NDSP4 & MPP9 WORKS PROGRAMME IMPLEMENTATION IN THE NINE NIGER DELTA STATES

LEGACY BOOK

EUROPEAN UNION (EU) NIGER DELTA SUPPORT PROGRAMME COMPONENT 4 (NDSP4) IN

No 8, Barrister Obinna Okwara Crescent/Plot 37 Chief Executive Quarters, Opposite Ahiajoku Convention Centre. Area B, New Owerri, Imo State. DELTA STATE EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019

DELTA STATE MAP

ETHIOPE EAST

NDOKWA WEST

BURUTU EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019 DELTA STATE

Publication: NDSP4/011/09/2019

TABLE OF CONTENTS

FOREWORD 4 PROGRAMME OVERVIEW 5 WORKS CONTRACT OVERVIEW 8 PROGRAMME IMPLEMENTATION TEAM 10 DETAILS OF NDSP4 PROGRAMME IN DELTA STATE • STAKE HOLDERS TEAM 11 • PROJECT LIST 12 & 13 • PHOTOGRAPH OF IMPLEMENTED PROJECTS 14

Page 3 DELTA STATE EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019

FOREWORD

The NDSP4 Publication series is an attempt to bring some of our key reports and consultancy reports to our stakeholders and a wider audience.

The overall objective of the Niger Delta Support Programme (NDSP) is to mitigate the conflict in the Niger Delta by addressing the main causes of the unrest and violence: bad governance, (youth) unemployment, poor delivery of basic services. A key focus of the programme will be to contribute to poverty alleviation through the development and support given to local community development initiatives.

The NDSP4 aims to support institutional reforms and capacity building, resulting in Local Gov- ernment and State Authorities increasingly providing infrastructural services, income gener- ating options, sustainable livelihoods development, gender equity and community empow- erment. This will be achieved through offering models of transparency and participation as well as the involvement of Local Governments in funding Micro projects to enhance impact and sustainability. Specifically, 863 community projects are expected to be implemented as part of the EU support to community development in the Niger Delta.

By the end of August 2019, some 690 out of the 863 micro-projects had been completed and accepted.

In addition, under the NDSP4 Service Contract, 330 uncompleted projects were taken up un- der an addendum No.1 to the contract (mpp9) and successfully completed 302 by the end of December 2017; the remaining 28 were carried over to NDSP4 Works contract-2.

Kingsley Fossu Team Leader – NDSP4

Page 4 EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019 DELTA STATE

PROGRAMME OVERVIEW

NDSP Component 4 (NDSP4) NDSP4 is an extension of MPP9 and is building on its achievement, focussing on focal com- munities and capable and reform-minded Local Government authorities. This component is implementing micro-projects co-funded with Local Governments, which will contribute to building the capacity of local governments in service delivery to the poor and to strength- ening the partnership between Government authorities and communities. By implementing Micro-Projects in a wide range of communities, the programme aims to improve the delivery of social and economic services and to sensitise communities to demand good governance through the community participatory planning and development.

NDSP4 includes allowance for community-based action in support of conflict prevention/ management or addressing other issues of relevance to the affected communities, including environmental improvements.

The Objective of NDSP Component 4 is to support local communities’ development initiatives and conflict alleviation by completing the 9th EDF MPP9 project, which has a financial short- fall. Expected results to be achieved are:

Result 1: Strengthened Community Governance through adoption of Community Development Action Plans by Communities and Local Government authorities. Result 2: Increased equitable access to basic infrastructure services by women and men. Result 3: Increased equitable access to income generating options and sustainable livelihood development by women and children. Result 4: Improved social cohesion among village communities.

Management Structure The MBNP, represented by the National Authorising Officer (NAO), is the FGN implementation agency and is supported by the following management structure: • National Project Steering Committee (PSC) • State Level Project Stakeholders Coordination Committee (SLPSCC) • Project Implementation Management Unit (PIMU): • Implementation Field Offices (IFOs) • Micro-Projects Implementation Committees (PICs)

Page 5 DELTA STATE EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019

Funding Arrangement The funding arrangement was based as follows: • Total EU Funding: €45,000,000.00 (for works/Services) • European Union: €25,905,000.00 (50% for works) • LGAs: €12,952,500.00 (25% for works) • Communities: €12,952,500.00 (25% in kind) • States: To facilitate, coordinate and monitor projects.

