Aeronautics Division

Investment description 16 bond cap FAA funds 16 total 17 + beyond Flight Level (Aircraft Storage & Maintenance) 35,000 - 35,000 -

KOBO Utilities (Navigational Aid Maintenance) 25,000 - 25,000 - Lawrence - Conduct Local Permitting & Design for RW 5-23 Runway Safety 32,840 591,120 623,960 - Area Mansfield - Obstruction Removal 29,784 536,112 565,896 -

Martha's Vineyard - Construct Airport Rescue & Fire Fighting- Snow Removal 18,000 684,000 702,000 - New Bedford - EA & Permitting for Taxiway A, Phase I Terminal Apron & 38,200 687,600 725,800 - North Adams - Reconstruct Main Apron and Taxilane 154,650 2,783,700 2,938,350 - North Shore 2-Way (Navigational Aid Maintenance) 27,200 - 27,200 - Pittsfield - Runway 8-26 Extension - Phase II 226,623 39,758 266,381 - Provincetown - Conduct Airport Master Plan Update 45,257 814,613 859,870 118,750 Southbridge - Construct New Admin Building & Hangar 38,889 77,778 116,667 1,472,872 Statewide - Administration Building Program (Group 1 Airports) 10,450,000 - 10,450,000 - Statewide - Airfield Markings Program 800,000 - 800,000 - Statewide - Security Camera Systems Installation Program 1,500,000 - 1,500,000 - Statewide - Vegetation Management - YOP Implementation 500,000 - 500,000 - To Be Programmed - AIP New Grants 2,328,293 - 2,328,293 - VOLPE-Carbon Neutral Project Phase 2 204,443 - 204,443 - Westfield - Residential Acquisition and Sound Insulation Program 116,889 2,104,002 2,220,891 - Westover - Land Acquisition/Noise Mitigation 113,524 2,043,486 2,157,010 - Westover - Land Acquisition/Noise Mitigation 138,889 2,500,000 2,638,889 - $ 16,823,481 $ 12,862,169 $ 29,685,650 $ 1,591,622

28 Commonwealth Projects

Investment description 16 17 + beyond Massport- Harbor Dredging 35,000,000 35,000,000 Road and Transportation Improvements at Umass Boston 25,000,000 50,000,000

$ 60,000,000 $ 85,000,000

29

Highway Division

16 17 + beyond ACTON- CARLISLE- WESTFORD- BRUCE FREEMAN RAIL TRAIL EXTENSION, INCLUDING 6 RAILROAD 700,000 10,450,875 BRIDGES & 1 NEW BRIDGE OVER ROUTE 2A/119 (PHASE II-A) ACTON- CONCORD- BOXBOROUGH- LITTLETON- RESURFACING & RELATED WORK ON ROUTE 2 200,000 - ACTON- MAYNARD- RAIL TRAIL CONSTRUCTION, INCLUDES BRIDGES, A-02-042 & M-10-012, 813,590 6,101,924 A-02-034 & MPB WALL ADAMS- ASHUWILLTICOOK RAIL TRAIL EXTENSION 397,762 2,983,215 ADAMS- ROUNDABOUT CONSTRUCTION AT ROUTE 8 & FRIEND STREET 1,300,000 - AGAWAM- CONSTRUCTION OF BIKEWAY LOOP CONNECTING CONNECTICUT RIVERWALK WITH MAIN 641,000 - STREET (1.7 MILES) AMESBURY- BRIDGE REPLACEMENT, A-07-026, ROUTE I-495 (NB & SB) OVER THE BIKEWAY (ABANDONED 851,973 8,945,716 B&M RR LINE) AMESBURY- NEWBURYPORT- SALISBURY- BRIDGE REPLACEMENT ON ROUTE I-95, A-07-016=N-11-007, OVER 70,000,000 4,000,000 (WHITTIER BRIDGE) & A-07-017 OVER EVANS PLACE AMESBURY- POWWOW RIVERWALK CONSTRUCTION, MAIN STREET TO WATER STREET, INCLUDES PED 200,037 2,000,373 BRIDGE OVER THE BACK RIVER & PED BRIDGE OVER THE AMESBURY- RECONSTRUCTION OF ROUTE 150 4,078,276 - AMHERST- HADLEY- NORTHAMPTON- NORWOTTUCK RAIL TRAIL IMPROVEMENTS, FROM DAMON ROAD TO 49,990 - STATIONS ROAD (8.5 MILES) AMHERST- NORTHAMPTON- SOUTHAMPTON- SIDEWALK & WHEELCHAIR RAMP CONSTRUCTION ON ROUTES 507,000 - 5, 9, & 10 AMHERST- PELHAM- RECONSTRUCTION OF AMHERST ROAD, FROM 800 FEET EAST OF ENFIELD ROAD TO 2,088,448 2,088,448 ROUTE 202 (2.5 MILES - PHASE II) ANDOVER- BRIDGE REPLACEMENT, A-09-011, STATE ROUTE 28 (NORTH MAIN STREET) OVER MBTA RR 1,853,091 6,671,126

ANDOVER- TEWKSBURY- INTERSECTION & SIGNAL IMPROVEMENTS AT DASCOMB ROAD, EAST STREET & 278,000 - SHAWSHEEN STREET ARLINGTON- BIKEWAY CONNECTION AT INTERSECTION ROUTE 3 & ROUTE 60, AVENUE, 1,172,951 - PLEASANT STREET & MYSTIC STREET ARLINGTON- CAMBRIDGE- IMPROVEMENTS AT ROUTE 2 & ROUTE 16 2,930,892 - ARLINGTON- RECONSTRUCTION OF MASSACHUSETTS AVENUE, FROM POND LANE TO THE CAMBRIDGE C.L. 2,006,374 -

ATHOL- PHILLIPSTON- RESURFACING & RELATED WORK ON ROUTE 2A, FROM ROUTE 32 TO ROUTES 2/202 772,000 - (MM 36.7 - MM 40.7: 4 MILES) ATHOL- SCENIC BYWAY ACCESS & OVERLOOK CONSTRUCTION 50,539 - ATTLEBORO- BRIDGE REPLACEMENT, A-16-053, I-95 (NB & SB) OVER NORTH AVENUE 2,917,342 20,421,395 ATTLEBORO- RAMP RECONSTRUCTION & REALIGNMENT, FROM ROUTE I-95 (SB) TO ROUTE I-295 (SB) 2,535,000 2,535,000

30

Highway Division

16 17 + beyond ATTLEBORO- RECONSTRUCTION & GEOMETRIC IMPROVEMENTS ON TIFFANY STREET, FROM ROUTE 123 TO 1,851,000 - NEW ROAD (PHASE II), INCLUDES CULVERT RECONSTRUCTION OF A-16-077 AUBURN- OXFORD- RECONSTRUCTION & IMPROVEMENTS ON ROUTE 12/20 OVERLAP, FROM THE ROUTE 1,450,000 - 12/20 INTERSECTION (OXFORD) TO ROUTE 12/20 INTERSECTION (AUBURN) AUBURN- ROOF REPLACEMENT AT THE AUBURN I-90 (EB) MAINTENANCE FACILITY 581,924 - AUBURN TO BOSTON- GUIDE & TRAFFIC SIGN REPLACEMENT ON A SECTION OF I-90 (MASSPIKE) 755,201 6,041,610 AUBURN, FITCHBURG & MARLBOROUGH - FAP # HSI-002S(751)X - HIGH FRICTION SURFACE TREATMENT, 2,136,185 - PAVEMENT REPAIRS AND RELATED WORK ALONG SECTIONS OF ROUTE 2, INTERSTATES 290 AND 495. (608032) BARNSTABLE- INTERSECTION IMPROVEMENTS AT FALMOUTH ROAD (ROUTE 28) AND BEARSES WAY 535,030 4,815,268

BARRE- TOWN COMMON IMPROVEMENTS 2,008,000 1,667,749 BEDFORD- BILLERICA- BURLINGTON- MIDDLESEX TURNPIKE/MITRE EXTENSION FROM ROUTE 62 TO NORTH 1,070,100 - OF PLANK STREET (PHASE II) BELCHERTOWN- PAVEMENT REHABILITATION & RELATED WORK ON ROUTE 181, FROM MAPLE ST TO 6,749,818 2,454,479 BELCHERTOWN/PALMER TOWN LINE (5.5 MILES) BELLINGHAM- BRIDGE DEMOLITION, B-06-011, ROUTE 126 OVER CSX RAILROAD (ABANDONED) & 1,878,019 707,290 INSTALLATION OF BIKE PATH CULVERT BELLINGHAM- MEDWAY- MILFORD- INTERSTATE MAINTENANCE & RELATED WORK ON I-495 1,715,288 - BERKLEY- DIGHTON- BRIDGE REPLACEMENT, B-08-001=D-08-011, ELM STREET (BERKLEY) CENTER STREET 1,427,463 - (DIGHTON) OVER THE BERNARDSTON- INTERSTATE MAINTENANCE & RELATED WORK ON I-91, FROM MM 50.4 TO MM 54.9 (4.5 5,310,000 - MILES) BEVERLY- RECONSTRUCTION & SIGNAL IMPROVEMENTS ON ROUTE 1A (RANTOUL STREET & CABOT 22,029,571 - STREET), FROM CABOT STREET (SOUTH) TO 440 FEET NORTH OF BLAINE AVENUE, INCLUDES CULVERT REPAIR OF B-11-008 BEVERLY- RESURFACING AND RELATED WORK ON ROUTE 128 6,071,733 - BEVERLY- SALEM- HARBORFRONT WALKWAY & CAUSEWAY PARK CONSTRUCTION 1,953,346 - BILLERICA- RECONSTRUCTION OF ALLEN ROAD, FROM ROUTE 3A TO WEBB BROOK ROAD (5,400 FEET) 2,737,626 4,790,846

BLACKSTONE- BRIDGE REHABILITATION, B-13-004, ROUTE 122 (MAIN STREET) OVER THE BLACKSTONE 500,000 - RIVER BLANDFORD- CULVERT REPLACEMENT, B-14-029, I-90 OVER UNNAMED TRIBUTARY TO PEEBLES BROOK 4,110,000 -

BOSTON- BOAT WALL REHABILITATION & MISCELLANEOUS REPAIRS IN I-93/I-90 CA/T (CRC 9) 1,932,045 4,140,097 BOSTON- BRIDGE PAINTING, B-16-272, SOUTHAMPTON STREET OVER I-93/US1/ST RTE 3 504,980 -

31

Highway Division

16 17 + beyond BOSTON- BRIDGE REHABILITATION, B-16-058 & B-16-059, MARKET STREET, OVER I-90 & MBTA/CSX & 947,633 2,274,319 EVERETT STREET, OVER COMBINED LINCOLN STREET, I-90, CSX, MBTA & BRAINTREE STREET BOSTON- BRIDGE REMOVAL, B-16-367, CASEY OVERPASS OVER WASHINGTON STREET WITH AT-GRADE 40,600,000 26,000,000 INTERSECTIONS BOSTON- BRIDGE REPLACEMENT, B-16-163, MORTON STREET OVER THE MBTA RAILROAD 714,733 - BOSTON- BROOKLINE- IMPROVEMENTS TO COMMONWEALTH AVENUE, FROM ARMORY STREET TO ALCORN 2,698,283 12,142,274 STREET BOSTON- BROOKLINE- SUPERSTRUCTURE REPLACEMENT, B-16-055, COMMONWEALTH AVENUE OVER I-90 35,375,000 76,291,666 & MBTA & DECK REPAIR, B-27-018, CARLTON STREET OVER I-90 & MBTA BOSTON- CAMBRIDGE- BRIDGE REHABILITATION OF ANDERSON MEMORIAL BRIDGE, B-16-011=C-01-007, 11,776,302 - NORTH HARVARD STREET OVER BOSTON- CAMBRIDGE- BRIDGE REHABILITATION, B-16-009=C-01-002, CAMBRIDGE STREET OVER THE 50,000,000 106,969,365 CHARLES RIVER (MEMORIAL DRIVE & STORROW DRIVE) (AKA - LONGFELLOW BRIDGE) BOSTON- CHELSEA- STRUCTURAL STEEL REPAIRS ON THE TOBIN BRIDGE, INCLUDES CHELSEA'S CROSS 367,800 3,678,000 GIRDERS BOSTON- CHELSEA- TOBIN BRIDGE TOLL PLAZA AND ADMINISTRATION BUILDING DEMOLITION 3,143,518 - BOSTON- CONSTRUCTION OF NEW PARKING FACILITY, LOT 5 LOCATED UNDER I-93, BETWEEN ALBANY 8,000,000 391,354 STREET, TRAVELER STREET, AND FRONTAGE ROAD BOSTON- DATA CENTER & HVAC EXPANSION & UPGRADES AT HQ 1,000,000 - BOSTON- EZ PASS SERVICE CENTER MAAB/ADA COMPLIANCE IMPROVEMENTS (145 HAVRE STREET, EAST 1,012,092 1,214,510 BOSTON) BOSTON- FIRE STANDPIPE SUPPORT REPAIRS ON I-90 & ASSOCIATED RAMPS (CRC 31) 125,510 1,317,855 BOSTON- FIREPROOFING REPAIRS IN I-93/TIP O'NEILL TUNNEL 92,064 613,760 BOSTON- HVAC CONTROLS UPGRADE WITHIN 8 BUILDINGS, ALONG I-90 CONNECTOR TUNNEL & TED 824,976 - WILLIAMS TUNNEL BOSTON- IMPROVEMENTS ALONG GAINSBOROUGH AND ST. BOTOLPH STREETS 1,437,645 1,725,174 BOSTON- INSTALLATION OR REPLACEMENT OF FIREPROOFING IN SELECTED AREAS IN I-93 TIP O'NEILL 523,210 - TUNNEL BOSTON- INTERIM IMPROVEMENTS AT CAMBRIDGE STREET & RIVER STREET 2,128,078 851,231 BOSTON- LEAK SEALING, FIREPROOFING & MISCELLANEOUS REPAIRS IN I-93, TIP O'NEILL TUNNEL (CRC 1E) 6,782,321 4,909,573

