale Access Park - Whipple St. and Albany Ave. COMPLETE 2011 De Burgos (Julia) 554 AD Park Development Bloomingdale Access - new park development COMPLETE 2011 * De Burgos (Julia) 554 SI Playground Park improvements COMPLETE 2019 De Burgos (Julia) 554 AD Park Development Bloomingdale Access Park - expansion CONSTRUCTION * DEARBORN (HENRY) 465 SI Lighting Exterior lighting - upgrade COMPLETE 2018 * DEBOW (RUSSELL) 405 SI Playground Chicago Plays! - new equipment COMPLETE 2015 DEGEORGE (BERNICE) 1093 SI Playground Chicago Plays! - new equipment COMPLETE 2014 DEJULIO (ANTHONY) 366 SI Playground Chicago Plays! - new equipment COMPLETE 2014 D'ELIA (AILEEN) 390 SI Playground Chicago Plays! - new equipment COMPLETE 2014 DIXON (LORRAINE) 1210 SI Site Improvement Landscape and site improvement COMPLETE 2011 DIXON (LORRAINE) 1210 SI Site Improvement Park improvements including playground COMPLETE 2015 * DIXON (LORRAINE) 1210 SI Site Improvement Park improvements - south entranceway COMPLETE 2017 * DOBSON 1094 SI Playground Chicago Plays! - new equipment COMPLETE 2015 DOGWOOD 344 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013 Donahue (Margaret) 570 AD Acquisition 1230 W. School St. COMPLETE 2013 *

Donahue (Margaret) 570 AD Park Development New park development including playground - 1230 W. School St. COMPLETE 2015 * DONOVAN (GEORGE) 1029 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013 DONOVAN (GEORGE) 1029 SI Athletic Field Athletic field - scoreboard COMPLETE 2017 DOUGHERTY (DANIEL) 368 SI Landscape Tree planting COMPLETE 2019 DOUGLAS (STEPHEN) 218 FR Concrete Masonry Structural Field house - framing and plastering COMPLETE 2011 DOUGLAS (STEPHEN) 218 FR Roof Landscape yard - roof COMPLETE 2011 DOUGLAS (STEPHEN) 218 FR Major Rehab Field house - locker room improvements COMPLETE 2012 DOUGLAS (STEPHEN) 218 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012 DOUGLAS (STEPHEN) 218 SI Lighting Lighting - exterior COMPLETE 2012 DOUGLAS (STEPHEN) 218 SI Athletic Field Artificial turf athletic field - new COMPLETE 2012 * Slam Dunk Basketball Court - rehab DOUGLAS (STEPHEN) 218 SI Courts All courts were rehabbed. COMPLETE 2012 DOUGLAS (STEPHEN) 218 SI Site Improvement Misc. - bleachers COMPLETE 2013

13 of 65 CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011-2019* As of December 15, 2019

PARK YEAR PARK NAME NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS COMPLETE $ DOUGLAS (STEPHEN) 218 SI Site Improvement Athletic field - drainage COMPLETE 2013 DOUGLAS (STEPHEN) 218 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2013 DOUGLAS (STEPHEN) 218 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2013 DOUGLAS (STEPHEN) 218 SI Athletic Field Athletic field - rehab COMPLETE 2013 DOUGLAS (STEPHEN) 218 SI Playground Chicago Plays! - new equipment (at 18th St.) COMPLETE 2014 DOUGLAS (STEPHEN) 218 FR Swimming Pool Pool - rehab COMPLETE 2015 DOUGLAS (STEPHEN) 218 SI Playground Chicago Plays! - new equipment (at California Ave.) COMPLETE 2015 * DOUGLAS (STEPHEN) 218 FR Swimming Pool Pool - rehab COMPLETE 2016 * DOUGLAS (STEPHEN) 218 SI Paving Paving - paths COMPLETE 2016 Chicago Plays! - new equipment (at Albany Ave.) with water DOUGLAS (STEPHEN) 218 SI Playground feature COMPLETE 2016 * DOUGLAS (STEPHEN) 218 SI Playground Chicago Plays! - new equipment at Albany Dr. COMPLETE 2016 * DOUGLAS (STEPHEN) 218 SI Lighting Lighting - pathway COMPLETE 2017 DOUGLAS (STEPHEN) 218 FR Minor Rehab Misc. - boiler COMPLETE 2017 DOUGLAS (STEPHEN) 218 SI Playground Playground - new equipment at Sacramento Dr. COMPLETE 2017 DOUGLAS (STEPHEN) 218 SI Landscape Site improvements - pathways COMPLETE 2018 DOUGLAS (STEPHEN) 218 SI Fencing Pergola - security fencing COMPLETE 2018 * DOUGLAS (STEPHEN) 218 SI Courts Tennis court - rehab COMPLETE 2018 * DOUGLAS (STEPHEN) 218 FR Major Rehab Field house - Major Rehab COMPLETE 2019 * DOUGLAS (STEPHEN) 218 SI Site Improvement Cultural Venue - assessment COMPLETE 2019 DOUGLAS (STEPHEN) 218 SI Site Improvement Miniature Golf Course - rehab CONSTRUCTION * DOUGLAS (STEPHEN) 218 SI Landscape Natural Area - new CONSTRUCTION * DOUGLAS (STEPHEN) 218 FR Major Rehab Cultural Center Initiative PLANNING DOUGLAS (STEPHEN) 218 SI Athletic Field Artificial turf athletic field - major rehab CONSTRUCTION * DREXEL (FRANCIS) 441 SI Playground Chicago Plays! - new equipment COMPLETE 2014 DUBKIN (LEONARD) 306 SI Site Improvement Misc. - garden beds COMPLETE 2012 * DUBKIN (LEONARD) 306 SI Paving Paving - entryway COMPLETE 2016 * DUNBAR (PAUL LAURENCE) 267 SI Courts Basketball court - rehab COMPLETE 2013 DUNBAR (PAUL LAURENCE) 267 SI Lighting Exterior - upgrade COMPLETE 2013 DUNBAR (PAUL LAURENCE) 267 FR Sculpture and Monument Sculpture - new COMPLETE 2014 DUNBAR (PAUL LAURENCE) 267 SI Athletic Field Athletic field - rehab COMPLETE 2014 DUNBAR (PAUL LAURENCE) 267 SI Playground Chicago Plays! - new equipment COMPLETE 2016 DUNBAR (PAUL LAURENCE) 267 SI Courts Tennis court - rehab COMPLETE 2016 * DUNBAR (PAUL LAURENCE) 267 SI Athletic Field Artificial turf athletic field - new COMPLETE 2019 * DUNHAM (ROBERT) 258 FR Fitness Center Fitness center - new COMPLETE 2011 DUNHAM (ROBERT) 258 SI Courts Tennis court - rehab COMPLETE 2013 DUNHAM (ROBERT) 258 SI Athletic Field Athletic field - rehab COMPLETE 2013 DUNHAM (ROBERT) 258 FR Minor Rehab Gym - bleachers COMPLETE 2018

14 of 65 CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011-2019* As of December 15, 2019

PARK YEAR PARK NAME NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS COMPLETE $ DUNHAM (ROBERT) 258 SI Lighting Athletic Field - lighting PRE-DESIGN * DURKIN (MARTIN) 268 SI Playground Chicago Plays! - new equipment COMPLETE 2014 DURKIN (MARTIN) 268 SI Paving 2016 DW Paving COMPLETE 2016 DURKIN (MARTIN) 268 SI Site Improvement Outdoor fitness station - new COMPLETE 2019 * DURSO (JOHN) 1037 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 DURSO (JOHN) 1037 SI Playground Playground - new PLANNING DUSABLE (JEAN BAPTISTE POINTE) 478 AD New Construction New Harbor Development - Gateway COMPLETE 2011 DUSABLE (JEAN BAPTISTE POINTE) 478 SI Site Improvement Landscape improvements COMPLETE 2013 DUSABLE (JEAN BAPTISTE POINTE) 478 AD Park Development Park development - clean and green COMPLETE 2016 * DUSABLE (JEAN BAPTISTE POINTE) 478 AD New Construction Navy Pier Flyover (CDOT) COMPLETE 2019 * DUSABLE (JEAN BAPTISTE POINTE) 478 SI Site Improvement Environmental remediation CONSTRUCTION * DUSABLE (JEAN BAPTISTE POINTE) 478 AD Park Development Park development - new PLANNING DVORAK (ANTON) 216 FR Minor Rehab Field house and perimeter drainage COMPLETE 2011 DVORAK (ANTON) 216 SI Paving Paving - paths COMPLETE 2011 DVORAK (ANTON) 216 FR Minor Rehab Misc. entrance accessibility COMPLETE 2011 DVORAK (ANTON) 216 SI Site Improvement Drinking fountain - rehab COMPLETE 2012 DVORAK (ANTON) 216 FR Major Rehab Field house - locker room improvements COMPLETE 2012 DVORAK (ANTON) 216 FR Major Rehab Transition plan - access improvements COMPLETE 2012 DVORAK (ANTON) 216 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012 DVORAK (ANTON) 216 SI Athletic Field Ballfield - rehab COMPLETE 2013 DVORAK (ANTON) 216 FR Minor Rehab Misc. - locker rooms COMPLETE 2014 DVORAK (ANTON) 216 SI Playground Chicago Plays! - new equipment COMPLETE 2015 * DVORAK (ANTON) 216 FR Minor Rehab Misc. pool stair renovation COMPLETE 2015 DVORAK (ANTON) 216 FR Swimming Pool Pool - filter COMPLETE 2016 DVORAK (ANTON) 216 SI Spray Pool Spray feature -rehab COMPLETE 2018 DVORAK (ANTON) 216 FR Major Rehab Field house and Pool house - Major Rehab COMPLETE 2018 * DVORAK (ANTON) 216 SI Landscape Tree Planting COMPLETE 2019 DVORAK (ANTON) 216 FR Swimming Pool Pool - liner COMPLETE 2019 DVORAK (ANTON) 216 FR Concrete Masonry Structural Pool Building - masonry PRE-DESIGN * DVORAK (ANTON) 216 FR Roof Over porch - new PRE-DESIGN ECKERSALL (WALTER HERBERT) 232 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 ECKERSALL (WALTER HERBERT) 232 SI Playground Chicago Plays! - new equipment COMPLETE 2016 ECKHART (BERNARD) 208 FR Major Rehab Transition plan - access improvements COMPLETE 2011 ECKHART (BERNARD) 208 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012 ECKHART (BERNARD) 208 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 ECKHART (BERNARD) 208 SI Playground Playground with water feature - new COMPLETE 2014 * ECKHART (BERNARD) 208 FR Swimming Pool Pool - tile and grout COMPLETE 2014 ECKHART (BERNARD) 208 SI Athletic Field Athletic Field - rehab COMPLETE 2017 *

15 of 65 CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011-2019* As of December 15, 2019

PARK YEAR PARK NAME NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS COMPLETE $ ECKHART (BERNARD) 208 FR Minor Rehab Misc. boiler COMPLETE 2017 ECKHART (BERNARD) 208 FR Major Rehab Field house - Major Rehab COMPLETE 2017 * ECKHART (BERNARD) 208 FR Swimming Pool Pool - filter upgrade COMPLETE 2019 ECKHART (BERNARD) 208 FR HVAC and Energy Efficiency Pool dehumidifier - new PRE-DESIGN * EDISON (THOMAS ALVA) 62 SI Playground Chicago Plays! - new equipment COMPLETE 2015 * EDISON (THOMAS ALVA) 62 FR Concrete Masonry Structural Field house - concrete and masonry PRE-DESIGN EDMONDS (MOLLY) 391 AD Acquisition Expansion COMPLETE 2012 EDMONDS (MOLLY) 391 SI Playground Chicago Plays! - new equipment COMPLETE 2014 EHRLER (WILLIAM) 283 SI Site Improvement Park improvements PLANNING ELLIS (SAMUEL) 1213 SI Site Improvement Misc. fencing and lighting COMPLETE 2014 * ELLIS (SAMUEL) 1213 AD New Construction Quad Communities Arts Recreation and Health Center COMPLETE 2016 * ELLIS (SAMUEL) 1213 SI Courts Basketball court - rehab COMPLETE 2016 * ELLIS (SAMUEL) 1213 SI Playground Playground - resurfacing COMPLETE 2016 ELM 279 SI Site Improvement Misc. - paving and fencing COMPLETE 2012 ELSTON (DANIEL) 1097 SI Playground Chicago Plays! - new equipment COMPLETE 2015 EMERALD 1098 SI Fencing Fencing - perimeter COMPLETE 2019 EMERALD 1098 SI Site Improvement Park improvements PLANNING EMMERSON (LOUIS) 104 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 EMMERSON (LOUIS) 104 SI Playground Chicago Plays! - new equipment COMPLETE 2015 EMMERSON (LOUIS) 104 FR Roof Roof - new PRE-DESIGN ESSEX 434 SI Playground Playground - new COMPLETE 2013 * EUCLID 66 FR Minor Rehab Transition plan - access improvements COMPLETE 2011 EUCLID 66 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013 EVERGREEN 1276 SI Playground Playground - surfacing COMPLETE 2017 FELLGER (CHARLES) 1100 SI Spray Pool Water feature - rehab COMPLETE 2017 FERNWOOD 65 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2011 FERNWOOD 65 SI Athletic Field Ballfield - rehab COMPLETE 2011 FERNWOOD 65 FR Minor Rehab Field house - interior COMPLETE 2012 FERNWOOD 65 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012 FERNWOOD 65 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013 FERNWOOD 65 FR HVAC and Energy Efficiency HVAC - exhaust fans COMPLETE 2013 FERNWOOD 65 FR Swimming Pool Pool - liner COMPLETE 2018 FERNWOOD 65 SI Landscape Tree planting COMPLETE 2018 FERNWOOD 65 FR HVAC and Energy Efficiency Boiler - new COMPLETE 2019 FERNWOOD 65 FR Major Rehab Pool building - Major rehab PRE-DESIGN FIELD (EUGENE) 41 FR Minor Rehab Misc. sump pump COMPLETE 2011 FIELD (EUGENE) 41 FR Major Rehab Transition plan - access improvements COMPLETE 2012 FIELD (EUGENE) 41 SI Fencing Fencing - at Chicago River COMPLETE 2013

16 of 65 CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011-2019* As of December 15, 2019

PARK YEAR PARK NAME NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS COMPLETE $ FIELD (EUGENE) 41 AD Park Development Aquatic restoration COMPLETE 2013 * FIELD (EUGENE) 41 FR Roof Roof - rehab COMPLETE 2014 FIELD (EUGENE) 41 SI Spray Pool Water feature - rehab COMPLETE 2014 FIELD (EUGENE) 41 FR Concrete Masonry Structural Concrete and structural - basement COMPLETE 2015 FIELD (EUGENE) 41 AD Acquisition 5056 N. Monticello Ave. COMPLETE 2015 * FIELD (EUGENE) 41 SI Athletic Field Athletic field - rehab COMPLETE 2017 FIELD (EUGENE) 41 SI Site Improvement Site improvements (CDOT) COMPLETE 2018 * FIELD (EUGENE) 41 SI Landscape Tree Planting COMPLETE 2019 FIELD (EUGENE) 41 AD Park Development Site improvements - 5056 N. Monticello Ave. CONSTRUCTION * FIELD (EUGENE) 41 SI Site Improvement Misc. - fencing, landscaping, utilities CONSTRUCTION * FILBERT 1281 SI Playground Playground - new COMPLETE 2012 * FLOWER (LUCY) 431 SI Playground Playground with water feature- new COMPLETE 2014 * FLYING SQUIRREL 331 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013 FLYING SQUIRREL 331 SI Fencing Expansion and perimeter fencing COMPLETE 2015 FOSCO (PETER) 1030 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012 FOSCO (PETER) 1030 FR Windows and Doors Pool building - window security COMPLETE 2012 FOSCO (PETER) 1030 FR HVAC and Energy Efficiency Misc. - HVAC rehab COMPLETE 2012 FOSCO (PETER) 1030 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012 FOSCO (PETER) 1030 AD Park Development Park expansion COMPLETE 2013 * FOSCO (PETER) 1030 SI Spray Pool Water play feature - rehab COMPLETE 2016 FOSCO (PETER) 1030 FR Swimming Pool Pool - rehab COMPLETE 2016 FOSCO (PETER) 1030 FR Minor Rehab Gym Floor - rehab COMPLETE 2019 FOSCO (PETER) 1030 FR HVAC and Energy Efficiency Misc. - compressor COMPLETE 2019 FOSCO (PETER) 1030 FR Major Rehab Roof and masonry COMPLETE 2019 FOSCO (PETER) 1030 FR Swimming Pool Dehumidification - new CONSTRUCTION FOSTER (J. FRANK) 26 SI Lighting Lighting - gym COMPLETE 2011 FOSTER (J. FRANK) 26 FR HVAC and Energy Efficiency Boiler and insulation COMPLETE 2011 FOSTER (J. FRANK) 26 FR Windows and Doors Natatorium - doors COMPLETE 2011 * FOSTER (J. FRANK) 26 FR Swimming Pool Pool Retrofit -compliance COMPLETE 2012 FOSTER (J. FRANK) 26 FR Major Rehab Transition plan - access improvements COMPLETE 2012 FOSTER (J. FRANK) 26 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012 FOSTER (J. FRANK) 26 SI Paving Parking lot - rehab COMPLETE 2013 FOSTER (J. FRANK) 26 FR Minor Rehab Misc. pool stair renovation COMPLETE 2015 FOSTER (J. FRANK) 26 SI Playground Chicago Plays! - new equipment COMPLETE 2015 FOSTER (J. FRANK) 26 SI Courts Basketball Court - rehab COMPLETE 2016 FOSTER (J. FRANK) 26 SI Paving Parking lot - rehab COMPLETE 2017 FOSTER (J. FRANK) 26 SI Spray Pool Spray feature - rehab COMPLETE 2017 FOSTER (J. FRANK) 26 FR Swimming Pool Pool - controls COMPLETE 2018

17 of 65 CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011-2019* As of December 15, 2019

PARK YEAR PARK NAME NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS COMPLETE $ FOSTER (J. FRANK) 26 SI Lighting Lighting upgrade to LED COMPLETE 2019 FOSTER (J. FRANK) 26 SI Courts Mini-pitch Soccer Court - new COMPLETE 2019 * FOSTER (J. FRANK) 26 FR HVAC and Energy Efficiency Foster - air conditioning COMPLETE 2019 FOSTER (J. FRANK) 26 SI Landscape Tree planting COMPLETE 2019 FOSTER (J. FRANK) 26 FR HVAC and Energy Efficiency Field house - boiler BID/AWARD FRANKLIN (BENJAMIN) 202 SI Athletic Field Ballfield - rehab COMPLETE 2011 FRANKLIN (BENJAMIN) 202 FR HVAC and Energy Efficiency Misc. - rehab COMPLETE 2012 FRANKLIN (BENJAMIN) 202 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012 FRANKLIN (BENJAMIN) 202 FR Swimming Pool Pool - liner, gutter, filter COMPLETE 2013 FRANKLIN (BENJAMIN) 202 SI Site Improvement Drinking fountain - new COMPLETE 2013 FRANKLIN (BENJAMIN) 202 FR Swimming Pool Pool Retrofit -compliance COMPLETE 2013 FRANKLIN (BENJAMIN) 202 SI Playground Chicago Plays! - new equipment COMPLETE 2013 FRANKLIN (BENJAMIN) 202 SI Spray Pool Water feature - rehab COMPLETE 2016 FRANKLIN (BENJAMIN) 202 SI Courts Basketball Court - rehab COMPLETE 2016 FRANKLIN (BENJAMIN) 202 FR Minor Rehab Gym floor - rehab COMPLETE 2017 FRANKLIN (BENJAMIN) 202 FR HVAC and Energy Efficiency Roof/HVAC - rehab PRE-DESIGN FULLER (MELVILLE) 4 FR Minor Rehab Fitness center - roof COMPLETE 2011 FULLER (MELVILLE) 4 FR Roof Field house and gym - roof COMPLETE 2011 FULLER (MELVILLE) 4 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012 FULLER (MELVILLE) 4 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012 FULLER (MELVILLE) 4 FR Swimming Pool Pool - liner and water line COMPLETE 2013 FULLER (MELVILLE) 4 FR Major Rehab Park Improvements including Field House and Playground COMPLETE 2016 * FULLER (MELVILLE) 4 FR Swimming Pool Pool - filter and gutter COMPLETE 2019 GAGE (GEORGE) 22 SI Athletic Field Artificial turf athletic field - new COMPLETE 2011 GAGE (GEORGE) 22 FR Roof Power house - roof COMPLETE 2011 GAGE (GEORGE) 22 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012 GAGE (GEORGE) 22 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012 GAGE (GEORGE) 22 FR Minor Rehab Field house - basement COMPLETE 2013 * GAGE (GEORGE) 22 FR Swimming Pool Pool - liner and water line COMPLETE 2013 GAGE (GEORGE) 22 FR Concrete Masonry Structural Concrete porch - rehab COMPLETE 2014 GAGE (GEORGE) 22 FR Minor Rehab Misc. - boiler COMPLETE 2017 GAGE (GEORGE) 22 SI Courts Mini-pitch soccer court - new COMPLETE 2017 * GAGE (GEORGE) 22 SI Landscape Tree planting COMPLETE 2018 GAGE (GEORGE) 22 FR Minor Rehab Access chair lift - new COMPLETE 2018 GAGE (GEORGE) 22 FR Swimming Pool Pool - filter and gutters COMPLETE 2018 * GAGE (GEORGE) 22 FR Roof Pool building - new PRE-DESIGN GAGE (GEORGE) 22 SI Athletic Field Athletic Field - bleachers and storage PRE-DESIGN * GALEWOOD 130 FR Minor Rehab Misc. - rehab after fire COMPLETE 2012

18 of 65 CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011-2019* As of December 15, 2019

PARK YEAR PARK NAME NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS COMPLETE $ GALEWOOD 130 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 GALEWOOD 130 SI Site Improvement Park improvements COMPLETE 2018 * GALEWOOD 130 SI Playground Playground - upgrade PLANNING GARFIELD (JAMES) 204 SI Lighting Lighting - lagoon COMPLETE 2011 GARFIELD (JAMES) 204 FR Minor Rehab Misc. - generator COMPLETE 2011 GARFIELD (JAMES) 204 SI Site Improvement Misc. electric service COMPLETE 2011 GARFIELD (JAMES) 204 SI Site Improvement Misc. - site drainage COMPLETE 2011 GARFIELD (JAMES) 204 FR Minor Rehab Conservatory - flooring COMPLETE 2011 GARFIELD (JAMES) 204 FR Major Rehab Gold Dome - concrete and structural COMPLETE 2011 * GARFIELD (JAMES) 204 FR Major Rehab Gym floor - restore or replace COMPLETE 2011 * GARFIELD (JAMES) 204 SI Athletic Field Artificial turf athletic field - new COMPLETE 2011 * GARFIELD (JAMES) 204 FR Minor Rehab Misc. conservatory improvement COMPLETE 2011 GARFIELD (JAMES) 204 FR Minor Rehab Field house - lockers and bathrooms COMPLETE 2012 GARFIELD (JAMES) 204 FR Minor Rehab Conservatory - shade cloth system COMPLETE 2012 GARFIELD (JAMES) 204 SI Fencing Conservatory - fencing COMPLETE 2012 GARFIELD (JAMES) 204 FR Minor Rehab Misc. - sump pump COMPLETE 2012 GARFIELD (JAMES) 204 SI Lighting Exterior lighting COMPLETE 2012 GARFIELD (JAMES) 204 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012 GARFIELD (JAMES) 204 FR HVAC and Energy Efficiency Conservatory - HVAC - Jensen Room COMPLETE 2012 GARFIELD (JAMES) 204 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 GARFIELD (JAMES) 204 SI Paving Conservatory - parking lot - rehab COMPLETE 2012 GARFIELD (JAMES) 204 FR HVAC and Energy Efficiency Gold Dome - boiler - upgrade COMPLETE 2013 GARFIELD (JAMES) 204 SI Landscape Conservatory - exterior pond liners COMPLETE 2013 GARFIELD (JAMES) 204 FR Minor Rehab Conservatory - Show House steam lines COMPLETE 2014 GARFIELD (JAMES) 204 FR Major Rehab Conservatory - Major rehab from storm damage COMPLETE 2014 * GARFIELD (JAMES) 204 FR Major Rehab Gold Dome - major rehab - front steps and building apron COMPLETE 2015 * GARFIELD (JAMES) 204 FR Minor Rehab Trades Building - rehab COMPLETE 2015 GARFIELD (JAMES) 204 FR Roof Power house - Rehab COMPLETE 2015 GARFIELD (JAMES) 204 FR Sculpture and Monument Conservatory - Solarise Exhibit COMPLETE 2015 * GARFIELD (JAMES) 204 FR Major Rehab Stables - restoration COMPLETE 2015 GARFIELD (JAMES) 204 SI Playground Chicago Plays! - new equipment at Madison St. COMPLETE 2016 GARFIELD (JAMES) 204 FR Roof Conservatory - entry roof rehab COMPLETE 2016 GARFIELD (JAMES) 204 SI Athletic Field Athletic field - rehab COMPLETE 2017 * GARFIELD (JAMES) 204 SI Site Improvement Conservatory - Wild Exploration Garden - design COMPLETE 2017 GARFIELD (JAMES) 204 SI Athletic Field Athletic field - rehab and batting tunnel COMPLETE 2017 * GARFIELD (JAMES) 204 FR HVAC and Energy Efficiency Conservatory - boiler COMPLETE 2017 GARFIELD (JAMES) 204 SI Paving Conservatory - parking lot COMPLETE 2017 GARFIELD (JAMES) 204 FR Minor Rehab Conservatory - plant cooler COMPLETE 2017

