2018-2021 Draft STIP

Project Original Draft Central Region Need ID: 2186 Name: Aleknagik Wood River Bridge Approach Roads Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 ACC -1,365,877 0 0 0 AHS C 37 Aleknagik New Bridge Access 2130 4 STP 1,365,877 0 0 0 Description: Construct road between Aleknagik (North Shore) with the Dillingham-Aleknagik Road. Totals: 0 0 0 0 0

Need ID: 2320 Name: Glenn Highway Mile Point 45-49 (Milepost 53-56) Reconstruction Moose Creek Canyon Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 3 NHPP 0 2,729,100 0 0 NHS C 9 Central Region Glenn Highway Reconstruction 541 3 SM 0 270,900 0 0 Description: Reconstruct approximately 3 miles of Glenn Highway, including replacement of the Moose Creek Bridge. Project straightens horizontal curve. Includes Bridge No. 0541 Moose Creek. 4 AC 0 0 0 45,465,000 4 SM 0 0 0 4,535,000 7 NHPP 0 0 0 909,300 7 SM 0 0 0 90,700 Totals: 0 3,000,000 0 51,000,000 45,465,000

Need ID: 2481 Name: Seward Meridian Road Improvements Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 SM 164,292 0 0 0 CTP C 7 Wasilla Reconstruction 2 STP 1,819,400 0 0 0 Description: This is the final phase of the Seward Meridian Parkway project, and consists of upgrading Seward Meridian Road to four lanes with a center turn lane, and a pathway from Palmer-Wasilla 3 AC 2,729,100 0 0 0 Highway to Bogard Road and extend Seward Meridian Road to connect with Seldon Road including upgrading the existing 6/10ths of a mile of of the existing road serving Teeland Middle School, Mat-Su 3 ACC 0 -2,729,100 0 0 Career and Tech High School, and Fonteras K-8 school. Project also includes installation of signal at the intersection with Seldon Road. 3 SM 270,900 0 0 0 3 STP 0 2,729,100 0 0 4 AC 0 0 0 23,288,320 4 SM 0 0 0 2,311,680 7 SM 0 0 142,855 0 7 STP 0 0 1,439,145 0 Totals: 4,983,692 0 1,582,000 25,600,000 23,288,320

Need ID: 2503 Name: Wasilla Fishhook Road / Main Street Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 3 NHPP 5,185,290 0 0 0 NHS C 7 Wasilla Reconstruction 4033 3 SM 514,770 0 0 0 Description: Develop a one-way couplet in downtown Wasilla bounded by Bogard Road, Knik-Goose Bay Road/Main Street, Yenlo/Talkeetna Street and the Palmer-Wasilla Highway. This project is needed to mitigate traffic congestion in downtown Wasilla, and is the initial effort to begin addressing the capacity and safety needs of the Knik-Goose Bay corridor. Knik-Goose Bay Road is a designated Totals: Safety Corridor. 5,700,060 0 0 0 32,000,000

Need ID: 2617 Name: Seward Highway Mile Point 17-23 (Milepost 17-22.5) Rehabilitation Snow River to Lawing Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s Totals: 0 0 0 0 57,700,000 603 605 NHS C 29 Central Region Seward Highway Bridge Rehabilitation 607 Description: Project will replace the bridge at Victor Creek (bridge no. 0607), rehabilitate both bridges over Snow River (bridge nos. 0605 & 0603), rehabilitate the roadway and may include widening shoulders and the construction of passing lanes where feasible.

Page 1 of 54 2018-2021 Draft STIP

Project Original Draft Need ID: 2620 Name: Seward Highway Mile Point 24-36 (Milepost 25-36) Rehabilitation Moose Pass to Sterling Wye Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 NHPP 0 909,700 0 0 NHS C 29 Central Region Seward Highway System Preservation 2 SM 0 90,300 0 0 Description: Rehabilitate roadway and or upgrade as needed. Project may include slow vehicle turnouts and sight distance improvements to increase passing opportunities. 3 NHPP 0 0 591,045 0 3 SM 0 0 58,955 0 Totals: 0 1,000,000 650,000 0 60,200,000

Need ID: 2670 Name: Sterling Highway Mile Point 116-129 (Milepost 157-169) Rehabilitation Anchor Point to Baycrest Hill Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 3 NHPP 591,305 0 0 0 666 3 SM 58,695 0 0 0 NHS C 30 Central Region Sterling Highway Reconstruction 4020 Totals: 650,000 0 0 0 80,800,000 Description: Provide passing lanes, widening and realignment as needed to address safety and passing opportunities, and resurface pavement between Anchor Point and the top of Homer Hill. Also includes the replacement of bridge #666 and bridge #4020. Project will be coordinated with, and partially funded by, the Highway Safety Improvement Program.

Need ID: 2673 Name: Sterling Hwy Mile Point 8-25 (Milepost 45-60) Sunrise Inn to Skilak Lake Road Construction Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 AC 0 20,004,600 0 0 NHS C 29 Central Region Sterling Highway New Construction 2 ACC 0 0 -5,000,000 -5,000,000 Description: Construct approximately 15 miles of new two-lane highway with 12-foot driving lanes, paved shoulders and passing and climbing lanes where necessary. 2 NHPP 0 0 5,000,000 5,000,000 2 SM 0 1,986,600 0 0 Totals: 0 21,991,200 0 0 295,000,000

Need ID: 6087 Name: Highway Safety Improvement Program/Safety Management Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 9 SA 607,500 607,500 607,500 607,500 REQD C 92 Central Region Safety 9 SM 67,500 67,500 67,500 67,500 Description: HSIP Management, studies and responses on safety-related issues. Totals: 675,000 675,000 675,000 675,000 1,350,000

Need ID: 6460 Name: AMATS CTP Program Allocation Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 0 3PF 593,077 607,904 623,102 638,679 CTP C 50 Anchorage System Preservation 0 SM 1,779,230 1,823,711 1,869,304 1,916,036 Description: AMATS CTP Program Allocation. See AMATS TIP for projects. 0 STP 26,271,400 26,928,185 27,601,390 28,291,424 Totals: 28,643,707 29,359,800 30,093,796 30,846,139 31,463,062

Need ID: 9299 Name: AMATS CMAQ Allocation for Qualifying Air Quality Projects Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 0 CMAQ-M 2,000,460 2,050,472 2,101,733 2,154,277 REQD C 50 Anchorage Traffic Management Operations 0 SM 199,540 204,529 209,642 214,883 Description: This is an additional allocation for projects utilizing federal mandatory Congestion Mitigation and Air Quality Improvement (CMAQ) funding on qualifying projects. Totals: 2,200,000 2,255,001 2,311,375 2,369,160 2,428,388

Need ID: 11439 Name: Whittier Tunnel: Maintenance and Operations Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 NHPP 3,775,255 3,775,255 3,775,255 3,775,255 NHS C 28 Whittier System Preservation 4 SM 374,745 374,745 374,745 374,745 Description: Maintenance and operations for federal-aid eligible portion of Whittier tunnel and approaches. Totals: 4,150,000 4,150,000 4,150,000 4,150,000 4,150,000

Page 2 of 54 2018-2021 Draft STIP

Project Original Draft Need ID: 11721 Name: Lucus Road Improvements Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 ACC -350,722 0 0 0 CTP C 7 Wasilla Parks Highway Reconstruction 4 STP 350,722 0 0 0 Description: Improve Lucus Road between Parks Highway and Spruce Avenue to an upgraded two lane facility with shoulders, turning lanes, pedestrian facilities, landscaping and drainage 7 ACC -67,506 0 0 0 improvements, including improved curb ramps to meet ADA standards as required according to the Preconstruction Manual. 7 STP 67,506 0 0 0 Totals: 0 0 0 0 0

Need ID: 11921 Name: Sterling Hwy Mile Point 23-43 Milepost 60-79 Skilak Lake Rd to Sterling Rehabilitation/Passing Lanes Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 ACC -15,000,000 -15,774,027 0 0 NHS C 29 Soldotna Sterling Highway Reconstruction 2270 4 NHPP 15,000,000 15,774,027 0 0 Description: Resurfacing, minor widening and passing lanes as needed. 7 ACC -508,933 0 0 0 7 NHPP 508,933 0 0 0 Totals: 0 0 0 0 0

Need ID: 11925 Name: Seward Hwy Mile Point 74-90 (Milepost 75-90) Ingram Creek to Girdwood Rd and Bridge Rehabilitation Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 ACC -10,087,200 0 0 0 636 2 NHPP 10,087,200 0 0 0 638 4 AC 79,143,900 0 0 0 NHS C 28 Central Region Seward Highway Reconstruction 639 4 ACC 0 -40,000,000 -39,143,900 0 Description: The project includes rehabilitation of the highway including passing lanes, and parking accommodations from just north of Twenty Mile River to the Alyeska Highway and construction of 4 NHPP 0 40,000,000 39,143,900 0 three replacement bridges within this segment at Glacier Creek (bridge #639), Virgin Creek(bridge #638), and Petersen Creek (bridge #636). Project also includes rehabilitation of three miles of highway 4 SM 7,856,100 0 0 0 near the southern termini of the Project including construction of passing lanes and the rehabilitation of the Ingram Creek Bridge near the southern termini of the project. Final construction of middle 7 NHPP 2,274,250 0 0 0 segment will occur as project Need ID 30569. 7 SM 225,750 0 0 0 Totals: 89,500,000 0 0 0 0

Need ID: 11959 Name: Glenn Highway Mile Point 33-41 (Milepost 34-42) Reconstruction Parks to Old Glenn Hwy Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 NHPP 454,850 0 0 0 NHS C 11 Central Region Glenn Highway Reconstruction 2 SM 45,150 0 0 0 Description: This project is the parent project for design and ROW acquisition to reconstruct the Glenn Highway from the Parks Highway to the Old Glenn Highway in Palmer. Project will be built in Totals: phases - Need ID 31329 from South Inner Springer Loop to the Old Glenn Highway and Need ID 31330 from Parks Highway to South Inner Springer Loop. 500,000 0 0 0 0

Need ID: 12640 Name: Seward Highway Mile Point 98-105 (Milepost 99-105) Bird and Indian Improvements Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s Totals: 0 0 0 0 38,000,000 NHS C 28 Anchorage Seward Highway New Construction 644 Description: Design and construct Seward Highway improvements. Project includes passing lanes and bike/ped trail. Includes replacement of bridge over Indian Creek.

Need ID: 12641 Name: Seward Highway Mile Point 104-115 (Milepost 105-115) Passing Lanes Indian to Potter Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 NHPP 1,455,520 0 0 0 NHS C 28 Anchorage Seward Highway Reconstruction 2 SM 144,480 0 0 0 Description: The project includes improvements in the Windy Corner area of the Seward Highway to consisting of highway realignment, wildlife viewing turnouts, and railroad relocation as needed. Totals: Project would coordinate construction of auxiliary lanes and other safety improvements funded through HSIP. 1,600,000 0 0 0 71,500,000

Page 3 of 54 2018-2021 Draft STIP

Project Original Draft Need ID: 16030 Name: Dillingham Downtown Streets Reconstruction and Rehabilitation Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 AC 6,421,572 0 0 0 CTP C 37 Dillingham Reconstruction 4 ACC 0 0 -6,421,572 0 Description: Realign, reconstruct, and rehabilitate approximately 0.61 miles of major collector that includes three streets forming a loop in the downtown area of Dillingham - Main Street from City Hall 4 SM 637,428 0 0 0 to the intersection with "D" Street; "D" Street north to 2nd Street back to City Hall. 4 STP 0 0 6,421,572 0 7 SM 27,180 0 0 0 7 STP 273,820 0 0 0 Totals: 7,360,000 0 0 0 0

Need ID: 18924 Name: Pavement and Bridge Rehabilitation Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 0 ACC -4,768,207 0 0 0 REQD C 92 Central Region System Preservation 0 NHPP 17,085,811 36,372,000 36,372,000 36,372,000 Description: Crack sealing, surface treatment drainage, signage, guardrail, illumination, and other refurbishments to prolong the life of road pavement and bridges and their safety related structures. Project includes NHS Lane Delineators, Destination & Distance Signing, Pavement Markings and Signalization, Abandoned Vehicle Program, Road Surfacing and Transfer, Road Surface Treatments, and 0 SM 3,185,767 5,442,000 5,442,000 5,442,000 improve curb ramps to meet ADA standards (in coordination with Need ID 30397). The scope does not include landscaping or other elements inconsistent with a pavement preservation focus. 0 STP 22,952,207 18,186,000 18,186,000 18,186,000 Totals: 38,455,578 60,000,000 60,000,000 60,000,000 120,000,000

Need ID: 23197 Name: Homer Lake Street Rehabilitation Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 AC 0 4,546,500 0 0 CTP C 31 Homer Reconstruction 4 ACC 0 0 0 -4,546,500 Description: Rehabilitate pavement of approximately 0.47 miles, construct a sidewalk on both sides of the road, improve the intersection at Pioneer to enhance safety, and provide drainage 4 SM 0 453,500 0 0 improvements. Lake Street is located in downtown Homer, between the Sterling Highway and Pioneer Avenue. 4 STP 0 0 0 4,546,500 7 SM 0 40,815 0 0 7 STP 0 409,185 0 0 Totals: 0 5,450,000 0 0 0

Need ID: 23207 Name: Kenai Beaver Loop Road Improvement and Pedestrian Pathway Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 3 ACC -345,686 0 0 0 CTP C 30 Kenai Reconstruction 3 STP 345,686 0 0 0 Description: Resurface existing Beaver Loop Roadway, add paved shoulders and separated pedestrian pathway. Length is approx 3.75 miles. The City of Kenai will assume ownership and maintenance of 4 AC 0 9,733,790 0 0 this state owned facility upon project completion. 4 ACC 0 0 0 -9,733,790 4 SM 0 966,210 0 0 4 STP 0 0 0 9,733,790 7 AC 0 909,700 0 0 7 ACC 0 0 -909,700 0 7 SM 0 90,300 0 0 7 STP 0 0 909,700 0 Totals: 0 11,700,000 0 0 0

Page 4 of 54 2018-2021 Draft STIP

Project Original Draft Need ID: 23335 Name: Bethel Ridgecrest Drive Rehabilitation Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 AC 2,827,627 0 0 0 CTP C 38 Bethel Reconstruction 4 ACC 0 -2,827,627 0 0 Description: Description: Rehabilitate Ridgecrest Drive between Akakeek and Ptarmagin Streets. Raise and widen the road, improve drainage and provide middle lane turnouts to reduce congestion and 4 EMRK 447,293 0 0 0 provide marked and lighted pedestrian crossings at the school intersections. Project will be coordinated with and partially funded by the Highway Safety Improvement Program. 4 SM 325,080 0 0 0 4 STP 0 2,827,627 0 0 7 SM 27,090 0 0 0 7 STP 272,910 0 0 0 Totals: 3,900,000 0 0 0 0

Need ID: 24596 Name: Knik Goose Bay Road Reconstruction Centaur Avenue to Vine Road Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 3 NHPP 14,100,350 0 0 0 NHS C 7 Wasilla New Construction 3 SM 1,399,650 0 0 0 Description: Project consists of widening the Knik-Goose Bay Road to a divided 4 lane facility from Centaur Avenue (near the Parks Highway) to Vine Road, a distance of 6.44 miles. Scope includes 4 AC 0 0 0 31,839,500 separated bike/ped facilities, appropriate safety engineering strategies such as rumble strips and reducing/combining access points that are determined to be most effective at reducing crashes along 4 SM 0 0 0 3,160,500 the road. Project can be constructed in multiple phases to fit funding. 7 NHPP 0 0 0 13,645,500 7 SM 0 0 0 1,354,500 Totals: 15,500,000 0 0 50,000,000 31,839,500

Need ID: 26113 Name: Kalifornsky Beach Road Mile Point 16-23 (Milepost 16-22.2) Paving Rehabilitation and Signalization Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 ACC -2,197 0 0 0 CTP C 30 Soldotna System Preservation 7023 2 STP 2,197 0 0 0 Description: Repave approximately 6.2 miles of K-Beach Road from Sterling Hwy to Bridge Access Rd. Additional work will include signalization of Gaswell/K-Beach intersection and plumbing for a signal 4 ACC -5,000,000 -4,762,016 0 0 at Ciechanski/K-Beach intersection. 4 STP 5,000,000 4,762,016 0 0 7 ACC -90,970 0 0 0 7 STP 90,970 0 0 0 Totals: 0 0 0 0 0

Need ID: 26124 Name: Gold Creek Bridge and Tatalina Bridge Replacement Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 AC 0 3,365,890 0 0 462 4 ACC 0 0 0 -3,365,890 CTP C 37 Takotna Bridge Replacement 473 4 SM 0 334,110 0 0 Description: Replace existing 1972 bridge over Gold Creek (bridge #0473) and raise the elevation of the approaches and replacement bridge to allow flood water and ice flow. Project also includes 4 STP 0 0 0 3,365,890 replacement of Tatalina Bridge (bridge #0462). 7 SM 0 13,545 0 0 7 STP 0 136,455 0 0 Totals: 0 3,850,000 0 0 0

Need ID: 27470 Name: Anchorage Glenn Highway Muldoon Road Interchange Reconstruction Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 ACC -21,733,663 0 0 0 NHS C 13 Anchorage Glenn Highway Reconstruction 4 NHPP 21,733,663 0 0 0 Description: Reconstruct interchange at Muldoon and Glenn Highway. 7 ACC -79,135 0 0 0 7 NHPP 79,135 0 0 0 Totals: 0 0 0 0 0

