1. WATER TREATMENT PLANT

TERMOENERGO INŽENJERING Bulevar Kralja Aleksandra 298 11 000

Tel: +381 11 3806 172 +381 11 3806 173 Fax: +381 11 3806 251 E-mail: [email protected]

OIL INDUSTRY OF SERBIA – OIL REFINERY “PANČEVO” (year 2003 – 2007.)

 TECHNICAL STUDY WITH ECONOMIC ELEMENTS FOR WATER TREATMENT PLANT (REVERSE OSMOSIS)

 TENDER DOCUMENTATION FOR NEW WATER TREATMENT PLANT AND MIXED BED EXCHANGERS

 WTP – DETAILED DESIGN FOR PUMS AND CONCOMITANT INSTALATIONS REPLACEMENT

 WTP – BASIC DESIGN FOR NEW WATER TREATMENT PLANT BASED ON REVERSE OSMOIS

 WTP – AS BUILT DESIGN OF WATER TREATMENT PLANT

 DETAILED DESIGN OF MIXED BED EXCHANGERS INSTALATION FOR DEMI WATER POLISHING

 - WTP IN HEATING PLANT “DUNAV”

CHEMICAL INDUSTRY PANČEVO- “PETROHEMIJA PANČEVO” (year 1995, 2008.)

 WATER TREATMENT PLANT - DETAILED DESIGN OF EXPANSION AND RECONSTRUCTION

2. CITY DISTRICT HEATING

TERMOENERGO INŽENJERING Bulevar Kralja Aleksandra 298 street 11 000 Belgrade Serbia

Tel: +381 11 3806 172 +381 11 3806 173 Fax: +381 11 3806 251 E-mail: [email protected]

BELGRADE DISTRICT HEATING SYSTEM (year 2006 – 2009.)

- BASIC AND DETAILED DESIGN OF RECONSTRUCTION OF HEATING PLANT “

- BASIC DESIGN AND FEASIBILITY STUDY OF HEATING PLANT “VISNJICKA BANJA”

- DETAILED DESIGN OF PUMPING STATION IN MILESEVSKA NO 38 STREET

- BASIC DESIGN WITH FEASIBILITY STUDY FOR RECONSTRUCTION OF HEATING PLANT “

- DETAILED AND BASIC DESIGN OF PUMPING STATION PPS1 IN BLOCK 38

- DETAILED AND BASIC DESIGN OF PUMPING STATION PPS2 IN BLOCK 28

DISTRICT HEATING OF ZAJECAR CITY (year 2007 – 2008.)

- CONCEPT DESIGN OF THE WHOLE ZAJECAR

- GENERAL DESIGN OF THE WHOLE ZAJECAR

- DETAILED DESIGN OF THE WHOLE ZAJECAR

- HEATING PLANT 3 X 16 MW (ENGINEERING)

- HEATING PLANT 3 X 10 MW

- STRATEGIC DEVELOPMENT PLAN

VRANJE - DISTRICT HEATING IN BLOCK 47 (year 2006.)

- BOILERHOUSE WITH STACK AND HEAVY FUEL OIL TANK FARM

- DISTRIBUTION NETWORK FOR BLOCK 47

LOZNICA – DISTRICT HEATING FROM VISCOSE PLANT (year 2005.)

- TECHNICAL STUDY ON TUNING OF PRIMARY NETWORK AND SUBSTATIONS

- TECHNICAL REVISION OF DESIGNS FOR RECONSTRUCTION AND MODERNIZATION OF BOILERS NO.1,2,3 IN POWERPLANT "VISKOZA"

- DETAILED DESIGNS FOR ERRECTION AND

CONNECTION OF BOILER NO.1

DISTRICT HEATING OF SREMSKA MITROVICA CITY (year 2000, 2009.)

 DETAILED DESIGN OF DISTRICT HEATING SYSTEM, MAIN HOTWATER PIPELINE AND BRANCH SECTIONS

 TECHNICAL INVESTMENT DOCUMENTATION FOR MAIN HOTWATER PIPELINE AND BLOCK NETWORK

 DETAILED DESIGN PROJECT FOR RECONSTRUCTION

OF PUMPING/HEAT EXCHANGE STATION

OBRENOVAC-ZABREŽJE DISTRICT HEATING (year 1998.)

- BASIC DESIGNS FOR -ZABREŽJE HEATING

- DETAILED DESIGNS FOR OBRENOVAC-ZABREŽJE HEATING

PLJEVLJA DISTRICT HEATING FROM POWERPLANT PLJEVLJA (year 1996.)

- BASIC CONCEPT SOLUTION FOR PLJEVLJA HEATING

- DETAILED DESIGNS FOR PLJEVLJA DISTRICT HEATING

- DETAILED DESIGNS FOR DISTRIBUTION NETWORK

- DETAILED MECHANICAL DESIGN OF PUMP STATION (REV.A)

- DETAILED DESIGN FOR MEASURING AND CONTROL OF PUMP AND EXCHANGER STATION

ŽUPSKI ALEKSANDROVAC – DISTRICT HEATING (year 1994.)

- BASIC DESIGN EXPANSION OF EXISTING BOILERHOUSE "VINO ŽUPA" WITH 2 STEAM BOILERS (41 t/h) AND PUMP/EXCHANGER STATION 34,7 MW

- PRIMARY HOTWATER NETWORK DESIGNS

- INVESTMENT PROGRAM

BEOGRAD DISTRICT HEATING FROM POWERPLANT “NIKOLA TESLA” (year 1994 – 1995.)

- BASIC TECHNOLOGICAL DESIGN FOR COUPLING OF HEATING SYSTEMS OBRENOVAC AND BEOGRAD (CONNECTION OF POWERPLANT UNITS I AND II WITH UNITS III,IV,V,VI)

SMEDEREVO DISTRICT HEATING (year 1994 – 1997.)