Micro Projects Categories Menu of proposed micro projects under NDSP-C4 include: • Basic Water Supply and Sanitation infrastructure, • Health Centres, • Educational Infrastructure, • Civic Centres/Town Halls and • Income Generating Infrastructure (Palm Oil Mills, Cassava Mills) • Open and Lock-up Markets, etc.

NDSP4 Achievement and Challenges So Far Below are Achievements of NDSP4 since its inception in January 2014: • Completion of the 9th MPP9 project under NDSP4 Additional Services contract with over 90% completion rate. • Facilitated the successful selection of NDSP4 LGAs and communities with the support of the nine ND States. • Sensitisation of key stakeholders on NDSP4 for awareness creation and seamless partici- pation. • Establishment of SLPSCCs & PICs in the nine ND States and communities for programme coordination, implementation and sustainability. • Successful procurement of works contractors (Lots 1 to 9) for construction of over 860 MPs via Works Contract 1 and Works Contract 2 in the nine ND States with high success in contract execution. • Preparation and Implementation of Programme Estimate 1 to facilitate full participation of key stakeholders (Communities, CSOs, State and LGA officials, etc.) in NDSP4. • Implementation of a robust visibility and communication action plan to create programme awareness and information dissemination via production and distribution of NDSP4 vis-

Page 6 EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019 DELTA STATE

ibility materials and promotional items (brochures, folders, jotters, Tee shirts and Caps, pens etc.). • Development and regular update of NDSP4 website with mobile application software for upload of events and progress of work during field missions. • Widening the scope of NDSP4 visibility via creation of NDSP4 Facebook account and Twit- ter handle. • Capacity building of State, LGA and communities on procurement, project monitoring, management, operation and maintenance of water and agro processing mills. • Commissioned study and publication of key stakeholders’ engagement on the sustaina- bility of provided micro projects facilities. • Main challenge is late commencement of construction work and delay by LGAs in the dis- charge of their counterpart contribution.

Related Programmes/Donor Activities in ND There are similar initiatives in the Niger Delta region funded by the EU and other international donor agencies that are targeted towards alleviating poverty and conflict. The donors and agencies include CIDA, UNDP, DFID, WHO, USAID etc.

For Further Information, Please Contact:

1. Kingsley Fossu (Team Leader) 2. Engr. Uwadiale, Oziegbe Wisdom (Chief Engineer) Email: [email protected] Phone: 08035439955 Phone: 09031271414 [email protected]

Office Address: Project Implementation Unit (PIMU), No. 8 Barrister Obinna Okwara Crescent, Plot37 Chief Executive Quarters, Area B, New Owerri, Imo State. Website: www.ndsp4.org Facebook: www.facebook.com/NDSP4 Twitter Handle: @EU-NDSP4

Page 7 DELTA STATE EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019

WORKS CONTRACT OVERVIEW

NDSP4 WORKS CONTRACT & CONSTRUCTION PROGRESS.

1) Overview of NDSP4 Works Contracts (Works Contract-1 & Works Contract-2) The NDSP4 works contracts are construction contracts comprising buildings and water projects. They are micro projects of basic standards. Building project; The walls are made of sand Crete block and the surface is rendered with cement-sand mortar finishing. The roof structural members are wood cov- ered with long span aluminium roofing sheets finished with wooden fascia boards. The ceiling sheets are cements fibre materials. The windows are made of aluminium casement and the doors are made of metals with transom. The floor is finished with cement / sand mortar screeded on a concrete damp proof course (DPC) except health center buildings which are finished with tiles. The walls and ceilings are painted with emulsion paint. Water project; The water project is a basic standard motorized bore- hole powered by solar energy. The tank stand is a steel structure with base plate bolted to concrete foundation footing with anchor bolts. The water tanks are plastic tanks with in-let and out-let units for water supply and distribution services. The solar power system is automatic in operation with the CU200 panel. This system is protected against thunder by proper earthing system. The water distribu- tion point is constructed with block and concrete structure with three battery taps units. The projects types include; solar powered motorised borehole, school block, health post, civic center, market stall, cassava mill and palm oil mill.