Page 5 of 54 2018-2021 Draft STIP

Project Original Draft Need ID: 27473 Name: Kenai Spur Road Rehabilitation Stage 1 Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 BOND 16,477,834 0 0 0 NHS C 29 Kenai N/A System Preservation 4 EMRK 2,191,935 0 0 0 Description: Rehabilitate 5.7 miles of the Kenai Spur Highway from mile-point 2.4 to mile-point 8.1 between Soldotna and Kenai to increase capacity and improve safety. Project will be consructed in two phases. This first phase, funded with GO bonds, will construct a 5-lane highway from Robin Street to Swires Road (MP 5.2 to 8.09). Federal funds will supplement the bonds to complete the improvements (see NID 30549). 7 BOND 1,384,159 0 0 0 Totals: 20,053,928 0 0 0 0

Need ID: 28089 Name: Glenn Highway Mile Point 59 - 85 (Milepost 66.5 to 92) Rehabilitation Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 NHPP 2,274,250 1,819,400 0 0 NHS C 9 Central Region Glenn Highway System Preservation 2 SM 225,750 180,600 0 0 Description: This project is the design effort for rehabilitation of the Glenn Highway from King River to Cascade. Actual construction work is being phased under separate projects identified elsewhere in Totals: the STIP as Need ID's 29930, 29931, and 30396. 2,500,000 2,000,000 0 0 0

Need ID: 28330 Name: Drainage Improvements for the Anton Anderson Memorial (Whittier) Tunnel Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 AC 12,735,800 0 0 0 REQD C 28 Whittier N/A System Preservation 4 ACC 0 0 -12,735,800 0 Description: This project will provide driving surface and drainage improvements and install traffic control devices. 4 NHPP 0 0 12,735,800 0 4 SM 1,264,200 0 0 0 7 NHPP 545,820 0 0 0 7 SM 54,180 0 0 0 Totals: 14,600,000 0 0 0 0

Need ID: 28469 Name: Community Refuge Trail Project Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 3PF 13,545 0 0 0 FLAP C 30 Soldotna N/A Reconstruction 2 FLAP 136,455 0 0 0 Description: Design two trailheads with parking facilities connecting a 1.7 mile long trail located along Ski Hill Road, within 200' ADOT&PF right of way. 4 3PF 120,623 0 0 0 4 FLAP 1,215,177 0 0 0 Totals: 1,485,800 0 0 0 0

Need ID: 28471 Name: Campbell Tract Facility Alternate Entrance Alignment Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 3PF 18,060 0 0 0 FLAP C 23 Anchorage N/A Reconstruction 2 FLAP 181,940 0 0 0 Description: Relocate the CTF entrance road 260' to align with East 68th Avenue. 4 3PF 164,292 0 0 0 4 FLAP 1,655,108 0 0 0 Totals: 2,019,400 0 0 0 0

Page 6 of 54 2018-2021 Draft STIP

Project Original Draft Need ID: 29115 Name: Sterling Highway Mile Point 20 - 21 (Milepost 57) Erosion Protection Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 NHPP 227,425 0 0 0 NHS C 29 Kenai Sterling Highway Reconstruction 2 SM 22,575 0 0 0 Description: Install erosion protection and, as necessary, realign the Sterling Highway near historical milepost (MP) 57, to prevent highway embankment damage due to the recent shifting of the Kenai 3 NHPP 0 22,742 0 0 River. 3 SM 0 2,258 0 0 4 AC 0 0 7,274,400 0 4 SM 0 0 725,600 0 7 NHPP 0 0 22,732 0 7 SM 0 0 2,268 0 Totals: 250,000 25,000 8,025,000 0 7,274,400

Need ID: 29116 Name: Parks Highway Mile Point 54-64 (Milepost 90 to 99) Rehabilitation Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 ACC -9,097,000 0 0 0 NHS C 10 Trapper Creek Parks Highway System Preservation 4 NHPP 9,097,000 0 0 0 Description: Resurface approximately 9 miles of the Parks Highway. Project may include base stabilization and shoulder widening as appropriate. Project is coordinated with Highway Safety Totals: Improvement Program project Need ID 19217 Parks Highway: Systemic Passing Lanes Project. 0 0 0 0 0

Need ID: 29730 Name: Seward Highway Dowling Road Interchange Rehabilitation Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 NHPP 909,300 0 0 0 NHS C 24 Anchorage Seward Highway Congestion 2 SM 90,700 0 0 0 Description: Project will improve the Dowling Road roundabouts, the associated highway ramps, and make other improvements as needed to enhance safety and increase traffic flow. Totals: 1,000,000 0 0 0 14,000,000

Need ID: 29731 Name: Seward Highway O'Malley Road to Dimond Boulevard Reconstruction Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 ACC -2,035,500 -10,000,000 0 0 NHS C 50 Anchorage Seward Highway Reconstruction 2 NHPP 2,035,500 10,000,000 0 0 Description: This project funds the design and ROW purchase for the final segments of this project reconstructing the Seward Highway from Dimond Boulevard to O'Malley Road and includes an 3 AC 0 18,194,000 0 0 underpass to connect 92nd Avenue (west of the Seward Highway) with Academy Drive (east of the Seward Highway), and construction is funded under Need ID 30691. 3 ACC 0 0 0 -18,194,000 3 NHPP 0 0 0 18,194,000 3 SM 0 1,806,000 0 0 Totals: 0 20,000,000 0 0 0

Need ID: 29736 Name: Parks Highway Mile Point 13-18 (MP 48.8 to MP 52.3) Pittman Road to Big Lake Road Reconstruction Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 AC 0 33,199,883 0 0 NHS C 70 Various Parks Highway Reconstruction 4 ACC 0 0 0 -33,199,883 Description: Widen Parks Highway to four lanes with attendant traffic and safety improvements between Pittman Road and Big Lake Cutoff. Project is coordinated with HSIP safety improvements. 4 EMRK 0 4,326,928 0 0 4 NHPP 0 0 0 33,199,883 4 SM 0 3,743,189 0 0 7 NHPP 0 3,364,410 0 0 7 SM 0 335,590 0 0 Totals: 0 44,970,000 0 0 0

Page 7 of 54 2018-2021 Draft STIP

Project Original Draft Need ID: 29737 Name: Parks Highway Bridge Replacement Montana Creek, Sheep Creek, and Goose Creek Bridges Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 NHPP 200,134 0 0 0 213 2 SM 19,866 0 0 0 215 3 NHPP 27,291 0 0 0 NHS C 12 Willow Parks Highway Bridge Replacement 4040 3 SM 2,709 0 0 0 Description: Replace Bridge 215 at Montana Creek, Bridge 213 at Sheep Creek, and the culverts that compose bridge 4040 at Goose Creek on the Parks Highway. The new bridges will have top widths to 4 AC 0 0 0 29,097,600 match the existing roadway width at the time of construction. Pedestrian facilities will be included if new bridge construction conflicts with existing pedestrian bridges. 4 SM 0 0 0 2,902,400 7 NHPP 0 0 0 100,023 7 SM 0 0 0 9,977 Totals: 250,000 0 0 32,110,000 29,097,600

Need ID: 29911 Name: Vine Road Improvements Knik-Goosebay Road to Hollywood Blvd. Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 SM 0 90,300 0 0 AHS C 14 Wasilla N/A System Preservation 2 STP 0 909,700 0 0 Description: Project will rehabilitate the existing two-lane rural road from the Hollywood Boulevard to Knik-Goose Bay Road. The road will be designed to accommodate ongoing traffic growth. Scope 3 SM 0 0 0 90,300 includes repairing roadbed, drainage improvements, repaving, pedestrian accomodations and possible HSIP safety improvements. 3 STP 0 0 0 909,700 Totals: 0 1,000,000 0 1,000,000 8,500,000

Need ID: 29913 Name: Sterling Safety Corridor Improvements Mile Point 45 - 58 (Milepost 82.5 to 94) Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 3 NHPP 0 0 0 363,720 NHS C 34 Soldotna Sterling Highway Reconstruction 3 SM 0 0 0 36,280 Description: Projects consists of expanding the highway from Soldotna to Sterling as a 4 lane highway. Also included are a pathway and HSIP funded safety improvments such as continuous illumination, Totals: medians, and center turn lanes. 0 0 0 400,000 70,000,000

Need ID: 29914 Name: Parks Highway Mile Point 87-128 (Milepost 123.5 to 163) Drainage and Culvert Improvements Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 NHPP 0 909,300 0 0 NHS C 15 Trapper Creek Parks Highway System Preservation 2 SM 0 90,700 0 0 Description: Project will construct improvements to drainage including culvert repair, replacement, and new installaions, as necessary to provide for adequate drainage. Totals: 0 1,000,000 0 0 10,000,000

Need ID: 29930 Name: Glenn Highway Rehabilitation Long Lake Section: Mile Point 76-85 (Milepost 84.5 to 92) Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 3 NHPP 1,818,600 0 0 0 NHS C 12 Chickaloon Glenn Highway Reconstruction 3 SM 181,400 0 0 0 Description: Improve alignment and mitigate rockfall. Project design efforts under parent project Need ID 28089. Totals: 2,000,000 0 0 0 89,600,000

Need ID: 29931 Name: Glenn Highway Rehabilitation Mile Point 70-77 (Milepost 79-84.5) Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 3 NHPP 0 0 0 1,455,520 NHS C 12 Chickaloon Glenn Highway Reconstruction 3 SM 0 0 0 144,480 Description: Improve alignment and mitigate rockfall. Project design efforts under parent project Need ID 28089 Totals: 0 0 0 1,600,000 20,000,000

Page 8 of 54 2018-2021 Draft STIP

Project Original Draft Need ID: 30389 Name: Central Region ITS Repair and Upgrade Project Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 0 NHPP 682,275 682,275 682,275 682,275 CTP C 92 Various N/A ITS 0 SM 67,725 67,725 67,725 67,725 Description: Purchase, install, repair, replace, redeploy, operate, and maintain, as allowed by ITS regulations, traffic signal, traveler information, traffic incident management, and illumination, and other Intelligent Transportation Systems (ITS) equipment and activities, improving operations such as remote operation of traffic signals, provide traveler information via changeable message signs and Totals: 511, and energy/cost saving in roadway illumination. 750,000 750,000 750,000 750,000 750,000

Need ID: 30390 Name: Central Region Adaptive Signal Control Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 0 NHPP 1,546,490 0 0 0 CTP C 92 Various N/A ITS 0 SM 153,510 0 0 0 Description: Purchase, install, integrate, operate, and maintain equipment, as allowed by ITS regulations to change signal timing for progression depending on traffic demand and provide enhanced Totals: response to emergency services. 1,700,000 0 0 0 0

Need ID: 30395 Name: Central Region Drainage Improvements and Erosion Prevention, Protection and Repair Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 0 NHPP 0 354,850 354,850 354,850 NHS C 70 Various N/A Other 0 SM 0 45,150 45,150 45,150 Description: Projects involves an evaluation of drainage infrastructure as well as erosion threats to the state transportation system. Infrastructure including , culverts, drainage basins, storm drain systems, ditches, swales, bridge embankments and abutments, side slopes, erosion protection features such as dikes and rip rap and other appurtenant drainage and erosion protection infrastructure will be repaired, replaced or improved as neccessary to protect the state's transportation infrastructure. 0 STP 0 100,000 100,000 100,000 Totals: 0 500,000 500,000 500,000 500,000

Need ID: 30397 Name: Central Region ADA Compliance Project Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 0 SM 4,515 221,235 27,090 4,515 NHS C 92 Various N/A Other 0 STP 45,485 2,228,765 272,910 45,485 Description: This project will provide ADA improvements along State owned and operated routes in the Central Region. Initial phase includes auditing State roads to determine ADA compliance and Totals: identify those issues that can be quickly resolved. Prioritization and construction of needed ADA improvements will be identified per audit. 50,000 2,450,000 300,000 50,000 2,450,000

Need ID: 30400 Name: Crow Creek Road Mile Point 4-5 (Milepost 4.3 - 4.95) Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 3PF 7,856 0 0 0 FLAP C 28 Girdwood N/A Bridge Rehabilitation 1028 2 FLAP 79,144 0 0 0 Description: Both road and bridge improvements to address identified deficiencies and arrest further degradation of the facilities. Road improvements will include stabilizing with higly frost susceptible 4 3PF 60,953 0 0 0 material , reshapement and regrade, drainage. Bridge improvements will consist of replacing timber planks at abutments, reinforce concrete footings, rip rap armoring, replacement/repair of approach rails, bridge signage, and clearing of brush to restore safe sight distance. 4 FLAP 614,047 0 0 0 Totals: 762,000 0 0 0 0

Page 9 of 54 2018-2021 Draft STIP

Project Original Draft Need ID: 30549 Name: Kenai Spur Road Rehabilitation Stage 2 Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 BOND 90,300 0 0 0 NHS C 30 Soldotna N/A Safety 2 NHPP 909,700 0 0 0 Description: Rehabilitate 5.7 miles of the Kenai Spur Highway between Soldotna and Kenai to increase capacity and improve safety. Project will be constructed in two phases. This second phase will 3 BOND 45,150 0 0 0 construct a 5-lane highway to increase capacity and improve safety from Sports Lake Road to Robin Street. Federal funds will supplement GO Bonds to complete the improvement (see NID 27473). 3 NHPP 454,850 0 0 0 4 AC 0 0 15,912,750 0 4 ACC 0 0 0 -15,912,750 4 BOND 0 0 480,391 0 4 NHPP 0 0 0 15,912,750 4 SM 0 0 1,106,859 0 7 AC 0 0 4,546,500 0 7 SM 0 0 453,500 0 Totals: 1,500,000 0 22,500,000 0 4,546,500

Need ID: 30569 Name: Seward Highway Mile Point 76 - 81 (Milepost 77 to 81) Placer River to Twenty Mile River Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 AC 0 0 70,000,000 0 627 4 NHPP 0 0 20,839,070 0 629 4 SM 0 0 9,060,930 0 630 7 NHPP 0 0 909,300 0 631 7 SM 0 0 90,700 0 NHS C 90 Kenai Seward Highway Reconstruction 634 Totals: 0 0 100,900,000 0 70,000,000 Description: The project consists of final work to rehabilitate the Seward Highway including minor realignment and replacement of the following bridges: Placer River Overflow 0627, Placer River Main Cross 0629, Portage Creek 0630 & 0631, 20 Mile River 0634. (Parent Design project: NID 11925)

Need ID: 30570 Name: Paving Wood River Bridge Approach Roads Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 AC 2,447,902 0 0 0 AHS C 37 Aleknagik N/A Other 4 ACC 0 -2,447,902 0 0 Description: Project consists of paving the newly built road between Aleknagik (North Shore) with the Dillingham-Aleknagik Road. (Parent design project NID 2186) 4 SM 242,282 0 0 0 4 STP 0 2,447,902 0 0 7 SM 907 0 0 0 7 STP 9,093 0 0 0 Totals: 2,700,184 0 0 0 0

Need ID: 30691 Name: Seward Highway O'Malley Road to Dimond Boulevard Reconstruction Phase II Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s Totals: 0 0 0 0 76,500,000 NHS C 24 Anchorage Seward Highway Reconstruction Description: This is the second phase of the Seward Highway project, and will reconstructs the Seward Highway from Dimond Boulevard to O'Malley Road. Project includes an underpass to connect 92nd Avenue (west of the Seward Highway) with Academy Drive (east of the Seward Highway). The design and first construction phase are under Need ID 29731.