19 of 65 CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011-2019* As of December 15, 2019

PARK YEAR PARK NAME NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS COMPLETE $ GARFIELD (JAMES) 204 FR HVAC and Energy Efficiency Conservatory - steam line COMPLETE 2018 GARFIELD (JAMES) 204 FR Minor Rehab Gold Dome - fire escapes COMPLETE 2018 GARFIELD (JAMES) 204 FR Swimming Pool Pool - filter, liner and gutter COMPLETE 2018 GARFIELD (JAMES) 204 SI Landscape Tree planting COMPLETE 2018 GARFIELD (JAMES) 204 FR Major Rehab Conservatory - tempered water system COMPLETE 2018 GARFIELD (JAMES) 204 FR Minor Rehab Conservatory - doors COMPLETE 2018 GARFIELD (JAMES) 204 FR HVAC and Energy Efficiency Conservatory - Boiler COMPLETE 2018 GARFIELD (JAMES) 204 FR HVAC and Energy Efficiency Horticulture Hall - vacuum system COMPLETE 2018 GARFIELD (JAMES) 204 FR Major Rehab Trades Building - structural COMPLETE 2018 * GARFIELD (JAMES) 204 SI Courts Tennis courts - rehab COMPLETE 2018 * GARFIELD (JAMES) 204 SI Lighting Lighting upgrade to LED COMPLETE 2019 GARFIELD (JAMES) 204 FR Minor Rehab Bandstand/Music Court - assessment COMPLETE 2019 GARFIELD (JAMES) 204 SI Site Improvement Conservatory - Children's Wild Garden COMPLETE 2019 * GARFIELD (JAMES) 204 FR Roof Gold Dome - internal drainage system PRE-DESIGN GARFIELD (JAMES) 204 FR Minor Rehab Glass replacement - annual program CONSTRUCTION GARFIELD (JAMES) 204 FR Major Rehab Cultural Center Initiative PLANNING GARFIELD (JAMES) 204 SI Playground Playground - upgrade PLANNING GARFIELD (JAMES) 204 FR Sculpture and Monument Cornwall War Memorial - restoration PRE-DESIGN GARFIELD (JAMES) 204 SI Paving Paving - pathways CONSTRUCTION GARFIELD (JAMES) 204 FR Major Rehab Conservatory - Elizabeth Morse Children's Garden DESIGN * GARIBALDI (GIUSEPPI) 1047 SI Playground Chicago Plays! - new equipment COMPLETE 2015 GARIBALDI (GIUSEPPI) 1047 FR Sculpture and Monument "Garibaldi" - restoration PRE-DESIGN GATELY (JAMES) 244 SI Site Improvement Misc. - drainage COMPLETE 2012 GATELY (JAMES) 244 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012 GATELY (JAMES) 244 SI Paving Parking lot - rehab COMPLETE 2019 GATELY (JAMES) 244 SI Site Improvement Water main - replacement CONSTRUCTION GATELY (JAMES) 244 AD New Construction Field house with indoor track and field - new CONSTRUCTION * GILL (JOSEPH) 364 FR Minor Rehab Misc. - sump pump COMPLETE 2011 GILL (JOSEPH) 364 FR Major Rehab Transition plan - access improvements COMPLETE 2011 GILL (JOSEPH) 364 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012 GILL (JOSEPH) 364 FR Fitness Center Fitness center - upgrade COMPLETE 2012 GILL (JOSEPH) 364 FR HVAC and Energy Efficiency Misc. - HVAC rehab COMPLETE 2012 GILL (JOSEPH) 364 FR Fitness Center Fitness center - upgrade COMPLETE 2012 GILL (JOSEPH) 364 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2013 GILL (JOSEPH) 364 FR Swimming Pool Pool - new boiler COMPLETE 2013 GILL (JOSEPH) 364 FR Swimming Pool Pool - filter COMPLETE 2014 GILL (JOSEPH) 364 FR Minor Rehab Misc. Pool stair renovation COMPLETE 2015 GILL (JOSEPH) 364 SI Athletic Field Ballfield - rehab COMPLETE 2015

20 of 65 CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011-2019* As of December 15, 2019

PARK YEAR PARK NAME NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS COMPLETE $ GILL (JOSEPH) 364 FR Concrete Masonry Structural Concrete and structural - doorway to pool COMPLETE 2016 GILL (JOSEPH) 364 SI Playground Playground - new COMPLETE 2018 * GILL (JOSEPH) 364 FR HVAC and Energy Efficiency Field house - compressor COMPLETE 2019 GILL (JOSEPH) 364 SI Site Improvement Playground - benches COMPLETE 2019 GINKGO 347 SI Playground Chicago Plays! - new equipment COMPLETE 2016 GLADSTONE (WILLIAM) 93 SI Athletic Field Ball field - rehab COMPLETE 2018 GLADSTONE (WILLIAM) 93 SI Landscape Community garden - new COMPLETE 2019 * GLADYS (GUNDERSON) 1102 AD Acquisition Expansion COMPLETE 2012 GLADYS (GUNDERSON) 1102 SI Courts Basketball court - rehab COMPLETE 2015 GLADYS (GUNDERSON) 1102 SI Playground Chicago Plays! - new equipment COMPLETE 2016 GOLDBERG (LOUIS) 384 SI Playground Chicago Plays! - new equipment COMPLETE 2013 GOLDBERG (LOUIS) 384 SI Site Improvement Misc. - fencing and drinking fountain COMPLETE 2016 * GOLDEN GATE 288 SI Playground Chicago Plays! - new equipment COMPLETE 2013 GOLDEN GATE 288 SI Paving Misc. pathway and fitness course COMPLETE 2014 GOMPERS (SAMUEL) 40 FR Swimming Pool Pool - liner COMPLETE 2011 GOMPERS (SAMUEL) 40 FR Minor Rehab Field house - locker room improvements COMPLETE 2012 GOMPERS (SAMUEL) 40 SI Playground Park Development - playground and athletic field COMPLETE 2012 * GOMPERS (SAMUEL) 40 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012 GOMPERS (SAMUEL) 40 FR Windows and Doors Misc. windows COMPLETE 2014 GOMPERS (SAMUEL) 40 FR Swimming Pool Pool - filter room drainage COMPLETE 2014 GOMPERS (SAMUEL) 40 SI Lighting Lighting - ballfield COMPLETE 2015 * GOMPERS (SAMUEL) 40 FR Swimming Pool Pool - deck COMPLETE 2015 GOMPERS (SAMUEL) 40 SI Lighting Lighting - exterior COMPLETE 2015 * GOMPERS (SAMUEL) 40 SI Paving 2016 DW Paving -pathways COMPLETE 2017 GOMPERS (SAMUEL) 40 SI Site Improvement Site Improvement COMPLETE 2018 * GOMPERS (SAMUEL) 40 SI Courts Basketball court - rehab COMPLETE 2019 * GOMPERS (SAMUEL) 40 SI Courts Court conversion - pickleball and play court COMPLETE 2019 * GOMPERS (SAMUEL) 40 SI Site Improvement Outdoor fitness station and scoreboard - new DESIGN * GOMPERS (SAMUEL) 40 FR Windows and Doors Field house - windows DESIGN * GOMPERS (SAMUEL) 40 SI Spray Pool Water play feature - rehab CONSTRUCTION * GOMPERS (SAMUEL) 40 SI Site Improvement Park Improvements DESIGN * GOMPERS (SAMUEL) 40 FR Roof Roof PRE-DESIGN GOOSEBERRY 348 SI Playground Chicago Plays! - new equipment COMPLETE 2016 GOUDY (WILLIAM) SQUARE 105 SI Playground Playground with water feature - new COMPLETE 2014 * GOUDY (WILLIAM) SQUARE 105 SI Fencing Fencing - planter beds COMPLETE 2015 * GRAND 1103 SI Playground Chicago Plays! - new equipment COMPLETE 2014 GRAND CROSSING 15 FR Roof Power house - roof COMPLETE 2011 GRAND CROSSING 15 FR Concrete Masonry Structural Power house - chimney COMPLETE 2012

21 of 65 CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011-2019* As of December 15, 2019

PARK YEAR PARK NAME NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS COMPLETE $ GRAND CROSSING 15 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012 GRAND CROSSING 15 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012 GRAND CROSSING 15 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 GRAND CROSSING 15 SI Athletic Field Misc. drainage COMPLETE 2013 GRAND CROSSING 15 SI Athletic Field Ballfield - rehab COMPLETE 2013 GRAND CROSSING 15 SI Playground Playground - Community pilot COMPLETE 2015 * GRAND CROSSING 15 SI Courts Tennis court - conversion to multipurpose COMPLETE 2016 * GRAND CROSSING 15 SI Landscape Tree planting COMPLETE 2018 GRAND CROSSING 15 FR Swimming Pool Pool - controls COMPLETE 2018 GRAND CROSSING 15 SI Site Improvement Track - rehab DESIGN GRAND CROSSING 15 FR Minor Rehab Locker room improvements - men and women CONSTRUCTION * GRAND CROSSING 15 FR Roof Landscape Building - roof PRE-DESIGN GRANDPARENTS 472 SI Playground Chicago Plays! - new equipment COMPLETE 2014 GRANDPARENTS 472 SI Fencing Fencing - at playground COMPLETE 2018 * GRANT (ULYSSES) 24 SI Lighting Lighting upgrade to LED COMPLETE 2011 GRANT (ULYSSES) 24 FR Minor Rehab Landscape Yard - rehab COMPLETE 2011 GRANT (ULYSSES) 24 SI Landscape Trees - Dutch Elm Disease management COMPLETE 2011 GRANT (ULYSSES) 24 SI Site Improvement Museum Campus - paving and drainage COMPLETE 2011 GRANT (ULYSSES) 24 FR Major Rehab 9th St. pump station - renovation COMPLETE 2012 GRANT (ULYSSES) 24 SI Lighting Lighting - Museum Campus COMPLETE 2012 GRANT (ULYSSES) 24 SI Landscape Hutchinson Field - Study COMPLETE 2012 GRANT (ULYSSES) 24 SI Paving Butler Field - drainage and paving COMPLETE 2013 GRANT (ULYSSES) 24 SI Paving Paving - permeable COMPLETE 2013 GRANT (ULYSSES) 24 FR Major Rehab Van Buren Pedestrian Bridge - renovation COMPLETE 2014 GRANT (ULYSSES) 24 FR Major Rehab Daley Bicentennial Field House - Major Rehab COMPLETE 2014 GRANT (ULYSSES) 24 AD Park Development Park Expansion at Roosevelt including new skate park COMPLETE 2014 * GRANT (ULYSSES) 24 FR Concrete Masonry Structural Queen's Landing - study COMPLETE 2014 GRANT (ULYSSES) 24 AD Park Development Park development - COMPLETE 2015 * GRANT (ULYSSES) 24 FR Major Rehab Cancer Survivor Garden - renovation COMPLETE 2015 GRANT (ULYSSES) 24 FR Sculpture and Monument Buckingham Fountain - restoration COMPLETE 2015 GRANT (ULYSSES) 24 FR Roof Buckingham Fountain - concessions COMPLETE 2016 GRANT (ULYSSES) 24 FR Sculpture and Monument John Alexander Logan Monument - paving COMPLETE 2016 GRANT (ULYSSES) 24 SI Site Improvement Hutchinson Field - site improvements COMPLETE 2016 * GRANT (ULYSSES) 24 FR Sculpture and Monument "Mestrovic" - restoration COMPLETE 2017 GRANT (ULYSSES) 24 FR HVAC and Energy Efficiency Landscape Building - boiler COMPLETE 2017 GRANT (ULYSSES) 24 SI Paving Shoreline - concrete restoration COMPLETE 2017 GRANT (ULYSSES) 24 SI Landscape Cubs Rally - Landscape damages COMPLETE 2017 * GRANT (ULYSSES) 24 SI Site Improvement Buckingham Fountain - plaza and fencing rehab COMPLETE 2017 *

22 of 65 CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011-2019* As of December 15, 2019

PARK YEAR PARK NAME NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS COMPLETE $ GRANT (ULYSSES) 24 FR Minor Rehab Buckingham Fountain - improvements COMPLETE 2017 GRANT (ULYSSES) 24 SI Site Improvement Queen's Landing - restoration COMPLETE 2018 * GRANT (ULYSSES) 24 FR Concrete Masonry Structural Buckingham Fountain- concrete restoration COMPLETE 2018 GRANT (ULYSSES) 24 SI Site Improvement Maggie Daley - park improvements COMPLETE 2018 GRANT (ULYSSES) 24 SI Paving Landscape Yard - paving COMPLETE 2018 GRANT (ULYSSES) 24 SI Site Improvement Lakefront Trail Separation - Chicago River to Roosevelt Rd. COMPLETE 2018 * GRANT (ULYSSES) 24 SI Lighting Skate Park - lighting and security COMPLETE 2018 GRANT (ULYSSES) 24 SI Courts Maggie Daley - pickleball courts COMPLETE 2018 * GRANT (ULYSSES) 24 SI Paving Shedd Aquarium - entrance paving COMPLETE 2019 GRANT (ULYSSES) 24 FR Concrete Masonry Structural Van Buren Bridge - additional COMPLETE 2019 GRANT (ULYSSES) 24 FR Minor Rehab Buckingham Fountain - valves and concrete restoration COMPLETE 2019 GRANT (ULYSSES) 24 SI Site Improvement Water main at Harrison St. COMPLETE 2019 GRANT (ULYSSES) 24 FR Minor Rehab Comfort Station - rehab COMPLETE 2019 GRANT (ULYSSES) 24 FR Roof 9th St - Pump Station BID/AWARD GRANT (ULYSSES) 24 AD New Construction Navy Pier Flyover (CDOT) CONSTRUCTION * GRANT (ULYSSES) 24 FR Sculpture and Monument "Logan" - restoration DESIGN GRANT (ULYSSES) 24 FR Sculpture and Monument "Eagle Fountains" - restoration BID/AWARD GRAPE 381 SI Playground Chicago Plays! - new equipment COMPLETE 2015 GRAVER (PHILIP) 179 SI Lighting Lighting - security COMPLETE 2011 GRAVER (PHILIP) 179 FR Minor Rehab Field house - dome restoration COMPLETE 2013 GRAVER (PHILIP) 179 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013 GRAVER (PHILIP) 179 FR Minor Rehab Misc. - bathroom improvements COMPLETE 2015 GRAVER (PHILIP) 179 SI Spray Pool Water play feature - major rehab COMPLETE 2018 GREEN (JEFFREY) 1212 SI Playground Chicago Plays! - new equipment COMPLETE 2014 GREEN BRIAR 188 FR Minor Rehab Misc. rehab COMPLETE 2012 GREEN BRIAR 188 SI Playground Chicago Plays! - new equipment COMPLETE 2014 GREEN BRIAR 188 FR Roof Roof - rehab COMPLETE 2017 GREEN BRIAR 188 FR HVAC and Energy Efficiency Boiler - new COMPLETE 2017 GREENEBAUM (HENRY) 132 AD Park Development Park development including playground, artificial turf field COMPLETE 2012 * Griffin (Marion Mahony) 1257 SI Site Improvement Misc. beach access COMPLETE 2012 * GROSS (THEODORE) 1031 SI Site Improvement Fencing and athletic field COMPLETE 2015 * GROSS (THEODORE) 1031 SI Playground Playground - upgrade PLANNING * HAAS (JOSEPH) 1032 AD New Construction Field house and park development COMPLETE 2011 * HAAS (JOSEPH) 1032 FR Fitness Center Fitness center - new COMPLETE 2012 HAAS (JOSEPH) 1032 SI Athletic Field Artificial turf athletic field - new COMPLETE 2012 * HALE (NATHAN) 234 SI Site Improvement Benches and warm-up cage COMPLETE 2011 * HALE (NATHAN) 234 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012 HALE (NATHAN) 234 FR Swimming Pool Pool - liner and gutter COMPLETE 2012

23 of 65 CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011-2019* As of December 15, 2019

PARK YEAR PARK NAME NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS COMPLETE $ HALE (NATHAN) 234 SI Lighting Athletic field - rehabs COMPLETE 2015 * HALE (NATHAN) 234 SI Playground Chicago Plays! - new equipment COMPLETE 2015 HALE (NATHAN) 234 SI Spray Pool Spray feature - drainage COMPLETE 2017 HALE (NATHAN) 234 SI Courts Tennis Courts - rehab COMPLETE 2017 HALE (NATHAN) 234 FR Minor Rehab Misc. bathroom partitions COMPLETE 2017 HALE (NATHAN) 234 SI Spray Pool Spray feature - filter system COMPLETE 2018 HALE (NATHAN) 234 FR Concrete Masonry Structural Field house - foundation COMPLETE 2018 HALE (NATHAN) 234 SI Athletic Field Artificial Turf Infields - new DESIGN * HAMILTON (ALEXANDER) 9 FR Minor Rehab Gym floor - restore or replace COMPLETE 2011 HAMILTON (ALEXANDER) 9 FR Minor Rehab Misc. - basement flooring COMPLETE 2011 HAMILTON (ALEXANDER) 9 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012 HAMILTON (ALEXANDER) 9 FR HVAC and Energy Efficiency Boiler and insulation COMPLETE 2013 HAMILTON (ALEXANDER) 9 FR Swimming Pool Pool - rehab COMPLETE 2015 HAMILTON (ALEXANDER) 9 FR Swimming Pool Pool - liner COMPLETE 2016 HAMILTON (ALEXANDER) 9 SI Courts Basketball Court - rehab COMPLETE 2016 HAMILTON (ALEXANDER) 9 SI Paving 2017 DW Paving COMPLETE 2017 HAMILTON (ALEXANDER) 9 SI Athletic Field Athletic Field - rehab COMPLETE 2017 HAMILTON (ALEXANDER) 9 SI Landscape Tree planting COMPLETE 2018 HAMILTON (ALEXANDER) 9 FR Major Rehab Cultural Center Initiative PLANNING HAMILTON (ALEXANDER) 9 SI Playground Playground and spray feature - upgrade PLANNING HAMILTON (ALEXANDER) 9 FR Major Rehab Field house - major rehab CONSTRUCTION * HAMLIN (HANNIBAL) 106 SI Courts Tennis court - rehab COMPLETE 2011 HAMLIN (HANNIBAL) 106 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012 HAMLIN (HANNIBAL) 106 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012 HAMLIN (HANNIBAL) 106 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012 HAMLIN (HANNIBAL) 106 FR Swimming Pool Pool - rehab COMPLETE 2014 HAMLIN (HANNIBAL) 106 SI Playground Chicago Plays! - new equipment COMPLETE 2015 * HAMLIN (HANNIBAL) 106 FR Roof Roof COMPLETE 2016 HAMLIN (HANNIBAL) 106 SI Paving 2016 DW Paving COMPLETE 2016 HAMLIN (HANNIBAL) 106 FR Minor Rehab Lobby - new flooring COMPLETE 2018 HAMLIN (HANNIBAL) 106 SI Athletic Field Athletic field - improvements COMPLETE 2019 * HANSBERRY (LORRAINE) 1111 AD Acquisition Expansion COMPLETE 2012 HANSBERRY (LORRAINE) 1111 SI Playground Chicago Plays! - new equipment COMPLETE 2016 HARDING (FREDERICK) 1106 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013 HARDING (FREDERICK) 1106 SI Fencing Fencing - perimeter COMPLETE 2014 HARDING (GEORGE) 1033 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013 HARRIS (HARRIET) 524 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2011 HARRIS (HARRIET) 524 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2011 *

24 of 65 CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011-2019* As of December 15, 2019

PARK YEAR PARK NAME NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS COMPLETE $ HARRIS (HARRIET) 524 FR Minor Rehab Misc. - backboards COMPLETE 2012 HARRIS (HARRIET) 524 FR HVAC and Energy Efficiency HVAC improvements COMPLETE 2013 HARRIS (HARRIET) 524 FR HVAC and Energy Efficiency Field house - boiler room ventilation COMPLETE 2017 HARRIS (HARRIET) 524 FR Swimming Pool Pool rehab COMPLETE 2018 HARRIS (HARRIET) 524 FR Swimming Pool Pool - liner PRE-DESIGN HARRIS (RYAN) MEMORIAL 1225 SI Playground Playground - new COMPLETE 2016 * HARRIS (RYAN) MEMORIAL 1225 SI Landscape Tree planting COMPLETE 2018 HARRIS (RYAN) MEMORIAL 1225 AD New Construction Park improvements PLANNING HARRISON (CARTER) 213 FR Fitness Center Fitness center - upgrade COMPLETE 2011 HARRISON (CARTER) 213 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012 HARRISON (CARTER) 213 SI Athletic Field Artificial turf athletic field - new COMPLETE 2012 * HARRISON (CARTER) 213 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 HARRISON (CARTER) 213 FR HVAC and Energy Efficiency Misc. Senior Center HVAC COMPLETE 2014 HARRISON (CARTER) 213 FR Minor Rehab Misc. Pool stair renovation COMPLETE 2015 HARRISON (CARTER) 213 FR Minor Rehab Misc. Pool stair renovation COMPLETE 2015 HARRISON (CARTER) 213 SI Paving Paving - paths and driveway COMPLETE 2016 HARRISON (CARTER) 213 SI Playground Chicago Plays! - new equipment COMPLETE 2016 HARRISON (CARTER) 213 FR Swimming Pool Pool - rehab COMPLETE 2016 HARRISON (CARTER) 213 FR Roof Roof rehab and security COMPLETE 2016 HARRISON (CARTER) 213 SI Paving 2016 DW Paving COMPLETE 2016 HARRISON (CARTER) 213 SI Courts Tennis court - rehab COMPLETE 2018 HARRISON (CARTER) 213 SI Courts Mini-pitch Soccer Court - new COMPLETE 2019 * HARRISON (CARTER) 213 FR Major Rehab Field house - major rehab CONSTRUCTION * HARSH (VIVIAN G.) 324 SI Spray Pool Water play feature - surfacing COMPLETE 2011 HARSH (VIVIAN G.) 324 SI Playground Chicago Plays! - new equipment COMPLETE 2016 HARTIGAN (DAVID) BEACH 1248 SI Site Improvement Misc. - fencing, lighting, landscape, benches COMPLETE 2014 * HARTIGAN (DAVID) BEACH 1248 SI Paving Misc. pathway extension COMPLETE 2015 * HARTIGAN (DAVID) BEACH 1248 SI Playground Chicago Plays! - new equipment COMPLETE 2015 HASAN (ELLIOT) 294 SI Playground Chicago Plays! - new equipment COMPLETE 2015 HAYES (FRANCIS) 242 FR Fitness Center Fitness center - upgrade COMPLETE 2012 HAYES (FRANCIS) 242 FR Minor Rehab Misc. - windows and benches COMPLETE 2013 HAYES (FRANCIS) 242 FR Minor Rehab Misc. - kitchen renovation COMPLETE 2013 HAYES (FRANCIS) 242 FR Swimming Pool Pool Retrofit -compliance COMPLETE 2013 HAYES (FRANCIS) 242 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013 HAYES (FRANCIS) 242 SI Lighting Lighting - athletic field COMPLETE 2014 HAYES (FRANCIS) 242 FR Windows and Doors Field house - window drainage COMPLETE 2016 * HAYES (FRANCIS) 242 FR Minor Rehab Natatorium - hot water heater COMPLETE 2018 HAYES (FRANCIS) 242 FR Swimming Pool Pool - gutter and liner COMPLETE 2019

25 of 65 CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011-2019* As of December 15, 2019