NDSP4 Works Contract 1 (WC1) & Works Contract 2 (WC2); A total of 863 numbers of community pro- jects were planned to be implemented as part of the EU support to community development in the Niger Delta. Of these, 579 projects were awarded in 9 Lots in the first tranch as Works Contract -1 (WC1). A total of 254 projects were also awarded in 8 Lots for the second tranch as Works Contract – 2 (WC2) except in Cross River State where a balancing 30 projects are yet to be awarded under WC2. These have been achieved through offering models of transparency and participation as well as the involvement of States in coordination and Local Governments in funding Micro projects to enhance impact and sustainability.

Outstanding MPP9 construction completion activities; Micro Projects Programme in the Nine Niger Delta States (MPP9) was the preceding programme before NDSP4. The outstanding part of uncom- pleted works in MPP9 was awarded to the consultant as addendum to their contract to provide su- pervision activities for the remaining MPP9 projects that were not completed during the life span of the programme. When the addendum contract (NDSP4-Addendum No.1) ends in June 2017, there were still residual of MPP9 construction activities not completed. The NDSP4 main part has technically provided supervision services for the MPP9 residual works since June 2017. The works done on the residual of MPP9 construction completion activities are clearly outlined.

MPP3, MPP6 and MPP9 Inventory Documentation: Additional activities of inventory documentation of MPP3, MPP6 and MPP9 have been added to NDPS4 assignment as part of its deliverables. Experts have been fully mobilized to site on the 18th June 2019 to commence these activities in the Nine Niger Delta States. The result of this assignment will provide detailed data of all completed projects under Micro Projects Programme in the Three Niger Delta States (MPP3 – Bayelsa, Delta & Rivers), Micro Pro-

Page 8 EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019 DELTA STATE

jects Programme in the Six Niger Delta States (MPP6 – Abia, Akwa-Ibom, Cross River, Edo, Imo & Ondo) and Micro Projects Programme in the Nine Niger Delta States (MPP9 - Abia, Akwa-Ibom, Bayelsa, Cross River, Delta, Edo, Imo, Ondo & Rivers State)

Page 9 DELTA STATE EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019

IMPLEMENTATION TEAM

S/N STATE NAMES OF EXPERTS DESIGNATION OF EXPERTS

1 All States Kingsley Fossu Key Expert – 1 (Team Leader)

2 All States Engr. Uwadiale, Oziegbe Key Expert – 2 (Chief Engineer) Wisdom

3 All States Engr. Ibrahim Musa Key Expert – 3

4 All States Engr. Prosper Erah Coordinating Engineer

5 All States Mr. Henry Akinsulire Account & Contract Officer

6 Delta Engr. Egbuaba Nnodu Non-Key Expert (NKE)

Engr.Moluno Anthony Rural Infrastructure Engineer (RIE) Ndidi

Mrs. Juliet Gidiagba Project Assistance (PA)

Page 10 EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019 DELTA STATE

DELTA STATE

S/N DESIGNATION DURATION NAMES /MINISTRY/ DEPT.

1 GOVERNORS • 2014 • Emmanuel Eweta Uduagha

• 2015 - till date • Ifeayi Arthur Okowa

2 DEPUTY GOVERNORS • 2007 -2015 • Prof. Amos Utuma

• 2015 – till date • Kingsley Otuaro

3 COMMISSIONERS DELTA • 2014 -2015 • Kenneth Okpara STATE MINISTRY OF ECONOMIC PLANNING/ • 2015- May, 2019 • Kingsley Emu MINISTRY OF FINANCE • May, 2019 – till date • Barry Gbe

4 PERMANENT SECRETARIES • 2014-2015 • Gift Nikoro

• 2015-2018 • Ben Igo

• 2018-2019 • Monday Onyebuke (Acting)

• 2019-till date • Joe Odlogbi (Acting)