Page 10 of 54 2018-2021 Draft STIP

Project Original Draft Need ID: 31129 Name: Central Region Maintenance Decision Support System Development Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 9 ACC -169,851 0 0 0 AHS C 92 Various N/A Other 9 NHPP 169,851 0 0 0 Description: This is a continuation of the Statewide study of practical alternatives for a Maintenance Decision Support System (MDSS). Purchase, install, and support installation and operation of weather sensing equipment on Central Region trucks. Develop a process to provide MDSS road condition information to the public through automated means. The intent is to develop a practical, Totals: workable, reliable MDSS for the Alaska Highway system and provided automated real-time road condition reports to Alaska travelers. 0 0 0 0 0

Need ID: 31270 Name: Parks Highway: Houston to Willow Rehabilitation Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 NHPP 0 0 1,091,160 0 NHS C 70 Houston Parks Highway Reconstruction 2 SM 0 0 108,840 0 Description: Project consist of rehabiliation of the highway including any needed safety improvements to the Parks Highway between Houston and Willow. Totals: 0 0 1,200,000 0 13,000,000

Need ID: 31274 Name: Glenn Highway: Airport Heights to Parks Highway Rehabilitation Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 NHPP 0 909,300 0 0 NHS C 50 Anchorage Glenn Highway Reconstruction 2 SM 0 90,700 0 0 Description: Project consists of rehabiliation the Glenn Highway between Airport Heights and the Parks Highway to be coordinated with HSIP safety improvements. Totals: 0 1,000,000 0 0 40,000,000

Need ID: 31275 Name: Mat-Su Intra-Regional Corridor Study Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 9 NHPP 363,880 0 0 0 NHS C 50 Anchorage Glenn Highway Planning 9 SM 36,120 0 0 0 Description: Project will examine options for improving east-west intra-regional connectivity in the Mat-Su urbanizing area in order to provide competitive alternatives (i.e. Palmer-Wasilla Highway, Totals: Bogard-Seldon Roads) to the high-speed, controlled access Parks and Glenn Highways. 400,000 0 0 0 2,000,000

Need ID: 31276 Name: Old Sterling Highway: Anchor River Bridge Replacement Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 SM 90,700 0 0 0 NHS C 31 Anchor Point N/A Bridge Replacement 910 2 STP 909,300 0 0 0 Description: Project consists of design effort to replace the Anchor River Bridge on the Old Sterling Highway. 4 BOND 0 0 8,000,000 0 7 SM 0 0 903 0 7 STP 0 0 9,097 0 Totals: 1,000,000 0 8,010,000 0 0

Need ID: 31329 Name: Glenn Highway: South Inner Springer Loop (Cienna Avenue) to Old Glenn Highway Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 AC 18,194,000 0 0 0 AHS C 70 Palmer Glenn Highway Reconstruction 4 ACC 0 -18,194,000 0 0 Description: Reconstruct to four lanes, pathway and shoulders. Accommodate turning movements, add frontage roads, traffic, safety, and intersection improvements, as necessary and feasible. This 4 NHPP 18,194,000 18,194,000 0 0 project is the first segment of the Parent Design project Need ID 11959 the Glenn Highway: Parks Highway to Old Glenn Highway and is also associated with Need ID 31330. 4 SM 3,612,000 0 0 0 7 AC 8,183,700 0 0 0 7 ACC 0 0 -8,183,700 0 7 NHPP 0 0 8,183,700 0 7 SM 816,300 0 0 0 Totals: 49,000,000 0 0 0 0

Page 11 of 54 2018-2021 Draft STIP

Project Original Draft Need ID: 31330 Name: Glenn Highway: Parks Highway to South Inner Springer Loop (Cienna Avenue) Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 AC 0 0 0 34,553,400 NHS C 70 Palmer Glenn Highway Reconstruction 4 SM 0 0 0 3,446,600 Description: Reconstruct to four lanes, pathway and shoulders. Accommodate turning movements, add frontage roads, traffic, safety, and intersection improvements, as necessary and feasible. This 7 AC 0 0 0 9,093,000 project is the second segment of the Parent Design project Need ID 11959 the Glenn Highway: Parks Highway to Old Glenn Highway and is also associated with Need ID 31329. 7 SM 0 0 0 907,000 Totals: 0 0 0 48,000,000 43,646,400

Need ID: 31489 Name: Tundra Ridge Road Realignment Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 SM 49,665 0 36,120 0 AHS C 38 Bethel N/A Reconstruction 2 STP 500,335 0 363,880 0 Description: Construct Tundra Ridge Road on new alignment that provides a public road connection. 3 SM 0 0 0 9,030 3 STP 0 0 0 90,970 Totals: 550,000 0 400,000 100,000 8,300,000

Need ID: 31493 Name: Kings River Bridge Replacement Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 NHPP 0 454,850 0 454,850 NHS C 10 Palmer Glenn Highway Bridge Replacement 544 2 SM 0 45,150 0 45,150 Description: Replace Kings River Bridge on Glenn Highway. 3 NHPP 0 0 0 454,850 3 SM 0 0 0 45,150 Totals: 0 500,000 0 1,000,000 10,750,000

Need ID: 31496 Name: Anton Anderson Memorial (Whittier) Tunnel Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 NHPP 0 454,850 0 0 AHS C 28 Whittier N/A System Preservation 2 SM 0 45,150 0 0 Description: Project consists of improvement to the driving surface and rail bed as well as replacement of toll facility and other equipment 4 NHPP 0 0 0 4,548,500 4 SM 0 0 0 451,500 Totals: 0 500,000 0 5,000,000 0

Headquarters Need ID: 6446 Name: Annual Planning Work Program Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 8 PLNG 6,778,023 6,778,023 6,778,023 6,778,023 REQD H 99 Statewide Planning 8 SM 1,401,500 1,401,500 1,401,500 1,401,500 Description: State Transportation Improvement Program (STIP), State Transportation Plan, data collection and analysis, and management systems are Federally required elements of this program. 8 STP 18,000 18,000 18,000 18,000 8 URPL 175,000 175,000 175,000 175,000 Totals: 8,372,523 8,372,523 8,372,523 8,372,523 16,745,046

Need ID: 6447 Name: Bridge and Tunnel Inventory Inspection Monitoring Rehabilitation and Replacement Program Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 0 ACC -283,826 0 0 0 REQD H 99 Statewide Bridge Rehabilitation 0 NHPP 3,729,770 3,729,770 3,729,770 3,729,770 Description: Inspection of all bridges and tunnels on public roads on a two-year cycle. The magnitude of structural deficiencies found during the inspection causes the subject bridge or tunnel to be 0 SM 740,460 740,460 740,460 740,460 eligible for replacement or rehabilitation with federal highway bridge program funding. Project also includes inspection of high tower structures. 0 STP 4,013,596 3,729,770 3,729,770 3,729,770 Totals: 8,200,000 8,200,000 8,200,000 8,200,000 16,400,000

Page 12 of 54 2018-2021 Draft STIP

Project Original Draft Need ID: 6448 Name: Urban Planning Program Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 8 3PF 187,809 187,806 187,809 187,806 REQD H 99 Statewide Planning 8 URPL 1,892,000 1,892,000 1,892,000 1,892,000 Description: Local government transportation planning and special studies including AMATS and FMATS. AMATS and FMATS Long Range Transportation Plans and preparation of Transportation Totals: Improvement Programs are federally required elements of this program. 2,079,809 2,079,806 2,079,809 2,079,806 4,159,612

Need ID: 6449 Name: Statewide: Highway Safety Improvement Program Safety Management Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 9 SA 477,000 477,000 477,000 477,000 REQD H 99 Statewide Planning 9 SM 53,000 53,000 53,000 53,000 Description: HSIP Management, studies, responses, and policy making on safety-related issues. Totals: 530,000 530,000 530,000 530,000 1,060,000

Need ID: 6450 Name: USGS Flood Frequency and Analysis Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 9 NHPP 309,298 309,298 309,298 309,298 REQD H 99 Statewide Planning 9 SM 61,404 61,404 61,404 61,404 Description: Cooperative effort with the US Geological Survey (approximately 50% cost share) to collect data on water levels. This data supports design of bridges and culverts primarily, but can also be used in design of road reconstruction and stormwater issues. 9 STP 309,298 309,298 309,298 309,298 Totals: 680,000 680,000 680,000 680,000 1,360,000

Need ID: 6451 Name: Statewide Research Program Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 8 ACC -320,732 0 0 0 REQD H 99 Statewide Research 8 RES 2,201,474 2,201,474 2,201,474 2,201,474 Description: Federally funded research projects are selected by the Statewide Research Board to improve the quality and efficiency of Alaska's Transportation network. Example: Improve pavement materials to reduce rutting due to studded tires. This also pays for dues to other research entities that that the State of Alaska is required to participate in. 8 SM 218,526 218,526 218,526 218,526 Totals: 2,099,268 2,420,000 2,420,000 2,420,000 4,840,000

Need ID: 6452 Name: National Highway Institute Training Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 9 SM 31,605 31,605 31,605 31,605 REQD H 99 Statewide Training 9 STP 318,395 318,395 318,395 318,395 Description: Technical training in engineering, planning, and administration related to federal highway program and funding. Totals: 350,000 350,000 350,000 350,000 700,000

Need ID: 6454 Name: Bridge Management System Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 9 NHPP 227,425 227,425 227,425 227,425 REQD H 99 Statewide System Preservation 9 SM 45,150 45,150 45,150 45,150 Description: Development and continued maintenance of a management system for addressing bridge deficiencies on public roads. 9 STP 227,425 227,425 227,425 227,425 Totals: 500,000 500,000 500,000 500,000 1,000,000

Need ID: 6455 Name: Small Hydrologic Investigations Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 9 NHPP 90,972 90,972 90,972 90,972 REQD H 99 Statewide Planning 9 SM 9,028 9,028 9,028 9,028 Description: Ad hoc response studies in various locations in cooperation with the US Geological Survey (approximately 50% cost share) and others (e.g., UAF, UAA, UAS & DNR-DGGS) to analyze Totals: hydrologic flood conditions. Also, the use of airborne survey technologies to track river ice accumulations during winter months. 100,000 100,000 100,000 100,000 200,000

Page 13 of 54 2018-2021 Draft STIP

Project Original Draft Need ID: 6457 Name: Seismic Bridge Retrofit Program Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 0 NHPP 818,730 818,730 818,730 818,730 REQD H 99 Statewide Bridge Rehabilitation 0 SM 162,540 162,540 162,540 162,540 Description: Structural evaluation, examination and enhancements to bridges that are determined to be insufficient in earthquake zones. 0 STP 818,730 818,730 818,730 818,730 Totals: 1,800,000 1,800,000 1,800,000 1,800,000 3,600,000

Need ID: 6458 Name: Civil Rights Program Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 9 DBE 170,000 170,000 170,000 170,000 REQD H 99 Statewide Training 9 OJT 55,000 55,000 55,000 55,000 Description: On the job training to provide training opportunities on construction jobs. Also, provides on-site construction review to assure compliance with Civil Rights laws. 9 STP 175,000 175,000 175,000 175,000 Totals: 400,000 400,000 400,000 400,000 800,000

Need ID: 12259 Name: Recreational Trails Program Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 0 3PF 132,283 132,283 132,283 132,283 REQD H 99 Statewide Transportation Enhancements 0 RTP 1,332,654 1,332,654 1,332,654 1,332,654 Description: This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. Totals: 1,464,937 1,464,937 1,464,937 1,464,937 2,929,874

Need ID: 12579 Name: Bridge Scour Monitoring and Retrofit Program Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 0 NHPP 432,108 432,108 432,108 432,108 REQD H 99 Statewide System Preservation 0 SM 85,784 85,784 85,784 85,784 Description: Description: Install monitoring and telemetry, perform activities required to meet the National Bridge Inspection Standards (NBIS) for scour, implement the DOT&PF Plan of Action (POA) for scour-critical bridges, coordinate with local agencies on NBIS compliance, and design and construct physical scour countermeasures at State bridges identified as scour critical National Bridge Inspection Standards 0 STP 432,108 432,108 432,108 432,108 Totals: 950,000 950,000 950,000 950,000 1,900,000

Need ID: 12979 Name: Highway Fuel Tax Evasion Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 9 STP 100,000 100,000 100,000 100,000 REQD H 99 Statewide Planning Totals: 100,000 100,000 100,000 100,000 200,000 Description: Continuing program to enforce the collection of motor fuel taxes in compliance with federal law.

Need ID: 18330 Name: Strategic Highway Safety Plan Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 9 S148 100,000 100,000 100,000 100,000 REQD H 99 Statewide Safety Totals: 100,000 100,000 100,000 100,000 200,000 Description: This project supports the Strategic Highway Safety Plan (SHSP). The goal of the plan is to reduce fatalities and major injuries by one third over the next 10 years. Scope of work includes: revisions as needed to comply with FAST Act requirements and other department priorities; membership and leadership meetings to assess strategies and actions; evaluation methods to track performance; and, collaboration with Highway Safety Improvement Plan (HSIP) and the Alaska Highway Safety Office (AHSO) staff to align projects with goals of SHSP.

Page 14 of 54 2018-2021 Draft STIP

Project Original Draft Need ID: 18791 Name: Statewide Congestion and Mitigation Air Quality Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 9 CMAQ-F 482,100 482,100 482,100 482,100 REQD H 99 Statewide Congestion 9 CMAQ-M 2,729,100 2,729,100 2,729,100 2,729,100 Description: The Department will work with DEC and appropriate local authorities to develop sub-allocations. Provide CMAQ funds to address non-attainment and maintenance measures in the Air Quality Statewide Improvement Program. 9 SM 318,800 318,800 318,800 318,800 Totals: 3,530,000 3,530,000 3,530,000 3,530,000 7,060,000

Need ID: 19119 Name: Enhanced Mobility for Seniors and Individuals With Disabilities Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 9 3PF 57,625 57,625 57,625 57,625 CTP H 99 Statewide Transit 9 5310 230,500 230,500 230,500 230,500 Description: FTA Section 5310 monies to be used for the purchase of rides and vehicles for eligible clients and agencies throughout rural and small urban Alaska. 9 STP 318,400 318,400 318,400 318,400 Totals: 606,525 606,525 606,525 606,525 1,213,050

Need ID: 19120 Name: Rural Transit and Rural Transit Assistance Program Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 9 3PF 3,567,231 3,567,234 3,567,234 3,567,234 CTP H 99 Statewide Transit 9 5311 8,323,545 8,323,545 8,323,545 8,323,545 Description: FTA Sections 5311, 5311(b)(3), and 5340 Monies available for administrative, operating, capital and training expenses for eligible rural public transit systems. Projects are determined Totals: through a competitive grant application process. 11,890,776 11,890,779 11,890,779 11,890,779 23,781,558

Need ID: 19217 Name: Highway Safety Improvement Program (HSIP) Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 0 RHE 1,180,000 1,200,000 1,230,000 1,230,000 REQD H 99 Statewide Safety 0 S148 22,460,000 22,910,000 23,390,000 23,390,000 Description: Evaluation, design, and construction of projects to address safety concerns statewide. 0 SA 30,220,000 30,800,000 31,460,000 31,460,000 0 SM 3,490,000 3,560,000 3,640,000 3,640,000 Totals: 57,350,000 58,470,000 59,720,000 59,720,000 119,440,000

Need ID: 19634 Name: Track Rehabilitation Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 0 3PF 1,100,000 1,694,000 1,912,500 1,300,000 REQD H 99 Statewide Railroad 0 5307RR 4,400,000 4,000,000 5,500,000 100,000 Description: track rehabilitation outside the AMATS and FMATS areas including shoulder widening and siding program. 0 5337GR 700,000 900,000 1,200,000 6,200,000 Totals: 6,200,000 6,594,000 8,612,500 7,600,000 8,800,000

Need ID: 19635 Name: Bridge Rehabilitiation Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 0 3PF 120,000 80,000 80,000 80,000 CTP H 99 Statewide Railroad 0 5307 400,000 200,000 200,000 200,000 Description: Bridge engineering and rehabilitation at mainline locations; such as BR 364.7, BR 364.8, BR 369.7, BR 58.7. 0 5337GR 200,000 200,000 200,000 200,000 Totals: 720,000 480,000 480,000 480,000 1,960,000

Page 15 of 54 2018-2021 Draft STIP

Project Original Draft Need ID: 19658 Name: Statewide Preventive Maintenance Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 0 3PF 2,500,000 2,500,000 2,500,000 2,500,000 REQD H 99 Statewide Railroad 0 5307RR 100,000 100,000 100,000 100,000 Description: This project partially funds statewide operating and maintenance costs related to passenger transit services. Additionally, includes passenger vehicle railcars and locomotives capital rehabilitation to extend functionality and serviceability of the asset. 0 5337GR 12,000,000 12,000,000 12,000,000 12,000,000 Totals: 14,600,000 14,600,000 14,600,000 14,600,000 10,225,000

Need ID: 19664 Name: Positive Train Control Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 0 3PF 25,000 25,000 25,000 25,000 REQD H 99 Statewide Railroad 0 5307RR 50,000 50,000 50,000 50,000 Description: Funds provide continuing development of a multi-phased program to design, develop, and implement a communication-based train control system. 0 5337GR 50,000 50,000 50,000 50,000 Totals: 125,000 125,000 125,000 125,000 250,000

Need ID: 19666 Name: Bond Principal Int Costs Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 0 3PF 3,400,000 3,400,000 3,400,000 3,400,000 REQD H 99 Statewide Railroad 0 5307RR 4,000,000 4,000,000 4,000,000 14,500,000 Description: These funds are for payment of the portion of the net Grant Receipt Revenue Bond debt services issued for ARRC Capital Improvements. Bonds were issued in 2007 and 2015. Capital Improvement Projects include track rehabilitation, positive train control, passenger rolling stock, Anchorage car shop design and Moody Tunnel. 0 5337GR 10,500,000 10,500,000 10,500,000 100,000 Totals: 17,900,000 17,900,000 17,900,000 18,000,000 18,200,000

Need ID: 20235 Name: Wideband Multimedia Mobile Emergency Communications Pilot Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 0 EMRK 178,160 178,160 0 0 CTP H 14 Wasilla ITS Totals: 178,160 178,160 0 0 0 Description: Provide a 4.9 GHz mesh network dedicated to public safety use in the Wasilla area.