BOSTON- MBTA DUCT BANK RELOCATION 538,065 1,434,839 BOSTON- MEDIAN REPAIR ON I-90, FROM COMMONWEALTH AVENUE TO DALTON STREET (APPROX. 1.5 14,797,416 - MILES), INCLUDES SUBSTRUCTURE IMPROVEMENTS TO B-16-005, COMM AVE. OVER I-90 BOSTON- MILTON- SYSTEMATIC MAINTENANCE & STRUCTURAL REPAIRS TO 7 BRIDGES ALONG THE I-93/ US 1,885,147 - 1/ST 3 BOSTON- MISCELLANEOUS RAMPS MICROSILICA OVERLAY REPLACEMENT ON I-90 & I-93 (CRC 28) 248,043 5,456,957

32

Highway Division

16 17 + beyond BOSTON- PARTIAL DECK REPLACEMENT & SUPERSTRUCTURE REPAIRS, B-16-365, BOWKER OVERPASS 6,231,739 - OVER BEACON STREET, COMMONWEALTH AVE & MUDDY RIVER BOSTON- PLUMBING REPAIRS AT VARIOUS LOCATIONS 145,720 - BOSTON- RENOVATIONS AND UPGRADES TO ELEVATORS AT 185 KNEELAND STREET 405,574 709,754 BOSTON- REPAIRS TO FAN ROOMS 1, 2, 3 & 4 (PRUDENTIAL PASSAGEWAY) 61,300 245,200 BOSTON- ROOF REPLACEMENT AT ERS/SUBSTATION BUILDINGS ADJACENT TO TOLL PLAZAS 31 AND 37 464,775 174,291

BOSTON- ROOF REPLACEMENT AT VENTILATION BUILDING #7 556,797 668,156 BOSTON- SCHEDULED & EMERGENCY STRUCTURAL REPAIRS ON THE TOBIN BRIDGE 601,124 - BOSTON- SOMERVILLE- CONDUIT SUPPORT REPLACEMENT & FIRE PROTECTION STANDPIPE MODIFICATION 12,917,497 - ALONG I-93 VIADUCT (CRC 18) BOSTON- SOMERVILLE- INTERSTATE MAINTENANCE & RELATED WORK ON I-93, INCLUDES WORK ON S-17- 5,000,000 - 029, S-17-031 & B-16-281 BOSTON- SUMNER & CALLAHAN TUNNEL VENT BUILDING AND CALLAHAN PUMP STATION MECHANICAL AND 1,516,261 9,097,567 ELECTRICAL UPGRADES BOSTON- SUPERPLUG REHABILITATION IN I-90 CONNECTOR TUNNEL (PHASE III) (CRC 4C) 99,838 2,196,425 BOSTON- SYMPHONY AREA STREETSCAPE (MASS AVENUE) IMPROVEMENTS INCLUDES REPAIR OF B-16-238 2,452,500 -

BOSTON- TRAFFIC SIGNAL IMPROVEMENTS ON BLUE HILL AVENUE AND WARREN STREET 340,793 3,407,928 BOSTON- UPGRADES TO THE HVAC SYSTEMS AT THE HOC 1,000,000 - BOSTON- UPS SYSTEM REPLACEMENTS IN TED WILLIAMS TUNNEL, CANA TUNNEL FACILITIES & HOC 598,117 2,691,527

BOSTON- VARIABLE MESSAGE SIGN (VMS) UPGRADES IN TED WILLIAMS TUNNEL/I-90 CONNECTOR TUNNEL 1,740,550 -

BOSTON- WATER QUALITY CONTROL STRUCTURES (WQCS) CLEAN OUT & REPAIR IN I-90 & I-93 TUNNELS 422,965 300,000

BOURNE- RESURFACING & RELATED WORK ON ROUTE 28 8,126,306 - BRAINTREE- MILTON- BOSTON- WEYMOUTH- STORMWATER RETROFITS ON I-93, ROUTE 3 & ROUTE 53 691,205 829,447

BRAINTREE- SAFE ROUTES TO SCHOOL (ROSS ELEMENTARY SCHOOL) 119,139 - BRAINTREE- WEYMOUTH- BRIDGE PRESERVATION TO 10 BRIDGES ALONG ROUTE 3 2,450,000 - BREWSTER- RESURFACING & RELATED WORK ON ROUTE 6A 6,332,460 - BRIDGEWATER- CONSTRUCTION OF A PRE-ENGINEERED MECHANIC'S SERVICE FACILITY AT THE DEPOT 105,000 -

BRIDGEWATER- TRAFFIC SIGNAL & INTERSECTION IMPROVEMENTS AT BROAD STREET (ROUTE 18) AND 1,025,000 - HIGH STREET

33

Highway Division

16 17 + beyond BRIMFIELD- PALMER- WARREN- GUARDRAIL UPGRADES & RELATED WORK ON SECTIONS OF I-90 1,146,513 859,885 (BETWEEN MM63.3 & MM69.6) BROCKTON - ROADWAY RECONSTRUCTION & RELATED WORK (INCLUDING SIGNALS) ON A SECTION OF 4,601,295 - WEST ELM STREET BROCKTON- CORRIDOR IMPROVEMENTS ON ROUTE 123 (BELMONT STREET), INCLUDING TRAFFIC SIGNALS 1,777,372 2,132,846 UPGRADING AT MANLEY STREET AND THE V.A. HOSPITAL BROCKTON- DOWNTOWN ROADWAY AND STREETSCAPE IMPROVEMENTS (PHASE I) 238,252 - BROCKTON- RESURFACING & RELATED WORK ON A SECTION OF ROUTE 27 (PLEASANT STREET & 200,000 - CRESCENT STREET) BROOKFIELD- BRIDGE REPLACEMENT, B-26-002, SR 148 (FISKDALE ROAD) OVER THE 615,000 -

BURLINGTON- TYNGSBOROUGH- PAVEMENT PRESERVATION AT VARIOUS LOCATIONS ON ROUTE 3 4,950,000 - CALLAHAN TUNNEL VENT BUILDING 13 BRICK FACADE RENOVATION AND REPAIRS AT LONDON AND 9,378,176 - DECATUR STREETS CAMBRIDGE- COMMON IMPROVEMENTS AT WATERHOUSE STREET, MASS AVE & GARDEN STREET 1,916,339 - CARVER: FAP# STP-002S(743)X ROADWAY RECONSTRUCTION AND RELATED WORK (INCLUDING SIGNALS) 4,973,707 - ALONG A SECTION OF ROUTE 58 (MAIN STREET) (606007) CHARLTON- BRIDGE REHABILITATION, C-06-038, STAFFORD STREET OVER I-90 915,889 1,717,291 CHARLTON- SOUTHBRIDGE- RESURFACING & RELATED WORK ON ROUTE 169, FROM ROUTE 20 TO 400 1,200,000 - FEET SOUTH OF VINTON STREET CHATHAM- BRIDGE REPLACEMENT, C-07-001, BRIDGE STREET OVER THE MITCHELL RIVER 7,741,571 - CHELMSFORD- BRIDGE SUPERSTRUCTURE REPLACEMENT, C-08-048 (2LP), HUNT ROAD OVER I-495 562,157 8,994,514

CHELMSFORD- TEWKSBURY- INTERSTATE MAINTENANCE & RELATED WORK ON I-495 9,355,000 - CHELSEA- REVERE- MALDEN- SAUGUS- RESURFACING & RELATED WORK ON ROUTE 1 8,183,757 3,507,325 CHELSEA- SILVERLINE/BRT CONSTRUCTION INCLUDES BRIDGE REPLACEMENT, C-09-001, WASHINGTON 23,979,468 11,614,239 AVENUE OVER THE MBTA AND B&M RAILROAD CHESTER- BRIDGE REPLACEMENT, C-11-020, GEORGE MILLER ROAD OVER THE MIDDLE BRANCH OF THE 45,475 - CHESTERFIELD- RESURFACING & RELATED WORK ON ROUTE 143, FROM WORTHINGTON T.L. TO 611,534 - WILLIAMSBURG T.L. (7.7 MI) CHICOPEE- HOLYOKE- BRIDGE REHABILITATION, C-13-012=H-21-030, ROUTE 116 (CHICOPEE/CABOT ST) 99,993 - OVER & PV RR (AKA WILLIMANSETT BRIDGE) CHICOPEE- SIGNAL & INTERSECTION IMPROVEMENTS AT MEMORIAL DRIVE (ROUTE 33) & BROADWAY 1,519,000 505,000

CHICOPEE- WEST SPRINGFIELD- BRIDGE PRESERVATION, C-13-023=W-21-022, I-90 OVER THE 1,444,000 - CONNECTICUT RIVER

34

Highway Division

16 17 + beyond CLINTON- RECONSTRUCTION & RELATED WORK ON WATER STREET AND BOLTON ROAD (1.2 MILES) 800,000 -

COLRAIN- BRIDGE REPLACEMENT, C-18-028 & NEW CULVERT, C-18-048, ST 112 (JACKSONVILLE ROAD) 936,671 9,835,049 OVER EAST BRANCH OF NORTH RIVER CONCORD- LINCOLN- LIMITED ACCESS HIGHWAY IMPROVEMENTS AT ROUTE 2 & 2A, BETWEEN CROSBY'S 16,940,506 - CORNER & BEDFORD ROAD, INCLUDES C-19-024 CONWAY- RETAINING WALL REPLACEMENT ON ROUTE 116 ALONG THE SOUTH RIVER 1,078,085 - CUMMINGTON- RESURFACING & RELATED WORK ON ROUTE 9, FROM WINDSOR T.L. TO GOSHEN T.L. 2,922,779 -

CUMMINGTON- RETAINING WALL REPLACEMENT ON ROUTE 9 ADJACENT TO C-21-023 OVER WESTFIELD 1,200,000 - BROOK DALTON- RECONSTRUCTION OF HOUSATONIC STREET, FROM ROUTE 8 & 9 TO ROUTE 8 2,000,000 5,000,000 DANVERS- BRIDGE REPLACEMENT, D-03-013, ROUTE 35 (WATER STREET) OVER WATERS RIVER 1,662,859 - DANVERS- MEDFORD- STORMWATER IMPROVEMENTS ALONG ROUTE 1/I-95/I-93 622,969 2,803,362 DANVERS- RECONSTRUCTION OF LIBERTY STREET, FROM WATER/HIGH STREET INTERSECTION TO 3,030,000 2,100,000 PAULINE ROAD, INCLUDES D-03-004 & D-03-014 CULVERTS DARTMOUTH- IMPROVEMENTS ON GRAND ARMY OF THE REPUBLIC HIGHWAY (U.S. ROUTE 6) AND FAUNCE 765,013 3,570,061 CORNER ROAD DARTMOUTH- PADANARAM BRIDGE CAUSEWAY RECONSTRUCTION, D-04-002, BRIDGE STREET OVER 1,310,584 5,897,629 APPONAGANSETT RIVER DARTMOUTH- RECONSTRUCTION OF FAUNCE CORNER ROAD & IMPROVEMENTS TO I-195 RAMPS & 9,530,000 7,030,000 INTERSECTIONS, INCLUDES REPLACEMENT OF D-04-016 OVER I-195 DCR- BRIDGE PRESERVATION AT VARIOUS LOCATIONS 3,785,480 37,854,804 DEDHAM- BRIDGE REPLACEMENT, D-05-003 (33K), NEEDHAM STREET OVER GREAT DITCH 1,301,383 2,114,748 DEDHAM- BRIDGE REPLACEMENT, D-05-033, PROVIDENCE HIGHWAY OVER MOTHER BROOK; FAP NO. NHP- 2,525,000 3,068,000 002S(749)X DEDHAM- NEEDHAM- BRIDGE REPLACEMENT ON ROUTE 128 (ADD-A-LANE BRIDGES) D-05-042, D-05-043, D- 14,185,000 - 05-040, D-05-041, D-05-038=N-04-030, D-05-039, N-04-029 (BRIDGE IV) DEERFIELD- BRIDGE REHABILITATION, D-06-044 & D-06-045, ROUTE I-91 (NB & SB) OVER THE DEERFIELD 6,635,000 - RIVER (STILLWATER ROAD AND LOWER ROAD) DENNIS- YARMOUTH- RAIL TRAIL EXTENSION, INCLUDES REPLACING D-07-015, CCRT OVER 5,320,558 2,364,692 ROUTE 134 & Y-01-009, CCRT OVER STATION AVENUE DENNIS- YARMOUTH- CONSTRUCTION OF A MULTI-USE PATH OVER THE BASS RIVER, INCLUDES NEW 105,010 2,310,214 PEDESTRIAN BRIDGE D-07-007=Y-01-010 DISTRICT 1 - RESURFACING & RELATED WORK AT VARIOUS LOCATIONS ON I-90 4,703,022 1,410,907 DISTRICT 1- ADA RETROFITS AT VARIOUS LOCATIONS 260,000 -