5 DESK OFFICERS • 2014 – 2019 • Mrs Patti Ogbewe

• 2014 -2019 • Mrs Atinor Evberedjo

Page 11 DELTA STATE EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019

NDSP4 PROJECTS COMPLETED DATA BASE FOR DELTA STATE

S/N Project Community Project LGA State Status ID 1 1 Kwale Civic centre Delta Completed 2 2 kwale School block Ndokwa West Delta Completed 3 3 Ogbe Ogume School block Ndokwa West Delta Completed 4 4 Inam Abbi School block Ndokwa West Delta Completed 5 5 Ebbamai Abbi Water Ndokwa West Delta Completed 6 6 Umusadege Ogbe Health centre Ndokwa West Delta Completed 7 7 Etua Ukpo Cassava mill Ndokwa West Delta Completed 8 8 Isumpe U/Unor School block Ndokwa West Delta Completed 9 9 Umuseti U/unor Water Ndokwa West Delta Completed 10 10 Ulogwe Isumpe Health centre Ndokwa West Delta Completed 11 11 Eweshi Onicha ukwani Cassava mill Ndokwa West Delta Completed 12 12 Igbe Ogume Health centre Ndokwa West Delta Completed 13 13 Umia Abbi Civic Centre Ndokwa West Delta Completed 14 14 Emu Uno Civic Centre Ndokwa West Delta Completed 15 15 Emu Ebeoma Cassava mill Ndokwa West Delta Completed 16 16 Umuseti Ogbe Health centre Ndokwa West Delta Completed 17 17 Emu Ebendo Lock-up market Ndokwa West Delta Completed 18 18 Oliogo Umuseti Water Ndokwa West Delta Completed 19 19 ogbole ogume Civic Centre Ndokwa West Delta Completed 20 20 Emu Obodeti Cassava mill Ndokwa West Delta Completed 21 21 Ibabu – Onicha Ukwuani Health centre Ndokwa West Delta Completed 22 22 Utagba-Ogbe School block Ndokwa West Delta Completed 23 1 Abraka P.O. Civic centre Delta Completed 24 2 Urhuoka School block Ethiope East Delta Completed 25 3 Erho- Abraka cassava mill Ethiope East Delta 26 4 Otorho Abraka Civic centre Ethiope East Delta Completed 27 5 Umeghe Abraka Civic centre Ethiope East Delta Completed 28 6 Oria Abraka Cassava mill Ethiope East Delta 29 7 Umeghe Abraka Civic centre Ethiope East Delta Completed 30 8 Okpara Inland Palm oil mill Ethiope East Delta 31 9 Okpara Inland Water Ethiope East Delta 32 10 Onude Okurekpo Civic centre Ethiope East Delta Completed 33 11 Imodje Health centre Ethiope East Delta Completed 34 12 Ovu Inland School block Ethiope East Delta Completed 35 13 Urhodo Ovu School block Ethiope East Delta Completed 36 14 Oviorie- Ovu Cassava mill Ethiope East Delta 37 15 Inland Cassava mill Ethiope East Delta 38 16 Igun Water Ethiope East Delta 39 17 Okpara w/s Palm oil mill Ethiope East Delta

Page 12 EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019 DELTA STATE

40 18 Eku School Block Ethiope East Delta Completed 41 19 Egbo Kokori School block Ethiope East Delta Completed 42 20 School block Ethiope East Delta Completed 43 21 Umeghe Health centre Ethiope East Delta Completed 44 22 Umiaghwa School block Ethiope East Delta Completed 45 1 Obotebe ZionR School block Burutu Delta Completed 46 2 Obotebe R Water Burutu Delta 47 3 AyokoromoR School block Burutu Delta Completed 48 4 Agbodobri Health centre Burutu Delta 49 5 KenlogbeneR Civic centre Burutu Delta 50 6 LabuloueighaR Civic centre Burutu Delta Completed 51 7 ObotebeR Palm oil mill Burutu Delta 52 8 AtiriR Open market Burutu Delta Completed 53 9 TorugbeneR Water Burutu Delta 54 10 TamigbeR Civic centre Burutu Delta Completed 55 11 Tuomo Health centre Burutu Delta Completed 56 12 Oboro Civic centre Burutu Delta Completed 57 13 Edegbene Health centre Burutu Delta Completed 58 14 Aya OjoboR Health centre Burutu Delta Completed 59 15 OjoboR Water Burutu Delta 60 16 Bulou NdoroR Civic centre Burutu Delta Completed 61 17 EkogbeneR Civic centre Burutu Delta Completed 62 18 Kiagbodo Cassava mill Burutu Delta 63 19 BurutuR Water Burutu Delta 64 20 OfougbeneR Civic centre Burutu Delta 65 21 Bikorogha Palm oil mill Burutu Delta 66 22 EbiberegbeneR School block Burutu Delta Completed

Total No. of projects 66

Page 13 DELTA STATE EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019

COMMUNITIES/PROJECTS – DELTA STATE

(NDOKWA WEST)