Need ID: 20294 Name: Air Quality Public Education Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 9 AC 0 1,091,640 0 0 REQD H 99 Statewide Planning 9 ACC -454,850 0 -545,820 -545,820 Description: The statewide air quality public education project will focus on a number of air quality issues of concern to Alaska including, but not limited to: air pollution health/environmental impacts 9 CMAQ-F 454,850 545,820 545,820 545,820 and ways local citizens can mitigate air pollution from sources like motor vehicles, unpaved roads, diesel engines/heavy duty vehicles, wood smoke, residential heating, etc. There may also be a focus on transportation alternatives that can assist in improving air quality (pedestrian, bike, transit, car/van pool). 9 SM 0 162,540 0 0 Totals: 0 1,800,000 0 0 1,800,000

Need ID: 20854 Name: Passenger Equipment Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 0 3PF 2,050,000 240,000 150,000 336,000 REQD H 99 Statewide Railroad 0 5307RR 750,000 900,000 600,000 100,000 Description: Passenger equipment rehabilitation. 0 5337GR 100,000 100,000 100,000 1,300,000 Totals: 2,900,000 1,240,000 850,000 1,736,000 702,000

Page 16 of 54 2018-2021 Draft STIP

Project Original Draft Need ID: 21314 Name: Transit Security Associated Transit Improvements (Transit Enhancement) Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 0 3PF 100,000 45,000 30,000 42,000 REQD H 99 Statewide Railroad 0 5307RR 500,000 225,000 150,000 120,000 Description: Purchase and install surveillance equipment system-wide, and other security expenses as appropriate. Transit enhancement projects system-wide such as rest rooms, wheel chair lifts, Totals: intuitive signage, and other enhancements as may be identified. 600,000 270,000 180,000 162,000 145,000

Need ID: 25836 Name: AASHTO Technical Programs Support Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 8 RES 163,746 172,843 0 0 CTP H 99 Statewide Planning 8 SM 16,254 17,157 0 0 Description: American Association of State Highway and Transportation Officials (AASHTO) offers several technical service programs on a voluntary membership basis. This project will support annual Totals: ADOT&PF's federally eligible technical service program memberships as selected by the Commissioner. 180,000 190,000 0 0 0

Need ID: 26168 Name: Air Quality Mobile Source Modeling Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 9 CMAQ-F 454,850 0 0 454,850 REQD H 99 Statewide Planning 9 SM 45,150 0 0 45,150 Description: Continue development and enhancement of the statewide framework for MOVES modeling in Alaska to ensure consistent development, application, and approval of modeling workflows (e.g., input data collection and processing, model setup and execution requirements, post-processing of outputs, etc.) in all regional mobile source inventory applications envisioned within the state. These regional applications include SIP emissions/emission budgets and transportation conformity emission inventories, NEI (National Emission Inventory) submittals to EPA that consist of both Totals: planning and episodic modeling inventories, throughout the state. Continue the support of the EPA requirement to use MOVES for local communities and state, and continue to evaluate MOVES versions to ensure unique aspects of Alaska conditions are addressed. 500,000 0 0 500,000 1,500,000

Need ID: 26269 Name: Transportation Asset Management Program Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 9 NHPP 1,819,400 1,819,400 1,819,400 1,819,400 REQD H 99 Statewide Planning 9 SM 180,600 180,600 180,600 180,600 Description: Develop Asset Management program for ADOTPF assets containing an inventory of specific assets, their condition, performance targets and a plan of how to achieve these targets in a cost effective and efficient manner through a mix of investments. Advance an Asset Management Improvement Strategy that will examine ADOTPF's proficiency and maturity in Asset Management Totals: practices, identify strengths and weaknesses, look at methodologies and practices, and set goals and objectives for continuous improvement. 2,000,000 2,000,000 2,000,000 2,000,000 4,000,000

Need ID: 26469 Name: Road Weather Information System (RWIS) Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 0 NHPP 477,592 477,592 477,592 477,592 REQD H 99 Statewide ITS 0 SM 47,408 47,408 47,408 47,408 Description: The Road Weather Information System is a network of environmental sensor stations strategically located on major arterials. This project will fund the ongoing maintenance and operations Totals: of the network and sites, including utilities. This also includes web application development and upgrades to support the large customer base. 525,000 525,000 525,000 525,000 1,050,000

Need ID: 26470 Name: 511 Phone and Web Maintenance & Operations Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 0 NHPP 427,559 427,559 427,559 427,559 REQD H 99 Statewide ITS 0 SM 42,441 42,441 42,441 42,441 Description: This project will fund the maintenance and operations of the 3rd Gen 511 travel information System website, 5-1-1 telephone and internal reporting system (RIDE). This includes funding Totals: the 511 Management Center operations, 24/7 technical support, and ongoing M&O activities. 470,000 470,000 470,000 470,000 940,000

Page 17 of 54 2018-2021 Draft STIP

Project Original Draft Need ID: 26471 Name: Highway Performance Monitoring System (HPMS) Reporting Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 9 NHPP 181,940 136,455 136,455 136,455 REQD H 99 Statewide ITS 9 SM 18,060 13,545 13,545 13,545 Description: This project supports the new Highway Performance Monitoring System (HPMS) integration application (HPMSAnalyst) used to meet annual FHWA HPMS Submittal requirements. Scope of work includes: ongoing operations and maintenance; integration with department applications; updates to ensure compliance with new federal requirements for performance measures; and, technical Totals: support. 200,000 150,000 150,000 150,000 300,000

Need ID: 27269 Name: Geographic Information System Development Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 9 SM 22,575 22,575 22,575 22,575 REQD H 99 Statewide N/A ITS 9 STP 227,425 227,425 227,425 227,425 Description: This project supports the Geographic Information System (GIS) development for Department decisions involving resource allocation, project selection, and results based budgeting. The project will directly support the Highway Performance Monitoring System, Traffic Data System, Crash Data System, and Transportation Asset Management Information System. Project activities include: Totals: GIS design and development, hardware and software acquisition, application design and development, and web-based services. 250,000 250,000 250,000 250,000 1,000,000

Need ID: 27270 Name: Roadway Data Collection Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 9 SM 90,300 90,300 90,300 90,300 REQD H 99 Statewide N/A ITS 9 STP 909,700 909,700 909,700 909,700 Description: This project supports the collection and processing of road centerlines, roadway inventory features, and roadway attributes. Project activities include: data collection planning, data collection, data processing, data quality assurance, and acquisition of data storage hardware and software. The resulting data will directly support: the Highway Performance Monitoring System, the Totals: Traffic Data System, the Crash Data System, and the Maintenance Management System. 1,000,000 1,000,000 1,000,000 1,000,000 2,000,000

Need ID: 27471 Name: Statewide Temperature Data Probe Network Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 0 NHPP 45,485 45,485 45,485 45,485 REQD H 99 Statewide N/A ITS 0 SM 4,515 4,515 4,515 4,515 Description: Temperature Data Probe’s (TDP) provide the vertical temperature profiles for the seasonal weight restriction program. Scope of work includes: maintenance and operations of the Totals: statewide network; new and replacement equipment; and, supporting equipment and software. 50,000 50,000 50,000 50,000 100,000

Need ID: 27689 Name: Crash Data Reporting & Analysis System Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 9 NHPP 136,455 90,970 90,970 90,970 REQD H 99 Statewide N/A ITS 9 SM 13,545 9,030 9,030 9,030 Description: This project supports the new CRASH (Crash Reporting and Analysis for Safer Highways) used to analyze crashes and produce crash reports for Strategic Highway Safety Plan (SHSP), the Alaska Highway Safety Performance Plan and the Highway Safety Improvement Program (HSIP) and the FAST Act performance measures requirements. Scope of work includes: support maintenance and Totals: operations; support GIS linear referenced network; revisions as needed to support crash locations and mapping needs; support IT hardware and software; and will support system integration with other department applications in order to meet reporting requirements. 150,000 100,000 100,000 100,000 200,000

Need ID: 27690 Name: Traffic Data Management and Reporting System Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 9 NHPP 90,970 90,970 90,970 90,970 REQD H 99 Statewide N/A ITS 9 SM 9,030 9,030 9,030 9,030 Description: This project will fund the current traffic data system (Traffic Server). Scope of work includes: integration with the GIS linear referenced network; system upgrades (hardware & software); ongoing operational support and data migration; training; technical support; and system integration with with other department applications in order to meet reporting requirements. Totals: 100,000 100,000 100,000 100,000 200,000

Page 18 of 54 2018-2021 Draft STIP

Project Original Draft Need ID: 27969 Name: Bus and Bus Facilities Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 0 3PF 437,500 437,500 437,500 437,500 REQD H 99 Statewide N/A Transit 0 5339 1,750,000 1,750,000 1,750,000 1,750,000 Description: FTA Section 5339 monies available for capital expenses for eligible rural public transit systems. Projects are determined through a competitive grant application process. Totals: 2,187,500 2,187,500 2,187,500 2,187,500 8,750,000

Need ID: 28129 Name: Road Weather Information System (RWIS) AURORA Pooled Fund Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 8 RES 25,000 25,000 25,000 25,000 REQD H 99 Statewide N/A ITS Totals: 25,000 25,000 25,000 25,000 50,000 Description: This project will provide collaborative weather-related research and sharing of road weather management best practices through the AURORA Transportation Pooled Program Fund (TPF- 5(290)), an international partnership of public road agencies. Alaska DOT's AURORA membership multiplies financial resources to address our most pressing road weather information system (RWIS) - related challenges. Key outcomes include relationships with national and international agencies and RWIS equipment providers involving decision support systems, standards, training, and research covering avalanche forecasting, sensor performance, seasonal weight restrictions, and winter weather maintenance strategies.

Need ID: 28309 Name: IWAYS Architecture Update Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 9 SM 2,258 2,258 2,258 2,258 REQD H 99 Statewide N/A ITS 9 STP 22,742 22,742 22,742 22,742 Description: This project will fund reviewing and updating necessary sections of the Alaska Iways Architecture. The update is required to ensure that ADOT&PF continues to meet and conform to the National ITS requirements. The existing Alaska Iways Architecture, last updated in 2008, will be reviewed and updated using consulting services to ensure ADOT&PF is using the latest ITS Architecture Totals: framework, and incorporating the updated processes and flows in the revised National ITS Architecture. This update will also ensure ADOT&PF is complying with the current systems engineering requirements and corresponding ITS Systems Engineering Checklist. 25,000 25,000 25,000 25,000 50,000

Need ID: 28310 Name: 511 Phone and Web Enhancements Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 9 NHPP 272,910 272,910 272,910 272,910 REQD H 99 Statewide N/A ITS 9 SM 27,090 27,090 27,090 27,090 Description: This project will fund planned and unplanned enhancements and system integration for the 511 phone, public website, entry tool system and Apps. Planned enhancements include: real- time traffic speed reporting, real-time information from external sensors and additional cameras as they become available. This project will fund purchasing the GPS components for portable message Totals: boards necessary to integrate signs with the 511 map. 300,000 300,000 300,000 300,000 600,000

Need ID: 28311 Name: Traveler Information Systems Marketing Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 9 SM 2,257 2,257 2,257 2,257 REQD H 99 Statewide N/A ITS 9 STP 22,743 22,743 22,743 22,743 Description: This project will fund marketing Alaska’s road weather information systems, the 511 phone, website, smartphone apps, and social media utilities. This will also include public outreach and Totals: education, training, marketing materials, media kits and consultant services. 25,000 25,000 25,000 25,000 100,000

Need ID: 28809 Name: Statewide Highway Data Equipment Acquisition and Installation Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 0 NHPP 4,548,500 2,729,100 2,729,100 2,729,100 REQD H 99 Statewide N/A ITS 0 SM 451,500 270,900 270,900 270,900 Description: Design, construct or rehabilitate traffic data collection sites and develop software for the State's federally required Traffic Monitoring system for Highways (TMS/H). Scope of work includes: purchase of items such as traffic data counters, cameras, computers, and software; program evaluations; and , IT needs for data collection, communications, and software. Totals: 5,000,000 3,000,000 3,000,000 3,000,000 6,000,000

Page 19 of 54 2018-2021 Draft STIP

Project Original Draft Need ID: 29429 Name: Alaska Historic Roads Eligibility Planning Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 9 SM 15,803 15,803 0 0 REQD H 99 Statewide N/A Planning 9 STP 159,197 159,197 0 0 Description: Fund National Register of Historic Places eligibility determinations for selected roads for advance planning purposes and develop management plans for eligible historic roads. The project tiers off efforts accomplished under the Programmatic Agreement regarding Alaska's Highway System Roads Affected by the Federal-Aid Highway Program (Alaska Road PA), which developed a historic Totals: overview of Alaska’s roads and a methodology for evaluating their National Register eligibility. The project would apply that methodology to selected roads and the historic road management plans will recommend practices consistent with the needs of transportation and historic preservation. 175,000 175,000 0 0 0

Need ID: 29609 Name: RWIS Air Quality Sensor Operations & Maintenance Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 0 SM 9,030 9,030 9,030 9,030 REQD H 60 Fairbanks N/A ITS 0 STP 90,970 90,970 90,970 90,970 Description: This project provides for air quality data analysis, program management, sensor calibration, maintenance checks, troubleshooting, travel, and repair of air quality sensors collocated at five Fairbanks Road Weather Information Station Environmental Sensor Stations through a Reimbursable Services Agreement between the Department of Transportation & Public Facilities and the Totals: Department of Environmental Conservation. The project also provides for training, consumable supplies, and repair parts. 100,000 100,000 100,000 100,000 200,000

Need ID: 29675 Name: OHA AHRS/IBS Development Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 9 SM 23,930 23,930 23,930 23,930 REQD H 99 Various N/A Planning 9 STP 241,070 241,070 241,070 241,070 Description: Development and maintenance of the Office of History and Archaeology (OHA) online database for cultural resource management known as the Alaska Heritage Resources Survey/Integrated Business System (AHRS/IBS). The AHRS is a restricted inventory of all reported prehistoric, archaeological, and historic sites within the State of Alaska. The database provides DOT&PF Totals: with easy on-line access to known cultural resource information. Work will include database programming and data entry and management. 265,000 265,000 265,000 265,000 0

Need ID: 29910 Name: Weigh-In-Motion Maintenance & Operations Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 9 NHPP 541,800 541,800 541,800 541,800 REQD H 99 Statewide N/A ITS 9 SM 58,200 58,200 58,200 58,200 Description: Maintain, operate and enhance the current network of weigh-in-motion equipment, communications, software, databases, and data visualization and reporting tools. Totals: 600,000 600,000 600,000 600,000 1,200,000

Need ID: 30269 Name: Cultural Resources Liaison Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 9 SM 27,541 14,448 14,900 0 REQD H 99 Statewide N/A Planning 9 STP 277,459 145,552 150,100 0 Description: Streamline project delivery by funding Federal and State resource agency liaison positions dedicated to working on Alaska Department of Transportation and Public Facilities (DOT&PF) projects. This project will fund a Cultural Resources Liaison between DOT&PF and the Department of Natural Resources, Alaska Division of Parks and Outdoor Recreation/Office of History and Totals: Archaeology (OHA) to improve and more efficiently streamline the review process of projects through Section 106 of the National Historic Preservation Act of 1966, as amended (36 CFR 800 Protection of Historic Properties) 305,000 160,000 165,000 0 0

Need ID: 30393 Name: Statewide Geotechnical Asset Management Implementation Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 9 NHPP 363,880 363,880 0 0 REQD H 99 Various N/A Planning 9 SM 36,120 36,120 0 0 Description: Implement geotechnical asset management based upon the formal GAM Plan published in 2015. Improve the asset management process for the agency's targeted geotechnical assets: unstable slopes and embankments, earth retaining structures, and material sites. Required steps include completion of asset inventories, inspection and condition rating, enhancements to supporting Totals: database information and reporting systems, capture and tracking of physical work accomplishment data, and upgrades to models forecasting life cycle cost and asset deterioration. 400,000 400,000 0 0 0

Page 20 of 54 2018-2021 Draft STIP

Project Original Draft Need ID: 30398 Name: Electronic Environmental Compliance System Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 9 SM 19,866 5,418 0 0 REQD H 99 Statewide N/A Planning 9 STP 200,134 54,582 0 0 Description: Develop and deploy a software solution to accommodate environmental document development and compliance oversight for all NEPA approvals, environmental permits, conditions and commitments for DOT&PF constructed projects, from pre-construction through construction completion, as required by federal and state laws and regulations. This software solution will support Totals: environmental document development, approval, permitting, inspection and reporting compliance workflows for DOT&PF preconstruction and construction staff and contract partners. 220,000 60,000 0 0 0

Need ID: 30689 Name: Statewide Transportation Alternatives Program (TAP) Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 0 TAP 4,000,000 4,000,000 4,000,000 4,000,000 TAP H 99 Statewide N/A Other Totals: 4,000,000 4,000,000 4,000,000 4,000,000 16,000,000 Description: The FAST Act eliminates the MAP-21 Transportation Alternatives Program (TAP) and replaces it with a set-aside of Surface Transportation Block Grant (STBG) program funding for

Need ID: 31089 Name: Locomotive Equipment Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 0 3PF 200,000 25,000 25,000 25,000 REQD H 99 Various N/A Railroad 0 5337GR 550,000 100,000 100,000 100,000 Description: Locomotive equipment rehabilitation. Totals: 750,000 125,000 125,000 125,000 200,000

Need ID: 31090 Name: Transit Asset Management Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 0 3PF 60,000 400,000 350,000 350,000 REQD H 99 Various N/A Railroad 0 5307RR 200,000 2,000,000 1,200,000 100,000 Description: Transit asset management program development and improvements. 0 5337GR 50,000 50,000 50,000 1,250,000 Totals: 310,000 2,450,000 1,600,000 1,700,000 1,500,000

Need ID: 31091 Name: Radio System Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 0 3PF 70,000 100,000 100,000 100,000 REQD H 99 Various N/A Railroad 0 5307RR 300,000 400,000 350,000 50,000 Description: Replace and/or upgrade radio system equipment and communication components. 0 5337GR 50,000 50,000 50,000 350,000 Totals: 420,000 550,000 500,000 500,000 500,000

Need ID: 31470 Name: Connected - Autonomous Vehicle Planning Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 0 SM 2,461 2,461 2,461 2,461 REQD H 99 Various N/A ITS 0 STP 24,797 24,797 24,797 24,797 Description: Planning and development for autonomous and connected vechicles. Totals: 27,258 27,258 27,258 27,258 109,032

Need ID: 31471 Name: McHugh RWIS Tower Upgrade Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 SM 4,515 0 0 0 REQD H 99 Anchorage Seward Highway Other 2 STP 45,485 0 0 0 Description: The existing McHugh RWIS Tower on the Seward Highway at MP 111.8 will be upgraded and reinforced. Work will also include moving the electrical connection from the old Alaska Railroad 4 SM 12,190 0 0 0 concrete building, scheduled to be demolished, to a new load center for the RWIS site. 4 STP 122,810 0 0 0 7 SM 2,257 0 0 0 7 STP 22,743 0 0 0 Totals: 210,000 0 0 0 0