- MAINS AND DISTRIBUTION NETWORK FROM PUMP STATION TO SUBSTATIONS APPR. 32 KM AWAY

- CENTRAL PUMPING STATION

- TECHNICAL INVESTMENT PROGRAM FOR DISTRICT HEATING

IRON & STEEL CONCERN – “SARTID 1913” (year 1994 – 1997.)

- TECHNICAL DOCUMENTATION - PRELIMINARY INVESTMENT PROGRAM FOR SMEDEREVO DISTRICT HEATING FROM METALWORKS SMEDEREVO

- FEASIBILITY STUDY FOR SMEDEREVO DISTRICT HEATING WITH WASTE HEAT FROM STEELWORKS

“SARTID 1913”

2.COMPRESSOR STATIONS

TERMOENERGO INŽENJERING Bulevar Kralja Aleksandra 298 11 000 Belgrade Serbia

Tel: +381 11 3806 172 Fax: +381 11 3806 251 E-mail: [email protected] www.termoenergo.com

ZASTAVA AUTOMOBILI

- DETAIL DESIGN OF COMRESSOR STATIONKS1

CAPACITY 1 x 4680 + 1 x 2635 + 1 x 3050 Q=10 365 m3/h

- DETAIL DESIGN OF COMRESSOR STATIONKS2 FOR MECHANICAL AND PRESSING WORKSCAPACITY

1 x 4680 + 2 x 2635 + 1 x 3050 = Q=13 000 m3/h

- MECHANICAL DETAIL DESIGN OF PRIMARY INSTALLATIONS FOR COMPRESSED AIR AND I RECIRCULATION SYSTEM AT PRODUCTION ZONE FOR ZASTAVA 10

ZASTAVA KOVAČNICA

- DETAIL DESIGN OF COMPRESS STATION

CAPACITY 4 x 4230 + 1 x 3050 = m3/h

Q=20 000 m3/h

JP “SRBIJAGAS

- UNDERGROUND STORAGE OF FGAS FUEL – BANATSKI DVOR – PRODUCTION LINE FOR GAS FUEL

NIS SRBIJE – RAFINERIJA NAFTE PANČEVO

- DETAIL DESIGN OF COMPRESS STATION FOR RECIRCULATION OF GAS (HYDROGEN)

PRESSURE 42 BAR, PEL=1,7 MW

- DETAIL DESIGN OF BLOWER INSTALLATION GB-2541S AT PLANT S-2450

- DETAIL DESIGN OF COMPRESS STATION FOR INDUSTRIAL AIR

CAPACITY 2 x 5260, Q=10500 m3/h

“British American Tobacco” – Duvanska industrija

- DETAIL DESIGN OF COMPRESS STATION

- DETAIL DESIGN OF BURNER INSTALLATION GB-2541S AT PLANT S-2450

- DETAIL DESIGN OF VACUUM STATION

DIN “FABRIKA DUVANA” A.D. – NIŠ u sastavu Philip Morris Srbija

- DETAIL DESIGN OF COMPRESSOR STATION SANATIONPROJEKAT SANACIJE KOMPRESORSKE STANICE

TE “NIKOLA TESLA” A - OBRENOVAC

- DETAIL DESIGN OF COMPRESSOR STATION NEEDED FOR VISUALISATION OF BURNING PROCESS AT BLOCKS A3-A6,

CAPACITY1670 m3/h, p= 8 barG

3. MEDICAL CENTERS

TERMOENERGO INŽENJERING Bulevar Kralja Aleksandra 298 11 000 Belgrade Serbia

Tel: +381 11 3806 172 +381 11 3806 173 Fax: +381 11 3806 251 E-mail: [email protected]

Hospital “Milenko Marin” – Loznica (year 2007.)

- GENERAL DESIGN FOR HEAT ENERGY UTILITY

Institute for oncology and radiology – Serbia (year 2000.) - DETAILED DESIGN FOR RECONSTRUCTION AND EXPANSION OF EXISTING INSTALLATIONS (DEPARTMENT OF CHEMATOLOGY – CHILDREN WARD)

Medical center – Podgorica (year 1999 – 2000.)

- GENERAL DESIGN FOR HEAT ENERGY UTILITY

- GENERAL DESIGN OF VENTILATION AND

AIR-CONDITIONING SYSTEM

- TENDER DOCUMENTATION FOR EQUIPMENT DELIVERY

Public hospital “Danilo I” – Cetinje

(year 1999 – 2000.)

- DETAILED MECHANICAL, ELECTRICAL AND INSTRUMENTATION DESIGN

City hospital “Dr. Miloš Pantić” – Valjevo

(year 1998.)

- CONCEPT DESIGN FOR HOSPITAL COMPLEX

- DETAILED MECHANICAL DESIGN OF TECHNICAL INSTALLATIONS

- DETAILED ELECTRICAL DESIGN

- DETAILED REGULATION AND CONTROL DESIGN

Public hospital “Đorđe Jovanović” – (year 1990.)

- DESIGN DOCUMENTATION CONTROL

3. POWER PLANTS

TERMOENERGO INŽENJERING Bulevar Kralja Aleksandra 298 street 11 000 Belgrade Serbia

Tel: +381 11 3806 172 +381 11 3806 173 Fax: +381 11 3806 251 E-mail: [email protected]

THERMAL POWER PLANT KOSTOLAC B 2 X 350 MW (year 2007 – 2008.)

- DETAILED DESIGN OF ASH DISPOSAL SYSTEM

- TEHNICAL REVIEW OF TECHNOLOGICAL AND MECHANICAL DESIGN PROJECTS OF ASH DISPOSTAL SYSTEM

NEOPLANTA – NOVI SAD (year 1995.)