35

Highway Division

16 17 + beyond DISTRICT 1- APPLICATION OF REFLECTORIZED PAVEMENT MARKINGS AT VARIOUS LOCATIONS 451,596 100,527 DISTRICT 1- BRIDGE STRUCTURAL REPAIRS AT VARIOUS LOCATIONS 100,000 - DISTRICT 1- BRIDGE SUBSTRUCTURE, DECK & JOINT REPAIRS AT VARIOUS LOCATIONS ON I-90 1,199,340 2,098,845 DISTRICT 1- CATCH BASIN CLEANING AT VARIOUS LOCATIONS 337,000 5,303 DISTRICT 1- CRACK SEALING AT VARIOUS LOCATIONS 260,000 19,353 DISTRICT 1- CULVERT AND DRAINAGE REPAIRS ON I-90 AT VARIOUS LOCATIONS 726,091 1,270,659 DISTRICT 1- DISTRICT 2- SIGNAL UPGRADES WITH FLASHING YELLOW ARROWS AT VARIOUS LOCATIONS 202,000 202,000 (PHASE II) DISTRICT 1- DRAINAGE REPAIRS AND IMPROVEMENTS AT VARIOUS LOCATIONS 722,000 150,000 DISTRICT 1- FABRICATION AND INSTALLATION OF OVERHEAD & GROUND MOUNTED GUIDE SIGNS 225,345 - DISTRICT 1- FACILITIES REPAIR AT VARIOUS LOCATIONS 405,000 150,000 DISTRICT 1- GUARD RAIL REPAIRS AND UPGRADES AT VARIOUS LOCATIONS 245,000 - DISTRICT 1- RESURFACING AT VARIOUS LOCATIONS 4,600,000 2,500,000 DISTRICT 1- ROADWAY REPAIRS AT VARIOUS LOCATIONS 445,064 911 DISTRICT 1- SCHEDULED & EMERGENCY BRIDGE DECK AND JOINT REPAIRS AT VARIOUS LOCATIONS 398,950 698,163

DISTRICT 1– SCHEDULED & EMERGENCY SUBSTRUCTURE REPAIRS AT VARIOUS LOCATIONS 1,088,962 340,277 DISTRICT 1- SCHEDULED & EMERGENCY SUPERSTRUCTURE REPAIRS AT VARIOUS LOCATIONS 814,500 626,576 DISTRICT 1- SCHEDULED AND EMERGENCY BRIDGE DECK AND JOINT REPAIRS AT VARIOUS LOCATIONS 950,000 1,382,527

DISTRICT 1- SIDEWALK REPAIRS AT VARIOUS LOCATIONS 236,056 232,074 DISTRICT 1- TRAFFIC MANAGEMENT AT VARIOUS LOCATIONS 189,874 - DISTRICT 1- TRAFFIC SIGNAL BETTERMENT AT VARIOUS LOCATIONS 370,000 210,035 DISTRICT 1- TREE TRIMMING & SIGHT DISTANCE CLEARING AT VARIOUS LOCATIONS 370,000 44,445 DISTRICT 1- VEGETATION SPRAYING AT VARIOUS LOCATIONS ON I-90 142,227 - DISTRICT 2- ADA RETROFITS AT VARIOUS LOCATIONS 570,000 (75,663)

DISTRICT 2- APPLICATION OF REFLECTORIZED PAVEMENT MARKINGS AT VARIOUS LOCATIONS 21,064 - DISTRICT 2- APPLICATION OF REFLECTORIZED PAVEMENT MARKINGS AT VARIOUS LOCATIONS 138,000 - DISTRICT 2- BRIDGE DECK & JOINT REPAIRS AT VARIOUS LOCATIONS 605,000 - DISTRICT 2- BRIDGE SHIELDING INSTALLATION AND SHORING (CRIBBING) TOWER AT VARIOUS LOCATIONS 100 -

DISTRICT 2- BRIDGE SHIELDING INSTALLATION AND SHORING (CRIBBING) TOWER AT VARIOUS LOCATIONS 168,000 56,397

DISTRICT 2- CATCH BASIN CLEANING AT VARIOUS LOCATIONS 477,000 - DISTRICT 2- CONSTRUCTION OF A STORAGE BUILDING AT THE DEERFIELD DEPOT 105,942 69,870 DISTRICT 2- DRAINAGE BETTERMENT & CULVERT REPAIR AT VARIOUS LOCATIONS 1,238,000 -

36

Highway Division

16 17 + beyond DISTRICT 2- EMERGENCY REPAIRS TO TRAFFIC SIGNALS AT VARIOUS LOCATIONS 10,000 - DISTRICT 2- FACILITY REPAIR AT VARIOUS LOCATIONS 360,000 157,896 DISTRICT 2- FENCE REPAIRS & UPGRADES AT VARIOUS LOCATIONS 80,000 - DISTRICT 2- GUARDRAIL REPAIRS AT VARIOUS LOCATIONS 148,000 - DISTRICT 2- HIGHWAY LIGHTING REPAIRS AT VARIOUS LOCATIONS 150,000 - DISTRICT 2- HOT MIX ASPHALT REPAIRS AT VARIOUS LOCATIONS 625 - DISTRICT 2- HOT MIX ASPHALT REPAIRS AT VARIOUS LOCATIONS 300,000 137,201 DISTRICT 2- INSTALLATION OF OVERHEAD & GROUND MOUNTED GUIDE SIGNS 54,986 - DISTRICT 2- ITS EQUIPMENT MAINTENANCE AT VARIOUS LOCATIONS 14,000 - DISTRICT 2- NON-ROUTINE & EMERGENCY STRUCTURAL REPAIRS AT VARIOUS LOCATIONS 1,543,000 7,673,288 DISTRICT 2- NON-ROUTINE & EMERGENCY STRUCTURAL REPAIRS AT VARIOUS LOCATIONS 357,000 - DISTRICT 2- RESURFACING & RELATED WORK AT VARIOUS LOCATIONS 337,691 - DISTRICT 2- RESURFACING & RELATED WORK AT VARIOUS LOCATIONS 2,857,867 - DISTRICT 2- SUBSTRUCTURE REPAIRS AT VARIOUS LOCATIONS 393,000 23,274 DISTRICT 2- SYSTEMATIC BRIDGE MAINTENANCE AT VARIOUS LOCATIONS 2,656,725 - DISTRICT 2- SYSTEMATIC BRIDGE MAINTENANCE ON I-391, ROUTE 2, ROUTE 5, ROUTE 9 AND ROUTE 57 1,458,381 265,160 CORRIDOR; NHP-002S(788)X DISTRICT 2- TRAFFIC MANAGEMENT AT VARIOUS LOCATIONS 919,000 - DISTRICT 2- TREE REMOVAL & SIGHT DISTANCE CLEARANCE AT VARIOUS LOCATIONS 535,000 - DISTRICT 2- VEGETATION MANAGEMENT AT VARIOUS LOCATIONS 70,000 13,120 DISTRICT 3- ADA RETROFITS AT VARIOUS LOCATIONS 477,235 -

DISTRICT 3- APPLICATION OF REFLECTORIZED PAVEMENT MARKINGS AT VARIOUS LOCATIONS 18,861 - DISTRICT 3- APPLICATION OF REFLECTORIZED PAVEMENT MARKINGS AT VARIOUS LOCATIONS 1,125,000 575,000 DISTRICT 3- CLEAN & PAINT STRUCTURAL STEEL BRIDGES ALONG I-90 2,188,886 - DISTRICT 3- CLEANING & PAINTING OF STRUCTURAL STEEL BRIDGES ON I-90 1,180,331 - DISTRICT 3- DISTRICT 4- DISTRICT 5- WORK ZONE PORTABLE CAMERA SYSTEMS INSTALLATION (ITS) 25,000 -

DISTRICT 3- DRAINAGE AND CULVERT REPAIRS AND IMPROVEMENTS 675,000 425,000 DISTRICT 3- DRAINAGE STRUCTURE AND PIPE CLEANING AT VARIOUS LOCATIONS 1,000,000 650,000 DISTRICT 3- DRAINAGE SYSTEM REPAIRS & IMPROVEMENTS AT VARIOUS LOCATIONS 32,367 - DISTRICT 3- DRAINAGE SYSTEM REPAIRS & IMPROVEMENTS AT VARIOUS LOCATIONS 1,050,000 625,000 DISTRICT 3- ELASTOMERIC PROTECTIVE COATING APPLICATION TO CONCRETE SURFACES 1,585,843 - DISTRICT 3- EMERGENCY & SCHEDULED SUBSTRUCTURE REPAIRS AT VARIOUS LOCATIONS 444,214 - DISTRICT 3- FABRICATION AND INSTALLATION OF OVERHEAD AND GROUND MOUNTED GUIDE SIGNS AT 15,000 - VARIOUS LOCATIONS DISTRICT 3- FACILITY REPAIRS AT VARIOUS LOCATIONS 345,000 225,000

37

Highway Division

16 17 + beyond DISTRICT 3- FENCE REPAIRS AT VARIOUS LOCATIONS 430,000 20,000 DISTRICT 3- GUARDRAIL & END TREATMENT REPAIRS AT VARIOUS LOCATIONS 525,000 70,000 DISTRICT 3- HIGHWAY LIGHTING AT VARIOUS LOCATIONS 163,000 - DISTRICT 3- HOT MIX ASPHALT & BERM REPAIR AT VARIOUS LOCATIONS 22,270 - DISTRICT 3- HOT MIX ASPHALT PAVEMENT & BERM REPAIRS AT VARIOUS LOCATIONS 650,000 50,000 DISTRICT 3- IMPROVEMENT AND REFURBISHMENT OF CRASH CUSHIONS AT VARIOUS LOCATIONS 200,000 154,676 DISTRICT 3- INSTALLATION OF CCTV CAMERAS AND VMS ON I-290, BETWEEN I-495 AND I-90 557,958 2,510,811 DISTRICT 3- RESURFACING & RELATED WORK AT VARIOUS LOCATIONS 225,000 - DISTRICT 3- RESURFACING & RELATED WORK AT VARIOUS LOCATIONS (AREA B) 777,880 777,880 DISTRICT 3- RESURFACING & RELATED WORK AT VARIOUS LOCATIONS (AREA C) 1,043,110 521,555 DISTRICT 3- RESURFACING & RELATED WORK ON I-90 409,131 - DISTRICT 3- RESURFACING & RELATED WORK ON I-90 (EB & WB) IN GRAFTON 1,424,250 9,969,750 DISTRICT 3- RESURFACING & RELATED WORK ON I-90 (EB & WB) IN MILLBURY 1,740,750 12,185,250 DISTRICT 3- RESURFACING, RETAINING WALL REPLACEMENT & RELATED WORK AT VARIOUS LOCATIONS 100,000 -

DISTRICT 3- SALT SHED REPAIRS AND IMPROVEMENTS AT VARIOUS LOCATIONS 260,000 145,000 DISTRICT 3- SCHEDULED & EMERGENCY BRIDGE DECK REPAIR AT VARIOUS LOCATIONS 1,587,339 -

DISTRICT 3- SCHEDULED & EMERGENCY BRIDGE DECK REPAIRS AT VARIOUS LOCATIONS 1,268,153 184,536 DISTRICT 3- SCHEDULED & EMERGENCY BRIDGE DECK REPAIRS AT VARIOUS LOCATIONS ALONG I-90 951,000 315,159

DISTRICT 3- SCHEDULED & EMERGENCY FACILITY REPAIRS & IMPROVEMENTS AT VARIOUS LOCATIONS 88,000 -

DISTRICT 3- SCHEDULED & EMERGENCY STRUCTURAL & SUBSTRUCTURE REPAIRS AT VARIOUS 1,187,500 625,000 LOCATIONS DISTRICT 3- SCHEDULED & EMERGENCY STRUCTURAL REPAIRS AT VARIOUS LOCATIONS 1,000,000 - DISTRICT 3- SCHEDULED & EMERGENCY TRAFFIC MANAGEMENT AT VARIOUS LOCATIONS 100,000 121,955 DISTRICT 3- SIGNAL BETTERMENT & RELATED WORK AT VARIOUS LOCATIONS 926,000 849,000 DISTRICT 3- SIGNAL BETTERMENT AT VARIOUS LOCATIONS 516,000 - DISTRICT 3- SIGNAL UPGRADES WITH FLASHING YELLOW ARROWS AT VARIOUS LOCATIONS (PHASE II) 331,895 105,482

DISTRICT 3- SUBSTRUCTURE REPAIRS AT VARIOUS LOCATIONS ALONG I-90 783,028 -

DISTRICT 3- TRAFFIC SIGNAL CONTROLLER CABINET & MISCELLANEOUS MATERIAL PURCHASE & 1,088,000 998,000 INSTALLATION DISTRICT 3- TRAFFIC SIGNAL UPGRADES AT 6 LOCATIONS 951,408 - DISTRICT 3- TREE CLEARING AND TRIMMING AT VARIOUS LOCATIONS 850,000 600,000

38

Highway Division

16 17 + beyond DISTRICT 3- TREE TRIMMING & TREE REMOVAL AT VARIOUS LOCATIONS 25,391 - DISTRICT 3- VEGETATION MANAGEMENT AT VARIOUS LOCATIONS 4,197 - DISTRICT 3- VEGETATION MANAGEMENT AT VARIOUS LOCATIONS 300,000 300,000 DISTRICT 4- ADA RETROFITS AT VARIOUS LOCATIONS 225,000 -