Page 21 of 54 2018-2021 Draft STIP

Project Original Draft Need ID: 31597 Name: Statewide Planning and Environmental Linkages (PEL) Studies Program Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 9 3PF 341,466 0 0 0 NHS H 99 Various N/A Planning 9 EMRK 3,440,000 0 0 0 Description: Develop a statewide PEL program including a guidebook and identification of priorities for PEL Studies. Initiate PEL studies to further refine and analyze conceptual highway improvements, 9 NHPP 2,729,100 2,729,100 2,729,100 2,729,100 evaluate environmental challenges, and improve the understanding of various design issues and anticipated project costs in an effort to reduce project delivery costs and schedules. 9 SM 541,800 541,800 541,800 541,800 9 STP 2,729,100 2,729,100 2,729,100 2,729,100 Totals: 9,781,466 6,000,000 6,000,000 6,000,000 12,000,000

Need ID: 31657 Name: CP LED Signal Upgrade Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 0 3PF 30,000 30,000 30,000 30,000 REQD H 99 Various N/A Railroad 0 5307RR 120,000 120,000 120,000 120,000 Description: Upgrade/replace train control point signals. Totals: 150,000 150,000 150,000 150,000 0

Need ID: 31658 Name: 4thGen Traveler Information Syst Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 9 NHPP 454,850 454,850 0 0 REQD H 99 Various N/A ITS 9 SM 45,150 45,150 0 0 Description: Funding will cover the design and deployment of a 4thGen Traveler Information System. This includes a new responsive public website, 511.alaska.gov, smartphone apps for android and iOS, an internal reporting system, and two phone systems for the public: dial 5-1-1 for highway reports and dial 800-642-0066 for AMHS schedules and reservations). Totals: 500,000 500,000 0 0 0

Marine Highways Need ID: 5985 Name: Shoreside Facilities Condition Survey Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 9 FBF 0 240,000 0 240,000 AHS M 99 Statewide Marine Highway Planning 9 SM 0 60,000 0 60,000 Description: Conduct and document shoreside facilities condition surveys. Prepare annual survey updates. Totals: 0 300,000 0 300,000 300,000

Need ID: 6413 Name: Fleet Condition Survey Update Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 9 ACC -400,000 0 0 0 AHS M 99 Statewide Marine Highway Planning 9 FBF 400,000 0 400,000 0 Description: Update AMHS fleet condition survey. 9 SM 0 0 100,000 0 Totals: 0 0 500,000 0 500,000

Need ID: 13883 Name: Skagway Terminal Modifications Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 AC 0 4,400,000 0 0 AHS M 33 Skagway Marine Highway Ferry Boats 4 ACC 0 0 -4,400,000 0 Description: Modify float for AMHS ferries. 4 FBF 0 0 4,400,000 0 4 SM 0 1,100,000 0 0 Totals: 0 5,500,000 0 0 0

Page 22 of 54 2018-2021 Draft STIP

Project Original Draft Need ID: 18358 Name: Ferry Refurbishment Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 ACC -166,474 0 0 0 AHS M 99 Statewide Marine Highway Ferry Boats 2 FBF 1,600,000 1,500,000 1,500,000 1,500,000 Description: Annual ferry refurbishment, regulatory driven, dry-docking. Address vessel refurbishment priorities as established in annual AMHS Fleet Condition Survey Report. 2 SM 400,000 375,000 375,000 375,000 4 ACC -2,214,869 0 0 0 4 FBF 2,214,869 0 0 0 Totals: 1,833,526 1,875,000 1,875,000 1,875,000 1,875,000

Need ID: 18359 Name: Design Construct Lease Purchase Ferryboats and Terminals Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 FBF 0 400,000 0 0 AHS M 99 Statewide Marine Highway Ferry Boats 2 SM 0 100,000 0 0 Description: Design/construct/lease/purchase ferryboats and terminals for AMHS. 4 FBF 0 100,000 0 0 4 SM 0 200,000 0 0 Totals: 0 800,000 0 0 0

Need ID: 26329 Name: Marine Highway Intelligent Transportation Systems Implementation Plan Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 SM 27,090 0 0 0 AHS M 99 Statewide ITS 4 STP 272,910 0 0 0 Description: Plan, design and construct projects that are part of the Alaska Iways Architecture (AKIA) where advanced technology can provide the greatest benefit to Multi-Modal Information Totals: Connections, Internal Operations, Traveler Safety & Infrastructure, Security Enhancements and Traveler Information and Communication. 300,000 0 0 0 0

Need ID: 28669 Name: Haines Ferry Terminal End Berth Facility Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 ACC -450,719 0 0 0 AHS M 33 Haines Marine Highway Ferry Boats 2 FBF 450,719 0 0 0 Description: The purpose of this project is to modify the existing Haines ferry terminal to accommodate end loading of AMHS ferry vessels. 4 AC 10,000,000 0 0 0 4 ACC 0 -5,000,000 -5,000,000 0 4 FBF 10,000,000 5,000,000 5,000,000 0 4 SM 5,000,000 0 0 0 Totals: 25,000,000 0 0 0 0

Need ID: 28789 Name: AMHS Gustavus Ferry Terminal Modifications Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 ACC -188,000 0 0 0 AHS M 33 Gustavus Alaska Highway Ferry Boats 2 FBF 188,000 0 0 0 Description: This project would include traction improvements on the apron, lighting for the purser's shelter, realignment of the dock at the head of the bridge to provide a more direct transfer of 4 EMRK 132,621 0 0 0 vehicles and create alternate access to the adjacent boat harbor to enhance secure access to the public ferry system. 4 FBF 5,200,000 0 0 0 4 SM 1,300,000 0 0 0 Totals: 6,632,621 0 0 0 0

Page 23 of 54 2018-2021 Draft STIP

Project Original Draft Need ID: 28790 Name: AMHS Tenakee Ferry Terminal Improvements Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 AC 8,000,000 0 0 0 AHS M 35 Tenakee Springs Marine Highway Ferry Boats 4 ACC 0 -4,000,000 -4,000,000 0 Description: Replace all existing mooring and transfer bridge structures. 4 FBF 0 4,000,000 4,000,000 0 4 SM 2,000,000 0 0 0 Totals: 10,000,000 0 0 0 0

Need ID: 28791 Name: AMHS Wastewater Treatment System Upgrades Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 FBF 4,000,000 0 0 0 AHS M 91 Various Marine Highway Ferry Boats 4 SM 1,600,000 0 0 0 Description: Replace or modify existing wastewater treatment systems at the AMHS ferry terminal facilities in Haines, Skagway, Sitka and Juneau. Totals: 5,600,000 0 0 0 0

Need ID: 29709 Name: Auke Bay Ferry Terminal Modification and Improvements Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 ACC -60,000 0 0 0 AHS M 34 Juneau Marine Highway Ferry Boats 2 FBF 60,000 0 0 0 Description: Install an additional dolphin at the Auke Bay Stern Berth, and improve mooring and berthing capabilities at the existing facility and refurbish the transfer bridge. Also to include ferry 4 FBF 2,400,000 0 0 0 terminal building refurbishment, including bathroom upgrades, ticket counter remodel, and roof replacement. 4 SM 600,000 0 0 0 Totals: 3,000,000 0 0 0 0

Need ID: 30189 Name: AMHS Tustumena Replacement Vessel Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 AC 206,807,412 0 0 0 AHS M 99 Statewide Marine Highway Ferry Boats 4 ACC 0 -51,701,853 -51,701,853 -51,701,853 Description: Construct a replacement ferry to service Southcentral and Southwest Alaska coastal communities. 4 EMRK 9,337,308 0 0 0 4 NHPP 0 51,701,853 51,701,853 51,701,853 4 OSF 22,000,000 0 0 0 Totals: 238,144,720 0 0 0 51,701,853

Need ID: 30529 Name: AMHS Ferry Terminal Storage Tank Removal Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 FBF 640,000 0 0 0 NHS M 99 Statewide Marine Highway Ferry Boats 4 SM 160,000 0 0 0 Description: Remove and replace underground storage tanks at AMHS ferry terminals. Totals: 800,000 0 0 0 0

Need ID: 31098 Name: Ketchikan Ferry Terminal Improvements Stage II Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 AC 0 2,400,000 0 0 AHS M 36 Ketchikan Marine Highway Reconstruction 4 ACC 0 0 -2,400,000 0 Description: This project will remedy structural and operational deficiencies at the Ketchikan AMHS Ferry Terminal. This project will replace and refurbish existing vessel mooring and berthing 4 FBF 0 0 2,400,000 0 structures, provide a new mooring dolphin structure and construct upland access and terminal building improvements. Stage 1 of 2 stage project (NID 27450) 4 SM 0 600,000 0 0 Totals: 0 3,000,000 0 0 0

Page 24 of 54 2018-2021 Draft STIP

Project Original Draft Need ID: 31450 Name: M/V Aurora Repower & Ship Systems Upgrades Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 AC 0 6,400,000 0 0 AHS M 99 Statewide Marine Highway Ferry Boats 4 ACC 0 0 -3,200,000 -3,200,000 Description: Replace main propulsion engines and subsystem upgrades. 4 FBF 0 0 3,200,000 3,200,000 4 SM 0 1,600,000 0 0 Totals: 0 8,000,000 0 0 0

Northern Region Need ID: 2118 Name: Mile Point 161-170 (Milepost 159 -167) Reconstruction Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 AC 0 0 34,113,750 0 NHS N 9 Northern Region Richardson Highway Reconstruction 4 SM 0 0 3,386,250 0 Description: Widen and reconstruct to current standards. Totals: 0 0 37,500,000 0 34,113,750

Need ID: 2119 Name: Richardson Highway Mile Point 169-176 (Milepost 167 - 173) Access/Safety Improvements Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 AC 0 0 0 27,291,000 NHS N 9 Northern Region Richardson Highway Reconstruction 4 SM 0 0 0 2,709,000 Description: Widen and reconstruct to current standards. Totals: 0 0 0 30,000,000 27,291,000

Need ID: 2130 Name: Richardson Highway Mile Point 354-359 (Milepost 353-357) Access/Safety Improvements Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 AC 0 23,910,400 0 0 NHS N 5 Fairbanks Richardson Highway System Preservation 4 ACC 0 0 -23,910,400 0 Description: Improve access control on the Richardson Highway. This project will upgrade and extend the existing frontage road system, construct improved at-grade intersections, and eliminate a 4 NHPP 0 0 23,910,400 0 number of existing access approaches onto the Richardson Highway. 4 SM 0 1,689,600 0 0 Totals: 0 25,600,000 0 0 0

Need ID: 3648 Name: Steese Highway Mile Point 122-123 (Milepost 128) Crooked Creek Bridge Replacement Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 SM 0 45,150 0 0 AHS N 6 Central Steese Highway Bridge Replacement 431 2 STP 0 454,850 0 0 Description: Replace Crooked Creek Bridge #0431 on the Steese Highway. Totals: 0 500,000 0 0 3,250,000

Need ID: 3687 Name: Access Road Improvements Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s Totals: 0 0 0 0 7,100,000 CTP N 37 Shageluk Reconstruction Description: Reconstruct the 2.6 mile airport access road. Work will include embankment stabilization, minor realignment and resurfacing.

Need ID: 3843 Name: Airport Way / South Cushman Intersection Reconstruction Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 NHPP 626,237 0 0 0 NHS N 1 Fairbanks Reconstruction 2 SM 62,163 0 0 0 Description: Reconstruct the intersection at Airport Way and Cushman Street. 3 AC 0 0 4,275,590 0 3 SM 0 0 424,410 0 7 AC 0 0 1,182,610 0 7 SM 0 0 117,390 0 Totals: 688,400 0 6,000,000 0 12,806,200

Page 25 of 54 2018-2021 Draft STIP

Project Original Draft Need ID: 6462 Name: Highway Safety Improvement Program/Safety Management Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 9 SA 324,000 324,000 324,000 324,000 REQD N 60 Northern Region Safety 9 SM 36,000 36,000 36,000 36,000 Description: Program management for support of HSIP activities. Totals: 360,000 360,000 360,000 360,000 720,000

Need ID: 6617 Name: Shepard Point Road Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 3PF 451,500 0 0 0 CTP N 32 Cordova New Construction 4 EMRK 4,548,500 0 0 0 Description: Construct approximately 4 miles of road from Orca Cannery to the deep water port site at Shepard Point. The State of Alaska's contribution of federal-aid funds to the Native Village of Eyak's Shepard Point Road project will be transferred to FHWA-Western Federal Lands Highway Division, pursuant to 23 USC 104(k), as a contribution to this IRR Program project. (TTIP Project #: NVE Totals: 0601). AKDOT will not certify, inspect, or oversee this project, nor be responsible for any non-federal match. 5,000,000 0 0 0 0

Need ID: 15685 Name: Airport Way (West) Improvements Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s Totals: 0 0 0 0 7,000,000 NHS N 5 Fairbanks Traffic Management Operations Description: Construct intersection improvements along Airport Way between Dale Road and the Parks Hwy. Project includes bicycle/pedestrian facilities along Hoselton Road to the Boat Street path.

Need ID: 16177 Name: Barrow-Ahkovak Street Upgrade Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 3PF 0 0 322,642 0 CTP N 40 Barrow System Preservation 4 AC 0 0 6,500,716 0 Description: Rehabilitate and pave approximately 0.625 miles of Ahkovak Street, from Okpik Street to Kiogak Street, including drainage improvements. 4 SM 0 0 322,642 0 7 3PF 22,575 0 0 0 7 SM 22,575 0 0 0 7 STP 454,850 0 0 0 Totals: 500,000 0 7,146,000 0 6,500,716

Need ID: 17662 Name: FMATS CTP Program Allocation Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 0 3PF 364,517 373,630 382,971 392,545 CTP N 5 Fairbanks System Preservation 0 SM 364,517 373,630 382,971 392,545 Description: FMATS CTP Program Allocation. See FMATS TIP for projects. 0 STP 7,344,444 7,528,055 7,716,256 7,909,163 Totals: 8,073,478 8,275,315 8,482,198 8,694,253 16,146,956

Need ID: 17663 Name: FMATS CMAQ Allocation Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 0 CMAQ-M 727,760 727,760 727,760 727,760 REQD N 5 Fairbanks System Preservation 0 SM 72,240 72,240 72,240 72,240 Description: This project is additional allocation for qualifying projects utilizing federal Congestion Mitigation and Air Quality Improvement (CMAQ) funding. See FMATS TIP for projects. Totals: 800,000 800,000 800,000 800,000 1,600,000

Page 26 of 54 2018-2021 Draft STIP

Project Original Draft Need ID: 18634 Name: Kotzebue Cape Blossom Road Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 3PF 0 1,973,510 0 0 CTP N 40 Kotzebue New Construction 4 AC 0 17,634,162 0 0 Description: Construct a new road from Kotzebue to a port site near Cape Blossom. 4 EMRK 0 892,328 0 0 Totals: 0 20,500,000 0 0 17,634,162

Need ID: 18923 Name: Pavement and Bridge Rehabilitation Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 0 NHPP 3,941,000 27,291,000 27,291,000 27,291,000 REQD N 60 Northern Region System Preservation 0 SM 3,768,000 5,418,000 5,418,000 5,418,000 Description: Crack sealing, surface treatment drainage, signage, guardrail, illumination and other refurbishments to prolong the life of road pavement and bridges and their safety related structures. The scope does not include landscaping or other elements inconsistent with a pavement preservation focus. 0 STP 27,291,000 27,291,000 27,291,000 27,291,000 Totals: 35,000,000 60,000,000 60,000,000 60,000,000 120,000,000

Need ID: 22298 Name: Alaska Highway Mile Point 85-86 (Milepost 1309) Tok River Bridge Replacement Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 NHPP 11,114,600 0 0 0 NHS N 6 Northern Region Alaska Highway Bridge Replacement 506 4 SM 1,074,570 0 0 0 Description: Replace the Tok River Bridge #0506 on the Alaska Highway. The new bridge will have additional width and eliminate vertical clearance restrictions. Totals: 12,189,170 0 0 0 0

Need ID: 22299 Name: Alaska Highway Mile Point 12-45 (Milepost 1235 -1268) Rehabilitation Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 NHPP 1,128,028 0 0 0 503 2 SM 111,972 0 0 0 NHS N 6 Northern Region Alaska Highway System Preservation 7085 Totals: 1,240,000 0 0 0 30,000,000 Description: Rehabilitate the Alaska Highway and construct passing lanes at various locations, Including possible repairs to Gardiner Creek bridge #0503 and Ten Mile Creek Bridge #7085. This is the

Need ID: 22315 Name: Alaska Highway Passing Lanes Mile Point 0-198 (Milepost 1221-1422) (Canadian Border to Delta Jct) Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 NHPP 0 454,850 0 0 NHS N 6 Northern Region Alaska Highway New Construction 2 SM 0 45,150 0 0 Description: Construct approximately 10 passing lanes at various locations on the Alaska Highway to improve safety. Totals: 0 500,000 0 0 25,000,000

Need ID: 22325 Name: Alaska Highway Mile Point 156-157 (Milepost 1381) Johnson River Bridge Replacement (#0518) Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 NHPP 0 0 0 3,274,920 NHS N 6 Northern Region Alaska Highway Bridge Replacement 518 2 SM 0 0 0 325,080 Description: Replace the Johnson River Bridge on the Alaska Hwy. Totals: 0 0 0 3,600,000 36,000,000

Need ID: 22331 Name: Parks Highway Mile Point 127-148 (Milepost 163-183) Rehabilitation Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s Totals: 0 0 0 0 14,200,000 NHS N 9 Northern Region Parks Highway System Preservation Description: Rehabilitate the Parks Hwy to improve drainage, and construct passing lanes. Also includes a grade separated crossing at Milepost 169 (Hurricane). This is the overall design project for the entire termini. Construction will happen in three stages under NID 30278, NID 30279 and the final segment for the grade separated railroad crossing under this NID.