PARK YEAR PARK NAME NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS COMPLETE $ HAYES (FRANCIS) 242 SI Landscape Tree Planting COMPLETE 2019 HAYES (FRANCIS) 242 SI Athletic Field Athletic field - rehab and drainage CONSTRUCTION * HAYES (FRANCIS) 242 FR HVAC and Energy Efficiency Roof units - new PRE-DESIGN HAYES (FRANCIS) 242 SI Paving Parking lot - rehab CONSTRUCTION HAZELNUT 417 SI Playground Chicago Plays! - new equipment COMPLETE 2016 HEGEWISCH MARSH 563 AD Acquisition Hegewisch Marsh - 13000 S. Torrence Ave. COMPLETE 2012 HEGEWISCH MARSH 563 AD Acquisition Hegewisch Marsh - expansion COMPLETE 2014 HEGEWISCH MARSH 563 AD Planning Hegewisch Marsh - Planning Study COMPLETE 2015 * HEGEWISCH MARSH 563 SI Site Improvement Site improvements - trails and benches COMPLETE 2018 HERMITAGE 1008 SI Courts Slam Dunk Basketball Court COMPLETE 2012 HERMITAGE 1008 SI Playground Playground - new COMPLETE 2012 * HERMOSA 125 FR Concrete Masonry Structural Field house - basement COMPLETE 2011 HERMOSA 125 SI Courts Misc. - landscape restoration COMPLETE 2012 HERMOSA 125 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 HERMOSA 125 SI Playground Chicago Plays! - new equipment COMPLETE 2016 HERMOSA 125 SI Fencing Fencing - perimeter COMPLETE 2016 HERMOSA 125 SI Courts Mini-pitch Soccer Court - 2 new COMPLETE 2018 HERMOSA 125 SI Athletic Field Athletic field - rehab DESIGN * HERMOSA 125 FR Roof Roof PRE-DESIGN HIAWATHA 229 FR Fitness Center Fitness center - upgrade COMPLETE 2011 HIAWATHA 229 SI Paving Parking lot - paving and drainage COMPLETE 2012 * HIAWATHA 229 FR Fitness Center Fitness center - new equipment COMPLETE 2012 HIAWATHA 229 SI Playground Playground - new COMPLETE 2014 * HICKORY 299 SI Playground Playground - resurfacing COMPLETE 2018 * HOARD (EDISON) 387 SI Athletic Field Ballfield - rehab COMPLETE 2014 HOARD (EDISON) 387 SI Playground Chicago Plays! - new equipment COMPLETE 2016 HOLLY 325 SI Playground Chicago Plays! - new equipment COMPLETE 2016 HOLLYWOOD 75 SI Playground Chicago Plays! - new equipment COMPLETE 2014 HOLLYWOOD 75 SI Landscape Tree planting COMPLETE 2018 HOLSTEIN 203 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012 HOLSTEIN 203 FR Minor Rehab Misc. - chimney replacement COMPLETE 2013 HOLSTEIN 203 SI Athletic Field Ballfield - rehab COMPLETE 2015 HOLSTEIN 203 FR Swimming Pool Wading Pool - filter COMPLETE 2016 HOLSTEIN 203 SI Spray Pool Water feature - surfacing COMPLETE 2016 HOLSTEIN 203 FR Swimming Pool Pool - deck COMPLETE 2016 HOLSTEIN 203 FR Swimming Pool Pool - filter PRE-DESIGN 2018 HOLSTEIN 203 FR Roof Roof - new COMPLETE 2018 * HOLSTEIN 203 FR Major Rehab Field house - major rehab - design COMPLETE 2018 *

26 of 65 CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011-2019* As of December 15, 2019

PARK YEAR PARK NAME NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS COMPLETE $ HOLSTEIN 203 FR Major Rehab Field house - major rehab COMPLETE 2018 * HOLSTEIN 203 FR Swimming Pool Wading pool - water main COMPLETE 2018 HOLSTEIN 203 SI Site Improvement Water main - emergency replacement COMPLETE 2019 HOMAN (JOSEPH) 1108 SI Playground Playground - design only COMPLETE 2011 HOMAN (JOSEPH) 1108 SI Playground Chicago Plays! - new equipment COMPLETE 2016 HOMAN SQUARE COMM. CTR. 515 FR Swimming Pool Pool Retrofit -compliance COMPLETE 2011 HOMAN SQUARE COMM. CTR. 515 FR HVAC and Energy Efficiency Boiler - rehab COMPLETE 2013 HOMAN SQUARE COMM. CTR. 515 FR HVAC and Energy Efficiency Misc. boiler tubes COMPLETE 2018 HOMAN SQUARE COMM. CTR. 515 FR HVAC and Energy Efficiency Misc. - compressor COMPLETE 2018 HOMAN SQUARE COMM. CTR. 515 FR Swimming Pool Pool - basin and doors DESIGN HONEYSUCKLE 351 SI Playground Chicago Plays! - new equipment COMPLETE 2016 HORAN (ALBERT) 1035 SI Courts Basketball court - rehab COMPLETE 2015 HORAN (ALBERT) 1035 SI Playground Chicago Plays! - new equipment COMPLETE 2016 HORAN (ALBERT) 1035 SI Fencing Fencing - perimeter CONSTRUCTION HORNBEAM 353 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013 HORNER (HENRY) 228 SI Lighting Lighting - exterior COMPLETE 2011 HORNER (HENRY) 228 FR Minor Rehab Misc. - gym bleachers COMPLETE 2011 * HORNER (HENRY) 228 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012 HORNER (HENRY) 228 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 HORNER (HENRY) 228 FR Concrete Masonry Structural Field house - stairs and masonry COMPLETE 2012 HORNER (HENRY) 228 FR Major Rehab Transition plan - access improvements COMPLETE 2012 HORNER (HENRY) 228 SI Lighting Lighting - exterior COMPLETE 2013 HORNER (HENRY) 228 SI Playground Chicago Plays! - new equipment COMPLETE 2016 HORNER (HENRY) 228 AD Park Development Riverbank development with Army Corps COMPLETE 2018 * HORNER (HENRY) 228 SI Site Improvement Dog friendly area - new COMPLETE 2018 * HORNER (HENRY) 228 SI Site Improvement Mini-pitch Soccer Court - new COMPLETE 2018 * HORNER (HENRY) 228 SI Lighting Lighting upgrade to LED COMPLETE 2018 HORNER (HENRY) 228 SI Courts Tennis court -rehab COMPLETE 2018 * HORNER (HENRY) 228 SI Fencing Perimeter fencing along Irving Park Rd. COMPLETE 2019 HORNER (HENRY) 228 SI Site Improvement Athletic fields - rehab and drainage DESIGN * HORNER (HENRY) 228 AD New Construction 312 RiverRun - Underpass at Irving Park Rd. (CDOT) CONSTRUCTION * HOUSTON (JESSIE "MA") 278 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012 HOUSTON (JESSIE "MA") 278 SI Playground Chicago Plays! - new equipment COMPLETE 2015 HOWARD (URE) BEACH 1256 SI Playground Chicago Plays! - new equipment COMPLETE 2015 HOWARD (URE) BEACH 1256 SI Site Improvement Site restoration COMPLETE 2018 * HOWARD (URE) BEACH 1256 SI Site Improvement Shoreline security COMPLETE 2019 HOYNE (THOMAS) 1036 SI Playground Chicago Plays! - new equipment COMPLETE 2014 HOYNE (THOMAS) 1036 SI Athletic Field Athletic field - scoreboard PRE-DESIGN *

27 of 65 CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011-2019* As of December 15, 2019

PARK YEAR PARK NAME NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS COMPLETE $ HUBBARD (GURDON) 1109 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013 HUCKLEBERRY 336 SI Playground Chicago Plays! - new equipment COMPLETE 2016 HUMBERT (JAMES) 1121 SI Playground Chicago Plays! - new equipment COMPLETE 2014 HUMBOLDT (ALEXANDER VON) 219 SI Athletic Field Artificial turf athletic field - new COMPLETE 2011 * HUMBOLDT (ALEXANDER VON) 219 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012 HUMBOLDT (ALEXANDER VON) 219 SI Paving Parking lot - rehab COMPLETE 2012 HUMBOLDT (ALEXANDER VON) 219 SI Site Improvement Misc. - water main COMPLETE 2012 HUMBOLDT (ALEXANDER VON) 219 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012 HUMBOLDT (ALEXANDER VON) 219 SI Playground Playground - additional equipment COMPLETE 2012 HUMBOLDT (ALEXANDER VON) 219 FR Swimming Pool Pool - filter COMPLETE 2013 HUMBOLDT (ALEXANDER VON) 219 FR Swimming Pool Pool - water line rehab COMPLETE 2013 HUMBOLDT (ALEXANDER VON) 219 FR Windows and Doors Landscape Yard - doors COMPLETE 2014 HUMBOLDT (ALEXANDER VON) 219 FR Major Rehab Field house - major rehab COMPLETE 2014 * HUMBOLDT (ALEXANDER VON) 219 SI Playground Chicago Plays! - new equipment (at Augusta Ave.) COMPLETE 2014 HUMBOLDT (ALEXANDER VON) 219 FR Minor Rehab Misc. - pergola rehab COMPLETE 2014 HUMBOLDT (ALEXANDER VON) 219 AD Planning Lagoon Water Management - Study COMPLETE 2015 HUMBOLDT (ALEXANDER VON) 219 SI Playground Chicago Plays! - new equipment COMPLETE 2015 HUMBOLDT (ALEXANDER VON) 219 SI Lighting Lighting - electric power COMPLETE 2015 HUMBOLDT (ALEXANDER VON) 219 SI Landscape Formal garden - restoration study COMPLETE 2015 HUMBOLDT (ALEXANDER VON) 219 SI Playground Playground at California - resurfacing COMPLETE 2016 HUMBOLDT (ALEXANDER VON) 219 SI Site Improvement Lagoon - natural swimming pond COMPLETE 2016 * HUMBOLDT (ALEXANDER VON) 219 FR Roof Stables - roof COMPLETE 2016 * HUMBOLDT (ALEXANDER VON) 219 FR Minor Rehab Gym floor - restore or replace COMPLETE 2016 HUMBOLDT (ALEXANDER VON) 219 FR Minor Rehab Boat House - remediation COMPLETE 2016 HUMBOLDT (ALEXANDER VON) 219 SI Playground Chicago Plays! - new equipment (at North Ave.) COMPLETE 2016 HUMBOLDT (ALEXANDER VON) 219 SI Paving 2016 DW Paving COMPLETE 2016 HUMBOLDT (ALEXANDER VON) 219 SI Site Improvement Baseball Batting Cages COMPLETE 2017 * HUMBOLDT (ALEXANDER VON) 219 SI Lighting Lighting - athletic field COMPLETE 2017 HUMBOLDT (ALEXANDER VON) 219 FR Roof Comfort Stations - rehabs COMPLETE 2017 HUMBOLDT (ALEXANDER VON) 219 SI Athletic Field Ballfield - rehab COMPLETE 2018 * HUMBOLDT (ALEXANDER VON) 219 SI Courts Mini-pitch Soccer Court - new COMPLETE 2018 * HUMBOLDT (ALEXANDER VON) 219 FR Swimming Pool Pool - liner and slide COMPLETE 2019 HUMBOLDT (ALEXANDER VON) 219 SI Landscape Athletic Field - rehab COMPLETE 2019 HUMBOLDT (ALEXANDER VON) 219 FR Major Rehab Cultural Center Initiative PLANNING INDEPENDENCE 83 FR Fitness Center Fitness center - accessibility equipment COMPLETE 2011 INDEPENDENCE 83 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012 INDEPENDENCE 83 FR HVAC and Energy Efficiency Misc. - HVAC rehab COMPLETE 2012 INDEPENDENCE 83 FR Major Rehab Bungalow - major rehab and green initiative COMPLETE 2013 *

28 of 65 CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011-2019* As of December 15, 2019

PARK YEAR PARK NAME NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS COMPLETE $ INDEPENDENCE 83 FR Minor Rehab Gym floor - new COMPLETE 2013 INDEPENDENCE 83 FR Major Rehab Major rehab including transition plan access improvements COMPLETE 2015 * INDEPENDENCE 83 FR Minor Rehab Misc. Pool stair renovation COMPLETE 2015 INDEPENDENCE 83 SI Playground Signature Playground - new COMPLETE 2016 * INDEPENDENCE 83 FR Swimming Pool Pool - filter system and gutter COMPLETE 2017 INDEPENDENCE 83 SI Paving 2016 DW Paving -pathways COMPLETE 2017 INDEPENDENCE 83 SI Athletic Field Athletic field - rehab COMPLETE 2018 INDEPENDENCE 83 FR Windows and Doors Field House and Pool building - windows CONSTRUCTION INDIAN BOUNDARY 165 FR Minor Rehab Misc. - sump pump COMPLETE 2011 INDIAN BOUNDARY 165 SI Courts Tennis court - rehab COMPLETE 2011 INDIAN BOUNDARY 165 FR Major Rehab Transition plan - access improvements COMPLETE 2011 INDIAN BOUNDARY 165 FR Minor Rehab Misc. downspouts COMPLETE 2012 INDIAN BOUNDARY 165 FR Major Rehab Field house - major rehab COMPLETE 2013 * INDIAN BOUNDARY 165 FR Major Rehab Nature Center - rehab COMPLETE 2014 INDIAN BOUNDARY 165 SI Spray Pool Water feature - rehab COMPLETE 2014 * INDIAN BOUNDARY 165 FR Major Rehab Field house - foundation and drainage COMPLETE 2014 INDIAN BOUNDARY 165 FR Minor Rehab Cultural Center Initiative PLANNING JACKSON (ANDREW) 19 FR Minor Rehab Landscape Yard - rehab COMPLETE 2011 JACKSON (ANDREW) 19 SI Landscape 63rd St. Beach - dune restoration COMPLETE 2011 * JACKSON (ANDREW) 19 SI Site Improvement Multi-use trail - Marquette Drive COMPLETE 2011 * JACKSON (ANDREW) 19 FR Major Rehab Field house - locker room improvements COMPLETE 2011 JACKSON (ANDREW) 19 SI Athletic Field Artificial turf athletic field - new COMPLETE 2011 * JACKSON (ANDREW) 19 SI Site Improvement Misc. - new waterlines COMPLETE 2011 JACKSON (ANDREW) 19 SI Athletic Field Athletic field - rehab COMPLETE 2011 JACKSON (ANDREW) 19 SI Lighting Lighting - exterior COMPLETE 2013 JACKSON (ANDREW) 19 SI Landscape Osaka Garden - restoration COMPLETE 2013 JACKSON (ANDREW) 19 SI Fencing Misc. gate COMPLETE 2013 JACKSON (ANDREW) 19 AD New Construction Water quality - pilot beach barrier COMPLETE 2013 * JACKSON (ANDREW) 19 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013 JACKSON (ANDREW) 19 SI Lighting Misc. electric transformer COMPLETE 2013 JACKSON (ANDREW) 19 FR Minor Rehab 63rd St. Beach House - electric upgrade COMPLETE 2013 * JACKSON (ANDREW) 19 FR Minor Rehab Bowling Green Club House - rehab COMPLETE 2013 JACKSON (ANDREW) 19 SI Playground Chicago Plays! - new equipment (at 64th St.) COMPLETE 2014 JACKSON (ANDREW) 19 SI Playground Chicago Plays! - new equipment (Chrysalis) COMPLETE 2014 JACKSON (ANDREW) 19 SI Athletic Field Misc. croquet field COMPLETE 2014 JACKSON (ANDREW) 19 SI Courts Basketball Court Rehab. COMPLETE 2014 JACKSON (ANDREW) 19 SI Paving Paving - 67th St. Pathway COMPLETE 2016 JACKSON (ANDREW) 19 SI Site Improvement Water conservation - study COMPLETE 2016

29 of 65 CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011-2019* As of December 15, 2019

PARK YEAR PARK NAME NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS COMPLETE $ JACKSON (ANDREW) 19 SI Playground Chicago Plays! - new equipment at 67th St. COMPLETE 2016 JACKSON (ANDREW) 19 FR Sculpture and Monument "Skylanding" - installation COMPLETE 2016 * JACKSON (ANDREW) 19 SI Spray Pool 63rd St. Beach Spray Feature - rehab COMPLETE 2017 JACKSON (ANDREW) 19 SI Site Improvement Osaka Garden - site improvements COMPLETE 2017 JACKSON (ANDREW) 19 SI Site Improvement Lakefront Trail Separation - 55th St. to 67th St. COMPLETE 2018 * JACKSON (ANDREW) 19 SI Paving Landscape Yard - paving COMPLETE 2018 JACKSON (ANDREW) 19 SI Paving Parking Lot at Hayes and Cornell – major rehab COMPLETE 2019 JACKSON (ANDREW) 19 SI Site Improvement Iowa Building - chess tables COMPLETE 2019 JACKSON (ANDREW) 19 SI Site Improvement Driving Range - sewer COMPLETE 2019 JACKSON (ANDREW) 19 AD Park Development Olmsted Historic Restoration COMPLETE 2019 * JACKSON (ANDREW) 19 SI Paving Parking lot at La Rabida - rehab CONSTRUCTION JACKSON (ANDREW) 19 FR Major Rehab Darrow Bridge - restoration (CDOT) DESIGN JACKSON (ANDREW) 19 SI Site Improvement Park improvements PLANNING JACKSON (ANDREW) 19 SI Site Improvement Utility infrastructure (CDOT) PRE-DESIGN JACKSON (ANDREW) 19 SI Site Improvement Framework Plan - concept design DESIGN * JACKSON (ANDREW) 19 FR Minor Rehab 63rd St. Beach House -assessment DESIGN JACKSON (ANDREW) 19 SI Athletic Field Artificial Turf Field and Track - relocation HOLD * JACKSON (MAHALIA) 386 FR Major Rehab Building demolition COMPLETE 2011 JACKSON (MAHALIA) 386 SI Lighting Lighting - athletic field COMPLETE 2012 JACKSON (ROBERT) 1112 SI Playground Playground - upgrade PLANNING JACOB 156 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013 JACOB 156 AD Acquisition Expansion COMPLETE 2014 JACOB 156 SI Site Improvement Misc. site improvements COMPLETE 2015 * JACOLIK (FLORIAN S.) 1288 SI Playground Chicago Plays! - new equipment COMPLETE 2016 JEFFERSON (NANCY) 338 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013 JEFFERSON (NANCY) 338 SI Courts Misc. - game court graphics COMPLETE 2014 JEFFERSON (THOMAS) MEML. 94 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012 JEFFERSON (THOMAS) MEML. 94 FR Roof Pool building - roof COMPLETE 2012 JEFFERSON (THOMAS) MEML. 94 FR Minor Rehab Field house - locker room improvements COMPLETE 2016 JEFFERSON (THOMAS) MEML. 94 FR Swimming Pool Pool - deck COMPLETE 2019 JENSEN (CHRIST) 82 SI Landscape Athletic Field - rehab COMPLETE 2019 JONES (MARY RICHARDSON) 479 SI Playground Playground - resurfacing COMPLETE 2013 JONES (MARY RICHARDSON) 479 SI Fencing Misc. - maintenance gate COMPLETE 2018 JONQUIL 1270 SI Courts Tennis court- rehab COMPLETE 2015 * JUNCTION GROVE 415 SI Playground Chicago Plays! - new equipment COMPLETE 2016 JUNEWAY BEACH 1258 SI Site Improvement Site restoration COMPLETE 2018 * JUNIPER 392 SI Playground Playground with water feature - new COMPLETE 2018 * KEELER (CYRUS) 1114 SI Playground Chicago Plays! - new equipment COMPLETE 2016

30 of 65 CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011-2019* As of December 15, 2019

PARK YEAR PARK NAME NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS COMPLETE $ KELLS (GEORGE) 1040 SI Playground Chicago Plays! - new equipment COMPLETE 2014 KELLS (GEORGE) 1040 SI Athletic Field Athletic Field - rehab COMPLETE 2019 * KELLY (EDWARD) 260 SI Paving Paving - pathways COMPLETE 2012 KELLY (EDWARD) 260 SI Playground Chicago Plays! - new equipment COMPLETE 2015 KELLY (EDWARD) 260 SI Athletic Field Artificial turf athletic field - new COMPLETE 2015 * KELLY (EDWARD) 260 SI Athletic Field Athletic field and basketball court- rehab COMPLETE 2017 * KELLY (EDWARD) 260 SI Athletic Field Athletic field - scoreboard COMPLETE 2017 * KELLY (JOHN) 493 SI Playground Chicago Plays! - new equipment COMPLETE 2016 KELVYN (WILLIAM) 126 SI Fencing Misc. - gates COMPLETE 2011 KELVYN (WILLIAM) 126 SI Playground Chicago Plays! - new equipment COMPLETE 2014 * KELVYN (WILLIAM) 126 FR Roof Roof COMPLETE 2015 KELVYN (WILLIAM) 126 FR Minor Rehab Drainage improvements and new gym floor COMPLETE 2015 * KELVYN (WILLIAM) 126 FR HVAC and Energy Efficiency Boiler - new COMPLETE 2019 KENMORE 1115 SI Playground Chicago Plays! - new equipment COMPLETE 2013 KENNEDY (DENNIS) 48 SI Paving Paving at entrance COMPLETE 2011 KENNEDY (DENNIS) 48 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012 KENNEDY (DENNIS) 48 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012 KENNEDY (DENNIS) 48 SI Courts Court - conversion to roller hockey and jr. tennis COMPLETE 2014 KENNEDY (DENNIS) 48 FR Minor Rehab Misc. Pool stair renovation COMPLETE 2015 KENNEDY (DENNIS) 48 SI Lighting Lighting - athletic field COMPLETE 2015 KENNEDY (DENNIS) 48 SI Paving 2016 DW Paving COMPLETE 2016 KENNEDY (DENNIS) 48 FR Swimming Pool Pool - rehab COMPLETE 2017 KENNEDY (DENNIS) 48 SI Courts Hockey Roller Court - new COMPLETE 2017 * KENNEDY (DENNIS) 48 FR Swimming Pool Pool - controls COMPLETE 2018 KENNEDY (DENNIS) 48 FR Swimming Pool Pool - filter PRE-DESIGN KENNICOTT (JONATHAN) 485 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012 KENNICOTT (JONATHAN) 485 FR Major Rehab Transition plan - access improvements COMPLETE 2012 KENNICOTT (JONATHAN) 485 SI Playground Chicago Plays! - new equipment COMPLETE 2014 KENNICOTT (JONATHAN) 485 SI Site Improvement Paving, fencing, lighting, alley closure COMPLETE 2016 * KENSINGTON 1041 SI Site Improvement Site and facility improvements COMPLETE 2012 KENSINGTON 1041 SI Athletic Field Athletic field - rehab COMPLETE 2012 KENSINGTON 1041 SI Lighting Lighting - exterior COMPLETE 2017 KENSINGTON 1041 FR Minor Rehab Misc. improvements COMPLETE 2019 KENSINGTON 1041 SI Playground Playground - new PLANNING KEN-WELL 1042 SI Paving Paving - entrance COMPLETE 2014 KEN-WELL 1042 SI Playground Chicago Plays! - new equipment COMPLETE 2014 * KEN-WELL 1042 SI Spray Pool Spray feature -rehab COMPLETE 2017 * KENWOOD COMM. 1010 SI Paving 2016 DW Paving COMPLETE 2016

31 of 65 CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011-2019* As of December 15, 2019

PARK YEAR PARK NAME NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS COMPLETE $ KENWOOD COMM. 1010 SI Courts Tennis Court -rehab CONSTRUCTION * KENWOOD COMM. 1010 SI Playground Playground - upgrade PLANNING KENWOOD COMM. 1010 SI Athletic Field Athletic Field - rehab PRE-DESIGN * KEYSTONE 1116 SI Playground Chicago Plays! - new equipment COMPLETE 2015 KILBOURN 84 SI Paving Landscape yard - paving COMPLETE 2011 KILBOURN 84 SI Fencing Misc. - gates COMPLETE 2011 KILBOURN 84 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012 KILBOURN 84 SI Playground Chicago Plays! - new equipment COMPLETE 2013 * KILBOURN 84 FR Major Rehab Greenhouse - restoration COMPLETE 2014 * KILBOURN 84 SI Site Improvement Misc. scoreboard COMPLETE 2014 KILBOURN 84 FR Roof Maintenance building - roof COMPLETE 2017 KILBOURN 84 SI Courts Court conversions CONSTRUCTION * KILBOURN 84 SI Courts Mini-pitch Soccer Court - new CONSTRUCTION * KILBOURN 84 SI Playground Nature playground - new CONSTRUCTION * KING (MARTIN LUTHER, JR.) 334 FR Minor Rehab Bowling alley - restoration COMPLETE 2011 KING (MARTIN LUTHER, JR.) 334 FR Roof Bowling alley - roof COMPLETE 2013 KING (MARTIN LUTHER, JR.) 334 FR Sculpture and Monument Monument - restoration COMPLETE 2013 KING (MARTIN LUTHER, JR.) 334 FR Roof Bowling Alley - roof COMPLETE 2016 KING (MARTIN LUTHER, JR.) 334 FR Minor Rehab Misc. bowling alley supplies COMPLETE 2016 KING (MARTIN LUTHER, JR.) 334 FR HVAC and Energy Efficiency HVAC - rehab COMPLETE 2017 KING (MARTIN LUTHER, JR.) 334 FR Minor Rehab Misc. improvements COMPLETE 2019 KING (MARTIN LUTHER, JR.) 334 SI Playground Playground - upgrade PLANNING King-Lockhart (Patrick, Anthony) 558 AD Park Development Park development - 106th St. and Western Ave. COMPLETE 2011 * King-Lockhart (Patrick, Anthony) 558 SI Site Improvement Sculpture and Entrance Columns COMPLETE 2013 * KIWANIS 42 SI Lighting Lighting - exterior COMPLETE 2015 * KLEIN (LOIS) 544 AD Acquisition Lincoln Ave. and Addison St. COMPLETE 2011 KLEIN (LOIS) 544 SI Playground Misc. kiosk COMPLETE 2013 * KOLMAR 85 SI Playground Chicago Plays! - new equipment COMPLETE 2013 KORCZAK (JANUSZ) 1090 SI Playground Chicago Plays! - new equipment COMPLETE 2015 KOSCIUSZKO (THADEUZ) 120 FR Minor Rehab Misc. window screens COMPLETE 2011 KOSCIUSZKO (THADEUZ) 120 FR Roof Natatorium - roof COMPLETE 2011 KOSCIUSZKO (THADEUZ) 120 FR Swimming Pool Pool Retrofit -compliance COMPLETE 2011 KOSCIUSZKO (THADEUZ) 120 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012 KOSCIUSZKO (THADEUZ) 120 FR Major Rehab Transition plan - access improvements COMPLETE 2012 KOSCIUSZKO (THADEUZ) 120 SI Paving Pathways and parking lot COMPLETE 2013 KOSCIUSZKO (THADEUZ) 120 FR HVAC and Energy Efficiency Boiler - pool COMPLETE 2014 KOSCIUSZKO (THADEUZ) 120 FR Swimming Pool Pool - rehab COMPLETE 2015 KOSCIUSZKO (THADEUZ) 120 FR Minor Rehab Misc. - floor restoration design COMPLETE 2015