DISTRICT 4- APPLICATION OF REFLECTORIZED PAVEMENT MARKINGS AT VARIOUS LOCATIONS 595,744 3,232 DISTRICT 4- BRIDGE CLEANING & RELATED WORK AT VARIOUS LOCATIONS 393,750 56,250 DISTRICT 4- BRIDGE SUBSTRUCTURE REPAIRS AND RELATED WORK AT VARIOUS LOCATIONS ALONG 1,101,143 1,104,000 INTERSTATES 93, 95 AND 495; NHP-002S(780)X DISTRICT 4- DRAINAGE REPAIR & IMPROVEMENT AT VARIOUS LOCATIONS 614,208 - DISTRICT 4- DRAINAGE STRUCTURE & SYSTEMS CLEANING AT VARIOUS LOCATIONS 170,000 68,479 DISTRICT 4- DRAINAGE STRUCTURE REPAIRS AT VARIOUS LOCATIONS 300,000 14,193 DISTRICT 4- FABRICATION & INSTALLATION OF OVERHEAD & GROUND MOUNTED SIGNS AT VARIOUS 375,000 53,178 LOCATIONS DISTRICT 4- FACILITY REPAIR & IMPROVEMENT AT VARIOUS LOCATIONS 504,949 48,188 DISTRICT 4- GUARDRAIL & FENCE REPAIRS AT VARIOUS LOCATIONS 405,535 - DISTRICT 4- HIGH FRICTION SURFACE TREATMENT AND RELATED WORK AT 3 LOCATIONS 416,480 1,874,160 DISTRICT 4- HIGHWAY LIGHTING AT VARIOUS LOCATIONS 438,928 127,671 DISTRICT 4- HIGHWAY LIGHTING BRANCH CIRCUIT RE-CABLING, FROM SIX (6) LIGHTING LOAD CENTERS 1,637,148 - ALONG ROUTE I-95 (128), FROM LEXINGTON TO WOBURN DISTRICT 4- HIGHWAY SWEEPING AT VARIOUS LOCATIONS 350,480 50,000 DISTRICT 4- IMPACT ATTENUATOR REPAIR AT VARIOUS LOCATIONS 100,000 6,655 DISTRICT 4- PAVEMENT REPAIRS AND CRACK SEALING AT VARIOUS LOCATIONS 317,628 - DISTRICT 4- RESURFACING & RELATED WORK AT VARIOUS LOCATIONS 410,610 - DISTRICT 4- RESURFACING & RELATED WORK AT VARIOUS LOCATIONS 2,452,615 1,341,006 DISTRICT 4- RESURFACING & RELATED WORK AT VARIOUS LOCATIONS 1,751,953 1,055,859 DISTRICT 4- ROADWAY REPAIR AT VARIOUS LOCATIONS 160,000 25,000 DISTRICT 4- ROOF & SIDING REPAIR & UPGRADES AT VARIOUS LOCATIONS 319,200 283,600 DISTRICT 4- SALT SHED IMPROVEMENTS & REPAIR AT VARIOUS LOCATIONS 220,000 10,000 DISTRICT 4- SCHEDULED & EMERGENCY BRIDGE DECK & JOINT REPAIRS AT VARIOUS LOCATIONS 1,900,000 538,161 DISTRICT 4- SCHEDULED & EMERGENCY BRIDGE DECK & JOINT REPAIRS AT VARIOUS LOCATIONS 713,000 192,762 DISTRICT 4- SCHEDULED & EMERGENCY DRAWBRIDGE OPERATION AND MAINTENANCE AT VARIOUS 2,354,764 1,850,653 LOCATIONS DISTRICT 4- SCHEDULED & EMERGENCY SUBSTRUCTURE REPAIRS AT VARIOUS LOCATIONS 2,900,000 475,970 DISTRICT 4- SCHEDULED & EMERGENCY TRAFFIC CONTROL AT VARIOUS LOCATIONS 93,906 - DISTRICT 4- SIDEWALK REPAIR & IMPROVEMENT AT VARIOUS LOCATIONS 310,975 20,000

39

Highway Division

16 17 + beyond DISTRICT 4- SIDEWALK REPAIR & IMPROVEMENTS AT VARIOUS LOCATIONS 10,000 - DISTRICT 4- SIGNAL UPGRADES WITH FLASHING YELLOW ARROWS AT VARIOUS LOCATIONS (PHASE II) 454,500 454,047

DISTRICT 4- TRAFFIC SIGNAL BETTERMENT AT VARIOUS LOCATIONS 400,000 44,471 DISTRICT 4- TRAFFIC SIGNAL CONTROLLER CABINET & MISCELLANEOUS MATERIALS PURCHASE & 804,000 52,202 INSTALLATION DISTRICT 4- TREE REMOVAL, TRIMMING & SIGHT DISTANCE CLEARING AT VARIOUS LOCATIONS 297,077 39,278 DISTRICT 4- TREE TRIMMING, TREE REMOVAL & SAFETY SIGHT DISTANCE CLEARING AT VARIOUS 500,000 158,876 LOCATIONS DISTRICT 4- VEGETATION MANAGEMENT AT VARIOUS LOCATIONS 389,885 - DISTRICT 5- ADA RETROFITS AT VARIOUS LOCATIONS 1,610,522 - DISTRICT 5- APPLICATION OF REFELCTORIZED PAVEMENT MARKINGS AT VARIOUS LOCATIONS 810,296 368,450 DISTRICT 5- BRIDGE PAINTING AT VARIOUS LOCATIONS 545,000 - DISTRICT 5- BRIDGE STRUCTURAL REPAIRS AND RELATED WORK ALONG INTERSTATE 495 AND ROUTE 6, 1,660,186 415,047 ROUTE 25 AND ROUTE 28 DISTRICT 5- CATCH BASIN AND PIPE CLEANING AT VARIOUS LOCATIONS 403,580 250,000 DISTRICT 5- DISTRICT 6- SIGNAL UPGRADES WITH FLASHING YELLOW ARROWS AT VARIOUS LOCATIONS 304,000 203,000 (PHASE II) DISTRICT 5- DRAINAGE & EROSION REPAIRS AT VARIOUS LOCATIONS 260,000 74,620 DISTRICT 5- DRAINAGE REPAIR & INSTALLATION AT VARIOUS LOCATIONS IN AREAS A, B, C & D 250,062 - DISTRICT 5- DRAINAGE REPAIRS AT VARIOUS LOCATIONS 604,998 345,713 DISTRICT 5- DRAWBRIDGE OPERATION, REPAIR & SYSTEMATIC PRESERVATION AT VARIOUS LOCATIONS 3,130,747 2,276,907

DISTRICT 5- DRAWBRIDGE OPERATION, REPAIRS AND SYSTEMATIC PRESERVATION AT VARIOUS 539,910 - LOCATIONS DISTRICT 5- EMERGENCY & NON-ROUTINE STEEL BEAM REPAIRS AT VARIOUS LOCATIONS 958,900 - DISTRICT 5- EMERGENCY & NON-ROUTINE STEEL BEAM REPAIRS AT VARIOUS LOCATIONS 2,069,112 1,379,408 DISTRICT 5- EMERGENCY & SCHEDULED INSTALLATION OF BRIDGE SHIELDING 126,427 - DISTRICT 5- FABRICATION AND INSTALLATION OF OVERHEAD AND GROUND MOUNTED GUIDE SIGNS AT 300,900 306,487 VARIOUS LOCATIONS DISTRICT 5- HAZARDOUS TREE REMOVAL & TRIMMING (AREA D) 81,665 - DISTRICT 5- HAZARDOUS TREE REMOVAL & TRIMMING (AREAS A, B & C) 340,000 - DISTRICT 5- HAZARDOUS TREE REMOVAL & TRIMMING (MARTHA'S VINEYARD) 31,336 - DISTRICT 5- HAZARDOUS TREE REMOVAL AND TRIMMING AT VARIOUS LOCATIONS (AREA A,B,&C) 1,390,487 926,992 DISTRICT 5- HAZARDOUS TREE REMOVAL AND TRIMMING AT VARIOUS LOCATIONS (AREA D) 288,352 192,234 DISTRICT 5- HIGHWAY LIGHTING REPAIRS & UPGRADES VARIOUS LOCATIONS 60,000 - DISTRICT 5- INSTALLATION OF REFLECTORIZED PAVEMENT MARKINGS AT VARIOUS LOCATIONS 5,000 -

40

Highway Division

16 17 + beyond DISTRICT 5- ITS CAMERA & VMS CONSTRUCTION ON ROUTE 24, FROM RANDOLPH TO FALL RIVER (39 MILES) 2,541,989 3,050,386

DISTRICT 5- LITTER REMOVAL AT VARIOUS LOCATIONS (AREA D) 87,000 52,191 DISTRICT 5- LITTER REMOVAL SERVICES AT VARIOUS LOCATIONS (AREAS A, B, & C) 240,000 96,760 DISTRICT 5- MAINTENANCE OF STATE ROADWAYS ON MARTHA'S VINEYARD 497,256 221,388 DISTRICT 5- MEDIAN DELINEATION REPLACEMENT ON ROUTE 6, FROM DENNIS T.L. TO ORLEANS T.L. 4,500 -

DISTRICT 5- PAVEMENT REPAIRS & CRACK SEALING AT VARIOUS LOCATIONS (AREA D) 35,797 - DISTRICT 5- PAVEMENT REPAIRS & CRACK SEALING AT VARIOUS LOCATIONS (AREAS A, B & C) 200,000 - DISTRICT 5- PAVEMENT REPAIRS AT VARIOUS LOCATIONS 900,000 200,000 DISTRICT 5- REMOVAL & REPLACEMENT OF HIGHWAY DELINEATOR POSTS AT VARIOUS LOCATIONS 93,679 444,976

DISTRICT 5- REPAIRS & UPGRADES TO CHAIN LINK & LAYOUT FENCE SYSTEMS AT VARIOUS LOCATIONS 66,887 -

DISTRICT 5- REPAIRS & UPGRADES TO IMPACT ATTENUATORS (SAND BARRELS) AT VARIOUS LOCATIONS 50,465 -

DISTRICT 5- REPAIRS & UPGRADES TO IMPACT ATTENUATORS AT VARIOUS LOCATIONS 79,000 - DISTRICT 5- REPAIRS & UPGRADES TO SALT SHED FACILITIES AT VARIOUS LOCATIONS 468,262 - DISTRICT 5- REPAIRS AND INSTALLATION OF SIDEWALKS AT VARIOUS LOCATIONS 461,589 384,657 DISTRICT 5- REPAIRS AND UPGRADES TO GUARDRAIL, CABLE & BARRIER SYSTEMS AT VARIOUS 270,000 36,000 LOCATIONS DISTRICT 5- REPAIRS, UPGRADES & CONSTRUCTION OF SIDEWALKS AND ACCESS RAMPS AT VARIOUS 125,000 - LOCATIONS DISTRICT 5- ROADSIDE VEGETATION REMOVAL AT VARIOUS LOCATIONS (AREA D) 400,000 43,245 DISTRICT 5- ROADSIDE VEGETATION REMOVAL AT VARIOUS LOCATIONS (AREAS A,B, & C) 900,000 211,996 DISTRICT 5- ROUTINE MAINTENANCE & STRUCTURAL REPAIRS TO ROUTE 3 CORRIDOR BRIDGES 1,075,232 - DISTRICT 5- SCHEDULED & EMERGENCY BRIDGE DECK REPAIRS AT VARIOUS LOCATIONS 1,160,000 212,801 DISTRICT 5- SCHEDULED & EMERGENCY BRIDGE JOINT REPAIRS AT VARIOUS LOCATIONS 1,474,413 5,456 DISTRICT 5- SCHEDULED & EMERGENCY FACILITY REPAIRS AND UPGRADES AT VARIOUS LOCATIONS 375,207 250,138

DISTRICT 5- SCHEDULED & EMERGENCY REPAIRS TO IMPACT ATTENUATORS (SAND BARRELS) AT VARIOUS 113,740 75,827 LOCATIONS DISTRICT 5- SCHEDULED & EMERGENCY REPAIRS TO IMPACT ATTENUATORS AT VARIOUS LOCATIONS 108,228 72,152

DISTRICT 5- SCHEDULED & EMERGENCY STRUCTURAL REPAIRS AT VARIOUS LOCATIONS 2,132,879 826,475 DISTRICT 5- SCHEDULED & EMERGENCY SUBSTRUCTURE REPAIRS AT VARIOUS LOCATIONS 1,200,000 972,979

41

Highway Division

16 17 + beyond DISTRICT 5- SCHEDULED & EMERGENCY TEMPORARY TRAFFIC CONTROL DEVICE INSTALLATION AT 353,912 190,000 VARIOUS LOCATIONS DISTRICT 5- SCHEDULED AND EMERGENCY STRUCTURAL REPAIRS AT VARIOUS LOCATIONS 4,097,568 2,277,082 DISTRICT 5- STREET SWEEPING AT VARIOUS LOCATIONS 324,080 - DISTRICT 5- TRAFFIC SIGNAL CONTROLLER CABINET & MISCELLANEOUS MATERIALS PURCHASE & 758,000 70,164 INSTALLATION DISTRICT 5- TRAFFIC SIGNAL REPAIRS & UPGRADES AT VARIOUS LOCATIONS 265,000 219,855 DISTRICT 5- TREE TRIMMING, SIGHT DISTANCE CLEARING & HAZARDOUS TREE REMOVAL IN MARTHA'S 199,000 9,000 VINEYARD DISTRICT 5- VEGETATION MANAGEMENT AT VARIOUS LOCATIONS 70,000 10,025 DISTRICT 6 - MISCELLANEOUS OVERHEAD SIGN REPAIRS IN TUNNELS (2014) 600,519 - DISTRICT 6 - STANDPIPE & FIRE SAFETY INSPECTION & TESTING 377,530 - DISTRICT 6- ADA RETROFITS AT VARIOUS LOCATIONS 1,100,000 -

DISTRICT 6- APPLICATION OF PAVEMENT MARKINGS AT VARIOUS LOCATIONS 223,536 - DISTRICT 6- APPLICATION OF PAVEMENT MARKINGS AT VARIOUS LOCATIONS 236,560 236,000 DISTRICT 6- BRIDGE WASHING AND CLEANING AT VARIOUS LOCATIONS 457,000 266,118 DISTRICT 6- DRAINAGE RECONSTRUCTION AT VARIOUS LOCATIONS 400,000 160,000