No. 1 No. 2 COMMUNITY: UMUSEDELI KWALE COMMUNITY: OWESSI, KWALE PROJECT TYPE: CIVIC CENTRE PROJECT TYPE: EDUCATION BLOCK LGA / STATE: NDOKWA WEST, DELTA STATE LGA / STATE: NDOKWA WEST, DELTA STATE

No. 3 No. 4 COMMUNITY: OGBE OGUME COMMUNITY: INNAM ABBI PROJECT TYPE: EDUCATION BLOCK PROJECT TYPE: EDUCATION BLOCK LGA / STATE: NDOKWA WEST, DELTA STATE LGA / STATE: NDOKWA WEST, DELTA STATE

No. 5 No.6 COMMUNITY: EBBAMAI-ABBI COMMUNITY: UMUSADEGE OGBE PROJECT TYPE: WATER PROJECT TYPE: HEALTH CENTRE LGA / STATE: NDOKWA WEST, DELTA STATE LGA / STATE: NDOKWA WEST, DELTA STATE

Page 14 EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019 DELTA STATE

COMMUNITIES/PROJECTS – DELTA STATE

(NDOKWA WEST)

No. 7 No. 8 COMMUNITY: ETUA UKPO COMMUNITY: ISUMPE UTAGBA UNOR PROJECT TYPE: CASSAVA PROCESSING MILL PROJECT TYPE: EDUCATION BLOCK LGA / STATE: NDOKWA WEST, DELTA STAT LGA / STATE: NDOKWA WEST, DELTA STATE

No. 9 No. 10 COMMUNITY: UMUSETI UTAGBAI COMMUNITY: OLUGWE ISUMPE PROJECT TYPE: WATER PROJECT TYPE: HEALTH CENTRE LGA / STATE: NDOKWA WEST, DELTA STATE LGA / STATE: NDOKWA WEST, DELTA STATE

No. 11 No. 12 COMMUNITY: EWESHI COMMUNITY: IGBE OGUME PROJECT TYPE: CASSAVA PROCESSING MILL PROJECT TYPE: HEALTH CENTRE LGA / STATE: NDOKWA WEST, DELTA STATE LGA / STATE: NDOKWA WEST, DELTA STATE

Page 15 DELTA STATE EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019

COMMUNITIES/PROJECTS – DELTA STATE

(NDOKWA WEST)

No. 13 No. 14 COMMUNITY: UMIA-ABBI COMMUNITY: EMU-UNO PROJECT TYPE: CIVIC CENTRE PROJECT TYPE: CIVIC CENTRE LGA / STATE: NDOKWA WEST, DELTA STATE LGA / STATE: NDOKWA WEST, DELTA STATE.

No. 15 No. 16 COMMUNITY: EMU EBEOMA COMMUNITY: UMUSETI OGBE, KWALE PROJECT TYPE: CASSAVA PROCESSING MILL PROJECT TYPE: HEALTH CENTRE LGA / STATE: NDOKWA WEST, DELTA STATE LGA / STATE: NDOKWA WEST, DELTA STATE

No. 17 No. 18 COMMUNITY: UMU-EBENDO COMMUNITY: OLIOGO OMUSETI PROJECT TYPE: LOCKUP MARKET PROJECT TYPE: WATER LGA / STATE: NDOKWA WEST, DELTA STAT LGA / STATE: NDOKWA WEST, DELTA STATE

Page 16 EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019 DELTA STATE

COMMUNITIES/PROJECTS – DELTA STATE

(NDOKWA WEST)

No. 19 No. 20 COMMUNITY: OGBOLE OGUME COMMUNITY: EMU OBODETI PROJECT TYPE: CIVIC CENTER PROJECT TYPE: CASSAVA MILL LGA / STATE: NDOKWA WEST, DELTA STATE LGA / STATE: NDOKWA WEST, DELTA STATE

No. 21 No. 22 COMMUNITY: IBABU ONICHA UKWUANI COMMUNITY: UTABGBA-OGBE PROJECT TYPE: HEALTH POST PROJECT TYPE: EDUCATION BLOCK LGA / STATE: NDOKWA WEST, DELTA STATE. LGA / STATE: NDOKWA WEST, DELTA STATE