32 of 65 CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011-2019* As of December 15, 2019

PARK YEAR PARK NAME NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS COMPLETE $ KOSCIUSZKO (THADEUZ) 120 FR Concrete Masonry Structural Field house and Natatorium - concrete, plaster, masonry COMPLETE 2015 KOSCIUSZKO (THADEUZ) 120 FR Minor Rehab Misc. Pool stair renovation COMPLETE 2015 KOSCIUSZKO (THADEUZ) 120 SI Site Improvement Artificial Turf Court - rehab COMPLETE 2019 * KOSCIUSZKO (THADEUZ) 120 FR Swimming Pool Pool Building - exterior doors COMPLETE 2019 Park improvements including turf ball field,playground, spray KOSCIUSZKO (THADEUZ) 120 SI Site Improvement feature, outdoor fitness course DESIGN * KOSCIUSZKO (THADEUZ) 120 FR Swimming Pool Pool - controls CONSTRUCTION KOSCIUSZKO (THADEUZ) 120 FR Minor Rehab Field house improvements - windows, doors, gymnasium CONSTRUCTION * KRAUSE (FRANCIS VERNON) 1079 SI Playground Playground with water feature - new COMPLETE 2013 KUCINSKI-MURPHY (VICKI, ROSEBETH) 1062 SI Playground Chicago Plays! - new equipment COMPLETE 2014 LA FOLLETTE (ROBERT) 201 SI Paving Paving - paths COMPLETE 2011 LA FOLLETTE (ROBERT) 201 SI Athletic Field Artificial turf athletic field - new COMPLETE 2011 * LA FOLLETTE (ROBERT) 201 SI Site Improvement Track - new COMPLETE 2011 * LA FOLLETTE (ROBERT) 201 FR Swimming Pool Pool Retrofit -compliance COMPLETE 2011 LA FOLLETTE (ROBERT) 201 FR Minor Rehab Field house - painting, plastering, drainage COMPLETE 2012 LA FOLLETTE (ROBERT) 201 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2014 LA FOLLETTE (ROBERT) 201 FR Concrete Masonry Structural Field house - concrete and structural COMPLETE 2015 LA FOLLETTE (ROBERT) 201 SI Courts Basketball Court - rehab COMPLETE 2016 LA FOLLETTE (ROBERT) 201 FR HVAC and Energy Efficiency HVAC improvements COMPLETE 2017 LA FOLLETTE (ROBERT) 201 SI Spray Pool Spray feature -rehab COMPLETE 2017 LA FOLLETTE (ROBERT) 201 FR Swimming Pool Pool - rehab COMPLETE 2017 LA FOLLETTE (ROBERT) 201 FR Minor Rehab Field house - plumbing interior COMPLETE 2019 LA FOLLETTE (ROBERT) 201 FR Major Rehab Field house and Natatorium - Major Rehab COMPLETE 2019 * LA FOLLETTE (ROBERT) 201 FR Swimming Pool Pool - boiler PRE-DESIGN LA FOLLETTE (ROBERT) 201 SI Site Improvement Park improvements DESIGN La Villita 553 AD Acquisition Celotex - 2800-3024 S. Sacramento Ave. COMPLETE 2012 * La Villita 553 AD Park Development Park development - "The Big Park in Little Village" COMPLETE 2015 * LA VILLITA 553 SI Lighting Exterior - ball field lighting CONSTRUCTION * LAKE MEADOWS 263 SI Paving Parking lot - rehab COMPLETE 2011 LAKE MEADOWS 263 FR Minor Rehab Field house - rehab COMPLETE 2011 LAKE MEADOWS 263 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012 LAKE MEADOWS 263 SI Playground Chicago Plays! - new equipment COMPLETE 2016 LAKE SHORE 107 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012 LAKE SHORE 107 SI Site Improvement Track - rehab COMPLETE 2015 LAKE SHORE 107 AD Park Development Park improvements - design only COMPLETE 2016 LAKE SHORE 107 SI Athletic Field Athletic field - improvements COMPLETE 2017 LAKE SHORE 107 SI Athletic Field Landscape irrigation system - new COMPLETE 2018 * LAKE SHORE 107 SI Playground Playground - new PRE-DESIGN

33 of 65 CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011-2019* As of December 15, 2019

PARK YEAR PARK NAME NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS COMPLETE $ LAMB (HAROLD) 446 SI Playground Chicago Plays! - new equipment COMPLETE 2014 LAMB (HAROLD) 446 SI Landscape Tree planting COMPLETE 2019 LANGDON (MARY MARGARET) 1077 SI Playground Chicago Plays! new equipment including court conversion COMPLETE 2015 * LAWLER (MICHAEL) 1011 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 LAWLER (MICHAEL) 1011 SI Playground Playground with water feature - new COMPLETE 2013 * LAWLER (MICHAEL) 1011 SI Athletic Field Artificial turf field - design DESIGN * LAZARUS (EMMA) 450 SI Playground Chicago Plays! - new equipment COMPLETE 2014 * LE CLAIRE COURTS - HEARST COMM. CTR 305 FR Roof Roof COMPLETE 2011 LE CLAIRE COURTS - HEARST COMM. CTR 305 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 LE CLAIRE COURTS - HEARST COMM. CTR 305 SI Playground Chicago Plays! - new equipment including water feature COMPLETE 2015 * LE CLAIRE COURTS - HEARST COMM. CTR 305 SI Spray Pool Spray feature - new COMPLETE 2017 * LEE (JOHN) 1286 SI Playground Chicago Plays! - new equipment COMPLETE 2014 LEGION 274 FR Sculpture and Monument Misc.- fountain restoration COMPLETE 2013 LEGION 274 SI Playground Chicago Plays! - new equipment (at Catalpa Ave.) COMPLETE 2014 LEGION 274 SI Playground Chicago Plays! - new equipment (at Catalpa Ave.) COMPLETE 2014 LEGION 274 SI Playground Chicago Plays! - new equipment at Thorndale Ave. COMPLETE 2015 LEGION 274 SI Playground Chicago Plays! - new equipment at Hollywood Ave. COMPLETE 2015 LEGION 274 SI Landscape Tree Planting COMPLETE 2019 LELAND GIANTS 395 SI Playground Chicago Plays! - new equipment COMPLETE 2015 LELAND GIANTS 395 SI Landscape Tree Planting COMPLETE 2019 LEONE (SAM) BEACH 1013 SI Paving Lighting - exterior COMPLETE 2012 LEONE (SAM) BEACH 1013 SI Playground Chicago Plays! - new equipment COMPLETE 2016 LEONE (SAM) BEACH 1013 SI Landscape Natural Area - new COMPLETE 2019 * LEONE (SAM) BEACH 1013 FR Major Rehab Lifeguard Station - Renovation Plan PLANNING LERNER (LEO) 273 SI Playground Playground - equipment COMPLETE 2012 LERNER (LEO) 273 SI Playground Chicago Plays! - new equipment COMPLETE 2014 LERNER (LEO) 273 SI Athletic Field Athletic field - rehab COMPLETE 2014 LEVIN (JOHN) 1220 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013 LEVIN (JOHN) 1220 FR Minor Rehab Field house - rehab COMPLETE 2019 LILY GARDENS 1218 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013 LILY GARDENS 1218 SI Landscape Tree planting COMPLETE 2018 LIMAS (JULIANN HOPE) 1066 AD Acquisition Expansion - 2422 S. Trumbull Ave. COMPLETE 2015 * LIMAS (JULIANN HOPE) 1066 SI Playground Chicago Plays! - new equipment COMPLETE 2015 LIN (MARGARET HIE DING) 360 SI Site Improvement Park improvements DESIGN LINCOLN (ABRAHAM) 100 FR Major Rehab Conservatory - steam tunnel COMPLETE 2011 LINCOLN (ABRAHAM) 100 SI Athletic Field Athletic field - rehab COMPLETE 2011 LINCOLN (ABRAHAM) 100 SI Site Improvement North Pond - signage COMPLETE 2011 LINCOLN (ABRAHAM) 100 SI Paving Landscape yard - paving COMPLETE 2011

34 of 65 CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011-2019* As of December 15, 2019

PARK YEAR PARK NAME NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS COMPLETE $ LINCOLN (ABRAHAM) 100 FR Concrete Masonry Structural Osterman Beach House - rehab COMPLETE 2011 LINCOLN (ABRAHAM) 100 SI Lighting Diversey Ave. to Fullerton Dr. - lighting COMPLETE 2011 LINCOLN (ABRAHAM) 100 FR Minor Rehab Montrose Comfort Station - entrance and washrooms COMPLETE 2011 LINCOLN (ABRAHAM) 100 FR Minor Rehab Landscape Yard - rehab COMPLETE 2011 LINCOLN (ABRAHAM) 100 FR Minor Rehab Misc. navigation beacon COMPLETE 2011 LINCOLN (ABRAHAM) 100 SI Site Improvement Pathways and drainage COMPLETE 2011 * LINCOLN (ABRAHAM) 100 FR Roof Comfort station at Diversey Ave. - roof COMPLETE 2011 LINCOLN (ABRAHAM) 100 SI Lighting Lighting - lagoon COMPLETE 2011 LINCOLN (ABRAHAM) 100 SI Site Improvement Lakefront Trail Separation - Montrose Ave. to Addison Ave. COMPLETE 2011 * LINCOLN (ABRAHAM) 100 FR Major Rehab Transition plan - access improvements - Boat Club COMPLETE 2011 LINCOLN (ABRAHAM) 100 SI Fencing Dog Beach fencing - at Montrose COMPLETE 2011 LINCOLN (ABRAHAM) 100 FR Major Rehab Theater on the Lake - terrace walls COMPLETE 2011 * LINCOLN (ABRAHAM) 100 SI Site Improvement Theater on the Lake - Restoration of Terrace Walls COMPLETE 2011 LINCOLN (ABRAHAM) 100 FR Sculpture and Monument "Swedenborg" - restoration COMPLETE 2012 LINCOLN (ABRAHAM) 100 FR Major Rehab Margate Field House - locker room improvements COMPLETE 2012 LINCOLN (ABRAHAM) 100 FR Concrete Masonry Structural Promenade restoration - Diversey Ave. to Belmont Ave. COMPLETE 2012 LINCOLN (ABRAHAM) 100 SI Paving Paving - paths - near Berwyn Ave. COMPLETE 2012 * LINCOLN (ABRAHAM) 100 FR HVAC and Energy Efficiency Conservatory - HVAC energy management COMPLETE 2012 * LINCOLN (ABRAHAM) 100 SI Lighting Misc. - electric service near Zoo COMPLETE 2012 LINCOLN (ABRAHAM) 100 SI Courts Tennis court - rehab COMPLETE 2012 LINCOLN (ABRAHAM) 100 SI Lighting Lighting - Roscoe St. and Barry St. underpass COMPLETE 2012 LINCOLN (ABRAHAM) 100 FR Fitness Center Fitness center - accessibility equipment COMPLETE 2012 LINCOLN (ABRAHAM) 100 FR Major Rehab Transition plan - access improvements - Cultural Center COMPLETE 2012 LINCOLN (ABRAHAM) 100 SI Fencing Misc. fencing COMPLETE 2012 LINCOLN (ABRAHAM) 100 SI Paving Belmont Harbor - sidewalk COMPLETE 2012 LINCOLN (ABRAHAM) 100 SI Site Improvement Dog friendly area at Belmont Ave. - improvements COMPLETE 2013 * LINCOLN (ABRAHAM) 100 SI Site Improvement Misc. benches at North Pond COMPLETE 2013 * LINCOLN (ABRAHAM) 100 FR Minor Rehab Cultural Center - rehab COMPLETE 2013 LINCOLN (ABRAHAM) 100 FR Major Rehab North Avenue Pier - rehab COMPLETE 2013 LINCOLN (ABRAHAM) 100 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013 LINCOLN (ABRAHAM) 100 FR Roof Conservatory - rehab COMPLETE 2013 LINCOLN (ABRAHAM) 100 FR Major Rehab South Field House - renovation and court rehab COMPLETE 2013 LINCOLN (ABRAHAM) 100 SI Paving Pathway and drinking fountain COMPLETE 2014 * Shoreline Protection with U.S. Army Corps (Montrose Dr. to Irving LINCOLN (ABRAHAM) 100 AD New Construction Park Dr.) COMPLETE 2014 * LINCOLN (ABRAHAM) 100 SI Lighting Lighting - ballfield COMPLETE 2014 LINCOLN (ABRAHAM) 100 AD Planning Diversey Driving Range - planning study COMPLETE 2014 LINCOLN (ABRAHAM) 100 SI Athletic Field Artificial turf athletic field - new COMPLETE 2014

35 of 65 CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011-2019* As of December 15, 2019

PARK YEAR PARK NAME NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS COMPLETE $

LINCOLN (ABRAHAM) 100 AD Planning Montrose Point - Ecological Restoration and Management Plan COMPLETE 2014 * LINCOLN (ABRAHAM) 100 SI Site Improvement Montrose Beach Dog Friendly Area - site improvements COMPLETE 2014 * LINCOLN (ABRAHAM) 100 SI Site Improvement Misc. water main rehab at lagoon COMPLETE 2014 LINCOLN (ABRAHAM) 100 SI Fencing Misc. fencing COMPLETE 2014 LINCOLN (ABRAHAM) 100 FR Sculpture and Monument "Fountain Girl" and Rustic Pavillion- restoration COMPLETE 2014 * LINCOLN (ABRAHAM) 100 SI Site Improvement Misc. - electric transclosures COMPLETE 2015

LINCOLN (ABRAHAM) 100 AD New Construction Shoreline Protection with U.S. Army Corps (Fullerton Ave.) COMPLETE 2015 * LINCOLN (ABRAHAM) 100 SI Paving Paving - paths - south COMPLETE 2015 * LINCOLN (ABRAHAM) 100 SI Site Improvement Montrose Point - restoration COMPLETE 2015 * LINCOLN (ABRAHAM) 100 FR Windows and Doors Conservatory - doors COMPLETE 2015 LINCOLN (ABRAHAM) 100 FR Windows and Doors Conservatory - glass restoration - Annual Program COMPLETE 2015 LINCOLN (ABRAHAM) 100 SI Playground Playground with water feature - new COMPLETE 2015 * LINCOLN (ABRAHAM) 100 SI Paving Paving - Diversey Driving Range COMPLETE 2015 * LINCOLN (ABRAHAM) 100 SI Playground Chicago Plays! - new equipment (Morrie Mages) COMPLETE 2015 LINCOLN (ABRAHAM) 100 SI Landscape Montrose Beach Dunes - Planning Study COMPLETE 2015 * LINCOLN (ABRAHAM) 100 FR Sculpture and Monument "Charitas" - restoration COMPLETE 2016 LINCOLN (ABRAHAM) 100 FR Concrete Masonry Structural Waveland Clock Tower - concrete and drainage COMPLETE 2016 LINCOLN (ABRAHAM) 100 SI Paving Green infrastructure renovation - Wilson Parking Lot COMPLETE 2016 * LINCOLN (ABRAHAM) 100 FR Minor Rehab Misc. - pumps at North Ave. COMPLETE 2016 LINCOLN (ABRAHAM) 100 SI Playground Chicago Plays! - new equipment at Simonds Dr. COMPLETE 2016 LINCOLN (ABRAHAM) 100 SI Paving 2016 DW Paving COMPLETE 2016 LINCOLN (ABRAHAM) 100 SI Playground Chicago Plays! - new equipment at Sunnyside Ave. COMPLETE 2016 LINCOLN (ABRAHAM) 100 SI Site Improvement Paving - running paths COMPLETE 2016 * LINCOLN (ABRAHAM) 100 SI Site Improvement Lakefront Trail Separation - Oak St. to Ohio St. COMPLETE 2017 * LINCOLN (ABRAHAM) 100 FR Sculpture and Monument "Totem Pole" - restoration COMPLETE 2017 LINCOLN (ABRAHAM) 100 SI Site Improvement Lakefront Trail Separation - Fullerton Ave. to North Ave. COMPLETE 2017 * LINCOLN (ABRAHAM) 100 FR Roof Conservatory - glass roof assessment COMPLETE 2017 LINCOLN (ABRAHAM) 100 SI Landscape Montrose Butterfly Garden COMPLETE 2017 * LINCOLN (ABRAHAM) 100 SI Site Improvement Osterman Beach - beach access COMPLETE 2017 LINCOLN (ABRAHAM) 100 SI Playground Chicago Plays! - new equipment at Stockton Dr. COMPLETE 2017 LINCOLN (ABRAHAM) 100 SI Athletic Field Artificial turf athletic field at Montrose Ave - major rehab COMPLETE 2017 LINCOLN (ABRAHAM) 100 SI Site Improvement Outdoor fitness station at Diversey Ave. - new COMPLETE 2017 * LINCOLN (ABRAHAM) 100 SI Site Improvement Bryn Mawr - dog friendly area COMPLETE 2017 * LINCOLN (ABRAHAM) 100 SI Playground Chicago Plays! - new equipment at Diversey Pkwy. COMPLETE 2017 LINCOLN (ABRAHAM) 100 FR Major Rehab Theater on the Lake - major rehab COMPLETE 2017 * LINCOLN (ABRAHAM) 100 FR HVAC and Energy Efficiency Power House - boiler COMPLETE 2017

36 of 65 CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011-2019* As of December 15, 2019

PARK YEAR PARK NAME NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS COMPLETE $ LINCOLN (ABRAHAM) 100 FR Minor Rehab Theater on the Lake Comfort Station - Rehab COMPLETE 2017 LINCOLN (ABRAHAM) 100 FR Concrete Masonry Structural Water main at Foster Ave. COMPLETE 2017 LINCOLN (ABRAHAM) 100 SI Site Improvement Ohio Street Beach - line sewer replacement COMPLETE 2018 LINCOLN (ABRAHAM) 100 FR Minor Rehab Shore Club - plumbing and electrical COMPLETE 2018 * LINCOLN (ABRAHAM) 100 SI Site Improvement Fountain Girl Garden - installation COMPLETE 2018 * LINCOLN (ABRAHAM) 100 FR Roof Cultural Center - clay tile roof restoration COMPLETE 2018 * LINCOLN (ABRAHAM) 100 SI Site Improvement Lakefront Trail Separation - Ardmore Ave. to Montrose Ave. COMPLETE 2018 * LINCOLN (ABRAHAM) 100 SI Site Improvement Lakefront Trail Separation - North Ave. to Oak St. COMPLETE 2018 * LINCOLN (ABRAHAM) 100 SI Site Improvement Theater on the Lake - signage COMPLETE 2018 LINCOLN (ABRAHAM) 100 SI Site Improvement Lakefront Trail Separation - Briar St. to Fullerton Ave. COMPLETE 2018 * LINCOLN (ABRAHAM) 100 FR HVAC and Energy Efficiency Boat House - furnace COMPLETE 2018 LINCOLN (ABRAHAM) 100 SI Site Improvement LFT Separation - Addison St. to Briar Ave. COMPLETE 2018 * LINCOLN (ABRAHAM) 100 SI Site Improvement Electric transformer - new COMPLETE 2019 LINCOLN (ABRAHAM) 100 SI Paving Wilson Parking Lot - rehab COMPLETE 2019 LINCOLN (ABRAHAM) 100 FR Minor Rehab South Field House - rehab COMPLETE 2019 LINCOLN (ABRAHAM) 100 SI Landscape Montrose Point - Bird Sanctuary Design COMPLETE 2019 * LINCOLN (ABRAHAM) 100 SI Playground Chicago Plays! - new equipment at Cannon Dr. COMPLETE 2019 * LINCOLN (ABRAHAM) 100 SI Site Improvement Theater on the Lake - bike racks COMPLETE 2019 LINCOLN (ABRAHAM) 100 FR Minor Rehab Cultural Center Initiative PLANNING LINCOLN (ABRAHAM) 100 FR HVAC and Energy Efficiency Zoo - gas boosters CONSTRUCTION LINCOLN (ABRAHAM) 100 SI Landscape Tree planting at North Pond DESIGN LINCOLN (ABRAHAM) 100 SI Athletic Field Artificial turf field rehab - at Foster Ave. PLANNING LINCOLN (ABRAHAM) 100 SI Landscape AIDS Awareness Garden - new DESIGN LINCOLN (ABRAHAM) 100 SI Site Improvement Diversey Rowing Lagoon - infrastructure PLANNING LINCOLN (ABRAHAM) 100 FR Sculpture and Monument "Benjamin Franklin" - restoration BID/AWARD LINCOLN (ABRAHAM) 100 FR Concrete Masonry Structural Waveland Clock Tower - masonry PRE-DESIGN LINCOLN (ABRAHAM) 100 FR Sculpture and Monument "Grant" - concrete and structural BID/AWARD LINCOLN (ABRAHAM) 100 FR Roof Margate Field House - roof and gutters PRE-DESIGN LINCOLN (ABRAHAM) 100 FR Minor Rehab Waveland - 1st Tee Junior Clubhouse DESIGN LINCOLN (ABRAHAM) 100 SI Athletic Field Artificial Turf Field at Diversey Ave - new DESIGN * LINCOLN (ABRAHAM) 100 SI Courts Foster Beach - basketball court DESIGN LINDBLOM (ROBERT) 243 FR Fitness Center Fitness center -upgrade COMPLETE 2011 LINDBLOM (ROBERT) 243 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012 LINDBLOM (ROBERT) 243 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012 LINDBLOM (ROBERT) 243 SI Playground Chicago Plays! - new equipment COMPLETE 2014 LINDBLOM (ROBERT) 243 SI Athletic Field Artificial turf field and track COMPLETE 2015 * LINDBLOM (ROBERT) 243 SI Landscape Tree planting COMPLETE 2018 LINDBLOM (ROBERT) 243 FR Roof Skylights - new COMPLETE 2018

37 of 65 CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011-2019* As of December 15, 2019

PARK YEAR PARK NAME NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS COMPLETE $ LINDBLOM (ROBERT) 243 FR Swimming Pool Pool - liner PRE-DESIGN LINDBLOM (ROBERT) 243 SI Athletic Field Athletic field - rehab DESIGN * LINDEN 308 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 LINDEN 308 SI Playground Chicago Plays! - new equipment COMPLETE 2015 LITTLE VENICE 1055 SI Playground Chicago Plays! - new equipment COMPLETE 2016 LIVINGSTON FIELD 510 AD Acquisition Livingston Field - expansion COMPLETE 2011 LIVINGSTON FIELD 510 AD Park Development Park development including artificial turf field COMPLETE 2013 * LONDON (LOUIS) 1120 SI Playground Chicago Plays! - new equipment COMPLETE 2016 LONDON (LOUIS) 1120 AD Acquisition Park expansion COMPLETE 2016 LOWE (SAMUEL) 1044 SI Courts Basketball court - rehab and drainage COMPLETE 2012 LOWE (SAMUEL) 1044 SI Site Improvement Site Improvements - fencing, lighting COMPLETE 2014 LOWE (SAMUEL) 1044 SI Playground Chicago Plays! - new equipment COMPLETE 2014 LOWE (SAMUEL) 1044 AD New Construction Field house - expansion COMPLETE 2014 * LOYOLA 115 SI Site Improvement Misc. beach access COMPLETE 2012 * LOYOLA 115 SI Paving Paving - paths COMPLETE 2013 LOYOLA 115 SI Playground Chicago Plays! - new equipment COMPLETE 2016 * LOYOLA 115 FR Concrete Masonry Structural Field house - masonry COMPLETE 2017 LOYOLA 115 FR Minor Rehab Access - chair lift COMPLETE 2018 LOYOLA 115 SI Athletic Field Athletic field - batting cage COMPLETE 2018 * LOYOLA 115 SI Lighting Lighting upgrade to LED COMPLETE 2019 LOYOLA 115 FR HVAC and Energy Efficiency Field house - boiler CONSTRUCTION LUNA 440 SI Playground Chicago Plays! - new equipment COMPLETE 2016 LUNT (ORRINGTON, STEPHEN) 1123 SI Playground Chicago Plays! - new equipment COMPLETE 2014 LYLE (JOHN) 1267 SI Playground Chicago Plays! - new equipment COMPLETE 2016 MADIGAN (MICHAEL J., SR.) 484 SI Lighting Lighting - exterior COMPLETE 2013 * MAGNOLIA 333 SI Playground Chicago Plays! - new equipment COMPLETE 2016 MAJOR TAYLOR BIKE TRAIL 548 SI Site Improvement Signage COMPLETE 2011 MAJOR TAYLOR BIKE TRAIL 548 SI Lighting Lighting and seating - trail COMPLETE 2018 * MALUS 394 SI Playground Chicago Plays! - new equipment COMPLETE 2015 MANDRAKE (HENRY BROWN) 504 SI Playground Playground - resurfacing COMPLETE 2012 MANDRAKE (HENRY BROWN) 504 SI Athletic Field Artificial turf athletic field - new COMPLETE 2013 * MANDRAKE (HENRY BROWN) 504 SI Courts Tennis courts - rehab COMPLETE 2016 * MANDRAKE (HENRY BROWN) 504 SI Site Improvement Athletic field - new scoreboard COMPLETE 2017 MANDRAKE (HENRY BROWN) 504 SI Paving Paving - entrance COMPLETE 2018 MANN (JAMES) 17 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2011 MANN (JAMES) 17 SI Courts Court - conversion to inline skating COMPLETE 2011 * MANN (JAMES) 17 FR Windows and Doors Natatorium - sliding doors COMPLETE 2011 * MANN (JAMES) 17 FR Major Rehab Transition plan - access improvements COMPLETE 2011