DISTRICT 6- ELECTRICAL SYSTEM UPGRADES AT VARIOUS LOCATIONS 100,000 - DISTRICT 6- FABRICATION & INSTALLATION OF OVERHEAD AND GROUND MOUNTED GUIDE SIGNS 215,000 - DISTRICT 6- FABRICATION & INSTALLATION OF OVERHEAD AND GROUND MOUNTED GUIDE SIGNS 170,000 170,000 DISTRICT 6- GENERATOR MAINTENANCE AND TESTING AT VARIOUS LOCATIONS 736,718 884,061 DISTRICT 6- HIGHWAY LIGHTING REPLACEMENT OR REPAIRS AND ELECTRICAL MAINTENANCE AT VARIOUS 1,000,000 53,515 LOCATIONS DISTRICT 6- HOPKINTON- INSPECT, SERVICE, AND REPAIR ELEVATORS AT VARIOUS FACILITIES 118,313 - DISTRICT 6- INSPECTION, TESTING, MAINTENANCE & REPAIRS OF FIRE DETECTION SYSTEMS AT VARIOUS 216,000 72,000 LOCATIONS DISTRICT 6- INSTALLATION & REFURBISHMENT OF CRASH CUSHION SYSTEMS AT VARIOUS LOCATIONS 400,000 81,235

DISTRICT 6- INSTALLATION & REFURBISHMENT OF PAVEMENT MARKERS AT VARIOUS LOCATIONS 285,334 - DISTRICT 6- INSTALLATION OR REHABILITATION OF BRIDGE DRAINAGE SYSTEMS AT VARIOUS LOCATIONS 475,368 -

DISTRICT 6- MAINTENANCE OF MHS COMMUNICATIONS SYSTEMS AT VARIOUS LOCATIONS 84,300 - DISTRICT 6- OVERHEAD DOORS, MAINTENANCE AND REPAIR 281,585 - DISTRICT 6- RESURFACING & RELATED WORK AT VARIOUS LOCATIONS (HMA) 3,480,000 2,350,000 DISTRICT 6- ROADSIDE BARRIER RECONSTRUCTION & REPAIR AT VARIOUS LOCATIONS 72,118 1,153,882

42

Highway Division

16 17 + beyond DISTRICT 6- ROADSIDE BARRIER RECONSTRUCTION & REPAIR AT VARIOUS LOCATIONS 90,000 - DISTRICT 6- ROADSIDE BARRIER RECONSTRUCTION & REPAIR AT VARIOUS LOCATIONS 590,000 60,000 DISTRICT 6- ROADSIDE VEGETATION MANAGEMENT AT VARIOUS LOCATIONS 500,000 1,992 DISTRICT 6- SCHEDULED & EMERGENCY BRIDGE DECK & JOINT REPAIRS AT VARIOUS LOCATIONS 227,299 - DISTRICT 6- SCHEDULED & EMERGENCY BRIDGE DECK & JOINT REPAIRS AT VARIOUS LOCATIONS 7,181,174 9,969,814 DISTRICT 6- SCHEDULED & EMERGENCY CLEANING OF DRAINAGE STRUCTURES AT VARIOUS LOCATIONS 320,000 104,838

DISTRICT 6- SCHEDULED & EMERGENCY CLEANING OF DRAINAGE STRUCTURES AT VARIOUS LOCATIONS 29,765 572,980

DISTRICT 6- SCHEDULED & EMERGENCY DRAWBRIDGE MAINTENANCE, REPAIR, AND OPERATION AT 1,462,028 365,507 VARIOUS LOCATIONS DISTRICT 6- SCHEDULED & EMERGENCY FACILITIES REPAIR AND IMPROVEMENT AT VARIOUS LOCATIONS 315,000 140,000

DISTRICT 6- SCHEDULED & EMERGENCY FACILITIES REPAIR AND IMPROVEMENT AT VARIOUS LOCATIONS 18,632 195,636

DISTRICT 6- SCHEDULED & EMERGENCY FIRE LINE, STANDPIPE, AND HYDRANT REPAIRS AND 421,612 281,075 IMPROVEMENTS AT VARIOUS LOCATIONS DISTRICT 6- SCHEDULED & EMERGENCY GUARDRAIL & FENCE REFURBISHMENT & SNOW FENCE 155,000 - INSTALLATION AT VARIOUS LOCATIONS DISTRICT 6- SCHEDULED & EMERGENCY GUARDRAIL & FENCE REFURBISHMENT & SNOW FENCE 4,970,000 266,055 INSTALLATION AT VARIOUS LOCATIONS DISTRICT 6- SCHEDULED & EMERGENCY STRUCTURAL & SUBSTRUCTURE REPAIRS AT VARIOUS 2,717,808 - LOCATIONS DISTRICT 6- SCHEDULED & EMERGENCY TRAFFIC CONTROL & SETUPS AT VARIOUS LOCATIONS 5,472 - DISTRICT 6- SCHEDULED & EMERGENCY TRAFFIC SIGNAL REPAIRS AT VARIOUS LOCATIONS 292,897 - DISTRICT 6- SCHEDULED & EMERGENCY TRAFFIC SIGNAL REPAIRS AT VARIOUS LOCATIONS 47,652 1,109,771 DISTRICT 6- SCHEDULED AND EMERGENCY MECHANICAL AND MILLWRIGHT SERVICES AT VARIOUS 824,454 471,117 LOCATIONS DISTRICT 6- STANDPIPE & FIRE SAFETY INSPECTION & TESTING 479,635 2,158,357 DISTRICT 6- STORMWATER RETROFITS AT VARIOUS LOCATIONS 117,000 - DISTRICT 6- TREE TRIMMING & SIGHT DISTANCE IMPROVEMENT AT VARIOUS LOCATIONS 312,976 - DISTRICT 6- TREE TRIMMING & SIGHT DISTANCE IMPROVEMENT AT VARIOUS LOCATIONS 320,000 50,000 DRACUT- RECONSTRUCTION OF ARLINGTON STREET, FROM BROADWAY ROAD (ROUTE 113) TO METHUEN 846,000 - STREET (APPROX. 7500 FT) DUDLEY- ROADWAY RECONSTRUCTION AND RELATED WORK ALONG A SECTION OF CENTER ROAD; FAP 1,165,000 1,165,000 NO. STP-002S(718)X DUXBURY- INTERSECTION IMPROVEMENTS @ KINGSTOWN WAY (ROUTE 53) & WINTER STREET 705,947 -

43

Highway Division

16 17 + beyond EASTHAMPTON- NORTHAMPTON- INTERSTATE MAINTENANCE & RELATED WORK ON I-91 FROM MM 21.2 TO 7,967,000 4,580,797 MM 26.9 IN BOTH DIRECTIONS (6.1 MILES) EASTON- SIGNAL & INTERSECTION IMPROVEMENTS @ ROUTE 138 (TURNPIKE STREET) AND ROUTE 106 1,499,949 - (FOUNDRY STREET) EDGARTOWN- OAK BLUFFS- TISBURY- DRAINAGE IMPROVEMENTS & RELATED WORK ON 130,967 873,113 EDGARTOWN/VINEYARD HAVEN ROAD ERVING- CONSTRUCTION OF A PRE-ENGINEERED STEEL STORAGE BUILDING AT MAINTENANCE DEPOT 504,000 -

EVERETT- MEDFORD- BRIDGE REPLACEMENTS, REVERE BEACH PARKWAY (ROUTE 16), E-12-004=M-12-018 40,342,860 44,825,400 OVER THE (WOODS MEMORIAL BRIDGE) & M-12-017 OVER MBTA AND RIVERS EDGE DRIVE

FAIRHAVEN- NEW BEDFORD- BRIDGE PRESERVATION, F-01-002=N-06-001 (EAST & WEST BRIDGES) ROUTE 6 13,700,000 - OVER & N-06-025, HATHAWAY ROAD OVER ROUTE I-195 FAIRHAVEN- RESURFACING & RELATED WORK ON ROUTE 6 (HUTTLESTON AVENUE), FROM EAST OF ADAMS 3,878,771 1,000 STREET TO EAST OF SHAW ROAD AT FAIRHAVEN/MATTAPOISETT T.L. FALL RIVER- INTERCHANGE IMPROVEMENTS AT ROUTE I-195/ROUTE 79/ROUTE 138 INCLUDING BRAGA 61,812,683 16,649,304 BRIDGE PHASE 2 CLEANING/PAINTING AND STRUCTURAL REPAIRS FALL RIVER- INTERSTATE MAINTENANCE & RELATED WORK ON I-195, FROM ROUTE 24 TO THE BRAGA 24,896 - BRIDGE FALL RIVER- MULTI-USE PATH CONSTRUCTION, FROM BRAYTON AVENUE TO QUEQUECHAN STREET, 1,377,880 1,000 INCLUDES REHAB OF F-02-106 & F-02-107 (QUEQUECHAN RAILTRAIL - PHASE III) FALL RIVER- NEW BEDFORD- BRIDGE REPLACEMENTS, F-02-091, COUNTRY CLUB ROAD OVER MAC RR, F-02- 33,876,859 5,978,442 029, MAC RR OVER BROWNELL STREET, F-02-030, MAC RR OVER PRESIDENT AVENUE, & N-06-024, MAC RR OVER ROUTE 18 & WAMSUTTA STREET FALL RIVER- RECONSTRUCTION & TRAFFIC SIGNAL IMPROVEMENTS ON PLYMOUTH AVENUE, FROM 178,286 - WORDELL STREET TO RHODE ISLAND AVENUE AT SLADE STREET/LAUREL STREET FALL RIVER- RESURFACING & RELATED WORK ON ROUTE 24 (FROM MILEMARKER 0.0 TO 1.7) 1,000 - FALL RIVER- SOMERSET- BRIDGE PRESERVATION, F-02-058, I-195 OVER THE COMB SR 79 & TAUNTON RIVER 104,686 - (BRAGA BRIDGE) FALL RIVER- SUPERSTRUCTURE REPLACEMENT, F-02-052, HERMAN STREET OVER ROUTE 79 972,128 - FALMOUTH- INTERSECTION IMPROVEMENTS AT EAST FALMOUTH HIGHWAY (ROUTE 28), DAVISVILLE ROAD 1,455,000 - & OLD MEETINGHOUSE ROAD AND INTERSECTION IMPROVEMENTS AT TEATICKET HIGHWAY (ROUTE 28) AND JONES ROAD/WORCESTER COURT FOXBORO- PLAINVILLE- BRIDGE PAINTING ON I-495 (NB & SB) 1,174,707 1,696,800 FOXBOROUGH- INTERSTATE MAINTENANCE & RELATED WORK ON I-95 20,000 - FRAMINGHAM- BRIDGE REPLACEMENT, F-07-001, ROUTE 9 (WORCESTER ROAD) OVER RESERVOIR OUTLET 4,435,500 -

44

Highway Division

16 17 + beyond FRAMINGHAM- BRIDGE REPLACEMENT, F-07-009, CENTRAL STREET OVER , INCLUDES 1,820,000 - REHAB OF WICKFORD ROAD BRIDGE, F-07-064 FRAMINGHAM- BRIDGE REPLACEMENT, F-07-015, WINTER STREET OVER MBTA, AMTRAK & CSX RAILROAD 3,172,000 2,785,000

FRAMINGHAM- DECK, JOINT & SUBSTRUCTURE REPAIRS ON F-07-018, MOUNT WAYTE AVENUE OVER 1,111,527 - MBTA/CSX FRAMINGHAM- RECONSTRUCTION OF ROUTE 126 (CONCORD STREET) 4,084,689 2,197,850 FRANKLIN- INTERSTATE MAINTENANCE & RELATED WORK ON I-495 2,069,415 - FRANKLIN- PEDESTRIAN BRIDGE CONSTRUCTION, F-08-005, OLD SR 140 OVER MBTA/CSX 44,735 984,179 FRANKLIN- RECONSTRUCTION OF ROUTE 140, MAIN STREET & EMMONS STREET (DOWNTOWN 3,370,000 925,492 ENHANCEMENTS) INCLUDES REHAB OF F-08-007 OVER MBTA FREETOWN- LAKEVILLE- TAUNTON- RESURFACING & RELATED WORK ON ROUTE 140 35,000 - GARDNER- BIKE PATH CONSTRUCTION, NORTH CENTRAL PATHWAY (PHASE VI) 61,289 980,631 GEORGETOWN- NEWBURY- WEST NEWBURY- NEWBURYPORT- INTERSTATE MAINTENANCE & RELATED 20,367,043 1,851,549 WORK ON I-95 GILL- MONTAGUE- BRIDGE REHABILITATION, G-04-010=M-28-031, AVENUE A OVER CONNECTICUT RIVER & 2,000,000 - REPAIR OF G-12-020=M-28-001, MONTAGUE CITY ROAD OVER THE CONNECTICUT RIVER GLOUCESTER- BRIDGE PRESERVATION, G-05-017, ROUTE 128 OVER (PHASE II) 4,193,447 - GREAT BARRINGTON- BRIDGE REPLACEMENT, G-11-005, SR 183 (PARK STREET) OVER 205,006 3,280,088

GREAT BARRINGTON- RECONSTRUCTION OF MAIN STREET (ROUTE 7) 2,209,200 - GREENFIELD- INTERSECTION IMPROVEMENTS AND RELATED WORK (INCLUDING SIGNALS) AT ROUTE 2A 1,128,157 - (MOHAWK TRAIL) AND SHELBURNE ROAD/RIVER STREET GREENFIELD- INTERSECTION IMPROVEMENTS AT ROUTE 5/10 & CHEAPSIDE STREET 212,708 372,239 GREENFIELD- RESURFACING & RELATED WORK ON ROUTE 2, FROM INTERSTATE 91 TO WEST OF THE 1,147,000 - GREENFIELD GILL T.L. (2.6 MILES) GROVELAND- REHABILITATION OF ROUTE 97 (SCHOOL STREET & SALEM STREET) 1,805,117 4,813,645 HADLEY- SIGNAL & INTERSECTION IMPROVEMENTS AT ROUTE 9 (RUSSELL STREET) & ROUTE 47 (MIDDLE 541,968 2,438,858 STREET) HANOVER- RECONSTRUCTION OF WASHINGTON STREET (ROUTE 53) & RELATED WORK, FROM THE ROUTE 1,645,599 - 3 (NB) RAMP TO WEBSTER STREET (ROUTE 123) HAVERHILL- BRIDGE MAINTENANCE ON H-12-041, RIVER STREET OVER I-495 1,679,120 - HAVERHILL- INTERSTATE MAINTENANCE & RELATED WORK ON I-495 2,018,474 - HAVERHILL- PEABODY- BRIDGE STEEL PAINTING AND REPAIRS OF SUBSTRUCTURE ELEMENTS, H-12-057 1,079,000 995,725 (2RR & 2RT) & P-03-037 (31T) HAVERHILL- RIVERWALK CONSTRUCTION (BRADFORD SECTION), FROM ROUTE 125 TO COUNTY ROAD 2,195,561 399,193

