STANDARD TEMPLATE

STANDARD TEMPLATE FOR EVALUATION OF ALL PROJECTS/ ACTIVITIES

Information to be furnished by the project S. No. Information required proponent Name of the project or activity Proposed Mining for Sri. S N Manohar 1. – Colour Granite Quarry 2. Name of the organization/owner Sri. S N Manohar Address for communication D. No. 704, 5th Cross, 3rd Phase, 3rd Block, 3. Kempegowda Layout, Banashankari 3rd Stage, - 560085, Karnataka 4. Telephone numbers 9849132789 5. Email id of the organization or contact person [email protected] Location of the proposed project or activity Sy. No. 269 Bidupalli Village, 6. Puttaparthy Mandal, District, 7. Appraisal category (b2 or b1) Category ‘B’ (B2) Nearest habitation and distance from the project 8. Bidupalli is the nearest village – 2.40 km (NW) or activity 9. Installed capacity / production capacities 2160 Cu.m per Annum Specify the fuel (coal / CNG / biomass/others) Diesel based machinery will be used during quarry 10. and quantity required operations. 300 liters of diesel will be used per day Details of land use/land cover Present land use will be changed with commencement 11. of mining activities. Occupancy, ownership of the land in which the activity is proposed: 12. (government land / private land / forest land Government Land /revenue land /temple land /leased land/ land belongs to other department) If it is a forest land, the following details shall be furnished: (Whether it is a reserved forest / protected forest/demarcated forest/ national parks/ 13. sanctuaries/ any land in possession of forest Not applicable department.) (The village map with Sy. No. Indicating nearest forest boundary line from the site shall be enclosed) 14. Total investment of the project/activity. 50 Lakhs A. Funds allocated for EMP (capital cost and 6.39 Lakhs (capital) recurring cost per annum) 2.32 Lakhs (recurring cost per annum) Brief description of the project with special Air Environment and Pollution Control Measures reference to specific pollution and its control During mining operations fugitive dust emissions will 15. measures. be generated. Control devices such as water sprinklers and covering drill with cloth will reduce the generation of dust. Regular maintenance of vehicles, machinery and DG set shall be carried out in order to minimize the

1 emissions. All overburden dumps shall be stabilized with legumes and grass to prevent the erosion of soil and arrest the dust emission during windy days

Noise Environment and Pollution Control Measures Noise levels may be increased during operations and these will be controlled with ears protection/use of latest noise controlled equipment.

All vehicles and machinery will be properly lubricated and maintained regularly.

Vibrations level during blasting operations and these will be minimized by using low explosives and low quantities. The vibrations may not be caused due to shot hole drilling and since the operations are only for short duration. The impact will be negligible.

Water Environment and Pollution Control Measures Garland drains with sedimentation pits will be provided all along the working pit.

Pumps of adequate capacity shall be installed to lift the accumulated rain water.

Good sanitation facilities (toilets with septic tank followed by soak pits) shall be provided and maintained for good hygienic conditions.

Land Environment and Pollution Control Measures Soil can be utilized for reclamation of degraded area.

Weathered rock if it is sufficiently soft and devoid of rock fragments can be utilized for roads, filling of road side ditches, formation of approach roads to quarries, construction works etc.

The mined out pit will be backfilled, drainage development, spreading, fertilization of soil, leveling and greenbelt will be developed all along the approach roads of mining lease area.

The spillages form fuelling of machinery shall be avoided and in case of any spillage the same shall be handled properly. 16. Compliance report on the following : A. Status of compliance of the conditions and Present proposal is for Environmental Clearance. environmental safeguards stipulated in the

2 earlier clearance letters. B. Details of the court cases, if any, pending in any court of law against the project as well as any No court case is pending against the proposed project directions passed by the court relating to the project directly or indirectly. C. Details of the notices, if any, given to the project under section 5 of the environmental No (protection) act, 1986 and section 18 of the air (prevention & control of pollution) act, 1981. 17. Whether the project attracts the provisions laid under the OM dt.16.11.2010 issued by the MoE No & F, GOI, w.r.t. Violation of EIA notification, 2006 and its amendments there of ? (yes / no) 18. Present stage and status of the project : Existing mine 19. Name of the consultant: M/s. Sri Sai Manasa Nature Tech Private Limited

3

Colour Granite of Sri. S. N Manohar Sy. No. 269, Bidupalli Village, Puttaparthi Mandal, , Andhra Pradesh

