[Stadium]

Knoxville Tennessee USA

eyland Stadium (pronounced NEE-land) is a sports BIM Start Date: January, 2018 Nstadium in Knoxville, Tennessee, United States. It serves BIM End Date: January, 2018 primarily as the home of the football team, but is also used to host large conventions and Average Team Size: 5 Engineers has been a site for several (NFL) exhibition games. The stadium's official capacity is 102,455. Structural Engineer RBA Structural Engineering LLC* Constructed in 1921 and originally called Shields–Watkins Field, Owner/Developer: the stadium has undergone 16 expansion projects reaching a capacity of 104,079 before being slightly reduced by Pinnacle's Value Addition alterations. One of 's most iconic landmarks, Neyland Stadium is the fifth largest stadium in the United 1. Provided accurate, reliable and cost effective solutions States, the sixth largest stadium in the world and the second through the performance of analysis based on overall systems largest stadium in the . The stadium 2. Validated design for constructability, performance and is named for Robert Neyland, who served three stints as head maintenance of various structures like column size, structural football coach at the University of Tennessee between 1926 openings, beam depths and clashes and 1952. BIM was used for developing the stadium consisting 3. Make a comprehensive analysis of detailed structural of 6 floors. elements like columns, beams and floors for delivering project The levels included - in a risk free environment A. 1947 South Stand Addition - Ground Floor Plan, 2nd - 6th 4. Digital Version of the Drawings facilitated 3D Model Floor Framing Plan Creation B. 1971 South End Zone - Upper Concourse Floor Plan, Seating Deck Plan, Lower Concourse Plan, Deck Framing Top & Bottom “Responsive to comments and questions. Delivered on time Chord, Framing Upper & Lower Concourse, Steel framing Vertical Provided services met expectations" Detail, Bracing Detail, Foundation Plan (2), Ramp Plan C. 1999 Jumbo Tron CD.PDF - Plan & Detail Client Feedback Trades Covered: Structure LOD: 300 Software Used: Revit 2017 Scope of Work Our scope of work for the project included: 1. 3D Model Creation at LOD 300 - As-Built Structural 3D Model Creation including Concrete Wall, Footing, Slab, Column, Beam, Metal Deck, Steel Framing & Step

Challenges & Solutions

Challenge - Input Inconsistency - Proper Drawing Interpretation due to Poor Input Quality - We worked on this project based on the hand-drawn as-built documents of 1947. It was challanging for us to do the proper interpretation of the drawing as the input quality was poor. Solution - We raised 20 RFIs and clarifications with our markups and offered intelligent solution to get the quick and appropriate answer.

Global Leader in BIM Engineering www.pinnaclecad.com Copyright © 2019 Pinnacle Infotech