- DETAILED DESIGN OF EXISTING POWER PLANT EXPANSION

MILL “BOROVO” – BOROVO (year 1994.)

- DETAILED POWER PLANT DESIGN – ANALYSIS OF PIPELINE RECONSTRUCTION (pressure 12 bar and 13 bar)

- STUDY WITH BASIC DESIGN FOR STABILITY AND SAVING ENERGY FOR DP “PROIZVODNJA AUTO GUMA “ BOROVO

- PROGRAM FOR REHABILITATION OF ENERGETIC SYSTEM IN MILL “BOROVO”

“OHIS “ – SKOPLJE (year 1990.)

- DETAILED MECHANICAL DESIGN OF EXISTING POWER PLANT EXPANSION

(existing boiler replacement by new boiler with capacity of 80 t/h superheated steam, pressure 64 bar, temperature 500oC)

MILAN BLAGOJEVIĆ LUČANI

- DETAIL DESIGN OF PIPE RING GLAVNI PROJEKAT CEVNOG PRSTENA VISOKOG PRSTENA ZA

POSTOJEĆU ENERGANU SA KOMPJUTERSKIM PRORAČUNOM DOZVOLJENIH NAPONA

ŠEĆERANA “4 NOEMBRI” – BITOLJ (year 1990.)

- TECHNICAL DOCUMENTATION CONTROL FOR EXISTING POWER PLANT EXPANSION AND OUTSIDE INSTALATIONS

OIL INDUSTRY OF SERBIA – OIL REFINERY “PANČEVO” (year 1991 – 2007.)

- BASIC DESIGN OF POWER PLANT EXPANSION

- TENDER DOCUMENTATION FOR EQUIPMENT DELIVERY FOR POWER PLANT EXPANSION

- DETAILED DESIGN OF POWER PLANT EXPANSION BY BOILER WITH CAPACITY OF 110 t/h, PRESSURE 45,6 bar, TEMPERATURE 412OC AND BY TURBOGENERATOR (POWER

12MW)

- DETAILED DESIGN OF POWER PLANT EXPANSION (BOILER 1 AND BOILER 2)

- TENDER DOCUMENTATION FOR DELIVERY OF NEW BOILER WITH CAPACITY OF 120 t/h SUPERHEATED STEAM

- TENDER DOCUMENTATION FOR DELIVERY OF TURBOGENERATOR

- TECHNICAL ANALYSIS OF NEW

BACKPRESSURE TURBOAGREGATE

CHARACTERISTICS

- DETAILED DESIGNS FOR NEW TURBOAGREGATE T3 INSTALATION

- DETAILED DESIGNS FOR BOILER K2 (BF 9601) INSTALATION

- STUDY FOR CHOICE OF NEW TURBOAGREGATE CHARACTERISTICS IN THE OLD PART OF POWER PLANT

- POWER PLANT – MECHANICAL AS BUILT DESIGN OF THE BOILER BF-9602 AND CONCOMITANT EQUIPMENT

BLACK METALLURGY CONCERN - “US Steel” (Former “SARTID 1913”) (year 1990 – 1993., 2008 – 2009.)

- DOCUMENTATION NOSTRIFICATION FOR BOILER 220 t/h, SUPERHEATED STEAM FOR POWER PLANT No. 2

- DETAILED DESIGN PROJECT FOR RECONSTRUCTION OF AGLOMERATION UNIT

“NATRON” - MAGLAJ

 DETAIL DESIGN OF NEW PUMP STATION FOR BLOCK 1 OF EXISTING POWER PLANT

 DETAIL DESIGN OF CONDENSATE COLLECTION

 DETAIL DESIGN OF COMPRESSOR STATION

TE “NIKOLA TESLA” A - OBRENOVAC

 DETAIL DESIGN OF CONNECTING TENT A AND TS 380/220 KV

 DETAIL ELECTRICAL DESIGN OF RECONSTRUCTION FOR THE MEASUREMENTS AND SIGNALISATION FOR EXCAVATOR STATION FOR BLOCKS A1, A2 I A3

B.A.T. CIGARETTE FACTORY, IBADAN, NIGERIA

 STEAM PLANT

 OIL SUPP FOR BOILERS & GENSET

 LPG INSTALLATION

 COMPRESSED AIR INSTALLATION

 VACUM INSTALLATION  EXTERNAL PIPEWORK

ICN GALENIKA d.d. - ZEMUN

 BASIC MECHANICAL DESIGN OF RECONSTRUCTION FOR CONDENSATE SYSTEM – ENERGY SAVE

 TECHNICAL REPORT ABOUT BOILER ROOM AND STEAM CONDENSATE SYSTEM

 BOILER ROOM –STUDY ABOUT RECONSTRUCTION OF EXITING BOILER ROOM CONDITIONED BY BRAKEDOWNS BOILER TPK BKG - 150

 STUDY FOR CONSTRUCION OF BOILER CAPACITY 25 T/H OF STEAM

 DETAIL DESIGN OF RECONSTRUCTION FOR BOILER ROOM, INSTALLATION OF BOILER S - 2500 INSTEAD OF BRAKEDOWND BOLIER

 GENERAL DESIGN OF BOILER ROOM RECONSTRUCTION

 DETAIL DESIGN OF MEASURMENT AND REGULATION FOR FEEDER TANK

 DETAIL DESIGN OF BOILER INSTALLATION S - 2500 (MANUF. NO. 237) FOR PHASE I OF BOILER ROOM

 ANALAYSIS OF POSSIBILITIES OF SUPPLY BOILER ROOM WITH TOBACCO WATER

 DETAIL MECHANICAL DESIGN OF NEW PIPELINE AND GAS SPLITTER INSTALLATION

 STUDY FOR NEW PIPELINE AND GAS SLITTER INSTALLATION MANUF. NO. 156/97

 DETAIL DESIGN OF BIOLER INSTALLATION NO. 2, S - 2500 OPTIMAL (MANUF. NO 214) FOR PHASE I OF BOILER ROOM

 DETAIL DESIGN OF BOILER INSTALLATION S - 2500 OPTIMAL (MANUF. NO 237) FOR PHASE I OF BOILER ROOM

 DETAIL MECHANICAL AND ELECTRICAL DESIG OF NEW LOADING STATION FOR OIL

4. ENERGY SAVING

TERMOENERGO INŽENJERING Bulevar Kralja Aleksandra 298 11 000 Beograd Serbia

Tel: +381 11 3806 172 +381 11 3806 173 Fax: +381 11 3806 251 E-mail: [email protected]