38 of 65 CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011-2019* As of December 15, 2019

PARK YEAR PARK NAME NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS COMPLETE $ MANN (JAMES) 17 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012 * MANN (JAMES) 17 FR HVAC and Energy Efficiency Pool - new boiler COMPLETE 2012 MANN (JAMES) 17 FR Minor Rehab Field house - wall repair COMPLETE 2013 MANN (JAMES) 17 SI Site Improvement Drainage improvements COMPLETE 2014 MANN (JAMES) 17 SI Athletic Field Ballfield - rehab COMPLETE 2014 MANN (JAMES) 17 FR Minor Rehab Misc. Veteran's Memorial Plaza COMPLETE 2015 MANN (JAMES) 17 FR Minor Rehab Misc. Pool stair renovation COMPLETE 2015 MANN (JAMES) 17 SI Playground Chicago Plays! - new equipment COMPLETE 2015 * MANN (JAMES) 17 FR Concrete Masonry Structural Natatorium - major rehab COMPLETE 2017 MANN (JAMES) 17 SI Landscape Tree planting COMPLETE 2018 MANN (JAMES) 17 FR Concrete Masonry Structural Field house - soffits and foundation PRE-DESIGN MAPLE 1283 SI Playground Chicago Plays! - new equipment COMPLETE 2015 MAPLEWOOD 1045 SI Athletic Field Athletic field - rehab COMPLETE 2017 * MAPLEWOOD 1045 SI Playground Playground - resurfacing COMPLETE 2019 MAPLEWOOD 1045 AD New Construction Field house - expansion COMPLETE 2019 * MAPLEWOOD 1045 SI Fencing Fencing - parking lot CONSTRUCTION MARIANO (LOUIS) 1239 FR Sculpture and Monument Fountain and plaza - restoration COMPLETE 2016 * MARQUETTE (JACQUES) 10 SI Paving Landscape yard - paving COMPLETE 2011 MARQUETTE (JACQUES) 10 FR Minor Rehab Landscape Yard - rehab COMPLETE 2011 MARQUETTE (JACQUES) 10 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012 MARQUETTE (JACQUES) 10 FR HVAC and Energy Efficiency Field house - new boiler COMPLETE 2013 MARQUETTE (JACQUES) 10 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013 MARQUETTE (JACQUES) 10 SI Courts Court - conversion to artificial turf junior soccer field COMPLETE 2013 MARQUETTE (JACQUES) 10 FR Minor Rehab Misc. locker room COMPLETE 2014 MARQUETTE (JACQUES) 10 SI Athletic Field Artificial turf athletic field - major rehab COMPLETE 2015 * MARQUETTE (JACQUES) 10 FR Minor Rehab Field house - interior restoration COMPLETE 2016 MARQUETTE (JACQUES) 10 FR Sculpture and Monument MLK Monument COMPLETE 2016 * MARQUETTE (JACQUES) 10 SI Paving 2016 DW Paving COMPLETE 2016 MARQUETTE (JACQUES) 10 SI Landscape Lagoon -pumps COMPLETE 2018 MARQUETTE (JACQUES) 10 FR Roof Field house - new roof PRE-DESIGN MARQUETTE (JACQUES) 10 FR Minor Rehab Cultural Center Initiative PLANNING MARQUETTE (JACQUES) 10 FR Roof Landscape Yard - roof and masonry PRE-DESIGN MARSHFIELD 1046 SI Courts Slam Dunk Basketball Court COMPLETE 2012 MARSHFIELD 1046 SI Site Improvement Misc. - new water line COMPLETE 2012 MARSHFIELD 1046 SI Playground Chicago Plays! - new equipment COMPLETE 2015 MARTIN (JOHNNY) 447 SI Playground Chicago Plays! - new equipment COMPLETE 2016 MASON (ELIZABETH) 1164 SI Playground Chicago Plays! - new equipment COMPLETE 2015 MASON (ELIZABETH) 1164 SI Fencing Fencing - perimeter COMPLETE 2019 *

39 of 65 CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011-2019* As of December 15, 2019

PARK YEAR PARK NAME NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS COMPLETE $ MASON (ELIZABETH) 1164 SI Spray Pool Spray feature - rehab DESIGN MATANKY (EUGENE) 168 SI Playground Chicago Plays! - new equipment COMPLETE 2014 * MATHER (STEPHEN TYNG) 241 SI Playground Playground - new COMPLETE 2012 *

MATHER (STEPHEN TYNG) 241 SI Athletic Field Athletic field - diamond, dugouts, bleachers and water supply. COMPLETE 2016 * MATHER (STEPHEN TYNG) 241 FR Roof Roof - rehab COMPLETE 2017 MATHER (STEPHEN TYNG) 241 SI Courts Mini-pitch Soccer Court - new COMPLETE 2018 * MATHER (STEPHEN TYNG) 241 SI Landscape Tree planting COMPLETE 2018 MAYFAIR 86 SI Paving 2016 DW Paving -pathways COMPLETE 2017 MAYFAIR 86 SI Athletic Field Athletic field - rehab COMPLETE 2018 * MCGUANE (JOHN) 2 FR Major Rehab Transition plan - access improvements COMPLETE 2012 MCGUANE (JOHN) 2 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012 MCGUANE (JOHN) 2 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 MCGUANE (JOHN) 2 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013 MCGUANE (JOHN) 2 FR Minor Rehab Misc. Pool stair renovation COMPLETE 2015 MCGUANE (JOHN) 2 SI Courts Tennis Courts - rehab COMPLETE 2016 * MCGUANE (JOHN) 2 AD Planning Field House - feasibility study COMPLETE 2018 MCGUANE (JOHN) 2 FR Swimming Pool Rehab - tile and plumbing COMPLETE 2019 MCGUANE (JOHN) 2 FR Major Rehab Field house - major restoration CONSTRUCTION * MCINERNEY (THOMAS) 443 SI Site Improvement Park improvements COMPLETE 2017 MCINERNEY (THOMAS) 443 AD Park Development Park improvements DESIGN * MCKEON (JOSEPH) 1162 SI Playground Chicago Plays! - new equipment COMPLETE 2014 MCKIERNAN (DAVID) 1060 FR Minor Rehab Accessibility improvements COMPLETE 2013 * MCKIERNAN (DAVID) 1060 SI Athletic Field Athletic field - rehab COMPLETE 2016 MCKINLEY (WILLIAM) 23 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012 MCKINLEY (WILLIAM) 23 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 MCKINLEY (WILLIAM) 23 SI Courts Tennis court - rehab COMPLETE 2012 MCKINLEY (WILLIAM) 23 FR Swimming Pool Pool - rehab COMPLETE 2013 MCKINLEY (WILLIAM) 23 FR Windows and Doors Field house - doors COMPLETE 2014 * MCKINLEY (WILLIAM) 23 SI Playground Chicago Plays! - new equipment COMPLETE 2014 MCKINLEY (WILLIAM) 23 FR Minor Rehab Landscape Yard - removal COMPLETE 2016 MCKINLEY (WILLIAM) 23 SI Paving 2016 DW Paving COMPLETE 2016 MCKINLEY (WILLIAM) 23 FR Major Rehab Field house - Major Rehab COMPLETE 2018 * MCKINLEY (WILLIAM) 23 SI Site Improvement Landscape Yard - paving and drainage COMPLETE 2018 MCKINLEY (WILLIAM) 23 SI Spray Pool Spray feature - tank rehab COMPLETE 2018 MCKINLEY (WILLIAM) 23 SI Athletic Field Artificial turf athletic field - major rehab COMPLETE 2019 * MCKINLEY (WILLIAM) 23 SI Lighting Lighting upgrade to LED COMPLETE 2019 MCKINLEY (WILLIAM) 23 FR Concrete Masonry Structural Power house - remove chimney COMPLETE 2019

40 of 65 CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011-2019* As of December 15, 2019

PARK YEAR PARK NAME NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS COMPLETE $ MCKINLEY (WILLIAM) 23 FR Roof Power house - roof BID/AWARD MCKINLEY (WILLIAM) 23 FR Sculpture and Monument "McKinley" - restoration PRE-DESIGN MCKINLEY (WILLIAM) 23 SI Site Improvement Dog friendly area -new CONSTRUCTION * MELLIN (CURTIS, SR.) 1219 SI Playground Playground - new COMPLETE 2013 MEMORIAL 1048 SI Courts Basketball - rehab COMPLETE 2011 MEMORIAL 1048 SI Playground Playground - new PLANNING MERRILL (GEORGE) 1126 SI Courts Site improvement COMPLETE 2013 MERRILL (GEORGE) 1126 SI Playground Chicago Plays! - new equipment COMPLETE 2014 * MERRILL (GEORGE) 1126 SI Courts Court -rehab COMPLETE 2014 * MERRIMAC 256 SI Site Improvement Misc. - flag poles COMPLETE 2012 * MERRIMAC 256 SI Playground Playground with water feature - new COMPLETE 2013 * MERRIMAC 256 SI Site Improvement Site improvements including paving COMPLETE 2013 * MERRIMAC 256 FR Minor Rehab Gym floor - restore or replace COMPLETE 2014 MERRYMAN (THERON) 1124 SI Playground Playground - new COMPLETE 2013 * METCALFE (RALPH) 448 SI Courts Tennis court - rehab COMPLETE 2011 * METCALFE (RALPH) 448 SI Athletic Field Athletic field - lighting and scoreboard COMPLETE 2015 METCALFE (RALPH) 448 SI Playground Chicago Plays! - new equipment COMPLETE 2016 METCALFE (RALPH) 448 SI Courts Basketball Court - new backboards COMPLETE 2019 * MEYERING (WILLIAM) 1049 SI Courts Basketball court - rehab COMPLETE 2013 * MEYERING (WILLIAM) 1049 SI Spray Pool Spray feature - rehab COMPLETE 2018 MEYERING (WILLIAM) 1049 SI Playground Playground - surfacing COMPLETE 2019 MICEK (FRANK) 1028 SI Playground Playground with water feature - new COMPLETE 2013 * MICEK (FRANK) 1028 SI Courts Basketball court - rehab COMPLETE 2013 MICEK (FRANK) 1028 SI Fencing Fencing - basketball court COMPLETE 2014 1268 FR Minor Rehab Misc. HVAC rehab COMPLETE 2011 MIDWAY PLAISANCE 1268 SI Landscape Tree Planting DESIGN MILLARD (ALDEN) 1127 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013 MILLARD (ALDEN) 1127 AD Acquisition Expansion COMPLETE 2017 MILLARD (ALDEN) 1127 SI Site Improvement Fencing and community garden CONSTRUCTION MILLER (SAMUEL) 1128 SI Playground Chicago Plays! - new equipment COMPLETE 2014 MINUTEMAN 307 SI Playground Playground - new COMPLETE 2012 * MINUTEMAN 307 SI Paving Paving - paths COMPLETE 2012 MINUTEMAN 307 FR Roof Roof - rehab COMPLETE 2017 MINUTEMAN 307 SI Fencing Ballfield - perimeter fencing COMPLETE 2019 MOCCASIN RANCH 337 SI Playground Chicago Plays! - new equipment COMPLETE 2016 MONTGOMERY (MABEL) 1129 SI Playground Chicago Plays! - new equipment COMPLETE 2014 MONTICELLO 1130 SI Playground Chicago Plays! - new equipment COMPLETE 2014 MONUMENT 57 SI Playground Chicago Plays! - new equipment COMPLETE 2014

41 of 65 CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011-2019* As of December 15, 2019

PARK YEAR PARK NAME NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS COMPLETE $ MOORE (MAURICE) 1050 SI Courts Misc. new backboards COMPLETE 2011 MOORE (MAURICE) 1050 AD Park Development Park development - including playground COMPLETE 2011 * MOORE (MAURICE) 1050 AD New Construction Expansion and access improvements COMPLETE 2015 * MORAN (TERRANCE) 1051 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012 MORAN (TERRANCE) 1051 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013 MORAN (TERRANCE) 1051 FR Roof Roof - rehab COMPLETE 2014 MORAN (TERRANCE) 1051 SI Spray Pool Park improvements PLANNING MORGAN (THOMAS LEEDS) FIELD 1132 SI Playground Chicago Plays! - new equipment COMPLETE 2014 MOUNT GREENWOOD 251 SI Paving Paving - paths COMPLETE 2011 MOUNT GREENWOOD 251 FR Major Rehab Transition plan - access improvements COMPLETE 2011 MOUNT GREENWOOD 251 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012 MOUNT GREENWOOD 251 SI Athletic Field Miracle Field - rehab COMPLETE 2016 * MOUNT GREENWOOD 251 FR Swimming Pool Pool - liner and gutter COMPLETE 2016 MOUNT GREENWOOD 251 SI Site Improvement Outdoor fitness station - new COMPLETE 2016 * MOUNT GREENWOOD 251 SI Playground Playground - fencing and mosaic COMPLETE 2017 * MOUNT GREENWOOD 251 SI Paving Paving - paths COMPLETE 2017 MOUNT GREENWOOD 251 SI Athletic Field Athletic fields- drainage COMPLETE 2017 * MOUNT GREENWOOD 251 FR HVAC and Energy Efficiency Steam boiler - new PRE-DESIGN MOZART (AMADEUS) 128 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012 MOZART (AMADEUS) 128 FR Roof Roof - rehab COMPLETE 2014 MOZART (AMADEUS) 128 SI Playground Chicago Plays! - new equipment COMPLETE 2015 MOZART (AMADEUS) 128 SI Athletic Field Athletic field - rehab PRE-DESIGN * MULBERRY 1284 SI Playground Chicago Plays! - new equipment COMPLETE 2015 MUNROE (ROY) 1052 SI Paving Paving - paths and drainage COMPLETE 2013 * MUNROE (ROY) 1052 SI Playground Playground and spray feature - new COMPLETE 2018 * MURRAY (DAVID) 1053 SI Courts Basketball court - new COMPLETE 2012 * MURRAY (DAVID) 1053 SI Playground Chicago Plays! - new equipment COMPLETE 2014 MURRAY (DAVID) 1053 FR Minor Rehab Bathroom - plumbing COMPLETE 2018 MURRAY (DAVID) 1053 SI Site Improvement Park improvements PLANNING NASH (DON) COMM. CTR. 482 FR Fitness Center Fitness center - upgrade COMPLETE 2011 NASH (DON) COMM. CTR. 482 FR Swimming Pool Pool Retrofit -compliance COMPLETE 2011 NASH (DON) COMM. CTR. 482 FR Roof Roof COMPLETE 2012 * NASH (DON) COMM. CTR. 482 FR Windows and Doors Field house - doors COMPLETE 2013 NASH (DON) COMM. CTR. 482 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2014 NASH (DON) COMM. CTR. 482 FR Minor Rehab Misc. Pool stair renovation COMPLETE 2015 NASH (DON) COMM. CTR. 482 SI Playground Park improvement COMPLETE 2017 NASH (DON) COMM. CTR. 482 FR Swimming Pool Pool - rehab CONSTRUCTION NELSON (ANDREW) 1133 SI Playground Chicago Plays! - new equipment COMPLETE 2015

42 of 65 CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011-2019* As of December 15, 2019

PARK YEAR PARK NAME NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS COMPLETE $ NICHOLS (JOHN FOUNTAIN) 277 SI Site Improvement Miscellaneous - fountain plumbing COMPLETE 2013 NICHOLS (JOHN FOUNTAIN) 277 SI Courts Tennis court - rehab COMPLETE 2016 * NICHOLS (JOHN FOUNTAIN) 277 SI Playground Chicago Plays! - new equipment at Kenwood Ave. COMPLETE 2016 NICHOLS (JOHN FOUNTAIN) 277 SI Playground Chicago Plays! - new equipment at Kimbark Ave. COMPLETE 2016 NICHOLS (JOHN FOUNTAIN) 277 SI Lighting Lighting upgrade to LED COMPLETE 2019 NINEBARK 355 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013 NINEBARK 355 AD Acquisition Expansion COMPLETE 2017 NOETHLING (GRACE) 425 SI Site Improvement Dog friendly area - improvements COMPLETE 2013 * North Boundary 557 AD Acquisition Kedzie Ave. and Touhy Ave. COMPLETE 2011 North Boundary 557 SI Site Improvement Pathways and benches COMPLETE 2011 North Boundary 557 SI Lighting Lighting - exterior COMPLETE 2014 * NORTH MAYFAIR 90 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013 NORTH PARK VILLAGE NATURE CENTER 533 FR Minor Rehab Staff Offices COMPLETE 2018 NORTHERLY ISLAND 34 FR Minor Rehab Solar charging station COMPLETE 2011 NORTHERLY ISLAND 34 SI Fencing Misc. fencing COMPLETE 2011 NORTHERLY ISLAND 34 AD Planning Framework plan COMPLETE 2011 NORTHERLY ISLAND 34 AD New Construction New Concert and Event Venue COMPLETE 2013 NORTHERLY ISLAND 34 SI Site Improvement Rotary Garden - benches COMPLETE 2015 NORTHERLY ISLAND 34 FR Major Rehab Tent - major restoration COMPLETE 2016 NORTHERLY ISLAND 34 SI Paving Lynn White Dr. - curb and asphalt COMPLETE 2016 NORTHERLY ISLAND 34 FR HVAC and Energy Efficiency Landscape Yard - boiler COMPLETE 2017 NORTHERLY ISLAND 34 SI Paving Adler Parking Lot - rehab COMPLETE 2017 NORTHERLY ISLAND 34 SI Landscape Misc. stones COMPLETE 2018 NORTHERLY ISLAND 34 FR Roof Landscape yard - roof COMPLETE 2018 NORTHERLY ISLAND 34 AD Park Development Park development - shoreline and natural area COMPLETE 2018 * NORTHERLY ISLAND 34 SI Landscape Field restoration COMPLETE 2019 NORTHERLY ISLAND 34 FR HVAC and Energy Efficiency Firehouse Building - rehab COMPLETE 2019 NORTHERLY ISLAND 34 SI Site Improvement Hamilton Exhibit - park improvements COMPLETE 2019 * NORTHERLY ISLAND 34 FR Roof Terminal - roof rehab CONSTRUCTION NORWOOD 141 FR Roof Landscape yard - roof COMPLETE 2011 NORWOOD 141 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012 NORWOOD 141 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 NORWOOD 141 SI Site Improvement Dog friendly area - new COMPLETE 2013 * NORWOOD 141 FR Roof Roof COMPLETE 2013 NORWOOD 141 SI Site Improvement Misc. site drainage COMPLETE 2013 NORWOOD 141 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013 NORWOOD 141 FR Minor Rehab Misc. Pool stair renovation COMPLETE 2015 NORWOOD 141 FR Swimming Pool Pool -deck COMPLETE 2016

43 of 65 CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011-2019* As of December 15, 2019

PARK YEAR PARK NAME NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS COMPLETE $ NORWOOD 141 SI Site Improvement Bocce Ball Court - rehab COMPLETE 2017 NORWOOD 141 SI Paving 2016 DW Paving -pathways COMPLETE 2017 NORWOOD 141 FR Minor Rehab Field house - drainage improvements COMPLETE 2018 NORWOOD 141 SI Site Improvement Hockey rink - new COMPLETE 2018 * NORWOOD 141 FR Swimming Pool Pool - liner COMPLETE 2019 NORWOOD 141 FR HVAC and Energy Efficiency Boiler - rehab COMPLETE 2019 NORWOOD 141 FR Windows and Doors Field house - windows BID/AWARD OAKDALE 235 FR Minor Rehab Misc. - hot water tank COMPLETE 2012 OAKDALE 235 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012 OAKDALE 235 FR Minor Rehab Misc. - washrooms COMPLETE 2012 OAKDALE 235 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012 OAKDALE 235 FR Minor Rehab Locker room - rehab COMPLETE 2015 OAKDALE 235 FR HVAC and Energy Efficiency Park improvements COMPLETE 2017 OAKDALE 235 SI Landscape Tree planting COMPLETE 2018 OAKDALE 235 FR Swimming Pool Pool - filter COMPLETE 2019 OAKDALE 235 FR Swimming Pool Pool - liner PRE-DESIGN OAKLEY 1137 SI Playground Chicago Plays! - new equipment COMPLETE 2015 * OGDEN (WILLIAM) 8 FR Minor Rehab Access improvements COMPLETE 2011 OGDEN (WILLIAM) 8 FR Fitness Center Fitness center - upgrade COMPLETE 2011 OGDEN (WILLIAM) 8 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012 OGDEN (WILLIAM) 8 FR Major Rehab Elevator COMPLETE 2012 * OGDEN (WILLIAM) 8 SI Spray Pool Water feature - rehab COMPLETE 2013 OGDEN (WILLIAM) 8 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2013 OGDEN (WILLIAM) 8 FR Roof Roof COMPLETE 2014 OGDEN (WILLIAM) 8 SI Playground Chicago Plays! - new equipment COMPLETE 2014 OGDEN (WILLIAM) 8 FR Minor Rehab Misc. - field house improvements COMPLETE 2016 OGDEN (WILLIAM) 8 SI Playground Chicago Plays! - new equipment COMPLETE 2016 OGDEN (WILLIAM) 8 SI Playground Park improvement COMPLETE 2016 OGDEN (WILLIAM) 8 SI Courts Mini-pitch Soccer Court - new COMPLETE 2019 * OGDEN (WILLIAM) 8 SI Courts Tennis Court -rehab CONSTRUCTION * OGDEN (WILLIAM) 8 FR Swimming Pool Pool - liner PRE-DESIGN OGDEN (WILLIAM) 8 SI Athletic Field Artificial Turf Field and Track - new CONSTRUCTION * O'HALLAREN (BERNARD) 1012 SI Courts Slam Dunk Basketball Court COMPLETE 2012 O'HALLAREN (BERNARD) 1012 SI Courts Tennis court - conversion and rehab COMPLETE 2013 * OHIO 1139 SI Playground Chicago Plays! - new equipment COMPLETE 2016 OHIO & HARDING 1138 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013 OLYMPIA 60 FR HVAC and Energy Efficiency Misc. - HVAC rehab COMPLETE 2012 OLYMPIA 60 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012

44 of 65 CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011-2019* As of December 15, 2019

PARK YEAR PARK NAME NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS COMPLETE $ OLYMPIA 60 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 OLYMPIA 60 SI Athletic Field Athletic field - rehab COMPLETE 2013 OLYMPIA 60 SI Playground Chicago Plays! - new equipment COMPLETE 2014 OLYMPIA 60 FR Roof Roof - new PRE-DESIGN ORIOLE 59 SI Lighting Lighting - ballfield COMPLETE 2011 * ORIOLE 59 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012 ORIOLE 59 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 ORIOLE 59 SI Athletic Field Athletic field - rehab COMPLETE 2014 * ORIOLE 59 SI Playground Chicago Plays! - new equipment (at Balmoral Ave.) COMPLETE 2014 ORIOLE 59 SI Playground Chicago Plays! - new equipment (at Gregory) COMPLETE 2014 ORIOLE 59 SI Spray Pool Misc. surfacing renovation COMPLETE 2016 ORIOLE 59 SI Paving 2016 DW Paving -pathways COMPLETE 2017 ORIOLE 59 SI Site Improvement Outdoor fitness station - new COMPLETE 2019 * ORIOLE 59 FR Roof Misc. gutters and downspouts PRE-DESIGN OWENS (JESSE) 237 SI Athletic Field Athletic field - study COMPLETE 2011 OWENS (JESSE) 237 FR HVAC and Energy Efficiency Boiler - automation system COMPLETE 2012 OWENS (JESSE) 237 SI Athletic Field Ballfield - rehab COMPLETE 2015 OWENS (JESSE) 237 FR Windows and Doors Windows - drainage PRE-DESIGN OZ 423 SI Playground Playground - rehab including new surfacing COMPLETE 2015 * OZ 423 SI Courts Tennis Court - rehab COMPLETE 2017 * OZ 423 SI Athletic Field Athletic field - rehab COMPLETE 2018 * OZ 423 SI Athletic Field Athletic field - scoreboard COMPLETE 2019 * PACKINGTOWN 404 SI Playground Chicago Plays! - new equipment COMPLETE 2016 PALMER (BERTHA HONORÉ) 520 SI Playground Chicago Plays! - new equipment COMPLETE 2014 PALMER (JOHN MCAULEY) SQUARE 539 AD Acquisition Palmer Blvd. COMPLETE 2014 PALMER (JOHN MCAULEY) SQUARE 539 SI Landscape Tree planting COMPLETE 2018 PALMER (POTTER) 13 SI Athletic Field Ballfield - rehab COMPLETE 2011 PALMER (POTTER) 13 FR Minor Rehab Gym floor - restore or replace COMPLETE 2011 PALMER (POTTER) 13 SI Paving Track - asphalt and lane lines COMPLETE 2011 PALMER (POTTER) 13 FR Fitness Center Fitness center - equipment COMPLETE 2011 PALMER (POTTER) 13 FR Fitness Center Fitness center - upgrade COMPLETE 2011 PALMER (POTTER) 13 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012 PALMER (POTTER) 13 SI Paving Paving - pathways COMPLETE 2012 * PALMER (POTTER) 13 FR Major Rehab Transition plan - access improvements COMPLETE 2012 PALMER (POTTER) 13 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012 PALMER (POTTER) 13 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012 PALMER (POTTER) 13 FR Windows and Doors Field house - windows and doors COMPLETE 2013 PALMER (POTTER) 13 FR Swimming Pool Pool - filter COMPLETE 2013

