Arv*a,rv ec - J

Page 1 nln e

8E,20t9"20 o) c= Name of the Department :" Geology & Mining Rs in lakh Acutual 20't8-19 Head of DevelopmenU Accour.tt Budget 2017-18 Budget Revised Estimate Estimate Estimate 2 19-20 1 2 3 4 5 A. Develo ment Activities a On-Goi Schemes 0 17.04 17.0A 1 DGPS Su and D itrzation of river bed uarfies 50.00 49 00 36.00 36 00 2) Preparation of M ining Plan for minor mineral quarrjes 49.00 Proposed to prepare mining plan in respect of 7 nos of river bed quarries @ Rs. 7 lakh each quarry in the following districts during 2019-20 :- 1. East - 2 nos of river bed quarries. 2. West Siang Districl 2 nos of river bed quarries Lower Siang District- 3 nos of river bed quarries.

b New Schemes 1) Refresher course on Surveying using Total Station, DGPS 10 00 & other scientific e Ui ments 2 Auct ion of 3 nos of river bed uarTtes 50.00 3) Research and Development works on Clay Deposits in 10.00 Pa are Lowe r Subansiri and Kamle Districts 4) Advisory Services for the Preparation of Rules for the 60.00 Auction of l\,4inerals

5) ldentifi caiion of carbonates rocks in and around Kaying 25 AA Area Wesl Sia Diskict 6 SERVICE UNIFORI\,I FOR Al\rDOs & [.4cs 26 00

(c) Committed liabilities (d) Maintenance of Assets 1 Buildin (i) Construction of Ty-lll Quarter (1 nos ) for AlvlDO at 40.00 Tawan (ii) Conskuction of Boundary Wall of AMDO office at 55.00 , & Koloriang. (Seppa @15 OO, Tezu & Kolorianq @ 20.00) (iii) Roads & Bridges - Conslruction of Approach road and 45 00 security wall of AMDOOffice@1500 lakh at (1)Laying Hanung Notified Quarry, Seppa, West Kameng, (2) 73 km Joram Lower S n iri and 3 Tezu 2) Others (to be specified) (i) Ivlineral Check Gates With Waiting shed & one unit of 50.00 Bachelor barrak : 05 nos of mineral check gates proposed to be nstructed Rs. 10 00 lakh (ii) Conskcution ofcartiography and survey room atthe 30 00 Directorate of Geol & N,4inin Total 500.00 B. Ca forward liabilities of tevtous f a Normal Develo ental Act v ties SADA

Total B 0.00

C. Bud et Announcement 1. E-Auction of Ru a Do omrte & Kalaktan Quartzite blocks 75 00 2 ional investi tion of imestone in Men a alea 125 00 3. lron ore ex oration in r-Gamlin & Yomcha area 150 00 4. APMDTCL 3200 00 Total c 3550.00 Grand Total :- A+B+C 4050.00