NIS SRBIJE – OIL REFINERY PANČEVO (year 1997 – 2007.)

- DETAILED DESIGN OF RAW WATER PREHEATING AND

CONDENSATE UTILIZATION - BASIC DESIGNS FOR CONDENSATE RECOVERY FROM TANK FARM SECTION AND BLOCKS V, VI, XXI

- DETAILED DESIGN FOR PROCESS CONDENSATE RETURN FROM BLOCK 6 TO POWERPLANT

- DETAILED DESIGN OF RECONSTRUCTION AND OVERHAUL

OF STEAM TRACER SYSTEM IN SECTIONS S-2100 AND S-2200

- AS BUILT DESIGN MECHANICAL DOCUMENTATION OF STEAM

TRACER SYSTEM IN BLOCK V SECTIONS S-100, S-600, S-750, S-850

- AS BUILT DESIGN MECHANICAL DOCUMENTATION OF STEAM TRACER SYSTEM IN BLOCK V SECTIONS S-200, S-900, S-1500

- DETAILED DESIGN OF TANK FARM CONDENSATE COLLECTING AND RECOVERY

- DETAILED CIVIL ENGINEERING DESIGN OF CONDENSATE COLLECTING STATIONS IN TANK FARM BLOCK 12

- DETAILED CIVIL ENGINEERING DESIGN OF CONDENSATE

COLLECTING STATIONS IN TANK FARM BLOCK 8

PHARMACEUTICAL FACTORY ZORKA PHARMA (year 2004.)

- TECHNICAL DOCUMENTATION ON RATIONAL HEAT ENERGY UTILIZATION

NIS – OIL REFINERY NOVI SAD (year 2000.)

- DETAILED DESIGN OF CONDENSATE RECOVERY FROM LUBEOIL PLANT I

METHANOL–ACETIC ACID COMPLEX MSK – KIKINDA (year 1998.) - CONCEPTUAL DESIGN OF HEAT ENERGY UTILIZATION IN MSK KIKINDA

ICN GALENIKA d.d. – ZEMUN (year 1998.)

- ENERGY SAVING - BASIC MECHANICAL DESIGN OF CONDENSATE SYSTEM RECONSTRUCTION

NIS SRBIJE – OIL REFINERY BEOGRAD (year 1998.)

- BASIC DESIGN OF RATIONAL STEAM UTILIZATION AND CONDENSATE RECOVERY IN REFINERY BEOGRAD

- DETAILED DESIGN OF CONDENSATE RECOVERY FROM PROCESS PLANTS

CHEMICAL INDUSTRY HIP - AZOTARA PANČEVO

(year 1995.)

- CONCEPTUAL DESIGN OF HEAT ENERGY UTILIZATION

- DETAILED AUTOMATIC CONTROL DESIGN OF "BABCOCK & WILCOX" BOILER

IRON & STEEL CONCERN - “SARTID 1913” (year 1994 – 1997.)

- DETAILED DESIGNS OF THE WASTE HEAT RECOVERY SYSTEMS

PETROCHEMICAL INDUSTRY HIP PETROHEMIJA – PANČEVO (year 1994 – 1996.) - DETAILED DESIGNS FOR RECONSTRUCTION, RECOVERY AND UTILIZATION OF CONDENSATE

- CONDENSATE SYSTEM OF LDPE PLANT

- RECONSTRUCTION AND EXTENSION OF CONDENSATE SYSTEM IN LDPE PLANT

PAPER MILL BEOGRAD (year 1992.)

- TECHNICAL ANALYSIS OF THE EXISTING STEAM AND CONDENSATE SYSTEM

“NATRON” – MAGLAJ (year 1991.)

- DETAILED DESIGN OF CONDENSATE RECOVERY SYSTEM

PAINT & LACQUER INDUSTRY DUGA – BEOGRAD (year 1990 – 1994.)

- BASIC MECHANICAL DESIGN OF CONDENSATE SYSTEM RECONSTRUCTION AND EXTENSION

- FEASIBILITY STUDY FOR ENERGY PRODUCTION, DISTRIBUTION AND UTILIZATION SYSTEM RECONSTRUCTION

2a. HEATING PLANTS

TERMOENERGO INŽENJERING Bulevar Kralja Aleksandra 298 street 11 000 Belgrade Serbia

Tel: +381 11 3806 172 +381 11 3806 173 Fax: +381 11 3806 251 E-mail: [email protected]

JKP “BEOGRADSKE ELEKTRANE”, BEOGRAD (year 2006 – 2009.)