45 of 65 CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011-2019* As of December 15, 2019

PARK YEAR PARK NAME NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS COMPLETE $ PALMER (POTTER) 13 SI Playground Chicago Plays! - new equipment COMPLETE 2014 PALMER (POTTER) 13 FR Roof Field house - roof COMPLETE 2015 PALMER (POTTER) 13 FR Minor Rehab Misc. pool stair renovation COMPLETE 2015 PALMER (POTTER) 13 SI Courts Court - conversion to minipitch COMPLETE 2016 * PALMER (POTTER) 13 SI Paving 2016 DW Paving COMPLETE 2017 PALMER (POTTER) 13 FR Swimming Pool Water slide - rehab COMPLETE 2019 PALMER (POTTER) 13 SI Site Improvement Walking Track - rehab CONSTRUCTION PALMER (POTTER) 13 FR Minor Rehab Cultural Center Initiative PLANNING PALMER (POTTER) 13 FR Major Rehab Transition plan - access improvements CONSTRUCTION * PALMISANO (HENRY) 531 SI Fencing Misc. security fencing COMPLETE 2014 PALMISANO (HENRY) 531 SI Site Improvement Misc. - circulation pond COMPLETE 2017 PALMISANO (HENRY) 531 SI Landscape Site improvements - pathways COMPLETE 2018 PALMISANO (HENRY) 531 SI Site Improvement Walkway - rehab COMPLETE 2019 PALMISANO (HENRY) 531 SI Landscape Nature area and Play Space - new COMPLETE 2019 * PALMISANO (HENRY) 531 AD Acquisition Environmental monitoring ONGOING PARK NO. 326 326 SI Fencing Misc. - perimeter fencing COMPLETE 2014 PARK NO. 382 382 SI Fencing Misc. - perimeter fencing COMPLETE 2014 PARK NO. 382 382 SI Site Improvement Park improvements PLANNING PARK NO. 414 414 SI Fencing Misc. - perimeter fencing COMPLETE 2014 PARK NO. 414 414 SI Site Improvement Park improvements PLANNING PARK NO. 419 419 SI Fencing Misc. - perimeter fencing COMPLETE 2014 PARK NO. 421 421 SI Fencing Misc. - perimeter fencing COMPLETE 2014 PARK NO. 421 421 SI Site Improvement Park improvements - TBD PLANNING PARK NO. 422 422 SI Lighting Lighting - exterior COMPLETE 2011 PARK NO. 422 422 SI Playground Chicago Plays! - new equipment COMPLETE 2016 PARK NO. 432 432 SI Fencing Misc. - perimeter fencing COMPLETE 2014 PARK NO. 432 432 SI Site Improvement Park development PLANNING PARK NO. 437 437 SI Fencing Misc. - perimeter fencing COMPLETE 2014 PARK NO. 468 468 SI Site Improvement Park improvements including fencing, signage COMPLETE 2018 PARK NO. 500 500 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 PARK NO. 500 500 SI Playground Chicago Plays! - new equipment COMPLETE 2016 PARK NO. 512 512 FR Roof Landscape yard - roof COMPLETE 2011 PARK NO. 512 512 AD Park Development - Access Park development COMPLETE 2012 PARK NO. 517 517 SI Lighting Lighting - exterior COMPLETE 2013 PARK NO. 519 519 SI Playground Playground - upgrade PLANNING PARK NO. 527 527 AD Planning Trades relocation - study COMPLETE 2011 PARK NO. 527 527 FR Minor Rehab Candle Factory- emergency rehab COMPLETE 2017 PARK NO. 534 534 SI Site Improvement Walking track and plaza - rehab CONSTRUCTION

46 of 65 CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011-2019* As of December 15, 2019

PARK YEAR PARK NAME NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS COMPLETE $ PARK NO. 534 534 SI Playground Playground - upgrade PLANNING PARK NO. 538 538 SI Landscape Natural Area - new CONSTRUCTION * PARK NO. 540 540 AD Acquisition Federal St. and 24th St. COMPLETE 2014 PARK NO. 543 543 AD Acquisition Printers Row Park COMPLETE 2014 PARK NO. 543 543 SI Lighting Exterior lighting - upgrades COMPLETE 2018 * PARK NO. 551 551 SI Site Improvement Park improvements COMPLETE 2019 PARK NO. 552 552 AD Acquisition 4901-09 W. Belmont Ave. COMPLETE 2014 PARK NO. 556 556 AD Planning Artesian Ave. and Western Ave. - study COMPLETE 2011 PARK NO. 556 556 AD Acquisition Artesian Ave. and Western Ave. COMPLETE 2013 PARK NO. 556 556 AD Park Development Park development - Artesian Ave. and Western Ave. COMPLETE 2015 * PARK NO. 559 559 AD Acquisition 6151 N. Sheridan - acquisition COMPLETE 2011 PARK NO. 559 559 SI Site Improvement Park Improvement Fund PLANNING * PARK NO. 565 565 AD Acquisition Indian Ridge - 116th St. and Torrence Ave. COMPLETE 2015 PARK NO. 565 565 SI Landscape Habitat Development - Indian Ridge COMPLETE 2017 * PARK NO. 565 565 SI Landscape Indian Ridge - restoration and management DESIGN * PARK NO. 566 566 AD Acquisition USX - 79th St. and Lake Michigan COMPLETE 2014 PARK NO. 566 566 SI Site Improvement Misc. access road COMPLETE 2014 PARK NO. 566 566 SI Landscape Natural Area - Habitat Development COMPLETE 2019 * PARK NO. 567 567 AD Acquisition Bloomingdale Access Park - Milwaukee Ave. and Leavitt St. COMPLETE 2012 PARK NO. 567 567 SI Lighting Lighting - exterior COMPLETE 2012 *

PARK NO. 567 567 AD Park Development Bloomingdale Access - new park at Milwaukee Ave. and Leavitt St. COMPLETE 2013 * PARK NO. 568 568 AD Acquisition Rosehill Cemetery - Western Ave. and Peterson Ave. COMPLETE 2012 PARK NO. 568 568 AD Park Development Park development - West Ridge Nature Preserve COMPLETE 2015 * PARK NO. 568 568 SI Landscape Nature Playground - new COMPLETE 2019 * PARK NO. 569 569 AD Park Development Dog friendly area - Monroe St. and Loomis St. COMPLETE 2014 * PARK NO. 569 569 AD Acquisition Dog friendly area - Monroe St. and Loomis St. COMPLETE 2015 PARK NO. 571 571 AD Acquisition Eleanor Street Park COMPLETE 2012 PARK NO. 571 571 SI Fencing Misc. - site improvements COMPLETE 2014 PARK NO. 571 571 AD New Construction New Chicago River Boat House COMPLETE 2016 * PARK NO. 572 572 AD Park Development Bloomingdale Line - planning COMPLETE 2014 PARK NO. 572 572 AD Acquisition Bloomingdale Park and Trail - various sites COMPLETE 2014 PARK NO. 572 572 AD Park Development The 606- new park and trail development COMPLETE 2015 * PARK NO. 573 573 AD Acquisition 114th St. and Champlain Ave. COMPLETE 2016 PARK NO. 573 573 SI Site Improvement Misc. new water source CONSTRUCTION * PARK NO. 574 574 AD Park Development Park development - "Rockwell Gardens" COMPLETE 2014 * PARK NO. 574 574 AD Acquisition Jackson Blvd. and Maplewood Ave. COMPLETE 2015 PARK NO. 575 575 AD Park Development Park development - Wacker Interchange COMPLETE 2012

47 of 65 CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011-2019* As of December 15, 2019

PARK YEAR PARK NAME NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS COMPLETE $ PARK NO. 576 576 AD Acquisition Whitford Pond - 2113 E. 134th St. COMPLETE 2012 PARK NO. 576 576 AD Park Development Whitford Pond - planning PLANNING PARK NO. 577 577 AD Park Development Morgan Park Sports Complex COMPLETE 2015 * PARK NO. 577 577 FR HVAC and Energy Efficiency Air conditioning - supplemental unit DESIGN PARK NO. 578 578 AD Park Development Park development - Washington Blvd. and Wolcott Ave. COMPLETE 2016 * PARK NO. 578 578 AD Acquisition New park - 1919 W. Maypole Ave. COMPLETE 2016 PARK NO. 579 579 AD Park Development Magid Glove - 606 Access Park Environmental Assessment COMPLETE 2016 PARK NO. 580 580 AD Acquisition New park - 4139 N. Oak Park Avenue COMPLETE 2016 PARK NO. 580 580 AD Park Development New Park Development - Oak Park Ave. and Irving Park Rd. COMPLETE 2019 * PARK NO. 581 581 AD Acquisition New park - 11625 S. Oakley Ave. COMPLETE 2016 PARK NO. 581 581 SI Athletic Field New Park Development - 116th St. and Oakley Ave. COMPLETE 2017 PARK NO. 582 582 AD Acquisition 9202-35 S. Vanderpoel Ave. - new park COMPLETE 2017 PARK NO. 582 582 AD Park Development New park -site improvements TBD PLANNING PARK NO. 583 583 AD Acquisition 10108 S. Exchange Ave. - new park COMPLETE 2017 PARK NO. 583 583 AD Park Development New park development PRE-DESIGN * PARK NO. 584 584 AD Acquisition 134 W. 119th St. - new park COMPLETE 2017 PARK NO. 584 584 AD Park Development New park development PRE-DESIGN * PARK NO. 585 585 AD Acquisition 6049 S. Whipple St. - new park COMPLETE 2017 PARK NO. 585 585 AD Park Development 6049 S. Whipple St. - park development PRE-DESIGN * PARK NO. 586 586 AD Acquisition 7208 S. Maplewood Ave. - new park COMPLETE 2017 PARK NO. 586 586 SI Fencing Fencing - perimeter CONSTRUCTION PARK NO. 587 587 AD Acquisition 658 E. 95th St. - new park COMPLETE 2017 PARK NO. 587 587 AD Park Development Park improvements COMPLETE 2019 * PARK NO. 588 588 AD Park Development New park with playground - with Kaboom COMPLETE 2018 * PARK NO. 589 589 AD Acquisition 227 W 110TH Place - new park COMPLETE 2018 PARK NO. 589 589 SI Fencing Fencing - perimeter CONSTRUCTION PARK NO. 590 590 AD Park Development 3940 S. Indiana Ave - new dog friendly area COMPLETE 2019 * PARK NO. 591 591 AD Park Development 3906 S Lake Park Ave - new dog friendly area COMPLETE 2019 * PARK NO. 592 592 AD Park Development 4153 S. Vincennes Ave - new dog friendly area COMPLETE 2019 * PARK NO. 593 593 AD Acquisition 4546 N. Kedvale Av. - new park COMPLETE 2018 * PARK NO. 593 593 SI Site Improvement Park improvements DESIGN * PARK NO. 594 594 AD Park Development New park with dog friendly area CONSTRUCTION * PARK NO. 596 596 AD Acquisition New park acquisition - 4800 S. Western COMPLETE 2018 * PARK NO. 596 596 AD Park Development Environmental remediation CONSTRUCTION PARK NO. 596 596 AD Park Development Park development including field house and turf fields PRE-DESIGN PARK NO. 596 596 AD Park Development Park development - design DESIGN PARK NO. 597 597 FR Concrete Masonry Structural Natural area - new DESIGN * PARK NO. 598 598 AD Park Development New park - 1450 N. Larrabee St. DESIGN *

48 of 65 CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011-2019* As of December 15, 2019

PARK YEAR PARK NAME NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS COMPLETE $ PARK-VIEW 1056 SI Playground Chicago Plays! - new equipment COMPLETE 2014 PARSONS (LUCY) 501 SI Playground Playground - expansion COMPLETE 2018 * PASCHEN (CHRISTIAN) 1057 SI Playground Chicago Plays! - new equipment COMPLETE 2014 * PASCHEN (CHRISTIAN) 1057 SI Fencing Fencing at basketball court COMPLETE 2016 * PASCHEN (CHRISTIAN) 1057 FR Concrete Masonry Structural Field house - tuckpointing PRE-DESIGN PASTEUR (LOUIS) 247 SI Athletic Field Artificial turf athletic field - new COMPLETE 2011 * PASTEUR (LOUIS) 247 SI Playground Chicago Plays! - new equipment COMPLETE 2015 PASTEUR (LOUIS) 247 SI Courts Mini-pitch Soccer Court - new COMPLETE 2018 * PASTEUR (LOUIS) 247 SI Fencing Misc. - fencing COMPLETE 2019 PENDLETON (HADIYA) 339 AD Acquisition Expansion COMPLETE 2016 PENDLETON (HADIYA) 339 AD Park Development Park development - including playground COMPLETE 2016 * PERIWINKLE 436 SI Playground Chicago Plays! - new equipment COMPLETE 2015 PETERSON (PEHR SAMUEL) 452 SI Courts Tennis court - rehab COMPLETE 2011 PETERSON (PEHR SAMUEL) 452 SI Paving Paving - paths COMPLETE 2012 PETERSON (PEHR SAMUEL) 452 FR Major Rehab Elevator - rehab COMPLETE 2012 PETERSON (PEHR SAMUEL) 452 FR Minor Rehab Field House - Major Rehab COMPLETE 2014 PETERSON (PEHR SAMUEL) 452 SI Playground Park improvement COMPLETE 2016 PETERSON (PEHR SAMUEL) 452 SI Playground Chicago Plays! - new equipment @ Central Park Ave. COMPLETE 2016 PETERSON (PEHR SAMUEL) 452 SI Paving Parking lot - rehab COMPLETE 2018 PETERSON (PEHR SAMUEL) 452 SI Landscape Tree planting COMPLETE 2019 PETERSON (PEHR SAMUEL) 452 SI Lighting Lighting upgrade to LED COMPLETE 2019 PETERSON (PEHR SAMUEL) 452 FR Concrete Masonry Structural Field house - concrete and masonry PRE-DESIGN PIETROWSKI (SYLVESTER) 1058 SI Playground Chicago Plays! - new equipment COMPLETE 2015 PINE 1287 SI Playground Chicago Plays! - new equipment COMPLETE 2014 PIOTROWSKI (LILLIAN) 230 SI Site Improvement Misc. - lighting and drinking fountain COMPLETE 2011 * PIOTROWSKI (LILLIAN) 230 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012 PIOTROWSKI (LILLIAN) 230 FR Major Rehab Transition plan - access improvements COMPLETE 2012 PIOTROWSKI (LILLIAN) 230 FR Swimming Pool Swimming pool - dome COMPLETE 2014 PIOTROWSKI (LILLIAN) 230 SI Lighting Lighting - athletic field and pathways COMPLETE 2015 * PIOTROWSKI (LILLIAN) 230 FR Fitness Center Fitness center - accessibility equipment COMPLETE 2015 PIOTROWSKI (LILLIAN) 230 SI Athletic Field Athletic field - rehab COMPLETE 2016 * PIOTROWSKI (LILLIAN) 230 FR Swimming Pool Pool - filter and controls COMPLETE 2017 PIOTROWSKI (LILLIAN) 230 FR Concrete Masonry Structural Field house - masonry and roof COMPLETE 2017 PIOTROWSKI (LILLIAN) 230 FR Minor Rehab Pool Building - covered walkway COMPLETE 2017 PIOTROWSKI (LILLIAN) 230 FR Swimming Pool Pool - liner PRE-DESIGN PIOTROWSKI (LILLIAN) 230 FR Major Rehab Cultural Center Initiative PLANNING PIOTROWSKI (LILLIAN) 230 SI Playground Playground - rehab PLANNING PLEASANT POINT 140 SI Playground Playground - new COMPLETE 2014 *

49 of 65 CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011-2019* As of December 15, 2019

PARK YEAR PARK NAME NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS COMPLETE $ POPLAR 323 SI Playground Chicago Plays! - new equipment COMPLETE 2016 PORTAGE 147 FR Roof Landscape yard - roof COMPLETE 2011 PORTAGE 147 SI Site Improvement Misc. - scoreboard COMPLETE 2011 PORTAGE 147 FR Minor Rehab Field house - gym and community room floors COMPLETE 2011 PORTAGE 147 SI Athletic Field Athletic field - rehab COMPLETE 2011 PORTAGE 147 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012 PORTAGE 147 FR Minor Rehab Field house - locker room improvements COMPLETE 2013 * PORTAGE 147 FR Concrete Masonry Structural Field house and Landscape building - masonry COMPLETE 2013 PORTAGE 147 FR Swimming Pool Deck - drainage improvements COMPLETE 2013 PORTAGE 147 SI Site Improvement Misc. - landscaping and drainage COMPLETE 2013 * PORTAGE 147 FR Minor Rehab Facility rehab - minor COMPLETE 2013 PORTAGE 147 FR Concrete Masonry Structural Pool house - concrete and masonry COMPLETE 2013 PORTAGE 147 SI Site Improvement Dog friendly area - expansion COMPLETE 2013 * PORTAGE 147 FR Sculpture and Monument Misc. fountain planters COMPLETE 2014 * PORTAGE 147 FR Windows and Doors Landscape Yard - doors COMPLETE 2014 PORTAGE 147 SI Paving Paving - parking lot and pathways COMPLETE 2014 * PORTAGE 147 FR Minor Rehab Misc. Indoor pool stair renovation COMPLETE 2015 PORTAGE 147 SI Paving Paving - paths COMPLETE 2015 * PORTAGE 147 FR Swimming Pool Pool - rehab COMPLETE 2015 PORTAGE 147 FR Swimming Pool Pool - rehab COMPLETE 2016 PORTAGE 147 FR Roof Roof and Skylight - rehab COMPLETE 2017 * PORTAGE 147 SI Spray Pool Spray feature - rehab COMPLETE 2017 PORTAGE 147 SI Paving 2016 DW Paving -pathways COMPLETE 2017 PORTAGE 147 SI Paving Landscape Yard - paving COMPLETE 2018 PORTAGE 147 SI Lighting Athletic field - lighting COMPLETE 2018 * PORTAGE 147 SI Courts Mini-pitch Soccer Court - new COMPLETE 2019 * PORTAGE 147 FR Swimming Pool Kiddie and lap pool - rehab COMPLETE 2019 PORTAGE 147 FR Swimming Pool Pool - drains PRE-DESIGN POTTAWATTOMIE 166 SI Site Improvement Dog friendly area - new COMPLETE 2011 * POTTAWATTOMIE 166 FR Fitness Center Fitness center - new equipment COMPLETE 2011 POTTAWATTOMIE 166 SI Athletic Field Ballfield - rehab COMPLETE 2011 POTTAWATTOMIE 166 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012 POTTAWATTOMIE 166 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 POTTAWATTOMIE 166 SI Courts Court - conversion to artificial turf junior soccer field COMPLETE 2013 POTTAWATTOMIE 166 SI Playground Chicago Plays! - new equipment including water feature COMPLETE 2015 * POTTAWATTOMIE 166 FR Minor Rehab Misc. - drinking fountain COMPLETE 2016 * POTTAWATTOMIE 166 SI Landscape Tree planting COMPLETE 2018 POTTAWATTOMIE 166 FR Roof Roof CONSTRUCTION

50 of 65 CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011-2019* As of December 15, 2019

PARK YEAR PARK NAME NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS COMPLETE $ PRAIRIE WOLF 329 SI Playground Chicago Plays! - new equipment COMPLETE 2016 PRITZKER 541 AD Acquisition Pritzker Park COMPLETE 2011 PRIVET 375 SI Playground Chicago Plays! - new equipment COMPLETE 2016 PULASKI (CASIMER) 217 FR Concrete Masonry Structural Pool deck - rehab COMPLETE 2011 * PULASKI (CASIMER) 217 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012 PULASKI (CASIMER) 217 FR Minor Rehab Field house - fire escape rehab COMPLETE 2012 PULASKI (CASIMER) 217 FR Minor Rehab Field house - rehab COMPLETE 2013 PULASKI (CASIMER) 217 FR Minor Rehab Field house- interior COMPLETE 2014 PULASKI (CASIMER) 217 SI Athletic Field Ballfield - rehab COMPLETE 2015 PULASKI (CASIMER) 217 SI Spray Pool Spray feature - rehab COMPLETE 2018 PULASKI (CASIMER) 217 FR Swimming Pool Pool - miami tank COMPLETE 2018 PULASKI (CASIMER) 217 FR Major Rehab Field house - concrete and structural PLANNING * PULASKI (CASIMER) 217 SI Spray Pool Water play feature - upgrade PRE-DESIGN PULLMAN (GEORGE) 1237 SI Site Improvement Park improvements PLANNING RAILROAD JUNCTION 354 SI Playground Chicago Plays! - new equipment COMPLETE 2014 RAINBOW BEACH 1001 FR Roof Roof COMPLETE 2012 RAINBOW BEACH 1001 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012 RAINBOW BEACH 1001 FR Minor Rehab Misc. - Beach House Rehab COMPLETE 2014 RAINBOW BEACH 1001 SI Playground Chicago Plays! - new equipment COMPLETE 2015 RAINBOW BEACH 1001 SI Site Improvement Water quality COMPLETE 2015 * RAINBOW BEACH 1001 SI Paving Paving - paths COMPLETE 2016 RAINBOW BEACH 1001 SI Paving 2016 DW Paving COMPLETE 2016 RAINBOW BEACH 1001 SI Site Improvement Lakefront Kiosk - installation COMPLETE 2017 RAINBOW BEACH 1001 FR Concrete Masonry Structural Field house - masonry COMPLETE 2017 RAINBOW BEACH 1001 FR Minor Rehab Field house - water heaters COMPLETE 2018 RAINBOW BEACH 1001 SI Landscape Tree planting COMPLETE 2018 RAINBOW BEACH 1001 FR Minor Rehab Concession Building - rehab COMPLETE 2019 RAINEY (EDWARD) 33 SI Playground Chicago Plays! - new equipment COMPLETE 2015 RAINEY (EDWARD) 33 SI Courts Court conversion - Cruyff Court COMPLETE 2016 * RAVENSWOOD MANOR 159 SI Playground Chicago Plays! - new equipment COMPLETE 2015 RENAISSANCE 509 SI Site Improvement Park improvements PLANNING REVERE (PAUL) 185 FR Minor Rehab Misc. plumbing COMPLETE 2011 REVERE (PAUL) 185 SI Paving Pathways - walking track COMPLETE 2015 REVERE (PAUL) 185 SI Site Improvement Site improvements COMPLETE 2017 * REVERE (PAUL) 185 FR Minor Rehab Misc. - flooring COMPLETE 2017 REVERE (PAUL) 185 SI Athletic Field Athletic Field - rehab COMPLETE 2017 * REVERE (PAUL) 185 FR Minor Rehab Facility Assessments COMPLETE 2018 REVERE (PAUL) 185 FR Major Rehab Field House - major restoration DESIGN *

51 of 65 CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011-2019* As of December 15, 2019

PARK YEAR PARK NAME NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS COMPLETE $ REYES (GUADALUPE) 352 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 RIDGE 175 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012 RIDGE 175 SI Courts Park improvements including paving and lighting COMPLETE 2013 * RIDGE 175 SI Paving Parking lot - rehab for accessibility COMPLETE 2013 RIDGE 175 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013 RIDGE 175 FR Minor Rehab Field house - lobby improvements COMPLETE 2014 RIDGE 175 SI Athletic Field Athletic field - rehab COMPLETE 2014 * RIDGE 175 FR HVAC and Energy Efficiency Boiler - pool COMPLETE 2015 RIDGE 175 FR Roof Ceramic Building - major rehab COMPLETE 2015 RIDGE 175 FR Minor Rehab Misc. Pool stair renovation COMPLETE 2015 RIDGE 175 SI Paving Site improvements - paving COMPLETE 2016 RIDGE 175 FR Swimming Pool Pool - filter COMPLETE 2016 RIDGE 175 FR Roof Field house and Ceramic Building - roof COMPLETE 2017 RIDGE 175 FR Swimming Pool Pool - boiler COMPLETE 2018 RIDGE 175 FR Major Rehab Field house - building assessment COMPLETE 2018 RIDGE 175 FR Windows and Doors Field house - windows COMPLETE 2019 RIDGE 175 FR Major Rehab Field house - second floor auditorium and elevator DESIGN * RIDGE 175 FR Minor Rehab Cultural Center Initiative PLANNING RIIS (JACOB) 123 SI Site Improvement Water service COMPLETE 2011 RIIS (JACOB) 123 FR Minor Rehab Ice Skating Rink - rehab COMPLETE 2011 RIIS (JACOB) 123 SI Paving Paving - paths and parking lot COMPLETE 2011 RIIS (JACOB) 123 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012 RIIS (JACOB) 123 SI Spray Pool Water feature - surfacing COMPLETE 2012 RIIS (JACOB) 123 SI Playground Playground - design COMPLETE 2013 RIIS (JACOB) 123 FR Roof Natatorium - roof COMPLETE 2014 RIIS (JACOB) 123 SI Playground Signature Playground - new COMPLETE 2014 * RIIS (JACOB) 123 FR HVAC and Energy Efficiency Field house boiler - rehab COMPLETE 2016 RIIS (JACOB) 123 SI Courts Tennis Court - rehab COMPLETE 2017 * RIIS (JACOB) 123 SI Site Improvement Track - rehab COMPLETE 2017 * RIIS (JACOB) 123 FR Swimming Pool Filter - motor and pump COMPLETE 2017 RIIS (JACOB) 123 SI Lighting Lighting upgrade to LED - Exterior LED upgrades COMPLETE 2019 * RIIS (JACOB) 123 SI Spray Pool Water playground - minor rehab COMPLETE 2019 * RIIS (JACOB) 123 AD Planning Park and field house - assessment PLANNING RIIS (JACOB) 123 SI Spray Pool Water play feature - major rehab PLANNING RIVER 186 SI Spray Pool Water feature - rehab COMPLETE 2011 * RIVER 186 FR Swimming Pool Pool Retrofit -compliance COMPLETE 2012 RIVER 186 SI Athletic Field Artificial turf athletic field - major rehab COMPLETE 2013 * RIVER 186 AD New Construction New Chicago River Boat House COMPLETE 2014

