UPDATE

• Business Case released in February • Fully funded • Major EOIs out to market – Tunnel & Stations PPP and Rail Systems • Enabling and Early Works contract being awarded soon • EES now on exhibition

56

ENVIRONMENT EFFECTS STATEMENT

• Melbourne Metro is being assessed via an Environment Effects Statement (EES) under the Environment Effects Act 1978 • EES assesses a concept design and has adopted a performance-based approach – output is Environmental Performance Requirements • Environmental Management Framework (EMF) developed through the EES and contains the Environmental Performance Requirements (EPRs) • MMRA setting up an Environmental Management System (EMS) to track and monitor performance

59 WHAT’S IN THE EES?

• Description of the proposed project • Outline of public and stakeholder consultation • Assessment of potential environmental, social and economic effects, by precinct • Environmental Performance Requirements • Environmental Management Framework (EMF) • Draft Planning Scheme Amendment • Urban Design Strategy • Sustainability approach

60

DOMAIN: ROAD CHANGES DURING CONSTRUCTION

• Construction of Domain station will be staged to reduce impacts on the road and network • As a minimum, one tram track, one bike lane and one traffic lane in each direction will be provided along St Kilda Road during construction. • Domain Road, between St Kilda Road and Dallas Brooks Drive, will be temporarily closed to and traffic while the station is built. • Route 8 trams proposed to divert via Toorak Road West.

63

DOMAIN: ROAD CHANGES POST CONSTRUCTION

• Closure of the southern arm of Albert Road at its intersection with St Kilda Road, with access to buildings maintained • Domain Interchange relocated to sit above Domain station • Reconfiguration of tram stops in the precinct • Provision of new pedestrian crossings along St Kilda Road, aligned with the new station and tram stops • Removal of the existing outer separator traffic islands separating traffic lanes along St Kilda Road in the vicinity of Domain station • Reconfiguration of traffic lanes along St Kilda Road between the intersections with Domain Road and Toorak Road West

65

TRANSPORT MANAGEMENT STRATEGY

General approach across Project: −Package approach/framework −Considers whole project lifecycle

Planning and Co-ordination - regular meetings and discussions between key stakeholders . Communications and Media - a comprehensive strategy [Inform] Travel Demand Management (TDM) - a TDM strategy with a programme response to encourage people to travel differently from their current, car based, behaviour. [Engage/Interact] Infrastructure - a package of network improvements on diversion routes, and other infrastructure based measures. Operational Plans - during the works a clear set of operational responses to incidents and activities on the network and provide business continuity; maintain network resilience 14

67

71 PROMOTING THE EES

• Advertisements in metro and local papers • Facebook and Google advertising • Ads in Arabic, Chinese, Greek, Vietnamese and Indian newspapers • Newsletters sent to 105,000 addresses • Direct mail sent to approximately 25,000 addresses • eNews, social media and website updates • Over 400 postcards have been handed out with information session dates and times • Information on the City of Port Phillip website • Media event with the Premier and the Minister for Public Transport

72 COMMUNITY INFORMATION SESSIONS

• Wednesday 1 June, 5-8pm: State Library of Victoria, • Wednesday 15 June, 5-8pm, Seasons Botanic Gardens, Experimedia Room, 328 Swanston Street, Melbourne 348 St Kilda Road, Melbourne • Thursday 2 June, 11am-2pm: University of Melbourne, • Saturday 18 June, 11am-2pm: Melbourne Town Hall, 90- Alan Gilbert Building (building 104), Room G20, 161 Barry 130 Swanston Street, Melbourne Street (cnr Barry and Grattan streets), Carlton • Tuesday 21 June, 11am-2pm: Melbourne Town Hall, 90- • Thursday 2 June, 5-8pm: Rydges on Swanston, Level 4, 130 Swanston Street, Melbourne 701 Swanston Street, Carlton • Friday 24 June, 5-8pm: Kensington Recreation Centre, cnr • Saturday 4 June, 1-4pm: Kensington Recreation Centre, Kensington Rd & Altona St, Kensington cnr Kensington Rd & Altona St, Kensington • Saturday 25 June, 11am-2pm: Punthill, 7 Yarra Street, • Tuesday 7 June, 5-8pm: Punthill, 7 Yarra Street, South South Yarra Yarra • Tuesday 28 June, 5-8pm: Seasons Botanic Gardens, 348 • Thursday 9 June, 5-8pm: Lithuanian Club, 44 Errol Street, St Kilda Road, Melbourne North Melbourne

73 EES EXHIBITION LOCATIONS

• City of Maribyrnong offices: 61 Napier Street, Footscray • State Library of Victoria: 328 Swanston Street, Melbourne • City of Melbourne Library – North Melbourne: 66 Errol • City of Port Phillip Library – Emerald Hill: 195 Bank Street, North Melbourne Street, South Melbourne • City of Melbourne Library – CBD: 253 Flinders Lane, • City of Stonnington Library – South Yarra: 340 Toorak Melbourne Road, South Yarra • Melbourne Town Hall: Administration Building, 120 Swanston Street, Melbourne

74