Davis-Besse Unit 1 Updated Final Safety Analysis Report

SECTION 8

TABLE OF CONTENTS

Section Title Page

8.0 ELECTRICAL POWER 8.1-1

8.1 INTRODUCTION 8.1-1 8.1.1 Utility Grid 8.1-1 8.1.2 Onsite Systems 8.1-1 8.1.2.1 Main Generation System 8.1-1 8.1.3 Essential Functions 8.1-3 8.1.4 Essential Loads 8.1-4 8.1.5 Design Bases 8.1-4

8.2 OFFSITE POWER SYSTEM 8.2-1 8.2.1 Description 8.2-1 8.2.1.1 Reliability Consideration 8.2-1 8.2.1.2 Stability Analysis 8.2-3 8.2.1.3 Switchyard DC System 8.2-4 8.2.1.4 Switchyard Systems 8.2-4

8.3 ONSITE POWER SYSTEMS 8.3-1 8.3.1 AC Power System 8.3-1 8.3.1.1 Description 8.3-1 8.3.1.1.1 Unit Auxiliary and Startup Transformers 8.3-2 8.3.1.1.2 13800 Volt Auxiliary System 8.3-2 8.3.1.1.3 4160 Volt Auxiliary System 8.3-3 8.3.1.1.4 Diesel Generators 8.3-5 8.3.1.1.4.1 Emergency Diesel Generators 8.3-5 8.3.1.1.4.2 Alternate AC Source – Station Blackout Diesel Generator 8.3-15 8.3.1.1.5 480V AC Auxiliary System 8.3-16 8.3.1.1.6 120V AC Auxiliary System 8.3-19 8.3.1.1.7 Channels 8.3-20 8.3.1.1.8 Physical Arrangement of the AC Electrical System Components 8.3-20 8.3.1.1.9 Tests and Inspections 8.3-23 8.3.1.1.10 Administratively Controlled Devices 8.3-24 8.3.1.1.11 Cross Ties Between MCC E11B and F11A 8.3-24 8.3.1.1.12 Motors 8.3-24 8.3.1.2 Analysis 8.3-24 8.3.1.2.1 Switching 8.3-25 8.3.1.2.2 Independent Circuits 8.3-25 8.3.1.2.3 Onsite Standby Emergency Diesel Generator Units 8.3-25 8.3.1.2.4 Power Distribution System 8.3-25 8.3.1.2.5 DELETED

8-i UFSAR Rev 30 10/2014 Davis-Besse Unit 1 Updated Final Safety Analysis Report

TABLE OF CONTENTS (CONTINUED)

Section Title Page

8.3.1.2.6 Parallel Operation 8.3-25 8.3.1.2.7 Testing 8.3-25 8.3.1.2.8 AC Electrical System 8.3-25 8.3.1.2.9 Controls 8.3-26 8.3.1.2.10 Electric Power 8.3-26 8.3.1.2.11 Protection Systems 8.3-26 8.3.1.2.12 Instrumentation 8.3-26 8.3.1.2.13 Periodic Testing 8.3-26 8.3.1.2.14 Cables and Raceway Functions 8.3-26 8.3.1.2.15 Cable 8.3-31 8.3.1.2.16 Safety Feature Actuation System (SFAS) and Reactor Protection System 8.3-31 8.3.1.2.17 Markers 8.3-32 8.3.1.2.18 Essential Cables 8.3-32 8.3.1.2.19 Power Cables 8.3-33 8.3.1.2.20 Routing of Class 1E Circuits 8.3-33 8.3.1.2.21 Electrical Conductors 8.3-35 8.3.1.2.22 Base Ampacity Ratings of Cables 8.3-35 8.3.1.2.23 AC Power Circuits 8.3-36 8.3.1.2.24 Cables for Reactor Protection Systems 8.3-36 8.3.1.2.25 Redundant Class 1E Instruments 8.3-36 8.3.1.2.26 Cable Spreading Room 8.3-39 8.3.1.2.27 Circuit Schedules and Connection Diagrams 8.3-39 8.3.1.2.28 Q-List Items 8.3-39 8.3.1.2.29 Penetrations 8.3-40 8.3.1.2.30 Cable for Class 1E Service 8.3-42

8.3.2 DC Power System 8.3-42 8.3.2.1 Description 8.3-42 8.3.2.1.1 DC Motor Control Centers 8.3-42 8.3.2.1.2 Station Batteries 8.3-43 8.3.2.1.3 Battery Chargers 8.3-44 8.3.2.1.4 Essential 125V DC Panels 8.3-44 8.3.2.1.5 Rectifiers 8.3-46 8.3.2.1.6 Monitoring and Surveillance 8.3-47 8.3.2.1.7 Physical Arrangement of DC Electrical System Components 8.3-48 8.3.2.1.8 DELETED 8.3.2.1.9 Tests and Inspection 8.3-49 8.3.2.1.10 Administratively Controlled Devices 8.3-49 8.3.2.2 Analysis 8.3-49 8.3.2.2.1 DC System 8.3-49 8.3.2.2.2 Reliability 8.3-49 8.3.2.2.3 250V DC System 8.3-49

8-ii UFSAR Rev 30 10/2014 Davis-Besse Unit 1 Updated Final Safety Analysis Report

TABLE OF CONTENTS (CONTINUED)

Section Title Page

8.3.2.2.4 125V DC Control Panel Boards 8.3-49 8.3.2.2.5 Station DC System 8.3-50 8.3.2.2.6 Battery Chargers 8.3-50 8.3.2.2.7 Design Criteria for Cables and Raceways 8.3-50 8.3.2.2.8 Redundancy in DC Control Power 8.3-50 8.3.2.2.9 DELETED 8.3.2.2.10 Quality Assurance Procedure 8.3-50 8.3.2.2.11 Drawings 8.3-50

8-iii UFSAR Rev 30 10/2014 Davis-Besse Unit 1 Updated Final Safety Analysis Report

LIST OF TABLES

Table Title Page

8.3-1 Emergency Diesel Generator Load Tables 8.3-51

8.3-2 Administratively Controlled Circuits (AC) 8.3-55

8.3-3 Administratively Controlled Circuits (DC) 8.3-56

8.3-4 Environmental Requirements for Class 1E Cable 8.3-57

8.3-5 DELETED

8-iv UFSAR Rev 30 10/2014 Davis-Besse Unit 1 Updated Final Safety Analysis Report

LIST OF FIGURES

Figure Title

8.2-1 DELETED

8.2-2 345kV Switchyard One-line Diagram

8.3-1 AC Electrical System One-Line Diagram, Sheet 1

8.3-2 AC Electrical System One-Line Diagram, Sheet 2

8.3-3 DELETED

8.3-4 4.16 Feeder Breakers Bus C1 Tripping and Lockout and Sychro Check Relays

8.3-5 4.16kV Feeder Breaker Bus Tie XFMR BD Brkr ABDC1 Control

8.3-6 4.16kV Feeder Breaker Bus Tie XFMR Brkr ABDC1 Control

8.3-7 4.16kV Feeder Breaker Buses C1, C2 Tie Brkr AC 110 Control

8.3-8 4.16kV Feeder Breaker Buses C1, C2 Tie Brkr AC 110 Control

8.3-9 4.16kV Feeder Breaker - Bus C1 (D1) Tripping and Lockout Relays & Synchro-Check Relays

8.3-10 4.16kV Feeder Breaker - Bus C1 (D1) Voltage and Aux Relays

8.3-11 4.16kV Feeder Breaker - Essential Unit Substations E1 & F1 Control, Sheet 1

8.3-12 4.16kV Feeder Breaker - Essential Unit Substations E1 & F1 Control, Sheet 2

8.3-13 Auxiliary Building Sections

8.3-14 “E” Buses 480V Unit Substations One-Line Diagram, Sheet 1

8.3-15 “F” Buses 480V Unit Substations One-Line Diagram, Sheet 2

8.3-16 Water Treatment and Turbine Bldg 480V Unit Substations One-line Diagram, Sheet 3

8-v UFSAR Rev 30 10/2014 Davis-Besse Unit 1 Updated Final Safety Analysis Report

LIST OF FIGURES (CONTINUED)

Figure Title

8.3-17 480V Unit Substation Lighting Distribution One-Line Diagram, Sheet 4

8.3-18 PZR and Annulus Heaters 480V Unit Substation One-Line Diagram, Sheet 5

8.3-19 Essential Unit Substations E1 and F1 Incoming Feeder Circuit Breakers, Sheet 1

8.3-20 Essential Unit Substations E1 and F1 Incoming Feeder Circuit Breakers, Sheet 2

8.3-21 Essential Unit Substations Incoming Feeder Circuit Breakers, Sheet 3

8.3-22 Essential Unit Substations MCC Feeder Circuit Breakers, Sheet 4

8.3-23 480V AC MCC (Essential) One-Line Diagram, Sheet 1

8.3-24 480V AC MCC (Essential) One-Line Diagram, Sheet 2

8.3-25 250/125V DC and Instrumentation AC One-Line Diagram

8.3-26 DELETED

8.3-27 DELETED

8.3-28 DELETED

8.3-29 DELETED

8.3-30 DELETED

8.3-31 Raceways and Grounding, Containment Details

8.3-32 Raceways, Containment EIev. 4 (603’)

8.3-33 Electrical Penetration Arrangement, Shield Bldg

8.3-34 Electrical Penetration Details

8.3-35 Raceway Cable Spreading Room Fire Barriers

8.3-36 Raceway Cable Spreading Room Fire Barriers

8-vi UFSAR Rev 30 10/2014 Davis-Besse Unit 1 Updated Final Safety Analysis Report

LIST OF FIGURES (CONTINUED)

Figure Title

8.3-37 Raceway Cable Spreading Room Fire Barriers

8.3-38 Criteria for Interposing Trays Fire Hazard

8.3-39 Raceway Separation Criteria Fire Hazard (Excludes External Source)

8.3-40 Raceway Separation Criteria Fire Hazard (Excludes External Source)

8.3-41 Raceway Separation Criteria Fire Hazard (Excludes External Source)

8.3-42 Raceway Separation Criteria Fire Hazard (Excludes External Source)

8.3-43 Fire Barrier Details

8.3-44 Fire Barrier Details

8.3-45 Fire Barrier Details

8.3-46 125/250V DC MCC No.1 (Essential) One-Line Diagram,

8.3-47 125/250V DC MCC No.2 (Essential) Single-Line Diagram,

8.3-48 480V AC MCC (Essential) One-Line Diagram

8-vii UFSAR Rev 30 10/2014 Davis-Besse Unit 1 Updated Final Safety Analysis Report

SECTION 8

8.0 ELECTRICAL POWER

8.1 INTRODUCTION

The electric power systems for Davis-Besse Nuclear Power Station are designed to be electrically self-sufficient and to provide adequate, redundant, and reliable power sources for all electrical equipment for start-up, normal operation, safe shutdown and handling all emergency situations.

8.1.1 Utility Grid

The primary Toledo Edison transmission voltage is 345 kV (nominal). Davis-Besse is connected to nearby 345 kV substations at Bay Shore (NW of Davis-Besse), Lemoyne (SW of Davis-Besse), Ohio Edison - Beaver substation (SE of Davis-Besse) and Hayes substation (SE of Davis-Besse). Office building support equipment at Davis-Besse receives some power from local distribution systems, but there are no transmission connections other than the four 345 kV connections described above.

Toledo Edison uses other transmission voltages than 345 kV. The most important voltage used, other than 345 kV, is 138 kV (nominal). There are several interconnections to other utilities at 345 kV and 138 kV. Utilities connected to the Toledo Edison grid include Detroit Edison, American Electric Power, and Ohio Edison. Each of the 345 kV substations connected to Davis-Besse is associated with at least one inter-utility connection.

8.1.2 Onsite Systems

The onsite electrical systems consist of the 13.8kV, the 4.16kV, and the 480V AC distribution systems, the 120V AC instrumentation and control system, the 250/125V DC systems two 4.16kV emergency diesel-generator units and one non-Class 1E 4.16 kV diesel generator which serves as the alternate AC source for station blackout. The normal source is the unit auxiliary transformer. The reserve power supply and startup sources are the two startup transformers. The standby power supply is provided by the two emergency diesel-generators. All voltages are nominal.

8.1.2.1 Main Generation System

The main generator is rated at 1069 MVA at 0.9 power factor, 25kV, 60 Hz. The protection for the main turbine generator consists of generator protection and turbine protection.

The generator protection system can be divided into the following categories:

1. abnormal conditions originating in the grid system

2. abnormal conditions originating in the main generation system.

Abnormal conditions originating in the grid system are identified on the generator as:

1. out of step

8.1-1 UFSAR Rev 31 10/2016 Davis-Besse Unit 1 Updated Final Safety Analysis Report

2. under frequency

3. negative phase sequence

4. over current (voltage restraint)

Abnormal conditions originating in the main generation system are identified as:

1. generator low field and loss of field

2. unit auxiliary transformer 11

a. sudden pressure

b. primary phase over current

c. secondary ground

d. differential

3. main transformer 1

a. sudden pressure

b. differential

4. generator differential

5. dual volts/hertz (overexcitation)

6. generator reverse power

7. generator field ground (alarm only)

8. generator stator ground

When the unit is in normal operation, with auxiliary power supplied through the unit auxiliary transformer, the occurrence of any one of the above conditions originating in either the grid system or the main generator system will result in isolation of the turbine-generator unit from the 345kV grid system by opening breakers 34560 and 34561. The 13.8kV buses A and B are immediately fast transferred from the unit auxiliary transformer 11 to the startup transformer(s) 01 and/or 02. The specific startup transformer(s) is determined by preselection using the reserve source selector switches.

These switches can align either startup transformer to each 13.8kV bus. The immediate fast transfer of the electrical auxiliary system to the startup transformer(s) is performed for trips initiated by both categories of generator protection because all trips initiated by category 1 do not indicate the existence of a grid condition which is incapable of supplying the auxiliary system. While station auxiliaries could operate during some of the category 1 transient, the generator-turbine must be isolated to minimize the possibility of damage. Using the fast transfer scheme to take advantage of a potentially stable grid may reduce the number of challenges to the emergency diesel generators. Should the power system grid be incapable of supporting the

8.1-2 UFSAR Rev 31 10/2016 Davis-Besse Unit 1 Updated Final Safety Analysis Report station auxiliaries, existing relays will detect that condition and initiate appropriate changes in the station’s electrical line up.

The turbine protection system detects abnormal conditions relating to the turbine. The more significant malfunctions or faults which cause turbine trips are listed in section 10.2.3.

Any of these abnormal conditions or trips results in a turbine trip which closes the main steam stop valves and the combined intercept valves. With the closure of these valves and any of the breakers 34560, 34561, HX11A, or HX11B closed, the generator anti-motoring circuit becomes functional in combination with a reverse power relay. The output of the anti-motoring circuit in series with the output of the reverse power relay operates a relay which trips breaker(s) 34560, 34561, HX11A, and HX11B.

Under normal operation with breakers 34560 and/or 34561 closed and breakers HX11A and HX11B closed, a turbine trip results in a delayed transfer of the 13.8kV buses A and B from the unit auxiliary source to the preselected startup transformer(s). The actual transfer is a fast transfer, but the transfer initiation is delayed by the generator protective relaying. In addition to protecting the main turbine generator and the turbine, a turbine trip, if it occurs above a certain reactor power setpoint, will initiate the Anticipatory Reactor Trip System (ARTS) which trips the reactor. This system is also actuated by the trip of both main feedwater pump turbines or an SFRCS trip.

8.1.3 Essential Functions

The station essential functions are:

1. Emergency Core Cooling

2. Containment Cooling

3. Containment Isolation

4. Emergency Ventilation

5. Safe Shutdown

6. Containment Vessel Combustible Gas Control

8.1-3 UFSAR Rev 31 10/2016 Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.1.4 Essential Loads

The station essential loads, related essential functions, and type of electric power supply to each load are:

Related Essential Function (refer to Load Section 8.1.3) Power Supply

High pressure injection pumps (1) 4.16kV AC Decay heat removal pumps (1) 4.16kV AC Component cooling pumps (1)(2)(5) 4.16kV AC Service water pumps (1)(2)(5) 4.16kV AC

Containment spray pumps (2) 480V AC Containment air cooler fans (2) 480V AC

Containment vessel hydrogen dilution (6) 480V AC blowers Hydrogen recombiner (6) 480V AC Containment vessel isolation valves (3) 480V AC Emergency ventilation fans (4) 480V AC Control room emergency ventilation fans (4) 480V AC Emergency diesel generator auxiliaries (1)(2)(3)(4)(5)(6) 480V AC Engineered safety feature valves (1)(2)(3)(5) 480V AC and 125V DC

Auxiliary feed pump controls (5) 125V DC

Safety features actuation system (1)(2)(3)(4) 120V AC Reactor protection system (5) 120V AC Main steam atmospheric vent valves (5) 125V DC

8.1.5 Design Bases

The electrical systems are designed to ensure that no single component failure will prevent operation of engineered safety systems. Redundant power sources are provided to ensure continuous operation of equipment under all modes of operation. Testing of systems is possible with the station in operation. Electrical and physical separation of cables and equipment associated with redundant elements is provided.

8.1-4 UFSAR Rev 31 10/2016 Davis-Besse Unit 1 Updated Final Safety Analysis Report

The design documents that are implemented in the design of the electrical systems are listed below:

Document No. Title Approval Date 1. AEC Safety Independence Between Redundant Standby (Onsite) 3-10-71 Guide 6 Power Sources and Between Their Distribution Systems

Safety Selection of Diesel Generator Set Capacity for Standby 3-10-71 Guide 9 Power Supplies

Safety Periodic Testing of Protection System Actuation 2-17-72 Guide 22 Functions

Quality Assurance Requirements for the Installation, 8-11-72 Safety Inspection, and Testing of Instrumentation and Electric Guide 30 Equipment

Safety Use of IEEE Standard 308-1971 “Criteria for Class 1E 8-11-72 Guide 32 Electric System for Nuclear Power Generating Stations”

10CFR50, General Design Criteria for Nuclear Appendix Power 2-10-71 Appendix A Plants (as applicable)

2. IEEE 308 Criteria for Class 1E Electric Systems for Nuclear Power 9-16-71 Generating Stations

317 Electrical Penetration Assemblies In Containment 2-4-71 Structures For Nuclear Fueled Power Generating Stations

323 General Guide for Qualifying Class 1E Electric 2-4-71 Equipment for Nuclear Power Generating Stations

334 Type Tests of Continuous-Duty Class 1E Motors 9-16-71 Installed Inside the Containment of Nuclear Power Generating Stations

336 Installation, Inspection, and Testing Requirements for 9-16-71 Instrumentation and Electric Equipment During the Construction of Nuclear Power Generating Stations

344 Seismic Qualification of Class 1E Electric Equipment for 9-16-71 Nuclear Generating Stations

387 Criteria for Diesel-Generator Units Applied as Standby 12-2-71 Power Supplies for Nuclear Power Generating Stations

8.1-5 UFSAR Rev 31 10/2016

Davis-Besse Unit 1 Updated Final Safety Analysis Report

3. In addition to the above, the relevant ANSI, IPCEA and NEC recommendations are used as guides in the design.

4. An ongoing program for environmental qualification is being implemented by DBNPS to qualify Class 1E equipment to the requirements of 10CFR50.49.

5. The design basis for the Emergency Diesel Generator excitation system also includes the following standards or regulatory documents used to qualify the replacement system. The first two guidelines below apply only to the RA70 Microprocessor-based Reference Unit.

EPRI TR- Guideline on Licensing Digital Upgrades: Endorsed by NRC 102348, TR-102348, Revision 1, NEI 01-01: A Regulatory Issue Revision 1 Revision of EPRI TR-102348 to Reflect Summary 2002-22 Changes to the 10CFR50.59 Rule.

EPRI TR- Guideline on Evaluation and Acceptance of Accepted by NRC SER 106439 Commercial Grade Digital Equipment for March 1997 Nuclear Safety Applications, October 1996.

EPRI TR- Guidelines for Electromagnetic Interference Issued November 2000 102323, Testing of Power Plant Equipment Revision 2

During the design phase of Davis-Besse Unit 1, complete adherence to the (February 1974) Regulatory Guide 1.75 “Physical Independence of Electric Systems” was not possible since plant design pre-dated the issuance of 1.75 as well as IEEE 384-1974. However, the independence principles followed in the design are considered adequate to preclude a common failure mode for any design basis event and do, in fact, represent partial conformance. IEEE 279 and IEEE 308, both 1971, were used as guides during the design phase of the plant with the exception, noted in Chapter 7. Separation between redundant Class 1E equipment and circuits is mainly by separate safety class structures (rooms). However, distance and barriers are utilized as acceptable alternates. Further, there is compatibility of mechanical and electrical system design which provides that failure of related mechanical equipment of one redundant system cannot disable Class 1E circuits and equipment essential to the operation of the other redundant system. The routing of non-Class 1E cables is discussed in Subsection 8.3.1.2.18.

8.1-6 UFSAR Rev 31 10/2016

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.2 OFFSITE POWER SYSTEM

8.2.1 Description

Station output generated at 25kV, is fed through an isolated phase bus to the 980 MVA main transformer where it is stepped up to 345kV transmission voltage and delivered to the station switchyard. The 345kV switchyard includes one line to Bayshore Substation, one line to Lemoyne Substation, one line to Beaver Substation (Ohio Edison), and one line to Hayes Substation.

Three overhead 345kV lines are provided from the switchyard to the onsite station distribution system, one line to each of the two startup transformers and a third line to the main transformer (see Figure 8.2-2).

One or both of the two 345kV overhead lines to the startup transformers will be available to supply all essential loads within a few seconds of a loss-of-coolant accident. The third overhead line to the main and auxiliary transformers can be made available to supply all essential loads following a loss of all onsite alternating current power supplies by removing the generator main leads disconnecting links and changing the auxiliary transformer tap.

The third overhead line to the main and auxiliary transformers may be utilized in place of a startup transformer to supply all essential loads within a few seconds of a loss-of-coolant- accident provided the unit auxiliary transformer is aligned to the 13.8kV bus(es) and the generator main leads disconnecting links are removed.

8.2.1.1 Reliability Considerations

The possibility of power failure due to faults in the network interconnections and the associated switching is minimized by the following arrangements:

a. Any one of the four 345kV transmission lines may be interrupted, and the others will be capable of carrying the load.

b. There are no offsite transmission line crossovers which would jeopardize availability of offsite power.

c. There are no transmission line crossovers onsite which would jeopardize the availability of offsite power. The 345 kV transmission tie lines between the switchyard and startup transformers No. 01 and 02 originate at separate positions in the switchyard and are routed on separate structures, adequately separated to minimize the possibility of their simultaneous failure.

d. There are no known offsite structures such as microwave towers or sources of fire, explosion or missiles, which, if postulated to fail in the worst possible manner, could result in damage which precludes meeting the requirements of General Design Criterion 17.

There are no onsite structures such as microwave towers which, if failed, would result in the loss of both sources of offsite power. The microwave tower is located in the southwest corner of the site, remote from the switchyard and transmission lines.

8.2-1 UFSAR Rev 31 10/2016 Davis-Besse Unit 1 Updated Final Safety Analysis Report

The only source of fire, explosion, or missiles in the switchyard that if postulated to fail in the worst possible manner could result in not meeting the requirements of Criterion 17 are the two switchyard a-c station service transformers and the 345 kV power circuit breakers.

The two a-c station service transformers are separated by a masonry firewall and are located remote from any essential switchyard equipment.

The 345 kV power circuit breakers are adequately separated (minimum 100 feet) to minimize the possibility of missile damage to equipment in separate positions in the event of a breaker blowup. e. Two of the 345kV transmission lines are constructed on the same right of-way for a part of their length (about 2 ½ miles), but the lines are supported on independent structures set far enough apart to avoid the possibility of structural collapse of one causing an outage of both lines. f. The 345kV system is protected from lightning and switching surges by lightning protection equipment and by overhead grounded shield wires. g. The 345kV system stability will be maintained on the loss of the generator. h. The bus switching arrangement in the 345kV switchyard includes two full capacity main buses. Primary and backup relaying (redundant systems) are provided for each circuit along with circuit breaker failure backup protection. These provisions permit the following:

1. Any transmission line can be cleared under normal or fault conditions without affecting any other transmission line.

2. Any single circuit breaker can be isolated for maintenance without interrupting the power or protection to any circuit.

3. Short circuits on a section of bus will be isolated without interrupting service to any circuit, other than that connected to the faulted bus section.

4. Short circuit failure of power circuit breaker No. 34562 will result in the loss of the startup transformer No. 02 and the Bay Shore line until the point of the fault is isolated by disconnect switches.

5. Short circuit failure of power circuit breaker No. 34561 will result in the loss of the main unit and the Bay Shore line, until the point of fault is isolated by disconnect switches.

6. Short circuit failure of power circuit breaker No. 34564 will result in the loss of the Ohio Edison tieline and the Lemoyne line, until the point of fault is isolated by disconnect switches.

7. Short circuit failure of power circuit breaker No. 34560 will result in tripping the generator main breakers, the loss of the unit from the system and of startup transformer No. 01, until the point of fault is isolated by disconnect switches.

8.2-2 UFSAR Rev 31 10/2016 Davis-Besse Unit 1 Updated Final Safety Analysis Report

8. Short circuit failure of power circuit breaker No. 34563 will result in the loss of the startup transformer No. 01 and the Lemoyne line until the point of fault is isolated by disconnect switches.

9. Short circuit failure of power circuit breaker No. 81-B-67 will result in the loss of startup transformer No. 02 and the Hayes line until the point of fault is isolated by disconnect switches.

10. Short circuit failure of power circuit breaker No. 81-B-66 will result in the loss of startup transformer No. 01 and the Hayes line until the point of fault is isolated by disconnect switches.

11. Short circuit failure of power circuit breaker No. 81-B-65 will result in the loss of startup transformer No. 02 and the Ohio Edison (Beaver) line until the point of fault is isolated by disconnect switches.

Providing all switchyard circuits, breakers, and transformers are in service, there are no known aspects of the Davis-Besse design that do not meet the requirement of General Design Criterion (GDC) 17. A single switchyard circuit or breaker(s) can be removed from service and the remaining circuits, breakers, and transformers will still meet the requirements of GDC 17.

8.2.1.2 Stability Analysis

Completed system studies have shown that the system meets Criterion 17. The results show that losing station output will not adversely affect the capability of providing offsite power to the essential buses.

These analyses are reviewed and revised as needed following significant long-term changes in the transmission or loading characteristics of the FirstEnergy grid, or when a system operating event otherwise demonstrates a need for analysis update. These analyses are generally performed by offsite personnel responsible for system planning or transmission system design. The results of the most recent analyses are summarized below:

A steady state analysis simulated anticipated summer loads with normal system conditions, single element outages, and multiple element outages. There were no thermal or voltage criteria issues identified at the Davis-Besse Nuclear Power Station.

A voltage stability analysis modeled anticipated load, system reinforcements, and topology for summer operating conditions. The analysis evaluated a single generator and one line out of service and evaluated two lines and one generator out of service. For all of the applied FirstEnergy Planning outage contingencies to the voltage stability analysis, there were no voltage stability issues identified with the Davis-Besse Nuclear Power Station.

Transient stability studies performed by PJM (Pennsylvania-New -Maryland Interconnection) evaluated a number of contingencies and determined that all faults were stable and that the Davis-Besse Power Station had acceptable damping. The evaluated contingencies include:

1. Loss of the main generating unit. 2. Three phase fault on each transmission line. 3. Stuck breaker conditions for clearing single phase fault on each transmission line.

8.2-3 UFSAR Rev 31 10/2016 Davis-Besse Unit 1 Updated Final Safety Analysis Report

4. Back-up relay breaker clearing for three phase fault at remote terminal of each transmission line.

8.2.1.3 Switchyard DC System

The design of the 125V DC system for the switchyard consists of two independent systems. A fused safety switch permits these two systems to be connected during periods of battery/battery charger maintenance and testing. This fused safety switch will normally be locked open to maintain system independence. Each consists of one 125V DC, 290 amp-hour battery (nominal), one battery charger, and one 125V DC 400 ampere distribution panel. Cable separation is maintained between the two systems.

There are two batteries for the control and protective relay functions of the 345kV switchyard and transmission lines. The two batteries are located on opposite walls in the switchyard relay house basement. Each battery is supplied by a separate battery charger, each charger is supplied from a separate and independent AC station service distribution panel. In the event of the loss of one battery, the other battery has sufficient capacity to supply all the DC circuits required to detect and clear a single fault including faults requiring initiation of breaker failure protection.

The DC circuits associated with each battery are routed in physically separate raceway systems. DC circuits for transmission line protective relays, J and K Bus differential relays, and 345kV breaker trip coils are completely redundant. The AC supplies to each battery charger are also physically separated.

8.2.1.4 Switchyard Systems

During normal operation, a single failure caused by a malfunction of either of the two switchyard DC systems will not affect the fault detection and fault clearing capabilities of the other system. The ability of the switchyard to supply offsite power to the station will not be affected by the loss of the two 125V DC systems because a loss of DC power will not cause equipment to change state.

8.2-4 UFSAR Rev 31 10/2016 FROM TO TO UNIIT NO. I START-UP START-UP MAIN TRANSF. TRANSF. TRANSF. NO. 1 N0.01 N0.02 \ \ \ "J" CEASTI BUS

34560 34563 81-B-66

34561 34564 81-B-67

34562 81-B-65

"K" IWESTl BUS ( ( ( TO BAYSHORE TO LEMOYNE TO OHIO TO HAYES SUBSTATION SUBSTATION EDISON CO. SUBSTATION

DAVIS-BESSE NUCLEAR POWER STATION 345 KV SWITCHYARD ONE-LINE DIAGRAM FIGURE 8.2-2 REVISION 30 OCTOBER 2014 OB 07-18-14 OFN: G/USAR/UFIG822.0GN Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.3 ONSITE POWER SYSTEMS

8.3.1 AC Power System

8.3.1.1 Description

The station distribution system consists of various auxiliary electrical systems designed to provide reliable electrical power during all modes of station operation and shutdown conditions (see Figures 8.3-1 and 8.3-2). The systems are designed with sufficient power sources, redundant buses and required switching, to ensure reliability. Engineered safety feature circuits are arranged so that a loss of a single bus section, for any reason, results in only single losses of auxiliaries leaving redundant auxiliaries to perform the same function.

The station distribution system is capable of starting and accelerating the largest required drive with the remainder of the connected motor loads in service. The system will have a fast transfer to the reserve power source following a turbine generator or reactor trip, without the loss of auxiliary load.

Protective relaying is arranged for selective tripping of circuit breakers or fused disconnect switches, thus limiting the loss of power to the affected area.

Separate analyses were performed assuming the power sources from the offsite network to the safety reIated buses as derived from (1) unit auxiliary transformer and (2) the startup transformer(s). For each case it was assumed that the need for electric power was initiated by an anticipated transient such as a unit trip or an accident, whichever presented the largest load demand. Manual load shedding was not assumed. The computer model developed to perform the analyses incorporated preliminary load data collected at the plant with the unit operating at 100 percent of the electrical output power. In addition, the computer model used actual test data for the installed equipment. The plant’s existing electrical auxiliary system configuration (e.g., breaker status, transformer taps, etc.) was included in the computer model.

Additional calculations were performed to analyze the transients caused by starting either a reactor coolant pump or condensate pump under full load conditions plus with all Class 1E loads already running. This was performed for different onsite distribution conditions and the bus voltages were determined for each case. The analyses show that the transient voltage dips caused by starting a reactor coolant pump or condensate pump do not fall below the voltage values needed by the Class 1E equipment to traverse the transient. Class 1E equipment is not required to actuate during the transient since all Class 1E loads are running in these cases.

Calculations were also done to determine the voltages on safety-related buses from a SFAS start which confirm that the equipment would be operating within their capabilities to perform their functions.

In conclusion the analyses have demonstrated that adequate voltage will exist on the safety- related buses so that the safety systems can perform their functions. The analyses have included contingency cases which further support the capabilities of the plant’s electrical auxiliary system. The analyses have included comparison of the safety-related equipment capabilities to continuous operating conditions, transient conditions and actuation conditions.

The steady-state analysis shows that the voltage on the Class 1E 4160V bus does not drop below the degraded voltage relay setting during the worst operating conditions of full auxiliary load and full Class 1E load.

8.3-1 UFSAR Rev 32 9/2018 Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.3.1.1.1 Unit Auxiliary and Startup Transformers

During normal operation of the station, the 52/69 MVA unit auxiliary power transformer, connected to the generator isolated phase bus, provides the normal source of electrical power for station auxiliaries.

Two startup transformers, each 39/52/65 MVA, are supplied from different 345kV switchyard bus sections. Each startup transformer provides power for startup, shutdown, and post- shutdown requirements. The two transformers will also serve as a complete reserve power source for the station auxiliaries in the event of failure of the unit auxiliary transformer supply.

The impact of open phase conditions on the capability of the startup transformers to perform their functions was evaluated. The conditions analyzed consisted of single (one of three) and double (two of three) open phase conductors on the high voltage (345 kV) side of the startup transformers. The analysis considered open phase conditions with and without a ground. Open phase detection and isolation systems for the startup transformers were installed to ensure that plant structures, systems, and components important to safety can perform their intended functions under postulated open phase conditions. Upon detection of an open phase condition, the system will isolate the affected startup transformer and provide operator indication of the open phase condition.

After initial installation, the OPPS will be operated with the automatic isolation function of the OPPS disabled for initial monitoring period, which is expected to last up to one operating fuel cycle. The monitoring period will used to confirm that the system performance and associated setpoints provide the correct level of protection.

During Operational Mode 3, 4, 5, 6, or defueled, the circuit connecting the 345 kV switchyard to the 13.8 kV buses through the main transformer and the auxiliary transformer may be utilized in place of a startup transformer, provided the generator main leads disconnecting links are removed and the auxiliary transformer tap is changed. Additional restrictions apply to bus configuration when the backfeed alignment is in use. Refer to the Technical Specification bases for more information.

Normally each startup transformer is the reserve power source of only one 13.8kV bus. However, if either transformer is out of service, the remaining startup transformer is available (by manual pre-selection) to automatically supply both 13.8kV buses should the normal source (auxiliary transformer) fail. Note that in MODES 1, 2, 3 and 4, a single startup transformer and a single bus tie transformer, supplying the loads normally served by two startup transformers and two bus tie transformers, can not be guaranteed to provide adequate voltage to all equipment required for safe shutdown following a LOCA.

The secondaries of all three transformers are of low-resistance grounded, wye-connected construction.

8.3.1.1.2 13800 Volt Auxiliary System

During normal operation each 13.8kV bus is fed from one of the 13.8kV secondary windings of the unit auxiliary transformer. During startup and shutdown, each bus is fed from the 13.8kV secondary winding of either startup transformer No. 01 or No. 02, or, during operational Mode 3, 4, 5, 6, or defueled, backfed through the main power transformer and unit auxiliary transformer with the generator links removed and the auxiliary transformer tap is changed.

8.3-2 UFSAR Rev 32 9/2018 Davis-Besse Unit 1 Updated Final Safety Analysis Report

The unit 13.8kV auxiliary distribution system consists of two 2000 A buses: A and B (see Figure 8.3-1). Each bus supplies the following loads:

two 9000 HP Reactor Coolant Pumps two 4500 HP Circulating Water Pumps one 12/16 MVA Bus Tie Transformer six 1000/1150kVA Nonessential Unit Substation Transformers

The transfer of a 13.8kV bus between the three sources of electrical power can be either manual or automatic. Manual transfer is initiated by the operator from either the control room or the switchgear room, and automatic transfer is initiated by the action of generator or transformer protective relays. Reserve source selector switches are provided to preselect the alignment of startup transformers for buses A and B. This pre-selection of the alignment is for the fast bus transfers. When power is being supplied to a 13.8kV bus by a startup transformer, the reserve source selector switch for that bus can preselect the alternate startup transformer source. This permits a fast bus transfer to the alternate startup transformer source should the original source fail.

The control circuits of the feeders will not allow multiple power sources to be connected to either bus A or bus B except for a momentary paralleling of sources by manual transfer on station startup or shutdown.

Manual bus transfer between the sources is a live bus transfer scheme allowing the incoming source feeder circuit breaker to first close onto the energized bus, and then its interlocks cause the outgoing source feeder circuit breaker to trip when the operator releases the control switch of the incoming breaker. This transfer scheme results in no power interruption to the bus. The live transfer is supervised by a synchro-check relay permitting the completion of the transfer only if the two sources are in phase. Manual transfer is provided between any of the three power sources as preselected by the operator.

The fast bus transfer scheme from the unit auxiliary transformer 11 to the startup transformers 01 and/or 02 is further enhanced by fast acting synchrocheck relays. Opening of the 345kV breakers 34560 and 34561 during normal power operation with the electrical auxiliary systems being supplied power from the unit auxiliary transformer 11 will result in these relays monitoring the phase angle difference between the secondary voltage of the unit auxiliary transformer 11 and the startup transformer(s) secondary voltage during the fast bus transfer. Should the angle exceed 35 degrees the transfer will be blocked to prevent out of phase re-energization and the associated over-voltage stresses on the plant’s electrical auxiliary system. These fast acting synchrocheck relays are also functional during the generator protective relaying delayed transfer scheme.

Automatic fast transfer of a 13.8kV bus from the unit auxiliary transformer to an available startup transformer is initiated by either generator protective relays or transformer protective relays. Transfer is made to the startup transformer which has been preselected as the reserve power source for the given 13.8kV bus by means of a selector switch in the control room or switchgear room. Automatic transfer occurs only from the normal to the reserve sources or between the two reserve power sources; the transfer from either of the startup transformers to the unit auxiliary transformer can only be done manually.

A startup transformer is available as a reserve source to a bus if:

8.3-3 UFSAR Rev 32 9/2018 Davis-Besse Unit 1 Updated Final Safety Analysis Report

a. Its secondary voltage is normal.

b. Its protective lockout relay is not tripped.

c. The bus feeder breaker closing DC voltage is available.

8.3.1.1.3 4160 Volt Auxiliary System

Power supply to the 4160 volt system is from two 12/16 MVA bus tie transformers which step down the voltage from 13800 volts to 4160 volts. Each bus tie transformer normally supplies one essential and one nonessential 4160 volt bus and is available as a reserve source for the other two 4160 volt buses. The capacities of the transformers and circuit breakers are sufficient to permit full station operation with one bus tie transformer out of service, providing both startup transformers are available. (Analysis has shown that the impedances of the bus tie and startup transformers are such that acceptable voltage levels can not be guaranteed for all accident scenarios with the entire station load being simultaneously supplied through a single bus tie transformer and a single startup transformer.) Each essential 4160 volt bus is provided with a fast bus transfer scheme that will transfer the bus from its normal source to an alternate source of power.

The 4160V auxiliary distribution system consists of five 4160V, 2000 amp buses (see Figure 8.3-1).

When the unit is off line with nominal loading on the buses, the startup transformer taps may be changed to maintain voltage within an acceptable range. When the unit is brought back on line, the two startup transformers’ taps are reset for unit power operation.

When the unit is offline with nominal loading on the buses, the unit auxiliary transformer can be made available to supply loads by removing the generator main leads disconnecting links and changing the unit auxiliary transformer taps to maintain voltage within an acceptable range.

Two essential buses C1 and D1 provide power to engineered safety feature equipment for safe station shutdown. Each of the essential 4160V buses supplies the following loads:

Motor HP Quantity (Nameplate) 1 Service Water Pump 600 1 High Pressure Injection Pump 600 1 Decay Heat Pump 400 1 Component Cooling Pump 400 1 Essential 4160-480V Unit Substation Transformer 1000kVA

Also, each bus supplies power to one 450 HP makeup pump motor.

In addition, a third 600 HP service water pump and a third 400 HP component cooling pump are provided. Each of these two pumps is connected to two 4.16kV Kirk Key interlocked, manually controlled transfer switching breakers. The Kirk Key interlock permits only one breaker to be closed at a time. Each breaker of a motor pair is connected to a separate essential 4.16kV bus.

Further interlocks are provided to prevent more than one component cooling pump breaker and one service water pump breaker from automatically closing and connecting to either emergency diesel generator at the same time. It should be noted that while swapping the running and

8.3-4 UFSAR Rev 32 9/2018 Davis-Besse Unit 1 Updated Final Safety Analysis Report spare Component Cooling pumps, both pumps are temporarily running on the same bus, and would remain on the bus if the emergency diesel generator was started. Administrative controls will alert operators to this unconventional EDG loading and to minimize the time during which two CCW pumps are connected onto one bus. Also, the sequences of aligning the pumps’ 4KV breakers are administratively controlled to ensure a pump is available for auto-loading onto each essential bus.

The two 4.16kV nonessential buses C2 and D2 supply power to non-safety-related station auxiliaries indicated on Figures 8.3-1 and 8.3-2. In the event of a station blackout, bus D2 can be aligned to either essential 4.16 kV bus for the purpose of using the Station Blackout Diesel Generator (SBODG) to supply loads required for coping with a loss of all AC power.

In normal operation, the secondary winding of each bus tie transformer is connected through a 2000 amp circuit breaker to its associated nonessential 4.16kV bus. This bus then feeds the corresponding essential 4.16kV bus through a 1200 amp circuit breaker. Each essential bus can also be energized directly from the other bus tie transformer.

Transfer schemes are provided to switch each 4.16kV bus from its normal bus tie transformer to its reserve. The transfer between the two sources is done either manually, initiated by the operator at the control room, or automatically initiated by a protective relay action. Manual transfer is a live bus scheme while automatic transfer is a fast one.

The 4.16kV system is low resistance grounded. The grounding point is the neutral of each source transformer.

The attached schematic diagrams (see Figures 8.3-5 through 8.3-12) are provided to permit an evaluation of compliance with the safety criteria.

Each 4.16kV safety-related bus is provided with two levels of voltage protection. Four relays at each level function as a coincidental logic to preclude spurious trips of the offsite power source. The time delays associated with the relays are chosen so as to minimize the effect of short duration disturbances from reducing the availability of the offsite power source, to assure that the allowable time duration of a degraded voltage condition does not result in failure of safety systems or components, and to assure the starting times of equipment assumed in the accident analysis are not exceeded. The Degraded Voltage Relays automatically initiate disconnection of the offsite power source whenever the voltage setpoint and time delay have been exceeded. The Loss of Voltage Relays automatically initiates disconnection of the offsite power source, load shed the bus, and starts the diesel generator whenever the voltage setpoint and time delay have been exceeded. See Technical Specification and Technical Requirements Manual for voltage and time delay values.

Starting one reactor coolant pump or circulating water pump can result in a voltage reduction on the 4.16 KV buses because the voltage drop on the 13.8 KV buses which supply power to the pump motors is fed through to the 4.16 KV buses. In order to block the low voltage trip when these pumps are started, a push button bypass allows the degraded voltage relays to be bypassed for up to one minute during pump starts.

8.3-5 UFSAR Rev 32 9/2018 Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.3.1.1.4 Diesel Generators

General Description:

8.3.1.1.4.1 Emergency Diesel Generators

Two redundant emergency diesel generator units, one connected to essential 4.16kV bus C1 and the other connected to essential 4.16kV bus D1, are provided as onsite standby power sources to supply their respective essential buses upon loss of the normal and the reserve power sources. Bus load shedding and isolation, bus transfer to the emergency diesel generator, and pickup of critical loads is automatic.

Each emergency diesel generator has the following ratings and characteristics:

Continuous rating 2600 kW #2000 hr. rating 2838 kW 200 hr. rating 2946 kW #30 minute rating 3035 kW *Short term rating 2860 kW Generator rating 3250 kVA Assumed power factor 0.8

* Short-term rating is the electric power output capability that the emergency diesel generator can maintain in the service environment for two hours in any 24-hour period.

# Any combination of normally connected (and operating) loads and loads that are automatically connected (and operating) following a loss of offsite power and/or LOCA will not exceed the smaller of the 2000 hour rating or 90 percent of the 30-minute rating (i.e., 3035* 0.9 = 2731.5 kW) of the emergency diesel generator, after taking into account actual expected loading (vs. rated load). Refer to Table 8.3-1 for the applicable load tabulations. (Reference Safety Guide 9, Regulatory Position C.2)

The emergency diesel generator is capable of attaining rated frequency and voltage approximately 10 seconds after the engine start signal is received.

Each of the two emergency diesel generators has the capability to:

a. Supply continuously the sum of the load on the essential 4160V bus needed to be powered at any one time.

b. Start and accelerate to rated speed in the required sequence its dedicated engineered safety features loads. At no time during the loading sequence, will the frequency and voltage decrease to less than 95 percent of nominal and 75 percent of nominal, respectively, except that during the first step in the required loading sequence, there may be a voltage dip below 75 percent of normal lasting for a few cycles due to the essential unit substation transformer excitation inrush.

During recovery from transients caused by step load increases or resulting from disconnection of largest load, the speed of the diesel engine will not exceed 75 percent of the difference between nominal speed (900 rpm) and the overspeed trip setpoint.

Each diesel will receive a starting signal when any one of the following occurs:

8.3-6 UFSAR Rev 32 9/2018 Davis-Besse Unit 1 Updated Final Safety Analysis Report

a. Loss of essential bus voltage

b. A safety feature actuation signal (SFAS level 2)

c. Manual start (local or remote)

d. Test signals to simulate any of the above

Any of the above conditions will initiate a start signal to the emergency diesel engine. However, except for manual synchronizing during routine testing, the essential bus will be isolated only upon loss of voltage or a bus fault, and the emergency diesel breaker will be closed only on loss of voltage without a bus fault.