52 of 65 CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011-2019* As of December 15, 2019

PARK YEAR PARK NAME NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS COMPLETE $ RIVER 186 FR Minor Rehab Misc. Pool stair renovation COMPLETE 2015 RIVER 186 FR Swimming Pool Pool - drainage COMPLETE 2015 RIVER 186 FR Swimming Pool Pool - rehab COMPLETE 2018 RIVER 186 SI Courts Tennis Court -rehab COMPLETE 2018 * RIVER 186 SI Site Improvement Ballfield Restorations with Stormwater Diversion (CDOT) COMPLETE 2018 * RIVER 186 SI Landscape Tree planting and ballfield COMPLETE 2019 RIVER 186 SI Lighting Lighting upgrade to LED COMPLETE 2019 RIVER 186 FR Major Rehab Field house - roof and tuckpointing PLANNING * ROBERTS (DANIEL) SQUARE 95 SI Playground Chicago Plays! - new equipment COMPLETE 2014 ROBICHAUX (JOSEPH) 320 SI Playground Chicago Plays! - new equipment COMPLETE 2015 ROBICHAUX (JOSEPH) 320 SI Courts Basketball Court - rehab COMPLETE 2016 ROBICHAUX (JOSEPH) 320 FR Major Rehab Field house - major rehab COMPLETE 2018 * ROBICHAUX (JOSEPH) 320 FR HVAC and Energy Efficiency HVAC - new roof units CONSTRUCTION ROBINSON (JACKIE) 236 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012 ROBINSON (JACKIE) 236 SI Playground Playground - new COMPLETE 2014 * ROBINSON (JACKIE) 236 FR Minor Rehab Field house - improvements PLANNING * ROGERS (PHILLIP) 240 SI Athletic Field Athletic field - rehab COMPLETE 2012 ROGERS (PHILLIP) 240 SI Playground Chicago Plays! - new equipment COMPLETE 2014 ROGERS (PHILLIP) 240 SI Paving 2016 DW Paving COMPLETE 2016 ROGERS (PHILLIP) 240 SI Athletic Field Athletic field - rehab COMPLETE 2016 ROGERS (PHILLIP) 240 SI Lighting Lighting upgrade to LED COMPLETE 2019 ROGERS (PHILLIP) BEACH 1262 SI Site Improvement Misc. - site improvements COMPLETE 2016 ROGERS (PHILLIP) BEACH 1262 SI Site Improvement Site restoration COMPLETE 2019 * RONAN (GEORGE) 275 SI Playground Chicago Plays! - new equipment COMPLETE 2014 Riverbank - Habitat Restoration RONAN (GEORGE) 275 SI Landscape Ronan East COMPLETE 2015 * RONAN (GEORGE) 275 SI Landscape Tree planting COMPLETE 2018 ROOSEVELT (THEODORE) 466 SI Lighting Lighting - exterior COMPLETE 2019 * ROSEDALE 91 FR Roof Roof COMPLETE 2012 ROSEDALE 91 SI Playground Chicago Plays! - new equipment COMPLETE 2016 ROSENBLUM (J. LESLIE) 231 AD Park Development Park development - including artificial turf field COMPLETE 2012 * ROWAN (WILLIAM) 248 SI Fencing Fencing - ballfield COMPLETE 2011 ROWAN (WILLIAM) 248 FR Minor Rehab Field house - locker room improvements COMPLETE 2014 ROWAN (WILLIAM) 248 FR HVAC and Energy Efficiency Misc. HVAC improvement COMPLETE 2014 ROWAN (WILLIAM) 248 SI Playground Chicago Plays! - new equipment COMPLETE 2016 ROWAN (WILLIAM) 248 SI Paving 2016 DW Paving COMPLETE 2017 ROWAN (WILLIAM) 248 SI Site Improvement Rink conversion to roller hockey COMPLETE 2019 * ROWAN (WILLIAM) 248 SI Athletic Field Athletic fields - rehab CONSTRUCTION *

53 of 65 CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011-2019* As of December 15, 2019

PARK YEAR PARK NAME NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS COMPLETE $ RUIZ (IRMA C.) 1278 SI Playground Chicago Plays! - new equipment COMPLETE 2015 RUIZ (IRMA C.) 1278 SI Courts Mini-pitch Soccer Court - new COMPLETE 2018 * RUSSELL (MARTIN) SQUARE 6 SI Playground Playground - resurfacing COMPLETE 2011 RUSSELL (MARTIN) SQUARE 6 FR Windows and Doors Field house - windows and doors COMPLETE 2011 * RUSSELL (MARTIN) SQUARE 6 SI Courts Slam Dunk Basketball Court COMPLETE 2012 RUSSELL (MARTIN) SQUARE 6 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012 RUSSELL (MARTIN) SQUARE 6 FR Minor Rehab Gym floor - restore or replace COMPLETE 2012 * RUSSELL (MARTIN) SQUARE 6 FR Fitness Center Fitness center - new equipment COMPLETE 2012 RUSSELL (MARTIN) SQUARE 6 FR Swimming Pool Pool - plumbing COMPLETE 2015 RUSSELL (MARTIN) SQUARE 6 FR Swimming Pool Pool - liner, gutter, filter COMPLETE 2016 RUSSELL (MARTIN) SQUARE 6 SI Courts Tennis court - conversion to artificial turf COMPLETE 2016 * RUSSELL (MARTIN) SQUARE 6 SI Paving 2016 DW Paving COMPLETE 2016 RUSSELL (MARTIN) SQUARE 6 FR Minor Rehab Field house - exterior wall COMPLETE 2017 RUSSELL (MARTIN) SQUARE 6 FR HVAC and Energy Efficiency Boiler - rehab COMPLETE 2017 RUSSELL (MARTIN) SQUARE 6 SI Landscape Tree planting COMPLETE 2018 RUTHERFORD SAYRE 127 FR Concrete Masonry Structural Field house - masonry COMPLETE 2011 RUTHERFORD SAYRE 127 SI Paving Paving COMPLETE 2012 * RUTHERFORD SAYRE 127 SI Courts Court - improvements COMPLETE 2012 * RUTHERFORD SAYRE 127 SI Lighting Lighting - exterior COMPLETE 2013 * RUTHERFORD SAYRE 127 FR Concrete Masonry Structural Field house - concrete COMPLETE 2014 * RUTHERFORD SAYRE 127 SI Site Improvement Misc. - flag pole COMPLETE 2016 RUTHERFORD SAYRE 127 SI Site Improvement Outdoor fitness station - new COMPLETE 2018 * RUTHERFORD SAYRE 127 SI Landscape Natural Area - new CONSTRUCTION * SACRAMENTO 1147 SI Lighting Lighting - playground - upgrade COMPLETE 2011 SACRAMENTO 1147 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013 SAINT LOUIS 1149 SI Site Improvement Misc. - drainage improvement COMPLETE 2011 SAINT LOUIS 1149 SI Playground Chicago Plays! - new equipment COMPLETE 2015 SAUGANASH 195 FR Minor Rehab Misc. radiator covers COMPLETE 2012 SAUGANASH 195 SI Site Improvement Outdoor fitness station - new COMPLETE 2016 * SAUGANASH 195 SI Courts Tennis courts - rehab and conversion COMPLETE 2016 * SCHAEFER (EDWARD) 1148 SI Playground Chicago Plays! - new equipment COMPLETE 2014 Schafer (Clara D.) 503 AD Park Development South Chicago - Clean and Green COMPLETE 2012 * Schafer (Clara D.) 503 AD Park Development South Chicago - Park development COMPLETE 2014 Schafer (Clara D.) 503 AD Acquisition South Chicago Park COMPLETE 2017 SCHAFER (CLARA D.) 503 SI Site Improvement Park improvements PRE-DESIGN SCHREIBER 1061 SI Site Improvement Landscape and site improvement COMPLETE 2011 SCHREIBER 1061 SI Playground Playground - new w/ water feature COMPLETE 2011 * SCHREIBER 1061 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012

54 of 65 CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011-2019* As of December 15, 2019

PARK YEAR PARK NAME NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS COMPLETE $ SCHREIBER 1061 FR Roof Roof COMPLETE 2017 SCOTTSDALE 265 SI Playground Chicago Plays! - new equipment COMPLETE 2015 SENECA 1242 FR Sculpture and Monument "Ben" - restoration COMPLETE 2012 SENECA 1242 AD Park Development Park improvements including playground BID/AWARD * SENKA (EDWARD "DUKE") 309 SI Fencing Misc. - perimeter fencing COMPLETE 2012 * SENKA (EDWARD "DUKE") 309 SI Spray Pool Water feature - surfacing COMPLETE 2012 * SENKA (EDWARD "DUKE") 309 SI Site Improvement Park improvements including pathways, lighting, courts COMPLETE 2013 * SENKA (EDWARD "DUKE") 309 SI Playground Playground - surfacing COMPLETE 2018 * SENN (NICHOLAS) 227 SI Playground Playground and spray feature - new COMPLETE 2017 * SENN (NICHOLAS) 227 SI Site Improvement Misc. kiosk COMPLETE 2018 * SEWARD (WILLIAM) 108 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012 SEWARD (WILLIAM) 108 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 SEWARD (WILLIAM) 108 FR Minor Rehab Field house - lobby improvements COMPLETE 2013 SEWARD (WILLIAM) 108 SI Athletic Field Ballfield - rehab COMPLETE 2015 SEWARD (WILLIAM) 108 SI Courts Basketball Court - drainage COMPLETE 2017 SEWARD (WILLIAM) 108 FR Major Rehab Field house - major rehab DESIGN * SHABBONA 148 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2011 SHABBONA 148 SI Paving Paving - accessibility COMPLETE 2011 SHABBONA 148 SI Playground Playground with water feature - new COMPLETE 2013 * SHABBONA 148 FR Swimming Pool Misc. restoration COMPLETE 2014 SHABBONA 148 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2014 SHABBONA 148 FR Major Rehab Major rehab including access improvements COMPLETE 2014 * SHABBONA 148 FR Roof Roof and drainage COMPLETE 2014 SHABBONA 148 FR Minor Rehab Misc. Stair renovation COMPLETE 2015 SHABBONA 148 FR Swimming Pool Pool - ladders COMPLETE 2017 SHABBONA 148 FR HVAC and Energy Efficiency Boiler - tubes COMPLETE 2018 SHABBONA 148 SI Paving Paving - pathways COMPLETE 2018 SHABBONA 148 SI Lighting Lighting upgrade to LED COMPLETE 2019 SHEDD (JOHN G.) 212 SI Fencing Fencing - ballfield COMPLETE 2011 SHEDD (JOHN G.) 212 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012 SHEDD (JOHN G.) 212 SI Courts Basketball court and pathway - resurfacing COMPLETE 2013 SHEDD (JOHN G.) 212 FR Minor Rehab Gym floor - rehab COMPLETE 2013 SHEDD (JOHN G.) 212 SI Playground Chicago Plays! - new equipment COMPLETE 2015 SHEIL (BERNARD) COMM. CTR. 398 FR Minor Rehab Access improvements - entrance, lobby, bathrooms COMPLETE 2015 SHEIL (BERNARD) COMM. CTR. 398 FR HVAC and Energy Efficiency HVAC - new system COMPLETE 2017 SHEIL (BERNARD) COMM. CTR. 398 SI Playground Shade canopy - new BID/AWARD * SHEIL (BERNARD) COMM. CTR. 398 FR Concrete Masonry Structural Field house - masonry and lintels PRE-DESIGN SHERIDAN (PHILIP HENRY) 205 SI Athletic Field Artificial turf baseball and multipurpose field - new COMPLETE 2011 *

55 of 65 CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011-2019* As of December 15, 2019

PARK YEAR PARK NAME NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS COMPLETE $ SHERIDAN (PHILIP HENRY) 205 FR HVAC and Energy Efficiency Misc. HVAC rehab COMPLETE 2012 SHERIDAN (PHILIP HENRY) 205 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012 SHERIDAN (PHILIP HENRY) 205 FR Swimming Pool Pool - new boiler COMPLETE 2012 SHERIDAN (PHILIP HENRY) 205 FR Fitness Center Fitness center - new COMPLETE 2013 SHERIDAN (PHILIP HENRY) 205 FR Minor Rehab Field house - windows, doors, tuckpointing COMPLETE 2014 SHERIDAN (PHILIP HENRY) 205 FR Minor Rehab Misc. Pool stair renovation COMPLETE 2015 SHERIDAN (PHILIP HENRY) 205 SI Courts Court conversion to inline hockey COMPLETE 2015 * SHERIDAN (PHILIP HENRY) 205 FR Swimming Pool Pool - rehab COMPLETE 2016 SHERIDAN (PHILIP HENRY) 205 FR Swimming Pool Pool - rehab COMPLETE 2016 SHERIDAN (PHILIP HENRY) 205 SI Athletic Field Paving - concrete COMPLETE 2017 SHERMAN (JOHN) 7 FR HVAC and Energy Efficiency Boiler and insulation COMPLETE 2011 SHERMAN (JOHN) 7 FR Concrete Masonry Structural Gym - walls COMPLETE 2011 SHERMAN (JOHN) 7 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012 SHERMAN (JOHN) 7 SI Site Improvement Misc. - water main COMPLETE 2012 SHERMAN (JOHN) 7 FR Roof Gym - roof COMPLETE 2012 SHERMAN (JOHN) 7 FR Minor Rehab Field house - kitchen COMPLETE 2013 SHERMAN (JOHN) 7 FR Swimming Pool Pool - liner, filter, water line COMPLETE 2015 SHERMAN (JOHN) 7 SI Playground Chicago Plays! - new equipment COMPLETE 2015 SHERMAN (JOHN) 7 SI Playground Chicago Plays! - new equipment COMPLETE 2015 SHERMAN (JOHN) 7 FR Minor Rehab Misc. Pool stair renovation COMPLETE 2015 SHERMAN (JOHN) 7 FR Minor Rehab Gym and auditorium floors - rehab COMPLETE 2016 SHERMAN (JOHN) 7 SI Athletic Field Athletic field - rehab COMPLETE 2016 SHERMAN (JOHN) 7 SI Landscape Tree planting COMPLETE 2019 SHERMAN (JOHN) 7 SI Playground Playground - upgrade PLANNING SHERMAN (JOHN) 7 FR Major Rehab Field house - major rehab CONSTRUCTION * SHERWOOD (JESSE) 1014 SI Spray Pool Water feature - surfacing COMPLETE 2012 SHERWOOD (JESSE) 1014 FR Minor Rehab Field house - kitchen COMPLETE 2013 SHERWOOD (JESSE) 1014 FR Minor Rehab Field house - locker room improvements COMPLETE 2015 SHERWOOD (JESSE) 1014 SI Landscape Athletic Field - rehab COMPLETE 2019 SHERWOOD (JESSE) 1014 SI Site Improvement Park improvements PLANNING SHERWOOD (JESSE) 1014 FR Roof Field house - misc. roof PRE-DESIGN SIMONS (ALMIRA) 124 SI Playground Chicago Plays! - new equipment COMPLETE 2014 SINTIC (GREGORY) 1155 SI Playground Chicago Plays! - new equipment COMPLETE 2015 SKINNER (MARK) 211 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 SKINNER (MARK) 211 SI Site Improvement Park improvements including playground, garden, dfa COMPLETE 2014 * SKINNER (MARK) 211 SI Landscape Community garden COMPLETE 2015 * SKINNER (MARK) 211 SI Athletic Field Athletic field - rehab COMPLETE 2017 SKINNER (MARK) 211 AD New Construction New Field house - Feasibility Study COMPLETE 2017

56 of 65 CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011-2019* As of December 15, 2019

PARK YEAR PARK NAME NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS COMPLETE $ SMITH (JOSEPH HIGGINS) 1015 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012 SMITH (JOSEPH HIGGINS) 1015 SI Athletic Field Athletic field - rehab COMPLETE 2012 * SMITH (JOSEPH HIGGINS) 1015 SI Courts Tennis court - rehab and drainage COMPLETE 2012 * SMITH (JOSEPH HIGGINS) 1015 SI Site Improvement Walkway - new COMPLETE 2012 * SMITH (JOSEPH HIGGINS) 1015 FR Minor Rehab Misc. - interior bleachers COMPLETE 2012 * SMITH (JOSEPH HIGGINS) 1015 SI Site Improvement Misc. - pool benches and tables COMPLETE 2013 SMITH (JOSEPH HIGGINS) 1015 FR Concrete Masonry Structural Ceramic Building - major rehab COMPLETE 2013 * SMITH (JOSEPH HIGGINS) 1015 FR Minor Rehab Field House and Pool building - access improvements COMPLETE 2017 SMITH (JOSEPH HIGGINS) 1015 FR Swimming Pool Pool - liner COMPLETE 2018 SMITH (WENDELL) 272 SI Playground Chicago Plays! - new equipment COMPLETE 2014 SNAPPING TURTLE 396 SI Playground Chicago Plays! - new equipment COMPLETE 2014 SNOWBERRY 389 SI Playground Chicago Plays! - new equipment COMPLETE 2014 SOUTH LAKEVIEW 290 SI Fencing Fencing - rehab COMPLETE 2013 SOUTH SHORE CULTURAL CENTER 429 FR Minor Rehab Misc. environmental COMPLETE 2011 SOUTH SHORE CULTURAL CENTER 429 FR Major Rehab Major rehab - exterior COMPLETE 2012 * SOUTH SHORE CULTURAL CENTER 429 FR Minor Rehab Auditorium floor - rehab or replace COMPLETE 2012 SOUTH SHORE CULTURAL CENTER 429 FR Minor Rehab Field house - interior painting COMPLETE 2013 SOUTH SHORE CULTURAL CENTER 429 FR HVAC and Energy Efficiency Misc. HVAC rehabs COMPLETE 2014 SOUTH SHORE CULTURAL CENTER 429 FR Concrete Masonry Structural Misc. entrance column restoration COMPLETE 2015 SOUTH SHORE CULTURAL CENTER 429 SI Site Improvement Lakefront Trail Separation - 67th St. to 71st St. COMPLETE 2018 * SOUTH SHORE CULTURAL CENTER 429 SI Paving Entrance rehab COMPLETE 2018 SOUTH SHORE CULTURAL CENTER 429 FR Minor Rehab Access - chair lift COMPLETE 2018 SOUTH SHORE CULTURAL CENTER 429 FR HVAC and Energy Efficiency Air handler - new COMPLETE 2019 SOUTH SHORE CULTURAL CENTER 429 AD New Construction Beach House - new CONSTRUCTION SOUTH SHORE CULTURAL CENTER 429 FR Minor Rehab Cultural Center Initiative PLANNING SOUTH SHORE CULTURAL CENTER 429 FR Major Rehab Major Rehab - interior CONSTRUCTION * SOUTH SHORE CULTURAL CENTER 429 AD Park Development Framework Plan - concept design DESIGN * SPIKINGS FARM 424 SI Playground Chicago Plays! - new equipment COMPLETE 2015 * SPRUCE 280 SI Playground Chicago Plays! - new equipment COMPLETE 2015 STANTON (EDWIN) 109 FR Swimming Pool Pool retrofit -compliance and filter COMPLETE 2011 STANTON (EDWIN) 109 FR Major Rehab Major rehab - interior COMPLETE 2012 * STANTON (EDWIN) 109 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012 STANTON (EDWIN) 109 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012 STANTON (EDWIN) 109 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 STANTON (EDWIN) 109 FR Major Rehab Major rehab - exterior COMPLETE 2013 * STANTON (EDWIN) 109 FR Swimming Pool Pool - rehab COMPLETE 2013 STANTON (EDWIN) 109 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2014 * STANTON (EDWIN) 109 FR Swimming Pool Pool - rehab COMPLETE 2015

57 of 65 CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011-2019* As of December 15, 2019

PARK YEAR PARK NAME NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS COMPLETE $ STANTON (EDWIN) 109 AD Park Development Park development (TIF) COMPLETE 2017 STANTON (EDWIN) 109 SI Playground Playground and spray feature - new COMPLETE 2017 * STANTON (EDWIN) 109 SI Athletic Field Athletic field - rehab COMPLETE 2018 * STARR (ELLEN GATES) 497 AD Park Development Park Development including playground COMPLETE 2016 * STARS & STRIPES 370 SI Playground Playground - new COMPLETE 2014 * STARS & STRIPES 370 SI Athletic Field Ballfield - fencing COMPLETE 2015 STARS & STRIPES 370 SI Athletic Field Artificial turf - ball field infield COMPLETE 2017 Steelworkers 523 AD Park Development USX site - Phase II - Lake Peoria Sediment Muds to Parks COMPLETE 2014 * Steelworkers 523 FR Sculpture and Monument Steelworker sculpture - new COMPLETE 2015 Steelworkers 523 AD Planning Park 523- concept planning COMPLETE 2015 * Steelworkers 523 AD Park Development Park Development COMPLETE 2018 * STEELWORKERS 523 AD Park Development Water landing and site access DESIGN * STONE (BERNARD) 526 SI Site Improvement Park development - passive park along Chicago River COMPLETE 2017 * STONE (BERNARD) 526 AD New Construction North Branch Bridge (CDOT) CONSTRUCTION * STOUT (FLORENCE) 291 SI Playground Chicago Plays! - new equipment COMPLETE 2016 STROHACKER (HOWARD) 1016 SI Playground Chicago Plays! - new equipment (at Kolin Ave.) COMPLETE 2014 STROHACKER (HOWARD) 1016 SI Spray Pool Water play feature - rehab COMPLETE 2019 SUMAC 1273 AD Acquisition Expansion COMPLETE 2012 SUMAC 1273 SI Playground Playground - new COMPLETE 2012 * SUMAC 1273 AD Park Development Site Improvements - expansion parcel CONSTRUCTION * SUMMERDALE 1151 SI Playground Chicago Plays! - new equipment COMPLETE 2014 SUN YAT-SEN 451 SI Playground Chicago Plays! - new equipment COMPLETE 2015 SUPERIOR 1150 SI Playground Chicago Plays! - new equipment COMPLETE 2014 SWEET CLOVER 430 SI Playground Chicago Plays! - new equipment COMPLETE 2014 SYCAMORE 1274 SI Playground Chicago Plays! - new equipment COMPLETE 2014 TAYLOR (ROBERT ROCHON) 271 SI Courts Slam Dunk Basketball Court COMPLETE 2012 TAYLOR (ROBERT ROCHON) 271 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012 TAYLOR (ROBERT ROCHON) 271 SI Lighting Lighting - interior gym COMPLETE 2012 TAYLOR (ROBERT ROCHON) 271 FR Minor Rehab Gym floor - restore or replace COMPLETE 2012 TAYLOR (ROBERT ROCHON) 271 SI Athletic Field Ballfield - rehab COMPLETE 2012 TAYLOR (ROBERT ROCHON) 271 FR Minor Rehab Misc. - washrooms COMPLETE 2013 TAYLOR (ROBERT ROCHON) 271 FR Swimming Pool Pool - rehab COMPLETE 2016 TAYLOR (ROBERT ROCHON) 271 SI Athletic Field Athletic field - rehab PRE-DESIGN * TAYLOR (ROBERT ROCHON) 271 SI Courts Basketball Court - rehab PLANNING TAYLOR-LAURIDSEN (JOHN, EMIL) 1025 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012 TAYLOR-LAURIDSEN (JOHN, EMIL) 1025 SI Athletic Field Athletic field - rehab COMPLETE 2015 * TAYLOR-LAURIDSEN (JOHN, EMIL) 1025 SI Site Improvement Parking lot - accessibility COMPLETE 2017 THE GROVE 397 SI Playground Chicago Plays! - new equipment COMPLETE 2014

58 of 65 CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011-2019* As of December 15, 2019