Page 27 of 54 2018-2021 Draft STIP

Project Original Draft Need ID: 22333 Name: Parks Highway Mile Point 203-228 (Milepost 239-263) Reconstruction (Nenana Canyon to Bear Creek) Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 ACC -4,659,345 0 0 0 NHS N 6 Northern Region Parks Highway Reconstruction 4 NHPP 4,659,345 0 0 0 Description: Reconstruct the Parks Hwy to improve overall safety and to support the construction of a natural gas pipeline. This project will also construct passing and turn lanes where applicable. Totals: 0 0 0 0 0

Need ID: 22335 Name: Parks Highway Mile Point 269-290 (Milepost 305-325) Reconstruction Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 NHPP 0 1,819,400 0 0 NHS N 6 Nenana Parks Highway Reconstruction 678 2 SM 0 180,600 0 0 Description: Reconstruct the Parks Highway including drainage improvements, passing lanes, and replacement of Little Goldstream Creek Bridge No. 678. 3 NHPP 0 0 0 909,700 3 SM 0 0 0 90,300 7 NHPP 0 0 0 454,850 7 SM 0 0 0 45,150 Totals: 0 2,000,000 0 1,500,000 30,000,000

Need ID: 22441 Name: Steese Highway and 3rd Street Widening Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 3 ACC -4,812,036 0 0 0 NHS N 2 Fairbanks Traffic Management Operations 295 3 NHPP 4,812,036 0 0 0 Description: Reconstruct and widen 3rd Street between Hamilton/Farewell and the Minnie Street Bridge (#0295). Work will include turn lanes and signalization improvements at the new Steese 4 AC 0 0 13,645,500 0 Expressway intersection. 4 SM 0 0 1,354,500 0 Totals: 0 0 15,000,000 0 13,645,500

Need ID: 22446 Name: Dalton Highway Mile Point 17-38 (Milepost 18-37) Reconstruction (Hess Creek Area) Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 NHPP 1,819,400 0 0 0 NHS N 6 Northern Region Dalton Highway Reconstruction 1213 2 SM 180,600 0 0 0 Description: Reconstruction, including widening, spot repairs and resurfacing of approximately 19 miles of the Dalton Highway in the Hess Creek Area. This is the overall design for the entire termini. 3 NHPP 90,970 0 0 0 Construction will happen in two stages under NID 30285 and this original NID 22446. 3 SM 9,030 0 0 0 Totals: 2,100,000 0 0 0 25,000,000

Need ID: 22452 Name: Dalton Hwy Mile Point 109-145 (Milepost 109-144) Reconstruction (Old Man Camp to Jim River Bridge#3) Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 ACC 0 -1,269,941 0 0 NHS N 40 Northern Region Dalton Highway Reconstruction 1560 2 NHPP 0 1,269,941 1,430,958 0 Description: Reconstruction, including widening, spot repairs and resurfacing of approximately 35 miles of the Dalton Highway. Also includes replacing Douglas Creek Bridge #1560. This is the overall 2 SM 0 0 142,042 0 design for the entire termini. Construction will happen in 3 stages: NID 30276, NID 30270 and the final segment of construction including bridge #1560 under this NID 22452. 3 NHPP 0 0 0 9,097 3 SM 0 0 0 903 7 NHPP 0 0 0 9,097 7 SM 0 0 0 903 Totals: 0 0 1,573,000 20,000 27,000,000

Page 28 of 54 2018-2021 Draft STIP

Project Original Draft Need ID: 22453 Name: Dalton Highway Mile Point 0-10 (Milepost 0-9) Reconstruction (Livengood to 9 Mile Hill) Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 AC 0 0 0 33,658,900 NHS N 6 Northern Region Dalton Highway Reconstruction 4 SM 0 0 0 3,341,100 Description: Reconstruct the Dalton Hwy to improve substandard sections. This project is the initial stage of a large scale effort to reconstruct critical segments of this highway prior to construction of Totals: the proposed natural gas pipeline. 0 0 0 37,000,000 33,658,900

Need ID: 22475 Name: Dalton Highway Mile Point 306-337 (Milepost 305-335) Reconstruction (Sag Camp to Happy Valley) Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 NHPP 0 0 2,729,100 0 NHS N 40 Northern Region Dalton Highway Reconstruction 2 SM 0 0 270,900 0 Description: Reconstruction, including widening, repair, resurfacing and enhancements to 30 miles of road. This is the overall design for the entire termini. Construction will happen in 3 stages: NID Totals: 30281, NID 30282 and this original NID 22475. 0 0 3,000,000 0 22,000,000

Need ID: 22476 Name: Dalton Highway Mile Point 210-238 (Milepost) 209-235 Reconstruction (Dietrich to Chandalar Shelf) Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s Totals: 0 0 0 0 30,000,000 1515 NHS N 40 Northern Region Dalton Highway Reconstruction 4049 Description: Reconstruction, including widening, spot repairs, resurfacing, replacing Owen Creek culvert #4049 and Nutirwik Creek bridge #1515. [This is the parent design for the overall termini. Segment one construction is under NID 30277. Segment two is under NID 30286. The final segment will pave the entire length under the parent design, NID 22476.)

Need ID: 22480 Name: Dalton Highway Mile Point 290-307 (MP 289-305) Rehabilitation (Kuparuk to Sag Camp) Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 AC 0 0 0 30,020,100 NHS N 40 Northern Region Dalton Highway Reconstruction 4 SM 0 0 0 2,979,900 Description: Rehabilitate and widen the Dalton Highway including minor realignments and grade raises. Construct turnouts and snowdrift mitigation features. Totals: 0 0 0 33,000,000 30,020,100

Need ID: 22481 Name: Dalton Highway Mile Point 363-417 (Milepost 362-414) Reconstruction (Pump 2 to Deadhorse) Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 AC 0 0 30,478,300 0 NHS N 40 Northern Region Dalton Highway Reconstruction 4 SM 0 0 3,521,700 0 Description: Reconstruct and pave 52 miles of the Dalton Highway. This corridor will be reconstructed in four segments: NID 29449, 29450, 29451, and the last stage of work will be to pave the entire Totals: project corridor under this NID. 0 0 34,000,000 0 30,478,300

Need ID: 23657 Name: Access Road Improvements Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 SM 98,575 19,866 0 0 CTP N 39 Nulato Bridge Replacement 1382 2 STP 1,091,640 200,134 0 0 Description: Rehabilitate the Nulato Airport Access Road and Mukluk Creek Bridge #1382. 3 SM 0 0 27,993 0 3 STP 0 0 282,007 0 4 AC 0 0 0 5,030,641 4 SM 0 0 0 499,359 7 SM 0 0 18,060 0 7 STP 0 0 181,940 0 Totals: 1,190,215 220,000 510,000 5,530,000 5,030,641

Page 29 of 54 2018-2021 Draft STIP

Project Original Draft Need ID: 23675 Name: Selawik Barge Landing Access Road and Boardwalk Improvements Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 3 SM 28,056 0 0 0 CTP N 40 Selawik Reconstruction 3 STP 310,700 0 0 0 Description: Rehabilitate the existing barge landing access road, construct a new gravel barge staging pad, install lighting, and replace sections of existing boardwalk. Will also include rehabilitation of 4 ACC 0 0 0 -4,366,560 the utility crossing at the land fill. 4 SM 0 0 433,440 0 4 STP 0 0 4,366,560 4,366,560 Totals: 338,756 0 4,800,000 0 0

Need ID: 24518 Name: Elliott Highway Mile Point 0-12 (Milepost 0-12) Rehabilitation (Fox to Haystack) Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 AC 14,110,400 0 0 0 NHS N 4 Northern Region Elliott Highway System Preservation 4 ACC 0 0 -14,110,400 0 Description: Rehabilitation, restoration and resurfacing. Also includes shoulder widening in selected areas. 4 NHPP 15,000,000 0 14,110,400 0 4 SM 2,889,600 0 0 0 Totals: 32,000,000 0 0 0 0

Need ID: 24519 Name: Little Goldstream Creek Bridge Replacement Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 AC 1,887,920 0 0 0 CTP N 6 Nenana Bridge Replacement 2080 4 ACC 0 -1,887,920 0 0 Description: Remove and replace the Little Goldstream Creek Bridge #2080 near Nenana. The existing timber structure at Little Goldstream Creek is experiencing abutment erosion and settlement. 4 SM 187,402 0 0 0 4 STP 0 1,887,920 0 0 Totals: 2,075,322 0 0 0 0

Need ID: 25596 Name: Rosie Creek Road Improvements Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 3PF 42,892 0 0 0 CTP N 5 Fairbanks Reconstruction 2 ACC -545,820 0 0 0 Description: Improve Rosie Creek Road from Chena Ridge to Becker Ridge, to include alignment, shoulder work, repair and overlay of pavement, and improving the intersection at Chena Ridge. 2 STP 977,928 0 0 0 3 3PF 0 45,150 0 0 3 STP 0 454,850 0 0 4 3PF 0 0 0 546,857 4 STP 0 0 0 5,509,143 7 3PF 0 9,030 0 0 7 STP 0 90,970 0 0 Totals: 475,000 600,000 0 6,056,000 5,509,143

Need ID: 25598 Name: Richardson Highway Mile Point 358-364 (Milepost 357-362) Bicycle/Pedestrian Path Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 AC 0 3,488,700 0 0 TRAAK N 2 Northern Region Richardson Highway New Construction 4 ACC 0 0 -3,488,700 0 Description: Construct a paved bicycle/pedestrian path on the Richardson Highway starting from the Richardson Highway/Airport Way intersection, continuing along the Richardson Highway to the 4 SM 0 346,300 0 0 Badger Loop North Bound Ramp, and terminating at the Badger Road/Old Richardson Highway intersection. 4 STP 0 0 3,488,700 0 Totals: 0 3,835,000 0 0 0

Page 30 of 54 2018-2021 Draft STIP

Project Original Draft Need ID: 26057 Name: Nome Port Road Improvements Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 3PF 9,030 0 0 0 CTP N 39 Nome Reconstruction 2 SM 9,030 0 0 0 Description: Widen and resurface the existing Port Road, including but not limited to: drainage improvements, safety improvements and pedestrian facilities. 2 STP 181,940 0 0 0 3 3PF 6,772 0 0 0 3 SM 6,773 0 0 0 3 STP 136,455 0 0 0 4 3PF 0 0 0 286,703 4 AC 0 0 0 5,776,595 4 SM 0 0 0 286,702 7 3PF 4,515 0 0 0 7 SM 4,515 0 0 0 7 STP 90,970 0 0 0 Totals: 450,000 0 0 6,350,000 5,776,595

Need ID: 26076 Name: Aurora Drive-Noyes Slough Bridge Replacement Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 SM 28,445 0 0 0 CTP N 1 Fairbanks N/A Bridge Rehabilitation 209 2 STP 286,556 0 0 0 Description: Replace the Noyes Slough Bridge on Aurora Drive in Fairbanks. 3 SM 35,217 0 0 0 3 STP 354,782 0 0 0 7 SM 27,090 0 0 0 7 STP 272,910 0 0 0 Totals: 1,005,000 0 0 0 7,250,000

Need ID: 26080 Name: Gold Mine Trail Road Upgrade Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 3PF 270,900 0 0 0 CTP N 4 Fairbanks Reconstruction 4 AC 2,729,100 0 0 0 Description: Upgrade and pave approximately 4,750 feet of Gold Mine Trail and replace guardrail. Realign two 90 degree turns as it approaches the Steese Highway with possible realignment of the 4 ACC 0 -2,729,100 0 0 intersection with the Steese. 4 STP 0 2,729,100 0 0 Totals: 3,000,000 0 0 0 0

Need ID: 26081 Name: Selawik Footbridge Rehabilitation Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 SM 99,330 0 0 0 1292 4 STP 1,000,670 0 0 0 CTP N 40 Selawik Bridge Rehabilitation 1401 Totals: 1,100,000 0 0 0 0 Description: Rehabilitate East Fork Footbridge #1292 and West Fork Footbridge #1401. Work will include repair or replacement of surface boards, install a traction system, repair railing on the access ramps, repair steel cross bracing, and foundation repairs.

Page 31 of 54 2018-2021 Draft STIP

Project Original Draft Need ID: 26085 Name: Nome Seppala Drive Rehabilitation Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 SM 18,060 0 0 0 CTP N 39 Nome Reconstruction 2 STP 181,940 0 0 0 Description: Realign and rehabilitate Seppala Drive in Nome from the intersection of Bering Street to the intersection of Airport Terminal Road. 3 SM 0 27,090 0 0 3 STP 0 272,910 0 0 4 AC 0 0 0 8,642,150 4 SM 0 0 0 857,850 7 AC 0 2,729,100 0 0 7 ACC 0 0 -2,729,100 0 7 SM 0 270,900 0 0 7 STP 0 0 2,729,100 0 Totals: 200,000 3,300,000 0 9,500,000 8,642,150

Need ID: 26155 Name: Nome Bering Street Rehabilitation Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 SM 40,635 0 0 0 CTP N 39 Nome Reconstruction 2 STP 409,365 0 0 0 Description: Repave Bering Street from Front Street to the intersection of Greg Kruschek Ave/Little Creek Road. Project will include minimal drainage improvements, asphalt repair, improve curb ramps 3 SM 5,418 0 0 0 to meet ADA standards as required according to the Alaska Highway Preconstruction Manual, and constructing a pedestrian facility path from the existing sidewalk to the end of the project. 3 STP 54,582 0 0 0 4 AC 0 0 1,311,308 0 4 ACC 0 0 0 -1,311,308 4 SM 0 0 328,692 0 4 STP 0 0 2,000,000 1,311,308 7 SM 23,930 0 0 0 7 STP 241,070 0 0 0 Totals: 775,000 0 3,640,000 0 0

Need ID: 26156 Name: Nome Center Creek Road Rehabilitation Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 SM 67,725 0 22,575 0 CTP N 39 Nome System Preservation 2 STP 682,275 0 227,425 0 Description: Rehabilitate Center Creek Road in Nome from Seppala Drive to Nome-Teller Hwy, including realignment of Center Creek Road and FAA/Doyle Road intersections. Rehabilitation includes Totals: 750,000 0 250,000 0 12,350,000

Need ID: 26157 Name: Parks Highway Mile Point 195-196 (Milepost 231) Enhancements Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 FLAP 2,000,000 0 0 0 NHS N 6 Northern Region Parks Highway Transportation Enhancements 694 2 SM 198,527 0 0 0 Description: Construct dedicated pedestrian facilities at McKinley Village, including intersection improvements, a rest area, and trail and pedestrian facility connections and replacing the Nenana River Totals: Park Boundary Bridge #0694. 2,198,527 0 0 0 28,000,000

Page 32 of 54 2018-2021 Draft STIP

Project Original Draft Need ID: 26161 Name: Fairbanks Air Quality Planning Project Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 9 CMAQ-F 72,776 72,776 72,776 72,776 REQD N 5 Fairbanks Congestion 9 SM 7,224 7,224 7,224 7,224 Description: The goal of this project is to update the local transportation model and EPA mobile source emission model. Fairbanks is a newly designated PM 2.5 non-attainment area and also a CO Maintenance area. An up to date transportation model and EPA mobile source emission model are needed for on-going transportation and air quality planning activities in the community. This project will provide funding to conduct federally mandated Air Quality Conformity Analysis for all long range and short term planning documentation. Totals: 80,000 80,000 80,000 80,000 160,000

Need ID: 27010 Name: Northern Region Signal Interconnect Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 ACC -1,275,902 0 0 0 CTP N 60 Northern Region ITS 4 CMAQ-M 2,729,100 2,729,100 2,729,100 2,729,100 Description: Improve capabilities of the Northern Region to communicate with signals, allowing for troubleshooting, signal timing modifications, and monitoring at single/multiple location(s). Project will include upgrades at NR Headquarters and incorporate improvements to interconnecting communication systems (for security and reliability), controller upgrades, signal timing plans, and other related items. Provide any related items and Training, Maintenance, and Operational funding as allowed by ITS. 4 SM 270,900 270,900 270,900 270,900 Totals: 1,724,098 3,000,000 3,000,000 3,000,000 3,000,000

Need ID: 27049 Name: Whitshed Road and Pedestrian Improvements Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 3PF 42,459 0 0 0 CTP N 32 Cordova New Construction 2 SM 42,459 0 0 0 Description: Provide pedestrian accommodations along Whitshed Road from the intersection with the Copper River Highway to the intersection with Orca Inlet Drive. Approximately .75 miles in length. 2 STP 855,482 0 0 0 3 3PF 0 0 27,090 0 3 SM 0 0 27,090 0 3 STP 0 0 545,820 0 7 3PF 0 0 4,515 0 7 SM 0 0 4,515 0 7 STP 0 0 90,970 0 Totals: 940,400 0 700,000 0 7,500,000

Need ID: 27524 Name: Denali Highway Mile Point 24-25 (Milepost 22) Rock Creek Bridge Replacement Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s Totals: 0 0 0 0 4,500,000 AHS N 9 Northern Region Denali Highway Bridge Replacement 684 Description: Replace Rock Creek Bridge #0684 on the Denali Highway.