- DETAILED DESIGN OF HEATING PLANT „Konjarnik“

- DETAILED DESIGN OF HEATING PLANT „Višnjička banja“

- TECHNICAL REVISION OF DCS AND BMS SYSTEMS FOR

HEATING PLANTS „Konjarnik“, „Dunav“, and „Voždovac“

- BASIC DESIGN OF HEATING PLANT „ZEMUN“

- DETAILED DESIGN OF PUMPING STATIONS PPS1 AND

PPS2

- DETAILED DESIGN OF PUMPING STATION IN

MILESEVSKA STREET

- DETAILED DESIGN OF INSTALAIONS FOR OIL

TRANSFER ON PIERS FOR BARGES AT RIVER SAVA IN

TO „NOVI BEOGRAD“

- DETAILED DESIGN OF RECONSTRUCTION FOR

EXISTING TS 10/0,4 AT LOCATION TO „KANAREVO

BRDO“

- DETAILED DESIGN OF RECONSTRUCTION AND MODERNIZATION SECTION FOR TECHICAL WATER AND

WATER FOR FIRE PROTECTION JKP “BEOGRADSKE ELEKTRANE”, BEOGRAD

- DETAIL DESIGN OF PUMPING STATION PPS3 – M4 AT TO

- DETAIL DESIGN OF RECONSTRUCTION AND MODERNIZATION FOR CIRCULATION SYSTEM AT TO "" 116 MW (2 x 58 MW) - DETAIL DESIGN OF RECONSTRUCTION FOR PUMP STATION AND EXCHANGER STATION AT TO ”DUNAV” 348MW (2x58 MW AND 2 x 116MW)

- DETAIL DESIGN OF RECONSTRUCION AND REPAIR FOR FUNNELAT TO NOVI BEOGRAD

NIS SRBIJE - RAFINERIJA NAFTE PANČEVO

- DETAILED DESIGN FOR EXPANSION OF POWER PLANT WITH BOILER CAPACITY 110 T/H, PRESSURE 45,6 BAR, TEMPERATURE 412 OC

- DETAILED DESIGN OF BOILER INSTALATION BF-9602 CAPACITY 120 T/H PRESSURE OF STEAM 45,6 BAR I TEMPERATURE 412OC

- DETAILED DESIGN OF INSTRUMETATION

FOR BOILER BF 9602 - DOCUMENTATION

DONE FOR FOXBORO

ICN GALENIKA d.d. – ZEMUN

- DETAIL DESIGN OF BOILER S – 2500 (MANUFACTURER NO. 237) INSTALLATION IN FIRST PHASE OF HEATING PLANT

- DETAIL DESIGN OF BOILER NO. 2 S – 2500 OPTIMAL (MANUFACTURER NO. 214) INSTALLATION IN SECOND PHASE OF HEATING PLANT

„CRVENA ZASTAVA“ KRAGUJEVAC (year 2006 – 2007.)

- DETAILED DESIGN OF HEATING PLANT

- AS BUILT DESIGN OF HEATING PLANT

JAPAN TOBACCO INTERNATIONAL “SENTA” (year 2006.)

- DETAILED DESIGN OF HEATING PLANT

DIN “FABRIKA DUVANA” A.D. NIŠ - PHILIP MORRIS SRBIJA

- BASIC DESIGN FOR INSTALATION OF NEW STEAM BOILER CAPACITY 5 T/H, 8 BAR

CITY OF ČAČAK (year 2005.)

- DETAILED DESIGN OF HEATING PLANT

CITY OF LOZNICA (year 2005.)

- DETAILED DESIGN OF HEATING PLANT

JP “NOVI DOM” VRANJE –BLOCK 47

 DETAIL DESIGN OF HEATING PLANT CAPACITY 2 x 5 MW WITH OIL FUEL STORAGE

HOTEL INTERKONTINENTAL CG, D.P. BEOGRAD

 BASIC DESIGN OF HOT WATER STEAM HEATING PLANT CAPACITY 2 X 4 MW AND PRODUCTIONOF STEAM 6 T/H, 12 BAR

Zastava automobili a.d. -Kragujevac

 BASIC AND DETAIL DESIGN OF HOT WATER HEATING PLANT CAPACITY 2 4 MW AND PRODUCTION OF STEAM 8 T/H, 12 BAR

Toplifikacija Moravija – Zaječar a.d.

 BASIC AND DETAIL DESIGN OF HEATING PLANT CAPACITY 3 x 16 MW AND OIL FUEL STORAGE

JP “Srbija Gas”, Podzemno skladište gasa – Banatski dvor

 BASIC AND DETAIL DESIGN OF HETING PLANT AT ENERGY SECTOR CAPACITY 2 MW

JP PTT “Srbija”, Printing office and paper warehose at Ada Huji

 BASIC AND DETAIL DESIGN OF HEATING PLANT AND OBJECTS SUPPLY WITH HEAT ENERGY

PKB “IMES”,

 DETAIL DESIGN OF HEATING PLANT, TWO BOILERS INSTALLATION OF 1,5 T/H, PRESSURE 8 BAR

 DETAIL DESIGN OF BONE BURNING PLANT WITH STEAM BOILER CAPACITY 1,5 T/H, PRESKA 8 BAR

D.M.D. IBP “BEOGRAD“ – ZEMUN (year 2000.)

 DETAILED DESIGN OF THE HEATING PLANT, CAPACITY 2x10 t/h

 (WITH COMPANY “TEHNOCAD” – BELGRADE)

“Milan Blagojević – Namenska” Lučani

 DETAIL DESIGN OF RECONSTRUCTION FOR HEATING PLANT, STEAM BOILER TE-111, MAXIMAL PRODUCTION 16 T/H, PRESSURE 12,5 BAR

PD RB “Kolubara” -

 DETAIL DESIGN OF HEATING PLANT FOR OIL FUEL, CAPACITY 2 MW

Cementara “TITAN” – Kosjerić

 DETAIL DESIGN OF OIL FUEL CHANGE WITH WOOD FUEL Q=1 MW

HOSPITAL “DANILO I” – CETINJE (year 1999 – 2000.)