Page 17 DELTA STATE EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019

COMMUNITIES/PROJECTS – DELTA STATE

( ETHIOPE EAST )

No. 23 No. 24 COMMUNITY: ABRAKA P.O COMMUNITY: URHOKA PROJECT TYPE: CIVIC CENTRE PROJECT TYPE: EDUCATION BLOCK LGA / STATE: ETHIOPE EAST, DEALTA STATE LGA / STATE: ETHIOPE EAST, DELTA STATE

No. 25 No. 26 COMMUNITY: ERHO ABRAKA COMMUNITY: OTORHO ABRAKA PROJECT TYPE: CASSAVA PROCESSING MILL PROJECT TYPE: CIVIC CENTRE LGA / STATE: ETHIOPE EAST, DELTA STATE LGA / STATE: ETHIOPE EAST, DEALTA STATE

No. 27 No. 28 COMMUNITY: UMEGHE ABRAKA COMMUNITY: ORIA ABRAKA PROJECT TYPE: CIVIC CENTRE PROJECT TYPE: CASSAVA PROCESSING MILL LGA / STATE: ETHIOPE EAST, DELTA STATE LGA / STATE: ETHIOPE EAST, DELTA STATE

Page 18 EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019 DELTA STATE

COMMUNITIES/PROJECTS – DELTA STATE

( ETHIOPE EAST )

No. 29 No. 30 COMMUNITY: UMEGHE ABRAKA II COMMUNITY: OKPARA INLAND PROJECT TYPE: CIVIC CENTRE PROJECT TYPE: PALM OIL PROCESSING MILL LGA / STATE: ETHIOPE EAST, DELTA STATE LGA / STATE: ETHIOPE EAST, DELTA STATE

No. 31 No. 32 COMMUNITY: OKPARA INLAND COMMUNITY: ONODE PROJECT TYPE: WATER SCHEME PROJECT TYPE: CIVIC CENTRE LGA / STATE: ETHIOPE EAST, DELTA STATE LGA / STATE: ETHIOPE EAST, DELTA STATE

No. 33 No. 34 COMMUNITY: IMODJE COMMUNITY: OVU INLAND PROJECT TYPE: HEALTH POST PROJECT TYPE: EDUCATION BLOCK LGA / STATE: ETHIOPE EAST, DELTA LGA / STATE: ETHIOPE EAST, DELTA STATE

Page 19 DELTA STATE EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019

COMMUNITIES/PROJECTS – DELTA STATE

( ETHIOPE EAST )

No. 35 No. 36 COMMUNITY: URHODO OVU COMMUNITY: OVIORIE OVU PROJECT TYPE: SHOOL BLOCK PROJECT TYPE: CASSAVA MILL LGA / STATE: ETHIOPE EAST, DELTA STATE LGA / STATE: ETHIOPE EAST, DELTA STATE

No. 37 No. 38 COMMUNITY: KOKORI INLAND COMMUNITY: IGUN PROJECT TYPE: CASSAVA MILL PROJECT TYPE: WATER SCHEME LGA / STATE: ETHIOPE EAST, DELTA LGA / STATE: ETHIOPE EAST, DELTA STATE

No. 39 No. 40 COMMUNITY: OKPARA WATERSIDE COMMUNITY: EKU PROJECT TYPE: PALM OIL PROCESSING MILL PROJECT TYPE: EDUCATION BLOCK LGA / STATE: ETHIOPE EAST, DELTA STATE LGA / STATE: ETHIOPE EAST, DELTA STATE

Page 20 EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019 DELTA STATE

COMMUNITIES/PROJECTS – DELTA STATE

( ETHIOPE EAST )

No. 41 No. 42 COMMUNITY: EGBO KOKORI COMMUNITY: ISIOKOLO PROJECT TYPE: EDUCATION BLOCK PROJECT TYPE: EDUCATION BLOCK LGA / STATE: ETHIOPE EAST, DELTA STATE LGA / STATE: ETHIOPE EAST, DELTA STATE

No. 43 No. 44 COMMUNITY: UMEGHE ABRAKA COMMUNITY: UMIAGHWA ABRAKA PROJECT TYPE: HEALTH POST PROJECT TYPE: EDUCATION BLOCK LGA / STATE: ETHIOPE EAST, DELTA STATE LGA / STATE: ETHIOPE EAST, DELTA STATE