Relays connected to potential transformers at the emergency diesel generator terminals will detect generator rated voltage and provide a permissive interlock for the closing of the respective generator circuit breaker. Interlocks are provided to prevent automatic closing of an emergency diesel generator breaker to an energized or faulted bus.

Emergency Operation:

Loss of essential bus voltage will be detected by the Loss of Voltage Relays. In addition, the Degraded Voltage Relays will permit continuous operation at reduced voltage conditions for a period of time not exceeding the time delay specified in Technical Specifications and the Technical Requirements Manual, after which the incoming 4.16kV essential bus source breakers will be tripped.

If loss of power is confirmed, by loss of voltage at either essential 4.16kV bus, the following will occur:

1. All bus load breakers, except the breakers supplying power to the 480V essential unit substation supply breakers and component cooling pump breakers, will be tripped.

2. Both source breakers will be tripped and the bus will be isolated.

3. The associated emergency diesel generator set will be started, if not already running.

4. When the emergency diesel generator reaches rated voltage, the corresponding emergency diesel generator breaker will close energizing the 4.16kV and 480V essential buses.

5a. In case the safety features actuation system has been tripped, the engineered safety features loads will be automatically energized according to the predetermined loading sequence given in Table 8.3-1.

5b. In case the safety features actuation system has not been tripped, the emergency diesel will be loaded manually; except that in any case, the component cooling water pumps, service water pumps, previously running makeup pump and the essential 480 volt buses will be started/energized. The loading sequence is provided in the Notes of Table 8.3-1. Also see Section 9.2.7.3 for details.

8.3-7 UFSAR Rev 32 9/2018 Davis-Besse Unit 1 Updated Final Safety Analysis Report

In the event of loss of power, there will be an interruption of approximately 10 seconds in power supply to the previously running component cooling pumps. The standby component cooling pump will start 10 seconds after the EDG output breaker closes.

However, there will be no effect on the diesel generator performance since each diesel is capable of operating without cooling water for three minutes at startup and for one minute at rated full load.

The diesel generators will remain on-line during this interval since the engine high temperature (high water) trip of each diesel is defeated during emergency operation.

Testing:

The emergency diesel generator units have been tested according to IEEE 387. Periodic testing requirements of the emergency diesel generators are given in the Technical Specifications. Each emergency diesel generator is equipped for test purposes only with means for periodically testing, synchronizing, and loading without interrupting service. Only one emergency diesel generator is loaded at any one time. During testing, interlocks will prevent paralleling an emergency diesel generator with the auxiliary or startup transformer until the generator has been manually synchronized by the operator and the synchronism-check relay contacts are closed. Also for testing purposes, an idle start/stop feature in the diesel generator control circuit allows the diesels to be started to an idle setting via the local idle start circuit and allows for a normal stop 10-minute idle cooldown.

A normal or emergency start signal overrides this feature, with exception of the start pushbutton on C3621 (C3622). The idle start/stop feature is intended to prolong the life and reliability of the diesel generators.

Mechanical/Electrical Protection:

Each emergency diesel generator is equipped with mechanical and electrical interlocks to ensure personnel protection and to prevent or limit equipment damage. During a non- emergency diesel generator operation (for example, on-line testing) some of the following mechanical and electrical protective devices are capable of initiating a diesel generator trip. However, during an emergency operation, namely on a loss of essential bus voltage or an SFAS level 2, controls limit the diesel generator trip to generator differential relay action (87/DG), and engine overspeed (OTS). This measure is taken to minimize the possibility of the above devices needlessly preventing the diesel from operating when required, as during a DBA. However, alarms are still provided for high crankcase pressure, low lube oil pressure, high engine temperature, and electrical protective relays. The 51V-2 relay is also not bypassed which will trip the EDG output breaker due to fault on the essential bus. This relay enhances the availability of the diesel generator.

8.3-8 UFSAR Rev 32 9/2018 Davis-Besse Unit 1 Updated Final Safety Analysis Report

Except as modified by a loss of essential bus voltage signal or SFAS level 2, the installed protective type devices that are incorporated in the design to protect the diesel generators from exceeding operating limits are as follows:

A. Electrical Protective Relays:

Description Function

Reverse power relay (32/DG): Trip breaker - provides anti-motoring protection for the diesel to preclude the danger of explosion and fire from unburned fuel.

Generator ground relay (51G/DG): Trip breaker - provides protection for ground faults in the generator, the 4.16kV essential bus, and the cabling between the generator and the bus. It also provides ground-fault back-up protection for feeder faults.

Generator differential relays (87/DG): Trips engine/breaker - provide protection for faults in the zone between the generator neutral and its associated 4.16kV essential bus.

Voltage controlled, over current relays (51V-1/DG,51V-2/DG): Trip breaker - provide generator fault backup protection as well as system fault backup protection.

Loss of field relay (40/DG): Trip breaker - provides generator protection due to loss of field.

Negative phase sequence relay (461DG): Trip breaker - provides generator rotor overheating protection due to unbalanced faults.

Over and under-voltage (27-59/DG): Alarm only - alarms if generator voltage exceeds limits.

Voltage balance (60/DG): Prevent false trip by - senses an imbalance between the bus potential transformers emergency diesel generator and the emergency diesel generator potential transformers voltage controlled, over- due to a blown fuse. current relays

Synchronism-check relay (25/DG): Manual breaker permissive - provides generator protection from being manually loaded onto a 4160V bus out of phase.

8.3-9 UFSAR Rev 32 9/2018 Davis-Besse Unit 1 Updated Final Safety Analysis Report

B. Mechanical Protective Devices:

(Nominal Setpoints - for variances on these setpoints, see the Instrument Index Drawing M-720I)

Description Function

High Jacket Water Temperature Switch (HJWTS) set at 205°F Trips engine/breaker High Crankcase Pressure Switch (CPS) - set at 1” of water Alarm only Low Lube Oil Pressure Switch (LOPS) - set at 20 psi Trips engine/breaker Engine Overspeed Trip (OTS) - set at 1035 rpm 115% speed Trips engine/breaker

Manual Emergency Shutdown: Trips engine/breaker - A manual emergency shutdown pushbutton which does not get by-passed during emergency operation is located locally at the engine control panel. This device is provided for personnel and equipment protection.

Essential Subsystems:

The following are descriptions of the essential subsystems for the diesels:

a. Starting air system - each of the two emergency diesel generators has a complete starting air supply system including starting air compressor, two air reservoirs (each of which has the capacity to provide 5 starts without recharging), and two sets of two starting motors in parallel, one set from each reservoir. The compressor has sufficient capacity to recharge two air reservoirs from minimum to maximum starting air pressure in not more than 30 minutes. Each air compressor will charge one of the two air reservoirs in the starting systems for each of the two emergency diesel engines. A third compressor, which can be manually aligned to act as either of the normally aligned compressors, is available when either of the other two compressors has been isolated. (Figure 9.5-8A - Diesel Generator Air Start System, and Figure 9.5-10 - Diesel Generator Day Tank Location)

b. Lubricating oil system - each diesel engine has its own independent lube oil system which is an integral part of the engine. The lube oil system consists of the following (Figure 9.5-8 - Emergency Diesel Generator Auxiliary Systems):

1. Lube oil filtering and cooling system - this system draws oil from the engine sump through a cleanable basket strainer by means of an engine-driven scavenge pump. The oil is directed to a full flow filter, and then to an oil cooler. Thermostatically controlled engine jacket water cools and maintains the lube oil temperature automatically at the proper operating condition. The cooled oil returns to an engine-mounted strainer.

2. Main lubrication and piston cooling systems - these systems draw oil from the oil cooler through the duplex strainer by the gear-driven pressure pump. The main lubrication oil system supplies oil pressure to all necessary moving parts of the engine. The piston cooling pump discharges oil in continuous sprays on the underside of the piston crown. All oil from these systems drains into the engine oil sump. A dipstick oil level gauge is provided, and the oil is added at the strainer.

8.3-10 UFSAR Rev 32 9/2018 Davis-Besse Unit 1 Updated Final Safety Analysis Report

3. Turbocharger cooling system - an independent, essentially powered, AC motor-driven turbo oil pump draws oil from the sump and delivers it to the turbocharger bearings through a replaceable cartridge filter. This pump is always kept running to provide pre-lubrication of the turbocharger bearings for starting and post-lubrication at stopping. The oil drains from the turbocharger housing into the oil sump. An alarm is actuated if sufficient oil pressure is not provided to the turbocharger bearings. An electric, DC motor- driven pump acts as a back-up to the AC turbo oil pump. The DC motor- driven pump is normally in standby (not running) but will automatically start when the discharge pressure from the AC motor-driven turbo pump drops off.

4. An essentially powered AC motor-driven circulating oil pump draws oil from the engine sump and circulates it through the main lube oil filter, the lube oil cooler, and the main lube oil gallery. This pump is always kept running to provide pre-lubrication of the engine with warm, filtered oil. c. Jacket water cooling system - each emergency diesel engine water jacket cooling system includes a heat exchanger, expansion tank, lube oil cooler, automatic cooling water temperature regulating valve, and engine-driven water pumps. Jacket cooling water is circulated in a closed loop through the engine lube oil cooler, the engine cooling water passages, and the shell side of the raw water heat exchanger. The raw water flowing through the tube side is a part of the component cooling water system.

An electric immersion heater powered from an essential source is provided in the diesel engine jacket water system, and is controlled by a temperature switch. The immersion heater keeps both the jacket water and lube oil systems warm during standby conditions to enhance reliability and fast starting of the emergency diesel generator set. The heated water is circulated by thermo-siphoning through the lube oil cooler where the circulating oil gets heated up, and is maintained above 85°F. A low jacket water temperature alarm monitors the operation of the immersion heater. (Figure 9.5-8 - Emergency Diesel Generator Auxiliary Systems)

d. Fuel oil system - the diesel oil system includes seven days storage of fuel oil for each emergency diesel generator. This system consists of the emergency diesel generator day tank, bulk storage (week) tank, pumps, and associated piping and valves to the respective diesel generator. The oil storage tank and the fuel oil transfer system are designated as Class 1E structures within the meaning of IEEE 308. A complete description of the diesel fuel oil system is given in Subsection 9.5.4.

The fuel oil filtering system is composed of a number of devices to guarantee fuel oil purity. Before entering the suction of the engine driven fuel pump, the oil passes through a strainer which protects the pump. The oil discharged from the pump then passes through a duplex cartridge filter. The fuel supplied by the DC motor-driven, redundant fuel pump is filtered in the same manner as that supplied by the engine driven pump, except that a duplex basket strainer is used on the suction of the pump. (Figure 9.5-8 - Emergency Diesel Generator Auxiliary Systems, and Figure 9.5-10 - Diesel Generator Day Tank Location)

8.3-11 UFSAR Rev 32 9/2018 Davis-Besse Unit 1 Updated Final Safety Analysis Report

The factors which are used to determine that the emergency diesel generator day tank capacity is sufficient for approximately 24 hours at 110 percent full load operation are as follows:

The emergency diesel generator day tank normally stores approximately 5000 usable gallons of fuel oil, (4728 gals at the tank low level switch setpoint for starting the Transfer Pump to 5155 gallons at the tank high level switch setpoint for shutting off the Transfer Pump). At 100 percent rated load, 5000 gallons of usable fuel oil is sufficient to continue operation for approximately 25 hours. If loading is 110 percent this quantity of fuel oil is sufficient to continue operation for approximately 23 hours, assuming a reasonable increase in the fuel oil consumption rate (lbs. of fuel oil per bhp per hour) above the rate at 100 percent load. However, a low-low level alarm is established with approximately 4530 gallons usable fuel still remaining in the tank. This quantity of fuel oil can maintain full load diesel operation for approximately 23 hours or approximately 21 hours at 110 percent loads, assuming the same reasonable increase in the fuel oil consumption rate used earlier. e. Air intake and exhaust systems - the air intake structure and filtering system for each diesel consists of an intake filter assembly, an intake silencer, and interconnecting piping to the diesel engine-mounted air inlet flexible connector. The filtered air then enters the impeller-end of a turbocharger where its pressure is increased for combustion and exhaust gas removal. The exhaust system consists of an engine-mounted manifold, turbine-end of the turbocharger, and inter- connecting piping to an exhaust silencer. (Figure 9.5-8A - Diesel Generator Air Start System)

The physical arrangement of the air intake and exhaust for the emergency diesel generators is shown in Figure 8.3-13 - Auxiliary Building Sections, and Figure 9.5-10 - Diesel Generator Day Tank Location. The air intake filter and intake and exhaust silencers are located outside at the roof of the auxiliary building above the diesel rooms. Suitable enclosures are provided to protect the filter and silencers from missiles, tornadoes, snow, rain, etc. Since the air intake is located outside of the diesel building, there is no possibility of fire extinguishing agents being drawn into the air intakes. The physical separation of the intake and exhaust preclude significant recirculation of exhaust gas into the air intake.

f. Excitation and voltage regulating system - a solid state excitation and voltage regulating system of the series boost static regulator type, is provided for each emergency diesel generator unit. The exciter is of the static type having fast response characteristics and reliability for allowing the startup of a heavy load parallel with a running load. The voltage regulator is a static type with silicon type rectifiers and provides the necessary excitation control to maintain the adjusted generator voltage with the generator operating at loads ranging from zero up to and including its overload capacity at rated power factor and frequency. The generator reactance’s, excitation system, and regulator response time are such that adequate voltage is provided to meet automatic loading requirements in accordance with AEC Safety Guide 9. The electric power supply for field flashing will be taken from the respective station battery. Sufficient electrical instrumentation is furnished to survey the variables required for successful operation of the excitation and voltage regulation system.

8.3-12 UFSAR Rev 32 9/2018 Davis-Besse Unit 1 Updated Final Safety Analysis Report

Electrical instrument power supplies will be 120V AC and 125V DC from redundant essential instrument power distribution panels.

Sufficient mechanical and electrical instrumentation is provided for each emergency diesel to survey the variables required for successful operation.

The systems monitored included the starting system, lubrication system, fuel system, cooling system, combustion air system and exhaust system.

Separation/Hazards

Figure 3.6-3 indicated the physical arrangement of the diesel generators, fuel oil day tanks, and starting air system. Physical separation is provided to each diesel generator and its associated auxiliary systems. The floor drains in the two EDG rooms are interconnected, and therefore not physically separated and independent. An evaluation of this common drain design verified that no credible single event would disable both EDG units (see also Flooding in this subsection). The redundant emergency diesel generating units are located in separate, adjacent rooms in the Seismic Class I auxiliary building (also see Subsection 8.3.1.1.8). A fire wall and door are provided between the two rooms. The local control and auxiliaries for each emergency diesel generating unit are located in the same room as the diesel with which they are associated.

Missiles

Internal missiles generated by one unit will not affect the redundant unit since the walls act as missile barriers. A high crankcase pressure switch is provided which will alarm. These units are located in the auxiliary building which is protected from external missiles generated by a tornado. There are no other external missiles which can affect these units.

Fires

Each diesel generator room is protected by a pre-action sprinkler system. Water is admitted to the system through an automatically actuated valve located outside the diesel generator rooms, which is automatically activated by photoelectric smoke detectors. Pressure switches are provided. Photoelectric smoke detectors are provided for alarm. In addition, a hose station and portable fire extinguishers are provided for each room. The diesel oil day tank rooms are protected with a wet pipe, automatic sprinkler system. Flow switches are also provided. Fire walls and doors separate each diesel generator and its associated auxiliary systems.

Flooding

Four-inch drains are provided in each room to accommodate fire suppression water, fuel oil spills or leak in a diesel engine heat exchanger component cooling water line. The floor drains in these two rooms are tied together and the drainage rate is limited due to the oil interceptor that these drains connect to. Fire suppression activities that introduce water at a rate in excess of the capacity of this common drain system require that the one of the outside doors to one of the rooms be opened or suppression activities minimized to prevent flooding in both rooms. See Table 9.2-6 for a single failure analysis of the component cooling water line.

Mechanical Failures

The intake, exhaust, fuel oil, cooling water, and lube oil systems are independent systems for each diesel generator unit.

8.3-13 UFSAR Rev 32 9/2018 Davis-Besse Unit 1 Updated Final Safety Analysis Report

The starting air systems are interconnected. Each compressor charges one air receiver for each unit. One compressor can be lost with the redundant compressor capable of charging one air receiver for each unit. Likewise, the loss of one air receiver and its associated piping and valves will not prevent starting from the redundant air receiver. In addition, a third swing compressor can be aligned to act automatically as either of the other two compressors. Interconnecting piping between redundant starting systems is typically isolated by double valving. However, with other alignments, such as the third compressor in service, interconnecting piping between redundant starting systems is isolated minimally by a single manual valve, as can be seen in Figure 9.5-8A. Also, there are two air lines on each EDG that tap off downstream of the air start solenoid valves, pass through a check valve, and then combine into a common header for the hydraulic governor air booster servomotor. The check valves prevent air back-leakage into the other air side.

Auxiliary Support Systems

The following are Seismic Class I auxiliary systems which supply the emergency diesel generator rooms of the auxiliary building:

- Fuel Oil System: this system is fully described in Subsection 9.5.4 and 8.3.1.1.4.1. (Figure 9.5-10 - Diesel Generator Day Tank Location, and Figure 9.5-8 - Emergency Diesel Generator Auxiliary Systems)

A Seismic Category 1, missile protected, fuel oil storage and transfer system that meets IEEE 308 requirements is provided.

- Component Cooling Water System: this system is fully described in Subsection 9.2.2. (Figure 9.2-2 - Component Cooling Water System)

Subsection 8.3.1.1.4.1 describes, in detail, the diesel generator jacket water cooling system.

- Ventilation System: this system is described in Subsection 9.4.2.1.2.

Subsections 9.4.2.1.2.3 and 9.4.2.1.3.3 describe, in detail, the emergency diesel generator room ventilation system.

During the winter, heating for the emergency diesel generator rooms is supplied by means of an electric heating system which maintains a 60°F minimum temperature with an outdoor design temperature of -10°F.

In addition, the ventilation fans in each room automatically start whenever the diesel in that room is operating. Outside air is mixed with the recirculation air, as required, to maintain design conditions in the room. The fan motors are energized from the essential 480V motor control centers to guarantee their availability.

- Station batteries: as noted in Subsection 8.3.2.1.4, some battery power has been assigned to each emergency diesel generator. This assignment is for control and field flashing, not for cranking service.

8.3-14 UFSAR Rev 32 9/2018 Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.3.1.1.4.2 Alternate AC Source - Station Blackout Diesel Generator

The purpose of the non-class 1E 4.16kV, 2865KW Station Blackout Diesel Generator (SBODG) is to provide AC power to all systems required for coping with a Station Blackout as defined in 10CFR50.2. This alternate AC power source meets the criteria specified in Appendix B to NUMARC 87-00, “Guidelines and Technical Bases for NUMARC Initiative Addressing Station Blackout at Light Water Reactors” and in Regulatory Guide 1.155, “Station Blackout.”

The SBODG and support systems (auxiliaries), except the engine radiator, are located in a separate structure south of the Station within the protected area. To protect the SBODG from likely weather events which could initiate a loss of off-site power, this structure shall conform to Ohio Basic Building Code. Additionally, all cabling between this structure and the Station is routed through buried duct bank. The SBODG engine radiator is designed for outdoor installation.

Two 1200 amp circuit breakers in series connect the SBODG to the Station’s nonessential 4.16 kV Bus D2. The circuit breaker which is at Bus D2 is normally closed and supplies power to SBODG auxiliaries during standby conditions. Closing the normally open 1200 amp circuit breaker which is located in the SBODG building connects the generator to Bus D2. During emergency conditions, power to the SBODG auxiliaries is supplied by the generator itself.

The SBODG is capable of supplying either of the Station’s essential 4.16kV buses through nonessential Bus D2 and is available within ten minutes of the onset of Station Blackout. During an emergency, the SBODG can be manually started and loaded onto Bus D2 from the Control Room auto starting and loading is not provided. Operation of circuit breakers to make an SBODG line up to either essential bus can also be accomplished from the Control Room. The SBODG is capable of unattended operation at rated full-load for at least four hours. The SBODG has the following ratings and characteristics:

Continuous Rating 2865kW, 3580kVA 2000 Hour Peaking 3135kW, 3918kVA Power Factor 0.8 Reactances xd = 2.35 xd’ = 0.42 xd” = 0.27

A 125V battery system is included among the SBODG auxiliaries. These batteries have sufficient capacity to maintain DC control power and diesel-generator starting and loading ability. SBODG Breaker AD213, which is normally closed, receives control power from the Station’s Train 2 D.C. Distribution System.

A compressed air system is used for SBODG engine starting. The primary system components are two ASME Code VIII air receivers and two electric motor driven air compressors.

The fuel oil supply for the SBODG engine is separate from the fuel oil supply used by the Station’s Emergency Diesel Generators. The SBODG fuel oil supply tank has enough capacity to provide an eight-hour supply with the generator at rated load. Four hours of fuel must be stored in this tank to meet the Site’s Station Blackout duration.

The SBODG building is protected by fire protection systems.

The diesel engine cooling system is a closed loop system. Cooling is provided using a force draft radiator with engine-driven cooling water pumps.

8.3-15 UFSAR Rev 32 9/2018 Davis-Besse Unit 1 Updated Final Safety Analysis Report

SBODG testing follows the recommendations presented in Appendix B of NUMARC 87-00. To facilitate testing, a sync-check relay prevents paralleling the SBODG with the auxiliary transformer or either start-up transformer until the generator has been manually synchronized.

8.3.1.1.5 480V AC Auxiliary System

The station 480V AC distribution system consists of:

Two 1000kVA 4160-480V AC essential unit substations (E1 and F1) for the supply of power to the 480V AC safety loads.

Six 1000kVA, 13800-480V AC nonessential unit substations (E2, E3, F2, F3, EF4, and EF6) for the supply of power to the 480V AC normal auxiliaries.

One 1000kVA, 4160-480V AC nonessential unit substation (F7) for the supply of 480V AC to Station Auxiliaries.

One 225kVA, 4160-480V AC distribution center for supplying 480V AC power to the station blackout diesel generator auxiliaries.

Two 750kVA, 4160-480V AC lighting substations (E5 and F5) for station lighting.

One 112.5kVA, 4160-480V AC outdoor distribution center for outdoor lighting.

Two 500kVA, 4160-480V AC switchyard distribution centers for supplying 480V AC power to the switchyard.

See Figures 8.3-14 through 8.3-18.

The two 4160-480V AC essential unit substations are double ended (two transformers) with transformer secondaries wye connected and the neutral high resistance grounded. The six 13800-480V AC nonessential unit substations are double-ended (two transformers) with transformer secondaries wye connected and the neutral solidly grounded, except for transformers AE3 and BF3, which are high resistance grounded. The capacity of each transformer is sufficient to permit station operation with one transformer out of service. The two 4160-480V AC essential and four of the 13800-480V AC nonessential unit substations have a single bus; each of the remaining two 13800-480V AC nonessential unit substations has a two bus arrangement with a tie breaker between the buses.

Each 4160-480V AC essential unit substation is supplied from its corresponding 4160V AC essential bus through redundant normally closed 1200 ampere circuit breakers; one feeder is connected to the primary side of each transformer. The transformer secondary side is connected to the 480V, 1600 amp bus through a 1600 amp circuit breaker. During normal operation both of the essential 4160-480V AC unit substation transformers are energized with one transformer carrying the load and the second transformer carrying no load. Transfer from one transformer to the other is by manual control only; automatic transfer is not provided. It is possible to accomplish either a live (bus energized) or a dead (bus de-energized) transfer at the operator’s discretion (see Figures 8.3-19 through 8.3-22).

Each 13800-480V AC nonessential unit substation is supplied from alternate 13800V AC Buses A and B. Apart from the arrangement of the incoming primary feeders, four of these substations are designed to operate in the same manner as the essential substations. Each of the

8.3-16 UFSAR Rev 32 9/2018 Davis-Besse Unit 1 Updated Final Safety Analysis Report remaining two substations has a manual transfer scheme between the two main circuit breakers and the bus tie circuit breaker such that only two breakers can be maintained in the closed position at the same time. The bus tie breaker is normally open.

The 4160-480V AC nonessential unit substation F7 is supplied from 4160V Bus D2 through a normally closed 1200 ampere circuit breaker. The transformer secondary side is connected to the 480V AC 1600 amp bus through a 1600 amp circuit breaker.

The nonessential 225kVA 4160-480V AC distribution center consists of a 480V AC motor control center BF81 which supplies power to the station black out diesel generator (SBODG) auxiliaries. The center is fed from transformer DF8, a 4160-480V transformer through breaker BF8105. Transformer DF8 is powered through a fuse from 4160V Bus D3 by either the SBODG via breaker AD301 or from Bus D2 via AD213. The normal feed for D3 (and DF8) is from Bus D2 breaker AD213.

Each of the two lighting substations has a single bus arrangement and one transformer. The primary side of the transformer is connected to one 4.16kV AC nonessential bus. The secondary side is connected to the 1600 amp bus through a 1600 amp circuit breaker. The two lighting substation 480V AC buses are connected through a normally open tie breaker. Either transformer can supply the entire station lighting load.

An outdoor distribution center supplies 480V AC power for outdoor lighting and other miscellaneous loads. The distribution center transformer is connected to one of two alternate 4.16kV sources through a manual throw-over switch.

Two switchyard distribution centers are provided to supply the switchyard AC requirement of 480V AC and below. Each distribution center transformer is connected on the primary side to one 4.16kV AC nonessential bus.

The 480V AC system also contains approximately 70 motor control centers about two-thirds of which supply nonessential station loads, and the remainder serve engineered safety features and other safety loads. The motor control centers are supplied from the unit substations.

The equipment is arranged and switching accomplished such that the loss of any 480V bus or any single failure would deprive the station of only part of the safety-related equipment associated with that particular function. The remaining operational equipment will be adequate in these circumstances to allow the station to continue to operate and supply all safety functions (see Figures 8.3-23 and 8.3-24).

The circuit breakers shown on Figure 8.3-2 identified as being “without automatic tripping device” and described as follows.

The breakers are molded case type which have continuous current ratings equal to the frame size, but are not equipped with automatically operating over current circuit tripping elements.

The breakers are designed to function as manually operated, high capacity disconnect switches only. Normal circuit protective functions are assigned to other system breakers, i.e., those breakers with over current tripping elements.

The use of this type of breaker can be justified in the design of a Class 1E power system since, as stated previously, circuit protective functions are properly assigned to breakers equipped with automatic over current tripping elements or current limiting fused disconnect switches.

8.3-17 UFSAR Rev 32 9/2018 Davis-Besse Unit 1 Updated Final Safety Analysis Report

The following is a description of the design of the Class 1E electric power systems downstream of the 480V switchgear buses “E1” and ‘F1” (Figure 8.3-2), to demonstrate conformance with IEEE Standard 308-1971 and Regulatory Guide 1.6.

As noted on the revised Figure 8.3-2, all possible cross connections, except three, between buses “E1” and “F1“ and a fourth between “F1” and non-essential Bus “F7”, have been eliminated. These remaining four listed below, are designed with both electrical and manual mechanical interlocking to guarantee independence between buses “E1” and “F1” and between “F1” and “F7”; this conforms to Regulatory Guide 1.6, position 4 (d). In addition, transfer between “E1“ and “F1” and between “F1” and “F7” is non-automatic, and thus conforms to Regulatory Guide 1.6, positions 4 (a) through 4 (c).

a. Motor control center F13 is non-safety related. It has its associated incoming, non- automatic circuit breakers, BF1310 and BF1304, mechanically interlocked by a Kirk key system which precludes having both breakers in the closed position at any one time. The associated upstream motor control center normal feeder breaker, BF705, at bus “F7” is automatically tripped by an electrical interlocking contact from breaker BF1304 if breaker BF1304 is open. Similarly, the upstream motor control center alternate feeder breaker, BF113, at bus “F1” is automatically tripped by an electrical interlocking contact from breaker BF1310 if breaker BF1310 is open. Thus there is no direct interlocking between buses “F7” and “F1“. In addition, an alarm in the control room is established if a non-normal breaker alignment (based on Figure 8.3-2) is set up.

b. Motor control center EF15 has a split bus arrangement, one bus for high speed and the second for low speed operation of containment cooler fan 1-3. Kirk key type mechanical interlocking is provided between breakers BEF152 and BEF154 and between breakers BEF151 and BEF153. This prevents both paired breakers from being in the closed position at any one time. Breakers BEF151 and BEF152 are electrically interlocked with their associated upstream substation breaker BE105. In addition, breakers BEF153 and BEF154 are electrically interlocked with their associated upstream substation breaker BF105. The electrical interlocking is actuated to trip the substation breaker if either of its associated downstream breakers is open. An alarm in the control room is established if a non-normal breaker alignment (based on Figure 8.3-2) is set up.

c. Motor control center EF12C can be fed from either bus “E1“ or bus “F1“ via motor control centers E12A or F12A, respectively. Kirk key type mechanical interlocking is provided between fused disconnect switches BEF121 and BEF122 in order to preclude having both fused disconnect switches closed at the same time. Electrical interlocking is provided between fused disconnect switch BEF121 and its associated upstream, latch-in type contactor at BE1280 of motor control center E12, section E12C and between fused disconnect switch BEF122 and its associated upstream, latch-in type contactor at BF1280 of motor control center F12, section 12C. In both cases, electrical interlocking prevents contactor closing if the associated downstream fused disconnect switch is open. The electrical interlocking also trips the contactor if the downstream fused disconnect switch is opened after the contactor has been closed.

d. Motor control center EF12D can be fed from either bus “E1” or bus “F1” via motor control centers E12A or F12A. Kirk key type mechanical interlocking is provided

8.3-18 UFSAR Rev 32 9/2018 Davis-Besse Unit 1 Updated Final Safety Analysis Report

between breakers BEF128 and BEF129 in order to preclude having both breakers closed at the same time. Electrical interlocking is provided between breaker BEF128 and its associated upstream contactor at BE1207 on MCCE12A and between breaker BEF129 and its associated contactor at BF1224 on MCCF12A. In both cases, electrical interlocking prevents contactor closing if the associated downstream breaker is open.

8.3.1.1.6 120V AC Auxiliary System

The station 120V AC system (see Figure 8.3-25) consists of:

Four essential instrument distribution panels each supplied from a 125V DC/120V AC inverter. The four essential instrument distribution panels are comprised of six physical panels, Y1, Y1A, Y2, Y2A, Y3, and Y4. The two physical panels for Channel 1, Y1, and Y1A, are administratively controlled as a single panel, identified as bus Y1. The two physical panels for Channel 2, Y2, and Y2A, are administratively controlled as a single panel, identified a bus Y2. Buses Y3 and Y4 are each comprised of a single distribution panel.

Two regulated instrument distribution panels each supplied from one 480/120V AC static voltage regulator.

Two uninterruptible instrument distribution panels each supplied from a 250V DC/120V AC inverter.

All inverters are fed from the DC power supplies as described in Subsection 8.3.2.

Each of the four 120 volt single phase, 60 Hertz essential instrument distribution panels supplies power to one of the four channels in the reactor protection system and the safety features actuation system. The essential instrument AC system is arranged so that any type of single failure or fault will not prevent the reactor protection system or safety features actuation system from performing their safety functions. There are four independent panels available, and a single failure within the system can involve only one panel. A combination of simultaneous failures or faults on any two of the channels will trip the reactor and trigger the safety actuation system.

The inverter and rectifier for channels 1, 2, 3, and 4 are equipped with a static automatic bypass switch for fault clearing capability and for maintaining power to the 120V AC essential distribution panels upon inverter failure. The alternate source for channels 1 and 3, and 2 and 4 inverters are essential 480V AC busses E1 and F1 respectively through a 480/120V AC constant voltage transformer (CVT). Although the essential CVT is available as a maintenance backup source, a non essential regulated instrumentation distribution panel is also available as an alternate source to the 120V AC distribution panel via manual transfer.

Each uninterruptible instrument distribution panel is fed from one 50kVA single phase, 60 Hertz 250V DC/120V AC inverter and supplies important non-safety related loads, as shown in Figure 8.3-25.

Each of the two regulated instrument panels is fed from one of two static voltage regulators, from a separate AC source, and supplies non-safety-related instrument and miscellaneous controls.

8.3-19 UFSAR Rev 32 9/2018 Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.3.1.1.7 Channels

Davis-Besse Nuclear Power Station Unit No. 1 has four essential Channels 1, 2, 3, and 4.

8.3.1.1.8 Physical Arrangement of the AC Electrical System Components

The physical locations of electrical distribution system equipment are such as to minimize vulnerability of essential circuits to physical damage as a result of accidents. Redundant Class 1E distribution switchgear (both medium and low voltage), some motor control centers, and distribution panels are located in separate, rooms in the Seismic Class I auxiliary building. In two cases, where redundant Class 1E motor control centers are located within the same room, horizontal separation distances are 6 and 17 feet. The MCCs separated by 6 feet have a block wall fire barrier located approximately midway between them. The locations are as follows: (See Figures 8.3-31 through 8.3-34.)

a. The auxiliary, startup, and bus tie transformers are located out of-doors, physically separated from each other. Lightning arresters are provided for the startup transformers. All outdoor transformers are protected by automatic water spray systems to extinguish oil fires quickly and prevent the spread of fire. Fire walls are installed between transformers to minimize the exposure to fire and mechanical damage.

b. The medium voltage switchgear buses are located indoors in physically isolated rooms as follows:

13.8kV bus A and 4.16kV buses C1 (Channel 1) and C2 are located in room 325;

13.8kV bus B and 4.16kV buses D1 (Channel 2) and D2 are located in room 323;

4.16kV manual transfer breakers (Channel 3) are located in room 324.

c. Low voltage switchgear room 428 contains the following:

480V AC unit substations F1 (Channel 2) and F2;

480V AC motor control center F12A (Channel 2);

480V AC motor control center F14 (Channel 2);

480V AC motor control center F15 (Channel 2);

480V AC motor control center F16A (Channel 2);

120V AC panel Y2 and 125V DC/120V AC inverter YV2 (Channel 2);

120V AC panel YBU and 250V DC/120V AC inverter YVB;

480-120V AC Constant Voltage Transformer XY2

120V AC regulated panel YBR and 480V/120V AC static voltage regulators XYB;

8.3-20 UFSAR Rev 32 9/2018 Davis-Besse Unit 1 Updated Final Safety Analysis Report

480V AC lighting substation F5 (non-essential). The other 480V AC lighting substation E5 is located in the turbine building d. Low voltage switchgear room 429 contains the following:

480V AC unit substations E1 (Channel 1) and E2;

480V AC motor control center E12A (Channel 1);

480V AC motor control center E14 (Channel 1);

480V AC motor control center E15 (Channel 1);

120V AC panel Y1 and 125V DC/120V AC inverter YV1 (Channel 1);

120V AC panel YAU and 250V DC/120V AC inverter YVA;

120V AC regulated panel YAR and 480V AC static voltage regulator XYA.

480-120V AC Constant Voltage Transformer XY1

e. Low voltage supply room 428B contains 120V AC panel Y4 and 125V DC/120V AC inverter YV4, both Channel 4.

480-120V AC Constant Voltage Transformer XY4

f. Low voltage supply room 429A contains the following:

120V AC panel Y3 and 125V DC/120V AC inverter YV3, both Channel 3;

480-120V AC Constant Voltage Transformer XY3

480V AC motor control center EF15 (Channel 3).

g. The remaining 480V AC motor control centers are located indoors in areas of electrical load concentration. Physical separation is maintained between essential motor control centers fed from redundant channels.

h. The redundant Class 1E emergency diesel generating units which serve as the standby power supplies are located in separate, adjacent rooms (318 and 319) in the Seismic Class I auxiliary building. A fire wall and door are provided between the two rooms. Starting air for each diesel is provided by independent air reservoirs, two (2) per diesel, one (1) for each set of starting motors.

The local control and auxiliaries for each emergency diesel generating unit are located in the same room as the diesel with which they are associated.

i. Four separate rooms, two on the east and two on the west side of the containment, are provided for electrical penetrations. The two rooms on each side are on different floors (see Figure 8.3-33).

8.3-21 UFSAR Rev 32 9/2018 Davis-Besse Unit 1 Updated Final Safety Analysis Report

Class 1E containment electrical penetrations carry only Class 1E circuits except as noted below. Redundant Class 1E containment electrical penetrations are widely dispersed around the circumference of the containment. Wherever possible, redundant circuits are run through separate penetration rooms. The center-to- center spacing between penetrations at the outside of the containment is 32 inches horizontally and 60 inches vertically. Separate penetrations are provided for power, control and instrumentation cables. For essential redundant systems in a given penetration room, penetrations are kept as far apart as possible, and in no case will they be less than 9 feet apart. Cables in the annulus space are installed as shown on Figure 8.3-34.

The minimum physical separation for redundant electrical penetrations inside the containment are listed below:

1E Channels Distance 1 to 2 22’ 1 to 3 24’ 1 to 4 23’ 2 to 3 10’ 2 to 4 21’ 3 to 4 24’

As discussed in Subsection 8.3.1.2.29, all containment electrical penetrations, regardless of circuit function assignments, are designed and tested to meet IEEE Std. 317-1971. Conax penetration assemblies were designed and tested to meet IEEE 317-1976 as modified by NRC Regulatory Guide 1.63, Revision 2. Cables which are part of Class 1E circuits are assigned to penetrations which are exclusively dedicated to Class 1E service, whereas cables which are part of non- Class 1E circuit functions are assigned to penetrations dedicated for that service. Exceptions are as follows:

1. The non-Class 1E cables that feed the motor space heaters associated with two containment cooler fans. These heater circuits are de-energized when the fans are running.

2. The cables for the Reactor Vessel Vent Line Temperature thermocouples, which are non-Class 1E circuits that utilize a penetration dedicated exclusively to Class 1E instrumentation circuits. This situation has been analyzed and found to have no adverse affect on Class 1E circuits in the same penetration.

3. The non-Class 1E cables associated with Containment Recirculation Fan 2 motor. These cables were originally Class 1E and were later downgraded to non-Class 1E. However, they physically remain with Class 1E circuits, and are considered associated Class 1E circuits. They have been evaluated and found not to present the potential to degrade the integrity of their Class 1E power supplies.

Redundant Class 1E containment electrical penetrations are widely dispersed around the circumference of the containment.

The electrical penetration assemblies are described in Subsection 3.8.2.1.10.

8.3-22 UFSAR Rev 32 9/2018 Davis-Besse Unit 1 Updated Final Safety Analysis Report

j. The applications, installation and routing of control, instrumentation and power cables are such as to minimize their vulnerability to damage from any source and to maintain the integrity of their respective redundant channels and/or branches.

k. All Class 1E cables are run in solid bottom trays when not in embedded conduit, exposed conduit, or wireway except for cables in the annulus space and manholes, In general, all Class 1E powercables are run in conduit except for those instances mentioned in Subsection 8.3.1.2.19.

l. The locations of redundant Class 1E actuated equipment such as pump drive motors and valve operating motors have been reviewed to ensure the minimum required functional capability despite any single design basis event or result therefrom.

8.3.1.1.9 Tests and Inspections

The AC electrical systems are designed to permit testing and inspecting the operability and functional performance of the components of the system as well as the operability of the system as a whole. Essential and safety-related systems are provided with complete redundancy to permit testing of one system while the redundant system is performing the same function. This ensures no interruption of station operation.

The 345kV circuit breakers will be inspected, maintained and tested on a routine basis. This can be accomplished without removing the generator, transformers and transmission lines from service.

Transmission line protective relaying will be tested on a routine basis. This can be accomplished without removing the transmission lines from service. Generator and unit auxiliary transformer relaying will be tested when the generator is off line. Startup transformer relaying will be tested while the transformer is off the line.

The 13800, 4160 and 480 volt circuit breakers and associated equipment may be tested while individual equipment is shut down. The circuit breakers may be placed in the test position and tested functionally. The breaker opening and closing may also be exercised. Circuit breakers and contactors for redundant or duplicated circuits may be tested in service without interfering with the operation of the unit.

Manual and automatic transfer schemes among the various power sources will be tested on a routine basis to prove the operability of the system.

The capability of the essential buses to provide power to engineered safety features components will be demonstrated as part of the surveillance requirements of the station Technical Specifications. Additionally, continuous normal operation of selected service water and component cooling pumps on the 4160V essential buses, of selected containment air cooler fans on 480V essential buses, and operation of the RPS, SFAS, and radiation monitoring systems on the 120V AC essential instrumentation buses will verify essential power availability. Emergency diesel generator availability will be verified according to Technical Specifications.

Local indication of 480V fused disconnect switch status is provided at the fused disconnect switch MCC bucket. A “status” light provides visual confirmation of a satisfactory circuit status for all 3 phases, which indicates fuse condition and disconnect switch closure.

8.3-23 UFSAR Rev 32 9/2018 Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.3.1.1.10 Administratively Controlled Devices

Administratively controlled circuit opening devices are listed in Table 8.3-2 by device number, type and location.

8.3.1.1.11 Cross Ties Between MCC E11B and F11A

The primary and backup boron dilution flow paths each have a Train 1 and Train 2 essentially powered isolation valve in series. These four valves are:

Line Valve Channel MCC Valve Location MCC Location

Primary Flowpath Auxiliary pressurizer El. 585’ spray HV2735 1 E11B Inside cont. Room No. 304

Auxiliary pressurizer El. 603’ spray HV2736 2 F11A Outside cont Room No. 427

Backup Flowpath Decay heat El. 603’ suction HVDH11 2 F11A Inside cont. Room No. 427

Decay heat El. 585’ suction HVDH12 1 E11B Inside cont. Room No. 304

Should one of the two redundant emergency diesel generators fail, should the 4 kV bus C1 or D1 fail, or should 480V bus E1 or F1 fail; it would be necessary to provide power to at least one of the affected two valves from the unaffected power supply. This would be accomplished by administratively utilizing the tie path between MCC F11A and MCC E11B as provided in Davis- Besse Emergency Operating Procedures (refer to Figures 8.3-23 and 8.3-24).

Interconnecting cables are designated as Channel 12 and are run in conduit dedicated exclusively for these cables.

8.3.1.1.12 Motors

All safety related Limitorque actuators shall be purchased to a specification which insures the motor will be able to perform its intended safety function with 70 percent of motor rated nameplate voltage, or, on an individual basis where the 70 percent of motor rated nameplate voltage does not apply, be purchased to a percentage of rated nameplate voltage which assures satisfactory operation under all required conditions.

While most initial purchase specifications required valve operation at 70 percent terminal voltage; in some cases subsequent evaluations have determined that required torque is greater than originally determined. In those cases operation of the valve has been established using available voltage at the Limitorque actuator’s terminals, as determined by calculation.

8.3.1.2 Analysis

The station AC electrical system as described under Sections 8.2 and 8.3 ensures the following:

8.3-24 UFSAR Rev 32 9/2018 Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.3.1.2.1 Switching

Three physically independent transmission lines are provided from the transmission network to the station switchyard minimizing power failure due to faults in the network interconnection and the associated switching (see Subsection 8.2.1.1).

8.3.1.2.2 Independent Circuits

Three independent circuits are provided to supply power to the onsite electrical distribution system, and with any two circuits in service the requirements of NRC General Design Criterion 17 are fulfilled.

8.3.1.2.3 Onsite Standby Emergency Diesel Generator Units

Two onsite standby emergency diesel generator units are provided. Independence and physical separation between the two units and between each unit and the other power sources is maintained so that no credible single event will disable more than one unit. The floor drains in the two EDG rooms are interconnected, and therefore not physically separated and independent. An evaluation of this common drain design verified that no credible single event would disable both EDG units (see also Flooding in Subsection 8.3.1.1.4.1).

8.3.1.2.4 Power Distribution System

The two engineered safety features power distribution systems are connected to different 4.16kV essential buses, and they are redundant in that completion of the starting and loading of one emergency diesel is adequate to satisfy the minimum engineered safety feature requirements.

8.3.1.2.5 DELETED

8.3.1.2.6 Parallel Operation

Parallel operation of the emergency diesel generators is not permitted.

8.3.1.2.7 Testing

During modes 1, 2, 3, or 4 an emergency diesel generator (EDG) can be tied to the grid (loaded) only if the other EDG is operable. If one EDG is inoperable during modes 1, 2, 3, or 4, the remaining operable EDG can be started for testing, but shall not be tied to the grid (loaded). In modes 5 or 6 with one EDG inoperable, the remaining operable EDG can be started and may be tied to the grid (loaded) for testing purposes. lf the remaining operable EDG is loaded in modes 5 or 6, the Technical Specification requirements for the required EDG being inoperable shall be followed.

8.3.1.2.8 AC Electrical System

The station essential AC electrical system consists of two electrically isolated and physically separated load groups. Each has access to normal (unit auxiliary transformer), reserve (startup transformer), and onsite standby (emergency diesel generators) power sources.

8.3-25 UFSAR Rev 32 9/2018 Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.3.1.2.9 Controls

Automatic and manual controls are provided to permit the following:

a. selection of the most suitable power source for the distribution system;

b. disconnecting the appropriate loads when normal and reserve sources are not available;

c. starting and loading the standby power supply.

8.3.1.2.10 Electric Power

Systems and equipment that provide electric power for the safe shutdown of the reactor are classified as Class 1E (essential) and are designed to perform their functions when subjected to any design basis event. The variation of voltage and frequency during switching of such equipment will not degrade the performance of any load to the extent of damaging the reactor coolant system or fuel rods.

8.3.1.2.11 Protection Systems

Protection systems are provided and designed to initiate automatically the operation of the appropriate equipment. Necessary protective devices are provided to isolate failed equipment and to identify the equipment that has failed. For the protection system related to the engineered safety features and essential functions, complete redundancy, independency, and inservice testability is maintained.