PARK YEAR PARK NAME NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS COMPLETE $ THROOP (AMOS GAGER) 1159 SI Spray Pool Water feature - rehab COMPLETE 2011 THROOP (AMOS GAGER) 1159 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 THROOP (AMOS GAGER) 1159 SI Playground Chicago Plays! - new equipment COMPLETE 2014 THUIS (GRACE ZWIEFKA) 1119 AD Acquisition Expansion COMPLETE 2012 THUIS (GRACE ZWIEFKA) 1119 SI Playground Chicago Plays! - new equipment COMPLETE 2014 TILL-MOBLEY (MAMIE) 1154 AD Acquisition Expansion COMPLETE 2014 * TILL-MOBLEY (MAMIE) 1154 SI Playground Chicago Plays! - new equipment COMPLETE 2016 TILTON (GEORGE) 1064 SI Playground Playground - resurfacing COMPLETE 2012 TILTON (GEORGE) 1064 FR Major Rehab Camelot School - joint use facility COMPLETE 2016 TILTON (GEORGE) 1064 FR Minor Rehab Building demolition COMPLETE 2017 TILTON (GEORGE) 1064 SI Playground Playground - upgrade PLANNING TOM (PING) MEML. 481 AD Park Development Park development - shoreline and athletic field COMPLETE 2011 * TOM (PING) MEML. 481 SI Playground Surfacing - rehab COMPLETE 2013 TOM (PING) MEML. 481 AD New Construction New Chicago River Boat House COMPLETE 2013 * TOM (PING) MEML. 481 AD New Construction New Field house COMPLETE 2013 * TOM (PING) MEML. 481 SI Athletic Field Ballfield - rehab COMPLETE 2014 TOM (PING) MEML. 481 FR HVAC and Energy Efficiency Field house - dehumidification system CONSTRUCTION TOM (PING) MEML. 481 SI Landscape Natural Area - new DESIGN * TOM (PING) MEML. 481 FR Minor Rehab Pavillion - roof PRE-DESIGN TOUHY (PATRICK) 246 SI Playground Playground - new COMPLETE 2013 * TOUHY (PATRICK) 246 SI Site Improvement Misc. - drinking fountain and trees COMPLETE 2014 * TOUHY (PATRICK) 246 SI Athletic Field Athletic field - rehab COMPLETE 2016 TOUHY (PATRICK) 246 FR Minor Rehab Field house - rehab COMPLETE 2017 TOUHY (PATRICK) 246 SI Site Improvement Cultural plaza - new COMPLETE 2019 * TOUHY-HERBERT (JOHN, VICTOR) 1065 SI Playground Chicago Plays! - new equipment COMPLETE 2016 TOUHY-HERBERT (JOHN, VICTOR) 1065 AD Park Development Park improvements PRE-DESIGN 2017 * TOUHY-HERBERT (JOHN, VICTOR) 1065 SI Landscape Tree Planting COMPLETE 2019 TREBES (ROBERT) 1017 SI Site Improvement Park drainage COMPLETE 2018 * TRIANGLE 518 SI Landscape Tree planting COMPLETE 2018 TRUMBULL (LYMAN) 16 FR Roof Power house - roof COMPLETE 2011 TRUMBULL (LYMAN) 16 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012 TRUMBULL (LYMAN) 16 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012 TRUMBULL (LYMAN) 16 FR Swimming Pool Pool Retrofit -compliance COMPLETE 2012 TRUMBULL (LYMAN) 16 FR Concrete Masonry Structural Chimney COMPLETE 2013 TRUMBULL (LYMAN) 16 SI Playground Chicago Plays! - new equipment COMPLETE 2016 TRUMBULL (LYMAN) 16 FR Swimming Pool Pool - liner and controls COMPLETE 2018 TRUMBULL (LYMAN) 16 FR Concrete Masonry Structural Field house - access improvements PRE-DESIGN TULEY (MURRAY) 18 FR Concrete Masonry Structural Concrete and structural - stairs COMPLETE 2011

59 of 65 CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011-2019* As of December 15, 2019

PARK YEAR PARK NAME NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS COMPLETE $ TULEY (MURRAY) 18 SI Site Improvement Misc. bollards COMPLETE 2011 TULEY (MURRAY) 18 SI Courts Slam Dunk Basketball Court COMPLETE 2012 TULEY (MURRAY) 18 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012 TULEY (MURRAY) 18 FR Minor Rehab Field house - assessment COMPLETE 2014 TULEY (MURRAY) 18 SI Fencing Tennis Court - fencing rehab COMPLETE 2015 TULEY (MURRAY) 18 FR Swimming Pool Pool - controls COMPLETE 2016 TULEY (MURRAY) 18 SI Athletic Field Athletic field - batting cage COMPLETE 2016 * TULEY (MURRAY) 18 SI Courts Tennis Court - rehab COMPLETE 2017 * TULEY (MURRAY) 18 FR Minor Rehab Cultural Center Initiative PLANNING TULEY (MURRAY) 18 FR Concrete Masonry Structural Field house - foundation restoration PRE-DESIGN * TULEY (MURRAY) 18 FR Roof Roof - new PRE-DESIGN UNION 210 SI Lighting Lighting - interior - upgrade COMPLETE 2011 UNION 210 FR Fitness Center Fitness center - accessibility equipment COMPLETE 2011 UNION 210 FR Roof Gym - roof COMPLETE 2011 UNION 210 FR Fitness Center Fitness center - upgrade COMPLETE 2011 UNION 210 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012 UNION 210 FR Swimming Pool Pool - filter COMPLETE 2012 UNION 210 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 UNION 210 SI Playground Playground with water feature - new COMPLETE 2012 * UNION 210 FR Minor Rehab Landscape Yard - rehab COMPLETE 2013 UNION 210 FR Major Rehab Field house and Pool house- major rehab COMPLETE 2015 * UNION 210 FR Swimming Pool Pool - rehab COMPLETE 2016 UNION 210 FR Swimming Pool Pool - gutters CONSTRUCTION UNION 210 SI Lighting Tennis Court - lighting BID/AWARD UNION 210 FR Concrete Masonry Structural Field house - drainage improvements PRE-DESIGN * UNITY 293 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013 * UNITY 293 SI Site Improvement Misc. gazebo and flower beds COMPLETE 2017 VALLEY FORGE 371 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012 VALLEY FORGE 371 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012 VALLEY FORGE 371 SI Site Improvement Misc. - flag pole COMPLETE 2014 VIOLET 361 SI Playground Chicago Plays! - new equipment COMPLETE 2016 VITTUM (HARRIET ELIZABETH) 233 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012 VITTUM (HARRIET ELIZABETH) 233 FR Minor Rehab Elevator - rehab COMPLETE 2013 VITTUM (HARRIET ELIZABETH) 233 SI Playground Chicago Plays! - new equipment including water feature COMPLETE 2015 * VITTUM (HARRIET ELIZABETH) 233 SI Paving 2016 DW Paving COMPLETE 2016 VITTUM (HARRIET ELIZABETH) 233 SI Site Improvement Misc. - water main rehab COMPLETE 2016 VITTUM (HARRIET ELIZABETH) 233 SI Courts Court - conversion to artificial turf junior soccer field COMPLETE 2016 * VOGLE (HENRY JR.) 402 SI Playground Chicago Plays! - new equipment COMPLETE 2015

60 of 65 CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011-2019* As of December 15, 2019

PARK YEAR PARK NAME NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS COMPLETE $ WAGNER (CLARENCE) 1068 SI Playground Chicago Plays! - new equipment COMPLETE 2016 WALLACE 1069 SI Playground Chicago Plays! - new equipment COMPLETE 2016 WALLACE 1069 SI Paving Paving - sidewalk DESIGN WALSH (JOHN) 393 AD Park Development Bloomingdale Trail - Access Park development COMPLETE 2019 * WANG (CHI CHE) 522 SI Athletic Field Athletic field - rehab COMPLETE 2016 WARD (A. MONTGOMERY) 511 SI Playground Playground - expansion COMPLETE 2012 WARD (A. MONTGOMERY) 511 AD Park Development Site and Facility Improvements COMPLETE 2012 * WARD (A. MONTGOMERY) 511 SI Site Improvement Dog friendly area - rehab COMPLETE 2014 * WARD (A. MONTGOMERY) 511 SI Lighting Dog friendly area - lighting COMPLETE 2018 WARD (A. MONTGOMERY) 511 SI Paving Misc. site improvement CONSTRUCTION WARREN (LAURENCE) 428 SI Paving Parking lot - drainage improvements COMPLETE 2011 WARREN (LAURENCE) 428 SI Courts Tennis court - rehab COMPLETE 2011 WARREN (LAURENCE) 428 FR Roof Gym - roof COMPLETE 2012 WARREN (LAURENCE) 428 FR Roof Roof - rehab COMPLETE 2012 WARREN (LAURENCE) 428 SI Site Improvement Golf Course - drainage improvements COMPLETE 2013 WARREN (LAURENCE) 428 FR Minor Rehab Misc. - ice rink rehab COMPLETE 2013 WARREN (LAURENCE) 428 SI Fencing Misc. fencing and gates COMPLETE 2014 WARREN (LAURENCE) 428 SI Site Improvement Misc. Cricket Pitch COMPLETE 2014 WARREN (LAURENCE) 428 SI Playground Chicago Plays! - new equipment (at Seeley Ave.) COMPLETE 2014 WARREN (LAURENCE) 428 SI Playground Chicago Plays! - new equipment (at Claremont Ave.) COMPLETE 2014 WARREN (LAURENCE) 428 SI Playground Chicago Plays! - new equipment (at Pratt Blvd.) COMPLETE 2014 WARREN (LAURENCE) 428 SI Paving Parking lot COMPLETE 2017 WARREN (LAURENCE) 428 FR Minor Rehab Field house - water damage rehab COMPLETE 2017 WARREN (LAURENCE) 428 SI Athletic Field Athletic field - lighting COMPLETE 2017 * WARREN (LAURENCE) 428 SI Paving Pathways COMPLETE 2017 WARREN (LAURENCE) 428 FR Concrete Masonry Structural Field house - tuckpointing COMPLETE 2018 WARREN (LAURENCE) 428 SI Site Improvement Outdoor fitness station - new COMPLETE 2018 * WARREN (LAURENCE) 428 SI Athletic Field Athletic fields - major rehab CONSTRUCTION * WASHINGTON (DINAH) 388 SI Playground Chicago Plays! - new equipment COMPLETE 2015 WASHINGTON (GEORGE) 21 SI Fencing Fencing - Bynum Island COMPLETE 2011 WASHINGTON (GEORGE) 21 FR Major Rehab DuSable Museum - Roundhouse Building Rehab COMPLETE 2011 WASHINGTON (GEORGE) 21 FR Major Rehab Swiss Chalet - feasibility study COMPLETE 2011 WASHINGTON (GEORGE) 21 SI Fencing Fencing - Green Youth Farm COMPLETE 2011 * WASHINGTON (GEORGE) 21 FR Minor Rehab Misc. - gym bleachers COMPLETE 2012 WASHINGTON (GEORGE) 21 SI Lighting Lighting - exterior COMPLETE 2012 WASHINGTON (GEORGE) 21 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012 WASHINGTON (GEORGE) 21 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012 WASHINGTON (GEORGE) 21 SI Athletic Field Athletic field - rehab COMPLETE 2012

61 of 65 CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011-2019* As of December 15, 2019

PARK YEAR PARK NAME NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS COMPLETE $ WASHINGTON (GEORGE) 21 FR Minor Rehab Field house - locker room improvements COMPLETE 2013 WASHINGTON (GEORGE) 21 SI Site Improvement Misc. - Allison Davis Garden - rehab COMPLETE 2014 WASHINGTON (GEORGE) 21 SI Athletic Field Ballfield - rehab COMPLETE 2014 WASHINGTON (GEORGE) 21 SI Site Improvement Water service COMPLETE 2015 WASHINGTON (GEORGE) 21 SI Playground Chicago Plays! - new equipment COMPLETE 2015 WASHINGTON (GEORGE) 21 SI Lighting Lighting - athletic field COMPLETE 2016 * WASHINGTON (GEORGE) 21 SI Playground Chicago Plays! - new equipment at 54th St. COMPLETE 2016 WASHINGTON (GEORGE) 21 FR Swimming Pool Pool - liner and gutter COMPLETE 2017 WASHINGTON (GEORGE) 21 SI Site Improvement DuSable Museum - Plaza Improvements COMPLETE 2017 * WASHINGTON (GEORGE) 21 FR Minor Rehab Trades Yard - rehab COMPLETE 2018 WASHINGTON (GEORGE) 21 SI Lighting Lighting upgrade to LED COMPLETE 2019 WASHINGTON (GEORGE) 21 SI Paving DuSable Museum - parking lot and drainage COMPLETE 2019 WASHINGTON (GEORGE) 21 SI Landscape Tree Planting DESIGN WASHINGTON (GEORGE) 21 SI Athletic Field Athletic field - rehab PRE-DESIGN * WASHINGTON (GEORGE) 21 SI Playground Playground - new PLANNING WASHINGTON (GEORGE) 21 FR Concrete Masonry Structural Pool Bleachers - concrete rehab PRE-DESIGN WASHINGTON (GEORGE) 21 FR Minor Rehab Lockers - new CONSTRUCTION WASHINGTON (HAROLD) 494 SI Spray Pool Water feature - rehab COMPLETE 2011 WASHINGTON (HAROLD) 494 SI Playground Chicago Plays! - new playground equipment COMPLETE 2014 WASHINGTON (HAROLD) 494 SI Courts Tennis Court - rehab COMPLETE 2016 * WASHINGTON (HAROLD) 494 SI Paving 2016 DW Paving COMPLETE 2016 WASHINGTON (HAROLD) 494 SI Playground Playground - new picnic area COMPLETE 2019 WASHINGTON (HAROLD) MEM. 506 SI Fencing Misc. - gates COMPLETE 2015 * WASHINGTON SQUARE 1244 SI Site Improvement Park improvements - TBD COMPLETE 2018 * WASHTENAW 1070 SI Paving Lighting - exterior COMPLETE 2012 WASHTENAW 1070 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013 WASHTENAW 1070 SI Athletic Field Athletic Field - rehab COMPLETE 2016 WEBSTER (DANIEL) 513 SI Site Improvement Site improvements COMPLETE 2017 * WEISMAN (ALBERT) 1135 SI Paving Misc. concrete curb COMPLETE 2014 WELLES (GIDEON) 110 FR Fitness Center Fitness center - upgrade COMPLETE 2011 WELLES (GIDEON) 110 FR Minor Rehab Field house - lobby improvements COMPLETE 2012 WELLES (GIDEON) 110 FR Major Rehab Transition plan - access improvements COMPLETE 2012 WELLES (GIDEON) 110 FR Minor Rehab Pool house - rehab COMPLETE 2013 WELLES (GIDEON) 110 FR Fitness Center Misc. new equipment COMPLETE 2013 WELLES (GIDEON) 110 FR Minor Rehab Locker rooms - rehab COMPLETE 2015 * WELLES (GIDEON) 110 SI Courts Tennis court - rehab COMPLETE 2015 * WELLES (GIDEON) 110 SI Playground Playground - expansion COMPLETE 2015 * WELLES (GIDEON) 110 FR Swimming Pool Pool - filter system COMPLETE 2015 *

62 of 65 CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011-2019* As of December 15, 2019

PARK YEAR PARK NAME NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS COMPLETE $ WELLES (GIDEON) 110 FR Concrete Masonry Structural Gym Building - drainage improvements COMPLETE 2016 * WELLES (GIDEON) 110 FR Roof Roof COMPLETE 2017 * WELLES (GIDEON) 110 SI Paving 2016 DW Paving -pathways COMPLETE 2017 WELLES (GIDEON) 110 SI Athletic Field Athletic field - scoreboard COMPLETE 2017 * WELLES (GIDEON) 110 SI Playground Nature Play Area COMPLETE 2018 * WELLES (GIDEON) 110 FR Swimming Pool Pool - accessibility stairs COMPLETE 2019 WENDT (KENNETH) 1145 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013 WENTWORTH (JOHN) 238 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012 WENTWORTH (JOHN) 238 SI Site Improvement Ice rink - new COMPLETE 2013 WENTWORTH (JOHN) 238 FR Minor Rehab Landscape Building - minor rehab COMPLETE 2014 WENTWORTH (JOHN) 238 SI Athletic Field Ballfield - rehab COMPLETE 2015 WENTWORTH (JOHN) 238 FR Concrete Masonry Structural Misc. entrance improvements COMPLETE 2016 WENTWORTH (JOHN) 238 SI Athletic Field Artificial turf - ball field infield COMPLETE 2017 * WENTWORTH (JOHN) 238 SI Paving Parking lot COMPLETE 2018 WENTWORTH (JOHN) 238 SI Paving Pathways COMPLETE 2018 WENTWORTH (JOHN) 238 SI Athletic Field Scoreboard - new COMPLETE 2018 WENTWORTH (JOHN) 238 SI Playground Playground - new PLANNING WENTWORTH (JOHN) GARDENS 286 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012 WESOLEK (MARLENE) 1080 SI Playground Chicago Plays! - new equipment COMPLETE 2016 WEST CHATHAM 249 SI Fencing Fencing - ballfield COMPLETE 2011 WEST CHATHAM 249 SI Fencing Misc. fencing COMPLETE 2011 WEST CHATHAM 249 SI Courts Basketball court - rehab COMPLETE 2012 WEST CHATHAM 249 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012 WEST CHATHAM 249 SI Playground Chicago Plays! - new playground equipment COMPLETE 2014 WEST CHATHAM 249 SI Athletic Field Artificial Turf Fields - football and baseball COMPLETE 2018 * WEST CHATHAM 249 SI Spray Pool Spray feature - rehab COMPLETE 2018 WEST LAWN 245 FR Fitness Center Fitness center - accessibility equipment COMPLETE 2011 WEST LAWN 245 FR Fitness Center Fitness center - upgrade COMPLETE 2011 WEST LAWN 245 FR Major Rehab Transition plan - access improvements COMPLETE 2011 WEST LAWN 245 FR Minor Rehab Misc. - access improvements COMPLETE 2011 WEST LAWN 245 SI Athletic Field Artificial turf athletic field - new COMPLETE 2013 * WEST LAWN 245 FR Concrete Masonry Structural Field house - parapet walls, drainage, interior restoration COMPLETE 2015 WEST LAWN 245 SI Lighting Athletic field - lighting COMPLETE 2015 WEST LAWN 245 SI Playground Chicago Plays! - new equipment COMPLETE 2015 WEST LAWN 245 SI Site Improvement Misc. - water main COMPLETE 2015 WEST LAWN 245 SI Paving 2016 DW Paving COMPLETE 2016 WEST LAWN 245 SI Paving Parking lot - rehab COMPLETE 2018 WEST LAWN 245 SI Courts Mini-pitch Soccer Court - new COMPLETE 2018 *

63 of 65 CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011-2019* As of December 15, 2019

PARK YEAR PARK NAME NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS COMPLETE $ WEST PULLMAN 225 FR Minor Rehab Misc. - insulation COMPLETE 2011 WEST PULLMAN 225 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012 WEST PULLMAN 225 FR Major Rehab Transition plan - access improvements COMPLETE 2012 WEST PULLMAN 225 FR Minor Rehab Misc. - sump pump COMPLETE 2012 WEST PULLMAN 225 FR Roof Roof - rehab COMPLETE 2012 WEST PULLMAN 225 FR Minor Rehab Misc. - bleachers COMPLETE 2013 WEST PULLMAN 225 FR Swimming Pool Pool - filter and liner COMPLETE 2014 WEST PULLMAN 225 FR Minor Rehab Misc. Pool stair renovation COMPLETE 2015 WEST PULLMAN 225 SI Paving 2016 DW Paving COMPLETE 2016 WEST PULLMAN 225 FR Concrete Masonry Structural Fieldhouse - emergency masonry COMPLETE 2016 WEST PULLMAN 225 FR HVAC and Energy Efficiency Boiler and pump - new COMPLETE 2019 WEST PULLMAN 225 FR Minor Rehab Cultural Center Initiative PLANNING WEST PULLMAN 225 SI Playground Playground - upgrade PLANNING WEST PULLMAN 225 FR Major Rehab Field house - major rehab CONSTRUCTION WESTERN 1165 SI Playground Chicago Plays! - new equipment COMPLETE 2014 WHITE (WILLYE B.) 1043 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012 WHITE (WILLYE B.) 1043 SI Fencing Misc. - fencing along Ashland Ave. COMPLETE 2014 * WHITE (WILLYE B.) 1043 SI Playground Chicago Plays! - new equipment COMPLETE 2015 WHITE (WILLYE B.) 1043 FR Minor Rehab Security camera - new COMPLETE 2018 WHITE (WILLYE B.) 1043 SI Courts Mini-pitch Soccer Court - new COMPLETE 2018 * WHITE (WILLYE B.) 1043 SI Athletic Field Athletic field - improvements COMPLETE 2019 * WHITE (EDWARD) 379 SI Playground Chicago Plays! - new equipment COMPLETE 2014 White (Jesse) 560 AD Acquisition 410 W. Chicago Ave. COMPLETE 2011 White (Jesse) 560 AD New Construction New Community Center COMPLETE 2014 * WICKER (CHARLES, JOEL) 214 FR Roof Roof COMPLETE 2011 WICKER (CHARLES, JOEL) 214 FR Sculpture and Monument "Wicker" - restoration COMPLETE 2011 * WICKER (CHARLES, JOEL) 214 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 WICKER (CHARLES, JOEL) 214 SI Site Improvement Misc. - benches, tables, and paving COMPLETE 2013 WICKER (CHARLES, JOEL) 214 FR Minor Rehab Misc. - building security COMPLETE 2014 WICKER (CHARLES, JOEL) 214 FR Concrete Masonry Structural Field house - entranceways COMPLETE 2015 WICKER (CHARLES, JOEL) 214 SI Athletic Field Field - major restoration COMPLETE 2016 WICKER (CHARLES, JOEL) 214 FR Sculpture and Monument Fountain restoration COMPLETE 2019 * WIEBOLDT (WILLIAM) 449 SI Playground Chicago Plays! - new equipment COMPLETE 2014 WILDWOOD 257 SI Courts Tennis court - rehab COMPLETE 2013 WILDWOOD 257 SI Playground Signature Playground - new COMPLETE 2018 * WILLIAMS (DANIEL HALE) 261 AD New Construction Field house - new COMPLETE 2019 * WILLIAMS-DAVIS (HATTIE KAY, IZORA) 532 SI Playground Playground - upgrade PLANNING WILSON (FRANK) 145 SI Playground Playground - new COMPLETE 2011 *

64 of 65 CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011-2019* As of December 15, 2019

PARK YEAR PARK NAME NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS COMPLETE $ WILSON (FRANK) 145 FR Concrete Masonry Structural Field house - concrete and masonry COMPLETE 2013 WILSON (FRANK) 145 SI Courts Tennis courts and paving - rehab COMPLETE 2015 * WILSON (FRANK) 145 SI Spray Pool Spray feature - rehab DESIGN WILSON (JOHN) COMM. CTR. 1018 FR Concrete Masonry Structural Field house - concrete and structural COMPLETE 2011 WILSON (JOHN) COMM. CTR. 1018 FR Concrete Masonry Structural Masonry CONSTRUCTION WINNEMAC 486 SI Athletic Field Athletic field rehab - soccer COMPLETE 2013 WINNEMAC 486 SI Athletic Field Athletic field - rehab COMPLETE 2016 * WINNEMAC 486 SI Athletic Field Athletic Field - rehab COMPLETE 2018 * WINNEMAC 486 SI Landscape Tree Planting COMPLETE 2019 WINNEMAC 486 SI Playground Playground - upgrade PLANNING * WOLCOTT (ALEXANDER) 403 AD Acquisition Expansion COMPLETE 2012 WOLCOTT (ALEXANDER) 403 SI Playground Chicago Plays! - new equipment COMPLETE 2016 WOLFE (RICHARD) 1072 SI Spray Pool Water feature - rehab COMPLETE 2012 WOLFE (RICHARD) 1072 SI Lighting Lighting - exterior COMPLETE 2012 WOLFE (RICHARD) 1072 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 WOLFE (RICHARD) 1072 SI Playground Chicago Plays! - new equipment COMPLETE 2015 WOOD (ELIZABETH) 316 AD Park Development Lathrop Homes Park Development (CHA) COMPLETE 2019 WOODHULL (ROSS) 1073 SI Playground Playground - resurfacing COMPLETE 2011 WOODHULL (ROSS) 1073 FR Major Rehab Transition plan - access improvements COMPLETE 2011 WOODHULL (ROSS) 1073 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012 WRIGHTWOOD 1074 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012 WRIGHTWOOD 1074 FR Swimming Pool Pool - deck COMPLETE 2016 WRIGHTWOOD 1074 SI Paving 2016 DW Paving COMPLETE 2016 WRIGHTWOOD 1074 SI Athletic Field Athletic fields - rehab COMPLETE 2019 WRIGHTWOOD 1074 FR Roof Roof PRE-DESIGN ZATTERBERG (HELEN) 1107 SI Playground Chicago Plays! - new equipment COMPLETE 2016

* Report as of December 15, 2019. The capital plan is a living document that is subject to change. Project listing includes capital projects and not general maintenance; does not include District-Wide Programs. This document is for public information and is not auditable. ** Program definitions: AD= acquisition and development, SI=site improvements, FR=facility rehab $ - Identifies projects funded in part or whole with outside grants or donations.

65 of 65