 DETAILED DESIGN OF THE HEATING PLANT IN HOSPITAL “DANILO I” CETINJE

HOSPITAL CENTER “PODGORICA” (year 1999 – 2000.)

 TENDER DOCUMENTATION FOR EQUIPMENT DELIVERY AND WORKS IN HEATING PLANT AND CONCOMITANT INSTALATIONS

ICN GALENIKA d.d. – ZEMUN (year 1997 – 2007.)

- HEATING PLANT – RECONSTRUCTION OF THE EXISTING HEATING PALNT, CAUSED BY BOILER (TPK BKG – 150) DAMAGE

- DETAILED DESIGN OF HEATING PLANT RECONSTRUCTION, BOILER S-2500 INSTALATION INSTEAD OF DAMAGED BOILER

- GENERAL DESIGN OF HEATING PLANT RECONSTRUCTION

- DETAILED DESIGN OF BOILER “S – 2500“ INSTALATION (Manufact. No. 214) IN THE FIRST STEP OF HEATING PLANT RECONSTRUCTION

- DETAILED DESIGN OF BOILER No. 2 INSTALATION (S- 2500 OPTIMAL) IN THE FIRST STEP OF HEATING PLANT RECONSTRUCTION

 DETAILED DESIGN OF HEATING PLANT

„STRAGARI“ COMPANY – STRAGARI (year 1992.)

 STUDY OF RECONSTRUCTION FOR THE HEATING PLANT WITH CAPACITY OF 25 t/h

PD RB “KOLUBARA” - LAZAREVAC

 DETAILED DESIGN OF HEATING PLANT FOR SOLID FUEL, CAPACITY 2 MW

4a. PUBLIC COMPANY

TERMOENERGO INŽENJERING Bulevar Kralja Aleksandra 298 11 000 Belgrade Serbia

Tel: +381 11 3806 172 +381 11 3806 173 Fax: +381 11 3806 251 E-mail: [email protected]

PUBLIC COMPANY – AIRPORT „NIKOLA TESLA“ BELGRADE (year 2003 – 2004.)

 BASIC AND DETAILED DESIGNS – ADAPTION AND REHABILITATION OF AIRPORT “BEOGRAD”, TERMINAL T2 – CONNECTING PART AND VIP PARLOUR

- ELECTRICAL DESIGNS

- INFORMATION SYSTEMS

 SYSTEMS OF DEVICES AND EQUIPMENT MONITORING AND CONTROL AT THE AIRPORT

5. PETROCHEMICAL COMPLEX

TERMOENERGO INŽENJERING Bulevar Kralja Aleksandra 298 11 000 Beograd Serbia

Tel: +381 11 3806 172 +381 11 3806 173 Fax: +381 11 3806 251 E-mail: [email protected]

OIL INDUSTRY OF SERBIA – OIL REFINERY “PANČEVO” (oil production: 5 million tons per year) (year 1990 – 2007.)

- DETAILED DESIGN PLANT FOR STORAGE, PREPARATION AND DOSING ADDITIVES IN DIESEL FUEL

- HEATING OF SEDIMENTATION BASIN FOR HEAVY FRACTION STORAGE

- DETAILED DESIGN BUILT SYSTEM FOR SUPPLY, STORAGE AND IMPORT RAW MATERIAL IN SPLIT

SECTION OF PLANT FOR PRODUCING AROMATIC

MATERIALS IN S-3600 - DETAILED DESIGN OF RECONSTRUCTION SEAL OIL

SYSTEM - VACUUM DISTILLATION S-2200 - DETAILED DESIGN OF CENTRAL CONTROL FOR TEMPERATURE REGULATION IN TANKS FARM

- DETAILED DESIGN OF POWER PLANT EXPANSION WITH STEAM BOILER CAPACITY 110t/h , PRESSURE 45,6 bar, TEMPERATURE 412 oC, AND BACK PRESSURE TURBINE WITH GENERATOR POWER 12MW

- DESIGN OF MEASURING AND CONTROL EQUIPMENT RECONSTRUCTION FOR MEASURING AND BALANSING OF ENERGY PRODUCTION AND CONSUMPTION IN RNP

- DETAILED DESIGN OF POLYMER BITUMEN PLANT S-

0290

- DETAILED DESIGN OF COMPRESSOR HOUSE FOR HYDROGEN

- DESIGN OF WASTE GAS BURNING SYSTEM RECONSTRUCTION, FROM RAW MATERIAL TANKS FOR BITUMENA

- FCC –DESIGN OF OPERATING SYSTEM IN HDS PLANT

- LOW PRESSURE STEAM SYSTEM IN RNP-FLOW CALCULATE

- PLANT S-2700 FLARE BURNER PA-2701 – DETAILED

DESIGN RECONSTRUCTION OF FLARE AND STEAM DISTRIBUTION TO PA-2701

- TANK FARM – DETAILED MECHANICAL DESIGN FOR RECONSTRUCTION OF BENZENE AND TOULENA SYSTEMS IN RAILWAY FILLING STATION

- DESIGN OF ANALYZER SYSTEM FOR MONITORING GAS EMISION FROM FLUE DUCT IN OIL REFINERY PANCEVO - DOCUMENTATION BASED ON CONTRACT

WITH ABB

- DESIGN OF ANALYZER SYSTEM FOR PROCESS

CONTROL ON PLANT BITUMEN,HDS AND FCC IN OIL

REFINERY PANCEVO - DOCUMENTATION BASED ON

CONTRACT WITH ABB

- DETAILED DESIGN OF MONITORING SYSTEM FOR STEAM BOILER BF 9602 – DOCUMENTATION BASED ON CONTRACT WITH FOXBORO

- DETAILED DESIGN OF COMPRESSOR HOUSE FOR INSTRUMENT AIR

- DETAILED DESIGN FOR INSTALLATION OF STEAM

BOILER BF-9602 CAPACITY 120 t/h PARE, PRESSURE 45,6 bar AND TEMPERATURE 412OC

- DETAILED DESIGN OF LOW PRESSURE STEAM PIPES

IN OIL REFINERY PANCEVO.