Need ID: 27525 Name: McCarthy Road Mile Point 60-61 (Milepost 27) Chokosna River Bridge Replacement Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 SM 22,575 0 0 0 AHS N 6 Northern Region Edgerton Highway Bridge Replacement 1193 2 STP 227,425 0 0 0 Description: Replace the Chokosna River Bridge #1193 of McCarthy Road, (aka Edgerton Hwy/McCarthy Road). Work may include minor realignment to facilitiate construction of the new bridge. Totals: 250,000 0 0 0 5,700,000

Page 33 of 54 2018-2021 Draft STIP

Project Original Draft Need ID: 27542 Name: Chena Hot Springs Road Mile Point 0-6 (Milepost 0 to 6) Rehabilitation Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 SM 0 106,373 0 0 AHS N 60 Fairbanks N/A System Preservation 2 STP 0 1,071,627 0 0 Description: Rehabilitate Chena Hot Springs Road. 4 AC 0 0 15,464,900 0 4 SM 0 0 1,535,100 0 7 SM 0 0 22,575 0 7 STP 0 0 227,425 0 Totals: 0 1,178,000 17,250,000 0 15,464,900

Need ID: 28069 Name: Richardson Highway Mile Point 360-361 (Milepost 359) Railroad Grade Separated Facility Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 NHPP 0 0 1,333,752 0 NHS N 2 Fairbanks Richardson Highway Railroad 2 SM 0 0 94,248 0 Description: Construct grade-separated facility on the Richardson Highway to reduce railroad/vehicle conflicts; improve connectivity with the Old Richardson Highway; and provide 3 NHPP 0 0 467,000 0 south gate access. 3 SM 0 0 33,000 0 7 NHPP 0 0 909,700 0 7 SM 0 0 90,300 0 Totals: 0 0 2,928,000 0 38,500,000

Need ID: 28109 Name: Kivalina Evacuation and School Site Access Road Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 3 SM 18,060 0 0 0 CTP N 40 Kivalina N/A New Construction 3 STP 181,940 0 0 0 Description: Construct an access road to the new Kivalina school site near Kisimigiuktuk Hill. Totals: 200,000 0 0 0 55,000,000

Need ID: 28429 Name: Parks Highway Mile Point 147-157 (Milepost 183-192) Reconstruction Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 7 NHPP 0 1,401,000 0 0 NHS N 9 Northern Region Parks Highway Reconstruction 260 7 SM 0 99,000 0 0 Description: Reconstruct the Parks Highway and replace the East Fork Chulitna River Bridge #0260. Totals: 0 1,500,000 0 0 46,000,000

Need ID: 29232 Name: Committed Measures for the Fairbanks SIP Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 0 CMAQ-M 7,333,810 1,728,430 1,728,430 1,728,430 REQD N 5 Fairbanks N/A Congestion 0 SM 665,177 171,570 171,570 171,570 Description: This project is to fund committed measures identified in the Fairbanks SIP that addresses the Fairbanks PM2.5 non-attainment. Totals: 7,998,987 1,900,000 1,900,000 1,900,000 3,800,000

Need ID: 29651 Name: Chena Hot Springs Road Jenny M Creek Bridge Replacement Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 AC 4,548,500 0 0 0 AHS N 6 Fairbanks N/A Bridge Replacement 312 4 ACC 0 0 -4,548,000 0 Description: Replace the Jenny M Creek bridge #312 on Chena Hot Springs Road. 4 SM 451,500 0 0 0 4 STP 0 0 4,548,000 0 Totals: 5,000,000 0 0 0 0

Page 34 of 54 2018-2021 Draft STIP

Project Original Draft Need ID: 29655 Name: University Ave Rehabilitation: Thomas St to Chena River (Segment I) Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s Totals: 0 0 0 0 18,000,000 NHS N 5 Fairbanks N/A System Preservation 263 Description: Widen and reconstruct University Avenue to current standards from Thomas Street to the Chena River, including replacement of University Ave Bridge #0263. This project is associated with NIDs 29656, 31155, 31577, 31578, and the parent design project NID 3821.

Need ID: 29656 Name: University Ave Rehabilitation: Chena River to Parks Highway (Segment II) Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s Totals: 0 0 0 0 25,000,000 NHS N 5 Fairbanks N/A Reconstruction 263 Description: Widen and reconstruct University Avenue to current standards from the Chena River to the Parks Highway. This project is associated with NID 29655, 31155, 31577, 31578, and the parent design project NID 3821.

Need ID: 29657 Name: Northern Region Atmospheric Data Equipment Installation & Upgrades Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 SM 67,725 0 0 0 REQD N 93 Various N/A ITS 4 STP 682,275 0 0 0 Description: Install five Road Weather Information System (RWIS) sites throughout the region to support the Northern Region Maintenance Decision Support System (MDSS). Upgrade existing Totals: 750,000 0 0 0 0

Need ID: 29809 Name: Richardson Highway Mile Point 175-188 (Milepost 173-185) Reconstruction & Widening Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 NHPP 0 0 0 909,700 NHS N 6 Various Richardson Highway Reconstruction 2 SM 0 0 0 90,300 Description: Reconstruct and widen the Richardson Highway. Totals: 0 0 0 1,000,000 21,000,000

Need ID: 29810 Name: Richardson Highway Mile Point 208-238 (Milepost 206-235) Reconstruction & Bridge Replace Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 ACC 0 -2,092,310 0 0 581 2 NHPP 0 2,092,310 2,920,137 0 582 2 SM 0 0 289,863 0 583 7 NHPP 0 0 0 909,700 NHS N 9 Various Richardson Highway Reconstruction 593 7 SM 0 0 0 90,300 Description: Reconstruct the Richardson Highway including replacement of Upper Miller Creek Bridge #0581, Lower Miller Creek Bridge #0582, Castner Creek Bridge #0583 and Bear Creek Bridge #0593 Totals: .This project will be constructed in four stages, under NID 31282, NID 31283, NID 31284, and this NID 29810. 0 0 3,210,000 1,000,000 83,000,000

Need ID: 29811 Name: Richardson Highway Mile Point 268-343 (Milepost 266-341) Passing Lanes (Delta Jct to Eielson) Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 ACC -345,580 0 0 0 NHS N 6 Various Richardson Highway New Construction 2 NHPP 345,580 0 1,364,550 0 Description: Construct passing lanes at various locations (yet to be determined) on the Richardson Highway to improve safety. Including intersection improvements at the southern access of Eielson Air Force Base to accommodate freight volumes in support of the addition of two F-35A aircraft squadrons. This is the overall design for the entire termini. Construction will happen in two stages under NID 30284 and this NID 29811. 2 SM 0 0 135,450 0 Totals: 0 0 1,500,000 0 25,000,000

Page 35 of 54 2018-2021 Draft STIP

Project Original Draft Need ID: 29812 Name: Richardson Highway Mile Point 117-151 (Milepost 115-148) Rehabilitation & Widening Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 7 NHPP 454,850 0 0 0 NHS N 6 Gakona Richardson Highway System Preservation 574 7 SM 45,150 0 0 0 Description: Rehabilitate the Richardson Highway including rehabilitation of Gulkana River Bridge #0574.Construction will happen in two stages, under NID 31286 and this NID 29812. Totals: 500,000 0 0 0 36,000,000

Need ID: 29829 Name: Steese Expressway / Johansen Expressway Interchange Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 NHPP 0 1,886,718 0 0 NHS N 2 Fairbanks Steese Highway Traffic Management Operations 2 SM 0 187,282 0 0 Description: Construct a grade separated interchange at the intersection of Steese Expressway and Johansen Expressway. Realign adjacent access as necessary to accommodate the selected 3 NHPP 0 0 2,729,100 0 interchange configuration 3 SM 0 0 270,900 0 7 NHPP 0 0 909,700 0 7 SM 0 0 90,300 0 Totals: 0 2,074,000 4,000,000 0 30,000,000

Need ID: 29880 Name: Tazlina Bike and Pedestrian Pathway Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 3PF 180,600 0 0 0 FLAP N 6 Tazlina Richardson Highway Transportation Enhancements 2 FLAP 1,819,400 0 0 0 Description: Design and construct a 10' wide pedestrian/bicycle pathway from Glennallen through Tazlina, and into Copper Center within the existing DOT&PF right-of-way, 10.9 miles in length. The project also includes a pedestrian bridge, approximately 469 feet in length. This is a Federal Lands Access Program (FLAP) award. (To be delivered by Western Federal Lands Division.) Totals: 2,000,000 0 0 0 0

Need ID: 29881 Name: Airport Way Drainage Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 NHPP 0 0 545,820 0 NHS N 1 Fairbanks N/A System Preservation 2 SM 0 0 54,180 0 Description: Improve roadway drainage by replacing drainage structures, reconfiguring roadway geometry and frontage road separation, grading, and adjusting utilities. This project will also address Totals: ADA compliance and associated drainage needs. 0 0 600,000 0 9,700,000

Need ID: 29909 Name: Weigh-In-Motion (WIM) Program Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 0 NHPP 0 454,850 0 0 NHS N 5 Fairbanks Richardson Highway ITS 0 SM 0 45,150 0 0 Description: Design and installation of federally required Weigh-in-Motion (WIM) equipment sites on the Richardson Highway (at the existing weigh station) and on the Parks Highway near Ester. Totals: 0 500,000 0 0 2,250,000

Need ID: 29973 Name: Richardson Highway Mile Point 68-84 (Milepost 65-80) Rehabilitation Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 NHPP 0 591,305 0 0 569 2 SM 0 58,695 0 0 NHS N 9 Northern Region Richardson Highway System Preservation 570 Totals: 0 650,000 0 0 20,500,000 Description: Restore the structural integrity of the Richardson Highway including upgrades and improvements to drainage and safety.

Page 36 of 54 2018-2021 Draft STIP

Project Original Draft Need ID: 30069 Name: Richardson Highway Mile Point 351-355 (Milepost 350 - 353) Access Improvements Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 NHPP 0 0 0 1,637,460 NHS N 5 Fairbanks Richardson Highway New Construction 2 SM 0 0 0 162,540 Description: Improve existing access control including development of frontage roads on the Richardson Highway. Work includes resurfacing the Richardson Highway, improving and consolidating Totals: intersections, and grade separation of the Alaska Railroad crossing. 0 0 0 1,800,000 38,000,000

Need ID: 30150 Name: Steese Highway Mile Point 4-6 (Milepost 4.5) (CHSR) Off-Ramp Bypass Lane Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 ACC -129,360 0 0 0 NHS N 4 Fairbanks Steese Highway New Construction 2 SM 129,360 0 0 0 Description: Construct a bypass lane and retaining wall at the Steese Highway north bound ramp to Chena Hot Springs Road. 3 NHPP 136,455 0 0 0 3 SM 13,545 0 0 0 4 NHPP 0 591,305 0 0 4 SM 0 58,695 0 0 Totals: 150,000 650,000 0 0 0

Need ID: 30196 Name: Eyak River Recreation Area Rehabilitation Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 3PF 113,281 0 0 0 FLAP N 32 Eyak N/A Transportation Enhancements 4 FLAP 1,141,220 0 0 0 Description: Re-route the direction of traffic entering the Eyak River boating site by creating an alternative access road into the site, widening and improving the boat ramp and parking area, redesigning the boat launch and providing more clearly defined parking spaces. (To be delivered by Chugach National Forest.) Totals: 1,254,501 0 0 0 0

Need ID: 30270 Name: Dalton Highway Mile Point 120-136 (Milepost 120-135) Reconstruction (Pung Creek to Prospect Creek) Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s Totals: 0 0 0 0 25,000,000 NHS N 40 Northern Region Dalton Highway Reconstruction Description: Reconstruction, including widening, spot repairs and resurfacing of approximately 15 miles of the Dalton Highway.This project is associated with NID 30276 and the parent design project NID 22452.

Need ID: 30276 Name: Dalton Highway Mile Point 109-121 (Milepost 109-120) Reconstruction Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s Totals: 0 0 0 0 25,000,000 NHS N 40 Northern Region Dalton Highway Reconstruction Description: Reconstruction, including widening, spot repairs and resurfacing of approximately 9 miles of the Dalton Highway. This project is associated with NID 30270 and the parent design project NID 22452.

Need ID: 30277 Name: Dalton Highway Mile Point 210-224 (Milepost 209-222) Reconstruction (Owen Creek to Chandalar Shelf) Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 ACC -15,000,000 -7,918,049 0 0 NHS N 40 Northern Region Dalton Highway Reconstruction 4049 4 NHPP 15,000,000 7,918,049 0 0 Description: Reconstruction, including widening, spot repairs, resurfacing, and replacing Owen Creek culvert #4049. This is the first segment of construction and the second segment is NID 30286. The Totals: final segment will pave the entire length under the parent design, NID 22476. 0 0 0 0 0

Page 37 of 54 2018-2021 Draft STIP

Project Original Draft Need ID: 30278 Name: Parks Hwy Mile Point 127-139 (Milepost 163-168.5,169.5-174) Rehabilitation, excluding R/R crossing Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 AC 0 0 19,614,000 0 NHS N 9 Northern Region Parks Highway System Preservation 4 SM 0 0 1,386,000 0 Description: Rehabilitate the Parks Highway to improve drainage and construct passing lanes. The grade separated crossing will take place under Need ID 22331, the parent design project and also Totals: associated with NID 30279. 0 0 21,000,000 0 19,614,000

Need ID: 30279 Name: Parks Highway Mile Point 138-148 (Milepost 174-183) Rehabilitation Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s Totals: 0 0 0 0 23,000,000 NHS N 9 Northern Region Parks Highway System Preservation 7037 Description: Rehabilitate the Parks Highway to improve drainage, construct passing lanes and realign the Little Honolulu crossing, #7037. This project is associated with NID 22331 and NID 30278.

Need ID: 30280 Name: Alaska Highway Mile Point 12-29 (Milepost 1235-1251) Rehabilitation Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s Totals: 0 0 0 0 25,000,000 NHS N 6 Northern Region Alaska Highway System Preservation 503 Description: Rehabilitate the Alaska Highway, including possible repairs to Gardiner Creek bridge #0503. This project is also associated with NID 22299, the parent design project.

Need ID: 30281 Name: Dalton Highway Mile Point 306-317 (Milepost 305-314) Reconstruction Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s Totals: 0 0 0 0 18,000,000 NHS N 40 Northern Region Dalton Highway Reconstruction Description: Reconstruct and widen the Dalton Highway, Construction will happen in 3 stages, under NID 30281, NID 30282 and the original NID 22475.

Need ID: 30282 Name: Dalton Highway Mile Point 315-329 (Milepost 314-327) Reconstruction Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s Totals: 0 0 0 0 50,000,000 NHS N 40 Northern Region Dalton Highway Reconstruction Description: Reconstruct and widen the Dalton Highway. Construction will happen in 3 stage, under NID 30281, NID 30282 and the original NID 22475.

Need ID: 30284 Name: Richardson Highway Mile Point 268-307 (Milepost 266-305) Passing Lanes (Delta Jct to Birch Lake) Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s Totals: 0 0 0 0 25,000,000 NHS N 6 Delta Junction Richardson Highway Safety Description: Construct passing lanes at various locations (yet to be determined) on the Richardson Highway to improve safety. Construction will happen in three stages, under NID 30284, NID 30449 and the original NID 29811.

Need ID: 30285 Name: Dalton Highway Mile Point 18-26 (Milepost 18-25) Reconstruction and Bridge Replacement Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s Totals: 0 0 0 0 25,000,000 NHS N 6 Northern Region Dalton Highway Reconstruction 1213 Description: Reconstruction, including widening, spot repairs and resurfacing of approximately 7 miles of the Dalton Highway in the Hess Creek Area, including replacement of Hess Creek Bridge #1213. This project is also associated with 22446.