Page 21 DELTA STATE EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019

COMMUNITIES/PROJECTS – DELTA STATE

( BURUTU )

No. 45 No. 46 COMMUNITY: OBOTEBE ZION COMMUNITY: OBOTEBE PROJECT TYPE: SCHOOL BLOCK PROJECT TYPE: WATER SCHEME LGA / STATE: BURUTU, DELTA STATE LGA / STATE: BURUTU, DELTA STATE

No. 47 No. 48 COMMUNITY: AYOKOLOMO COMMUNITY: GBODOBIRI PROJECT TYPE: SCHOOL BLOCK PROJECT TYPE: HEALTH POST LGA / STATE: BURUTU, DELTA STATE LGA / STATE: BURUTU, DELTA STATE

No. 49 No. 50 COMMUNITY: KENLOGBENE COMMUNITY: LABULOUEIGHA PROJECT TYPE: CIVIC CENTRE PROJECT TYPE: CIVIC CENTRE LGA / STATE: BURUTU, DELTA STATE LGA / STATE: BURUTU, DELTA STATE

Page 22 EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019 DELTA STATE

COMMUNITIES/PROJECTS – DELTA STATE

( BURUTU )

No. 51 No. 52 COMMUNITY: OBOTEBE COMMUNITY: ATIRI PROJECT TYPE: PALM OIL PROCESSING MILL PROJECT TYPE: OPEN MARKET LGA / STATE: BURUTU, DELTA STATE LGA / STATE: BURUTU, DELTA STATE

No. 53 No. 54 COMMUNITY: TORUGBENE COMMUNITY: TAMIGBE PROJECT TYPE: WATER SCHEME PROJECT TYPE: CIVIC CENTRE LGA / STATE: BURUTU, DELTA STATE LGA / STATE: BURUTU, DELTA STATE

No. 55 No. 56 COMMUNITY: TUOMO COMMUNITY: OBORO PROJECT TYPE: HEALTH POST PROJECT TYPE: CIVIC CENTRE LGA / STATE: BURUTU, DELTA STATE LGA / STATE: BURUTU, DELTA STATE

Page 23 DELTA STATE EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019

COMMUNITIES/PROJECTS – DELTA STATE

( BURUTU )

No. 57 No. 58 COMMUNITY: EDEGBENE COMMUNITY: AYA OJOBO PROJECT TYPE: HEALTH POST PROJECT TYPE: HEALTH POST LGA / STATE: BURUTU, DELTA STATE LGA / STATE: BURUTU, DELTA STATE

No. 59 No. 60 COMMUNITY: OJOBO COMMUNITY: BOLOU NDORO PROJECT TYPE: WATER SCHEME PROJECT TYPE: CIVIC CENTRE LGA / STATE: BURUTU, DELTA STATE LGA / STATE: BURUTU, DELTA STATE

No. 61 No. 62 COMMUNITY: EKOGBENE COMMUNITY: KIAGBODO PROJECT TYPE: CIVIC CENTRE PROJECT TYPE: CASSAVA MILL LGA / STATE: BURUTU, DELTA STATE LGA / STATE: BURUTU, DELTA STATE

Page 24 EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019 DELTA STATE

COMMUNITIES/PROJECTS – DELTA STATE

( BURUTU )

No. 63 No. 64 COMMUNITY: BURUTU COMMUNITY: OFOUGBENE PROJECT TYPE: WATER SCHEME PROJECT TYPE: CIVIC CENTRE LGA / STATE: BURUTU, DELTA STATE LGA / STATE: BURUTU, DELTA STATE

No. 65 No. 66 COMMUNITY: BIKOROGHA COMMUNITY: EBIBEREGBENE PROJECT TYPE: PALM OIL PROCESSING MILL PROJECT TYPE: SCHOOL BLOCK LGA / STATE: BURUTU, DELTA STATE LGA / STATE: BURUTU, DELTA STATE

Page 25 DELTA STATE EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019

1. Description of LGAs Contribution

Facility to be S/No. Constructed Description of Works Details of Activities Projects Concerned • Excavation of Foundation; 0.45m wide x 0.60m deep The LGA shall Construct • Blinding and casting of foundation concrete; a perimeter fence 0.15m thick (350kg/m3) around the project • Construction of fence wall with 0.15m thick 1. Fence in Project where necessary. The cement/sand blocks up to 1.8m above ground All Projects Construction of the level. fence includes the • Construction, installation and finishing of steel following processes: entrance gates of 3.0m wide for all projects and 1.20m wide for borehole/water tower