- DETAILED DESIGN FOR RECONSTRUCTION OF STEAM

TRACING SYSTEM IN OIL REFINERY PANCEVO.

- DETAILED DESIGN FOR RECONSTRUCTION PIPES OF HIGH PRESSURE STEAM IN OIL REFINERY PANCEVO

- DETAILED DESIGN OF TRUCK FILLING STATION (PROJECT IS DESIGN FOR COMPANY ENERECO – ITALIJA)

- DETAILED DESIGN OF TANKER FILLING STATION

(PROJECT IS DESIGN FOR COMPANY ENERECO –

ITALIJA)

- DETAIL DESIGN HIGH PRESSURE STEAM

CONNECTION PIPE BETWEEN OIL REFINERY AND

PETROCHEMICAL IN PANCEVO

- DETAIL DESIGN OF RECONSTRUCTION AND SUPERSTRUCTURE TANK FB-9300 (VOLUME 1.000 m3) I FB-9320 (VOLUME 1.500 m3) FOR DEMINERALISED WATER.

- DETAIL MECHANICAL DESIGN OF TANK FB-0810

3 (VOLUME 6.750 m ) HEAVY SLOP.

- DETAIL MECHANICAL DESIGN FOR RECONSTRUCTION OF TANK FB-0707 FOR PYROLITIC BENZINE

- DETAIL MECHANICAL DESIGN FOR RECONSTRUCTION OF TANK FB-2001 (VOLUME 4.600 m3) FOR CATALYTIC BENZINE

- DETAIL MECHANICAL DESIGN OF RECONSTRUCTION TANK FB-0706 FOR BENZENE

- DETAIL MECHANICAL DESIGN OF TANK FB-0810 3 (VOLUME 10.000 m ) FOR HEAVY SLOP.  - DETAIL MECHANICAL DESIGN OF TANK FB-0706 FOR ADDITIVES IN FUEL.

NIS SRBIJE – OIL REFINERY NOVI SAD (oil production: 2,5 million tons per year) (year 2000 – 2007.)

- DETAIL DESIGN CONDENSATE RETURN FROM PLANT "ULJARA I"

- DETAIL MECHANICAL DESIGN FOR RESTITUTION TANK STORAGE FOR OIL PRODUCTS

- DETAIL DESIGN PLANT FOR ISOMERATION (PROJECT IS DESIGNING FOR FIRM PETROL INVEST – SARAJEVO)

CHEMICAL INDUSTRY HIP - AZOTARA PANČEVO (year 1998 – 2000.)

- BASIC DESIGN FOR USING HEAT ENERGY

- DETAIL DESIGN BOILER AUTOMATION “BABCOCK & WILCOX ”

NIS SRBIJE – OIL REFINERY BEOGRAD (year 1997 – 2002.) - DETAIL DESIGN RECONSTRUCTION ENERGY SYSTEM.

- DETAIL DESIGN FOR CONDENSATE RECOVERY AND RETURN FROM PLANT.

CHEMICAL INDUSTRY HIP PETROHEMIJA – PANČEVO (year 1994 – 2007.)

- RECONSTRUCTION SYSTEM FOR IGNITION,MAINTENANCE AND CONTROL FLAME START-UP BURNERS IN POWER PLANT HIP PETROHEMIJA

- FUEL OIL STATION IN POWER PLANT

- DETAIL DESIGN RECONSTRUCTION ,RECOVERY, AND RETURNING CONDENSATE.

- DETAIL DESIGN FOR TRANSPORT MIXTURE PARAFFIN FLUENT SOLVENT AND USED COMPRESSOR OIL FROM COLLECT RESERVOIR IN PENG PLANT TO FUEL OIL HEADER PIPE.

- DETAIL DESIGN RECONSTRUCTION SYSTEM FOR DOSING CHEMICALS IN PLANT FOR PRIMARI FRACTION IN PLANT ETILEN

05REKONSTRUKCIJA REZERVOARA I TANKVANA

TERMOENERGO INŽENJERING Bulevar Kralja Aleksandra 298 11 000 Beograd Serbia

Tel: +381 11 3806 172 Fax: +381 11 3806 251 E-mail: [email protected] www.termoenergo.com

NIS SRBIJE - RAFINERIJA NAFTE PANČEVO 2004 - RECONSTRUCTION OF RESERVOIR FB-9320 3 Vn=1000 m - DESIGN OF VERTICAL RESERVOIR FB-9300 3 Vn=1000 m - DESIGN OF VERTICAL RESERVOIR FB-0810 3 Vn=6700 m

2005 - RECONSTRUCTION OF RESERVOIR FB-0707 3 Vn=540 m - DESIGN OF VERTICAL RESERVOIR FB-0706 3 Vn=85 m - RECONSTRUCTION OF RESERVOIR FB-2001, 3 Vn=5000 m - DESIGN OF VERTICAL RESERVOIR FB-0810 3 Vn=10000 m

2006 - RECONSTRUCTION OF RESERVOIR FB-2002, 3 Vn=5000m , - RECONSTRUCTION OF RESERVOIR FB-1405, 3 Vn=21700 m , - RECONSTRUCTION OF RESERVOIR FB-2007 3 i FB-2008, Vn=1000 m (alkilat), - DESIGN OF VERTICAL RESERVOIR WITH STEEL EMERGENCY CONTAINERFB-0812 3 Vn=5000 m - SANATION OF RESERVOIR FB-1505, 3 Vn=21700 m ,