8.3.1.2.12 Instrumentation

Essential instrumentation, control, and power requirements are supplied by reliable, independent, and redundant sources designed to ensure that no single failure will result in loss of power to safety-related equipment.

8.3.1.2.13 Periodic Testing

All essential electrical systems are designed to permit periodic testing of the operation of individual system components with the station in operation.

8.3.1.2.14 Cables and Raceway Functions

Cable functions are divided into three categories: Power (P), Control (C), and Low Level Instrumentation (L). In addition cables are classified according to their service as essential and non-essential. Cable tray and wireway are classified according to their service as carrying essential and nonessential cables and according to their function. Conduit are only classified according to their service. Four essential channels are provided.

8.3-26 UFSAR Rev 32 9/2018 Davis-Besse Unit 1 Updated Final Safety Analysis Report

Essential Channels

Cables are identified with the color and by the first digit of the cable number corresponding to the channel, and the second character corresponding to the function as follows:

Channel Function

Designation Color Designation

1 Green Power (P) 2 Orange Control (C) 3 Light Blue Instrumentation (L) 4 Maroon

Cable tray and wireway are identified with the label background color corresponding to the channel, and the color of the label alphanumeric identifier corresponding to the function. The first digit of the identifier indicates the channel and the second character indicates the function.

Channel Function

Designation Color Designation Color

1 Green Power (P) Black 2 Orange Control (C) White 3 Light Blue Instrumentation (L) Yellow 4 Maroon

Conduit containing essential cables are banded with the color associated with the essential channel. Scheduled conduit (excludes lighting and communication circuits) in Containment and the Auxiliary buildings have an alphanumeric identifier which is stamped on a metal tag and attached to the conduit. Function is not included in the labeling of any scheduled conduit.

Interconnections Between Essential Channels

The 2 out of 4 logic design of the NI/RPS & SFAS necessitates running interconnecting cables between control room cabinets having different essential channel designations. The identifiers are 12, 13, 14, 23, 24, and 34.

Each cable is marked with the color corresponding to the channel which is designated by the first character of the cable number. For example. cable number 12SFSP01 means that the cable runs between Channel No. 1 and Channel No. 2 cabinets and is colored green which corresponds to Channel No. 1.

The interconnecting cables between the SFAS cabinets of different channels and between the RPS cabinets of different channels are routed through raceways that are independent of any other raceway. Interconnecting cables having different identifiers do not share a common raceway once outside the cabinets. Wireways containing the interconnecting cables have the same identifier as the cables, i.e., the first two characters of the raceway number are the same as the first two characters of the cable number.

External to the SFAS/RPS cabinets physical separation is required between interconnecting cables that are prefixed with 12, 13, 14, 23, 24 or 34. Physical separation is achieved by

8.3-27 UFSAR Rev 32 9/2018 Davis-Besse Unit 1 Updated Final Safety Analysis Report installing the differently prefixed cables in independent raceway system. Cables having the same prefix (identifier) share the same raceway. The interconnecting cables may contact non- essential cables of any channel (A, B, or C) provided bridging does not occur. (Bridging occurs when a single non-essential cable or conductor is simultaneously bundled, routed, or formed with cables or conductors of two different essential channels.)

Raceways connected to the RPS, with the exception of those used for NI loops, do not contain voltages in excess of the isolation device circuit ratings. The NI loop cables have a working voltage of 1200V for the intermediate and power range channels and 2400V for the source range channels. These cables, however, are run entirely in their own separate conduits from the detectors to the RPS cabinets.

RPS and SFAS In-Cabinet Isolation

As discussed in Subsection 7.3.2.3, physical separation between redundant channels of the SFAS is accomplished by locating each redundant channel in a separate cabinet assembly.

Internal to the SFAS cabinets, physical separation is maintained between interconnecting cables and input sensor cables. Physical separation is required between interconnecting cables and non-essential cables where bridging could occur. All cables pass through fire stops at cable entrances/exits. Isolation is provided between trip signals in interconnecting cables and essential cables. The isolation device circuits are designed to withstand the effects of short circuits, open circuits, grounds, electrical transients and the application of AC or DC potential as listed below:

1. Analog signal isolation device circuits are capable of withstanding a maximum of 600V DC or AC peak across their output without affecting the input.

2. Digital signal isolation device circuits have a minimum dielectric strength rating of 450V AC (RMS) between the input and output signals.

The isolation device circuit includes the isolation device, internal wiring and field wiring connection terminal strips. No single failure of an isolation device circuit will compromise the operating ability of the redundant system.

Analog signal isolation devices, with individual power supplies, are provided between the sensing channel and the logic channel. Digital signal isolation devices are provided between the logic channel trip bistables and the output modules of the actuation channel.

Electrical noise transient testing was performed on the SFAS equipment during system functional testing at the vendor facility. Noise transients were generated in close proximity to all interconnecting wiring including essential and nonessential wiring. All equipment was operational with inputs and outputs simulated. It was verified that the equipment operation was not affected by the transients. The noise test report has been submitted as part of the docket under separate cover.

As a further precaution against electrical noise, particularly radio interference, no portable radio transmitters (with attached transmitting antenna) or any other radio transmitting antennae will be allowed in the control/cabinet room or cable spreading room.

8.3-28 UFSAR Rev 32 9/2018 Davis-Besse Unit 1 Updated Final Safety Analysis Report

A test program was implemented by TED to demonstrate the adequacy of noise rejection isolation devices and internal cable routing of the RPS and SFAS for credible electrical faults introduced from non-Class 1E systems and equipment.

An evaluation of the Station and Instrument Ground Systems at the Davis-Besse Nuclear Power Station was performed by the Lawrence Livermore National Laboratory, California.

The reactor protection system was subjected to electromagnetic, electrostatic, and noise level tests. Also, system isolation tests were performed on selected devices of the RPS. A complete test description (test parameters, schematics, equipment list, procedures, and specifications) for each test was submitted by Toledo Edison Co. Each test consisted of four basic parts: type of test, acceptance criteria, pretest values, and post-test values. After the system or device was subjected to a selected type of test, the test values were analyzed to determine if the system or device failed to meet the acceptance criteria.

The scope of the testing for the SFAS was to demonstrate that the isolation capability of the digital and analog isolation devices are not degraded to unacceptable levels following the inadvertent application of postulated electrical faults in excess of normal operating currents. Also, that due to the intermix of non-Class 1E and Class 1E signal wiring, postulated electrical faults appearing on the non-Class 1E circuitry will not produce unacceptable effects in the Class 1E circuitry by means of mutual inductance and/or capacitive coupling.

The isolation device testing consisted of testing one of each type of device used in the SFAS Class 1E to non-Class 1E circuitry, while system testing consisted of utilizing one complete channel of the SFAS.

Based on the above, the isolation noise testing performed on the RPS and SFAS was found to be acceptable.

The reactor protection system has adequately demonstrated its capability to perform the Class 1E protective functions when subjected to electrostatic, electromagnetic, isolation and noise level tests. The above tests, performed to NRC approved test methods and MIL-N-19900B as required, concluded that:

(1) no significant degradation to the Class 1E circuitry occurred as a result of the fault tests;

(2) no spurious trips or resets of the relays occurred as a result of the fault tests; and

(3) no spurious trips, resets, or reactions of the SFA system occurred as a result of the fault tests.

NRC reviewed the tests and documents submitted and issued a Safety Evaluation Report accepting the tests and results, concluding that an analysis and testing of the ground grid systems has been conducted per NRC criteria and the ground ties found in the ground grid systems which do not meet design criteria have been isolated and corrected.

As discussed in Subsection 7.2.2.1, physical separation between redundant channels of the RPS is accomplished by locating each redundant channel in a separate cabinet assembly. The cabinet assembly provides physical protection of the cabinet internal equipment from external hazards such as missiles and fire. All openings between the cable spreading room and RPS

8.3-29 UFSAR Rev 32 9/2018 Davis-Besse Unit 1 Updated Final Safety Analysis Report cabinets through which RPS cables pass, are sealed to prevent the passage of fire, smoke, and fumes.

Internal to the RPS cabinets, the independence of redundant channels is maintained by isolation device circuits. The isolation device circuits have been tested and analyzed to protect against short circuits, open circuits, grounds, and the application of AC or DC potential as listed below:

1. Analog signal isolation device circuits are capable of withstanding a minimum of 400V DC or AC peak across their output without affecting the input.

2. Digital signal isolation device circuits have a minimum dielectric strength rating of 480V AC RMS between the input and output signals.

The isolation device circuits include the isolation device, internal wiring, and field wiring connection terminal strips. The isolation device is an isolation amplifier for analog signals and a relay for digital signals. The isolation device circuit internal wiring and field connection terminal strips have the same characteristics (flame retardancy, maximum operating temperature, dielectric strength) as the wiring and terminal strips used internally within the cabinets for Class 1E service.

The isolation device circuits have been tested and analyzed by type tests and type analysis to establish the isolation device characteristics. The RPS isolation device circuits for Toledo Edison Davis-Besse 1 Nuclear Power Generation Station are production units of the circuits tested and analyzed by type. The isolation test report was submitted as part of the docket under separate cover.

The RPS exhibits a high degree of immunity to the effects of electromagnetic and electrostatic- induced noise on non-Class 1E signal output leads and Class 1E input leads. The immunity to noise has been established by operating experience, tests, and noise-rejection circuits. The Noise Test Report was submitted as part of the docket under separate cover.

ASP In-Cabinet Isolation

Physical separation between redundant channels of the Auxiliary Shutdown Panel (ASP) is accomplished by locating each redundant equipment system and its terminations in separate and independent, fully enclosed subsections of the panel. Refer to Subsection 7.4.2.5 for additional design features for the ASP.

Internal to the ASP, the separation of 1E and non-1E analog circuits is maintained by an isolation device circuit. The circuit configuration for the analog isolation in the ASP differs from the configuration used in the NI/RPS only in that the operational amplifier in the ASP is used in the non-inverted mode while the amplifiers in the NI/RPS are used in the inverted mode. The voltage isolation capabilities of the ASP configuration is very similar to that of the Nl/RPS. Analysis performed on the ASP circuits has shown the same isolation capabilities as the NI/RPS.

Clarification to Essential Channels of the SFAS

The logic of the safety actuation Channel No. 1 requires that both the terminating relays of sensing and logic Channels No. 1 and No. 3 be de-energized to initiate the actuation of Channel

8.3-30 UFSAR Rev 32 9/2018 Davis-Besse Unit 1 Updated Final Safety Analysis Report

No. 1. Similarly it is required that sensing and logic Channels No. 2 and No. 4 be de-energized to initiate actuation Channel No. 2. See Subsection 7.3.1.1.2.

Approximately fifty percent of the field cable terminations of actuation Channel No.1 are made in the Channel No. 1 SFAS cabinets while the remaining field cables of actuation channel No. 1 are terminated in the Channel No. 3 SFAS cabinets. Similarly for actuation Channel No. 2, the terminating field cables are in Channel No. 2 and Channel No. 4 SFAS cabinets.

The field cables are coded by the color of the actuation channel that it serves.

Nonessential Channels

Nonessential, i.e., non-Class 1E, functions are divided into channelized categories for improving station reliability. Classifications are alphabetized as contrasted to the numerical essential channels and are designated as Channels A, B, and C.

Nonessential cables may have any mix of black, white, or yellow when routed in raceways designed to carry nonessential cables. Nonessential cables that are routed in raceways designated to carry Class 1E cables are color coded, as a minimum:

1. At the exit/entrance of the shared raceway and at numbered junction boxes when the nonessential cable terminates at non-Class 1E equipment.

2. At the exit/entrance of the shared raceway, at numbered junction boxes, and at each end when the nonessential cable terminates at Class 1E equipment.

When non-essential cables are routed in raceways designated to carry essential cables (see Subsection 8.3.1.2.18), color coding is as follows:

Designation Color

Channel A Dark blue

Channel B Tan

Channel C Silver Fleck

8.3.1.2.15 Cable

Each cable is identified at each end with a cable number: the first digit indicates the channel, and the second digit indicates the function. In addition, the jacket of each essential cable is marked with the color corresponding to its channel every 5 feet (maximum) when in tray/wireway and at end points and intermediate pull points when installed in conduits.

As a minimum, cable routed in conduits is color coded at the termination points and intermediate pull points. In addition, each essential cable is identified at each end with its associated alphanumeric designation as described above.

8.3.1.2.16 Safety Feature Actuation System (SFAS) and Reactor Protection System

The Safety Features Actuation System and Reactor Protection System logic cabinets are painted in the corresponding channel colors.

8.3-31 UFSAR Rev 32 9/2018 Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.3.1.2.17 Markers

Each tray carrying essential cables is identified with colored plastic markers at intervals averaging every fifteen (15) feet, in compliance with Paragraph 5.1.2 of Regulatory Guide 1.75 giving the tray number. The first digit of each tray number indicates the channel, and the second digit indicates the function. Where a mixture of functions occurs in a common tray or wireway (see Subsection 8.3.1.2.18, below, for cases where mixtures exist), the second digit of the tray or wireway number indicates the function of the majority of the cables in the raceways. Markers have background colors corresponding to the channel and the digit color corresponding to the function. The markers are color-coded on the basis of the majority of the cables in the raceway. Trays carrying control and instrumentation cables are amply sized to contain the required number of cables.

Each essential conduit is color coded according to channel at all entry and exit points through which the conduits are run, as well as all attach points to equipment or trays.

Control trays are those trays that contain conductors that carry continuously 10A or less at 150 volts or less.

Instrumentation trays are those trays that contain conductors that carry 50 ma or less.

8.3.1.2.18 Essential Cables

Essential cables only run in raceways specifically designated for the corresponding channel. Nonessential cables may run in raceways designed to carry essential cables; however, no nonessential cable will run in the raceways of more than one essential channel. Cables for a given function are only run in raceways designated for that function, except (1) that small motor- operated valve leads and solenoid valve leads may be classified as control cables and routed accordingly and (2) where physical limitations prevent the installation of independent raceways for a given function (a mixture of functions occurs in the following raceways: 1CJQ10, 1CJR10, 1CJS10, 3LP63D, 4LP56D, 1PGS01, and 1PGS03).

Exception (1) is allowed since the operating voltage of the control and power section of a particular valve circuit (solenoid or small motor operated valve) are the same (120 volts) and are actually derived from the same power supply. Consequently, classifying and routing the entire circuit as control is of no concern.

Exception (2) concerning raceways 1CJQ10, 1CJR10, and 1CJS10 is allowed since both 480-volt power and 120 volt control are derived from the same motor control center (MCCE11C), the lengths of raceways are very short (approximately 2 feet) and all cable contained therein has an insulation rating of 600 volts. Furthermore, these raceways are physical extensions of the MCC to the MCC crown box.

Exception (2) concerning raceways 3LP63D and 4LP56D is allowed since the control cables carry low voltages (6 volts AC and 24 volts DC) and will not generate noise within the instrumentation cable which is shielded and twisted. In addition, these voltages are well below the ratings of the analog isolation devices in the SFAS as discussed in Subsection 8.3.1.2.14.

The nonessential control cable that is run in raceways 1PGS01 and 1PGS03 is allowed since the nonessential cable does not come in contact with cables of more than one essential channel.

8.3-32 UFSAR Rev 32 9/2018 Davis-Besse Unit 1 Updated Final Safety Analysis Report

Furthermore, there is no safety channel violation associated with any of these exceptions.

8.3.1.2.19 Power Cables

All essential power cables are run in exposed steel or embedded nonmetallic conduit, except in the annulus space, in manholes, where physical limitations exclude the installation of conduit, and where channel separation is required in manholes. When physical limitations exist and/or channel separation in manholes is required, the power cables are run in tray or wireway. Power cable is contained in the following trays/wireways: 1CJQ10, 1CJR10, 1CJS10, 1PBM01, 1PJA01, 1PAM01, 1PAM02, 2PAM02, 3PAM01, 1PGS01, 1PGS02, and 1PGS03. Justification is as follows:

1CJQ10, 1CJR10, 1CJS10: The space available was insufficient to terminate all conduits destined for the various vertical stacks of MCCE11C. Short sections of tray, in lieu of cabinet extensions, were used to gather and deploy the cable to the appropriate stacks (see Subsection 8.3.1.2.18).

1PBM01, 1PJA01: Physical limitations that imposed restrictions on conduit bending radius and space limitations at the containment penetration terminal boxes prevented the installation of conduits at penetration terminal boxes P1P2MI and P1P2MX. Short sections of wireway were used to gather the cable and nest the cable to the penetrations. There is no separation conflict in this instance.

1PAM01, 1PAM02, 2PAM02, 3PAM01 (located in manhole 3001): Wireways were used to achieve channel separation, by use of a metal barrier, inside manhole 3001. Wireway was used in lieu of conduit because the need for channel separation was not apparent until after the cables were pulled.

1PGS01, 1PGS02, 1PGS03: The location of embedded conduit stub-outs with respect to the penetration terminal box, in conjunction with structural steel interferences, prevented the installation of conduit.

The embedded nonmetallic conduits are in concrete duct banks which are Seismic Class I structures. Class 1E cables of different essential channels are run in separate nonmetallic conduits encased within the duct bank and separation between these conduits is a minimum of 1-1/2 inches.

8.3.1.2.20 Routing of Class 1E Circuits

The routing of Class 1E circuits has been reviewed for exposure to potential hazards such as high-pressure piping, missiles, flammable material, and flooding (see Chapter 3). All raceways are flame retardant.

Trays carrying essential control and instrumentation cables are amply sized to preclude overfill. Control cable trays are filled to 60 percent of tray cross-sectional area or less except at tray cross fittings where the limit is 54 percent in the entering and exiting legs of the cross. The cable cross sectional area above the tray side rails is included with the cable cross-sectional area within the side rails in determining tray fill percentage. Instrumentation and control cable tray loading is permitted to the height of the side rails. At crosses, tees, and where large conduit spills into trays, the height of the fill may exceed the side rails height due to cable crossover. Where the intent of vertical cable tray separation criteria would be negated by cable

8.3-33 UFSAR Rev 32 9/2018 Davis-Besse Unit 1 Updated Final Safety Analysis Report exceeding the tray rail heights, the inclusion of a thermal insulating material provides the required separation. In addition, all trays are ladder type with solid bottoms. Trays passing through fire walls, floors and ceilings are provided with fire stops.

The minimum cross-sectional area of the cable tray cross fittings used is 90% of the combined cross-sectional area of the two (2) intersecting trays, and therefore, in order to maintain the 60% fill limitation within the cross fitting, limits the fill to 54% (90% of 60%) in the entering and exiting legs of the cross. In no instance is there any essential system tray cross fitting with entering or exiting legs having a cable fill in excess of 54%. The identified 54% fill limitation will be maintained for tray cross fittings’ legs on essential system trays.

By not exceeding the 54% fill limit on each leg, recognizing that cables cannot terminate within a Tee, the exceeding of the 60% fill of the Tee is prevented.

Separation between trays carrying redundant Class 1E circuits is usually accomplished by locating these trays in separate rooms. However, as defined in Section 5.1.4 of Regulatory Guide 1.75, in some general plant areas, defined as areas from which potential hazards such as missiles, external fire, and pipewhip have been excluded, open top trays carrying redundant Class 1E circuits are normally separated by a minimum of 4 feet vertically (bottom to bottom) and 18 inches horizontally. These minimum distances are considered adequate, since (1) the tray system is solid bottom rather than open ventilated, and (2) cable jackets have a self- extinguishing and non-propagating flame resistance characteristic as supported by certified test results.

The cable spreading room and main control room do not contain high-energy equipment such as switchgear, power transformers (except a 30 KVA dry type lighting transformer in the cable spreading room), rotating equipment, or potential sources of missiles or pipe whip and will not be used for storing flammable material. Separation criteria for open top cable trays in the cable spreading room are the same as for the general plant areas discussed above (4 feet vertically and 18 inches horizontally).

In both the general plant area and cable spreading room, where there are conditions of either convergence of trays carrying redundant Class 1E cables or crossings of trays carrying redundant Class 1E cables, where vertical or horizontal distance cannot be maintained, solid covers, flame retardant barriers, and/or thermal insulating materials are used. The locations of these installations in the cable spreading room are shown on Figures 8.3-35, 8.3-36, and 8.3-37.

The minimum vertical separation distance of 4 feet between trays carrying redundant Class 1E cables does not exclude trays carrying non-Class 1E cables from being interposed between the trays carrying Class 1E cables. This arrangement can be justified since (1) the trays carrying non-Class 1E cables are also solid-bottom type and (2) the flame retardance of the non-Class 1E installed cable is the same as that of the Class 1E cable discussed previously with minor exceptions. The criteria are shown on Figure 8.3-38. Where such distances are not met, fire barriers are installed.

The separation criteria between trays, wireways, and conduits are as shown on Figures 8.3-39 through 8.3-42. Enclosed tray, wireway, and conduit are equated insofar as these criteria. The fire barrier details associated with Figures 8.3-39 through 8.3-42 are shown on Figures 8.3-43, 8.3-44, and 8.3-45.

8.3-34 UFSAR Rev 32 9/2018 Davis-Besse Unit 1 Updated Final Safety Analysis Report

The above minimum separation distances do not necessarily apply to embedded conduits carrying redundant Class 1E cables. However, they do apply at points where these embedded conduits leave the embedding material and the previously enclosed cables do not continue in exposed conduit.

Thermal blankets (Kaowool or equivalent) will be provided in all open top trays with certain exceptions (e.g., trays inside containment and other selected areas). These exceptions will be documented on controlled documents.

Design and control of the cable systems layout is in accordance with approved Design Control Procedures. Trays, wireways, and conduits carrying essential cables are clearly marked on all layout drawings, and each is reviewed and approved prior to being utilized in the field. Review has included consideration of failure of a non-seismically qualified equipment affecting both redundant channels of essential components and failure of a high energy line in the vicinity of Class 1E equipment to ensure the design criteria are not violated.

During installation, electricians are responsible for installation of the equipment and cable systems in accordance with the issued drawings using approved procedures. After installation, the system is inspected in accordance with another approved procedure and the results recorded. Any deviations from issued drawings are documented and reviewed to ensure design intent is not violated. This information is then included on final, as-built drawings.

Pulling and inspection of cable within the installed raceways is performed using similarly approved procedures and results of final inspection documented.

8.3.1.2.21 Electrical Conductors

Class 1E electrical conductors except heat trace cables have insulating materials which resist heat, moisture, radiation, and ozone. Jackets are also applied over the insulations. These jackets make the cables self-extinguishing and prevent flames from spreading. Heat trace cables are not considered here, since they are used as heating elements for piping and instrumentation rather than as system interconnections. Ground wires may be bare or covered with an insulation or jacket material. Minor amounts of PVC Cables are routed in non-essential trays in the unit.

Prototypes or actual production samples of each type construction have been tested to demonstrate that all cables will withstand the environmental conditions specified (see Table 8.3-4).

Interconnections between cabinets of the SFAS are achieved by using the same single conductors as that used within the SFAS cabinets. This wiring is supplied as a part of the SFAS equipment. It is single conductor with one layer of an insulation/jacketing of polytetrafluoroethylene material which is compatible with the environmental service conditions. The wireways in which these SFAS interconnections are run are sealed with silicone foam for additional fire retardancy as necessary.

8.3.1.2.22 Base Ampacity Ratings of Cables

Base ampacity ratings of cables are established as published in IPCEA P-46-426 and in accordance with the manufacturer’s standards. To this basic rating a grouping derating factor, also in accordance with IPCEA tables, is applied.

8.3-35 UFSAR Rev 32 9/2018 Davis-Besse Unit 1 Updated Final Safety Analysis Report

Credit is taken for load diversity factors where applicable.

Motor feeder power cables are selected on the basis of 100% load factor and continuously rated for 125% of the motor full load current. If exception is taken to this requirement then the basis shall be documented in an evaluation which demonstrates that the feeder cables are capable of carrying their design load under normal and emergency conditions of operation for their design life expectancy.

Power and control cables for services required to operate for extended periods after a loss of coolant accident are suitable for operation under condition of high ambient temperature, radiation, pressure, and humidity prevailing after an accident.

8.3.1.2.23 AC Power Circuits

All AC power circuits have circuit protection provided by either circuit breakers or fused disconnect switches. Fuses are also used on some AC power circuits for fault current backup protection.

Thermal overload protective devices are not used to trip any safety-related motor operated valve. The tripping contacts on the overload protective device are not connected to the coils of the valve motor’s reversing starter. Many of the heaters in the overload protective devices have been replaced with shorting bars which prevent the overload device from sensing an overload condition. However, motor thermal overload devices are used to trip some safety and non- safety related motors for pumps, fans, dampers and drives.

8.3.1.2.24 Cables for Reactor Protection Systems

Essential cables for reactor protection systems and safety features actuation system equipment are installed within Seismic Class I structures. The cable installation is Q (Nuclear Safety Related) and as such is subject to quality assurance procedures to ensure that the design criteria are met through all stages of design, procurement, and installation.

8.3.1.2.25 Redundant Class 1E Instruments

Redundant Class 1E instruments are located in separate cabinets or in separate compartments of the same cabinet. When this is not feasible, physical separation of 12 inches is maintained between redundant essential channels or metal barriers and conduits, either rigid or flexible metal, are utilized for maintaining separation. The cabinets are located in plant areas which minimize potential hazards such as missiles, external fires, and pipe whip.

Redundant Class 1E sensors and their connections to the process system have been sufficiently separated to ensure that the functional capability of the protection system has been maintained despite any single design basis event or result therefrom. Sensor to sensor separation is a minimum of three (3) feet.

The main control board is located within a fire wall type control room in the Seismic Class I auxiliary building. The control room is protected from and does not contain high-energy equipment such as switchgear, power transformers, rotating equipment, or potential sources of missiles or pipe whip. The separation distance between redundant Class 1E equipment and circuits internal to the control board is a minimum of 12 inches. Barriers such as flexible or rigid metallic conduit are installed where separation distance is less than 12 inches. Wiring is flame retardant. Class 1E incoming cable and internal board wiring identification uses color coding as

8.3-36 UFSAR Rev 32 9/2018 Davis-Besse Unit 1 Updated Final Safety Analysis Report discussed in Subsection 8.3.1.2.14. Where common devices accommodate redundant Class 1E circuits the minimum separation is met by use of barriers.

Cable entrance to the main control board is through blockouts in the control room floor. Typically, each block out is dedicated to only one redundant Class 1E channel.

Instrument Cabinets

Blockouts for cable entrances beneath the Reactor Protection System and Safety Features Actuation System cabinets enclose cables for the various sub-logic matrices which are necessary to establish the two-out-of-four logic described in Subsection 7.3.1.1.2.

All sensor input cables to the SFAS cabinets are enclosed in either rigid or flexible metallic conduit.

Further, no single event which fails all cables passing through a particular block out can preclude proper operation of the Reactor Protection System or Safety Features Actuation System as appropriate (see Sections 7.2, 7.3 and Subsection 8.3.1.2.14).

Some sensor-to-process connections of redundant sensors have a common section of line. This is justified since failure of this connection will cause the sensors to fail in the safe position.

The locations of redundant Class 1E actuated equipment such as pump drive motors and valve operating motors have been reviewed to ensure the minimum required functional capability despite any single design basis event or result therefrom.

The main control boards have the following fire stops and separation barriers:

a. All control room vertical panels shall have the cable runs in the base of the panels enveloped with low density silicone foam up to a height level with the base of the panel.

b. All control room control consoles shall have the cable runs in the base of the consoles enveloped with low density silicone foam up to the top of the cable tray in the base of the consoles.

c. All essential cable conduits in the base of the control room cabinets and consoles shall be sealed with low density silicon foam, if the conduit end is in the base.

d. All essential cable runs in the base of the control room cabinets not in conduit shall have the cable runs coated with low density silicone foam up to the cable identification tag affixed to the cable or eight (8) inches above the base of the panel. This eight (8) inches provides the fire stops and cable separation for cable crossover between essential channels and between control panels.

e. Openings in fire barriers through which cables pass into the main control boards are closed with fire rated seals equal to the rating of the barrier. If the cable is routed to the control boards in conduit, the conduit is sealed internally as required to maintain the fire barrier rating.

8.3-37 UFSAR Rev 32 9/2018 Davis-Besse Unit 1 Updated Final Safety Analysis Report

f. Panel C5716

A horizontal barrier is installed to completely close the top of this vertical panel.

The center barrier extends up to the additional horizontal barrier at the top of the panel.

The center barrier is extended and completed down to the enveloped cable in the base of the panel.

A vertical barrier is installed to complete the sides of this panel, and C5716 is isolated from C5715 and the void between C5716 and C5717.

All joints in barriers and voids around cables penetrating the center barriers are sealed with silicone rubber.

g. Panel C5717

A horizontal barrier is installed to completely close the top of the vertical panel.

Vertical barriers are installed to complete the sides of this panel, and C5717 is isolated from the void between C5717 and C5716.

A readily removable barrier is installed to extend the center barrier to complete isolation between Channels 1 and 2.

h. Panel C5718

A horizontal barrier is installed to completely close the top of the vertical panel.

A vertical barrier is installed to complete panel isolation at the bottom of the vertical panel between C5717 and C5716.

i. In Panels C5715, C5716, C5717, and C5718, smoke detectors are installed to maintain fire detection now that these panels are completely isolated.

j. Barriers required by the above are made from 1/2 – inch – thick Marinite. Barriers to isolate C5717 and C5716 from the void between these panels may be installed within the void if more convenient than within the panels.

Within enclosures (control boards, instrument cabinets, distribution panels, motor control centers, etc.), non-Class 1E wiring may be routed, bundled, or formed with Class 1E wiring. The following specific criteria are used to guide the installation. Deviations from these criteria, as well as the other separation criteria, may occur. However, these deviations are documented and analyzed as a prerequisite for acceptance. The non-Class 1E with Class 1E criteria are:

a. When located in the same enclosure with essential cables, Channel A cables may be bundled, routed, or formed with Channel 1 cables. Similarly, Channel B cables may be bundled, routed, or formed with Channel 2 cables.

b. In enclosures designated for Channel 3 use, Channel A cables stay be bundled, routed, or formed with Channel 3 cables. Similarly, in enclosures designated for

8.3-38 UFSAR Rev 32 9/2018 Davis-Besse Unit 1 Updated Final Safety Analysis Report

Channel 4 use, Channel B cables may be bundled, routed, or formed with Channel 4 cables. However, in the specific case where Channel A is bundled, routed, or formed with Channel 3 (and conversely Channel B is bundled, routed, or formed with Channel 4), a verification is made that bridging does not exist. (Bridging occurs when a single nonessential cable or conductor is simultaneously routed, bundled, or formed with cables or conductors of two different essential channels.)

c. If an enclosure contains both Channels 1 and 3 cables, Channel A cables will preferably be run with Channel 1 cables. Similarly, if an enclosure contains both Channel 2 and 4 cables, Channel B cables will preferably be run with Channel 2 cables. However, in the specific case where Channel A is bundled, routed, or formed with Channel 3 (and conversely Channel B is bundled, routed, or formed with Channel 4), a verification is made that bridging does not exist.

d. When located in the same enclosures with essential cables, Channel A cables will not be bundled, routed, or formed with Channel 2 or 4 cables. Similarly, when located in the same enclosures with essential cables, Channel B cables will not be bundled, routed, or formed with Channel 1 or 3 cables.

e. Channel C cables will not be bundled, routed, or formed with any essential cables.

f. Any single nonessential cable will not bridge two or more essential channels within enclosures.

8.3.1.2.26 Cable Spreading Room

All cables in the cable spreading room associated with essential channels are arranged so that redundant circuits for each of the individual systems are isolated either by physical separation or by fire barriers where physical separation cannot be maintained.

8.3.1.2.27 Circuit Schedules and Connection Diagrams

Circuit schedules and connection diagrams have been prepared to give a permanent record of the routing and termination of all cables.

8.3.1.2.28 Q-List Items

All electrical equipment classified as Q (Nuclear Safety Related) have been designed in accordance with the latest codes and standards as of the date of licensing of the plant to perform under the environmental conditions required. To ensure the proper design has been accomplished and that the equipment is subsequently fabricated and installed as specified, a detailed Quality Assurance/Quality Control program has been instituted and is described in further detail in Chapter 17.

Each safety-related electrical purchase is covered by a procurement package which ensures that appropriate technical requirements and environmental conditions are applied during design of the equipment, includes any special quality control procedures to be followed by the manufacturer, and includes any required acceptance testing. The design development process is monitored so that all design additions/deletions changes are reviewed and approved prior to incorporation in the station. The manufacturing process is monitored by inspectors representing the Davis-Besse Nuclear Power Station (DBNPS) Nuclear Group with the authority to reject any non-conforming material.

8.3-39 UFSAR Rev 32 9/2018 Davis-Besse Unit 1 Updated Final Safety Analysis Report

The electrical installation contractor is responsible for the proper handling and installation of the electrical equipment after it arrives at jobsite. All work in relation to the receipt, handling, storage, installation, and testing of Safety Related items is performed in accordance with procedures that have been reviewed and approved by the Davis-Besse Nuclear Power Station (DBNPS) Nuclear Group or its agents prior to use. Representatives of Davis-Besse Nuclear Power Station (DBNPS) Nuclear Group monitor all phases of this work ensuring the procedures are properly followed and have the responsibility for giving final approval prior to acceptance of a complete installation.

Adequate records such as inspection and test reports are maintained to demonstrate the traceability of all Safety Related material from the time of manufacture to final installation.

8.3.1.2.29 Penetrations

The electrical penetrations are designed and tested to meet IEEE Standard 317-1971.

Conax penetration assemblies are designed and tested to meet IEEE 317-1976 as modified by NRC Regulatory Guide 1.63, Revision 2.

Short-circuit tests were performed on two prototype penetrations, as required by the above- mentioned standards, to ensure that the penetration assemblies can withstand, without loss of mechanical integrity, the maximum possible fault current vs. time conditions.

The two prototype penetrations tested were a medium-voltage penetration consisting of a unitized header 26 inches OD, 3 inches thick, with 6 modules, and a low-voltage penetration consisting of 3 x 350 kcmil in a single hole plate.

The prototype penetrations withstood the following currents for the indicated times:

Start 1/4 Time Start Symmetric Symmetric Number Asymmetric RMS Amperes RMS Amperes of RMS Amperes 3 Phase 3 Phase Cycles

Medium-voltage 70,000 Penetration (C phase) 44,700 33,700 26.5

41,300 Low-voltage Penetration (B phase) 23,400 20,400 30.5

After completion of the short-circuit tests, a leak test was performed on each prototype penetration. The results of that test met the requirements of the above-mentioned standard.

In addition, prior to the performance of the above-mentioned tests, each prototype penetration successfully passed radiation and environmental (LOCA) tests.

The electrical system design provides both primary and backup fault protection for power circuits which are energized during plant operation and are routed through electrical penetrations. Should the primary protection fail to act, the backup will act in sufficient time to preclude thermal and mechanical damage to the penetration assembly under fault conditions.

8.3-40 UFSAR Rev 32 9/2018 Davis-Besse Unit 1 Updated Final Safety Analysis Report

The basic philosophy of this type of protection is to provide selective tripping of circuit breakers in order to maintain maximum continuity of service by removing that section of the system where the fault has occurred. The primary protection is set to trip the breakers instantaneously under high-fault currents. In the event the primary protection or the corresponding breakers fail to act, the backup protection will respond to disconnect the affected circuit. During some high current faults the backup protection may act before or in unison with the primary protection. The tripping time of the backup protection has been set in such a way that it will trip faster with higher fault currents, i.e., it has inverse time characteristics. Diversity of 125V DC control voltage (for 13.8 kV buses A and B between source breakers and load breakers) is utilized to further assure that the backup breaker will trip if the load breaker fails due to a loss of control voltage.

The short circuit studies performed for Davis-Besse Unit I determine the maximum symmetrical short circuit current which might flow through the 13.8kV electrical penetrations. This calculated short circuit current is lower than the tested value of the medium voltage penetrations. The calculated permissible tripping time for the fault current is based on a correlation of current and 2 = 2 time using the relationship 1 tI I21 t 2 . Under this fault condition the primary and secondary protection will act to preclude the damage of the penetration. This protection is adequate for the medium voltage penetrations.

Similarly, for the low voltage penetrations, the calculated maximum symmetrical short circuit current and the calculated permissible tripping time for this fault current has been determined. Under this fault current, the primary and secondary protection will act to preclude the damage of the penetration. Circuits with lower fault currents have been similarly evaluated.

The above analysis establishes the adequacy of the primary and backup protection of the electrical penetrations.

Electrical penetration assembly (EPA) terminal boxes, installed inside the containment structure are used to house the terminations of the electrical penetration assembly pigtails to their respective field cables. For circuits which are required to function in an accident environment the termination of the field cable/EPA pigtail combination is performed utilizing an environmentally qualified (Raychem) splice kit.

During a postulated accident condition, these terminal boxes are subject to a pressure rise; imploding could result. To reduce the differential pressure across the terminal box, each box is fitted with a vent hole in the bottom, proportional to the size of the box. Since the cable splicing located internal to these boxes are environmentally qualified, the vent holes do not have an adverse effect on safety.

The purpose of the electrical penetration assemblies (EPAs) is to provide continuity of electrical circuits through the containment structure, while maintaining the integrity of the containment pressure boundary. The electrical penetration assemblies consist of Conax and Amphenol modules in a header plate.

A nitrogen supply system is connected to the EPAs to monitor the leak integrity of the penetration assemblies. The nitrogen supply system consists of two separate trains, one in the west auxiliary building (electrical penetration Room 1 [Room 402]) and the other in the east auxiliary building (electrical penetration Room 2 [Room 427]). The nitrogen gas cylinders are permanently connected to the electrical penetration assemblies’ header tubing to provide a continuous pressurization to a value recommended by both Amphenol and Conax and greater

8.3-41 UFSAR Rev 32 9/2018 Davis-Besse Unit 1 Updated Final Safety Analysis Report than containment pressure. The nitrogen pressure is checked periodically and the cylinders replaced as necessary to maintain the recommended nitrogen pressure.

The dry nitrogen serves the following functions:

a. Maintain the penetration dry during both normal and LOCA conditions.

b. Prevent leakage from the Containment Vessel interior to the environment.

c. Monitor EPA integrity. A high nitrogen consumption would indicate that an EPA might be leaking.

The following exception is taken to Regulatory Guide 1.63 :

a. IEEE 317-1971 is used instead of IEEE 317-1972. The Conax penetration assemblies meet the requirements of IEEE 317-1976 as modified by NRC Regulatory Guide 1.63, Revision 2.

The only redundant circuits which are routed through the same penetration room are the power supplies and the space heater supplies to the containment cooler fans numbers 2 and 3 in room 427.

The separation of 9 feet will preserve the integrity of the redundant circuits.

8.3.1.2.30 Cable for Class 1E Service

Each manhole (i.e., 3001 , 3004, 3005, 3006, 3020, 3041, and 3042) that accommodates cable for Class 1E service is provided with a sump and a sump pump. In addition, essential cable is suitable for direct burial service.

The insulation resistance of essential power leads passing through manholes will be tested per station procedures as part of the motor and equipment maintenance program on a periodic basis to assure cable insulation integrity over the design life of the station.

8.3.2 DC Power System

8.3.2.1 Description

The station DC equipment consists of two 250/125V DC motor control centers, four batteries, six battery chargers, four essential distribution panels, four 480V AC/125V DC rectifiers, and four nonessential distribution panels.

The system is designed to provide a continuous, reliable, and redundant 250/125V DC power source for control, instrumentation and DC loads required for normal operation and orderly shutdown and control of the station. The system is arranged to form two completely independent load groups as shown in Figure 8.3-25. The DC equipment is classified as Class 1E except nonessential distribution panels.

8.3.2.1.1 DC Motor Control Centers

Two redundant 250/125V DC motor control centers are provided. Each motor control center has a positive, a negative, and a neutral bus arranged to form a 250/125V DC system. Each

8.3-42 UFSAR Rev 32 9/2018 Davis-Besse Unit 1 Updated Final Safety Analysis Report live bus is connected to a corresponding 125 volt battery, a normal battery charger source, and a manual standby battery charger as indicated in Figures 8.3-46 and 8.3-47. The standby charger is connected to the bus through a normally open manual switch. In the event of AC power failure, the motor control center will be supplied from its respective batteries without any interruption of power.

Each of the two motor control centers supplies two 125V DC essential distribution panels, five 250V DC oil pump motors, two 250/125V DC emergency lighting feeders and one 250V DC/120V AC nonessential inverter.

DC motor control center 1 also supplies power to the motor operations of the auxiliary feed pump discharge stop valve to steam generator 1 (MV3870), the auxiliary feed pump turbine 1 main steam isolation valve (MV106) and the DC lube oil pump motor for the high-pressure injection pump 1-1 (MP197-2).

DC motor control center 2 also supplies power to the DC lube oil pump motor for the high pressure injection pump 1-2 (MP198-2).

8.3 .2.1.2 Station Batteries

Four 125V DC approximately 1500 ampere-hour, on eight hours discharge basis, lead-sold batteries are provided and arranged to form two independent 250/125V DC systems. Using 1.75 volts per cell as the minimum cell voltage each battery has the following capacity:

Amperes Rating Discharge Time

187 8 hours 750 1 hour 1400 1 min

Each battery is maintained in a fully charged condition and is normally float charged at approximately 132 volts from its associated battery charger. Battery discharge will occur either when the DC requirements temporarily exceed the charger capacity or during a loss of a battery charger supply. Each battery is connected to one 125V DC bus of one of the two DC motor control centers as shown in Figure 8.3-25.

Design Bases

The station batteries are sized to supply the station DC and instrument AC loads for a period of one hour without AC power availability. Manual shedding of some loads is required within 30 minutes of a loss of AC power to maintain adequate voltage at all required DC loads. An age factor of at least 1.25 is applied in the station battery sizing analysis to ensure that the batteries will supply the required loads when battery capacity decreases to 80 percent of the manufacturer’s rating.

The loads on each battery are as follows: Station battery 1P supplies the loads of essential 125V DC distribution panel D1P, motor operated stop valve for Auxiliary Feed Pump 1-1 discharge to Steam Generator 1-1 (MV3870), and the lube oil pump for the HPI Pump 1-1 (MP197-2). Station battery 1N supplies the loads of essential distribution panel D1N and motor operated isolation valve for Main Steam Line 1 to Auxiliary Feed Pump Turbine 1-1 (MV106). Also batteries 1P and 1N feed the 250V DC MCC1 loads.

8.3-43 UFSAR Rev 32 9/2018 Davis-Besse Unit 1 Updated Final Safety Analysis Report

Similarly, station battery 2P supplies the lube oil pump for the HPI pump 1-2 (MP198-2) and essential distribution panel D2P. Station battery 2N supplies essential distribution panel D2N. Also, station batteries 2P and 2N feed the 250V DC MCC2.

The battery loads, operating requirements, and load shedding requirements during the worst case accident with no AC power available for battery chargers are detailed in the DC System Analysis.

The DC load list (contained in the DC System Analysis) establishes the one-hour duty cycle for each battery. The battery with the largest load was used in sizing the capacity and ampere rating of all four batteries. The first minute of the duty cycle includes the momentary loads and non-continuous loads that may occur at random during the one hour duty cycle. It also includes the continuous loads carried by the battery immediately following a design basis event coupled with a loss of ac power to the battery chargers. The first minute loads include the starting current for certain dc motors, the dc load current associated with operation of 13.8kV, 4.16kV, and 480V breakers, and the starting and field flashing of the emergency diesel generators.

The plate requirement which satisfies the above load cycle is a battery with ten positive plates and with performance characteristics equal to or better than a GNB model NCX-21.

8.3.2.1.3 Battery Chargers

Six static solid state battery chargers are provided. Each is rated at 480V AC, 3 phase, 60 Hertz input and has a nominal output of 125V DC. Each charger is capable of supplying all steady- state DC loads required under any condition of operation while recharging the battery to a fully charged condition over a period of 12 hours from the maximum discharge condition established in the DC System Analysis.

Technical Specification surveillance testing assures that each charger is capable of delivering the necessary current and voltage for an extended period of time to demonstrate this design capability. The six chargers are arranged into two groups. Each group consists of three chargers, two of which are supplied from one essential 480V AC motor control center and constitute the normal DC supply to both live buses of the corresponding DC motor control center. The third charger is provided as a standby source and is supplied from a separate 480V AC bus on the same essential channel. The third charger can be manually switched to supply either live bus on the given DC motor control center. Each charger has a circuit breaker in its AC power incoming feeder and a fused disconnect switch in DC power output circuit for isolating the charger.