45

Highway Division

16 17 + beyond HAWLEY- BRIDGE REPLACEMENT, H-13-003, SAVOY ROAD OVER THE CHICKLEY RIVER 59,327 1,305,205 HIGHWAY LIGHTING UPGRADES AND IMPROVEMENT ALONG INTERSTATE 495 AT 4 INTERCHANGES WITH 1,832,343 (80,179) ROUTES 117, 111, 9 AND INTERSTATE 290 – FA # STP-495-5(082)X

HOLDEN- BRIDGE REPLACEMENT, H-18-008, ROUTE 31 (WACHUSETT STREET) OVER THE QUINAPOXET 662,079 - RIVER HOLDEN- BRIDGE REPLACEMENT, H-18-020, RIVER STREET OVER QUINAPOXET RIVER 100,044 2,200,962 HOLYOKE- CANAL WALK EXTENSION (2ND LEVEL CANAL), FROM APPLETON STREET TO DWIGHT STREET 1,560,000 - (PHASE II), INCLUDES REHAB OF H-21-062 HOLYOKE- SIGNAL INSTALLATION & IMPROVEMENTS ON CHERRY STREET @ I-91 (INTERCHANGE 16) 371,000 -

HOLYOKE- WEST SPRINGFIELD- INTERSTATE MAINTENANCE & RELATED WORK ON I-91 (MM10.5 TO 15.0) 3,500,000 -

HOPKINTON- CONSTRUCTION & RELOCATION OF RESEARCH AND MATERIAL LABORATORY FROM SOUTH 17,239,807 20,687,768 BOSTON HUBBARDSTON- RESURFACING AND RELATED WORK ON BURNSHIRT ROAD 79,017 - HUBBARDSTON- SUPERSTRUCTURE REPLACEMENT, H-24-004, BURNSHIRT ROAD OVER 279,037 -

HUDSON- BRIDGE REPLACEMENT, H-25-003, STATE ROUTE 85 (WASHINGTON STREET) OVER THE ASSABET - 4,520,176 RIVER HUDSON- BRIDGE REPLACEMENT, H-25-004, HOUGHTON STREET OVER ASSABET RIVER 105,000 - HUNTINGTON- BRIDGE REPLACEMENT, BRIDGE RAMP, H-27-006, FREIGHT YARD ROAD (INTERSECTS MAIN 1,304,389 - BRIDGE STRUCTURE ON SOUTH SIDE OF SPAN 4) OVER THE MASSDOT MAINTENANCE FACILITY

LANCASTER- BRIDGE REPLACEMENT, L-02-018, JACKSON ROAD OVER ROUTE 2 1,400,000 4,081,188 LAWRENCE- INTERSECTION IMPROVEMENTS AT LAWRENCE STREET AND PARK STREET 205,893 926,519 LAWRENCE- NORTH ANDOVER- INTERSTATE MAINTENANCE & RELATED WORK ON I-495 7,809,800 - LAWRENCE- UNION CROSSING PEDESTRIAN IMPROVEMENTS; TCS-002S(753)X 624,307 - LEE- RECONSTRUCTION OF TYRINGHAM ROAD, FROM THE TYRINGHAM T.L. TO ROUTE 102 (2.0 MILES) 1,064,000 -

LENOX- INTERSECTION & SIGNAL IMPROVEMENTS AT US 7 & US 20 (VETERAN'S MEMORIAL HIGHWAY) @ SR 38,112 381,118 183 (WALKER STREET) LENOX- PITTSFIELD- RESURFACING AND RELATED WORK ON ROUTE 7/20 2,900,000 - LEOMINSTER- BRIDGE REPLACEMENT, L-08-014, WHITNEY STREET OVER THE MONOOSNOC BROOK 930,000 -

46

Highway Division

16 17 + beyond LEOMINSTER- RECONSTRUCTION OF MECHANIC STREET, FROM LAUREL STREET TO THE LEOMINSTER 609,162 2,741,230 CONNECTOR LEXINGTON- BRIDGE REPLACEMENT, L-10-009, ROUTE 2 (EB & WB) OVER ROUTE I-95/ROUTE 128 (DESIGN- 18,858,742 13,350,000 BUILD) LEXINGTON- BURLINGTON- INTERSTATE MAINTENANCE & RELATED WORK ON I-95 14,958,000 - LEXINGTON- BURLINGTON- WOBURN- STONEHAM- READING- WAKEFIELD- LYNNFIELD- EXPANSION OF 2,366,494 2,500,000 FIBER & CCTV ON I-95 LITTLETON- BRIDGE REPLACEMENT, L-13-021, TAYLOR STREET OVER I-495 (NB & SB), L-13-022, I-495 (NB & 11,874,295 1,402,261 SB) OVER ROUTE 2 & L-13-023, I-495 (NB & SB) OVER RAILROAD BRIDGE LONGMEADOW- BERNARDSTON- INSTALLATION OF ADVANCED TRAFFIC MANAGEMENT SYSTEM ON I-91 372,002 - CORRIDOR (DESIGN-BUILD) LONGMEADOW- SPRINGFIELD- TEMPLETON- WESTFIELD- STORMWATER RETROFITS ON I-91, ROUTE 5, 495,477 353,912 ROUTE 2 & ROUTE 20 LOWELL- BRIDGE REPLACEMENT, L-15-045, MARKET STREET OVER THE WESTERN CANAL 150,797 3,317,545 LOWELL- BRIDGE REPLACEMENT, L-15-058, VFW HIGHWAY OVER BEAVER BROOK 954,443 20,997,757 LOWELL- METHUEN- TRAFFIC SIGN REPLACEMENT & RELATED WORK ON I-495 2,500,000 - LOWELL- SIGNAL & INTERSECTION IMPROVEMENTS AT VFW HIGHWAY, BRIDGE STREET & LAKEVIEW 2,098,044 970,000 AVENUE LYNN- RECONSTRUCTION OF ROUTE 129 (BROADWAY), FROM LYNNFIELD STREET TO CHESTNUT STREET 2,127,397 -

LYNNFIELD- WAKEFIELD- INTERSTATE MAINTENANCE & RELATED WORK ON I-95 2,500,004 - MANCHESTER BY THE SEA- SAFE ROUTES TO SCHOOL (MEMORIAL ELEMENTARY) 443,417 - MANSFIELD- NORTON- INTERSTATE MAINTENANCE & RELATED WORK ON I-495 93,000 - MANSFIELD- SIDEWALK CONSTRUCTION & RELATED WORK ON EAST STREET AT THE JORDAN-JACKSON 83,322 874,882 ELEMENTARY SCHOOL (SRTS) MANSFIELD- SWANSEA- SOMERSET- NEW BEDFORD- STORMWATER IMPROVEMENTS ALONG I-495 AND I- 348,061 1,566,275 195 MARLBOROUGH- NORTHBOROUGH- INTERSTATE MAINTENANCE & RELATED WORK ON I-290 9,481,951 2,844,585 MEDFORD- BRIDGE REHABILITATION, M-12-002, MAIN STREET (STATE ROUTE 38 S) OVER 3,983,078 7,022,564 (AKA - CRADOCK BRIDGE) MEDFORD- CLIPPERSHIP DRIVE PARK CONSTRUCTION 464,456 - MEDFORD- STONEHAM- WOBURN- READING- HIGHWAY LIGHTING REHABILITATION ON I-93 (PHASE II) 1,595,694 15,956,936

MEDWAY- RECONSTRUCTION ON ROUTE 109, FROM HOLLISTON STREET TO 100 FT. WEST OF HIGHLAND 3,656,726 9,751,268 STREET, INCLUDES REHAB OF M-13-012 MELROSE- INTERSECTION & SIGNAL IMPROVEMENT TO LEBANON STREET, FROM LYNDE STREET TO MAIN 2,395,000 - STREET

47

Highway Division

16 17 + beyond MERRIMAC- RECONSTRUCTION OF ROUTE 110 (WEST MAIN STREET/EAST MAIN STREET), FROM 400 FEET 2,486,607 - WEST OF ORCHARD STREET TO BROAD STREET METHUEN- INTERCHANGE RECONSTRUCTION ON I-93 AT ROUTE 110/113 ROTARY, INCLUDING REMOVAL OF 21,390,286 17,564,245 M-17-017 & M-17-018, REHAB OF M-17-007 & NEW BRIDGE CONSTRUCTION OF M-17-040

MIDDLEBOROUGH- ROCHESTER- RESURFACING OF ROUTE 28 (EAST GROVE, WEST GROVE, WAREHAM 3,807,336 1,853,668 STREET) FROM THE MIDDLEBOROUGH ROTARY TO THE MIDDLEBOROUGH/ROCHESTER T.L.

MILLBURY- BRIDGE REPLACEMENT, M-22-020, ROUTE 146 (NB & SB) OVER WEST MAIN STREET & 8,570,639 16,069,948 IMPROVEMENTS ON ROUTE 146 @ ELM STREET, ELMWOOD STREET & WEST MAIN STREET (ROUNDABOUT)

MILLBURY- SUTTON- MEDIAN BARRIER REPLACEMENT ON ROUTE 146, FROM ROUTE 122A TO BOSTON 1,734,553 4,625,474 ROAD MILLBURY- WORCESTER- RESURFACING & RELATED WORK ON ROUTE 146 650,000 5,761,898 MILTON- IMPROVEMENTS AT GLOVER ELEMENTARY SCHOOL IN THE VICINITY OF CANTON AVENUE, 189,044 850,697 BROOKS ROAD AND VOSES LANE (SRTS) MONSON- PALMER- RESURFACING & RELATED WORK ON ROUTE 32, FROM MM 5.69 TO MM 6.88 AND FROM 1,007,845 - MM 8.24 TO MM 8.80 AT ROUTE 20 (1.69 MILES) MONTAGUE- CANALSIDE BIKE PATH & PEDESTRIAN CROSSING IMPROVEMENTS, MONTAGUE CITY ROAD AT 397,045 397,045 SOLAR AVENUE & DEPOT STREET (850 FEET) MONTAGUE- RECONSTRUCTION ON GREENFIELD ROAD, FROM 195' SOUTH OF SHERMAN DRIVE TO 3,060,000 1,379,319 HATCHERY RD (2.0 MILES) MONTAGUE- REHABILITATION OF HATCHERY ROAD & GREENFIELD ROAD PEDESTRIAN BRIDGE, M-28-009, 3,517,038 - FROM GREENFIELD ROAD NORTHEASTERLY TO THE INTERSECTION OF TURNERS FALLS RD (.41 MILES)

MONTAGUE- RESURFACING & RELATED WORK ON GREENFIELD ROAD, FROM TURNERS FALLS ROAD TO 50,000 - THE FUTURE BIKE/PED BRIDGE OVER THE B&M RAILROAD (1.75 MILES) MONTEREY- RESURFACING & RELATED WORK ON ROUTE 23, FROM GREAT BARRINGTON T.L. TO OTIS T.L. 3,490,000 -

MONTGOMERY- BRIDGE PRESERVATION, M-30-008 (4GT), I-90 OVER US 20, WESTFIELD RIVER, & CSX RR. 2,785,882 9,054,118 PROJECT INCLUDES MISC. STEEL REPAIRS, DECK REPAIRS, SUBSTRUCTURE REPAIRS AND BARRIER REPLACEMENT. - MULTI-USE PATH CONSTRUCTION, FROM WASHINGTON STREET TO ORANGE STREET 130,153 976,151

NANTUCKET- RESURFACING & RELATED WORK ON POLPIS ROAD, FROM EAST OF NORTH PASTURE LANE 20,000 - TO FULLING MILL ROAD

48

Highway Division

16 17 + beyond NATICK- BRIDGE REPLACEMENT BR. NO. N-03-003 (STEEL) MARION STREET OVER THE MBTA RAILROAD - 3,392,137

NATICK- WELLESLEY- INTERSECTION IMPROVEMENTS @ ROUTE 9 (WORCESTER STREET) & OAK STREET, 1,350,000 - FROM 1500' WEST OF OAK STREET TO 300' EAST OF OVERBROOK DRIVE NEEDHAM- WELLESLEY- REHAB/REPLACEMENT OF 6 BRIDGES ON I-95/ROUTE 128: N-04-020, N-04-021, N-04- 49,146,000 96,731,173 022, N-04-026, N-04-027, N-04-037 & W-13-023 (ADD-A-LANE - CONTRACT V) NEW BEDFORD- FAIRHAVEN- INTERSTATE MAINTENANCE & RELATED WORK ON I-195 4,830,000 419,035 NEW BEDFORD- INTERSECTION IMPROVEMENTS AT ROUTE 140/ROUTE 6 (KEMPTON STREET) AND 771,000 - BROWNELL AVENUE NEWBURY- NEWBURYPORT- CLIPPER CITY RAIL TRAIL ALONG THE CITY BRANCH (PHASE II) 511,427 3,579,989 NEWTON- CLEANING AND PAINTING 5 BRIDGES, N-12-015, N-12-029, N-12-030 & N-12-031, WOODLAND ROAD, 782,664 - AUBURN STREET, ROUTE 30 & PUTNAM STREET OVER I-90 NEWTON- WESTON- STORMWATER RETROFITS ON I-90 1,200,000 100,000 NORTH ADAMS- TRAFFIC SIGNAL REPLACEMENT AT ASHLAND STREET (ROUTE 8A) & AMERICAN LEGION 205,000 - DRIVE NORTH ATTLEBOROUGH- TRAFFIC SIGNAL AND INTERSECTION IMPROVEMENTS AT EAST WASHINGTON 572,527 2,576,369 STREET (ROUTE 1), SOUTH WASHINGTON STREET AND HOPPIN HILL ROAD (ROUTE 120)