• Construction of a simple building with Cement/sand blocks, timber roof trusses and Alu-zinc roofing sheets with overall dimensions 6.0m x 3.30m. The building comprises of not less than 4 units of squat toilets, 2 no each for men and women separated with central hand wash The LGA shall lobby. undertake the • Excavate Foundation; 0.45m x 0.60m construction of Pour • Blind and cast concrete strip foundation; 0.15m Flush Toilets for thick ( 350kg/m3) projects where toilet • Foundation and structural walls; 0.15m full Construction of Construction 2. facility are required to masonry blocks and finished trowelled cement Toilets Projects compliment the main plaster. activity and function of • Roofing; hard wood trusses and covering in Alu- the project. The zinc roofing sheets construction of toilets • Doors; solidcore flush doors on hard wood door involves the following: frame and fitted with appropriate locks. • Plumbing; Twyford or similar make ceramic squat toilet pans fitted on the floor and plumbed to Soakaway/septic tank pits with PVC pipes and accessories. • Construct septic tank of 2.10m x 3. 60m x 2. 89m and finish to drawings details • Conduct geophysical survey (field work, interpretation and report) for the location of borehole at a suitable site. The LGA shall • Drilling of borehole in sedimentary formation undertake the drilling • (0-60m). and installation of • Supply and install 110mm diameter UPVC borehole with hand casings of 10 bar and 110mm diameter UPVC Water Supply pump for the supply of Health centres, screens of 10 bar pressure rating; slot size 0.5. 3. (Borehole with water to projects that Agro processing and • Conduct water quality analysis (biological, Hand Pump) require water to markets chemical and physical) and borehole complement function. disinfection. The borehole is • Install to designed depth an appropriate hand construction shall pump on a concrete plate form with include the followings: bucket/users' stand with drain troughs to waste channel.

The LGA shall construct • The drying platform shall be constructed of a drying platform for reinforced concrete 3.0m x 6.0m Construction of 4. warehouse projects and • Excavate foundation 0.45m x 0.45m Agro Processing Drying Platform the drying platform • Blind and cast foundation concrete/beam 0.15m shall be constructed as thick x 0.25m (350kg/m3)

Page 26 EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019 DELTA STATE

follows: • Fill and compact with good quality laterite • Cast 0.10m thick concrete with BRC reinforcement

The LGAs shall supply furniture for use by the School pupils and Teachers. Such • School Desk: 1.2m long double seater furniture shall be made writing desk with integral bench unit. of seasoned hard wood • Teachers Table: 1.4 x 0.7 x 0.9m size Supply of School Classroom 5. and finished in • Teachers Chair; 0.45 X 0.45m back chair Furniture Blocks appropriate wood with seat and back rest finished in foam polish. The items shall and leather covering. include the following and shall be approved by the Local Education Authority: The LGA shall supply Patients’ Requirements medical equipment to • Beds the specification and • Drip stand approval of the Ministry • Bedside locker of Health: Primary • Delivery bed Supply of Health Care 6. • Waiting chairs Health Centres Equipment Department. The Staff Requirements medical equipment • Consulting tables shall include the • Consulting Chairs following basic and • Examination bed minimum numbers of items: • Treatment kit The LGA shall undertake the provision of residential accommodation for station nurses at the • Separate living and sleeping rooms Accommodation health post as well as Health Centres and 7. • Kitchenette for Staff head teachers at the School Projects • Toilet projects. The accommodation shall comply with the following minimum specifications: The LGA shall • Incinerator size; 0.9 x 1.35m undertake the • Walls to be of laterite brick units, 2.70m construction of an high and with base window for fire and Construction of incinerator for agro another at 0.9m for filling of waste for Agro Processing 8. Incinerator Pit processing projects. burning. Mills The incinerator shall be • Roof to be reinforced concrete resting constructed in the directly on the walls with windows following manner: underneath.

Page 27 LEGACY BOOK

EUROPEAN UNION (EU) NIGER DELTA SUPPORT PROGRAMME COMPONENT 4 (NDSP4) IN DELTA STATE

PRODUCED BY

FUNDED BY EU