8.3.2.1.4 Essential 125V DC Panels

Four redundant 125V DC panels are provided, as a part of essential power systems, to supply 125V DC power to safety-related loads. The four panels are designated D1P, D2P, D1N, and D2N, and supply DC loads as follows:

a. Essential DC panel D1P (Channel 1) supplies:

1. Essential safety features actuation system solenoid valves (Channel 1)

2. 480 Volt essential unit substation Bus E1

3. 4.16kV essential switchgear Bus C1

8.3-44 UFSAR Rev 32 9/2018 Davis-Besse Unit 1 Updated Final Safety Analysis Report

4. 120V AC essential inverter YV1 through a coupling diode

5. Emergency diesel generator 1-1

6. Nonessential DC panel DAP

7. Radiation sampling system solenoid valves

8. Relay cabinets for: 120/240 VAC System: Reactor Coolant Pump: and SFRCS

9. Auxiliary Feedwater Pump Turbine 1-1 control circuits

10. Component Cooling Water Pump and Emergency Ventilation System flow indicators

11. Control Rod Drive shunt trip breaker B

12. 4160 Volt essential transfer switchgear CD b. Essential DC panel D2P (Channel 2) supplies:

1. Essential safety features actuation system solenoid valves (Channel 2)

2. 480 Volt essential unit substation Bus F1

3. 4160 Volt essential switchgear Bus D1

4. 120V AC essential inverter YV2 through a coupling diode

5. Emergency diesel generator 1-2

6. Nonessential DC panel DBP

7. Radiation sampling system solenoid valves CH-2

8. Relay cabinets for: 120/240 VAC; Reactor Coolant System; Reactor Coolant Pump; SFRCS

9. Auxiliary Feedwater Pump Turbine 1-2 control circuits

10. Component Cooling Water and Emergency Ventilation System flow indicators

11. Control Rod Drive shunt trip breaker A

12. Motor Driven Feedwater Pump control valve position controller

13. 4160 Volt essential transfer switchgear CD

8.3-45 UFSAR Rev 32 9/2018 Davis-Besse Unit 1 Updated Final Safety Analysis Report

c. Essential DC panel D1N (Channel 3) supplies:

1. 480 Volt essential unit substation Bus E1 (alternate source)

2. 4.16kV essential switchgear C1 (alternate source)

3. 120V AC essential inverter YV3 through a coupling diode

4. Emergency diesel generator 1-1 (alternate source)

5. Nonessential panel DAN

6. Reactor Coolant Pump relay cabinet

7. Motor Driven Feedwater Pump control valve position controller

8. Control Rod Drive shunt trip breaker D

d. Essential DC panel D2N (Channel 4) supplies:

1. 480 Volt essential unit substation Bus F1 (alternate source)

2. 4.16kV essential switchgear D1 (alternate source)

3. 120V AC essential inverter YV4 through a coupling diode

4. Emergency diesel generator 1-2 (alternate source)

5. Nonessential DC panel DBN

6. Reactor Coolant System and Reactor Coolant Pump relay cabinets

7. RC2A PROV solenoid

8. Control Rod Drive shunt trip breaker C

Each essential panel is fed normally from one DC motor control center with a manually switched reserve supply from the second DC motor control center as shown in Figure 8.3-25.

Four 125V DC nonessential panels are provided. Each supplies DC loads as indicated on Figure 8.3-25.

8.3.2.1.5 Rectifiers

Four rectifiers are provided to supply normal DC power to the four essential inverters. Each rectifier output is connected in parallel with the DC panel reserve supply to the inverter and is rated at 480V AC, 3-phase, 60 Hertz input, 125V DC nominal output. The output voltage is maintained at least 3 volts higher than the station battery voltage, which reverse-biases a coupling diode to prevent current flow from the reserve supply, and to prevent back-feeding the DC system. The failure of the rectifier Ac source and/or of the rectifier itself will forward bias the coupling diode, and cause the battery and/or battery charger to become the DC source to the essential inverter with no power interruption.

8.3-46 UFSAR Rev 32 9/2018 Davis-Besse Unit 1 Updated Final Safety Analysis Report

Channel 1 and 3 rectifiers are fed from a Channel 1 essential 480V AC motor control center, while Channel 2 and 4 rectifiers are fed from a Channel 2 essential 480V AC motor control center.

8.3.2.1.6 Monitoring and Surveillance

Instrumentation, relays and indicators are provided locally and at the main control board to monitor the status of the DC system equipment.

The locally mounted instruments are:

a. On each motor control center:

1. DELETED

2. Two 125V DC ammeters 800-0-800 ampere each to read battery current flow.

3. Two DC voltmeters — relays each connected to a separate bus and set to alarm in the control room at an under-voltage or an overvoltage.

4. One ground detector to alarm in case any of the three buses is grounded.

5. Two directional current relays with time delay to alarm battery discharge.

b. On each battery charger:

1. One under-voltage relay on the input side set to alarm when battery charger input voltage drops below the design capability of the battery chargers.

2. One under-voltage alarm relay on the output side.

3. One DC ammeter.

4. One DC voltmeter.

5. One Over Temperature alarm relay.

6. One Fan Failure alarm relay.

7. One Charger Failure alarm relay.

c. On each 125V DC essential panel:

1. One under voltage alarm relay.

2. One indicating light, indicating low voltage DC.

The main control board mounted instruments are:

a. Four DC ammeters 800-0-800 amperes indicating each battery output current.

8.3-47 UFSAR Rev 32 9/2018 Davis-Besse Unit 1 Updated Final Safety Analysis Report

b. Two DC voltmeters 0-300V each to measure motor control center bus voltage.

c. Four DC voltmeters 0-150V one for each essential 125V DC panel.

d. Eight indicating lights, two for each essential 125V DC panel; one indicates the status of the normal feed switches, and the second indicates the status of the alternate feed switches.

e. Four indicating lights; each indicates the status of the DC motor control center disconnect switches associated with the standby battery chargers.

f. Four indicating lights; each indicates the status of the feed switch from each essential 125V DC panel to the respective essential inverter.

8.3.2.1.7 Physical Arrangement of DC Electrical System Components

DC distribution system components are arranged and located in areas to minimize their vulnerability to physical damage as a result of accidents.

Battery chargers as well as the other listed equipment (below) for the Class 1E batteries are located in separate fire wall type rooms adjacent to their associated batteries.

Low voltage Switchgear Room 428 contains the following:

a. DC motor control center 2

b. Battery chargers DBC2P, DBC2N, and DBC2PN

c. Essential distribution panels D2P (Channel 2)

d. Distribution panels DBP and DBN

Low voltage Supply Room 428B contains essential distribution panel D2N (Channel 4)

Low voltage Switchgear Room 429 contains the following:

a. DC motor control center 1

b. Battery chargers DBC1P, DBC1N, and DBC1PN

c. Essential distribution panel D1P (Channel 1)

d. Distribution panels DAN an DAP

Low Voltage Supply Room 429A contains essential distribution panel D1N (Channel 3).

Low Voltage Battery Room 429B contains 125 volt batteries 1P and 1N, and Room 428A contains batteries 2P and 2N. In each room the two 125 volt batteries are mounted on two racks separated by an aisle approximately 5 feet wide.

The Class 1E batteries are located in separate battery rooms in the Seismic Class I auxiliary building. Each battery room has fire walls and is served by an independent Class 1E ventilation

8.3-48 UFSAR Rev 32 9/2018 Davis-Besse Unit 1 Updated Final Safety Analysis Report system. Air flow alarm is provided in the Control Room to assure that hydrogen buildup is prevented in the battery rooms.

8.3.2.1.8 (TEXT DELETED HERE AND PLACED IN 8.2.1.3)

8.3.2.1.9 Tests and Inspection

The ungrounded DC system has detectors to indicate when there is a ground existing on any portion of the system. A ground on one portion of the DC system will not cause any equipment to malfunction. Grounds will be located by logical isolation of individual circuits connected to the faulted system while taking the necessary precautions to maintain the integrity of the essential bus supplies.

The station batteries are under continuous automatic charging and will be inspected and checked on a routine basis while the unit is in service according to the surveillance requirements of Technical Specifications.

8.3.2.1.10 Administratively Controlled Devices

Administratively controlled circuit opening devices are listed in Table 8.3-3 by device number, type and location.

8.3.2.2 Analysis

Analysis of the station DC system described in Subsection 8.3.2.1 is given in the following subsections.

8.3.2.2.1 DC System

The DC system provides continuous DC power source to essential instrument, safety features systems, and necessary control systems regardless of auxiliary electrical system conditions. The system is designed to permit periodic testing of individual components as well as the system as a whole during station operation.

8.3.2.2.2 Reliability

The reliability of the system is increased by providing redundancy of equipment and circuits.

8.3.2.2.3 250V DC System

The 250V DC system consists of two independent load groups. A failure in one group will not affect the other.

8.3.2.2.4 125V DC Control Panel Boards

Four separate 125V DC control panel boards are provided. Each panel is supplied by redundant feeders from both 250/125V DC buses through manual throw-over switches to prevent any DC panel from being supplied from more than one battery at a time. These DC panels provide DC instrument and control power as necessary for proper functioning of the unit.

8.3-49 UFSAR Rev 32 9/2018 Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.3.2.2.5 Station DC System

The station DC system is arranged so that a single fault within the system will not prevent the reactor protective system, engineered safety feature control system, and the engineered safety features from performing their safety functions. The batteries are mounted on Seismic Class I racks, installed in separate rooms within a Seismic Class I structure, and separated by fire walls to minimize the possibility of simultaneous damage to both batteries.

8.3.2.2.6 Battery Chargers

The battery chargers are designed to prevent the AC source from becoming a load on the battery due to a power feedback as a result of the loss of AC power to the chargers. This preserves the battery.

8.3.2.2.7 Design Criteria for Cables and Raceway

The design criteria for cables and raceways routing, loading, sizing. and marking are identical to those described under Subsection 8.3.1.2.

8.3.2.2.8 Redundancy in DC Control Power

Redundancy is maintained in the DC control power supply to the 13800, 4160, 480 volt AC systems by providing two DC control feeders for each separate bus or appropriate group of circuit breakers. Each feeder is supplied from a separate 125V DC battery.

8.3.2.2.9 (TEXT DELETED HERE AND PLACED IN 8.2.1.4)

8.3.2.2.10 Quality Assurance Procedure

A quality assurance procedure identical to that described under AC system (Subsection 8.3.1.2) ensures that the design criteria through all stages of design, procurement and installation are met.

8.3.2.2.11 Drawings

Section 1.6 provides a cross reference between USAR figures and electrical control drawings.

8.3-50 UFSAR Rev 32 9/2018 NOTES 1. l0lo5 tf,otctTED til SIEF I ARE THOSE TXAT STrrl 45 sffi t5 IHE EErcETCI OIE5EI OENERATON I EOC BREEER Effi'. LOOP OTILT rHEsE 10 05 cilstsr F xmratLl oFERArtxG' m tlr€illrErT LooS ffor sHEo By Uv stcNrL oR t0405 rHlr ErtE a sF^S SIGHAL TW SE SI BLOCIEO gI THE SEfr€ffif,. frllI r0l0 LOOPl L(xf,z r.00P5 LUE DEO TM AT SIEP I STEF I o I I V I'AM'AL riI{,AL LOAOINO EOUlPI'EI{T OESCEIPIIOTI L0^0 XY AI kvtr sItP SIEP III STIP lv SIEF EE['AR(S (sEE NOTI ffi f EtorE &r REltlFt(s ?. lF a PUF rrs n!ffuxc oN rHls rniJx PRlffi ro ro55 G 8US BKR I LOAD I LOAD .$E LOADI hG (sE Mlt 6r S''ITE POER (LWI II TILL BT SEO AI UV FELITS IS HF/kVl f,otE r r ?1t STTFI 81 l]E OEIAT trLAY 2.5 SEEMS I'I€P IAI AFIEft 7H€ EDC ilTPUT BiE^XER CTOSE'. { fuF IILT ET TiIPP€D {160V stq AUTOSrtCttt IN sTfP I rHEt 0X ruF t5 STAST€0 AY StrS 400 90 ?at, l0 t 61. EO ffi ft 0f, 0x s N 0r ff fo(rortrc i tmF. I, STING CHARGER I' IOI HMTALTY Iff s!AYICE. II CIH EE TACEO IX SRVICE XHILII IF tP H IN IS flOT AVAILIBLE. MiE 6TIER' ffiR $FEILIIIfl TEsTING. ALL IgIEE O€CAY HETI PUF I urtdti cffiG r1t.1P,tPf,- Ts ffittf,c ar THETF SrE$r-Srrrt E ffi rr trs r[sftE toror ARE Iil sEFvlcE Hlm IO rE ff,ll tLW 0B tOP rlwl 'Ltrt,l. IHE 100 Y^LUE ruffiB lE giM ffif effi[ [r sERvlct xll.fl[trBrtqrr- h CrE.g5.O@. lli{ffir t" *tTr&l!tsE! E rdinlNuus ilarl& t1{-t s[ m oFEFATtNc tolD Emrlc [Br] 9il W ffirr*uffs SrtaDr-srrrE LoE 0F W Sllmli C*ffi" *E {fl dfto xvr Af,E GTICULATEo ErStD rPW K ffif,Iro LorUJd.,

5, DELETEO

80s El BEI r tr.2 ?9. ?5

0, tHt cfflrtuEilr HtmmE[ otlul0H StsrEt rcHor ts

{tov_lf,c rHcltor r t5 r ilcxuP ro rHE cHD srsrff, lI RTNIF€0. €r BCEl rfE c!r-r cGE L6s, xorE 21 cf1 -1 cL ff ol 0i IiE SYSIEX tS HAruALLT LOAOEO Oil TO EOCT 'I APMOXIUIELY '

O. OUEITC I LOCA. SXE.UP PUF! AFE WELID AI TUI.frT {560 SPI. THESE PUFS TE TI LOEF OUIPUI OURIIG T LOOP ottY tvE|r. T8E tEcoD L0A0 vALqE tx EACH coL!* REPRESEf,IS IHt LW LOADIrc tr Ih€ PUPs. Fgn rmA4ffi IHE 10105 LlsrEo lssuE A LTFGE Locr. FOF A LfCE LMT ftE ESSEXIII PEESSUEIZEE HETTERS IILL f,OI REHAIil ET€HCI:ED. S(I Tffi VTRT 5fr1 LOCAS YILL HEITEAS FEIA]il EXERC!Z€O. IN SIEH CAEE OIER TMCEF IOTOS SCH AS CIf,T PUFS YILL rcT BE PRESETI. fiHP r Slrcl HY FtX i6i !. THE ITCXITUOES tr IHE LOADS FEO FROX BUSSES c? rxo De rE FRovloEo a5 tiFoRH Tloil To IHE trERA]OE IH IHE EVENI IHAI TH€t IRf ucraEo. *F0RE IHESE L0r0s crr EE lD0E0. HO{WEI IHE OPEFAIM ruST YEEIF1 IffTI FCft Fr rot xYlc lso I v ? [Dtrtff rtLL xor oEaloro rHE E06. 'HEIF la. DUEIrc EOC trEffAIIOT, HCE T8E JACiEI rlrEi ltftilruRE EElcHtt l5!'4, rH€ Effi IETSIM HE IEiS IILL EEEF6IZE.

15. COHIAINEf,I T IilI]TG IRNS'frEF5 ME rcT JrcTUMO IX I{E TOIAL LOAO OE€IU5E IHE1 & REOUIRED TO E DEEiERGIZED OURI[G CTIT CLOSEflT. rfERE ts rmMLLy oey ffE ftuilHiC C#of,€tT C00tt[6 ,AIER ICCII PUP. WILE SYFPIIC IHE RUf,NIrc IP 5F& PUFs. TW CCI ryS ARE IEPORAFITI RUf,f,Irc OI IHE STE rus, AXD IMO EX IH M I[ BUs IF IHE EOG YAS 6!lirE0, rHl: TBLE lccouf,rs Fffi oNLr qE ccr PUF OECAUST PMCEOURES OIRTCI IH€ fENAIORS IO LITIT ITE rmff' f IIf, THII IM CCI PUPS AFE CffNECIEO TO IHE rrlt tus 00E t0 EDc Lol0lrc corcEnils.

I', OEL€TEO 20, PO!5 lf,D Potlf Clr 8E OFERrrto tN FLrCE OF pmlr rs p0a!1. RtgP€crtvEtr. rH€ poo]r lxD malr PupS AM $TECTEO AS ftUffTIHC 8[CTUsE TflET FESPFESEII TM msr cfrsERvlTII LolD. 2I, TNA$OREN CGE LOSSES TEE TISIED il IiE T ELE FG PURPOSE # REPPTSEf,TIBC IOII OIESEL OEffiBIIOT LOAD. IHE IOEilTtFICAIIff NMEfts LISIED Uf,DEF TtT'M 1OD' FO8 IEAHSFOREB Cffi LOSSES A8E FICTIIIflS AS DO MI ETISI IH IHE PLilT ffi If, Sf. ??. 1W rc$Srsrs tr rHE LOIOS rHAl rRt IDDEo l0 IHE EOC WET THE EOG il?h'T EREAIEi CTOTES TilLfiI[G I LOOP EEilT. ?!. IF I[ RUgIrc G' PU* IT3 Of, THtg IFAII PiIS TO IHI LOOF.ffLi EYEhI. II TILL EESITRI ffiE[ IHE EOG OU'FUT BEfi€R CLOSTS ILOP 1 I. IF IIE ru PUP IA5 PUf,iITC il THIS IAAIH P8IO8 IO THE LOOF.MT TVENI. II IILL 8E SHIO Et uv ftLrrs rf,o srrEr 2.! sEcoEs IiTEF rHE EoG @rrur mEr.EE CrOStS. 24. a00P 2'ftcuFs Ttt it0, 5tc0il0s AFrEE TiE EDG ourPor giEfiEn cL05E5. tr rHE acy PUp ls$cl^rEo vlrH rHts TAltt t5 lx sTAiloB, mtoa ro IHE LooP-flLt EvEilL ]I IILL STANT OUHIilC LMF ?, TXE Erc ltB C0FFE55m rt rlLr Srrtl 20 StCoXDt SlEft rHE Effi OTFUT gffriEF CLoSES FALortrc r tmP tVEXT. 25. 100P 3. fiCUES tEHry-frE rlr r SECOXoS IFrER r8t E00 OUIPUT BEEATER CLOSES. THE 5I PUP sIAFTs IH L@P I. ?6. TME.UP PUp XOIOF fr 15 ourttrr CtA55 O Fffi EHER@{Ci FEED SL(EO CO(Irc. IflE SCEHABIO IS ilISID' IH€ 00un0s^XO s FoRHAL oEsrcx EA5t5 EWHTS OESCfitgED til T* ursrt: HOEYEI. txE DPhoFFlllE OulLlrr CLl55 l! rtxt vlc RFI taF ilY rxtrrtc&Lr c06t0Effi0.

GENERAL NOTE

5UFrcATIAG MCUEtrIAlIOil Fffi LOAO 5EruErcINC TIO ffrcFf DErERHlMrtfr, 15 EtL lS rm toAo vaLUE!. ts orcuEtrrEo ti clLcutlrtol f-EE-0!5.m]-w. DtSnArEo l0lo v&uts F8 rcrms IEE ctLcuLlIED il r{ cilstoEEllfl r0 rcTffi EFTICIEXCY qO PMF .TC'OE 8Y EITP POETSIIIIff. IHE SUMF]IEO IOIIT LO O OI TiE EEfiOETCY O:EsTT 6EEf,TIF rsE$ lH To rccourt sysTEH L6sEs, lftclu0ls {(v lxD {eoY PtrE CA6LE L65ES AiO IE XOI DERIEO FFOX TflE AMITIq * iIL@ATIS ND XILOYAES Iil IHE EflUHS LISIEO.

REFERENCE DRAWI NGS E-! 1.t6rV ilE LtrE ouGRrX E-{ 5H,l E.5 sH, z

E-9 2{O VaC t?0 vrc rccs rEssl otE LtH€ ^mDu6ftlx E-1IE sFrs rcrtvrTED filtrutT raguLAU0N

DAVIS-BESSE NUCLIAR POlllER STATION

BEI?Z? EMERGEI\lCY DIESIL GENTRATOR I-I

sEt 2f,f LOADINC TABLT E-1042 SH,l TABLE 8.3- I PAGE 8, J-5I REVISION 32

SEPIEMBER 201B

DS 0J'29-I$ DFlt=I ;/Ettc/tI0425Hl.D0tl LMP il.I tlalr lm TYIR Srtp I $tEP lo TTEP I I II 3ItF t,EP V IffilTL ns EffllP*rrll OCStRIFtl Ul Loro tr lt II tlitt rr LorDllli mIlRrs Rfrrai9 ui l+/lrYl t r rolD r Lolo lolt I r {t{Y EC (r{ fia oir ff on Er2A 8Et ? 55 EICF O.C. EfiT' I YEXI Fllr I 0 ,t0?51 t.50 tco t. sl t. l? 0tr ofl Or ofl I o{ oil r.50 s t.6? 5. JI PO6l I FUEL OIL Efi'sIEi FUF I F tll s or C' o,00 or o{ ol il fi q o. oo ol I 00 o.to .o{ il

EOo r-r rG ruRBo olL plrlf rf,at-I 0' tt il H 0t/ O. (,r ffil3El Otr Pm Hfls qlp t.t pFl z. !{ B' ora 0r Oil 0lr

Lr. PUI? STFltrCr t oar f,i fla 3.E6 ().l f,l sEtrt! 0.00

5t r0 ,tlllrt trhusTuff tY ft?t2t iY r0 clxg tvt t+, YLY Httt

Er zo or or il OH 0,fi IAEX UP SENVICE YITEF E'BTITGF OISX YLY 0 0.oo 0,oo

E€r z!r8 EEt 291 (cct Foffi tos cmLER Fff 5 oa

o.6f r(E l.a, tf, Pt# l-t Dl30t vLv EI 2E t[,r zti fllct PaEESUAE tX. ff l rti iEglic rll,xFJe 0. ro o.m o.m LlXf, 150 vrv

o, t6 or il f 'rg

coltaitrfEtr llF oootEF Fr{ r - Hs il

FE7{.r 0.t Io0 o.rt 0.40

xYlc F6ft fiool.s trt I {3{ H ox 0f ct 6l ox .I. ilt 0l. ffi il

o. {0 ffi

{,51 z.aa ox oa G

EFIzU fi{ oa 0t

o.o0 SFTIC o.m

0t{ a,r ao 1a. rt It'lt TUt txt Ll*lE orl LrFf Ptr r

otr a.tr I

r ,tt

FII

0.00

I'GI H tt,00 H rt.E O,E rtEE xOlE ra, dr (SE€ xqft 1{r F|JEL olL ?ilr ft. Urt I rtfi

OI 0, oo rlt c0rftc5g6

git ItE 0.m I'EIIEL GEX TU@O LUE OII. FIJF lPAl T o'?5 o. T? o,5 gf IIEL ffi.UCT FUF llitxt | .00

7tl Erar 04 --itr'-' DAVIS.BESSE NUCLEAR POHER STATIOt-l IITT-ET rt2 Yetor IffiIA d.3l ts o, !t o.al il fi{ fla 0t oil ota plor tgt ErtI rti qwl[t E ] YE2 rEr@ rlrl lI at vl Y rff3or t 8 o.5l r00 O,J! 0. {l oar 0l{ Or or ot or Ei'{EROENCY DITSEL GEl'lERATOR cTrI fl8 ailtttrEB 5lnE tItE .t I-I fEt rEt0t r.t'tot i c o.3l ro0 o.ll 0. {r ff il il il ol oaa 0. rt lo0 o.tl 0lr 0i LOADING IABLE

EC TIIEF R'P ROOI VEIT FIi Mfl VE? rE2t m{{fE 6.tr loo o.tt 0, rl 0lr 0ll oil of, H !f, oa il ot B ox 0r E- I 042 SH.2 YEA TEAN IFN YEzO LOTO TEzS 1.00 Ha oo 50 .20 ofl qt oil ofl 0i 0lr oa C ot ox 0t oa IABLE 8. J- I .I|IIT.IIIII ilfl, fiilw ttfrf Gilrlnq,t PAGE 8. ]-52 lrtl,cl urtirt llcr rtt I rlx q,l c ra REVISION 32

SEPIEI,IBER 2OI8

0B 1 l -70- lI Lflt.l :/tlE[/il0425n?.06H NOTES

L00P ol{.Y 1. LOADS INOICAIED ]H SIEP I ARE THOSE IHAT STAET A5 SOON AS lHE EUERGENCY DIESEL CENERAIOR IED6) EREAKER CLO5E5. lfitE r.01tr IHESE LOAOS CONSI5T OF NOflHALLY OPER[TING OR If,IER9]TTENT r00P2 LOOPS LOTDS TDfiD ITI.trJ LOAOS NOT SHEO BY UV SIGNAL OR LOADS THAT RECEIVE I ), [I AI kYtr /1T STEP I SIEP I o SIEP I I SIEP SITP IY SIEF Y T$.U& IilrAL rorDllrc grcr FEEDilG BU5 BTR E(ruIPXENI DESCFIPTIO{ Loro . III REI.ARf,S ISEE I{OTE ISEE NOTT irl REL RTS SFAS SIGNAL ANO NRE NOI BLOCXEO BY THE SEOUENCER. r LOAT) r LOAD t€t r.oat llrc rsf,E rrolE HF /t(Yl T IOIE I r 24t 251 ir 2ll ?. ]F MU PUMP YAS RUNNINc ON THIS 1RAIH PRIOF TO LOSS OF OFFSITE POUER ILOOP1 II YILL BE SHEO 8I UV RELAYS ANO {q9! !!98 START 8Y T]fE 8ELA1 RELAY 2.5 SECONOS ISIEP 1A] AFIER DI ADI13 i,P04 32 400 ?85. l0 1 81. €O ON ON ON ON OH ON ON ON ON OH 0fl OH IHE EOC OUTPUI EREA(ER CLOsEs. HU PUF TILL BE IRIPPED AUTOHNTICALLY IN STEP ] IHEN DH PUUP IS sTARTED BY 5FA5 NOTE 20 0l tDl 08 rfo43J {00 0 0.00 0.00 FOLLOYING A LOOP. 561 2rl,8 ON ON ON ON fr f,. 5Y]N6 CHARGER NOI ilORYALLY IN SERVICE. II CAH 8E PLACEO DI notla OECAY HEAI PUXP ? r7r.l0 ON OH ON 0{ IN SERVICE I,(AilUALLY IF EP OC ?tr I5 trOI AVNILAELE. OUR I NC BATTERY CHARCER SURVE I LLAHCE TEST I NG. ALL IHEEE ON ON 0tr OH DI A0! 07 SERV]CE UATEP PUHP 2 oil EATIERT CHARCERS (2N,2P,2PN- TfO OPERNIIHG AI IH€]R DI ADl 09 SERV]CE UATER PUUP 3 pooil NOTE 20 5PARE STEADY-sTAIE ANO OHE AT II5 IESIIKG LOAD] ARE IN sERVICE PRIOR TO AN EVENT (LOOP OR LOOP UIIH LOCA). IHE LOAO VALUE 01 a01 05 XAf,E-UP PUUP 2 t!+3 724 ON SEE NOIE I€ ANO NOTE 10 ON ON ON 0tr ISEI NOTE 2) REPRE5ENI5 THE STINC CHARGER PLACEO IH SERV]CE XAHUTTLY IS 2P OR 2N, o? nD2l o xP2{r 0 800 98 620. r 0 ON AgND2 IEANSF 80 coRE Loss, NorE ?l BOCL 11.? kYl 0 0.00 OH ]O. C-EE-O15.O3-OO8, ATTACHMENT 5, ESTAELISHES THE COilTINUOUS { AHO OPERAIINC LOAO PERCENTiGE {8{II 480V LC RATIX6 }4.6 I(V^] FOR THE CONTJNUOUS sIEADY"SIAIE LOAO OF THE BATTERT BUS F] 8F111 COHTAINI,,IEHT SPRAY PUMP 2 0 po562 200 1 ?5.5 65.48 ON ON CHARGERS. THE f,Y AND (V[R ARE CALCULAIEO BASEO UPOtr THE FtrFR. INqTP. AIR COMRFSSOR IISq trr lqo ?oo 100 I 56, f,6 80,97 OH r00 L95 l .21 4. DELETEO rRnxsF- nFt coRF lossFs. NolF 7t D'ICI ?6.00 wa 100 3.70 ?5,14 DELE?ED 4a0v mc 5, FI BOF! I xFrR oFr-r coRE Loss, NoI€ 2r oFt -l cL oo ?.00 | 2.84 ON 0s ON ON ON 0tr OH ON 0t{ ON 0tr ON 5. REOUIRES SPECIAL 8US ALIGHUENI. FI BOFI 2 rrMR oFr -2 coEE 1055, NOrE 2r oil ON ON ON 0f, ON ON 0t{ ON 0h ON T. OELEIED B. THE COTITAINMENI HIOROGEN OILUTION sYsIET ICHO) I5 NOIE 1 (sEE trOIE 16) rttt BFttt5 COHTIINI'ENT LT6, TRANSF(L?SO] I x1301 o,00 0, 00 sEE 6 INITIITED APPROXIHTIELY EI O[Ys POSI LOC' tBD REOUIRES FttA 8Fll15 COilTIINHENT LTG. TFINSF(LISD2' x?902 10.00 hvt 0 SEE hOIE I 6 ( sEE a{oIE r 6 ) BANUAL LOAOINC ON €OCl-?. IHE HYDROGTN FUR6E SYSTEH (YF6O) A BACXUP TO IHE CHO SYSIEiI, IF FEOUIREO. BF1t12 CC PUHP ROOH VENT. FAN ? r{co7 52 ?.50 00 ON OH ON I5 IHE SYSTEH ]S HANUALLY AC|UAIEO AFPEOXIHATELI IIO ( (5EE HOTE EFt114 CONIAINHENT LIG. TRANSF L4901 ) x{9Dl {5.00 kvt o 0.00 I5) DAYS post L0CA. COiITROL ROOT A AUX.ELOC.LTG.TRAHSF, x5?Dt 30.00 wr 98 25.16 1 ?.82 0t{ 0ir 0tr 9, OELETED COilTROL ROOf, ETER.VENI.5YSIEH FAH ? ffiozt 2 5 too (. 2. 3. 2{ 0tr 0tr OUfiINO LOCA. MAXE-UP PUMPS ARE HOOELED RUI.OUI r'ic055e 50 99 {r ,62 ]O. A TI ?J,89 1560 bhP}. THESE PUHP$ ANE IT LOIER OUIPUT OIJRIXC A LOOP i65121 r0 r00 r 5,5e 1l,Jl OH ONLY EVENI, IHE SECONO LOAD VALUE IN EACH COLUIfi REPEESENTS THE LOOP LOADIf,G OF THE PUUFs. t.{7 r ,68 0t{ FT 1A 0.00 SEE NOIE B 11. FOR LOCA/LOOP IHE LOAOS LISTED ASSUI4E N LAftGI LOCA. FOR A LARCE LOCA THE ESSENIIAL PRESSURIIEi HEAIERS T]LL 14 1 ON ON ON ON OH DH ON OH Ft 8Ft 24 2,e4 0{ TOT HE),AIII ENEROIZEO, ONLY FOF VERY sf,TLL LOCA5 YILL FI l A 6Fr 1 33 CC CRD BSTR PUI4P I.2 SUCT VLV ON oft HEAIER5 REX[]X EXERGIZEO, ]N THICH CASE OTHER LARcER LOADS SUCH AS CTHT SPRTY PUT'PS HILL NOI 8E PFESEXI. FI l A 8Ft t {o RCS SFAS CHl CTUT PRESS. SY. I.Y. Hvz000 0. l! 1 FI l A BFt144 CTTT ISO VLV PENT 15A xv200e 2. OELETEO Fl l t BFr 1 25 PRJR VAP SMPL LINE VLV CTF Fffi VLV OP HV2f9A 0.r! 0 0,00 1]. ICE YAGNITUOES OT THE LOAOS FEO FROT BUSsEs C2 AHO O? ARE PFOVIDEO AS INFOFHATION IO THE @EEAIOH IN F11l BF1121 PRIR LOD. SXPL LINE VLV HV2lE8 0.r! 0 0.00 EVENT THA] IHEY ARE 8AC[FEO. EEFORE THESE LOAOS'HE CAH 8E AOOEO, HOTEVER, THE UUST THAT THEIR FlIA BFl I ?8 PRIR SHPLE ISOLATION VLV HV240B o. f,l t00 0.26 0.5? ON 0tr OPERATOR VERIFY LIHE ADDITION CILL NOT OVERLOAD lHT EO6. P8E55URIZE8 SPRAY LINE )SOLATION V^LVE HV?7J6 o, ]I 0 0.00 0. o0 t4. DURING EDG OPERTIION. ONCE lHE JACXET TATER TETPEHITUFE CTRH EI4ER CNDS UNIT ? VLV xv?9?B o.l l o o. oo o.m REACHES 155'F. IHE EDC IUHERSlON HETIERS YILL 0,r6 ro0 o. l7 ON ON 0il 0t{ ON ON oat DEENERG I TE. Fltl 0. J3 ro0 0.5? ON OH ON fr ON ON I5. DELETED Flt A 0tr OH ON ON 0[ ON I6. CONTAINT'fNT LICHTI(6 TRANSFORTf,RS ARE HOT INCLUOEO FTIA 0tr ON ON ON 0x OH IN THE TOTAL LOAD AECAUSE IHEY ARE REOUIRED IO BE DEENEROIZED DURING CTUT CLOSEOUT. FTIA Brr | 82 CTHT VCX RELIEF VLV ] G{ ON ON ON ON ON FITA Blr r g3 CTI'T VCH RELIEF VLV ON ON ON OH ON t7 THERE IS NORTALLY ONLY OtrE RUNNINc COHPOIIEtrT COOLING YATEF (CCY) PUIiP. YHILE STAPPIIIG IHE RUTINII{G AhD SPTRE FIiA BFr r 84 CTIT VCU PELIEF VLV IIOTOR ON ON ON otr ON PIJI.IPS. TYO CCT PUI,IPS ARE IEPORTRILY RUTNITC Of, THE SAHE BUs. ANO TOULO RETA]N OH THE 8US IF IHE EOC IA5 FIIA BFl I 06 CC U^TER DISCHAROE LIHE 2 ISO VLV STARIED, THIS IABLE ACCOUNTS FOP OTILY OI{E CCY PUIf FIIA BFI19 CC YATER IN LINE 2 I5O VLV xv5098 .60 0 SECAUSE PEOCEOURES DIRECT THE OPERATORS IO !IHIT THE Af,OUNT OF TITE THAT IUO CCT PUHP$ ARE CONHECTED IHE FllA 8Fil18 5G {E AUX FO TATER ISOLATION VLV HVSgT .t.00 0 0.00 SAHE EUS DUE TO EOB LOIDINC COilCEFilS. 'O FllA vLv uv505 o,6? 00 0.80 4t 0l{ ON OH BFl1ll sG re oPllll LIHE lsoLATtox 1 8. DELETEO clirT lso vlv xv6{e? o.70 0 0.00 0.00 1 9. OELETEO CF TANK 1 -2 I SO VLV rcIOR TVCFl A 1 0.50 o o,00 0, oo 0 0. 00 20. FPOO33 ANO IIPO4JS CAI{ BE OPERATEO IN PLACE OF IFOO]I 0.00 AHD MPO4]1. RESPECTIVELY. THE HPMf,] AEO UPO4JI PUUPS CF TANX 1 -2 VENT VALYE IVCF5A o o,00 o,m ARE sELECTEO TS PUNIIK6 SECAUSE IHEY REsPRESENT THE Ir.!05T CoNSERVAIIVE 1040. 0 0.00 0.00 EI. IRAtrSFORHER CORE LOSS€s iRE LISTEO Of, IHE TABLE FOR PURPOsE OF REPRESENIING IO]AL OIESEL OEHERTTOH LOAD. FlIB ON ON ON OH ON 0t{ ON THE IOEHlIFICATION NUI€ERS L]SlEO UNDEE Bf,R- ANO AOAO- ([r FOR IRANSFORHEF CORE LOSSEs ARE FICIITIOUS ANO OO trOT FlIE 8Fr r 56 CC YATER OUT I5O VLV E FEOH CIflT 0tr ON 0t EXISI ]N THE PLATT OR IN sAP. FlrA Brr 1 59 CC YATER TO CTI'T ISO VLV 22. 1OOP I-CONSISTS OF INT LOAOS IHAI ARE ADOED IO IHE FIIE BFI I 47 CIBT SPHAY PUMP 2 OUT VLV HVlSll 00 00 LOOP EVEI{T. FIIB BFlr75 CC YATEH IO CRD COOLER INLEI VLV tavl 5678 0.66 100 FiIE EFI r 5e CTf,T TORTAL SUXP 15 VLV HVZOI 2-8 o,65 r00 0. s0 0x ON 23, IF THE BUNNINo CCI PUUP VAs ON THIS TRAIf, PRIOR TO THE LOOP.ONTY EVENI. II IILL HESIARI TflEN IHE EOG OUIPUI CTRL RTI EI'iER VEHI FAN VLV xv5?6?r o. f,3 0 0.00 0.00 2 IN BREAXER CLOSES ILOOP I I. JF THE XT' PI.JS Tis RUNtr)t{G OH CONTAIN[ttrT/ANNULUS O/P I50 VLV HY62{E o. f,3 0 0.00 0. 00 THIs TRAIX PEIOR IO THE LOOP-ONLY EVEHT, IT V]LL 8E SHEO BY UV RELAYS AIIO SITFI 2.5 SECONDS AFTER IHE EO6 OUIPUI HVOH?A 100 ON OH 0t{ EUST LIHE OUT VLV A r ,00 t.l{ 1.?! 0lr BREA(ER CLOsE5.

24. IOOP 2'OCCURS IEN (1OI SECONOS NFTER THE EOG OUTPUT 100 r,?1 0,91 OH ON 0tr ON OH ON otr ON BFEATER CLOSES, ]T THE CCI PUHP ASSOCIAIEO UITH THIS TFAITI STAIIDEY PFIOE IO IHE LOOF.OBLI EVETT, BFr r 66 00 2. ?8 2. J{ ON OH ON ON ON ON IS IT Fttc II YILL SIART OURIBG LOOP U, Ft l c 8Fr 1 r? AFPz SUCTIOI{ YLV IHE EDG AIR COPRISsOP I€ YILL START 20 sECOtrOs AFTER IHE EDC OUTPUT BREII(Eft CLOSES FOLLOIIN6 A LOOP EVENI, FllC EFr r 2g DH NOHHAL SUCI:oil L]NE 2 ISO VLV XOIOR FrlC BFr 1 l4 ?5. tOOP 3'OCCURs TYEHTY.OHE I21 ) SECONOS AFIER THE EOO OUTPUT BREAKER CLOSES. THE 5Y PUMF SIARIS IN LOOP ]. Fl1a 6Ft151 CTXT H? PURGE OUT I5O VLV 2 Hv!057 0. !J r00 Flla LOT PRE55 INJECI VLV 2 IIOIOft IVoHI i 26. f,AINTAIN ffiC F]3 ALIGNBEII'TO NORf,IL SOURCE UflII F7 UNLE55 FO8XALLY EYALUAIEO IN C-EE.O15-05-OO8 A5 ACCEPIAELE.'U8 Fllf 8F1 1 l9 flPl z-1 vtlvE HoT0R HYHP?T 00 r00 75 THE LOAO Y]LL 8E ON IHROUoHOUT ENIIRE EOG LOOF/LOCA AND XPI E.? VALVE XOIOR UVHP2B r00 7l LOOP Of,LY sEOUENCE5. OR CIfl SE CAXUTLLY LOIOEO ON frEH Nf, ILTERNATE ALIoIIMENI HAs BEEN EVALUATED III C.EE.OI5.03.OO8 A5 ACCEPTIBLE. HYOFOCEN PUR6E SYSTET fILIEN tF60 2.O0 kvl o o, o0 0,00 rEI12? r.50 wr ro0 7,5Q o. 00 p0I6? 5 0 0. o0 0.00 GENERAL NOTE r00 7.50 0.00 ON OH SUPPORIIH6 OOCUTiIIIITAIIOH FOR LOAD SEOUETICIHG ATO OH/OFF OETERMINATIOH, A5 UELL A5 FOR LOAO VALUES, I5 OOCUI{EHTEO Ftto 8Ft187 84 { 3,86 {{. I6 SPIRE ISEE HOTE 3) Itr CALCULATION C.EE-OI5.OO3-0O8. OISPLIYED LOAO YALUES TOTORS ARE CALCULATEO YIIH CONSIOEEA'IOil IO I'OTOR 'OR oil EFFICIENCY ANO POYER FACTOR gY ETAP POTERSTATIOft. IHE LOAD THE EIf,ROEHCY GEifRATOR Fllo BF1 1 55 ECCS sUf,F PUHP ZN 5.96 OH SUHARIZED IOTAL Otr DlESEL TAIES IN IO AcCOUNT SISTEH LO55E5. ITCLUOING 4XV AtrO {8OY F1l O BFl l5{ ECCS SUM PUXP ?B POUTR CABLE LO55E5 ANO I5 NOT OERIVEO FROH IHE ADOITION OF XILOUATTS ANO X]LOVAFS ]N THE COLUHf,S L]STED. Ftlo 8Fl r 6r CC AUX ELDG TO LII]E 2 I5O FIID BFr I 64 CTHT H2 PUE6E FAN 2 SY Iil VLV F!ID BFr r 18 REFERENCE DRAUING r 79 RM HVAC VLV 2 rv54{2 0.1 3 100 o.24 0. 0x FIID Brr lt5 t50 l7 E-5 4.I6(V ONE LINE DIAGFAE FItD BFtr17 HAIH FO CATER 2 I50 VLV HOIOR Lv60r 39. {0 100 lJ. ?2 r 8.20 OH E-{ 5H.2 48OV UNIT 5U8 STA ONE LINE DIACRAT Fttn BFr r 85 DECAY HENT 1.E OTLT CC YLV HVSIO l.oo 0 0.00 0.00 E-5 SH.2 48OV TCC INON ESS) ONE LINE OIAcFAX CTMT ET.fR SUMP OUT VLV xv0H9t l.oo 100 t.i4 l.?3 ON ON ON 0h ON E-5 5H.2 -5 48OV HCC (ES51 OilE LINE DIAGRAI HVHUl 28 o 0. oo o. oo E-9 a40 vtc tND t20 vac HccS (Ess) ONE LINE DIACFAi{ E IB SFAS ACT!VATED EOUIFHENT IAEULATION [co]r r ?.50 100 7,ll 4,51 0a{ 00 7.93 4.95 oar FIIE 8Fr 1 95 0 0.00 0.00 FtlE 8Fl I 9{ HPI PUI'iP I.2 HIH RECIFC I5O VLY FIIF srl 2l lokva 0l5T xavR OH 0tr or OH ON OR ON OH F lZl BFr23o OIES.6EH.FUEL OIL 5IOR. E TRANSF FU HP OH ON OH OH 0il FlZ^ gF tzzg CTFX.EI{ER.SISI,STANDBI CONO,UNlT 2 cs06r e ?.50 00 6. rl 5.?8 ON 0x Ft?^ 6F r 205 NFP ROOH VEHI FAN A taco? 3 2 ?.50 00 6.68 {,{9 0t{ Ft?l 8F r e04 LOY VOLI SBCR. RM, VEHT. FTH 2 rcor !l 0 00 8. 7r 5. {l OH ON DAV ]S-BESSE NUCLEAR POI.IER SIAT ION EI'ER VEI{T FTN 2 HC0]0a t5 r0o 1 2.20 ON ON OH BATIERI CHABGEF 2P DSC?P 7{,6 kvl 84 {3.85 44.75 ON ON OH OH 0x 0il ON (SEE NoTE 3sl BAI'EEY CHARCER 2H D8C?H 7{.6 kvl 04 41. E6 44, ?5 ON ON OH OH ON ON 0x (sEE N0IE 3sl YRF Z ?0.00 kv^ 55 l 0,40 7.80 ON OH OH otr OH ox ON ON 0t{ ON OH OH EI'4ERGENCY DITSEL GENTRAIOR I-? ON ON ON OH 0il ON ON 0tr ON OH ON Ft 2r BF 1 Zll HP] PUXP 2 AC LUBE OIL PUTP ON 0tr ON 0x 0f, LOADING TABLE Ft z^ BF1213 PRzF sEATER rstE NoTE ll l ON ON Ft?L BFl?II PRZR HEATER YLBI ? {?.oo kvl o0 0tr ON I Ft 2l BF12!5 PRZF HEATER ON t-1043 sH. FI ?A EFIAlE EHER. VENTL. FAN IH DITFER 2 xc50r 6 0.5l o0 o.51 0x FlzA BF I ?25 EITRGEflCT YETI sYsTET CRO55 TIE OUCTYOFI DAXfEB xc505? 0.31 0.00 0.00 IABLE 8. ]- I FI2A 8Fr22l CIIT AIR COOLER 2 5T IN ISOLAIIOH VLV HYI 557 o. f,l 100 0.3r 0. {? ON OH FI2A RCS LEIDOYII COOLER *I CCT I BYI 409 o 0. 00 o, o0 PAGE 8.3-53 RCS LEIDOYH VLV 2 CCT INTAI(E VLY rvl 4r 0 0. ]I o 0. o0 o. oo FRZR SII#LE Ltr IO CTI'T VENI HENOER VLV cY?00 0.1 3 0 0. o0 0. o0 100 5.08 ]. 17 0t{ ON ON ON 0il OH REVISION 32 Ft 2n 8Fr ??5 EVs TO SPENT FUEL POOL A"CONffECT OMPP 0.3t 0.47 ON ON 0! ON 0r

F!24 8F 1 239 LOI VOLTAOE STCR RII 428 VEXT flOTOR F! 2A BFl2l 0 EATTERI NOOX {?9A TO ATH OACPER ON 0f, OH ON OH OH SEPIEI4BER 201B FI 2A BF 1 208 I.IU PUI'P DISCH CROSS CONNECT LINE I5O VLY Fl ?t BF 1 2f,7 C LETDOTN COOLER I.I I{LET VLV OFERATOR .00

DB I l-20-17 0FN=t r/ELEC/I104lSHt.0GN LOOP (NL? ITI!E T$ruAL LOOPI LOOP? LOIDS ADOT,D IHnl' [I II AT SITP I lItP lo SIEP I I SITP I I SIEP IV SIEP V lrxuAt LoADlN0 BTEI TETDIXG nJs BTR EOU I DESCB I PT I OI{ LOTD [vlR r FEt IR(S ISEE IIOTE I SEE HOIE REHTFXS 6US PIf,NI LOAO T LDAD stE LoA0l l{c .!EE EtE t [ 9.r r HP /KYA I t lr}tE r r ?2 I ?!r 211 I