2007 - SANATION OF RESERVOIR FB-1204 AND 3 FIRE PROTECTION SYSTEM, Vn=21700 m - SANATION OF RESERVOIR FB-1501 Vn=5460 m3 - SANATION OF RESERVOIR FB- 1303/1304/1307 AND FIRE PROTECTION 3 SYSTEMVn=5000 m - SANATION OF RESERVOIR FB-1906 AND 3 FIRE PROTECTION SYSTEMVn=13000 m - SANATION OF RESERVOIR FB-1403 AND 3 FIRE PROTECTION SYSTEMVn=5460 m - SANATION OF RESERVOIR FB-1401 AND 3 FIRE PROTECTION SYSTEMVn=13040 m - SANATION OF RESERVOIR FB-1702 AND 3 FIRE PROTECTION SYSTEMVn=13000 m

2008 - SANATION OF RESERVOIR FB-0403/0404 AND FIRE PROTECTION SYSTEMVn=4500 - SANATION OF RESERVOIR FB-0401/0402 AND 3 FIRE PROTECTION SYSTEMVn=540 m - RECONSTRUCTION OF RESERVOIR R29, 3 Vn=60000 m ,

- SANATION OF RESERVOIR FB-1022 AND FIRE 3 PROTECTION SYSTEM, Vn=13000 m

NIS SRBIJE - RAFINERIJA NOVI SAD 2007 3 - RECONSTRUCTION OF RESERVOIR,Vn=30000m ,

2008 - RECONSTRUCTION OF RESERVOIR N11, Vn=15000 m3, 3 - RECONSTRUCTION OF RESERVOIR, Vn=30000 m , - SANATION OF RESERVOIR B6, B11, B14, B16, (benzin), 3 Vn=5000 m , 3 - SANATION OF RESERVOIR B7 i B8, Vn=3000 m , 3 - SANATION OF RESERVOIR B5, Vn=2000 m , 3 - ADAPTATION OF RESERVOIR B2 i B3, Vn=1000 m , 3 - ADAPTATION OF RESERVOIR G1, Vn=3000 m ,

DIREKCIJA ZA ROBNE REZERVE REPUBLIKE SRBIJE

2006/7 3 - DESIGN OF RESERVOIR D13, Vn=5000 m , 3 - DESIGN OF RESERVOIR G8, Vn=5000 m ,

NIS SRBIJE A.D. Novi Sad, NIS - PETROL BEOGRAD, JUGOPETROL 2008 - RECONSTRUCTION OF RESERVOIR R29, Vn=60000 m3, - SANATION OF EMERGENCY CONTAINER - DELIVERY AND INSTALLATION OF GEAR

6. PHARMACEUTICAL INDUSTRY

TERMOENERGO INŽENJERING Bulevar Kralja Aleksandra 298 11 000 Belgrade Serbia

Tel: +381 11 3806 172 +381 11 3806 173 Fax: +381 11 3806 251 E-mail: [email protected]

HEMOFARM CONCERN – HEMOMONT d.o.o.

(year 2005.)

- RECONSTRUCTION OF COMPLETE FACILITY IN ORDER TO MEET GMP REQUIREMENTS

- HVAC SYSTEMS (11 AHU’S)

- CLEAN ROOMS – MECHANICAL, CIVIL, ELECTRICAL, INSTRUMENTATION AND CONTROL DESIGNS

“Zorka pharma” (year 2004.)

- DOCUMENTATION FOR ENERGY SAVING – TECHNICAL UTILITIES

ICN Galenika d.d. – Zemun (year 1997 – 2007.)

- MECHANICAL DESIGN OF SYSTEM RECONSTRUCTION – ENERGY SAVING – TECHNICAL UTILITIES

- TECHNICAL REPORT ON CLEAN STEAM SUPPLY AND CONDENSATE SYSTEM

- DETAIL MECHANICAL, CIVIL, ELECTRICAL AND INSTRUMENTATION DESIGN FOR HEATING PLANT RECONSTRUCTION

- DETAIL INSTRUMENTATION AND CONTROL DESIGN FOR FEED WATER SYSTEM

- DETAIL DESIGN OF GAS DISTRIBUTION SYSTEM IN ICN

- DETAIL DESIGN FOR STEAM BOILER INSTALLATION

- AS-BUILT DOCUMENTATION FOR STEAM BOILER INSTALLATION

- DETAIL PROCESS-MECHANICAL AND ELECTRICAL DESIGN FOR FUEL OIL STATION

7. FOOD INDUSTRY

TERMOENERGO INŽENJERING Bulevar Kralja Aleksandra 298 11 000 Belgrade Serbia

Tel: +381 11 3806 172 +381 11 3806 173 Fax: +381 11 3806 251 E-mail: [email protected]

Agricultural plant “Godomin” (year 2002.)

 PROCESS – MECHANICAL, ELECTRICAL AND CIVIL DESIGN OF SUPPLYING SYSTEM

Agricultural complex “Plantaže” – Podgorica (year 2002.)

 DETAIL PROCESS-MECHANICAL AND ELECTRICAL DESIGN FOR COOLING STATION

Sugar factory “4 noembri” – Bitolj (year 1991.)

 DESIGN REVISION FOR POWER PLANT RECONSTRUCTION

08TRANSPORTATION OF ASH AND DROSS

TERMOENERGO INŽENJERING Bulevar Kralja Aleksandra 298 11 000 Beograd Serbia

Tel: +381 11 3806 172 Fax: +381 11 3806 251 E-mail: [email protected] www.termoenergo.com

TE KOSTOLAC

- TRANSPORTATION OF ASH AND DROSS: - PUMP STATION - EXTERNAL DISTRIBUTION FROMPUMP STATION TO DUMP