NORTHAMPTON- INTERSECTION IMPROVEMENTS AT ROUTE 5 (PLEASANT STREET) AND CONZ STREET 392,188 1,830,209

NORTHBOROUGH- RESURFACING & RELATED WORK ON ROUTE 20, FROM 20 FEET NORTH OF TOMBLIN HILL 43,000 - ROAD TO THE MARLBOROUGH TOWN LINE. NORTHBRIDGE- RECONSTRUCTION OF SUTTON STREET, FROM SUTTON T.L. TO ROUTE 122 (APPROX. 2.2 2,100,000 - MILES) NORTON- BRIDGE REPLACEMENT, N-23-017, PLAIN STREET OVER THE 161,207 1,692,672 OAK BLUFFS- TISBURY- BRIDGE REPLACEMENT, O-01-001=T-04-001, BEACH ROAD OVER LAGOON POND 15,726,724 - DRAWBRIDGE OAKHAM- RUTLAND- RESURFACING & RELATED WORK ON ROUTE 122, FROM ROUTE 122A IN RUTLAND TO 1,978,280 - THE OAKHAM/BARRE T.L. ORLEANS- INTERSECTION IMPROVEMENTS (ROUNDABOUT) AT CHATHAM ROAD (ROUTE 28) & CRANBERRY 25,000 - HIGHWAY (ROUTE 6A) OXFORD- STURBRIDGE- CLEANING & PAINTING STRUCTURAL STEEL ON S-30-029 & O-06-052 ON I-90 (EB & 985,174 - WB) PALMER- BRIDGE PRESERVATION. P-01-046, I-90 OVER QUABOAG RIVER, P-01-047, I-90 OVER NECRR & 4,271,498 1,830,642 MCRR & P-01-049, I-90 OVER ROUTE 181 (SYKES STREET) PAXTON- RESURFACING AND RELATED WORK ON ROUTE 122, FROM ROUTE 31 TO THE RUTLAND T.L. 800,000 -

49

Highway Division

16 17 + beyond PEABODY- BRIDGE REPLACEMENT, P-03-013, HOWLEY STREET OVER NORTH RIVER 1,783,091 305,094 PELHAM- BRIDGE REPLACEMENTS, P-04-006, MEETINGHOUSE ROAD OVER AMETHYST BROOK & P-04-007, 1,134,620 1,031,473 MEETINGHOUSE ROAD OVER HARRIS BROOK PEMBROKE- RECONSTRUCTION ON ROUTE 14, FROM THE HANSON T.L. TO WASHINGTON STREET (ROUTE 1,458,121 6,561,544 53) PITTSFIELD- BRIDGE REPLACEMENT, P-10-010, WOODLAWN AVENUE OVER CSX RR 3,661,200 - PITTSFIELD- TRAFFIC SIGNAL AND INTERSECTION IMPROVEMENTS AT CENTER STREET AND WEST 139,773 1,397,725 HOUSATONIC STREET (ROUTE 20) PLYMOUTH- RECONSTRUCTION OF ROUTE 44 (SAMOSET STREET) FROM ROUTE 3 (NB RAMP) EASTERLY TO 2,010,700 - WATER STREET QUINCY- ADAMS GREEN TRANSPORTATION IMPROVEMENTS 4,323,500 - QUINCY- INTERSECTION & SIGNAL IMPROVEMENTS AT HANCOCK STREET & EAST/WEST SQUANTUM 2,908,019 - STREETS QUINCY- WEYMOUTH- BRIDGE REPLACEMENT, Q-01-001=W-32-001, STATE ROUTE 3A (WASHINGTON 56,000,000 22,500,000 STREET) OVER THE FORE RIVER RAYNHAM- BRIDGE DECK REPLACEMENT, R-02-025, ROUTE 138 OVER I-495 3,168,721 1,249,900 RAYNHAM- SIGNAL & INTERSECTION IMPROVEMENT @ ROUTE 44 (NEW STATE HIGHWAY), ORCHARD 1,819,404 397,251 STREET & ROUTE 24 (NB) OFF-RAMP RAYNHAM- TAUNTON- BRIDGE REPLACEMENT, R-02-012=T-01-049 (3MR), SR 24 OVER THE TAUNTON RIVER 6,792,066 -

RAYNHAM- TAUNTON- RESURFACING & RELATED WORK ON ROUTE 138 117,800 - READING- RECONSTRUCTION OF WEST STREET, FROM WOBURN C.L. TO SUMMER AVENUE/WILLOW 3,160,000 2,140,000 STREET REHOBOTH- EMERGENCY REPAIR OF CULVERT R-04-002 ON WHEELER STREET 802,725 802,725 REVERE- BRIDGE REPLACEMENT, R-05-001, REVERE BEACH PARKWAY OVER MBTA (WINTHROP AVENUE) 6,797,415 1,000,000

ROYALSTON- BRIDGE REPLACEMENT, R-12-006, NORTH FITZWILLIAM ROAD OVER LAWRENCE BROOK 915,000 -

SALEM- RECONSTRUCTION ON CANAL STREET, FROM WASHINGTON STREET & MILL STREET TO LORING 2,205,544 5,881,451 AVENUE & JEFFERSON AVENUE SANDISFIELD- BRIDGE MAINTENANCE, S-03-033, ROUTE 8 (SOUTH MAIN STREET) OVER W. BRANCH 356,650 297,208 (PHASE II) SANDISFIELD- BRIDGE MAINTENANCE, S-03-033, ROUTE 8 (SOUTH MAIN STREET) OVER WEST BRANCH 52,000 - FARMINGTON RIVER (PHASE I) SANDWICH- DUMPING GROUND CLOSURE AT ROUTE 130 MAINTENANCE FACILITY 404,527 151,698 SAVOY- RESURFACING & RELATED WORK ON ROUTE 116, FROM CHESHIRE T.L. TO PLAINFIELD T.L. 50,738 -

50

Highway Division

16 17 + beyond SAVOY- SUPERSTRUCTURE REPLACEMENT, S-06-004, RIVER ROAD OVER THE WESTFIELD RIVER 321,095 1,498,445 SEEKONK- DARTMOUTH- GUIDE & TRAFFIC SIGN REPLACEMENT ON I-195 & SR 24 1,951,000 - SEEKONK- INTERSECTION IMPROVEMENTS AT ROUTE 114A, ARCADE AVENUE & MILL ROAD, INCLUDES 1,387,749 1,055,000 REHAB OF CULVERT S-08-004 OVER SHARON- INTERSTATE MAINTENANCE & RELATED WORK ON I-95 4,790,200 274,000 SHEFFIELD- GREAT BARRINGTON- RESURFACING & RELATED WORK ON ROUTE 7 (MM 0.0 TO MM 9.38) 5,363,000 -

SHIRLEY- UXBRIDGE- WORCESTER- STORMWATER RETROFITS ON ROUTE 2, ROUTE 2A, ROUTE 146 AND 260,645 695,053 ROUTE 122 SHREWSBURY- WORCESTER- BRIDGE REHABILITATION, S-14-001=W-44-018, STATE ROUTE 9 (BELMONT 10,800,000 - STREET) OVER LAKE QUINSIGAMOND (AKA - KENNETH F. BURNS BRIDGE) SOMERSET- PARK & RIDE EXPANSION ON ROUTE 103 356,750 - SOMERSET- RESURFACING & RELATED WORK ON ROUTE 103 2,381,187 - SOMERVILLE- BRIDGE REPLACEMENT, S-17-025, ROUTE 28 (MCGRATH HIGHWAY) OVER GILMAN STREET 7,330,000 - (AKA - GILMAN STREET BRIDGE) SOMERVILLE- CAMBRIDGE- RECONSTRUCTION OF BEACON STREET, FROM OXFORD STREET TO 1,913,666 6,697,832 CAMBRIDGE C.L. SOMERVILLE- IMPROVEMENTS AT HEALEY SCHOOL (SRTS) 82,605 826,052 SOMERVILLE- MULTI-USE PATH CONSTRUCTION, FROM CEDAR STREET TO LOWELL STREET (PHASE I) 60,000 -

SOUTHBRIDGE- BRIDGE PRESERVATION, S-21-002, ROUTE 131 (MAIN STREET) OVER 798,281 3,725,310

SPRINGFIELD- BRIDGE PRESERVATION, S-24-077, ROUTE I-291 OVER PAGE BOULEVARD 2,098,000 726,638 SPRINGFIELD- NORTH END & BRIGHTWOOD INFRASTRUCTURE IMPROVEMENTS, FROM OSGOOD STREET 594,379 5,943,793 TO THE CHICOPEE C.L. (NORTHERLY SEGMENT) SPRINGFIELD- SIGNAL & INTERSECTION IMPROVEMENTS AT SUMNER AVENUE, ALLEN STREET, ABBOTT 75,000 - STREET & HARKNESS AVENUE SPRINGFIELD- VIADUCT DECK REPLACEMENT OF S-24-061 ON I-91 (EARLY ACTION) 60,550,000 115,028,015 STATEWIDE - REAL TIME TRAVEL MONITORING SYSTEM (RTTM) 12,100,000 1,503,472 STATEWIDE- ALL-ELECTRONIC TOLLING SYSTEM (AETS) ON I-90 & THE HARBOR CROSSINGS (DESIGN- 60,000,000 34,585,000 BUILD) STATEWIDE- CONVERSION OF INTERSTATE AND FREEWAY EXIT NUMBERS TO MILEPOST-BASED 1,138,473 5,123,127 STATEWIDE- IMPLEMENTATION (PHASE III) OF THE FLASHING YELLOW ARROW AT SIGNALIZED 328,800 1,479,600 INTERSECTIONS--ONE OF THE "FHWA NINE PROVEN COUNTERMEASURES" STATEWIDE- INTERCHANGE RAMP SIGN & PAVEMENT MARKING UPGRADES 834,382 - STATEWIDE– MANUFACTURE & INSTALLATION OF TOLL MODULAR BUILDINGS IN SUPPORT OF THE ALL- 1,215,928 - ELECTRONIC TOLLING SYSTEM

51

Highway Division

16 17 + beyond STATEWIDE- REPLACEMENT OF VARIABLE MESSAGE SIGNS (VMS) 127,972 4,351,063 STERLING- BRIDGE JOINTS REPAIRS AND BEAM-END REPAIRS AT 5 BRIDGES ON I-190 6,500,000 168,167 STONEHAM- WINCHESTER- WOBURN- TRI-COMMUNITY BIKEWAY INCLUDING NEW BRIDGE, W-43-029, OVER 560,724 4,766,156 THE STURBRIDGE- CLEAN & PAINT BRIDGES ALONG I-84 CORRIDOR 6,000 - STURBRIDGE- RESURFACING AND RELATED WORK ON ROUTE 20, FROM ROUTE 49 TO I-84 1,031,974 1,805,954 SUTTON- INTERSECTION IMPROVEMENTS @ ROUTE 146 & BOSTON ROAD 1,800,000 - SWANSEA- SUPERSTRUCTURE REPLACEMENT, S-35-018, I-195 (EB/WB) OVER THE 2,610,345 - TAUNTON- BRIDGE REPLACEMENT, T-01-015, WASHINGTON STREET (SR 140) OVER THE MILL RIVER 2,356,787 219,375

TAUNTON- RECONSTRUCTION ON COUNTY STREET (ROUTE 140), FROM THE ROUTE 24 (SB OFF-RAMP) 428,332 1,927,494 NORTHERLY TO MOZZONE BOULEVARD TEWKSBURY- RESURFACING & RELATED WORK ON ROUTE 38 1,865,205 - UXBRIDGE- SUPERSTRUCTURE REPLACEMENT, U-02-024, ST 122 (MILLVILLE ROAD) OVER PWRR 680,640 1,276,201 WAREHAM- BRIDGE REPLACEMENT, W-06-002, PAPER MILL ROAD OVER 161,532 1,696,081 WAREHAM- ROCHESTER- RESURFACING & RELATED WORK ON ROUTE 28, FROM ROUTE 6 TO ROUTE 58 4,997,361 154,382

WARREN- RESURFACING & INTERSECTION IMPROVEMENTS AT ROUTE 67 & ROUTE 19 (TOWN CENTER) 347,519 1,563,835

WARREN- RESURFACING & RELATED WORK ON ROUTE 67 @ WEST WARREN & WARREN TOWN CENTERS 111,302 1,113,018

WASHINGTON- RECONSTRUCTION OF WASHINGTON MOUNTAIN ROAD, FROM BECKET T.L. TO THE DALTON 6,900,000 - T.L. WAYLAND- SIGNAL & INTERSECTION IMPROVEMENTS AT ROUTE 27 (MAIN STREET) AND ROUTE 30 197,499 1,974,989 (COMMONWEALTH ROAD) WEST BRIDGEWATER- BRIDGE REPLACEMENT, W-18-012, ROUTE 106 (WEST CENTER STREET) OVER THE 401,885 4,219,793 WEST BRIDGEWATER- INTERSECTION IMPROVEMENTS AT ROUTE 106 & ROUTE 28 (CENTRAL SQUARE) 1,333,463 -