480V MCC FI2B 6Fr255 EXER 06. ROOH ? VENT FIN ] 0 r{c025] 7.50 100 E.6r ,37 ON ON ON OH OH ON ON ON 0il ON 0[ ON 8Fr256 EilER. OG. ROOH ? VENT FAN { r1c02 54 7.50 o0 9.45 ON ON ON OH ON ON ON ON ON ON ON FUEL OIL BOOSTER PUHP rf 1592 l 0 0.00 BATTERI ROOU VENI FAN 2 rcora2 l 00 05 .53 ON oil OH ON & ft ON off OH F1 28 DIES.OIL PUHP HSE.ELECT.UNII IIIT. A lE]094 {.00 kvt 100 4.00 0.00 0tl ON ON ON OH ON (sEE Fr 28 8F r e58 c362? 1 5.0 kYl 100 15.OO 0,00 0x ON ON ON ON ON NOTE I4) F128 gFr26l 10 100 10,?1 5.{ ON ON ON ON ON ON ON Fl 2A 8F 1 26r EHEE. O. G. 2 5OA(.BAC( PUMP 00 0.90 1.U OH ON ON 0tr ON ON Fl ?8 BF 1 257 FIRE FUMP D O. TRANSTER PUHP E 0.00 0.00 Fl ?8 BFt 289 EDG 1 -2 AC TUFBO OIL PUHF HFI 47 -4 0.81 ON 0x ON OH ON OH ON 0t Fl EB BTI ?68 DEISEL O1I. FUIP HOUSE SUMF FUBP I.I8 ON 0h ON ON ON OH ON F1 2g 8f t ?52 AFP 1 -? IO SG sTP VLV OPER rrYaeT2 ?.60 f,. 71 ON 0t ON OH OH OH F I28 BFl ?60 PRESSUFIZER 1 SPFAY VLV TOTOR MVRC2 oo 8F1 ?70 l?oYAc f,cc YFt Loao IF 2.00 wa o0 ,60 ON ON OH 0h ON ox ON ON ON ON

SERYICE TTIER PUF SIRAItrER ? FO152 I r00 0. s6 0x ON OH OH ON ON ON SER. YTR PUTP SIRAIHER ? DRA)E VLV HV1 180 o, f,l 0 0.00 0.00 Hvl 595 0, ?0 100 o.80 41 0{

Fr2C BF 1 ?81 Mv?9!0 1 .00 0 o. oo 0,00

F 12C BF I 202 0 0.00 o,00

gFr ON ON ON ON ON ON ON F1 2D 2t 1 5T PUIF YENT FAH ] llr I,ls 6.91 FI ?D BFI EJ5 5Y PUHP YENT. FAX { 8.26 5.89 ot OH fr ON ON ON OH ON

BFr 3r 5 BA ADO. II( ROOS sTC. SPACE HIR. YEOSO? f,g kYl (SEE NOTE 26] 0tr 6A LIHE5 HEAI TRACIilC sEC. SISTEU BASSY il1.00 kYl ( SEE NOTE ?6 ] ON TUPBINE GEXERAIOR GEAR OIL PUF iP0200 50 r00 ISEE NOIE 26] ON IURSINE CEtrERAIOE IURH. GEAR Hm82 60 r00 51.18 t5.58 (sEE HOIE 25) ON ISEE NOIE 26I IURSINE EEIR]XG O]L LIFT PUIP I FOz5l 100 4. a? 3,58 {SEE trOTE 26J OH (SEE NOTE 26} TUREINE BEAFTNC OIL LIFI PUlf ? p0254 5 100 4. {? 3,58 (SEE trOTE 26] OH {5EE HOTE 26} IURSII{E 8€ARING OIL LIFI PUMP } F0251 100 4.4? 3.58 (SEE ilOTE 26I oil ISEE NOTE 26I FT I IUREINE EEARING OIL LIFT PUHP. FO?5{ 100 4.41 3,58 oil ISEE NOTE 26} Fl5 r00 {, {7 0l{ ISEE NOTE ?6) Fr ! BFI fz{ IURAIHE EEARIHC OIL LIFI PUHP I 100 t.af ON ISEE NOTE ?6) (SEE HOTE Fr 3 BFI ]O? ETEF I HST 0.r2 26, NOTES DR AIR COOLER FAN 2 . HS t6 trorag.LEctro I ltFEltr*t rtrGt Ft{ BFI 40r COilIAIHI€ilT ETE sI{EEI I. Fr{ 8Fr 401 CONTA]XT€TT AIR COOLER FAH 2 - LS k6001 ? {0 OH fr

CONTAIN'{NT AIR COOLER FAH 3 . HS EOOl f, 50 SPTRE SPTRE COHTAINI{NI AIR COOLER FAN J . LS t{c001 l {0 0.00 SPNRE SPTRE

5TA,VEHI,NORM RANGE RAO,MON.RE4598BA PUHP p?7{ -} 0.5 ro0 3t t0 ON 0fi ON ON ON 0f, SPARE Ft6l BF 1 623 F1 6A 8F1 61 7 0 0.00 0,00 FI 6A 6Fr 61 6 OF TO 81PAS5 VLV IN THE UUSZ HFLH LIffE 0 0. o0 0. 00 F1 6t BFr 62{ ISOLITIlTER (CONs]ANI VOLIAOE XFI{R} XYA 11.r9 oil OH ON ON ON 0{ OH F15t BFI 525 ISOLIMIlER tCOBS]ANT VOLTACE XFilR} XY4 1t.r9 0x ON 0tr ON ON OH OH ON ON

Fr 68 BFI 609 SPAFE Fr 68 BF1 61 0 CTUT AIT RAD BON RE4597SA PUMP trP27l.t/{ ON ON ON ON ON ON 0t{ ON 0u

F7t BF?1 05 EIAC CLOsED COOL]HC LOOF FAN I ucl { 51 3. O0 00 1 .36 ON Ffl EFll 05 EIAC CLOsEO COOL]NC LOOP FAN 2

ON 8F71 l4 l.tPz42 - 1 0.75 00 BF?1 05 EXER IHSI AIR CLOSED COOLING LOOP PUXP I HF250r 1.50 00 6.5? a, l7 ON EH€F IiIST AIR CLOSEO COOLING LOOP PUHP 2 MPz60Z ?.50 6.52 ON XFE FOR PNL 13{01 x3402 to.00 wA 3f,. 3f, 8. OO 6.00 ,!d\ l_oN Yrd\ XFTR FOR RTCEPT Rt{ ll{B x1401 15.00 kvr 8. OO ON

F8l 2.{0 kvl r00 r .92 1 ,44 0tr 100 ON F8r BFEr 05 XFH OFI CORE LO55 OFSCL 6.00 wl 0.80 5,95 (SEE F8r 8F8r Ot DG ]TOiERStOH HEIIER 06 IH 1 5,00 kvl 100 1 5.00 0.00 NOIE I{} OH

F8r ErEr r a FUEL OIL IAil( FH UNIT HTR E?07 5.00 kvl o,m 0.00 4. ON 8r BfBr r l vf,NT Flh HCI 52A 00 ]9 2.rl F8l EFSt 1 4 HCI 5?B 5 o 0.o0 0.00

F81 8F6t 1 ? VENI FAN t'tc155 o0 00 0z O, EE OH

F81 8FB1 08 ltR coxPRE$50R ilc4 304 r 0.oo 0.00 0.00

lac4 1 F81 BF81 09 rtR corFREssoft ]0& 0.00 0 0.00 0,00

r A 1 F61 8F8r r 0 RAOIAIOR FAT lEz1 5.00 0 0.00 o.00

Fg1 6F81 r 1 RAOIAIOR FAN HEzI I B 1 5.00 o.00 o.00

F8r BFSl I 5 FZ79A o. t5 o.00 o.00 F8l BFSr t 6 SUIf PUI.P HF219g 0. ?5 0 0.00 0.00 F8r BFEI 07 DEISEL 6EN TURBO LUBE OlL PUI,P PEEOA 0. ?5 r00 o. 72 0.96 ON

F8r BFSl 06 F2809 .00 r00 o.9? 1,10 ON F8r BFEr Ol 480 VAC RECEPINCLE zR30r r 50.00 w^ 0 0. o0 0.00 F8l BFEI 04 460 V^C RECEPTACLE zRl0l ? o, o0 0.00 F8l BFEI I 7 X]05? LTG TRANsF TJ05Z 50.00 wl t8 17.10 0.40 ON

JOCKEY FIRE PUT,P HPOO50 5 100 {.5r ON ON OH ON ON ON ON 0il 0il

flF01 5I 1 0 0. oo 0. o0 5PAPE EF1?C 8EF r 25 rvl l8l 0. Il 0 0.00 0. oo

EF1 EO 6EFI ?9 0. lt o, {7 ON o{ ON ON ON OE

41 60 SICR

D? AD20l STATIOII AIR COi{PRESSOR D2 40208 rUX. BOILER F.O. FAH HC011 0 400 /r 5 0.m lD21 I L ICHIINO SUB TRANSFORH€R 0F5 28J.00 kv/ 0 l0?1 r 5TITCHYARO FEEOER r"2 r00.00 kv, 0 0. o0 0. 00

2.9.q!_J.EE \F2 YF2OI CICT ANILYZEF SAIIPLE LINE T4 IN VLV OP 0 xY50r 0a 0. l3 r00 a, f1 o, 4l oil ON ot ON ON ON gv50r YF? CTHI ANTLTZEF SATFLE LIHI * IN VLV XIR OP 08 0. 13 r00 o, f,1 o.47 oil ON 0x 0tr ON ON DAVIS-BESSE NUCLEAR POI,JER SIAIION 0. l3 r00 o,lr o, {7 ox ON 0il ON ON ON \F2 r00 0. l1 0.4r ffi OH ofl OH OH ON 1F2 Ys205 OP yv50r oE 0,33 r00 0.31 0. {1 OH OH OH OH ON ON E[,{TRGINCY CENERAIOR I -2 YFZ tF2t2 CC PUBP FAN RX o.t7 loo o.13 0fl OH ON ON ON DIESTL \F? YF2O8 XFTG YF26 LOAO YF?B 2.00 hvl ON 0r ON ON ON ON 0il ON oil ON 0tr LOADING IABLE

olEsEL trfltG t- I 04J SH.2 FAIEO OUTPUI ?600Kt OVEFLOAO OUIPUT 2A60Kr TABLE 8.3- I FOR HOUES z8 5EXr 2OOO PAGE 8.3-54 2946(r FOR EOO HOURS J0!5xI FOR 7r HOuR REVISION 3?

SEPTEi.,1BER 201B

DB 05-08 l8 0FN=t r/ELtC/E104l5ll2.DGN Davis-Besse Unit 1 Updated Final Safety Analysis Report

TABLE 8.3-2

Administratively Controlled Circuits (AC)

DEVICE TYPE OF DEVICE NO. DEVICE TYPE LOCATION OPERATION

ITEM 1 CBY305 Circuit Breaker Panel Y3 Kirk Key CBY105 Circuit Breaker Panel Y1

ITEM 2 CBY405 Circuit Breaker Panel Y4 Kirk Key CBY205 Circuit Breaker Panel Y2

ITEM 3 Y101/YAR04 Transfer Switch Panel Y1/YAR SPDT

ITEM 4 Y101A/YAR06 Transfer Switch Panel Y1A/YAR SPDT

ITEM 5 Y201/YBR04 Transfer Switch Panel Y2/YBR SPDT

ITEM 6 Y201A/YBR06 Transfer Switch Panel Y2A/YBR SPDT

ITEM 7 Y301/YAR05 Transfer Switch Panel Y3/YAR SPDT

ITEM 8 Y401/YBR05 Transfer Switch Panel Y4/YBR SPDT

ITEM 9 BE F154 Non Automatic BE F152 Circuit Breaker MCC EF15 Kirk Key

BE F153 Circuit Breaker MCC EF15 Kirk Key BE F151 Non Automatic Circuit Breaker

ITEM 10 BE F121 BE F122 Circuit Breaker MCC EF12C Kirk Key

ITEM 11 BE F128 Non Automatic BE F129 Circuit Breaker MCC EF12D Kirk Key

ITEM 12 BF 1310 Non Automatic BF 1304 Circuit Breaker MCC F13 Kirk Key

ITEM 13 AC108, AD108 Circuit Breaker 4160 V Swgr. Insert or Withdraw AC113, AD113 C1, D1 Breaker

ACD2, ACD3 Non Automatic Transfer Open or Close with Circuit Breaker Swgr. CD Kirk Key Interlock

ITEM 14 BE1168/BE2238 Circuit Breaker MCC E11C/E22A Kirk Key

ITEM 15 BE1167/BE2237 Circuit Breaker MCC E11C/E22A Kirk Key

ITEM 16 BF1114/BF6204 Circuit Breaker MCC F11A/F62 Kirk Key

ITEM 17 BF1115/BF6205 Circuit Breaker MCC F11A/F62 Kirk Key

ITEM 18 ACD4, ACD5 Non Automatic Transfer Swgr. CD Kirk Key Circuit Breaker

8.3-55 UFSAR Rev 31 10/2016 Davis-Besse Unit 1 Updated Final Safety Analysis Report

TABLE 8.3-3

Administratively Controlled Circuits (DC)

TYPE OF DEVICE NO. DEVICE TYPE DEVICE LOCATION OPERATION

ITEM 1 D1P02 Disconnect Switch Panel D1P Sliding Bar D1P01

D201 Disconnect Switch DC MCC2 Open 400 A Fuse DC MCC2 Remove

ITEM 2 D1N02 Disconnect Switch Panel D1N Sliding Bar D1N01

D232 Disconnect Switch DC MCC2 Open 400 A Fuse DC MCC2 Remove

ITEM 3 D2P02 Disconnect Switch Panel D2P Sliding Bar D2P01

D102 Disconnect Switch DC MCC1 Open 400 A Fuse DC MCC1 Remove

ITEM 4 D2N02 Disconnect Switch Panel D2N Sliding Bar D2N01

D133 Disconnect Switch DC MCC1 Open 400 A Fuse DC MCC1 Remove

ITEM 5 D1N05 Circuit Breaker Panel D1N Kirk Key D1P05 Circuit Breaker Panel D1P

ITEM 6 D1N07 Circuit Breaker Panel D1N Kirk Key D1P07 Circuit Breaker Panel D1P

ITEM 7 D1N09 Circuit Breaker Panel D1N Kirk Key D1P09 Circuit Breaker Panel D1P

ITEM 8 D2N05 Circuit Breaker Panel D2N Kirk Key D2P05 Circuit Breaker Panel D2P

ITEM 9 D2N07 Circuit Breaker Panel D2N Kirk Key D2P07 Circuit Breaker Panel D2P

ITEM 10 D2N09 Circuit Breaker Panel D2N Kirk Key D2P09 Circuit Breaker Panel D2P

ITEM 11 43DC/HA01 Transfer Switch HA01 DPDT 43DC/HAAC Transfer Switch HAAC DPDT

ITEM 12 43DC/HB01 Transfer Switch HB01 DPDT 43DC/HB14 Transfer Switch HB14 DPDT

ITEM 13 B302 Circuit Breaker DBC1PN Kirk Key B303 Circuit Breaker DBC1PN

ITEM 14 B302 Circuit Breaker DBC2PN Kirk Key B303 Circuit Breaker DBC2PN

8.3-56 UFSAR Rev 30 10/2014 Davis-Besse Unit 1 Updated Final Safety Analysis Report

TABLE 8.3-4

Environmental Requirements for Class 1E Cable

WITHIN SECONDARY SHIELD WALL TEMPERATURE HUMIDITY PRESSURE RADIATION CHEMICAL SUPPLIER** DBA 287 °F 100% RH 40 psig – 1 Week 108 RAD Total 2800 PPM Borated BIW Water 1-Week***

NORMAL 122 °F 100% RH ±0.5 psig 3.5 x 107 RAD Total None

WITHIN PRIMARY CONTAINMENT DBA 287 °F 100% RH 40 psig – 1 Week 108 RAD Total 2800 PPM Borated KERITE, Water 1-Week*** BIW

NORMAL 122 °F 70% RH 0.0 psig 3.5 x 107 RAD Total None

WITHIN AUXILIARY BUILDING DBA 122 °F 100% RH 0.0 psig 3.5 x 107 RAD Total* None OKONITE,

NORMAL 122 °F 100% RH 0.0 psig 3.5 x 107 RAD Total* None KERITE, BIW, CCC

OUTSIDE ENVIRONMENT DBA Same requirement as within Auxiliary Building OKONITE,

NORMAL Same requirement as within Auxiliary Building KERITE, BIW

* Requirements are not applicable to interconnecting cable between SFAS Cabinets which will withstand 104 RAD. The dose in the Cable Spreading Room and the Control Room will not exceed 5 RAD over 40 years of normal operation plus 5 RAD during the DBA.

** Suppliers are listed for historical information only. Other suppliers may be used as long as requirements are met.

*** For pH Control reference Section 9.3.3.2

8.3-57 UFSAR Rev 30 10/2014 TO 345KV SWITCH YARD FROM 345KV SW ITCHYARD

8 •Ac MA IN TRANSFORMER ' I" 980MVA STAR T-UP FDA 65'C RISE z{A

i 'S HXl lB gt HXOIA g t) HX02A g ~ HXllA ! NJ; [2000A J ~ ?ND ~J;NO ~.r ! l 750MVA r [1~~~~] l I 3. BK v SWGR BUS 'A" r ! x x x REACTOR COOLANT PUMP NO. 1·2 9000HP REACTOR COOLANT PUl-f' NO. I· I 9000HP x x x ! HBBFJ < t HBBF4 < 'SHB80 REACTOR COOLANT PUMP NO. 1· 1 9000HP REACTOR COOLANT PUlol' NO . 2-2 900011' t t t t I ~ }HBBF2 gt g ) o CIRCULATING WTR . PUMP NO. 2 450 0HP CIRCULATINC 'OIR. PIMP JlO. I 450011' g ) HAAC g ) HAAE4 g ) HAAE2 g ) HAAEJ : ~ ? ~ J; ~ J; CIRCULATING WTR. PUMP NO. 4 4500HP CIRCULATING WTR. PUMP NO. J 4500HP ~ J; ~ J; ~ J; ~ J; ! ··- ~ ··-··-·~ ·-··-··- ··-··-·· ;.~---··-i-T---- ~~~-~~~- --·- ·· -··-· · -seo~i~:JoY.T~-oJ[i.~;f~[~Al°R " IT0Fs;os ~;l~~ii:~:~-.;~:j;j;·-· ··-··J 8 87 ··- ---··-··-·-· ''-··--··-··-··-·"·-··-· _) • ~ TRANSFORMER "B O' ~·8 •-f:-0-11• .:. · SH.5 11/16MVA DA/FA -:c\ c Sin 12/16MVA OA/fA .....- "'?i ~~! ~~IsE ~~~v~ra l•, GOHZ 'i I J. 6 KV-4. !6KV B~~ J0,61llZ ff ac K~~~~ 16Kv "'" e A 1°6.41. @12MVA ~ t)AOJOI b, 4200·480V / oG.417. @12MVA l-{C C ~ N 4. I 6K VA ~ J; o [1000A J SWGR. ~ y 150MVA BUS "03" ....------1----4--1------~------

I MAIN GENERATOR EMERGENCY i·------··-··-··-··-··------·-··-··-··- --·-··-: EMERGENCY \06911VA 0.90 P.r. DIESEL D!ESEL 25KV,l•, GOHI ABOD2 A021l A020F7 GENERA TOR 2 i .;:!i t .;:!i t ."\? !I GENERATOR I 2600 KW 0.80 P.f. ,o J o J o 2600 KW 0.80 P.F. Jo , 60HZ I ~ ,J; [1000A J~ J; ~ i l•,60HZ 4. 16KV 250MVA f SWGR . BUS "02' f i STATION AIR COMPRE SSOR Cl40 l8 2H P : MOTOR DRI VEN FEEDWATER PUMP SOOHP I ~~~~g~[t/~~C~~ - O~AFT FAN I~~~~~ l 2 ~88trn~ m: ~~~~-~b.P~MP NO. l~~~ 1 HEATER DRAIN PUMP NO. 2 JOO HP J SWITCHYARO FEEDER NO. 2 SOOKVA : LICHTING SUB. XfMR OFS 7501\VA I NISC. / TENP LOADS XF14l OF6 7SOKVA : -· -··--·-··- ··-··-··-··-··-··-··-··-··-··-··-··-! r-·· ·· -··-··-·· ·· -··-··-··-· · -··--·,...··- ·· -··-...·_·-_·_·--·_·--·-· --·-· -..._+-r·_--_ ·_·-_-_4-_.·_15_K-_v- ....xF"Uf sw ...GR_- ·_"_i:o_"_··_-_·-_-_-·_-,_!~.-1--··_-_··---· · ---··--~·. -··-··-··- ··-· -··-··-··-.. - ·. •. --·-··-.. .. -·· :. ~~AACOI ~ r) AD I OI Q ~ f)AO ll0."I T) A0109 NO<'lbi~NO ~ T) AC I 09 ~ ~A CllO Q ~ ~ AC I OJ i r) ABOCI J. N J; NO - J; NO[NOOA .J; ~po AC05~ .J; ~ AC04 - NO r aOOAJ- NO J - Q r .r 2 r -f "po I 4. 16KV x2sOMVA ESSEN. r swGR . I Bus ·f 1" ( 16 1 t I 6KV I l.?SOMVA 1 ESSEN. swGR. 1 Bus ·c1l 1 1 51 141 till.ill ! ., HIGH >RESSURE INJECTION PUMP NO. 2 600HP < t _ ? NO : SERVICE WA TER PUl-f' NO. J :! t NO :! t 0H EICl!CAYPRHEE~STUPREU". PIN!,E0 C.Tl1 DN PUMP NO. I 64 0~Pp :! tAC ICEI · g ?D ECAY HEAT PIMP NO. 2 400HP g ) ;:;: g ! 600 HP - ; - ) • " " ~ - ) I . FOR 480V ELECTR ICAL SYSTEM ONE Llh'i DIAGRAM SEE ! ~ CIJMPONEM T CLNG . PUMP NO. 2 400HP ~ I" e ~ AOlos'i ~ ~ COMPONENT CLNG. PUMP NO. I 400HP ;<: SHEET 2 OF TH IS DWG. i, ;;_ MSEAKREVICJEP PWAUMPTERNPOUllP.z NNOO.T20J GooHHPP ,"- ~ ••• : - ACIOB - .J; ~ SERVICE WATER PUMP I GOOHP - J; - 1 450 ., ..------....;...... ;...._ _,Y !;! MAKE UP PUMP NO. I NO!NOTE. 41 450HP 2. BUS RATINGS ARE INDICATED THUS 12000A I. J. FOR STATION OISTRIBUTION TRA NSF ORMER TAP SETTINGS L.._. -~ --- ·-··-··-· - -··-··-··-· · -· · -··- ·· --·- -··-··-·'------_.._j _,...----N-'O_<...,tHOT\5f.

ESSENTIAL UNIT SUBSTATION "Fl" ,---·--· ------.. ---.-~B--1~!~i~f&KVA·- -.-~fl · - : 8 1000/ IJJJ KVA : REFERENCE DRAW IN GS :-·-·------·--··1 I AA/FA RISE •

DAVIS-BESSE NUCLEAR POWER STATION

UNI T SUBSTATION 'EFG " UNIT SUBS TAT ION 'f2" UNIT SUBSTATION "F3" UNIT SUBSTATION "EF4" UNIT SUBSTATION 'E3' ,. ______·-··-··-··-··-··-··-··-··-··-··-··-··-··-··-··- ·----·· AC ELECTRICAL SYSTEM ONE -LINE DIAGRAM i W rl 0 ~~~t 1 ~1 st vA J ·- · ·-·iB;i0ff~/i ~fs~v;··-·· ~"X~! ~-·x-· --·- ·· -··;-2,·:joo~~iso··K-v;·-·· ! : r··~;:-- ·-··--·-··-··- · ·J~;y;i~Jif~~Fi·-··-··- ·· -··-··- ·-x-·1 .Ac .Ac : l ~..v"8F 3" ~~~F~O~~ RISE A S,_'-'v l•, 60HZ "'-~ c ; ""'""" l•, 6GHZ '-A...V ! 3• , 60HZ '-"""° J ! '-".,t, Ci : ! E-I, SH. I ! l l .8KV- .48KV ~ J IT"' I J.81(V · .48~V IT"' . I .(1:""' 13.8KV-.48KV ~ • ' BF ' IJ.BKV-.48KV B ~AE "i rr 8 8 8 8 8 4 IT"' 4 "BF2" •-{ ., ,l"AF2" 1 .. • • ! "BF S' .l •-<, •-

DB 03-11 8- 16 D F N~I :/[l [C/E JSHl.DGN FRr,i 4, l6xv Es5Eil 5r6R BUs '01' FR[ 4.16KV E55EN SYCR BUS 'OI Ffllt ,{. t6r(v ESSEtt SICR 8u5 'Ct FnH {.t6t(v E55EN 5r6E BUs 'Cl' FRr,r ti,8r(V 5[0R BU5 'B' FRM IJ.B(V 5I'OR BU5 'A'' FRt.,t I].8KV sWR 8U5 'B' FRt{ 13.8(v 5t6F BUs'A' ( ( (sEE (sEE (5EE NOIE I I sEE ilolt 1 ) SEE IIOIE 1 ) {sEE NOTE ]) NOTE II NOIE ]] tsEE NOTE I) ISEE NOTE I] ESSEN ESSEN UNII sUB 'E1, UNIT 5U8.F2.. UN I T SUB "E 2,' UNIT SUB"FI Y t 1000 r(va I I I 000 (vA I 000 rvA Ei I 000/ I I 50 xvl 1000/1 150 l{VA I 000/ I I 50 l(vi I 000/ I I 50 KVA 550 C RI 5E I rd 550 C RISI 550 C RISE OA/FA 55O C RISE OA/FA 55E C RIsE OA/FA 55P C RISE oa,/FA 550 C RISE 5r,60t12 1r,60HZ 36,60HZ r<: lr,60Nz ld,60Hz lr, 60Hz 16, 6oHZ ^<, ^

SECI ION $cI lotr SICTI0ll FFt{ tJ.8r(Y smB 8U5 '8' FRH 15.0r(V 5r0R BUS '[' - (stE (sEE 'f I 28' 'E r?8' K 'El2a' ti0IE ll NOTE I) UN IT SUB ''EF6.' a e Y Y t 000/ il 50 t(vA r 000/r r50 Iva I 01./Ft 550 C EISE or/fr 550 c RlSt ^i*L to, 6fttz lr,60fiz *Li. I "F2t" I 1.8r(v { 8r(v 1 3,8l(V- . 48t(V 480v l',tcc i I I .8F6" e{ 'AE6 " I StcII0H'F2ti' 5ECII0N SECT 1oil t 4 80V e 48OV ESSEN MCC.EI I,, = { e :'FzrB' 'F ?t c' I 'E r 2C' sEcr. 't I ta' 6 I 88f6 8F609 8rt6 ,.E6. H 48OV SY6R. BUS,,F6' 48OV SI{GR. BUS I dEcr.'Er?E' I r{0 I stcr. 'E I 20' ,.E2I,. )E E@ P3 I 48OV MCC 5E[I.'fil8' SECT,'F] SECI I 1D' a I I

sECT,'E I IB' SECr tU{ SECIlort SECIIOI t0r{'E2la' 'Ea l 0' '82 rC' 'E2tB';q 6 a 480v-F61', 480v 480v 480v 480v 4 80v l|lCC MCC ',F62" MCC 'F53', MCC 'E6t' MCC "E62" MCC 'E6 3

FRH ',B' FOF. FRI 'r' Fn[ BUs 'E' FRII J.8[V SISR BUs tEta E,8t(v 5I0E 8U5 'B' FRr. rl.8Kv 5r0R 8uS 'a 13.8r(V sSR BU5 Y .2/0 t].6XY 5Y0fi 8U5 t].fiv srcR (sEE riolE r) t'l/c rstt Ml|t t) ISET NOTE II ISEE NOTE II ($t trolt t, (sEE l0rE t) .'F3 @ UNIT SUBSTATION,'TF4'' UNIT SUBSTATION UNIT SUBSIATION,.E3, NOTES 1, FoR C0ililNuAil$,t 0F t3.8t(V & 4.15t(V oilt LIIE DIA6RAi{ KYA t000/il50 sTE SHEEI OF THIS DTG. 1000/1150 (va I 000/t I 50 l(va 1000/l 150 l(\iA I 000/t I 50 l(vr t000/t I 50 fivr oi/Ft 550c Rtst I 0A/FA 550C RlSE 550c Rtst OA/FA 55OC RISE oa/FA 550C RISI oi/Fa 550c RISE oa/Ft ld, 60Hz 2. ONEAI(IR5 TITHOUI TUIOI,iATIC IRIPPIHG OEVICE ARE jr, 16, 60{Z 10,60fi2 5!, 6012 AE EfiI J6,60llI BF] I l. 8t(v-. {8t(Y 3 tilotcalEo IHUS I 3.8rV-. {8l(V I l,8*Y-.18r(V I t,8l(v-. 481(v l. I 5.8r(v-.48r(Y 13.0rv-.40{v .AF]. i t 4 'AE4' r{ J r€lt' a l. aLL 480v rcc BusES aPt 600a. c c 8In 4, ALt UIIII SUBSTAIIOI{ BUSTS ARE 1600A, tt0 HO r{0 a 5. FDB SIAIIOt{ DISIFIEUIION TFANSFORI,{R TAP sEIIINGs, BEtl BAES B8F,{ 81 409 ErFl sotl sEE s}IETI ] OF THIS OU6. ,E4. 48OV SI{GR, BUS,'F4'' qSOV SI{GR. BU5 480v sHGR. BUs 'F3" 480V SWGR. BUS 'E3 6. BREAI(Ifl IRATT RAIIHC SHOIT.I. FOR IRIP RATIIIG 5TT APPLICIBTT SHEEi OF E-4, t-5 OR E.6, NO 7. stzlr{o 0f cofl0ucloRs rxo PRoTEcilvE oEvtcES FoR TEI4P. IOAO5 TO BE PEff TIAIIOI.IAL ELETTRICAL CODE. NO NO ti0 tt0 NO Ir/0 lr0 lr0 lr0 NO r0 Ao :< 8, THERE IHIS NOTE 15 RTFEFTNCIO, IHE ORIG]IIAI ENEATER HTs E |:lg BEEN RTPIACED UIIH A BREAITR OF GREITER FRAI,IE sIZE A5 ; E6 a€ Ao te H@ bB HB H3 H3 H3 s3 BB B3 IIIDICAITD. IN IHESI APPLICAIIONS, IHE BREII(ER FRAHE SIZE I CAN IIOT BE ASsUI.{ED TO BE II.IOICAIIVE OF THE AITPACITY OF assoct arto ctRcutT coilPorttlrrs. 9. yHEnE ',o'/rto1 '0' BfffloiRlts iRE 0EPtcrE0 FoR {80vrc srcR, ELECIRICAL COIPOiIEXTS HOUSTO Tt{IIRELY YITHIII THE 5T6R CUBIETE sHALL BE COXSIDEFEO IO 8I IITH]N IHE O BOUIIOARY, E e9* FLEX AS$CIATED BEENI(ERs IET OPEN OURING IIORXNL OPERATIOH PE!Io AIID I'IAY II+ACI OPEFAOILIIY IF CLOSED TTIEIT ASSOCIiIED BUs 5u" OU : ! EOUIPI{I,II I5 III SERVICE. I u-z< T ./ 480V MCC 6F EY E 48OV.,E 480v MCC 'F 4 t " c80v t,lCC 'E4t' t 'Fj 3J, !d 2^ REFERENCE DRAI{INGS SECTION SECIION sEC r I oit 62 SECTION,F{IA. sEcTIoil'F{18' SECIIOt,i.E{IB. 5tCIl0tl 'E{ll' *-= -lt sEcII0t{'FllA' 4$0v SuB5rrTtfrr oilE otrGRrHS 99 - ,:* U+ 6< 'FllB' 'Eil8'< 'ElJr' E- il SE 6E E-{ urtr t ll{t E-5 480v rCC sysrEu 0r{ t-trE otrGErr = I =*i= E!l - gi E.6 .{8OV ESSENTIAL I.{CC STsIEI{ OI{T TIIIE OIAGRAH s3 FRI 4,t6r(v SmR 8u5 '02' FRr {. l6r(v S|CR BUS 'C?' (SEE NOiE IJ {sEE NOIE II .E5, OISTRIBUIION CENTER'F5' DISTRIBUTION CENIER LTG. LTG. .E32. Y 48OV MCC ''F 32. 4gOV MCC I r'--'---'-"-"-"- 750 KVA 150 r(vr I DAVIS-BESSt NUCLTAR POIlIER STAIION .<' 3s, 50Hl ld,60Hi r{ I0lr I2A. - * SECIl0tt SECTIori G _t 4. t6r(v- 480v/eI7Y {. t6[v- {80Y/277Y c H'FJ?B' 'tta'

^Y' DF 5.. CE5 t" G t AC TLECTRICAL SYSTEi,1 8DF5 BCE5

.F5" ,.E5. ONE DIAGRAM 48OV LTO. DISiRIBUTION SIIIICHBOARD 48OV LTG. DISIRIBUIION 5I{ITCHBOARO LINE MCC 'F31' 480V UCC "EI|" 480v o E-I SH. 2 5ECTIOII ''FJ]A' O = sECTloil'FJ18' sECil0N ',$r8' g SECIl0tt'E51[' E T IGURE 8.3.2 @ b s

REVISION 32 l- lo 16 ae c; de a@ ilo {@ =u @

-y -!5 -!5 -5 -I -r -I Je JS Jg -1 -I-c-E-g ,a, 'c or e( e6-e 0--s o@-* o4 0L o[ oL €G oc o[ cr tg or or or SEPIEI'.IBER 201B

DB I 0-l 0-1 7 DFN=l r /ELEC/El 5H2. DCN BUS LOSS OF SYNCHRO CHECK BUS C1 a C2 BACK UP OC BUS C1 PARTIAL DIFF. OVERCURRENT c1 a c2I TRIPPING I TRIPPING I I.. >loe >I< >·>E )>.o( )>.o( >· AUX. RELAY 51 -1 51 GS -1 I BACK UP RELAYS VOLT AGE ,------A--, 51 -2 51-3 51 GS-2 QC TO SH.14C ~--~'-~~~ A1 3 A1 2 2C (86P2l DSA A1 A13

A1 3 A1 1 c A13 A13 A2------<------4t--~ RESET PB A2------<------~ A10 10 1 10 10 I CS O JCS 10 10 10 10 10 11 10 10 I CS 86-1 9 51-1X 51 -1 x ICS 2 51X AC11 0 2 C1 'M _ ___,a----, 10 c1 12 C1 'M 'M l/) 8 (SHT.6l => co co l/) l/) co 11 co l/) l/) co l/) l/) co _J <( <( 86-1 <( <( <( <( A10 0 0:: LLl LLl LLl LLl LLl LLl 1- ICS :::;;: :::;;: ICS C'1 12 :::;;: :::;;: JCS :::;;: :::;;: ICS A2 7 :z <1>----25P <( <( <( <( <( <( 0 l/) l/) l/) l/) l/) l/) 74V (_) 9 52S1 b 8 C1 . 0:: I·:~S2A !CS ABDC1 1- <( :::r:: LLl 1 10 (SHT.4l / l/) '-" AC11 0 :::r:: A2 ------<------4t--~ 2 :z (_) 6 (SHT.6l A A2 0 I- 3' A13 A13 A13 ' LLlCl l/) A10 :z=> :::;;: 0 1- 0:: :z LL A13 0 (_) U- Cl > 8 8 8 LCl + RES. 51-1X RES. 86-1 RES. 86-2 N 1 1 1 200 7 b I C 200 7 b I C 200 7 b I C

13 13 13 13 13 51 -1 x 86-1 86-2 94-1 94-2 C1 1 4 14 C1 14 C1 C1 14 C1 14 30Al.0 f 30A A1 3 A1 12 12C A1 A1 3

DSA SCHEME NO. AC103 (SEE NOTE 1 l A1 3 A1 TO EQUIPMENT NO'S. SH.14C 74V PART 11 11 c ( 86N l (FOR SCHEME AC103l C1 OF SCHEME ~ ~ COT131 DAVIS-BESSE NUCLEAR POWER STATION A13-AC103C AL AL 1 SH. 21 4. 16 KV FEEDER BREAKER A1 -AC1 01 NOTES: BUS Cl TRIPPING AND LOCKOUT A2 -ABDC1 1. FOR SCHEME NO.AD103, BUS D1, AND SYCHRO CHECK RELAYS A1 O-AC11 0 TRIPPING LOCKOUT a SYNCHRO CHECK E-34B SH. 13A RELAY LISTINGS SEE SHT.13. FIGURE 8.3-4 2. FOR DISCONNECT SWITCH DSA DETAILS REVISION 28 SEE DWG. E-30B SHT.20, FIG.5. DECEMBER 2010 DB 11-15-10 DFN=F/SCHEME/E34BSH4.DGN CLOSE •I• IND 1cmoN •I• MANUAL TRIP ·I JND 1cm o~ I• AUTO TRIP .. BUS QC I XFMR QC I BUS UV 1 A2 A2 A2 ( A2 A2 A2 2 I OS cs P2t A2 At AtO MQ 2C At3 At3 BDCP41 -A2 A2 tC 2iCI CSID t t cs 5 27 Y - I I 27X -5 25SD 86-3 86-3 P32 P22 86-2 _C_t_ I-Ct- -;;c HIS6220\ I HS6221 C · ABDCt C2 -Cl- 6 CSH . 14 ) 7 ( SH . 14 A) 2 12 CSH. t 5> 2 E-32B) ~ Ct (SH. t 4 (SH. 13> 25SC 6C 25SD 2 27X-4 5t-2X I / A13 A13 -Ct- DG1 DG1 CSID t ' / 5 GT C2 /\ 6 ' R A2 ?c1 ABoc1 Tc/ ' / ' A2 Cl Cll I T~c Ct Ct Ct 52X A2.___ -e------e----uA2 Rt Gt TRt t TR G rnt ABDC1 t 62 95 11 V'> Al A2 A2 A2 A2 A2 A2 A2 A2 ::::> AACC2 co 52Stb AIO AtO 2 86-4 _. ACIOI 71 TD\ CSH.2) 80 0 5 I0 12 BL I a:: 52Xl 52Slb OS OS E-32B ) 1-- AACC2 ACl 10 · 153 CSH.6) :z: Alt 6 9 BL2 TRI (SH. t4 0 39 CSH. 2> CSH.6> t t s2b I BL5 <...> M TDDO ACl 10 OS a:: E-64B ) AIO (...!) 0.8- ( 54 . BL6 ill 3: SH. IB A2 A2 VI M 15 SEC. AtO ~ ADJ. 0 JUMPER a:: SET AT AIO LL. 10 SEC. <...> BG-!_ /E -328) Cl 7A 4 BO ~SH. 14 > I.(') AIO N A2 13 74 NOTES: 52Hl 152520 TEST TD DOZ 1. FOR GENERAL NOTES 8 LOCATION DESIGNATIONS 4 POS. ill 14 I5 H SEE DWG. INDEX E-34B. 3 86-2 ct CSH.13> 2. SEE SH.4 FOR CONTACT ASSIGNMENTS. SPARES AND 4 SW. DEVELOPMENT REFERENCES. ill 3. FOR BREAKER INTERNALS SEE DWG. E-30B SHEET 16A. 1 A2 52510 t3 r---1'~- 4. TIME DELAY RELAY CTDR> DIP SWITCH SETTINGS ARE: 2 8 I 1 - ON 4 - OFF 7 - ON r-1'~-1~ 52b I TRIP I 52 2 - ON 5 - ON 52 TOR I p CLOSE : 0. 5 SEC.± I 01. __ J 3 - ON 6 - ON t 4 I NOTE 4 52X OUTPUT CONTACTS TRANSFER UPON APPLICATION ---~-J 10 OF POWER. THEN RETRANSFER AFTER TIME DELAY. 6 62 I 0 DS 6 TDDO 5 15HZ

SCHEME No. ABDCI CHANNEL I START UP SYSTEM No. 004 DAVIS-BESSE NUCLEAR PO~R STATION WIRE PREF IX BOC 4. 16 KV FEEDER BREAKER 0')') 0') I I '-'-' I '-I' EOUiPMENi NUMBERS (BUS TIE XF~ BRKR. ABDCl C~TROL), tCO CU P32, Rt, Gt, TRtl Cll 1, CL3t A2 - ABDCl A9 - AACC2 SHEET 1 C P31, CL21, CL41 A TR, G, TRI 2 ~ - C5715 I AlO - AC110 E-34B SH. 3 CC> Cl CO> Cl - C3615 A23 - AC203 FIGURE 8.3-5 BLOCK DIAGRAM *SEE DWG. 7749 E-22 SH.1 HA - HAAC A13 - AC103 REVISION 21 SCHEME No. ABDCI FOR CONNECTIONS HB - HBBD Al - AC101 NOVEMBER 1998 • - .... - .... ": ·- .,._!jf1...o} cs Q ' S~~< SPARE O TL3JtTL4 O SHS SH6 52H1 DS13 051'1 P62 3•t3C P~2 SP11o--.!.!i i!l--oSP12 O 1 a O !TEST POSJ 0IR9·"s:.r 0 11 O TLS l'TL6 D SH7 SHB I 0511 0512 SPISo---!Eii!L-o SP16 SPARE 5251 3 ~"' ·r::;;S1 a S2X O TL7ltTL8 O o---!Ei"f!!--o SH11o S•1' .& S~2o} 059 0510 TRsi TRa ... TR7 3-~ii.;'=---oo . • I • TOO SP19 SP20 o--"'t r-<> SPARE SH1 3 SH1 4 52H2 O TL9ll'TL10 TO BRKR AACC2 TRIP CRKT ISH.11 7 8 0 > SPARE O 41 0 OEST PDSI 057 058 DS SH15 SH16 o.!b!li .,I!Jl.o DSS DS6 5251 b 0 0 } TD BUS Cl BRKR CS3 '•~c CS<4 } .,.l!ll.j flill..o s~t6 AC101 CLOSE CRKT 053 054 IE-648 SH. IAI 0 .,_2j i§f...o SPARE SP25 CSS CS6 CS .,..Iill.j tlliio o--!i i!£..o 051 052 5251 b csr csa 9 ~ t 10 } TD BUS Cl LOCKOUT ' RELAYS ISH. 171 ll-<'+A~~ > SPARE > SPARE S2S2 52 AUX 5251 b b ~~·~~ SWITCH DEVELOPMENT REFERENCE } TD BUS Cl BRKR 1;t14 AC110 CLOSE CRKT 0 ,~,16 0 1 ·FOR CS AT SWGR. SEE FIG 2, SH 9A, DWG E·30B !SH. SJ SP35: SP36 2 · FDR REMOTE CS SEE FIG 3, SH 9. DWG E-308 17 18 sir,-"'~, 3 - FOR REMOTE zggp SEE FIG 4, SH 9A, DWG E-308 Si!llb } TD BUS C2 BRKR 4 ·FOR OS SEE FIG 4, SH 10, DWG E-308 l'1':":18 AACC2 CLOSE CRKT 0 '~bro 0 S ·FDR REMOTE H~~~~l SEE FIG 1, SH 10. DWG E-306 S 8 !SH. I ) SP39 SP40, 3r 7 T NOTES: 'G....All 1. FOR GENERAL NOTES a LOCATION DESIGNATIONS J 62 } S2S2 } SEE DWG. INDEX E-348. l;DO C~9 TO BUS C2 9 o 10 TO UV RESET&: 94-1/DGl BRKR AACC2 3 b 54 CLOSE CRKT S~~D IE-64B SH. 1EI ~)-o ISH. 11 3 BRKR CLOSING 3039 SPRING FAILURE G S4 PART OF SCHEIE 5~ } COT 131 SH. 21 :'.:2: -} ANS I 5~~2 SP24 PART OF SCHEIE ~ 2 Z413 SEE SH. 24 • 742 !743 YAN4 AN2 • 622 y623 ~D 4 2 41 2 4 21 , - 74 • r- _T 39 ~ , 62 • r- TDC TOO TOO I TDC TDC TOO DAYIS·IESS: lllllElll POIER SIAlllll S2S2b } 4. 16 lY FEEDER IRllER 8 6 8 7 PART OF SCHEIE IIJS llE IFll llR, •I IDHlll.1, AN6 621 0 t t B SP~B COT 131 SEE SH. 20 . SP27 HEI 1 • E·.1411 511. 4 SPARE FllUIE l.H * NOT TO BE USED REVISION 29 DECEMBER 2012 DB 05·22· I 2 DFN •F /SCHEME /E34BSH4. DGN I CLOSE ,.. •I• INDICATION •I• MANUAL TRIP .,JNDICATIO~~ += AUTO TRIP ... , BUS oc+Bus UV . GNO oc--1-- PHASE oc ----i AtO 51-5 R6 10 10 10 ( R2 cs A13 R5 86-3 ---+At C2 eJB "( / AIO 0A cs CCP41 ' R 2 7 27¥-1 27X4 <( <( JC ----..--. cs CSH. 15> tl er }_c_1_ & & 25SO / H156223 \ P32 P22 ' 8 1 V') HS6221 c1 u---..----, 14> Vl /\ ~ A13------A1 10 I 0 T~c 51-4 AJO AtO "'8 f>C ------.,...-CL3 J---<.i---¥1'-7-C ._ Rt GI TRl 1 JCS <( V'I Vl E-648 )10 525 lb 8C 2550 AlO <( co ( CSH. 13) 15HZ c 7A > A2 At3 IS') 52H1 N AtO TEST AIO 13 6 74 NOTES: POS. 52S2a TODO 1. FOR GENERAL NOTES 8 LOCATION DESIGNATIONS 14 ISHZ SEt DWG. INDEX E-348. 2. SEE SH.6 FOR CONTACT ASSIGNMENTS, SPARES ANO sw'. DEVELOPMENT REFERENCES. 3. FOR BREAKER INTERNALS SEE DWG. E-308 SHEET 16A. 3 t3 r __ j'_l_ 52S1a 4. TIME DELAY RELAY DIP SWITCH SETTINGS ARE: 2 4 I 1 - ON 4 - OFF 7 - ON r-1'~_1.!.. 52b I TRIP I 52 2 - ON 5 - ON 52 I __ J 3 - ON 6 - ON p CLOSE : 52X OUTPUT CONTACTS TRANSFER UPON APPLICATION 14 I ---~-J OF POWER, THEN RETRANSFER AFTER TIME DELAY. 6 62 10 OS 6 TDDO 5 tSHZ

SCHEME No. AC110 CHANNEL 1 START UP SYSTEM No. 001 OAV[S-BESSE NUCLEAR P~R STATl(JN Ll3 VIRE PREFIX CC 4.16 KV FEEDER BREAKER (8L'S Ct &C2 TIE 8RKR. ACllO CONTROl.l, P32, Rt, Gt, TRll Clt 1, CL31, P22 EQUIPMENT NUMBERS SHEET t P31 , CL 41 , CL 21 TR, G, TRI, P21 c AIO Cl AlO - AC11Q A13 - AC103 £-348 SH. 5 CD> FIGURE 8.3-7 ~ - C5715 !1 - ACl 01 BLOCK DIAGRAM 9_ - C3615 A2 - ABDC1 REVISION 21 SCHEME No. AC110 NOVEMBER 1998 • - L L ~~ SH3 6 SH4 o--=-{5 F-o SPARE SPARE SHS SH6 52Ht 52S1a 52X ~ !TEST POS>

~ i...;.I L9 L1 0 15 1__6 .....:3;....il r!-- b1 4 } SPARE SH7 SH8 o 13H o s2s1 TOO SP13 SP14 0 3:f.t4 0 SH11 S SH12 6 o--1 J-2--o SPARE SH1 3 7 8 SH1 4 52H2 1~1 TO BUS C2 TO BUS Ct O :H o 1-c__., 0 0 L4 :f-t'-3 } OS 1 0$2 SPARE 863A 3 b 4 52l> 0 OR201 ~ OS SP23 ~t $~4 57 58 7 b 8 DS3 DS4 ~)-o 0 CL31 TO BRKR AACC2 SP27 :1-t S~8 c$.t~ CLOSE CRKT CS4 CS3 Q622 - 0 1~~16 0 TO 8RKR ABDCt SP35 SP36 3C 3 62 1 CLOSE CRKT TR~~2 } 52S1a } b C I TOO __!j dQ_ TO BUS C2 LOCKOUT 1 20 o1Lf~ SPARE --, ..------RELAYS !SH. 15l 0 lt 0 cs SP39 SP40 HIS6223 ~~ SWITCH DEVELOPMENT REFERENCE 1 - FOR CS AT SWGR, SEE FIG 2. SH 9A, OWG E-308 52510 $..t~ 2 - FOR REMOTE CS, SEE FIG 3, SH 9, DWG E-308 SPARE } TO BUS C2 8RKR 3 · FOR REMOTE 25SD SEE FIG 4, SH 9A, OWG E-306 --1, t-L- AACC2 TRIP CRKT 4 - FOR OS SEE FIG 5. SH 10, OWG E-308 ~~ 5 - FOR REMOTE H~~~~ 1 SEE FIG 1. SH 10. OWG E-308 o1Lf~ SPARE 52Slb } TO BUS C2 BRKR cs NOTES: AC110 1. FOR GENERAL NOTES a LOCATION DESIGNATIONS BRKR CLOSING O 174 t1 8 0 AACC2 CLOSE ~~ 3~3 SPRING FAILURE SP17 SPt 8 SEE DWG. INDEX E-348. 39 PART OF SCHEME 5~ COT 131 SH. 21 $..t~ ANS 52Stb } TO BUS C1 BRKR 52 52 a 51 51 5 ~ t 6 AC101 CLOSE CRKT 0-(f-I ~)-0 SPARE 52 AUX * 742 1743 ?AN4 ~~aJS~ 4 2 41 2 74 39 52S2a } TDC TOO TOO TDC __L ~ TO BUS Ct LOCKOUT DAVIS-BESSE NUCLEAR POWER STATION --, ..------RELAYS (SH. 13 l 52S2a 4.16 KV FEEDER BREAKER 8 (BUS C1 C2 TIE BRKR. AC110 CONTROL), 741 ANG 17 ~ & 9 H SP38 SHEET 2 52 2 S2St b } TO BUS Ct 2 2 PART OF SCHEME s a }TO UV RESET a __9 ~1 u,._1O_ BRKR ABOC1 1 Z413 SEE SH. 24 E-348 SH. 6 SPARE rl~ 94-1/0G1 -.1 H CLOSE CRKT Q~ FIGURE 8. 3-8 * NOT. TO BE USED SP29 SP30

Al~ AIO ' $111. a ~SM•~>

I 6C..-\ .u. l 0.- 5'.~•b iAcFt()>l.•0)

Al. Al~ ._...,.._;;~~~-+~--....-~~~~~~~~~~~~~~~~-" 8

\J 0 > ~ 01

74V -O-I- ,.~lt..T OF' s.<:.~l~Mt ,--·''\~h· o-~--U-L-<) C.OT s 31 l\il.';'l_ "'- ~· 31-\.al

tiOT&~ I, t='OR. G,l!.'-'ltR."'- NOTE-. ~ 1-0ClioTION D~l(Ol ~~ t>NC, ti..iOE.l!. S:.·l4~ 2. FOR 5;::.C.l'E ACI03,6:J5 (1, SEE.~ U•6 511. 13,l.