Brief Summary Sri. S N Manohar is a private Lessee having past 5 years experience in granite business and vast experience in quarry. The proposed Colour Granite mine is located in Sy. No. 269 of Bidupalli Village, Puttaparthi Mandal, Anantapur District, Andhra Pradesh over an area of 3.00 Hectares. The Asst. Director of Mines & Geology; vide Notice No. 266/Q2/CG/2008 dated 18-02- 2010 asked the applicant to submit Mining plan. The Director of Mines & Geology; Hyderabad vide Notice No. 6984/R4-1

The mining lease area of 3.00 Hectares opencast manual mining is followed and it has been proposed to produce approximately 2160 Cu. m/ Annum of Colour Granite. The nearest habitation, Bidupalli is located at a distance of 2.40 km due NW from lease area. About total 51 workers are going to be engaged for at least 300 days in a year for loading Colour granite in to trucks / tractors/ tippers. The mining lease area falls in Survey of India Topo sheet No. 57 F/16. Sri Sathya Sai Railway Station is about 6.79 km due NW. Sri Sathya Sai Airport is about 5.81 km due N from lease area. Seaport is about 293.65 km due SE from lease area.

The Geo Co-ordinates of the mine lease are: S. No. Latitude Longitude 1. 14° 06' 24.12"N 77° 47' 24.02"E 2. 14° 06' 23.00"N 77° 47' 24.00"E 3. 14° 06' 24.42"N 77° 47' 25.29"E 4. 14° 06' 22.93"N 77° 47' 25.20"E

The lease area is a plain terrain. The area is devoid of any forest or tree cover. It comprises shrubs only. The presence of reptiles and other minor wild life’s rabbits, field rats etc., no major wild life exists in this area . There are two pits, one on the South-Eastern side and another on North West side of the Q.L. area. The total production of so far mining from beginning of quarry is 243 Cu. m and 972 Cu. m of waste material generated. It is proposed to dig three trial pits to a size of 3 m x 3 m x 3 m on Southern, Northern sides and middle of the area as there is over burden and weathered granite. This exploration pits will be taken up after the quarry lease grant. The trail pits are useful to evaluate the quality and depth occurrence of marketable Cherry Brown granite. Initially, the total quantity of mineable reserves is considered as (economic) marketable reserves. In this way a mineable reserves of 41107 Cu. m are available in this Q.L area. The production is proposed to obtain 2160 Cu. m per year. Life of mine is 21 years.

Water is required only for drinking purposes and dust suppression. The number of working people is around 51. So the total water requirement will be around 7.5 KLD. Source of water is tankers and bore wells. In this type of extraction the recovery factor is as medium as 20 % so only 80% comes out as waste. This waste shall be stacked in the dump yard to reuse for reclamation purpose. Waste will be shocked over a length of 50 m, width 15 m to a height of 6 m, in the South Western corner of the area. During the next five years about 41427 Cu. m of waste material will be generated.

The project is located in 3.00 Hectares of Government Land. There will be change in land use as the Colour granite mine will be excavated. An extent of about 2400 Sq. m area will be sliced down during 1

Colour Granite of Sri. S. N Manohar Sy. No. 269, Bidupalli Village, Puttaparthi Mandal, Anantapur District, Andhra Pradesh next five years to a depth of 8 m.

Every year about 50 m length of buffer zone will be planted along the boundary on Northern, South East and Western side area. About 33 saplings consisting of Neem, Teak will be planted per year over an area of 50 m x 6m at 3 m grid interval Year wise plantation area is shown in Plat No.IV.

An extent of about 2400 Sq. m area will be sliced down during next five years to a depth of 8 m. The proposal for reclamation of land affected by mining activity will be done at the end of mining lease. No reclamation is proposed in the first five years period because, the mining will be continued to further depths and reclamation will be possible only after completion of mining up to the proposed depths. Reclamation and rehabilitation of the lands affected by mining will be done by back filling, soil amelioration and afforestation. This will be taken up on need basis before the conclusion of mining operations. The back filling of the mine starts from the eastern end proceeds towards northern side. Drainage will be developed along the slopes of the hill. Reclamation of the affected land includes back filling, drainage development, spreading and fertilization of soil, leveling and re-vegetation etc. Care will be taken to implement the said factors.

Sri. S. N. Manohar have allocated budget of 6.39 Lakhs (Capital Cost) and 2.32 Lakhs (Recurring Cost) for the environmental protection measures. The project involves collection of Colour Granite. Although granite is a minor mineral, it is a major contributor in foreign exchange earnings. India is the second largest exporter of raw granite after China and ahead of Brazil and South Africa. This project will also provide employment to local people helping them earn livelihood.