WEST SPRINGFIELD- CONNECTICUT RIVERWALK & BIKEWAY EXTENSION, FROM ELM STREET TO ASHLEY 272,264 816,791 AVENUE WEST SPRINGFIELD- HOLYOKE- EASTHAMPTON- NORTHAMPTON- HATFIELD- WHATELY- DEERFIELD- 4,038,136 - GREENFIELD- BERNARDSTON- GUIDE & TRAFFIC SIGN REPLACEMENT ON I-91 WEST SPRINGFIELD- SUPERSTRUCTURE REPLACEMENT, W-21-025, SR 147 (WB/EB) (MEMORIAL AVENUE) 4,900,000 - OVER (US 5) RIVERDALE STREET (DESIGN-BUILD) WEST SPRINGFIELD- WESTFIELD- GUARDRAIL UPGRADES & RELATED WORK ON SECTIONS OF I-90, 2,764,015 - BETWEEN MM 40.0 AND MM 46.0

52

Highway Division

16 17 + beyond WEST STOCKBRIDGE- BRIDGE REPLACEMENT, W-22-004, ROUTE 41 (GREAT BARRINGTON ROAD) OVER 1,570,000 612,887 WILLIAMS RIVER WEST STOCKBRIDGE TO AUBURN- GUIDE & TRAFFIC SIGN REPLACEMENT ON I-90 (MASSPIKE) 5,135,441 2,934,538 WEST TISBURY- INTERSECTION IMPROVEMENTS AT STATE ROAD (VINEYARD HAVEN ROAD) AND OLD 15,000 - COUNTY ROAD WESTBOROUGH- SOUTHBOROUGH- RESURFACING AND RELATED WORK ON ROUTE 9 5,600,000 1,150,000 WESTFIELD- BRIDGE DECK & JOINT REPAIRS ON 8 BRIDGES ON I-90, BETWEEN WEST RD & SOUTHAMPTON 743,129 2,415,169 RD (ROUTES 10/202) WESTFIELD- RECONSTRUCTION OF ROUTE 187 (FEEDING HILLS ROAD), FROM 400 METERS EAST OF OLD 1,105,000 - FEEDING HILLS ROAD TO AGAWAM T.L. (.73 MILES) INCLUDES REHAB OF W-25-054 & W-25055 CULVERTS

WESTFORD- RECONSTRUCTION OF ROUTE 110 AT BOSTON ROAD AND CARLISLE ROAD (MINOT'S CORNER) 35,999 -

WESTMINSTER- DECK REPLACEMENT, W-28-023, ROUTE 2A/140 OVER ROUTE 2 1,031,742 2,210,876 WESTON- BRIDGE PRESERVATION ALONG I-90 1,190,307 510,132 WESTON- STATE POLICE STATION REPLACEMENT ON I-90 1,900,000 - WESTON TO BRAINTREE- BRIDGE RECONSTRUCTION OF W-29-018 & DECK, JOINT & STRUCTURAL REPAIRS 801,360 - & RELATED WORK OF 7 BRIDGES ALONG I-93/US 1 & I-95/ST 128 WESTPORT- RESURFACING & RELATED WORK ON ROUTE 88 3,979,489 - WESTWOOD- SAFE ROUTES TO SCHOOL (DOWNEY SCHOOL) 393,598 - WEYMOUTH- ABINGTON- RECONSTRUCTION & WIDENING ON ROUTE 18 (MAIN STREET) FROM HIGHLAND 3,409,589 56,258,213 PLACE TO ROUTE 139 (4.0 MILES) INCLUDES REPLACING W-32-013, ROUTE 18 OVER THE OLD COLONY RAILROAD (MBTA) WEYMOUTH- BRAINTREE- RESURFACING & RELATED WORK ON ROUTE 3 8,250,000 - WEYMOUTH- NEW ROADWAY CONNECTION BETWEEN TROTTER ROAD AND EAST WEST PARKWAY 2,000,000 300,000 WILBRAHAM- RECONSTRUCTION OF BOSTON ROAD (ROUTE 20), FROM DUDLEY STREET TO 400 FT. EAST 81,198 1,136,771 OF DUMAINE STREET (0.28 MILES) WILLIAMSTOWN- BRIDGE REPLACEMENT, W-37-009, HOPPER ROAD OVER GREEN RIVER 1,425,000 1,000,000 WILMINGTON- INTERSECTION IMPROVEMENTS ON ROUTE 62 (MIDDLESEX AVENUE) @ GLENN ROAD AND 917,041 100,500 WILDWOOD STREET WILMINGTON- WOBURN- INTERSTATE MAINTENANCE & RELATED WORK ON ROUTE I-93 4,110,000 - WINCHENDON- BRIDGE REPLACEMENT, W-39-001, HARRIS ROAD OVER 134,250 2,953,507 WINCHENDON- MULTI-USE TRAIL CONSTRUCTION (NORTH CENTRAL PATHWAY - PHASE V) INCLUDES W-39- 1,291,000 - 023, W-39-024 & W-39-028 WINCHESTER- SIGNAL & IMPROVEMENTS AT 4 LOCATIONS ON CHURCH STREET & ROUTE 3 (CAMBRIDGE 2,354,608 - STREET) WOBURN- BRIDGE REPLACEMENT, W-43-003, SALEM STREET OVER MBTA 213,072 4,687,591

53

Highway Division

16 17 + beyond WORCESTER- BIKE PATH CONSTRUCTION, FROM TAINTER STREET TO KILBY STREET AND RESURFACING 2,010,000 - KILBY AND GARDNER STREETS WORCESTER- BLACKSTONE VISITOR CENTER & BIKEWAY (EARLY ACTION SITE WORK - PHASE I) 1,095,685 3,287,054 WORCESTER- BLACKSTONE VISITOR CENTER (PHASE II) 550,996 8,815,934 WORCESTER- BRIDGE RECONSTRUCTION, W-44-094, (SR 9) BELMONT STREET OVER I-290, INCLUDES 6,250,000 3,400,000 PEDESTRIAN BRIDGE WORCESTER- CONSTRUCTION AND RELOCATION OF DISTRICT 3 ADMINISTRATION BUILDING ON 5,141,991 11,684,258 PLANTATION PARKWAY WORCESTER- MAIN STREET BUSINESS DISTRICT STREETSCAPE IMPROVEMENTS 335,178 7,373,908 WORCESTER- MARLBOROUGH- GUIDE & TRAFFIC SIGN REPLACEMENT & RELATED WORK AT I-290 & ROUTE 1,800,000 - 85 CONNECTOR WORCESTER- RECONSTRUCTION OF LINCOLN STREET (ROUTE 70), FROM MARSH AVENUE TO PLANTATION 1,300,000 5,790,303 STREET (PHASE II) WORCESTER- STRUCTURAL REPAIRS & PAINTING ON I-290, INCLUDES W-44-108, W-44-107, W-44-106, W-44- 3,900,000 - 105, W-44-104, W-44-103 WORCESTER- WEST BOYLSTON- INTERSTATE MAINTENANCE & RELATED WORK ON I-190, INCLUDING W-44- 14,044,734 5,266,775 124, I-190 OVER ROUTE 12 & RAMP B WRENTHAM- BRIDGE PAINTING ON I-495 (NB & SB) 1,241,750 1,793,639 WRENTHAM- RESURFACING & RELATED WORK ON ROUTE 140, FROM THE FRANKLIN/WRENTHAM T.L. TO 10,000 - THE FOXBOROUGH/WRENTHAM T.L. $ 1,628,096,700 $ 1,329,012,519

Notes: 1: It should be noted that this list includes all projects managed by the Highway Division. Some elements of these projects impact MBTA or Rail and Transit property. The total value of Highway work is $ 1,560,867,427 2: These totals reflect construction spending only. Overhead cost for design, right-of-way acquisition, environmental permitting etc. are not included in these figures.

54 Planning and Enterprise Services

Investment description 16 General Services 3,000,000 ISA Spending 3,000,000 Office of Security and Emergency Management 1,500,000 Office of Transportation Planning 26,000,000 GIS support services 1,055,680 Long-range transit plans 785,324 South Station Expansion FEIR 9,046,000 Research initiatives 2,019,698 Healthy transportation 603,052 Management of corridor studies Examples of planning activities 1,604,948 Assistance on corridor studies 1,050,151 Technical oversight and assistance 671,460 Massachusetts Technical Assistance Program (MTAP) 602,181 Local Technical Assistance Program (LTAP) 1,039,928 IT 17,500,000 Queuing System Replacement 400,000 IT Infrastructure and Facilities Lifecycle Management 4,200,000 Highway Transportation Asset Management Program (TAM) 3,400,000 Highway Call Center 200,000 New Security Identification System 500,000 Information security / Payment card industry compliance 1,100,000 Permits 2,000,000 Licensing System Integration 3,600,000 Crash Report Replacement 2,100,000 $ 51,000,000 FHWA Funding $ 22,800,000

55 Registry of Motor Vehicles

Investment description 16 17 + beyond ALARS 34,450,000 41,800,000 Design study at the CCRTA to move Cape Branch 300,000 - Electronic Filenet Doc Storage 3,500,000 - Kiosks-Branch check in and Transactions 400,000 - $ 38,650,000 $ 41,800,000

56 Rail and Transit Division / Rail

Investment description 16 16 bond cap 17 + beyond Acquire & Fit Out SE Mass Maintenance Facility (Rochester) 150,000 150,000 - Ballast Cars -- Lease 108,000 108,000 109,000 Ballast Cars -- Purchase 100,000 100,000 3,100,000 Berkshire Line - Basic Track Rehabilitation (37 miles) 1,000,000 1,000,000 6,500,000 Berkshire Line - Emergency Bridge Repairs & Bridge Monitoring 2,000,000 2,000,000 3,500,000 Cape Cod & Southeast Mass Rail Lines Additional Track / ROW & Grade Crossing Improvements 150,000 150,000 - Capital Repairs/improvements So Deerfield Maint. Depot 250,000 250,000 - Engineering Task Order Contracts 750,000 750,000 17,500,000

Fall River - Limited Track Rehabiitation 750,000 750,000 - Fall River - Wharf Yard and Runaround (South Extension) 1,000,000 1,000,000 - Falmouth Depot 1,000,000 1,000,000 - Field Inspection and Design Task Order Contract 250,000 250,000 1,500,000 Framingham Secondary - Rebuild Track Walpole to Foxboro 1,000,000 1,000,000 - Framingham Secondary - Track Rehab Framingham to Walpole (18 miles) 2,000,000 2,000,000 4,000,000 Framingham Secondary Walpole Interlocking Modifications 500,000 500,000 - Freight Rail Inspection and Heavy Repair - Framingham Secondary 500,000 500,000 1,500,000 Freight Rail Inspection and Heavy Repair - Middleboro Secondary 500,000 500,000 1,500,000 Grade Crossings - FHWA Section 130 Crossing Safety funds 9,000,000 - - Industrial Rail Access Program 2,500,000 2,500,000 6,500,000 Marine Transporation Capital Reinvestment 500,000 500,000 750,000 PRIA: Springfield 4,000,000 4,000,000 12,500,000 PRIA: Vermonter 1,000,000 1,000,000 4,150,000 Rail Asset Management / Oversight Support Task Order Contract 250,000 250,000 250,000 Secondary Line - Palmer - Barre Track Safety and Rehabilitation 300,000 300,000 - Watuppa Line (Dartmouth) Track Rehabilitation (MP 0.20 - MP 10.66) 900,000 900,000 500,000 $ 30,458,000 $ 21,458,000 $ 63,859,000

57 Rail and Transit Division / Transit

Outstanding capital funding requests 16 RTA Total FTA funds 16 MAP 16 Intercity Berkshire Regional Transit Authority 507,200 906,800 - - Brockton Area Transit Authority 204,600 - - - Transportation Authority 829,776 530,089 - - Cape Cod Regional Transit Authority 403,686 3,748,186 - - Franklin Regional Transit Authority 247,386 - - - Greater Attleboro-Taunton Regional Transit Authority 358,500 4,837,872 - - Lowell Regional Transit Authority 2,048,341 4,295,352 - - Martha's Vineyard Regional Transit Authority 1,655,000 - - - Regional Transit Authority 1,519,800 10,807,065 - - MetroWest Regional Transit Authority 2,578,265 433,056 - - Montachusett Regional Transit Authority 814,500 846,000 - - Nantucket Regional Transit Authority 677,500 - - - Newburyport Parking Garage 5,000,000 Transit Authority 9,565,162 384,855 - - Southeastern Regional Transit Authority 2,231,694 1,917,586 - - Worcester Regional Transit Authority 246,139 11,138,276 - - Statewide discretionary - 8,248,988 4,592,739 2,160,000 $ 28,887,549 $ 48,094,125 $ 4,592,739 $ 2,160,000

58 MBTA

Investment description 16 17 + beyond Beverly Garage 601,139 - Casey Overpass - Highway 7,939,220 5,084,229 Chelsea Silver Line BRT - Phase I Highway 23,228,478 11,614,239 Commonwealth Ave. Bridge 1,000,000 1,454,176 DMU Implementation (planning) 300,000 - Energy Conservation 11,500,000 - Fitchburg Line - Wachusett Extension 5,412,423 2,785,948 GLX Mitigation Costs 12,757,400 55,204,479 Green Line Extension 151,788,470 632,065,812 Green Line Extension to Route 16 8,100,000 182,000,000 Green Line Real - Time Tracking System 7,408,843 - Knowledge Corridor 3,900,000 31,450,000 Map Replacement 902,442 - Red & Orange Line Infrastructure Improvements 23,905,391 - Red & Orange Line Vehicle Procurement 79,230,000 250,473,645 Salem Parking Garage 7,156,383 - South Coast Rail - Highway 28,076,859 5,171,418 South Coast Rail - MBTA 16,113,591 97,870,140 South Station 664,465 - Worcester - Framingham 12,153,104 - $ 402,138,208 $ 1,275,174,086

59