11 SE'£ t,v-14 ,14~-E-2'% ~II I (~2) F"OR ':>YMC. ... ~"41?~"­ D~TEC.TION C~l<.T'!.

DAVIS-BESSE NUCLEAR POWER STATION EQU~~~~1oi~~Me.ER~ FOR ~- A.01C13 ~ - AA.COi ~- AOllO 4.16KV FEEDER BREAKER ESSENTIAL BUSES TRIP, LOCKOUT AND SYNCHRO-CHECK RELAYS, SHEET 1

E34B SH. 13

FIGURE 8.3-9

REVISION 18 OCTOBER 1993 POWER SUPPLIES UNDERVOLTAGE UNDERVOLTAGE AUX. ... I.. INDICATION .... I 1· ·1· ·1· ~~~~~? A~~~3~ _____ 1 I ) I -= (l t 1 T11 27X-2 nl 21x-1 nl ;1x 2- t < i 7 7 Cl ( Dl I C1 ( 01 ) M C1 ! 01 ) I ~ l l l l l l l l 3 I"')- MT I"') 0 27-2 27-4 0 ~) I u mon c:::::i <( Ti 27X-1 I <( 8 8 ITTI5Tl I <:t: Ml - I"') I :r:. . 7 7 ::z: :::c Cl <01 l Cl <01 l Cl (01 l C1 (01 l 0 I V> V> 27-1 27-3 :::a: Cl I 0 :::a: C1 W1 l ~) LLl 0:: 0 => I LL.. 0:: 8 0 10 12 10 12 10 LL.. a 1 12 12 :z: I Cl c:::::i 1- w w ::z: => ::::> 0 I z: z: u I I- I-- z: ::z: I 0 0 81 81 . 13 u u I 27X-2 27X -1 27Y-1 27Y-2 27Y-3 I 84 B4 14 14 14 Cl Wl l CHDll Cl <01 l Cl !D1 l C1 (01 l I I J-L-~~~---~~---~~---~~---~~~~~~--~~~~~~~~~~---~~~~---~~~--~~~1--~~~~~~~~~~~----...._~--+I~~~~"'--/ I SCHEME NO. AC103 ( AD1 03 l ------J 27Y-1 27Y-3 C1 W1 l I C127Y-2 (01 l I C1 (01 l I OWG. I DWG. I I OWG. CONTACTS FUNCT! ON 'ONTA°'"l. I) I 11 "' FUNCT! ON I REF. I l. I REF. I jcoNTACTsl REF. THIS THIS I 1 2 j SPARE SH . ~~ SPARE SH. I~ r:- ---- OPERATE SPARE ~~ 27X-6 SH.14A ~~ SPARE ~Jl- NOTES: Cl

27-1 27-2 27-3 27-4 A A _!J, ~ SPARE 0AVIS-BESSE NUCLEAR POWER ST ATI ON Rj 27X-1 27X-2 M Cl (01 l TµM Cl (01 l 4. 16KV FEEDER BREAKER-BUS Cl (DI l T14 4 27X-1 27X-2 C1 ( D1 l Cl W1 > VOLTAGE ANO AUX RELAYS 13 15 13 15 13 15 13 T15 E- 348 SH. 14 ~IM2 T2I~ FIGURE 8.3-10 tr) n n n n \ I 27X1 2 27X26 C> v \'------v---_____,/ Q ""' C1 REVISION 25 N' SPARE RELAY TEST. TS1 -4 /Cl <01 l BUS (01 ) AUX. - (SEE E-2048 SHT. 1. FOR Cl l UNDER VOLTAGE RELAYS JUNE 2006 (SEE E-2068 SHT. 1• FOR Dl l E-648 SH.1E!2U

DB 05-01-06 DFN F:/SCHEME/E34BS14.DGN ,.. CLOSE INDICATION .. ,.MANUAL AUTO TRIP OS ·1· TRIP ... l=:x= •I• BUS oc •I• FEEDER OC ·I· ------FEEDER GNO------, ~ 50/51 OS A 10 R6 10 10 10 SOGS ( R2 Rt P41 -4 I VI""" (/') ~ A13 I IT A ~ ~ T~c R G TR21

VI A A A :=I al -' LI R9 C> c:: OS OS I- SCHEME~ :z: JUMPER L2 RIO FOR 39 R7 ACl2CE 8i : 8 M TOOO OS ADI IDF ONLY I c:: 2 2 1 2 <..!) 0.8- R8 ;,.. CLI 1 CLI ' ' VI M 15 SEC. r l ,______: ::E ADJ. ------...... -,,_,,' ' C> JUMPER c:: SET AT FOR SCHEME ' ------LL. A 10 SEC. JUMPER 8r <..> ACI ICE ADl2D7_ I 0 TA ONLY : 7 > '---e---+------i~~------~-t------' I 3 52Hl CL '°N ,------TEST POS. 6 74 .------~-~-~--~-~8--1 SOGs PO~R 4 TODO - SUPPLY 50GS 5 15HZ ~ ~ :------

NOTES: t3 r __ _19_ ! 1 1 ! 16 15 14 1· 1. FOR GENERAL NOTES 8 LOCATION DESIGNATIONS r_15_!!.. I SEE OVG. INDEX E-348. 52b I TRIP I 52 I------' 2. SEE SH.17 FOR CONTACT ASSIGNMENTS, SPARES AND ~ CLOSE I 52 I __ J SW. DEVELOPMENT REFERENCES. 14 I I 3. FOR BREAKER INTERNALS SEE E-308 SHEET 16A. ---,;:i;-J owe. IOA OS 6 10

(-)

SCHEME No. '------DAVIS-BESSE NUCLEAR POW:R STATION Sc EME UNIT START WIRE ~ ..li:,l EQUIPMENT NUMBERS UBSTA UP CH. PREFIX A A ------.----- 4.16 KY FEEDER BREAKER ESSENTIAi. :0. Q D ~ ~ A C B X A!3 * SEE OWG. c NO. SYS. lfili Et • Ft 2 smsunm.s cONTRU. I~~~ 1E ; ~) .3C2 (f) P41, CL2t. ACI ICE El 005 XtE HIS6226 ACICEll C5715 XCE11 ACt03 SHEET 1 FOR CONNECTIONS 3CN m> ~~~j R, G, ACl2CE El 005 X2E E-348 SH. 16 FIGUI 8.3-11 -- . -B-- __ P22JR1 ""A _A._]J. -x'-t+-AfH-HJIF----l-F-t-- --005_...... _..,_._~,.__.. n-1 AOl2DF Ft 005 2 REVISION 23 BLOCK DIAGRAM NOVEMBER 2002 owe- E-?to& "!!!!»"'4,TC.H OEVELO"'F"'N\ti.""T RE~l<.i;.NCL s~GR ~le:. ~~A ~-301 \- Foa c.'!:t AT , :::,,ke- z. 1 ,owe, ~- t=O~ tiit.E1'40TCi c.~, s;,e. FtC- t t SHq ,PNC. £.-~Of ~- o~ i:-ac::;; 10 , J:"oe I 11.•£ s ) .,.... s:>wc. E- :.o e

•Nol~;° I - ~vst Et(N£a''"" .... oTi., ( t..OC.~, 10 ... Ol.~\~"'4AT\OM" ~lf. owe... '"'o&"' £. '\4t>

DAVIS-BESSE NUCLEAR POWER STATION 4.16kV FEEDER BREAKER - ESSENTIAL UNIT SUBSTATIONS El AND Fl CONTROL, SHEET 2

E348 SH. 17

FIGURE 8.3-12

REVISION 9 JULY 1989 Removed in Accordance with RIS 2015-17

DAVIS-BESSE NUCLEAR POWER STATION AUXILIARY BUILDING SECTIONS FIGURE 8.3-13

REVISION 29 DECEMBER 2012

118 llli-29-12 lfl•JGIUSMIJlflGlllJ.IGllltll TO STATION COMPUTER 4.16.KV ESS£N SWGR. BUS 'Cl' RELAY ANO INSTRUMENT TABLE DEVICE OE SCRI PTI ON FIMCTION A AMMETER v VOlTIUER ® TRANSFER SWITCH 27 UNDERVOL TAGE RELAY REMOTE ALARM 141 181 I 121 NETERIMG 1161 St:E NOTE 2 XFMR 'CEl-2" !>IN NEUTRAL OC RELAY TRIP CORRESPONOING HIGH Siil!'. 3 •. 60HZ FEEDER BREAKER 4.1611V· 0.48J(V 501GS GROUtll SENSOfl RELAY REMOTE ALARM 3-4/0 AWG. !CUI IOO OKVA DA 55'C 51 OVERCURRENT RELAY ALARM MOTOR OVERLOAD FRM ABOVE 3·350llClllL !CU I I 120KVA OA 65'C 600/460 FRM ABOVE~ 600/540 6001600 Z•5.96Y. ON Alll£TER W/ 5:0.02 IOO OIC VA BASE .!. A AUX. CT. 760 M. C.C . 'El5'-~I-++-<+-,..-...~ I 151 ~[f~: .. ---"'i cE:--!"~ 191 SPARE--<< > <131 76'1 IC TMTSE~IRNiTL! Ill FAHi BE105 300:5 BE109 BE 113

111 11 71

2000•5 BCE 11 2000:5 1000:5 BCEl2 2000:5 3-410 AWC. !CUI NO 9-l50KCNIL !CUI FRM ABOVE fRM ABOVE~ 6001600 M.C.C.'El1A' • (~~ I IOI 1141 8£106

6·500KCMIL !CUI FUTURE FUTURE l-llC 500KCMIL ICUI~ 6001600 600A FRN BELOW~ 6001600 600A --< Ill M.C.C. •EllA' .. ---"'i C+-~ (1] --< (15J M.C .C. "El6A' .. ---"'i (~~ 118 J B£10T BEi 18 C5 P1of' I !Ill BEii i 300:5 NO

ESSEN 480V UNIT SUB "EJ" Q

TO STATION COMPUTER ll.8!V SWGR . BUS '8'

@ill ~ I. COM'Af!TMENT NIMBERS A1£ IN PARENTHESIS . ~ 2. ALL RELIYS ANO INSTRUIENTS TO BE LOCATED IN 14l 181 112 1 METERING 1161 SEE NOTE 2 COMPARU(HTS Ill ANO 1161 . 3. DELETED ~ XFMR ·eer 10001115111\YA : OA / FA; ;s•c 4. INSTTU4ENTS NOTED WITH ASTERISK I •I ARE LOCATED IN THE [ I 12011288KYA: OAIFA: 65'C IRE MOTE I CONTROL ROOM. 6·500KCl4IL I CUI 6-l50KCMIL !CUI Z•6.91X ON IOOOKVA BASE FRM ABOVE~ 6001660 SPARE 600A FRAIE FRM BELOW~ 600/660 l PHASE, GOil! 5. CIRCUIT BREAKER FRAIE Sill AND TRIP RATING FOR (~,...... ~ IJ. BKV DELTA TO 480VOLTS WYE THE TRIP UNIT ARE SliOllN AS FOLLOWS: M.C. C. 'EHA" .. ---"'i C+.-,..-...~ 15J CRO TRIP --<+-,..-...~ 191 M. C.C. ·r13A" llJJ 6001 300 BIUHR 1 . BE105 BE109 BE21l NO FRAME sm--1 '-LONG-TIME DELAY PICKuP SETTING OF TRIP DEVICE 6. CABl.E SIZES ARE BASED ON THE REOUIRED AMPACIT Y TAKINC I NTO 1171 ACCARTMENT B OF UNIT SUB Fl CONTAINS SMOKE DETECTOR DS8601 • .& 14. rnrnoT!~t ~~l~~L~~Y~R~ '. ~~~O~:t~~\~~o\~HCTIONS CCilf£CTED 1 15. '11\iERE "0' I NOT "O"• BOUMJARIES ARE DEP ICTED FOR ~80VAC SWGR, ELECTRICAL CIN'Oll:NTS HOIJSEO ENTIRELY WITHIN THE s,.,;R CUBICLE SHALL BE CONS IDEREO TO BE WI TH IN THE 0 BOUNDARY. FLEX ASSOCIATED BREAKERS ARE OPEN OUlllNG NORMAL OPERATION 480V UNIT SUB "E2" AHO MAY lll'ACT OPERABILITY IF CLOSED illjEN ASSOC IATED BUS EOUIPMENT IS IN SERVICE.

TO STATION COMPUTER REFEREN CE DRAWINGS E·I AC ELECTRICAL SYSTEM ONE LINE DIAGRAM IJ.8lV SWCR. ll.8KY SWGR. BUS 'A" BUS "B' E-2 MAIN ONE LINE DIAGRAM E·l 4.16KV ONE LINE DIAGRAM - E·5 480V MCC SYST EM ONE LINE DIAGRAM !"! E·6 480V ESSENTIAL llCC SYSTEM ()t£ LI NE DIAGRAM ~~OCAIED~ C3610 ~ 181 SEE NOTE IJ !121 IETERING 1161 SEE NOTE 2 !ii 8 l fMR ' Aff ;, ,6c ~ XFMR ·au· 1000111 50ICVA1 OAIFA; 55°C I000/1150K VA: OAIFA : 55•c I I 20112881VA: OA!fA; 65°C [ I 120/1 288KVA ; OAIFA : 65°C l·l50KCMIL ICUI 6·350KCMIL !CU I A-f-11•. Z•6.65Y. ON IOOOKVA BASE ~ · ~H~t ~oi\~OIJlYA BASE 87n '~c , FRM ABOVE°'\ 8001600 FRN ABOVE°'\ 8001600 c l PHASE , 60!iZ 13.BKY DUTA TO 480VOllS li1'E ! SI 191 M.C.C. "FllA" • (~~4>+ lilt I J. BllV CELT A TO 480VOI. TS WYE M. C. C. 'EllA' • ---"'i C«+-l°"'l...+>+ ---"'i 51 N l-----f.. BEJOS BE31l 400 •5 NO DAVIS-BESSE NUCLEAR POWER STATION

160011600 160011600 ..... ~-+T"f-l~«+-,...... ~>+'>-t"T'1~~-i~'-21..._~~~~~~~~~~~~-i~~~~~~~~~~~~~~--1~~~~~~~~~~~~~~--1...... ~~~~~~~~~~~~~-t-1-11.1_.~M--<·«~~>+·>-+...... t.-.~~ llE II 1000:5 BAEl 2000:5 SEE 2000:5 BBE3 2000 :5 BUSES 480V UNIT SUBSTATIONS NOIE 14 NO l-410 AWC. I CUI 6·350KCMIL ICUI 6-l50KCMIL !CUI ONE-LINE DIAGRAM FAM ABOVE~ 8001600 FRMBE~OW eoo1192 FRN BELOW°'\ 8001540 M.C.C. "El2A• • (i(~~>+ !61 FD~~~:~ 150 ~+-,..-...-+>+ I llOl M.C.C. 'F32A" • ---"'i ('lo<+-~>+ 1141 E-4, SH. 1 BEl06 MP0791 BE~IO 250: 5 8£314 3·4/0 AWG ICUI llO J·250!CMIL ICUI 6·350KClllL ICUI 6-l50KCMIL + Ill M.C.C. "E31A' • ---"'i CE<+-~>+ F~~~~~Nl~~ .. :«+-~>+ 1111 M. C.C. 'FJIA" ,. ---"'i (~+-,..-...~>+ I 151 --< 118l "'12l B£30l BEJO! lfER SW 05462 8011 BEll5 NO MO REVISION 31 OCTOBER 2016;

480V UNIT SUB "E3" OB 09-01&-1 6 OFN•l : /ELE C/E4SH l.O~ ro SlATION COMPUTER 4.16. SKV ESSEN SWGR. BUS "DI"

~ 141 IBI 1121 METERING I 161 SEE NOTE 2 1 E-4, Sil. I XFNR 'DFl-2' r~ ~~~i- • ~1r~ •

fl))

2000:5 BDFll 2000:5 BOFl2 2000:5 3-410 AYG . ICUI NO :;~~:,~· r~~ FRM ABOVE 6-SOOKCMIL ICUJ I 101 M.C.C. 'F12A" ABOVE""\,,(~ Rm~Mm =\ ~ :RM 1141 ZSR3603 BFI06.. Bf 114 J 3-SOOllCMI L !CUI RM ABOVE 6-SOOKCMIL ICUI FUTURE 600A 600/540 FRM ABOVE~ 600/600 --< Ill N.c.c. "Fl2B" ~+-"'-+ 171 M.c.c. 'F llA' • :~-+ 1161 BFIOT BF 115 cs p~ 2 1111 BFlll l00:5 NO

SEE NOTE 11 * ESSEN 480V UNIT Sl!B "FT Q

TO SlATION COMPUTER

13. B!V SWGR. I l. BlV SWGR. BUS "A' BUS 'B' - ~ ~ 141 161 1121 METERING I 161 SEE NOTE 2 E-4, SH.I ~ KFll! ·ar2· [ 1000/I CSOKVA; OA/FA; 55°C 6-500llCM!L !CUI 6·350KCMIL ICUI 1120/12BBKVA; OA/FA; 65•c Z0 6. ~51. ON IOOCl\VA BASE ABOVE~ ABOVE~ FRM 6001660 SPARE 600A FRAME FRM 600/660 l PHASE, 60HZ M.C.C. 'E2lA' • ~:E-l'"l...+ 151 CRO TRIP --<~ 191 M.C.C. 'F2lA" • ~ (~ llll ll.BKV DELTA TO 480VOLTS WYE BF205 BRmtR 2 BF209 BF213 NO

121 1171

2000:5 BAF2 2000:5 2000:5 BBF2 2000:5 NO 6-250KCM!L ICU! 3-4/0 AWG !CUI J·SOOJICM!l !CUI FRN BELOW~ 600/600 MAlfJAL XFER FRM ABOVE~ 600/300 FRM ABOVE~ 600/600 SWITCH 04603 M.C.C. "F22' • (E-~ M.C.C. 'EnA' • CE-~ 161 POI.AR CRANE • (E-r'\-+ I 101 1141 BF206 ALT. FEED Bf210 BF214 NO NO l-JSCl\CMIL !CUI 6-350CCM l l ICU! FUTURE FRM ABOVE~ 600/600 FRM BELOW~ 600/600 GODA CRD fD 2 (Il l 171 (4605 • :e-L"~ M.c.c. 'F21A' • (E-~ 1151 --< (181 BF211 BF215

480V UNIT SUB "F2"

NOTES I. FOR t«lTES ,lEGENO ANO REFERENCE DRAWINGS SEE OWG. E-4 SIHT I. TO STATION COMPUTER 2. WHERE "O' /NOT 'O' BOUNDARIES ARE OEPICTEO FOR 4BOVAC SWGR, ELECTRICAL COJoPONENTS HOUSED ENTJREL Y WITHIN THE SWGR 13.6KV SWGR . CllBICLE SHALL BE COOSl!l£REO 10 BE WITHIN THE 0 BOIMOARY. BUS 'B' FLEX ASSOCIATED BREAKERS ARE OPEN DURING NORMAL OPERATION ANO MAY IMPACT OPERABILITY IF CLOSED lll

181 SEE NOTE ll 1121 METER !NG 1161 SEE NOTE 2 E-4, SH. I E-4, SH. I a IE .be .;, XfMR 'B f l' 1000/1 ISOKVA; OA/FA; 55°C B Bin =[ l-l50KCMJL I CU! 6-l50KCMIL CCLII 1120/IZBBKVA; OA/FA; 65°C FRM ABOVE~ A-fCH1· 1•6. 72r. ON IOOOCVA BASE B00/600 B00/600 fRM ABOVE ' 800/600 c Bin J PllASE, 60HZ M. C.C. 'EllA' • (~E-r'\-+» 151 SPAR£-<~.-~» l~I M.C.C. 'FllA' • ~ (K.-r'\-+~ +·~"T":t""---""""' 11 F11 BUSES 480V UN[T SUBSTATIONS 2ooo:s B~~J zooo:s 00~p 14 51 2ooo:s sari 1ooo:s J-410 AllG. IClll E-4 SH. I 6-l50KCMIL ICU! 6-l50KCMJL ICU! ONE-LINE DIAGRAM FAM ABOVE~ B00/600 FRMBE~OW 800/192 FRM BELOW~ 800/540 M.c.c. 'El2A' • (~E-r'\-+» 161 FO ~ \!':~ 1~0 ~-r'\-+» !IOI M.c. c. 'F32A' • (E<-"-+>+ 1141 E-4, SH. 2 Bf306 NPOTn Bf,110 250:5 Bflf 4 NO 3·250KCMIL ICUI J-500llCMIL

141 181 141 ~~.;r. ·;.• ' "'"" .•: ~+n;;~;::;-··---- .. -·-··-·-.. ---- -··-··-.. - Xf Mfl 'A(4' SEE NO TE l,5H . I r·--.. -··-··- .. _,,_,,_ .. ______,,_ .. _,,_,, ______, ~- __ 2 ll. 2KV-480V AM P 600/400 400 CRN WASH 200 ...... 15 1 200 1 ~-+I 151 ~~p·~~ ,__---t-.....+-« PU ~P 1- 2 !1'004 1 3(405 300:5 MP0041 Bf 405 300:5 NO .. ------f~ - ~~~ ------~:: ~! ) 150/ IOC ) 225/ 2DD t 25110 22. 5170 )1 50/30 1600/1440 I ~251 100 I 19> 121 ~ 11> Z0 00:5 BAE4 200 0:5 Bf 409 2000: 5 BBF4 2000 :5 I :4~-----2~8: 2 ~= - = A~-1Bf:5---~r: _: NO __ 8 ISEE NOTE 31 J I ~;:~~~~ 4/C •8 l/O 12 A FRM BELOW""'\ 600/600 ~ : ~Plmr . PN L. IOOA IOO A, 39 ·~ 1304 1 SPARE "Bl SWS FOR • :+..-I""\-+ FUTURE ·an· DISC.SW DS1 762 c ,, 15KVA XFMR M.C.C. "E4J' 161 600A 161 l-l/C , 4 DSXJ04 0 SOA 1 460·208 Y/120 BE406 XJ009 l•-60HZ 9KVA XFMR 4/C •8 4 •8 AWG l -500KCMIL ICU> 6-500KCM ll ICU> 6-l 50KCMIL ICU> IOOA, 39 460V -2 08Y/1 20V C 1000A FRM ABOVE FRM BEL OW""'\ 600/600 FRM BELO W ~ 600/600 052763 3•-60HZ 2/C 1 4 41 16 Ill M.C.C . ' E< IA" • : ~-+ 171 I IOI M.C. C. "F 41A" • C+-"~ 171 ! J I 54 8 BEm BE4 07 BF< Ol 50A tc ' 1 600A0V DISC, JOA . ~ 600VGOA DISC, 45A . SEE NOT E l , SH. I DSX3040A DSMPT I ~ 3 UC PANEL 3 ..1J_ 1! 48 0-1 20 V l / C ll009 i~~~t&I ~2 J/C 021 ~ ~~ ;;, FUT URE • c ':' •2 ___ @"-_:_ 1:_0~1~ 1~NS J •6 4/C •8 J/C •2 MARSH4 PUMP • l I MP1 T6-J 480V UNIT SUB "EF4 " 27 2 ,------J 6120/240 ITE M::ARY I MA:SH li;~ : 1 ). :i; ~:J ), OU8- 16 PUMP •2 I NON NON 1 Ll040 MP2 76·2 I. 5KVA XFMR ~ 1. SK VAXF>lll IQ SWJON I Mill!. )

800:5 600A Ill SP ARE ~~ 171 I Bf70G 50 EME RCENCY INS!. AIR COMPRES$0R J-•350 MCM ICU > AUX. Oil PUP FUTURE FR~AB OV E ~ 600A/600A --< 141 M. c.c. "FTI ' • ( ~-+ 181 BF704 BF707

480V UNIT SUB "F7 " DAVIS-BESSE NUCLEAR POWE R STAT ION WATER TREATMENT &TURB INE BLDG. 480V UNIT SUB-STAT ION ONE LINE DIAGRA M E-4 SH . 3 FIGURE 8.3-16 REVISION 31 OCTOBER 2015 DB OHB-16 DFN 'I :/[LEC/E4Sfl4 .DGN NO TES NOTES (CONT' Dl I. ONLY FIRST FIVE DIGITS Of CONDUIT RACEWAY ARE INDI CAIEO HEREIN . 11. THE PORTA3LE CABLE IS CONl>ECTED TO RECEP TAQE S ATOP THE NCC ' S FOR COMPLETE DESIGNATION SEE ELECTRICAL qACEWAY SCHEDULE. ONLY DURING MODES 5 AND 6. DURING POWER OPERATION, THI S CABLE ;;R--;U~2-~ SEE OWG. E-3 l,~ 6;;GR-;U~2~~ SEE owe. E-3 I 1;:-;;; 1 2. UNLESS OTHERWISE NOTED ALL BRKRS ARE 3 POLE. LOAD BREAKERS ON ES AND r-iieerils-1 r-iiC(EiJs-1 IS REMOVED AND STOWED. THE NONESSENTIAL CONTAINMENT LIGH TI NG I 1 1 FOR DETA IL S I 1111 I FOR DETAILS F5 THA T SUPPLY SINGLE PHA SE TRANSFORMERS ONLY USE 2 OF THIER 3 POLES. SOURCE SHALL 8E USEO ONLY WHEN THE NORMAL ESSEN! I AL SDURCE IS lrn l DEENERGIZED FOR MAINIENANCE. I I l. XFRMS lllD LTC PNLS Ll701 & L210l FURNISHED AND INSTALLED I I I t I t ON CONTRACT NO. 8. :-::rI ~ BF2J45 I :-::rI ~ BE2JJ9 I I A0211? I I AC211 ) I 12. KIRK KEY !NllRLOCKSI I A KEY CAN ONLY BE 4. CABLES HEOING LTG. PN L'S. ARE STRANDED CROSS LI NK£0 ---' 6-----6 I I I ! I POLYETHYLEN£ TYPE, FURNISHED BY CC\4. 1-11c No.a-1Wc 1-3/C No.a-1111 ·c WITHORAWN WHEN THE CU . BKR. IS OPEN: KEY WILL BE HELD WHEN THE BK R. IS CLOSED. I I 3 No. 210 I 5. ALL LTC . OISTRUBITION FD BRKRS ARE 2l5A FRA~ SIZE. EXCEPI ~~ERE NO TED OTHERW ISE. MANUAL XFER 13. [jJ SYMBOL INDICATES CONT ACTOR. L__ SWITCH 60Al.f> ~------~~~~¥~1~s1a6 I ------__J 14. SUPPLY BREAKERS BOFS AND BCE5 ANO TIE BREAKER Bf517 AR[ KIRK L-- _L, 6. A.C. LTC. CONTACTOR SHALL BE AS CD TYF E 920 RC SWITCH KEY IN TE RLOCKEO SO THAT THE TIE BREAKER CANNOT BE CLOSED IF ELECTR ICALLY Of'ERAlEO ANO MECHAN ICAL\ Y HELD 600 VAC, 2A CROUP+28 CROUP!t-2C ~OIP:SWYO FD 2 SWY D~FOI ,1 ~ IA GROUP 18 CRIJUP IC CROUP: FU SE FD 75 AMP , l POLE. 120 VAC CO IL WITH HEMA TYPE 12 ENCLOSURE. BOTH SUPPLY BREAKERS ARE CL05[0. FUSE FD I ~DU~E I 1. T\£ PHOlOELECTRIC CELL AT THE WATER TREATMENT BUI LDING IS A FISHER ~ ' ~rn~~ i :;; i MODUU1 PIERCE MODEL FP779DB-S5. THE PHOTOELECTRIC CELL Al THE TURBINE -- -- __ J DI STRI BUT ION _ ------![ __ I No. BUILDING IS A FISHER PIERCE t-\00£L FP\20-EPS . ~~\~~OJ CENTER ~~E 3 No. 210 ,.-~~~\~~OJ 8. LOAD IN LTG. PANEL 5702 \LOC ATED IN CABLE SPREADING ROOMI 9 SHALL NOT EX CE ED A BALANCED LOAD OF 15 KVA. 9. CABLES 01SCONl£CTEO PER ! MM NO. IS i 88-0S59 AND BB -0612. 5KV-J No. 210 B~~~~A~.w~~ ~ 10. ECP 11-0470- 001 REMOVED SOUTH DISTR IBUTION CENTER . OISTRIBUTION DISTRIBUTION -- -1 CABLES WERE cu r Off FLUSH ANO LEF T IN PLAC[. PNL. DP6702 PNL. DPG 80 2 SEE NOTE 10 RM. 603 RM. GQI 6 4 tiQ!U!!...Ml2QQ I ~l~l/zrn I I NOTES CONT' 0 ZONE A-4) ,,,.- f6~ ~~~Al~s ' SH . UHlli"!!f!ON I 8 l•,60HZ , I I-'--- 0tMcc2 -- -1 ~EE OWG. E-7 FOR DETAILS 1•

r------~I TG OISTRISl!TION SWllCHBOARO ·rs· ~:~ nfs;~~~~~~~ ~A~Ji· ~:L- 1 LOAD 8J{~· : fs·------i sw:L EL[V. 4 1603' -0' I AREA 6 I 750 KVA XFMR ~Kn•MR e l•,GOH1, I E BLDG. -C -r l•,60HZ, 4\71 J .60~1 '. F~ ~ ~.E:4iesE:6: )BE:6l E-408 SH. I YARD LIGHTING A ~480V-2 0 0/120V . C ~4BOV-108 /110Y . L_ 8 A X3052 E-360A LIGHTI NG L COIMUNICATl(}I NOTES, STANDARDS & OE TAILS No.e-1111·c 4-llC No.210-l"C c~ ~'.~~; c~B JOKVAXFWR E-36 2A LP SCHEO. AUX . BLOG . ~• ~~:::g u 1~~~..... 3".60H Z, 21 21 5' ~;;,. g; ;;,.(•Bov- 1oa1 12ov. E-383A LP SCHEO. CONTAINMENT BlO G. CKT S CKTS 3 75 KVA KFMR -< ,...... !.. ~ .!.. X GOI E-384A LP SCHED. TURBINE, OFFICE & MISC. L2001 LIGHT ING PNL l•,61111, JOA LTG. CONTACTOR PHOTO Ll04 2 ~ ILCJ0\4 1 WISUECTOR ELECTRIC 480V-208/120V. i AC ID PUMP HOUSE SWCH ON/Off I AUTO CELL SEE '--y---/ Xl702 OWG. E-406 SBO BU ILDING J' c ~ J No.25DMCM HIC No.5 DAVIS-BESSE NUCLEAR POWER STATION WATER 7REArnEN1 I -IC No. 210 11/1 • r - MCcFTi"a------1 480V UNIT SUB-STATION LIGHTING DISTRIBUTION I l I I I 42 I 5\ )BF2160 ~ )BF1151 I IT~IFllA-: REG. XFMRSKVA CKTS !____ ~ _:3~4J 1•.60H2. ONE LI NE DI AGRA IM 10B/240-110V.iE LTG. PNL. H3601 H4601 I_ iJi99A-iii1·--- mm-~111· [~;JJ60l4E-I' 42016A-3' X4709 L4705 LGOO I RM 325 RM 429 J-1/C No.6 AWG 1-JIC No.6 3-1/C No. 12 AWG-l'C l-l/C-l50MCM 3- 1/C No.6 '--y---/ '-v---' '--v----" E-4 SH. 4 8 JO KVA XFMR 30 KVA XF\41 9 KVA XFMR 8Y6 cJ~s TRIPLEX l'C 4 AUX BUILDING OFFICE HEATER PNL'S •MR LTG. PNL. ~~B 4-\IC No.2-2'C 4-llC No.2-1111·c •'1.- 4-1/C No.a IN 1111·c L4706 8 I0,60HI , C ~2 JO c~ 21 480V-240/120V. '----v--' a~ m~ ms X323J AUX. SLOG. 1- \IC No . 1/0 SEEE-405 REVISION 31 HTR. PNL. Y2712 LTC. PNL. 11c No. 2- 1·c L2701 OISTRIBU!lON PNL BY-S 8 ~ SE[ DWG. E-428 SH. l ~ s AUX. BLDG . DIE SE L OIL DC TOBER 2016 EL. 565' -0 ', AREA 7 PU~PHOU SE DPJ233 Oil 03- 15 - 16 o rn ~r :/£LE C/ E4SH 4. DGN IO SIAiION tRt{ 13.8(v srGR. FRti lt.8(v srcR. BUs.A. COIfUIER Eus 'g',

* I

fUIURE fUIURE iT ct6t I 6004 6004 480-120 480- I ?0 t 4t (gr t{t {l) ZZ I il) 9E604 BFSO{ t XFIIR.AE6. -( -( 1000/l15Oltv[; 0A/FAi 55oC a rAc xFuR',8f6' I 120/12881(YA; 0[/FA; 55oC ^4. 1000/l'|SSYA; Ot/F t.i 55oC B (cut E l.6.Il 0ll 10001(V[ r{fr' G-tsot(cHtr I Ac I 120/1288[V*i 0*t'tl; Elst] fl FRg EELOT z=6.14,4 oil t000r(vt B[5E 3 PHA5I. 60Ht c I PHA5I, 6012 r1.8Xv 0ELTA I0 480VU-IS rYE r5) t' tl.c.c.'E5t' {5t U,[,C,'F5t' ll.8l(v 0El-IA I0 ,q80v0LI5 IYE BF6O5 {00:5

(9)

BAE6 BF6O9 2000:5 BBF6 il0 ISEE NOTT 9] 6-55fiCr.fi1 (CUr 6- FRII BELOT H.c.c.'86?' (61 H.C.C.'F6?' t6t BE6O6 8F605

6-isor(cilr tcur FUIURE FRH 600/480 500r l-t/c 4/0 r/r? 0R0 ( ir H. C. C. 'E63' {t, r.{.c.c.'F6l' r ?l G) IURBINE OECI( sOUIH END POTER 8F601 BE6O] sE60? BF6O? 3-t/c 4/0 r/r2 6R0 -( TTIIP II.fr8INE OECI( SOUTH EI{D POUTR LOAOS fl0

48OV UNII SUB 'EF6'

FRli 4. t6tv SIGR 8rr5',C2"

! q=

4, l6r(v JPH, 600 ar'f 8u5 ill t2t (1)

05c?05- | 05c?05- j 5004 5004 ror ,r'ooo ti'

+

I

I

I

I d NOIES sEt tt0IE 2 ! I. FOR IDDITIOIIAT TIOIES,LECEIIO AIIO REFERENCE I I 5PA8E ORATINGs sEE OTC. t.4 SHEET I. ^Ac xFm 'xJ051 ^Ac 2. FIELo 5H0UL0 nEPrrCE Eilsilnc r00 rlP rircoRir 80tsfi IYPE t 4 t60/180Y I t00 Nxr FIJsEs ylTH our|HY Fu5E5 m PUI 50t 10 t lr(s rI IHt rflr 50q(va PRIT,IiRY OF TRNN5FORIIR X]050. IROTI OUIACE c '"f,r' 5. DSC3OsO PIGTAII.S SHATL IIOT BE COII}IECIEO iO IHE SECOilOTRY SUPPORI 5ERY|CE 8100. 6 OF XFIf X3O5O. III OEDER TO E5TAilI5I,1 ALI. PE TROI IHE SUBSIrI lOli f500t{clt THE FEEOENS (xfm (5EE l/C 150ircil D5J00l 4004 J/L tlolE 4 OUIAGE SUPPORT SIfrSTiTION, PPF PI)ITR E-20t8r 5E[0N0ARY CABLIilG) SHALL BE 0tSC0t6fC1E0 FH0t{ X3050 tilo RECONNECTED TO TllE PIGTAILs OF OSC]050.

580 BLOC. 4. SERVICE BUITOIIIG 6 PROVIDES POrtN IO EOIH IHT TTLO IRAIIIItI6 PERSOTIIIEL PFOCESSIIiC CEi{IER ANO IHE B]SIJLFIIE sHEO, BOIH OF THICH ARE TOCIIEO FAC IL ITY OUISIOE IHE PROIECIEO ANEA. IHE g]sULTIlT SHTO CO+IIIIt{s IHE 5t00 0ECHL0RI[aT]oil sril0 (DB-5100i,

{. I6KV DISCONNECT DSCzOs

DAVIS.BESSE NUCLEAR PO|{TR STAIION

PZR & ANNULUS HEAITRS 4BOV UNII SUB-SIATION Ot\lT LINE DIAGRA},I E.4 SH. 5 FIGURT 8.3-I8

RE\/ISION 3?

SEPTEI-,IBER 201B

DB I2-()I-17 OFN=I :/ELEC/E4SH5.DGI,i FROM 4.16KV SWGR. BKR. AA----.. FROM 4.16KV SWGR. BKR. AB--- \:_Q,WG.NO. E-22 SH. I !DWG. NO. E-22 SH.21 ~G.NO. E-22 SH. I IDWG. NO. E-22 SH.21)/'\ C:EI-( ' ~ CEl-1 8 (DFl•I) ( DFI -'Z.) ..> 1'1Z.,._M&FO&~S:l2 to.lli\ITGI"''- O'ISIC:llR. lt.S.~ HS A~ SIW 211:1..""'( GiR. T'(9£. I"'C. SI .. ~~~ &\IS UN DEIL"O I..T"'G!llt Ra.I-""I' GE. iVPE. H6A 14 (NOT USE~ l(O * ' 8\J& UHDE.lt..'JO\.T#l>.~l Rt\."Y ~) GiE. TVPE 1AVS4E SHORT CIRCUIT TYPE TERMINAL. + S\.OCI<.

480·1'2.CW I IO& I I

., 8

*HIGH RliSISTANCE QROUNDING EQUIPMENT-GE TYPE.- 0S~l81l..AY 10811>.XAMC (REF. OWG5. E-7Q-"'2·1 ·001 TMP.U E·7Q·Co"·l-OOI AND E-1Q-'-8·1-00I)

SPA(.£ Mli:,..TE&S (o"'ir. f'ER, f,CC.TIOM)

7 , $C.llEMC 8 Mo Pn'Oll:I. i..lo I~ &BICA.I 5) 17 1a 1a ,, L-1 MOOS&. No UlSalc:Ji.IS) •I='• (2) - ' ~ ....---1----+------.... ---1----a-- a----...--i------4~--+-­ ~------Ml\IW CO... 'T1l9L,... 80,..ltt:>----..,.------~:":""":"":'~~------4t-- ava E.I (Fl) DAVIS-BESSE NUCLEAR POWER STATION (WP &JoHN liU•dtMU) "I.. ESSENTIAL UNIT SUBSTATIONS ' El AND Fl INCOMING FEEDER SCWEhtE UNIT 6T'-'"·UP w1aa ' E.ltUIPN\trNT "-Iv"" a 11.u It.I.PUT - S/ITi.l.lo\o SVloTEloUlt CH"MNll. Er Pla'SFlll. No c lllCI ,..,. IC& ~c.g IC CIRCUIT BREAKERS SHEET I ...... ac:...... E-37B SH. I ea:1 ICI ooa I IC.e a1c.& l!l'ZC.& .e.&:102 BE.106 ... c.tCSll ~c.e12 ICIC 2,C.£. EI •t.&Go C:.5715 E4-1~ FIGURE 8.3-19 + 2. El Q'l70 I C>F t BICIF 82.Cl'I" &FIC2 BFI06 ""1>1 DFll "-DI DFll IDF 2.DP E42.I .... "' REVISION 29 DECEMBER 2012

DB 04-04-12 DFN F:/SCHEME/E37BSHl.DGN/TIF •

( 2."'I 1, --BC. £'(Ft) c. r. 1)$ 4 > [1.!£ (A) Vl7 t.b!!:., m' '--v---' voa (i-4 t;J ( £ S • '2.' ') [.E1an (e.s·,2.10) Be..

,BLOC.9' DI ..~&._. M ?\ ff NOT TO &E USEO · S ... llN\'E 'No (.S&E Tl\&LS) \ \

! I I

{ . ·. "--- --... ______)

DAVIS-BESSE NUCLEAR POWER STATION

ESSENTIAL UNIT SUBSTATIONS INCOMING FEEDER CIRCUIT BREAKER, SHEET 2 MISCELLANEOUS DETAILS E37B SH. 2 - FIGURE 8.3-20 REVISION 14 JULY 1991 TR.IP "UlllLl"l<.V CO.NT ....CT~

D E'VIC£ TyPlj 74'1/ l..o"ioT Cc:l..aT P.....,.~ ~E T"fP& ttc:iiA.11 8

IT"LK ~- 14V IND LIGHT u 1 AND FUSES TO SE INS1'ALl.E'O ... av CONTRACTOR. ... .,., !!! . "'"Bl...... ~ 52hb .. ~ • ...... g .... •T •• $ st>ARe :d!" 2 t>S • 1>7 "OJ ..... I I ..~~ ..:> :> "' ..J ... Oo MM N C.9t:!T!lpL aae,gp t-NF -~OMN ~ ?- ,a,...,.,.gs) "2 "z 0 .0 uu ., ... ..NOTES~ 00 I. CONTROL SW. CONTACT$ 1-U;. 3-3C.,, S·Sc.,17-7c ARE. IN SCHE.WUE.S 0C.Et1 t aDF 11. +·+c:.~&·6'., v • >> L.COHTROL. SWITCH CONTACTS 2·'!C. • 8-8c. SCIE"" I U OllEMA.L. I A.L1'£2Wll.1'E .., • AR& IN SCHE.MES J:CE'IZ. I BOFi2.. w...... _,, PNL C-'T-.PNL e«T 3.C.£.LL sw1TCMES(5'2.hQ,,,S2.hlio) SHOWN IN. TEST AND .... (I) INCl'T7IDIN ~ acEH DIP Wl'THl>RA_WNi p0SITIONS • - ... &USC.I 'I. Dl<;CO>.. jEC.; S'.l\"TC.\\ 5HoWi.i o6 Fol!. ~E:~ BCS:l" (2) - "' ' a~Elf ~ &DFU O>ILY 81>Fll (.3) D~P .D2N ~ AC.IGEll ) A.t.tutl'L T, Bt>F~ f4) (SEE. TAl!ILE.) I - v!v ;:¢¢< I I i)ec..e11 ) Bc:.e.12 DAYISilW: IUlEIR IUl:R SIAlllll I c I l EW:lt:lllL 11111 !UISIAlllllS cu I A I lc;l.11 llDlllG IEEllR Clllllll llEllER, WIRt;; cs 51([1 3 CLi.1 <.i PR.EFll. SEE E-)0 Pll "',,...., IY!o Ill. (Ii) T~lt "'"""" .... SH nG e A E-llB SH. 3 n , E12. eu !HUI I.HI ... .. 005 II 11 l(.iil2 2.42.0 I I .. , F OI 1l REVISION 29 005 ~ II 3 2 &\..OC.K DtAGRf..M DF f ADll>frl '24 2. DECEMBER 2012 MAIN C4NT.&OAf!D(WFfJOHH IMRMU) DB 05-22-12 DFN F:/SCHEME/E37BSH3.DGN/TIF C:.L..OSE TR\P /J>..\JXILl~R'( CONT~CTS 1.. -1- r.I • • I

I ...,..,..____ A 1 .....------2.16 '220 ...... ,...,__....,...,.___ B _..___.... -- '" cs Cl .., !sz.a.. i I 52.CL .....,._....,_..._ c _ ...... -.ii.---~ 1cJ' B1' "'l BA 1_ C(ti2tC) c.~i211 1- ;,q +o PA +S' 1~ ""~ 1_ lb.I S.PA.R.E <;!>All.£ I ' ' l:t NOTES: 1. CELL SWITCHS (52ho,52hb) ARE ·- f T' t t t :~ SHOWN IN TEST AND WITHDRAWN T>- _:-> _ ) sz )---)--J~;~ POSITIONS. FOR SCHEME BEi 18 SPARE CONTACT ~ !~ 4-4T IS ABANDONED BECAUSE OF 1 l J J J DISCONTINUITY IN WIRE #236. "Q" 1Z 51 41 -+---1-----1+- I - 3. FOR SCHEME BEi 14 AND BF106 NOT I{/) II Q II 1j CABLES FROM UNIT SUBSTATION SA BREAKERS BEi 14 AND BFI06 ARE SEE :d> CONNECTED TO FLEX RECEPTACLE NOTE:~ -~09 ENCLOSURES. I __ --- 4 lrJ. 4. WHERE "Q"/NOT "Q" BOUNDARIES ARE I 1sc:1- z~o DEPICTED FOR 480VAC SWGR. ' I DS A B c I I z I I 10 3 ELECTRICAL COMPONENTS HOUSED I j I U 52.h'\,. ENTIRELY WITHIN THE SWGR CUBICLE _L_-.=-....:-.=---=---=---- - .J FOR SCHEME U &~ SHALL BE CONSIDERED TO BE WITHIN 3Tfi'2.'3f THE "Q" BOUNDARY. BE114 &BF106 o 9 JO M ONLY (NOTES 3 ~ 5) > 5. FLEX ASSOCIATED BREAKERS ARE OPEN PART OF 11) DURING NORMAL OPERATION AND MAY ('J [Z4120] SEE E·378,SH.8A IMPACT OPERABILITY IF CLOSED WHEN [Z42.'2.] SE£ E-3713; SH· 7A ASSOCIATED BUS EQUIPMENT IS IN SERVICE. ec sc. l B) (B) (A) TR i P12 tA\ l\'B1C _.,,..._...._ SCHEMe: BA 8A SA SC.)tE\'AE SC\.lEME Sri I! SCH~ME BEU~q 8EllB~6A18 480V ""C.C:.. e.Y S BLOC~ D\~Gt1:l.~MC.:. 4-BFI07 ~f/J a GO Hi! UNIT START-UP l~WlJK. SPLICE IN RM, 3'2S SCHEME CHANNEL WIRE EQUIPMENT NUMBERS ANNUC INPUT WIRE NUMBER S/STN NO. SYS NO. PREFIX c BA HC IDDE'S: 1 'V PlJLL/3DX BEI09 006 T -- BE109 RI=" 12B '4~ ~ BEI06 006 I - - BE106 BEl2A 7 4') 3 BE107 El 00(; I - - BE107 BE 11 l4i 4 DAVIS-BESSE NUCLEAR POWER STATION BF 113 SPARE BE 114 005 I -- Rr 114 ZSR3602 Z420 - J ESSENETIAL UNIT SUBSTATIONS BE 115 FUTURE SC MCC FEEDER CIRCUIT BREAKERS BE 118 ~ 006 I - - Hf 118 BE16A 74?0 8 E- 378 SH. 4 BF 118 --006 2 BFl 18- .. BF 16A- -Z422 9- w BFI06 4 005 2 -- BF106 ZSR3603 Z422 f FIGURE 8. 3-22 BFI07 F1 006 2 BFl07 BF 129- -z422 11- 74?? BF 113 006 B - - BF 113 BF1310 12 -S<:.~!.ME '5f' llS ' &E I 0 7 REVISION 31 BF 114 U05 2 -- BF 114 BFl2A Z4?2 I~ BF 115 006 2 -- BF 115 BF 11 Z422 14 f3LOC.~ t>\"'-G.12.,.._ ~S OCTOBER 2016 BFI09 SPARE DB 09-06-16 DFN F:/SCHEME/E37BSH4.DGN/CIT MCC EllA r anErs,EL. 565') 2t ?t fr I4CC E I lB ( AREA B, Er. 585') ?t MCC tllC { AREAo, Er. 505'r

FOR COMECI]ON (KC n0 P tPlr{ P IPzH PlP?H NO P1 PZX FRot'( BE22i7 E22ar I I 50/50 I 50/{0 t50/15 r50/r5 50/4t I 50/t 5 o TO t5 t5 10 IR I BE22l7 BEI]OO XYE?T Btlr6? 8til08 8Ellt4 ETl IE5 Btlr{l 8Eil5{ fivcF0tB tiv2ol 2A ilvlru59a !aY0H I 20 r{v507{0 I BEiltl I t01 BE -€, BE]I?O fDR r0 240vrc Hcc CF II( I I50 vLv cIHl ilonil sUt{F RCP 2-r s€rl OH RI}EVAL C'IHI YACII cc PUt'tP EH + 1 ilP8!l a FD TO E H2 5Y5, I -l ECCS R[ r05 ECCS Rr 105 ttc5 gIP tlcc IB tso vlv RtI LII€ VLV SUCI LII{E vLY plp?tt RETITF VLV vfi{Ir taN I I Dtt FD iO l{C E]1C t-l F0 r0 ucc EltD P IP2T P IPA' P tPa,t PlPzt{ CIIII lS0. vLY, HV rc 150 vLv I HY t iC I5O YLV E Pr.f A NOIE 6 l5 l 5 t5 r50/ I 5 t t50/r00 '0' U t t5 5 tt t5 I NC580l I 50/ 881 6l il15 Bil 8t wcFozB l.{vl}6G0 tr1185 I Eil t02 8fl t03 88il?t 8ilit6 8Eil10 PRZF SPRAY L CF SITPL ncP SEAL RC PRZfi I CITII AIE CI.F re I re LETDOTT cs Pr+ [TB5 MC062l HIHPOzC MV50380 I( vlv ?-2 t"t I H? OILUIION 5T5 HP IIIJ YLV DH PIF I ECCS SUIP qJT YI|Y O CIIII HZ PURCE 150 vtv OUI VLV NET IINE VLV srf,t v[Y ] IIJ I50 VtV ]-I l.l Bili FIIF?.H P IPzT SIAFIER ilr'f, I SIJCI VLV f8T 8T5I PI,f B o{JI lso Ytv I l l5 I 00 A t5 *t''ot'i ilorE DEI.,IINERAL I ZEO H0iE l0 I HoH'0' l ITR STOP VTV I 50/t 5 '0' 75 P] PIP58 I t5 IUTUFT I2. UTIII I 50/t 5 8E1165 BEIIT? $ilIII Bil111 I 159 FoR Cor'rilEciloil *€, gv 50 ."d-{L 8til05 BEIIIT BElI?] Bt r 169 CF TI( VENT VLV LEIOOTN CIRS irvt{J0e0 IPCP cc 0t t50 l lfr fH,t lso vLv CIRL flli FRoil BE?2]B il{CC E22al IIPE9JA 0 1 l-|l .|Lu 1 vlv Ir{R I 129 HP t-2 vLv BElte5 ECCS Surf l-J crt{r ls0 Itr vlv ?rii FRII CIIII VENIL FIil 1 ItI vt v SPARE l'rJ cllll FTCIEC (SEE 4 Itr{ P IP2H TO t{vl{I 2a A ?2A IIOIE FLT VLV PI? Ptill FAN I 225 r5 I BE PRZR SPRIY IIJ 1 IH PI P?H DIG. E-5 5H, 2218 I 50/10 I50 VLV t5 rl 6 I t5 SPTRE l5 KCt{lL BEil5l BEl t78 FD FRII I,ICC E] !A + IE 6-500 8il166 t{vl4llr ili6 BE 06 8E1il8 -€' 8Eil2{ rD FRI,I ITC EIIA Ft) TO UCC FI IA RCP SEAL .t SPARE fi I.2 cr rl* i5E v,v I tlO Hvl567l REI VLV T0 ifr+n 8Eil 35 LP I IIJ vt t2 ECCS 5u1.f, t-3 cnir I50 vtv CC til'6;C vtv I LIIIE FEIiT ?{A 8E I I 50 tiOIE 9 CTIIT EHTR SUI{P Plf I FD FRH IO CRO OUI VLV UIIII SUB EI CIHI ts I0 rrcc EllE IFM I '0'

MCC EI4 MCC EF 15 r ,imr 6, n . Eol'l SPLICEO IO aEEA ?T MCC E I { rHir(E EL. 576' r [cc E]zt MCC sTRUc., EL. sr6') tt MCC E12A i 6. rr. Eol'l r rRE[ 6, tL. 605') CTIIT TIR CLR FAN ] fTR SYCHS 2C srnuc., EFI2C rrlrmr A EXTEilst0t{ DfG. t-6,5H.5 HEIII. 9 NOTE 9 NOIE EARR IER IHIS sHT IHIS sHT ts€t NoTt ?r A (5Et 150/40 l0a I o-oa t50/l I5 It fioIE I NOTE s tor rL I r{oIE ll IHIS THI5 a FD FRH j-ltc VHH I()A l00a I BE I 2]J 5HI. BE r 235 5HT. 214 8EF I ?5 UI'IT SIJB EI Bt12t6 rtsl]r HC021 l I 250 |(CHIL 2254 d wt58l0 (EIIIRY FROT iEOVEI CTRII EHER CIRI.I BOOI{ ErtR CIRI' ETIR SIS BATTERY CHARCTR BAITERI CHARGER 5r 5r Pl+ sIRt* I tD I0 ttc EFt2c 5Y PIf SIRNR 1 oBc t{J BEF I 2? 08il .0. cl{05 rr{ll 1 vLv vtNT sts FAlr I co{oEr{str{c uitr I 08c lP tt{ r8lil FD) {BTI,I FO I YLV '0' 8EF r 5l 8EF t5l (8Ig For I {/0 t5 C I 5 50/ t5 l/c ilo. r1c00l 3 HC00t J ' l0a CHlPS CH 2 PfR t5a 150 t(cHIt- (SEE Ht6r{ 5P0 HICH sPD L@ NOTE (FRII 8E r 2i5 8t r 226 BEl2l9 ? f0 fRlr r.lcc E I rFRt{ r|cc Ft5 t2l ll UTII1 SU8 EI UII 8EI50 UII1I BFI5()I) 1 CC TTR OISCH EI'[R VENI FAI{ 1 VEXTL FAll 1 SATTERY RII RTCI YRF I AFP ] SUCT II l) 5f PTf SIRI{R 5X JOCI(EY FIRT PTP IINE I ISO VLV LOT YS-TIGE IO AIX OPR I)RII YLY SMUCIIJffE VLV I 50/ I 50/t0 I IE I5 6A A A

gE BE BE 1222 8E t237 8E I ??l I 22r BE 2n BE I 284 r{v BEF I2{ Irc5056 i I FO FROTI MCC Et2r cR055 TIE AFP RII EI'IR VEHTL FAII RtcI tRt] LOI VOLTTGE ISEE IIOIE ?I 5Y 150 vLv T0 5T PI.f sTRNR, ] DUCITOFI( OIIIPTR VEHTL FAtI I III DAI'PER I RII 429 VENT CLil6 TTR 1 50/l 50 I 50/t0 o 10 rlcc E tzE SPTRE iVIA JTI807 d 50n 504 8E 1202 8t r 2t4 BEI?I] BE I ?4? BE 124 l t P1 P5B NOTE 5 FD TO HCI EIzC CC TTR PRZR HTR Ti,€I LOY VOI.TAGI, SIGR I 8EF I 52 8EF I 54 VENI LII.IE I RI{ 4?9 5/25- I MCC I. SEE OTG T-5, 5H, I FOfl CEHERTL IETEs. I CH PIR CH PIR II2F I Jl I ? *o LOT sPO LOY 5M r AnEa 6, EL, 585') ------l+ , IO EFIM ?. rlRr xEY tr{rtRLocxs d d 8il,!0 t ol lEr Ctli oHLY BE rllHDRAsl' II{EN THE CRKI ERXR m FUSEo 0lSC. CIt,iI AIR CLR I-5 l.tc00 I I xEY YlLL HELD IHE 8Rl(R !S Ct0StO. Ir{ IS0 vLv CIIII AIF SIIICH l5 0PEll; 8E fitN Fil{ ctR FAt{ I bI PROYIO€ IHREI TEYS FOR EACH 5TI ITITERI.OCI(S TITH ur{lI I ff (EXAIfLE r0r THE taoloR C0ilTRoL CEr{rt8 Dt5t6r.rAIloil. ttlA, BE IACH PRZR HTR TI,E! !3J1c_ IFRfl TCC Et5 (FRt{ l{cc Ft5 I29I FB, EIC.) STAIfED ttt (il, UI{IT BE l50t) wtr 8il501) cl xEyS CoRRESP0ttolttG I0 IHIERLoC(S Sr AttY CIvEil t'fc sHALI. NOI FIT AHY OIHEF IICC. t/c H0. 4/0 5 ]. FOR IICC EFIzC s€PARATE COHPTRI|f,TII5 ARE TEOUIREO FOR THE INCOIIIIIG FUSED OIsC. SIIICHEs } A I'f,IAL BIRRIER IO EI{sUNE BEF I5 5EPARAIIOII EETIEEI,I THE II{COI,III{C FEEOTRS TRU HCC'5 E12C & F12C, P IPSB JT]95J t{c001 5 CII{T AIR 1. {8OV BREN(ER 15 FURNISHEO UIIOEfl IzOVAC I,[[ B/II. I I cLR F^r{ '0" J MCC EF I 2D ( aREA 6, EL. 603') 5. LAC|( 0F 5yt80L (r 0Rl1 0Eil0IES ilo 5IABIIilC fRoil 5fA5 0R sFflCs, PRZR I]IR r[lBI ,------1 6. ERENIERS BEIII? ANO BE]15] ART HAIi{IIINED II,I IHI OPEI{ POSITIOT{. t{0. AYG r-llc ilo. 2 (5€E t{oIE ?) PRZR HTR T[IB2 T. TSERE O/HOH.O EOUNDIRIES TRE OEPICIEO FOR 48OVAC KI [0 d I 50a EssEI{It[L BRETKERS, EI.TCIRICIL NIO COt{IRq. COIIPOI{EI{IS HOUSEO EI{TIRELY IHE BRTAXTR CUSICLE SI,IATL BT COIISIDEREO TO BE TITI{IH PRZR HTR HIIBJ I e9 XIIHII{ r(x I IHE O BOTJIIDIRY. TXAIfIES T{AY INCTUOE OVEFLOAO HEATERs, ?08 I (FR[ ICC Fl?[ OVERLOID EEI-AYS. AI'ID CONTACIOfi I'IOUI{TEO AUXILIAflY 5IITCHEs. HCC Et2Al RfF. CR 01-063?9. il t50r UIIIT BF I 224) 8. IHT, IOTO YIUE FOR SAITERT CHTROERS 15 OEPTITOEIII UPOH THE LOAD - '0' 1*, '0' Scfif RI0, A5 DErtRr{ll'lto BY CAtCULAT Ioil C-EE 0 I 5. 0 J-008, (FRr rcc Et?a BE I 2O8A 9. TRAIE SIZE OF CIRCUII 8RE[I(ER HA5 8€EI{ II{CffTSO AHO IHE uillI BEr20?r BATTERY RII 42S TO AII' DRR ASSOCIITEO HCC HIRDUAffE IilST BE EVALUAIEO FOR ACCEPIiBITIIY PRIOR IO II{CREISI}IG CIRCUIT BREAKER IRIP RATIHG, ctR t-l tr{ t50 vlv IO. THT EBEAI(ER AssEI.GI.E HAs BEEII EVALUAITO ACCEPTIBLE IITH MCC EIzE MCC E15 MCC El lCIExIEilIl0N) MCC E]IE THE I15A TRIP UNIT III ECP II-0?24.00]. MCC ( AFEA 7, EL. 56i'r MCC E I r mu 6. Er. 5s5') ( El lD 28 ( AREA 8. tr. 5{5'l ( aFEA 5, tt, 60J'r r aRtr 8, tt, 585',) aREr 8, EL. 601') LIGIND coirTrcT0R 3- l/c-H0 Ffiox nccE I 2r fn0H tr '0' U l{0T'0' '0' 4/O AUG {Y1A JIISO?I lc + STARTER OR COIIIACTOB IIIICH RTCTIVES A SICHAL FROI IHT 7 IIIE r 5 {5Ft5} RTF. l5 t5 5 I 50/30 l t5 SAFETY FEATUREs ACTI'AIIOiI sYsITX OI[. E.IIB, STAETER OR COI{TACTOR TfiICH RECEIVTS A SICIIAL FROII IHE SIEAX gt L BE] I6I 8EI95 85 8E I ?58 r 291 BE t29{ BEilli BEltSl 45 AND FEEDTATER RUPIUFT CONIROI SYSITII (sFRCsI REF. {}T[. E-]98 0 tf t 59l c3621 t0 F0 FfioH HCC EllC CC TO t0 FRoil tacc El1A BA l I FUEI EITR OGl sGI DRN YLV cTtal vacr{ I50 vt TTR cil{r. t50. Ptf OIt cIilI COI{TRACION sPACE. lr0T U INSTALLITION IO IilsIAI.I. Iti EXISIIT{G LINE A VLV '0' '0' EOOSIER PIIP lltfRsl0r{ HIR RETIEF YI-Y PENI 7] o fD FRH SEr09 '0' ti0T '0' 5 I 50/t 5 1 II'I5TALLATION COiITRACIOR IO RTTIOYT TAICHIilO ITPT sIARITR l0 UI{IT sUB EI I t ttr 7 ANt) REPLACE |ITH FVIIR sTIRITR. (ENTRY FROl,l AEOVEI ,-.@ BE I te6 BE I 199 BEltSS J-J50 r(CuL t0 fRlt r18 BE] INSTALLATIOI{ COTITRACTOR IO II{5IATI., AOD YTRIICTT STRUCTURES tiv t5 I l0 rll'! rtoil4 !0 UTIII SU8 EI w50?t0 A 0H I'roRil SucI cc cEo B005TER BA At)D T[1. ilolt i 8E 1268 trPI 50? I0 tFPl tccs Rl{ 105 HTI(EUP PUHP I-I cl[l YA${ LPl.HPI CRO55 I0 HCC El?C, l4cc EFI2C, HCC EilE & ilzt I r0CAIt EXISTIHG VLv PrP vLv. U HoT'0' 150 vtv cLR Fiti 4 OISCHARGE YIIVE FEL IEF VLV coiiH I50L vLv I STARTERS AS SHOTI,I. RC l,iu Pl,lP I tlNE I I50 I sUCT. HIRI D]TsEL OIL PIP HOJSE 1 I 5 l l5 II{ OIL PIiP tt ti 50/10 I 1tr l swP 1-1 Pt'P A U l{0I '0' '0' NOIE 7 {7 BE I I89 BE r 255 t5 t{olt 7 BE 1295 8E r 296 lt39 =m, rtTTt 2 r.tc025 t '-p" '-p, vActa CIRX I}H REI{OVAL r{r PU}fs DlScH cR0s5 8A ADO T(I EtiER 0c Rn I ECCS Rr1 r05 HPI PUif I.I cTxT EI.{ER 5Y5 CLR OUI IOYER co|tl LIHE I50 Vt V HIR 2 VEIITL FAN I CLR FAI.I 5 AC LUBE OIT PUif RELIEF VLV sIAID BY C0tt0 UN IT 192 I BE I e?0 xl0?1 NOIE 9 t50/ I 5 r0 f{c EF t5 L5 5 RC I,IU PI,iP I 116 )(FI'R 901 NUCLEAR POl.lER STATION uri tr 8EF I 52 DAVIS-BESSE DO PI'IP HsE I0 vcc ElzF l- SPARE TO gE '0' 8Et t90 BEilll BE I 286 KC EF15 8Eil{0 L t49 BE I t60 T sEE NOTE { HvHPlz UIIII BEF t50/15 I BAIIEftY CHARCTS C II,II H2 CIRI,i EI{R EHER 00 Rr,t HP NJEclrox Pu" r CIII vAcra I Att D8C tPtt VTV VENI SYs VACH PHP VEIiIL 2 I{IN RECIR[ I50 YTV REL IEF VLV (ESSENTIAL) FAH I 5T IT I.I Fit{ YEI tII{T 5/?5- I r 4BOV AC i,|CC '0' '0' t5 150/15 121 FDfi r0 t2ovrc Hcc l HV6{050 FUIURE t5 FC f,U, PUIP I2'UI,III 8E r26r BEil{6 SUCII0I{ VLV ONE LINE DIAGRAM NOIE I 8t r 10r 8El25l EICF OOI r[FPl 0lsCH rP008l '0' '0' sorx PIF I0 ssz 00 xtES Pt,P I E-6 SH. I

HOIE: I.ITCHII{G OI{ LOY 8t r ?85 luc0?8t 5PEE0 oilt1. F IGURE BIIIIRY RI,I 8.3.23 v[Nt rrN t-l

'0' U t5 REVISION 32 r'f t{ 7l 8El Er'tR. 051. GEr{. r- r AC TUREO OIL PUIP SEPTE}4BER 20IB

0B l0-10-11 0Ft{.l :/tLEC/tESHI.DGN MCC F14 MCC FI5 aREr MCC FllA r aREA?, EL. 6oJ'r MCC Fl 18 i B, n. 6oi'l ?J r AREA 6, Et. 603'I ( AREA 5. EL. 60]')

'0' u FOR ION NOIE 7 t t5 5 FROM FSzr , 15 r F0 tR[ il,rcc rl t UNIT 5U8 FI IO 8F1120 BFII16 IsIDI F0 r0 ucc Ft lc BF I t3l r5Jl2l BF I t09 I 180 Bfr 08 BF r 162 BF $8 r60 8t 28 n9MV05248 tlvcFola iro1E FD FFH IICC FItN cIr,rI Is0 cF Tr( 2 ISo vlv CTRII & AUX t CIRM EHER sYS H2 OILUIIOH 5TS CTHI VACil cilli lso vLv CTIII NORT SUI4P CIIIT ISO VtV PEt{I IA il0TE BUILOING LTC XFIff N0iE '0' NOT cot'{DEilsulc t ilI 2 BLIR 2 ntrI.IEF VLV I50 vt v PENI T2 FOR CONNECI ION P2Py t0 l(CMIT r 50/15 I 50/t 75 5 l5 RP5 5Fl5 FR0i{ BFG205 il,rcc F62r l t CIHI PR€55 SPARE IO SYIICH I50 8Fr 8F BF 22 It3 Bfu 25 8Filt0 BF I t8t 8flilt 8til86 8Fll47 8Fil76 FD FRI4 t0 rRx VLV HIR 8t5205 HV2',n60 HV060!0 Hv525?r r1vt53l0 yLV [v15678 UNIT SU8 F] tirill sl8 11 CIIII cF Tr( 2 st{Pl CII,II RECRlC PFZR SPRAY LII{T H2 0lL $r$. r-2 c1l,tT vacll 564 offi [!v cIRt Rt{ fltR c5 Pltr 2 oul vlv cc IN I5o 2 IF m tAl,r 2 t50 vtv cilrl t50. vLY, REL IEF VLV YETiIL Frfi 2 lil vl'/ IO CRO + {sf,t NoTE { t 5 t l5 rwd*. 150/r9 ti irflts DYc. ) tl 50 l I'IOIE I xYF ?a 8F r r{,{ BFII?8 8F I BF I t25 BFtr49 01 19 8Fil82 BFl r!5 ET r58 'ftE BF I rgS HV0240B BF r52 Xftrlotre cilrr t50 vlv RC PRZR CII,IT ct It( 2 vEilI vlv C IRTI Ei,TR cc cRo 8005rER FDR T0 ?{ovAC r,tCC CC TIR CIHI VACH F0 r0 Hcc EltB cc oul 150 ulr r $l 1'r TTFI; T PENI vLv 2 D 515IEII FAH 2 PTIP ? SUCI VLV LlliE 2 REt IEF VLV F8I CIXI [5ir vrr iarE 5 I]T StfL tsc P?P5F no P?P5F I 50/t 5 r 5olro I 50/ t5 l I 5 r0 ilcc til5 ItoTE I UtiIT BEF]54 IIOIE I sflT. IHl5 IO i2 8F t8 th BT l0 BF I 18,1 401/225 8Fl l 06 I 181 r0l 48 t{vDH t I 0 Hvsolgo P?P5F UN II ITR VACiI EHERC CC vti'j r0rfi a CIRil ETfR soe ffr tso PFZR VAPOR Oil RTH}VAI cIrI vlclr cc CIIII CIFI' lll 150 8r;i uv a VLV SHPL L INE VLV sUCr YLV R[I.ITF VTV LIHE ISO VLV FTI- ITF VLV SIANDBY CONO UTIII IO CIHI - I CNOS UNIT 2 P2P5F LtilE BFill7 2 I.2 5/25 n 5/2S- tr 5 o.!a rsor I5 I 50/1 5 F0 r0 r{cc FllB 2254 T0 ttc o \{r* FIIE BF l1? 8[ BFI]O? 8ft40l 8F r 50t cc Ptf Rfl PRZR TOO AFPI 2 II{ r0 I0 rcc Ft l0 CTRI,I Tl,lER VENI Hc00t ? FAN VENTL FAN 2 SilPL LlriE vtv ilr I50 vtv 5Y5 VACH PHP I-? CIHI CI.B ?

NOIES: LAICHII{O ON LOT HOIES! I.IICHIHO OII LOY 5Ptt0 oilrY. SPEEO OIILY,

MCC F 1 2A { iREn 6, tr. 60l'r MCC Fl2C rrNIaKE slnuc., EL.516'l A 1r 2t MCC F I ZB r anra 6, EL. ror'l FO FRT SET D[G. E-6 SH. I NOTE 9 ilorE 9 IINIT FI '0' r{0I '0' THIs SHT IHIS $II NOTE 7 400t225 r5 o-oA [oIE NOIE S l5 toa I I KCIIIL tl z. TH I5 IH IS \-lrll-tF-l gF BF BF ] ?09 5HT. sF t2le SHT. TO BF I2I{)A t2t8 BF DG FUEL FO TO MCC FI?C BATTERY CHAR6IR BAITERf CHARGI,R vEt{ Ir- FUEL OIt EI'[R OG? 5f Pl.+ slRtrfi 2 t0 I0 flcc Er12c SI TO !TOftAGE DBC?P 0Bca III DAI,fER ? EOO5TER PfP ? lllf,Rs|oil HIR EASlr{ Yt, v FD fRX 8,10t '0' '0' I 5r E (Dr.a r50/r5 uflll 5u8 tI t-150 r(oatt t5 I Fa9 (FE()t'l gF BF t229 t0 8F AB0vtl Er I ?5? BF l 2t5 BF 1 281 =p" xvl 3670 4A crRL $rtR 5Y5 AFP RI' VEIIIL FAI{ 2 LOT CTXTT AIR CLR RECT YRF2 BATTERY RI'i LOT VOLIAGE BF t 268 AfP 2 0t5CH 5T PI.f STRNR 2 5[ IO INTAI(E tflllE DRT{ VLV VLV sIAilD 8r CorO 2 FAI vtilll- FAil ? vot IAoE srCR RH t-2 IH IS0 VLV TO NTI DPfl S|GR Rr,r 428 vEr{T DttSEL ott PuP I0 5C? FORTOAI 5 P2P5F I 50/10 HOUST SUIF 1.] PHP B '0' 225 I 50/! 50 tE t5 IE 1 A I0 tacc SPARE IO t{cc I (BTr,r FIM EFlaJ 8F BF BF BF 8f l2ll 8F r 225 BF I 205 8,1221 BF II 1 I2?? I 284 2P 5 rnorE ?r 1tv13950 FflI.I F tf,tgB-l YRF '-p- vL FD l.{cc t?A HPI PUlf, 1_? cn0s5 ilt EI.{ER VEiITL FAIi 2 CTI{I AIR CtR I-] RECT { Elffi Dc RH 2 BF 5Y lso v TO LEIOOII{ CLR I T te CLNO ITF IC IUBE OII. Pt,,tP DUCT$RI( OAi,PER Iil I50 VLV VEIIIT FAII 'Yt ETTF OG CC fTR IN VLV t' AIR CI.?sR 2 fn0H t2 t0 P2P5F P?P5F FDR T0 I20VAC l{CC o tr 150/ t5 SPTNE l5 8F r ?40 8F t? rl BF l20S BF 1256 NOTES BF BT 8F I 228 I{U PUI,P DISCH CRO55 Et'fB 0c Rri 2 NOTE ? t26 r I. SEE DXG E.5, 5H. I FOR Cf,I.IERAL IIOTES. llvlt.J0 I B llvI{t00 cot{lr. LIIrE IS0 vLv VEITL FAt{ { '0' '0' LETDOXT{ CLR I ltlDoril ctE 2 rc LEIOOTil CLR 2 BF I 259 EI{R DC 2 8rr?l0r IN VLV vtv r5 CC fTR IN VLV 50at( Pt+ 2. {80VAC BREAI(ER I5 FtRt{t5+rE0 Uil0ER t20ViC B/H. STITERY nn {28A tr BATTERY RI{ 1 50/1 5 150/{04 '0' '0' TO ATII OPR VEI'II FAN I-2 LACI( 0F SYIEoL (r DEH0IE$ ilo SIaRTINC FR0r1 oft 5FnC5. 8t t2 t{ 1 l. oRl) 5f[5 1 50/ t5 HIR LEIZ NOIE ? {. BNET(TR IIOOULE 8EII5I OI llCC EIIB AIIO BRENIER llo(}UE BF]]J5 IFPz DISCH BF 8r t?60i l?60 '0' OtI I,ICC FIIA SHALL BE REIIOVEI) FROII I'ICC'5 TNO APPNOPRIAIELY IOSG I l.{l,Rc020 P2P5F PRZR I SPEAY VLV BF I 25? sIOffTO, EI,iTRGEIICY IIE OF I{CC EIIB AI{O HCC FIIT SHATL BE OO XFER PIf ? ACCOI'PIISHTO 15 PROVIDEO IN THE EI'IBCEIICY OPERiIIHC PROCEDURES. PRZR HIR LEI] 5. BREA(TflS 8tII4?, EFII{8 AND 8FII9{ ARE IIAIHIAINEO IN THE 1 t269 8F ?85 oP$r P0stiloH. PRZR SIIPL.LIIIE IO 6. BREIXER 8fI260A IS LOCAIEO IN THE FIEST SIACI(.TOP CUBICTE CTIIT YEIIT Ht)R VLV 0F l,icc FtzB. JIi95{ P?P5F I ?. THEFT O/IIOII.O BOTJIIDARIES AFE DEPICTTO FOR IS5EiITIAL {8OVAC I '0' '0' EREAI(ERS, ETTCIRICAL ANO COI.IIFOI COIfONEHIS HOOSIO t.tiIIRELY a I I 5 TITHIN IHE BREAI(TR [U8ICI.E sHAI.L EE COTISIOEREO IO Bt TIIHITI ITBIJ tP l {?{ THE O BOUNDARY. EXAHPTES IIII INCLUOE OVENTOO HT,IIERS, 8r I OYERLOAI} RELAYS. AI{O COTIIACIOR I,IOUI{IEO TUXILIARY STIICHES. HIR FEF, CF 0i-061?9, t8I] I EI,fR, OIEsET. GEN. ]-2 aSl H0. 2 r$ -l/c il0. 2 trc AC TUBBO OIt FUTf IHE LOAD VALUI FOR SATTERY THARCEES OTPEI{OTI{I IJPON I.OAD n8t2 8, 15 IHE SCENERI0, AS oETEfir,ft{ED 8Y CILCULAT t0r{ C -EE -0r 5. 0]-008. PEZS t HIF LBI2 I 9, FRAI{E SIZE OF CIRCUIT BREAI(Efl HAS 8IT.il IilINITSED tNO THE I ASsOCIIIED HCC HAROTIRE I'IJSI BE EYIUTIEO FOP TCCTPITEI[IiY fl-8I I PnloR i0 tNcRErSlN0 clRcUlI 8nEil(ER rRtP Rrilr{6. I THE EREAXIR AS5EIOIE HAs BTIil IVTIUTIEO ACCEPTTSLE TIIH IT5T PFZR HIR t8I I IO. iRtP ui[i lir EcP t]-0??4-00?. '0' HoT'0' LECEND NOIE 1 I CONIiCIOR E MCC FlIE U COilTRTCIOR IO RELOCIIT BI(RS FROI{ UCC E22A SCHEITS MCC ( aREa ?, EL. s6s'l MCC FllD ( aREAr,EL. s6s'r il BE22l7, BE22l8, BE22t{ AND 8E22r5. FllC a ( aREA 8, EL. 545') A INSTALLATION CONTRACIOR TO IHSIALT IODITIOHAL VEFTICTT '0' STRUCTURE T0 r{CC FrzC, HCC il14 & Fl?A & HCC FllE rflo r0crrE l-l EXISIIHG STARTERS IS SHOT$. '0' HOIE 1t0 i I 004 5 STAR1TR OR COTITACTOR THICH RECTIYTS A FROI{ IHE l5 t00A E t5 It SIcIIAL SAFEIY FEATURES ACTUAIION SYSIEI{ I5FA5I REF. OTG, E.I?8, l- SPaRE BF I te9 BFI t5I BF r r85 BFI I t5 il17 l{vHP5 I BFil9t IN5TALTATIOti COIITRACTOR TO INS1ALT IN EXIsTIIIG sPACE. uvl 5t 80 FD FRl,l IICC o FO HCC NORI.{ SUCT EC HU 0H RHaovAr FIIA 8A rfi Ff VLV HP INJECIIOI{ PUI{P 2 TRH FIIA DA Ptf 2 2 I50 IHSTALIATIOiI COHIflICIOR TO REHOVE LATCHIIIG TIPE STARIER LINE 2 150 vlv ri 0lr PI,lP CLfl r,ilu. REctRc, LIriE I50 vL t '#- '0' '0' ANO REPIACE TIIH FVIIE STARTER. U '0' t50/t5 1 t5a sTARIER 0R cor{IAcion rHlcH RECEIvEs a stcNAL FRol THE srErfl l5 SPARE A (SFRCSI gFtl9Z ANO FEEOIATER RUPIURE COITROL SYSIEII REF, OIG. T.198. 36 BF t9 BF BF I t6s 8F1195 tv0H6l HV26490 BF 7l r.rc0lil I.P INJ ? VLV HP INJ 2.I CT YlE IO LPI-HPl cR055 CoHr{ ECCS nH il5 ADO TK 2 LINI 8 VLV BA I5O YALVE ? CTB fAH I ftcruPlf2 tt, HTR I AUX CT.AR LUBE OIL PI+ l0A l0l t50t15 '0' ri HOIE tl !- SPARE 60t I 8F fi BF t4t BF {5 157 r0 Hcc DAVIS-BESSE NUCLEAR POI.IER SIAIION BF l F -p, AFP 2 SUCT HP INJ 2 VL tccs Rr ll5 ltt ECCS FL t15 H2 PURCE NOTE 5 CIIII CLR FTI 3 cLR tatr 2 8Fil78 FTN 2 5T IN VLV 1 5 ECCS R[ ils flo NOTE 7 t50/t5 (ESSEI-ITIAL) rtv & Ac t50 '/tv I '0' il0i 4BOV AC MCC 8Fil42 1r€ l'ivoll09t l5t CTI'T H2 PIJffOE 8Ft t5 cIII. Etffl. sutP VLV. PtP A PI.F 8 OUT I5O VLV ? OH PTIP 2 OUI ONE DIAGRAi'4 8rrrr? LINE sUCI vtv fRX 8I5I BFI!79 rEIl22 8i r00 I(2 ECCS Ril 115 HIR 2 2 HV & AC ISO vlv 2 [-6 SH. F IGURE 8.3-24 BFI!8? BIIIERY CHIRCER D8CzPI{ FEEO REVISION 32

SEPTEI4BER 20IB

DB 05-08-]8 OFN.I :/EL[C/E6SH2.DCt,| FROM ESSENTIAL FROM ESSENTIAL FROM ESSENTIAL FR OM ESSrnTI AL FROM ESSEN ! I Al FROM ESSENTIAL REFERENCE DRAWINGS NCC E12A MCC El 10 MCC E12A MCCF12A MCC Fl 10 MCC F12A E·I AC ELE CTR ICAL SYS TE M ONE LINE DIA GR AM STATION STAl!ON Sf!T ION STAT ION BATTERY 1P BATTERY 1N BATTERY IP BATTERY JN BATTERY CHARGER E-1 15 KV ANO 13. 8 KV METERING !NO RELA YING ONE LINE. 01 4CRAM BATTERY BA TTER Y CHAR GER BATTERY BATTERY BATTERY CHARGER DBCIPN CHARGER CHARGER _..__ OBC1PN CH ARGER E-3 4.16 KV METERIN G AND RELAY I NC ONE LINE OA!GRAM 480V Jo AC 480V 3• AC E-4 48 0V UNI T SUBSTATION ONE LIN[ DIAGRAM DBCIP TD 115 voe OBCIN OBC2P 10 125 voe DBC2N E-6 •BOV MCC

800A NO 0221 NOTES

I . • MA IN CON TROL BOARO MOUN TEO.

• 125 voe 2. 0 All IT[MS ON THIS OWG. ARE O·LIST ITEMS, EXCEPT F'OR 0 EOUIP MENT MARKED WITH 0 . J. DELETED

0206 4. DELETED 0106 0101 JOA 5. llllB •••• MAKE BE FORE BR [AL 101 400A I OA 6. THIS FUSE I S NORMALLY REMOVED WHEN NORMAL SOURCE I I IS[[ USED IE. l!llEN 0101 AND OIP OI AR E CLOSED 10 132 ANO! OJNOI . 0202 AND 02POl,02Jl AND 02NO I J. NO TE 61 ~ VWEN ALTERNATE SOURCE I S TO BE USED FUSE MUST BE f RE-INSERT ED PR I OR TO CLOSING SWITCHES 0201 ANO DI P02 {R SOURCE YAR AUX I LIARY SHUTDOWN PANEL SUPPLY CH·I BORATED WATER STORAGE TANi INOICATING LI GHTS SEI SMIC RECORDING SYS. C5764A CO MMUNJCATION SYSTEM B HEA T TRAC ING CAB. Cf P050 BUS YJ I SEE NOTE 71 0 CONTAINMEN T GAS 'H," ANALYZER CH · I BUS YIA O"Nll. ~l!.S'!o NO~D OT>'llR.. ISIL .... A.U,. C)trlD. WlT'°' lit.N 111. "QS. N~~ ,M,TtllUM';.MT•~•O"°' "St"f'!.T~PiA CNU C:-oR R&.'9T1:t.lC.T1cw." sa.a MOTe, 4. OM 'DWG,.. ~-SC'.' !o.1'.LL '-M81<0DEO CONDUIT$ "•OT Pio.RT OP cc-14 i I 0 ~76 -0-"'75

1-•vJ l-4• tL- ~10 1.or·------

3"K>83A.·3"uP To B'!loW,..O!>O SU £•111.7

REFERENCE DWGS. £·3008 E.L..E.C.TAt~llrt.L fUM::1i.'H•"f "-C~UL.t. ;.- 'l01 "'- ;.ROUNOIN.. '£Ti..N01'.R0' f Ot;.T0.11..'!'o £ .3co& IU<:CW'"l 4 c,ltOUNDl'"'t CO..,. ..,N .... "N'T 1)£1"A.1L'i. -+·· 1-'!'o~ 1'1~£-'t 4 ""°UNOINC, CONT"IN,.5.MT t;.l.. !. ('!>lo'>·O) £- 1'111.C£WA.1 - .,_,_,.. ,. co...... ,MT s.1...11 ( S8'!.-o) to-'!'o-""i;. lt.. CllW .. 't 4 C.-MOINC, COMT ..INl•llU•T liL.4 (li011-0) c- 3"7 S.- S49 ~~~~J ~ ~::'u'::~'(. ~.:,~~~~~ ::;.~,._c.;!13-o) ll· '!'olo, 0 li-1170 :~;~;:,ll \~~=~"a.\,:."'r~·~~~.. ~!~J, ~~':,~. ) 1 l.· 37• C."-i.~IC."-l.. P~ ..S,Tq,llTION arr.1tl\Q 'T. CCtotT ...tNtrlis.tN.. l O&TO.ol.... C<>Nt"A.lMMli'.MT ~Lt ('ic.'S-o)

p..1w •ll~ ~L- S

,...'f!I ••. LL· 1'a

P"Pta:L

1:1... 'J~'5·-11~j_-+------~t,~<'. "'; ....:: MARGINAL QUALITY DOCUMENT BEST COPY AVAILABLE

FOR CONT!NU ...TION

SECT ION• B-B· k"'-lt: Vt",1'-d('O"HC.. E·Ui-, I E· 31.<.)

DAVIS-BESSE NUCLEAR POWER STATION RACEWAY ANO GROUNDING CONTAINMENT DETAILS E-362 FIGURE 8.3-31 REVISION 24 JUNE 2004 Removed in Accordance with RIS 2015-17

DAVIS-BESSE NUCLEAR POWER STATION RACEWAYS CONTAltllNT EL. 4 (603) E-366 FIGURE 8.3-32 REVISION 30 OCTOBER 2014 • '1·15•14 IJIW--...CIT I. 'FOii. ll'&tE.TA. ..TtC* TalMt~ llCIK Oll9'1ClN,,,.TK)MS Sll.1i. KCT'~ ~ Ofl .",... l.1oP--.R' 9\.0CM.OU~ ~1. 6C ~ OJl:r ._,,ITt-4 .. CE.L\,l,A,,MI' c,or.E.. "Pl E·JQZ. SHI~ • .S.JIDCl"lllATIMi ~ ax•ft:ll.....a. U1U Falt !.. ANNAJfiA allllCK...... ~- I .. ._...... ,...._,,.,. ,.....n1A,..... ~ ftl.~tCK sea \ ., Dail&. •·14-t ...... !! ., ·.i ;r• ~ .. ;a -- ·.c ...... • ...... s ·= 'o! .. ... :z ...... t : l ~ ! !! .. ·: : '! :: ...... J; ~ 8 I: ·: L • • J > ~ rs ·= oS D u ; .. j _; • • .. .. .i •; J J , .; "'; 1 ..i •_; _; 0 0 ii a 0 0 0 0 0 0 0 u u u v6 8 v u u ~ g 9 u "I • s I I i I I + . .. - " I I I I I I I ~ HNT. .,...... './) ,,_ lfMIM!l'I ~ ..

~1i.TR ...TtON Ro'# & U •• Ge,IO~a·

. ~~.: ... .'..... ,.,, -~~~~~.H-~-+~~~~~~~~~:.~!~ ROW 9

'P'IP'$M REFERENCE OWGS. C.l.~'T9'.t4:A.\. A.""C:E.W"'f ~OU\..~ c.liOJfrilOtwe. t.'tloMOMlD'\o C °''T"''-'Tt &.utc.,.R.tc.N.. t.,."MOMlO' • OG.1'1',\.'S ~~~~ t;:-u:·,~ ~i:.'::"~; ~:~z:~) A.frloe4.'fllA1 - tt."DUNO\.... CONT"4f01..... '1' 5\.. "!' (.•1191') A.llrti.Ctl'ffl\"f f C,,Ali)UftOMt;Qr, CON'l ...\""'-M't' OC.Tflr1U.• ll""C,1&.W"'f If CriRQ\MOlK .. CQtrtT ..\Mlll~'-T G.L.5'.,.;.) S.\,... C.'Ttt.1CJli4, P&.MW....,.A,,"'l'IOM. ~Gi.T. CC»(T...... Mll.N't "'°'!it~ .. :a'?e a Q..C.C.TQ.tclio\. PO'fi.TltA.TlOM DC,T-..i\.."S

••. "4'·:11•;•.·, •.;. ···~'. :. . B

SECTION °A·A \C...._, "•"•1'·0· MARGINAL QUALITY DOCUMENT r---- BEST COPY AVAILABLE \ ..,,. I\

SECTION°B-8° ~'Ji\!1-·(-o"

DAVIS-BESSE NUCLEAR POWER STATION ELECTRICAL PENETRATION ARRANGEMENT SHIELD BLDG E-370 FIQJRE 8.3-33 REVISION 24 JUNE 2004 C0"1i.R E.X.POS.EO NOZZLE E.C~E WITH NEOPR~NE. MOLDING OR APP,Vl::D O:QUAL.

l?aH.IELO eLD~. { t~<.:;t)

TACK WELD CND. SPACER SHEET 'C', WITH ROUNDED FIGURE I CORNERS, TO~ I X I ANGLE. FOR PEN. P2L2C & P1L5W ONLY I

OUTSIDE TERMINAL lllSIDIO BOX mwc. E-377) ..,.R,., eox (.,...... 511o) C.NO. BUS.HIN.c;..S 'LCCKNUTS

NOTES LOC... TIP .~-~;; ·f::':!.":~· -~~:,, 1.. FOR SPA.C.~R SM.EE.TS ti C:.N.0. i\.RRl\NGE.-1 ME.NT • SIU:C SE.E. "'"E.IOTS Z. t 3 ·-·~~: '._ ·. ·,p..: 'T--t----...;;;...... J'"~'" / -.·· .·. '2.. FO~ DETA..ILS or Nol.ZL.E SE..'i:. i 'il~-E.'2.IOA. I Pl:"--'-"f-:Diiior. L 'Zll211Vt -:::!::::::::/' 3.FOR 'BOJC. 51CH11:.DUL.E .j \.DCATION OF / l"CND ~LINER I" CND P~N.ETR.A.T\Ot'll"D ~E.'e. O"INGi,. NO'Sa. v.!:~i,C"lo"L ~....,__, FIEJ.010CXWYEc:T LENciTH __.15" so. E.-"a"JOE.,, E.-"all E.. C.0PPE1\.GRD BUS 01' ND. 4~ CA8L£ 10 6NO !!.E.AL CONDUITS. 4/0AWG 4. ALL WORK B'/ CDNTR.AC T cc-14 TO &.D6 4/0AW& !'U47E (lEt DETAIL SN·3J AND l'.LL !!.PACE.So E~CE. PT A.S. NOTED. TD BLDG- STEEL WITH 4/0 Ll.tt ( ~." /JOLT:J STEEL z. llE.TWE.E.N C.ONDlllT!!. GND~ID IN S.MILLD i.LDC,, Gt.SE.e."' A.MPHE..NOL owc;._ i:,ooo 4(c.C,t. f/El.D n> CONNECT CA8LE--' WALL (1.E.E. NDTE. 7) (E.-ZS-3) FO~ T'iP. PE,NE.TR#)..TIOl\l 10 5P;!Ce.f! fSHEET 'I:·· W/111 l'!lo"'Y· DE.Tl>IL5. 4/0 ux, ( ~- Vz • .&x.73 RJli 7. SEAL SHALL BE I'S SPEOFlED IN 0.C, liofOC.Wew<; OF CND 's, 114'il-E·30ZA SH.- IG 4.4-1i• UlVU VDLlll&E AND IN5TJI, PENETRATIONS RE~lllREll tT~PE Z.~3) IPTE.S CD-1. 8. DETAIL OF BltlCKOJT SPACER 5Hf.ETS ANO GONCUT:!I A:!! SHOWN IN THE SHIELD HLDG. \'\IAU....18 NOT' Afft..ICA6LE TO PeNEfRATION AL~W~Pa.'l.C:.. A ... CCREl:RILL H"'5 BEEN PROVIDED IN5TEAD .. THE 4/0 GRQIMllD C.A~LE SHALL e£ ROUTED DIRECTLY 8ETilrilEEN JIEttETAATDN ~ ans DE BO'll """' THE fit'" c.tlREDRILL. DAVIS-BESSE NUCLEAR PDll:R STATION q, flUIMING :!TRUCTVRE fOR FIRE 15 ATTllCMEl> TO PENETRRT ION NllZLLE FOR PEllE.TRATION P2.CSG.,5EE Wl6, E-1i,,1! AIR l>ETl\ll':> lRE'f', ClllL, C-C.S5-13ol5.00"Z.), ELECTRICAL PENETRATION DETALS IO.FlllllllUE. SfRUClURE FOR ARE WRl\'P' 15 ATTACHED TO PENETRATIDN 11,1'.JZ.Z.LE E·J78BSH. I FDR PENETRATION PIP31hSEE. llWG. E-IZOZ.B FDR ~ETlllLS CRoF. CRLC. C·C55-1!1:1s.OOZ), FIGURE 8.l-34 11. fKJIMING STRUC.lllltE. R>R. Fl"R~ WMI' 15 lllTACltEO .lll PEUETY.l\TIOJJ"1(DZ.2.LE - l'ElllE..TIUITIDU '?il\.'11!., 'SE~ DIN&. E-1,,'1'0 FOil llETAI L.. (RE.f. C.AU:. c.-css-1:1.1 ... 011.), REVISION 29 DECEMBER 2012 DB 6-14-12 DFN•J 1 /RASDGN/E378BSH1 .DGN/CI T NOTE:. ~~ ~ OE.t;IG.N~TE~ CNO. use.o l=oR OTHI:.~ 'IN 10:,E NQIE. D IN t:·l'I~ =·:_,-:_ .., ~~ +--...... i • ":;M2!) • DES.1c.,N1•.;re:S C.NO'S ..... ooe.o Fvl~ P'ENE ;-;-':>f" l'o'\1-'>~.1 "::':> Pl>.L 2."1 1 P~l-IE:; {'t'>L ""~, Pt;L4-E. I PAL.30 Al'lC PC.\..*'H ON\..'f. CNO.<;.PAC.G.~ I PENILTRA.T10N A«;..~~Ml:,L"f ':.HEE.T TYPE.~ _ OES1C,NA.TION~ . Pl PZM,P0P4A, P"P48, Pll.P 2. P PBPS~Pll.P~a. PSP•O, PePso PC.P4N, PC:.P4P, PC PLlq, Pc P <:, N Pc.P'E:.P,PC:.P~ PtC Z. L ,P2.C. ':>C"\,PAC:..1N , PAC ~E. I Pec:i.o,Pec:. 3~PSC 40. PCC.4-T ~C.C.4U PCC4'4 PCC.Sj PCC. SU Pee.~·./ • ' ?tLIL ,PZ.L4C,,P3L45 ,P4LI Cy PAL~0 1 Pi:i..l.'lN,PSL1E. ,P9Ul €. PeL3q,PC::.LZG. PC.LZ.F, PC.\. '?..C, CCL4-W

GAL"-':.TL.CNO. SPAC:.e.R m ?A.P3F' S"E.E.T 3/ 1 to"T'°'IC.K.

.!> ~ ..: ;:.: --t-----1---'1:4"" '° NOTE.: 1.01ME.NSI01'l0:. NOTt:O A A.PP\.."'f TO C:ND SP,::\C. E. R "'::.1-\.@0NL"'/. ?.THQE~ CNO. SPAC.ER ~HE.GTS PC.~ PE.NE. TRATlON ll.~ ONl."'f

DAVIS-BESSE NUCLEAR POWER STATION ELECTRICAL PENETRATION DETAILS CND SPACER SHEET TYPE II CNO SPACER SHEET TYPE ill 7 -1'lz" C.NO. PER ~'S.SY. , _ .,_ .. t.NO. PER. /.'>..~S"'f. ? - 'Z. • CNO. Pe.R A.SS'/ E378B SH. 2 2.- 3" C.NO. ~R ~S.S'f. 3'- 3" C.NO. PE.~ 11.SS."i. -~ "-SS'E..MBLIE'St RGq. I AS'iEM6\. 'f REQ.. FIGURE 8.3-34

REVISION 9 JULY 1989 1~

C.ONTA\NMENT VESSEL.. (EXIST.) (, I If ) ANNULUS SPA.C.E VAAlE~ SilELD 6L.DG. \.2:-to t L.------~(~-4-:-:_-3 -:::-:: -1'0-4~.- WITH ROJNOE.O WELD-NECK FLA.NGE CORNE.Rf>, TO SX\5TlNG lXI .4NGL.E

C.ND &U~HIN~S> f LOC.KOUT~ 10%" OJT&\OE l'ERM\Nt\L. eox (.owe,. E·~nl) 12.''

t/1.£.JVAA CND •. 5PAC£~ SNEE! TYPE J2 2· 45/t/JCND PER ASSY I· 2Yz., ~D PH<. A~Y 4 llSSEM&JES ~ GALV STL ~E£T ~I#" 1HJGK. C..NO SP....CER PE.NETRAT\ON ASSEM8L'( SHE'C.l' TYPE DE5\GNA.110N5 1''C:ND 4/0 AWGtTO NOTES G,ROUND QR.ID \ D\MENSION& NOTED A APPLY ,.o <:,ND.· GPACER SH@ONLY 2. lWO T'\'PE m CNt>. SPACER 5HEl:fS PER 1'14" DIA (TYPE I) 11 PEN'E\AATlON REQUlREO / DIA {TYPE.5 Z~3) 3. '¥ OES\GNATECZ, C.NO USEO FOR GRD. WlRE 11 Y2 0IA (2 PL;:/C£S)

I~ DAVIS-BESSE NUCLEAR POWER STATION

ELECTRICAL PENETRATION DETALS E-3788 SH. 3 f\ E.U> 10 CONNECT lENGlH OF

IIAVIS.BESSE ruCUfrR PO}ER STITIffi Tf,CTIIIT CIBIT SPNEf;DIIG STH rrffiEArfftEEffiE+l c-rsfu:*e-rSLlr) HflrnE t,F55 ' nEustfii 0 JltrY l!l8a ~..... c-=::'°~-~~=·~=~==~·==~== :::.:>~&l!J•• CL a.is·-·• t.___J C.L.Q.IQ.'·CI• .. aC'-CW&t --..,•u~•• !~·ti-~·; a• i!;~~;;_.,· L--.1 ====~=._=_=a=·!>=~=~=· ~-!.~:·~~· s...... a...,. .- =L___J====:::./~ g.L-C.•3·-·· ~-"70 r=: ACI...... '7 ac...... - SECTION }t" p;Cl... 11

r-.....---.,... ~.Gao'•.. &1...c;i;o,·1• ec,.ac.o1 ec.-c::.01 tCll't.I I

r-.....---., KL.. C..W·H:r -..-oc:11 - -r===i--~--....r==:l----lt:.:..-:.oo·

.______, E\-C.IG··a· r--1'1. -·~-.... &Q -'-c:~ .. , SE<;WN.... '8-8· SECIJ2~ ·1 1-1 (

c====J &t.,O.•'·C'9 • .....0 ~ C::CV- 'Tl:) ~I MIC IMYO~ ~T'"'~•C..QSL" C•S..- ~--.I r------. Ct...C1..,.:.c.· c====i I CL..o.c·... o· Ac:.J18rG;1&

Alf;.~MI. &L..c:.•s·-a.· ...... o. c...... a..•···· ~------. §ECTI~ '16-16. SFcrn;ir20-·· -20·

ci.. c;zo·-a• CL..M:...... ,• ~ao··•· .._c==-J_ __.__ _., c===J__ .J r===i aa.... Oa.O'· a• ac.-c.oa

c===-J ltL..C.•"·1~ ( .... ~ .. r===

SfCI!flj ·22-22' S£CT!~.f5-25" r-ai

--~·.s--i ,ec:.-c•• EL. C.2.0'· a· c==-:i &L..c..2'0"·a· C : : s .._......

ac.P~o-r

~i:__c•===·=:::======:::::::=·===::t• •c...... ,.?::J LR~..cJ NOTES SECTl'i?'f28-28' SECTl~,.;30-30. SfCTI~ ·31-31· S£CT!~32 SECTgi33-33. ~·o ... ~ca-~-. IC>l • 32' se£ -·&o:I.- - ... SECT1Qt29 -29· ' ...

L__J 11.1-.oao'r ~a.A ac.,.c:.io C.L-c.aa·.a· L--.J o..-•O"" ...~.,,....,.....,C::==:=:=:=:=:!1!1~·~.c:~-~A~o0~~ ...... :""'."' ..·rF---c:=r II :::::~ •c.l"HC>• .L. ..A.Oa ~.._,_ r--.---... i c==J r==tp ~IO'" &>..aotW·G" c=J a.-'··•&rn

SfCT9!1 °36 :,& ....1 DAVIS-BESSE NUCLEAR POWER STATION RACEWAY CABLE SPREADING ROOM FIRE BARRIER SECTIONS~EM .lY 2 CE-356):..Jt. ~ Sk • i ?) FIGURE 8.3-36 REVISION 0 JULY 1982 ~-·· 5ECT~l!!-4( SECT!~• ·39-39·

5!:::.~ r----1C==L-.c:::.--..1=.c....M==-.==1--__.., AC.eQ•• c:======:::i~,.1:'! ~~r=::i

SE"C!!ON,..... , 45-45.

~~~c:=::::==~ -======~ t...... 01•·.:I ~c:::=:=~~:;. '.,_.... ,..,. ~,. ~~:'tf:=L-...J &t,...••"'P~G· .Gl"ll:lil!lo C.\...C:.tG"·O" l.___J .c:.•c..• AC.'¥&.•• CL.C.uc:;.•.a• ~'E======:::i·~~~··EL. .:..•·-o.· '---..J c======::::::i~~~·· A£.~ ....

SECTOJ 49 -49. SECTION Ll8·48· lb!GI CC·~

c:=====:i..--~c::=:::i ~--

.. ll"Otll AOCll'l"llOl.6'I.. ..orc. A..o ~ o...iec.c ...... &-...- ..... ,. ar..,.~.,...... ,c~..,~~ .§P ..,...... ,,..,...,TM&...... ~ v-· '""ID& aT.-...A..,&...... &C"" ~ T..J..CO...... ,..~Cialro.IWCI:,...,, CEIUM; ATTACHMENT .... T'• CClflC. TlltA.V CCl'WClll ~ .a,,...·~ ~co ~c.9 T'mA"t" C~ ~ •e C..WT'(al nLET _. ""~- Oli.IC.C•) r--. •T'Cll9 ..~rOllll~~T(el r&.CTOI~ ~~ A. tk.A.D um-~ •• .,...., ~·-~~c...-..aw """''""' T1114V C'O'V&.. ...,._,.Aii&..l.CD a. ....c&T ~...... _ c.a-N a& r....aT&N&.D -.a.~... ,. ....~ ...... , e. CUT ca.Ir •l'C.Cr ~ .._ ~~o~ ..,..,...... ~...,... ~ ...9'C&a °" ~- °"'...... C.J/AJIO c...... _•'-""""~o ...... _. ...~VITM~~. &.IWLAT&.O M.C.TIOll OJ' CA&L.& TaAY H.&.Y M.. U~D N UC.U O' 1.TANIOAAO TRA"r COi/Ulli, ~) ElEVAT!OO: EX!ST!!\G TRAY S!.JFffiRJ

--~...... , .. ~ -,..,.,,,,., ·~ZONTAL "VERTICAL ....,,.,... ur...... c."'~ ~ ,,,.,.. -·-,.e.q·q wO'f& • BEM:> IE-0 ..,&...... ('TV... , '

a•,_ ...... • 1 .... ""'-CM...... , DAVIS-BESSE NUCLEAR POWER STATION ~ ,9M&&T.....,.._.... RACEWAY CABLE SPREADING ROOM TYPyCAL OETAILtSMiP M~IA!. fll§TALLATION FIRE BARRIER SECTIONS~\ ( Rf& s -a ~ TYPICAL CU~ TRA;L

CHA~~~L. A (B)

.se:.E. ~OTC. 3 \ c;;."' OR ~~.. 1 ------___ \.___ ------MO~E.. 5=-=- ~c_:r:_~t__- - --·------

CHA..~~E.L- a (1) / Cl-IA"-J....iE.1- 2 (I ) /

~OTE.S: LE.C3E.tiJO :

I. ALLTR.AYS .b....RE.. SOLIO BOTTOM. a. F"IRE.. SARRIE.~S E:.XTE.t-JC , ..... ee:yo~c E.AC.H SIOE. Or C:F

3. 9ARRIE..R f=)~OVIC>EC-SE:.~~TIOt-J OAVISBESSE NUCLEAR POWER STATION C.R•TE..R•A F'OR ~E.CUt-..JCAfl-JT CLASS :C..E. CRITERIA FOR INTERPOSING TP.A YS TRAYS ~OT MET. FIRE HAZARD 4. BARRIE.~ ~ROVIOE:.C F'OR SE.f=)A.~ATIOt-J FIGURE 8.3-38 SE.T~E.E...IJ A(e) A.~O a(a) NOT E.SSE.."'T•AL.. A~O E..SSE.~IAL- 2.. REVISION 0 JULY 1982 A.A.C:E\..twlA.V CHA.~.._..E.L- SE:F=As::ii>ATIO~ N:.TIQN A£~'C(SE1.-E.CI Qt-..JE:) NOTES l c::o ...... ~1c;.uF:eATte:::XtJ FeAC..E:.'--'A.,... OISTA>-.JCe:. ·o· !TRAY SMELT SE.lF•G- de,.•Gt- ' )( Y ( tklCt-tE: 5') CA:;:>VEJ=t MAT\..... 8. 3-39 B. 3-39

F"I~ e-"R-=;,te:..t==ts A~e:. ~OT RE.QUt~E:.O I C!.. 3 .. A 1'' OR 1....E..~~ I '· Se:.T\,.y"E.e::..t-J T\JC> (2) RACE:.'-l"AVS CC>"-JT~t t-...J t "-JG CL.A..~S, a 1,3.. 4 :C.lii:. c:AB' ES OS:- ;HE. SAME.. C.t-tA1'.J._..E:.L A~O SE.- I, a..a. _J_. T"""'E..E.~ R>CE.~A.,,.-.5 ~rAt ~I~~ r--..J Ot....J - C.L-ASS:, J: E:. = t..a, s .. . . c::ASL....E.S.

1 2 I Z."" lh.J AC.TIOU ~E.c;:>u1F;E..O ~0'-' ..JM'-..J •t-...JOIC:.ATES> A =· SA.~ s::c.a e:.. s=. '""STA. "-"-e:..c:; AT A....._.....,... F='Ot ~ '"'i I r-....J Tt-t E:. SF=.AC.E.. eE.T"'-'E.E.t...J R.A.C:.E..~A..,.... 5 Xi, -r: A >JO '.Jt. V RE:.Sl=E.C:.T1 VE..L..Y. """'HE~ THE. F=E:.FU=E.>.JCtC.\..J'-.AI=< 01sr~<:::E. r S lt-..J ~E•'"-'E.l=t ==· A 1-iC.':FllilO~.._._ ~~ A t/E:.ATIC:.A\.... t='-A.~E..."' THE.. CISTAJitJC.E. 15 OIV'IC>E:O l~TO •TS t-IORtiii!.Oh..JTA..\.- A'-JC v£RT1C:.A\- CQMF=Ot...JEtit.JT.S. F'tRE.. 6ARR\El=lt.S ARE. t=Ds:a:::;)Vace:o ~E.'.a-..J A"-JA\...YSIS OF' BOT\'-i C::OMPO~e:".J'=­ ~~u•RE. A F'll'~E.. BARF=illE.t=t...

4. ~HE..l=lE MU&.-Ttll=>L..E. R~E'WAY.S E:..XIST 11'...I Cu::>SE.. PROXJMITV -ro E:..AC...H OTHE..F=t., E.AC.H ~A..l~ C:OMBl..._,- ATtC>tJ JS A-JJAl...Yze:c SH&:.:e:.:r MA"rE:..~IAL... tS MJ~IM 'M •/e 11-flC..tir AS6E..$:"':"c:::>.$- rREE.. MARIN ITE.. 1 xQ QY •,.3,' sE.E. "-JoTE. • co. SS:.FD~ATICN fllll:f~W•~e::,."1&:~"'MiiD F'OR Tl-IE.. Et-.IC:.l....OS.£0 2 I, .:S., 4 I' Pf~, Ml,__,IMUM F=ilAC.S:.~V"- C:O""-ITA_,U.. ..J l~G sr=-~Fu=~s l~COt--.J. CAS\...E..S 3 I, 2., 4 5£.fDA.RA.T'1t::HJ (11="AE.F•X.E:.O ·=~••, 14,,E!!!>,,2.4_.34).ARE. Tt-tE:. AJS 4 c•aTA~CE.) av &A,....,r::.. ~ •.. a,, :e r::'"OR TME. ~UME.RlC.A.\- X,Y C:MAt-...lt-JE.1- C..c:>M&. 7. Tr:tiA"Y C.QVE.lllt ""-"ILL BE- A"-'Y Ct-...JE.. OR A,)...J'Y C.Ot-16 ~YMBOLS___ OF" THE. FOL...L~lt-...JC:.. : A) SC'-IC M&:..TAL..1-IC:. TRA.V C:.OV"E.R B) 51-1&:.E.T MATERIA...t.... C) THERMAL.. lft..J5·U'-ATl...._.C::. BL....At-.JK.E..T .,_____ r e . ~ME.~E.. ~OtJ~C:.L...~S %£. ~YS IUTE..J=tl='O!SE.C E\ETW'E.E.ti..J t=tE.OLJ"-'~'--.1,- C:.L...ASS :CE. ~AYS.,, Tt-1E. I SE.PARATIO~ F=c~UtRE.'"'1E..~S SS:.T'WE~ Of='E.t-J- 1 r -rcs= r::t.E..Cu~OAJ-JT C::'-ASS ::C.E.. ll=:tA.VSD ~ ...... ~CT eE.. a...s:..ss -ra-tA..t-J A.a.. v1::.RT•c:.AL..1.....v At-...10 ua-r 1-10R1a. I TME.t=ltMAL- UJSUL-ATl.._.Clt MATL. Ot=- Sl1-ICO"-'E. I Ml~IMUH SE.P~AA.TIC»-J CIST.A..~E.. .. 0£..TE.FtMtWE..'O r='"QAN ,..._, SP..AC..E. BE..T~E..E.1'.J FtA.CE..W'A.Y-S s. = ev TE:!!>T A"-JC At.JJ/!ll..\.."'T'&1$. IF' Le:.&S Tt-t~ Mlt...JIMUM I 1 xtt v SE..£. AC.TI 1. RE:.C C:.OL.Ur-n... l. If cu-..; ;:;c&:(ltU i : DAVIS-BESSE NUCLEAR POWER STATION ...... E..RMAL. l~SUL...ATl ...... MATt-,. OR Ot..JE. C'.it .sn_u::.. RACEWAY SEPARATION CRITERIA ~ F=llACE~AY.S ~O/c:::>A i 1>--JSIOC X Y FIRE HAZARD J FIGURE 8. 3-39 REVISION 9 JULY 1989 IJ :i ~A.C.E.~Y C.~ti.JE.LSC:.PAAAT•O~ ,IC.Taot-J REA:C'O (SE'-£c:T c:»J£) RA.C'.E:..'--'AV C:HAJJtJE.L SE.~f'AT'f.O,_. ~IOtJ R£q'O(SFI ECT ONllt) -.- ~F'ICitUAATIQlt.~~--~AV CUST~C:E.. c'· T. __-,. •Mtwt.:"1 '!!SE~FiG lslEJ'w:;. '--Ot...JFl~URATIC>tJR~E"'-'A~ CIS&T~E.·o.. fliiifA'T ~-~:mil FIG slE~G. X V (ttJCl-tES) ~R MATt-. 8.3-39 B.3-39 )(' y (t~C.t-tESJ COVE~ t-'IAT"L... B.3-39 8.3-39 )( I i!., .3, 4 (s.E.E.. t-..JOTE. 9 I a .. .s. .a. >ICJDTA..._,C:.IE.) 41-..--- ! l_ 1,a.. :s x-.v i! 0, t I m.. c. xev z 0 a A,C:. )(-V ii y 3 &,C::. xetv "i! 4 A .. C:. l_ Xfjt. y i! I i!~ 3,4 XI/. V i! a I., 3., 4 •z ><¢V a 3 •.. ~4 ii >< 2 1,,.3,4 a .:a 1,e.,4 i!. 4 ia,..a i!. ,- .. _ox ~·- lYf A 2,4 'X ii!. a I, 3 x C:. I, C!,S,4 )( •.. 1 x r v I ae.,a, 4 )( '& 1>< I - -o-· e. •.. 3'4 x 1!. .?!» l,i!.,4 x i! Ll.... -v~r ~ 4 1,c;e ')( z

~ . A 2!,4 '1" z - - e I., S, 4 . • ./ ./ Q I 1,3,4 v I - ( "': j 2 i!. 3 1, a,4 ./ v - - - • ./ 3 1,2!.4 z - 4 1, a,a • ..,, t/ ~ - 0 i - Q 1,a,.a &. - - y • p v i """' I I l e, c:. v - - I!. A .. C:. v •z - - 3 IB,C: v z - 4 A .. C::. _I_ v 'Z - IBJ - - j I e,~,4 ,/ ../ ,, 3,, 4 _.-~l~&S - Ct - • .I' / )( 3 1, a, .s.. • ./ .,/ I 2,31.,4 ..c.. v - - ... - - -4 •ta, a • ./ ,/ () - 2 J, S.4 v ii - - u j • • 3 1,1!.4 v iL v I - - 4 I, 2,3 v 1IE. - - 0 \ u I v I I a,c. v z - - e A.C: v ... - - 3 e.c:. 'I" a - - .... A,C. _I_ v - - .. : DAVIS-8ESSE NUCLEAR POWER STATION RACEWAY SIPARATION CTITIR&A FIRE HAZAN> FIGURE B. 3-4' I REVISION 9 ...vt...Y 1989 RAc:.£."-'.A."-.' CM At-..Jt...JE. '- SSE.PA~ATIO.._., N:.T 1otu "Eac f51£1 ECT I ) r=t~C:.E. ~A.Y' ~FIGUFl,,-l~ .. C>t&T~E (tltJ.) TAAY SHE.Er l'ffr'f' wr- .f'e ~IC& ~ )C v .,..._ ..'E.t:I - Ca Oa ~- MAT't... B.3-39 8.3-39

~ I )( I e,3,4 A.e,c '84' <.ICD• '(' Z, z.• I I I 2 1.,3,4 A.,S.,C: - - ~ 3 I., 2!.~ 4 ~e.c:. 4 1,a.~ ~e,,c:. i y J3

I a,~4 A.,B,C:. ,z4· <.41!... v a ... :9.14 •••• - - 1w 1 3 I, 2.,4 "•c:A._B,C: 4 r·1x I 1,2,,5 A,,~C:. ,. 0 y I { J : (

I -.~.4 ~e,c: ~ <.4C. .. v z.,a· 2 I. 3, 4.1 A..,1!5, c:: - - 3 I, 2 4 A..e.. c::. er\ 4 11 ~a .Ai...B,c:. I t 5:: J Qt

.'

DAVl&BESSE NUCLEAR POWER STATION RACEWAY SEPARATION CRITERIA FIRE HAZARD FIGURE B. 3 .. 42 REVISION 9 ~y 1989 &AlltPtt e:.Fllt ,-M~A.1.- 1)..JS.U\...A.TI~ MATll:Jlt&AJ....

VE.llllTIC:..AL.. SE.PAA/!1111.TICt-J '-l!EJE.S THAt-J RID:il\..Jlflll!:.O auT Citllt~TEl=l Tt-t4'~ I"' (SEE FIGa. I 8. 3-4 I &42 FOR SEPA.lltATIOU C:.P=tl TEflltt A.)

El E:~TIQ"-1 :

f

(

PIO&tJT' ~l-llC.-E. AFl==tCF ktATE.. SE.PAJ=t.A:r10U C:R1TE.11t11ta.. ca M ..T. .SMEE.I MA.T"EFllAL.. £.)(TEJJC TO A l='Ott-JT ~MIC.PIE. EL.E.VA.Tla.J: A•~& L..E.L... fltUi-J ~OPR\Aai...TE. SE.~RA.TlO._._. CflltllE...RIA 19' ME..T.

DAVJS..BESSE NUCLEAR POWER STATION Ir FIRE BARRIER DETAILS FIGURE B.3-43 REVISION 9 JULY 1989 THEJltMAL.. l~SUL.ATl~Gt ( ( MA.Tl!JlllAL.

1-CRIBO~TAL- .51it.M 0 .RATI~ L F'S. TKA.tJ "'IE.GIUlllllE.C SUT Clt-S: ATE.A TM~ I~ (SEE. FIQ. 8 . 3 - 4 0 &4 2 FOll'll. .s&fDA.N~TCU s CRITll.Jlt\A.~ . ~· -- <

~ - ~ - " - ··~ SME.E.T MATE-AIAL.. E.>C.TiE.J-..1 - COVEJlltS B:.)(TE.tJO TO A IC A POI~ ~HE.lllliL -ID019'..rr ~MEJlllE. A..P9f=fl'OPAI --=-· A.fDf9AOPf=tl~ Sl!:PAAATIO~ .SE.fDAF=tATIC»tJ C.,_l ,-E.RlA IS ME.-r. C:tllla,TE.11111.Ai.. IS M&..,..

..______,I ~ ...I _ __.I

·-· ·~-- ·---- :.-~.·------~' .. - - . {'""';· -~- .·

ca) I

l (I) I DAVIS-BESSE NUCLEAR POWER STATION FIRE BARRIER DETAILS llJr ~1111111:.C ~Hlt.JIJ (t) IS FIGURE 8 .. 3-44 C:L....A.SS %&:. CR ~u-c• .__ :CE. At-JC(&) IS R~~~ REVISION 9 C:L...AAS :Z:E.. JULY 1989 'EL.IC.V~TIOIJ TMSC.RMAt.... ltJSUL..ATIUO. M ...TE.lltl~L-

VEJ=fTIC:.""'- Qpt H~I ac>tJT'AL. SIC~~TICt-..a 1• OR \-IC..S (SEE. FIO.. 8. 3-39, 40, 41, &42 FCR SE.~.._TIOtJ C:.flflT£11t1A.) D '~1 ,...------~·-~j. •- AIDPAQ)(.y~· '-II-IE.AMAL. lflJSUL..ATl~ca. '-J'OOL.. l~.S'T"A'-'-E.C TO A. SME.lt.T MATE.RIAL- £.)('TE.t--105 ~OltJi- ~E.P:llE. A.PPFtOt=tPllPl.A:rE,. TC A ~QI~ "1./ME.RE. SILfD~flilA.TtOt...J CRtTE..R\A. lS APf:=tlliO,.~I A.TE. 5EPAJlllATI~ AE~·c. ft-.J Ct:l1IE.RIA IS ME.T. MET. OtJE. R.AC.E..WA: 09'i...U... ¥ \N't-flE.ti-1 IDJ~SUL...A­ Tt O~ A.SSUw=t.EC>. CTMICA- '--tl&E. Sc:>TM ,.AC.~& F'11. • ..rr:.c. D Sl-llE.E.T MATE..l=ttA.L. 11tEc;u1R D I~ 0"-JE. flllt 4 C:£~--t' Ch.J'-V. L-OCA.TJC>~ QE.f=IE>JC~T QflJ .::;~.~- ~. .SA*CF f .. .

&IL..1 c:.cu~.J E.

DAVl&BESSE NUCLEAR POWER STATION FIRE BARRIER DETAILS FIGURE 8 . 3 - 4 5

REVISION 9 JULY 1989 FROM MCC EI/A FROM MCC EI ID FROM MCC EI 2A DEVICE DESCRIP TION FUNCTION DSC I PN, DBC IP, OBC IN

A OC AMIUER. 4.5" SO. TYPE, IY. ACCY. SCALE 800-0·BOOA I NDICATION DEV ICE DESCRIPTION FUNCTION DBCIPN OBCIN ~Bf ~~R..!_ ~~~G,!!. --·-·-·-·-,DBCIP ·-·-·---·.., Al DC AMMEfER BD0·0·800A IND I CATION A1 oc AMMETER D·800A IOIGllALI IAJOI) SEE REF. owe. ITA8LE II INDICAT ION ·-·-·-·-·, I Al OC AMMETER O·SOOA I ANALOG I INOICATI ON I v VOLTMETER DISPLAY FOR GE TYPE 196 METER RELAY INDICATION V2 OC VOLTIUER 0·150V IVlOll SEE REF. DWG. llABLE 11 INDICATION ! VI O·I mA AMMETER WITH SCALE READING 0·300V INDICATION 27-1 UNOERVOLTAl;E RELAY IXJIJI SE[ REF . owe. llABLE I I ALARM 21 ·2 UNDERVOLTAGE RELAY 10091 SE( REF. OWG. ITABL E I I ALARM SHUNT I SOmV, BOOA IGJOll SEE REF. owe . I TABLE I I SHUNT 1 rn onw. 800A 1Gl021 SH REF. OWG.

SH~T IOOmV, 800A

! I ______J ______j -·---·---· ·-·-·-·-·J DC MCC I rAREA 6, ELEV . 603' -0")

·a· NOT ·o· •mvoc SOOA N [UT~A L NEUTRAL SODA

NDT "O" "Q"

RCP BACKUP OIL LIFT PMP 1-1 2 500 KCMIL :_ 2-:;;.KCMIL 7 'O' NOT "O' :_ 2·:::AKCMIL7 400A~ 400A IOOA BOA 400A~ NO ::~.2 0101 0101 +---c~:n~, 0112 ·125 voe BATTERY CH ARGER •115 voe •115 voe DI 11 D5TE I DBCIPN DISTRIBUTION DISTRIBUTION I DISTRIBUTION 1-3/C No . 2 AWG PNL DIP PNL 02P EMER LIG Pill DIN XFER SWO< 3 ·o· NOT ·a· 2 500 KCMIL 1~1/CNo .210 2&1/CNo .110 200A 400A JOOA 200A 400A +- +- NO ~ Oltlli 0128+- 0145 Dill HPI PUMP I ·I •11s voe INV YVA 01ll DI 15 01 18 · 125 voe - 125 voe DC LUBE OIL PUMP TO MCC DIPA MCC DINA DISTRIBUTION RCP BACKUP MFPT I T·C EMER l lHISSHT. I PNL 02N I THI S SHI. I OIL LIFT EICR BRG BRC OI L Pfol' PMP 2·2 OIL PMP ·o· NOT ·a· ·o· NOT ·o· ·a· NOT ·o·

FROM OISTRIBUTION ---~ PANEL YAR • STA BATTERY IN

FROM OC MCC DI FROM OC HCC DI 101281 THIS SHI. IOI 451 THIS SHI. • INVERTER WITH INTEGRAL SUTIC .-"---. .-"---. TRANSFER SWITCH NOTES: I. DELETED •125 voe 2. ALL THE POWER DISCONNECT SWITCHES IN OC MCCI ARE MOLDED NEUTRAL NEUTRAL YVA CASE MCN·AUTOMAT IC BREAKERS . CONllNOUSLY RAllU AS SHOWN. l. 'O'/NOT 'O' BOUNDARIES ONLY APPLY TO 500A FUSES ANO FUSES CONNECTED TO NEUTRAL BUS. DAVIS-BESSE NUCLEAR POWER STATION • SU BATTERY IP 4. ADDITIONAL NOTES I EE D•G. E·5,SH. I. I. THI S ORAVING DEP I CTS THE RELOTIVE PHYSICAL LAYOJT Of THE MCC . G. THE DISCONNECT DEVICE FOR THE TURBINE GENERATOR EMERGENCY BEARI NG OIL PUMP !01161 IS A MAGNE TIC BR[AlER OIU WES llNGHOOSE I 25/250V DC MCC No. I (ESSEN TI All TYP£ HKA RATED 215170 AMPS. TO OISTRIBUflDN DIOl DI08 DIJS PANEL YAU ONE LINE DIAGRAM AFPI OISCH TO SCI AfPTI MN SIM IN ISO VLV SYMBOLS: CORNER ~ SHIPPING SPLIT • REMOTE EQUIPMENT NOT TD BE FURNISHED •S PAR T OF E-6SH. 3 TRANSi TI ON r THE MCC CONTRACT. SECTTON ·------~~-~~~ FIGURE 8.3-46 SHIPPING 5PLIT ---1--1---.,..----~...... -~__...-..__. DC MCC D IPA DC MCC DINA I AREA 6. lLEV .603 ' ·O" I ! AREA 6, £LEV.6Dl' ·O'I REVISION 31 KEY PLAN >·~· OCTOBER 20lt> DC MCC I

DB 03-17-16 DFN=I:/ELEC/EGSH 3. 0GN FRO M MCC FI 2A FROM MCC F 11 0 FRO M MCC F I 2A DEVICE DESCRIPTION FUNC TI ON DBCZPN DBC 2P OBC2N ... A DC AMMHER, 4.5 ' SO. TYPE, fl ACCY . SCALE BDD - 0-SOOA INDICATION DEV ICE DESCRI PTI ON FUNCTI ON OOCZN I BATTERY C'ARCER OB C2PN •_B~~ ~R_::. ~~~~R - •-·---·-·-- BA IT ERY CHrnCER ----·---·-,DBC:?P -·-·-·-·-· --·-·-·-·-, Al DC AMMETER B00-0 -BOOA IHOICATI Oll A2 oc AtoM:T ER 0- BOO A IO I GI TALI IAJO l l SEE REF. owe. !TABLE ll IND I CATION --·------, I A3 DC AWHER 0-800A IANALIJGI I NOlCATI Oll v VOL !METER DI SPLAY FOR GE IYPE 1% METER RELAY IHOICATION V2 DC VOL TMETER 0- 150V I VJ Ol l SEE REF. OWG. !TABLE ll IND ICATION VI 0-1 •A Al+IETER WITH SCAL E READI NG 0-300V I NDICATION 17-1 UNOERVOLTAGE REL AY I X3131 SEE REF . owe . !TABLE ll ALA RM H~ 27-2 UNDERVOLTAGE RELAY IX3091 SEE REF. DWG. IHBLE ll ALARM H~ H~i SHUNT I 50rnV , 800A I GJOI I SEE RH. DWG. I TABL E I l '-''-"' Uu ~~ rv "" ~ ...... SHUNT 2 IOOrnV, BOOA IGJ0 21 SEE REF. owe. !TABLE ll ~ GE lYPE 1% MEIER RELAY . SEE RELAY SETllNG ~ANUA L VOL. I lAB JD, SH. 202 FOR SElPOJNlS ALARM •Ir Al

·o· NOT ·o·

+125 voe 50 0~ NEUIRAL - I NEU TRAL I SOOA - 121 voe 1-J/( N~- ·a· NO! ·a· No. 6 AWC PBP50 JA IOOA B~ I OOA GOA 2 I ' Q' ' O' V 715 ~- NOT ~. .._ ...... ,__ k~ T--iCn-1 10 ., ...... ,__ kt-~ - ~10V ~ f-<~ l -No.; k~ MP0712 v 211s ~c f-

FROM DIS TR IBU TION ----~ PANEL Y8R 1 STA BATTERY 2N

_.__ e INVERTER WITH _._ INTEGRAL STA TI C ---- TRANSFE R SWITCH _.__ ------YVB

e >U BA TTER---Y 2P DAVIS-BESSE NUCLEAR PO WER STATION l25/250V DC MCC No . 2 (ESSENTIALl fO OISTRI BUT ION PANEL YBU ONE LINE DIAG RAM NOT£S : r SHIPPING SPLITS l l. DEL ETED E-6 SH. 4

2. All !HE POWER OISCONHECT SWl l CHES IN DC MCC1 ARE MOLDED I I I I I CASE NON-AUlOMAllC BREAK ERS, CONllNO USL Y RA IED AS SHOWN. FI GURE 8.3-4 7 J. ADDITIONAL NO TES SEE OWG. E-5 , SH. I. KEY PLAN 4. 'O ' /NQT "O' BOUNDAR I ES ONLY APPLY 10 500A FUSES. AND FUSES CONNECTED TO NEUTR AL BUS. DC MCC 2 REVISION 31 5. THIS DRAW I NG DEPICTS lHE RELATIVE PH YSICAL LAYOUT Of THE ICC. SYMBOLS: OCTOBER 201 5 * REMO TE EOUIPMENl NOT TO BE FURNISHED AS PARI OF THE MCC CONTRACT.

DB 03 - 17-16 DfN= [: /[LEC/E6SH4 .DGN 6·"2 AWG F- ICC EUC EXTENSION

J•SOO kCtll L FROM 410¥ BUS El DWG.E •4, SH. I ICC EIZC EXTENSION ICM. I I _.,.__,.,__ NCC £120 fCM•IJ ICC Et&A fCH. I I NCC £1111 fCH.t I PLUED ___ _ EXISTING ICC EIZC DWG.£·&, SH.1 NOTE S 190115 IXUOI I 100A TOA ~:...__...._....,. 150115 101021 "Cl" NOT"G" +- __ +-~--~-- t-'-D--- JOA IA I~ IEl210 TO NCC El20 -r-,..._ , STA.VENT. +- '--ii----1~ •... 8El61J m!"~~"llf.~~iA 8Et2tM MFU401 1SOl15 tR 150115 ~sft"u 110115._,...__ ...,.. ___ SPARE BACK IP SEAV WTR PU .. STRAINER +-~;.._ ____ sPARE ~o;-1 f--sPARE +- 400 8E

D

I INTAKE STRUCTURE.EL 57&• 1 INTAkE STRUCTURE.EL STI' UREA 6, EL 62:S 0 RM SU J FIRE PUW ROOlll FIRE PIN' ROOlll

J•SOO lClllL F- 4- BUS Ft OlfG, E•4, SH.2 MCC FHA fCH.21 lllCC FtU ICH.2J

150/IS USJ021 150/JO +-~---'--+- ~~'----- SPARE BFIU2 SU.VENT. IF1603 1so11s 1!0'115 IR~ :C~s=• 150/JO IL ...~---I .7 +-~----- sPAAE +-~---I i____/jO\ lf'1616 BFIUJ •oo BF'12tt ~ BYPASS YL Y IN 4001250 f-~'----- THE llUJ2 NINIFLOW 150130 tL SEAV WTR POW LINE ~'----- BFl&OI ~ SPAR£ VENT FAN :S BFl620... FROM llCC F16A +- ----1 f--- TO MCC F118 BFl608 150140 ...~;..._ ___ _ ISO/IS 1501301~ 150115 tR BFtUS +-~'---'--"" SPARE f-~---I r--'1!J ._,...---I 1--G! BFl2J5 llCHCM BFl617 . llYJ)'{IO BFllOI RC -EIP PIN' 150140 SERY lfTA PUMP ._,...;__ 1501100 JL 150/30 1L I Yl:NT FAN 4 SUCTION VAL YE ___ _ 750115 I XJ703 I ~ BFIU4 ._,...---I f-- SPARE f- --j f-- SPARE f-~ CONSTANT BFllO& YCL TAGE BFt602 SF'ta10 cnn. ATMOSPHERE TRANS· RAO.-. RE4597BA FORNER XY2

150115 1L 150/30 1L ._,...----11--- SPARE +-~----1 f--- SPARE 8F'1111 IF'1107 DAVIS-BESSE NUCLEAR POWER STATION 480V AC MCC (ESSENTIAL) I INTAKE STRUCTURE,EL.576' UREA 6, EL• &01•, All 4211 UREA I, EL. HJ•, RM SOOI SERV WTR PU• ROOM t ONE LINE DIAGRAM E-6 SH. 5 FIGURE 8.3-48 REVISION 30 OCTOBER 2014

II 01-15·14 llFN•lllELECIE&SllS.11111