Page 38 of 54 2018-2021 Draft STIP

Project Original Draft Need ID: 30286 Name: Dalton Highway Mile Point 223-238 (Milepost 222-235) Reconstruction and Bridge Replacement Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 AC 0 23,652,200 0 0 NHS N 40 Northern Region Dalton Highway Reconstruction 1515 4 ACC 0 0 0 -23,652,200 Description: Reconstruction, including widening, spot repairs, resurfacing 13 miles, and replacing Nutirwik Creek bridge #1515. Construction will happen in three segments under NID 30277, 30286, and 4 NHPP 0 0 0 23,652,200 the final segment will pave the entire length of the project under the parent project NID 22476. 4 SM 0 2,347,800 0 0 Totals: 0 26,000,000 0 0 0

Need ID: 30369 Name: Northern Region ADA Reconnaissance and Improvements Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 SM 13,545 22,575 0 0 NHS N 93 Northern Region N/A Safety 2 STP 136,455 227,425 0 0 Description: This project will design and construct improvements recommended by the Northern Region ADA Reconnaissance Study. 3 SM 0 9,030 0 0 3 STP 0 90,970 0 0 4 SM 0 0 180,600 0 4 STP 0 0 1,819,400 0 7 SM 0 9,030 0 0 7 STP 0 90,970 0 0 Totals: 150,000 450,000 2,000,000 0 0

Need ID: 30391 Name: Dalton Highway Wetlands Mitigation Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 0 NHPP 1,364,550 0 0 0 NHS N 40 Various Dalton Highway Environmental Only 0 SM 135,450 0 0 0 Description: Perform activities as required to fulfill compensatory mitigation commitments for projects on the Dalton Highway. Totals: 1,500,000 0 0 0 0

Need ID: 30429 Name: Tok Cutoff Mile Point 37-50 (Milepost 38-50) Rehabilitation Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 AC 0 11,371,250 0 0 NHS N 99 Chistochina Tok Cutoff Reconstruction 651 4 ACC 0 0 -11,371,250 0 Description: Rehabilitate the Tok Cutoff. Improvements will include drainage, embankment stabilization and rebuilding the pavement structure. Bridge rail upgrades and deck repairs to Indian River 4 NHPP 0 11,371,250 11,371,250 0 Bridge #0651. 4 SM 0 2,257,500 0 0 7 NHPP 136,455 0 0 0 7 SM 13,545 0 0 0 Totals: 150,000 25,000,000 0 0 0

Need ID: 30449 Name: Richardson Highway Mile Point 338-340 (Milepost 337) Eielson AFB Intersection Improvements Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 ACC -1,612,310 0 0 0 NHS N 6 Eielson AFB Richardson Highway Safety 4 NHPP 1,612,310 0 0 0 Description: Intersection improvements at the southern access of the Eielson Air force Base of the Richardson Highway to accommodate additional freight volumes in support of the addition of two F- Totals: 35A aircraft squadrons. This is associated with the parent design project NID 29811 and NID 30284. 0 0 0 0 0

Need ID: 30989 Name: Richardson Highway Mile Point 115-117 (Milepost 113) Realignment (Slide) Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 NHPP 0 0 436,656 291,104 NHS N 6 Northern Region Richardson Highway Reconstruction 2 SM 0 0 43,344 28,896 Description: Realign the Richardson Highway to mitigate the Copper River slide and erosion. Totals: 0 0 480,000 320,000 4,000,000

Page 39 of 54 2018-2021 Draft STIP

Project Original Draft Need ID: 30995 Name: Parks Highway Mile Point 172-175 (Milepost 208-210) Reconstruction Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 NHPP 0 0 636,790 0 NHS N 6 Northern Region Parks Highway Reconstruction 2 SM 0 0 63,210 0 Description: Reconstruct the Parks Highway. Totals: 0 0 700,000 0 5,400,000

Need ID: 30998 Name: Elliot Highway Mile Point 44-65 (Milepost 47-69) Rehabilitation Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 NHPP 0 682,275 0 454,850 NHS N 6 Northern Region Elliott Highway Reconstruction 440 2 SM 0 67,725 0 45,150 Description: Rehabilitate the Elliott Highway, including the Tolovana River Bridge #0440. Some segments require major rehabilitation and some require embankment reconstruction as reflected in poor Totals: pavement condition. 0 750,000 0 500,000 14,000,000

Need ID: 31155 Name: University Avenue Rehabilitation (Segment Ia) Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 AC 2,274,250 0 0 0 NHS N 5 Fairbanks N/A Reconstruction 4 ACC 0 0 -2,274,250 0 Description: Improve the University Avenue intersections at Geist Road and the Johansen Expressway. The improvements are part of the construction of University Avenue Segment 1 and will prepare 4 NHPP 2,274,250 0 2,274,250 0 the intersection for new traffic patterns that will be in place during Segment 1 construction. This project is associated with NID 29655, 29656, 31577, 31578, adn the parent design project NID3821. 4 SM 451,500 0 0 0 Totals: 5,000,000 0 0 0 0

Need ID: 31278 Name: Parks Highway Mile Point 269-283 (Milepost 305-319) Reconstruction (Stage I of II) Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s Totals: 0 0 0 0 25,000,000 NHS N 6 Nenana Parks Highway Other Description: Reconstruct the Parks Highway. Construction will occur in two stages, NID 31278 and the parent project, NID 22335.

Need ID: 31282 Name: Richardson Highway Mile Point 208-219 (Milepost 206-216) Reconstruction (Stage I of IV) Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s Totals: 0 0 0 0 29,900,000 NHS N 9 Various Richardson Highway Other 581 Description: Reconstruct Richardson Highway including replacement of the Upper Miller Creek Bridge # 0581. This project will be constructed in four segments, under NID 31282, 31282, 31284, and the final segment will be constructed under the parent NID 29810.

Need ID: 31286 Name: Richardson Highway Mile Point 139-151 Milepost 137-148 Rehabilitation and Widening (Stage II of II) Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 AC 0 0 17,284,300 0 NHS N 6 Gakona Richardson Highway Other 4 SM 0 0 1,715,700 0 Description: Rehabilitate the Richardson Highway. This project will be constructed in two segements, under NID 31286 and the parent NID 29812. Totals: 0 0 19,000,000 0 17,284,300

Need ID: 31577 Name: University Ave Rehabilitation: Thomas St. To Chena River (Segment 1 North) Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 NHPP 13,645,500 0 0 0 NHS N 5 Fairbanks N/A Reconstruction 4 SM 1,354,500 0 0 0 Description: Complete University Avenue improvements from new Indiana Avenue to EOP (Thomas St) including final Wolf Run configuration, construction of New Indiana Ave, and portion of Halvorson Totals: Road extension. This proejct is associated with NIDs 31578, 29655, 29656, 31155, and the parent design project 3821. 15,000,000 0 0 0 0

Page 40 of 54 2018-2021 Draft STIP

Project Original Draft Need ID: 31578 Name: University Ave Rehabilitation: Side Streets Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s Totals: 0 0 0 0 10,000,000 NHS N 5 Fairbanks N/A Reconstruction Description: Finish Halvorson, portions of Goldizen and Geraghty Avenue, as well as advance utility reolocations as part of the larger University Avenue Rehabilitation project. This project is associated with NIDs 31577, 29655, 29656, 31155, and the parent design project 3821.

Need ID: 31596 Name: Winter Trail Marking Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 SM 9,030 9,030 9,030 9,030 CTP N 99 Various N/A Other 2 STP 90,970 90,970 90,970 90,970 Description: Mark overland winter trails in Northern and Central Region with semi-permanent trail markers. Trail markers will ensure winter travelers can safely journey between communities in the 4 SM 45,150 67,725 45,150 67,725 area. 4 STP 454,850 682,275 454,850 682,275 Totals: 600,000 850,000 600,000 850,000 1,200,000

Need ID: 31656 Name: Chena Pump Road Bike and Pedestrian Facility Rehabilitation Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 SM 10,836 0 0 0 TRAAK N 5 Fairbanks N/A System Preservation 2 STP 109,164 0 0 0 Description: Rehabilitate the existing Chena Pump Road bicycle path between Dartmouth Drive and the Pump House Restaurant. Improvements include widening Chena Pump Road shoulders between 4 AC 0 1,455,520 0 0 the Pump House Restaurant and Grebe Drive, bridge work onthe Cripple Creek pedestrian bridge, drainage and roadside hardware. 4 ACC 0 0 -1,455,520 0 4 SM 0 144,480 0 0 4 STP 0 0 1,455,520 0 Totals: 120,000 1,600,000 0 0 0

Northern Region Need ID: 2436 Name: Kodiak - Otmeloi Way Reconstruction Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 3 OSF 0 500,000 0 0 CTP S 32 Kodiak N/A Reconstruction 4 ILLU 0 3,400,000 0 0 Description: Reconstruct approximately one mile of Otmeloi Way. Road improvements will include grading, drainage, paving, and construction of pedestrian facilities. Realignment and lighting as 4 OSF 0 1,450,000 0 0 needed. Upon completion, ownership and maintenance responsibility for Otmeloi Way and associated facilities will be transferred to the Kodiak Island Borough. 7 OSF 0 750,000 0 0 Totals: 0 6,100,000 0 0 0

Need ID: 7174 Name: Highway Safety Improvement Program/Safety Management Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 9 SA 180,000 180,000 180,000 180,000 REQD S 91 Southcoast Region Planning 9 SM 20,000 20,000 20,000 20,000 Description: HSIP Management, studies and responses on safety-related issues. Totals: 200,000 200,000 200,000 200,000 400,000

Page 41 of 54 2018-2021 Draft STIP

Project Original Draft Need ID: 8990 Name: Ketchikan - Water Street Trestle No. 1 Improvement Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 3PF 9,030 0 0 0 CTP S 36 Ketchikan Bridge Rehabilitation 389 2 STP 90,970 0 0 0 Description: Replace or rehabilitate Water Street Trestle No. 1 (No. 389) 3 3PF 9,030 0 0 0 3 STP 90,970 0 0 0 4 3PF 0 0 207,690 0 4 AC 0 0 2,092,310 0 4 ACC 0 0 0 -2,092,310 4 STP 0 0 0 2,092,310 7 3PF 0 0 9,030 0 7 STP 0 0 90,970 0 Totals: 200,000 0 2,400,000 0 0

Need ID: 16065 Name: Industrial Boulevard Widening and Sidewalk Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 3PF 30,454 0 0 0 CTP S 34 Juneau Reconstruction 2 STP 91,361 0 0 0 Description: Widen the paved surface and add curb, gutter and sidewalk on the west side from Glacier Highway to Maier Drive. Includes drainage, lighting improvements, including improved curb 3 3PF 2,500 0 0 0 ramps to meet ADA standards as required according to the Alaska Preconstruction Manual. 3 STP 7,500 0 0 0 4 3PF 1,184,325 0 0 0 4 STP 4,552,975 0 0 0 7 3PF 7,500 0 0 0 7 STP 22,500 0 0 0 Totals: 5,899,115 0 0 0 0

Need ID: 18922 Name: Pavement and Bridge Rehabilitation Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 0 NHPP 4,548,500 4,548,500 4,548,500 4,548,500 REQD S 91 Southcoast Region Rehabilitation 0 SM 1,354,500 1,354,500 1,354,500 1,354,500 Description: Crack sealing, surface treatment drainage, signage, guardrail, illumination and other refurbishments to prolong the life of road pavement and bridges and their safety related structures. Project includes NHS Lane Delineators, Destination & Distance Signing, Pavement Markings and Signalization, Abandoned Vehicle Program, Road Surfacing and Transfer and Road Surface Treatments. 0 STP 9,097,000 9,097,000 9,097,000 9,097,000 Totals: 15,000,000 15,000,000 15,000,000 15,000,000 30,000,000

Need ID: 21114 Name: Ketchikan - S. Tongass Hwy Improvements Deermount to Saxman Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 ACC -800,000 -683,794 0 0 AHS S 36 Ketchikan South Tongass Highway Reconstruction 2 STP 800,000 683,794 0 0 Description: Reconstruct roadway and related non-motorized facilities, as necessary, to improve safe movement of vehicle, bicycle and pedestrian traffic on Stedman and South Tongass Hwy. Project 3 ACC 0 -4,727,270 0 0 begins at approximately Deermount Street and ends approximately 0.2 miles before Totem St. in Saxman; total project length is about 2 miles long. Include pedestrian and bicycle improvements as 3 STP 0 4,727,270 0 0 needed throughout the project with improved curb ramps to meet ADA standards as required according to the Alaska Preconstruction Manual. 4 AC 0 0 13,481,754 0 4 SM 0 0 1,338,246 0 7 SM 0 0 36,120 0 7 STP 0 0 363,880 0 Totals: 0 0 15,220,000 0 13,481,754

Page 42 of 54 2018-2021 Draft STIP

Project Original Draft Need ID: 22279 Name: Haines Hwy Reconstruction & Chilkat Bridge Replacement: Mile Point 22 to 25 (Milepost 23 to 25.3) Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 AC 0 0 0 16,556,540 NHS S 33 Haines Haines Highway Reconstruction 742 4 SM 0 0 0 1,643,460 Description: Replace bridge #742. Possible realignment of road on either side. Widen road to 36'. Straighten curves to meet a 55 mph design speed. Provide a long-term solution to debris flow problems. Enhancements planned along the Chilkat River. This is one of three construction projects that fall under the Haines Highway Reconstruction design project, Need ID 2152. Other construction 7 NHPP 0 0 0 545,820 segments under Need IDs 26330 and 27829. 7 SM 0 0 0 54,180 Totals: 0 0 0 18,800,000 16,556,540

Need ID: 23055 Name: Repair or Replace Rink Creek Bridge Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 ACC -30,930 0 0 0 CTP S 33 Gustavus Bridge Replacement 2203 2 STP 30,930 0 0 0 Description: Remove existing Rink Creek Bridge, #2203 and replace with adequate structure which will provide access to the Falls Creek Hydroelectric Project and must be designed to accommodate Totals: heavy vehicles. Project spans the length of the bridge plus tie in to the road only. 0 0 0 0 0

Need ID: 23375 Name: Keku Road Rehabilitation Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 ACC -109,164 0 0 0 CTP S 35 Kake Resurface 1152 2 STP 109,164 0 0 0 Description: Rehabilitate Church/Canadian Side, Silver Spike, Keku, and Boat Harbor Spur Roads from Sixth Street to Portage Bay Boat Harbor for a total length of approximately 3 miles. Pavement 3 ACC -22,742 0 0 0 resurfacing is needed along the length of the project; sub-grade repairs, embankment stabilization, and riprap repairs are needed in localized settlement areas. Repair, adjust, or relocate roadside 3 STP 22,742 0 0 0 appurtenances, such as guardrail and utilities, as necessary. 4 ACC -5,786,117 0 0 0 4 STP 5,786,117 0 0 0 Totals: 0 0 0 0 0

Need ID: 23455 Name: Ketchikan - S Tongass Hwy Improvements Saxman to Surf St Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 ACC -1,028,944 0 0 0 AHS S 36 Ketchikan South Tongass Highway Reconstruction 2 STP 1,028,944 0 0 0 Description: Reconstruct South Tongass Highway from Saxman to Surf Street. Construct pedestrian facilities through this segment on the water side. Construct guardrail and drainage improvements as 3 ACC 0 -989,074 0 0 needed. 3 STP 0 989,074 0 0 4 AC 0 0 6,495,258 0 4 ACC 0 0 0 -6,495,258 4 SM 0 0 644,742 0 4 STP 0 0 0 6,495,258 7 AC 0 0 1,819,400 0 7 SM 0 0 180,600 0 Totals: 0 0 9,140,000 0 1,819,400

Page 43 of 54 2018-2021 Draft STIP

Project Original Draft Need ID: 23475 Name: Glacier Highway Reconstruction: Fritz Cove Road to Seaview Avenue Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 ACC -90,970 0 0 0 NHS S 34 Juneau Glacier Highway Reconstruction 2 NHPP 90,970 0 0 0 Description: Reconstruct Glacier Highway between Fritz Cove Road and Seaview Avenue at Auke Bay to reconstruct segments of road sub-base, widen roadway, flatten curve alignments, improve 4 ACC -14,970,784 0 0 0 intersections, drainage systems, resurface roadway, lighting, guardrail, improve bicycle and pedestrian facilities including improved curb ramps to meet ADA standards as required according to the 4 NHPP 14,970,784 0 0 0 Alaska Preconstruction Manual, and add a center turn lane through the Auke Bay business area. Total length of project is approximately one mile. 7 ACC -546,068 0 0 0 7 NHPP 546,068 0 0 0 Totals: 0 0 0 0 0

Need ID: 23563 Name: Egan Drive Improvements - Main St to 10th St. Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 CST 1,658,540 0 0 0 NHS S 33 Juneau Reconstruction 4 EMRK 1,332,696 0 0 0 Description: Resurface Egan Drive from Main Street to 10th Street. Replace retaining wall under Merchants Wharf. Improve intersections, pedestrian facilities, add bike lanes as appropriate, and 4 NHPP 7,127,514 0 0 0 improve curb ramps to meet ADA standards as required according to the Alaska Preconstruction Manual. 7 CST 32,960 0 0 0 7 NHPP 332,040 0 0 0 Totals: 10,483,750 0 0 0 0

Need ID: 23595 Name: Wrangell - Evergreen Road Improvements and Pedestrian Access Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 3PF 460,530 0 0 0 CTP S 36 Wrangell Reconstruction 4 AC 5,047,786 0 0 0 Description: Reconstruct Evergreen Road from the Alaska Marine Highway terminal to the airport, approximately 1 mile along Evergreen Roads. Straighten curves where able. Construct curbs, gutter 4 ACC 0 0 -5,047,786 0 and sidewalk from the Ferry Terminal to Petroglyph Beach access including improved curb ramps to meet ADA standards as required according to the Alaska Preconstruction Manual. Redesign electrical 4 EMRK 501,384 0 0 0 services. 4 SM 90,300 0 0 0 4 STP 0 0 5,047,786 0 7 3PF 2,709 0 0 0 7 STP 27,291 0 0 0 Totals: 6,130,000 0 0 0 0

Need ID: 24337 Name: Skagway - State Street Rehabilitation Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 3 NHPP 9,097 0 0 0 CTP S 33 Skagway N/A System Preservation 3 SM 903 0 0 0 Description: Resurface State St. in Skagway and rehabilitate the subgrade and storm drain system as needed. Rehabilitate sidewalks per needs identified in Southcoast Region. 4 AC 4,642,820 0 0 0 4 ACC 0 -4,642,820 0 0 4 NHPP 5,000,000 4,642,820 0 0 4 SM 957,180 0 0 0 7 NHPP 9,097 0 0 0 7 SM 903 0 0 0 Totals: 10,620,000 0 0 0 0

Page 44 of 54 2018-2021 Draft STIP

Project Original Draft Need ID: 26110 Name: Sawmill Creek Road Reconstruction & Pedestrian Improvements Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 EMRK 147,436 0 0 0 AHS S 35 Sitka Reconstruction 2 SM 26,097 0 0 0 Description: Reconstruct the segment of Sawmill Creek Road between the roundabout and intersection of Jeff Davis Street. This project will include ADA compliant sidewalks on each side of the road, 2 STP 115,466 0 0 0 reconfiguration of lanes for improved bicycle access, improvements to the intersection of SMC Road and DeGroff St., and associated drainage improvements. 3 SM 18,060 0 0 0 3 STP 181,940 0 0 0 4 AC 0 3,002,010 0 0 4 ACC 0 0 -3,002,010 0 4 SM 0 297,990 0 0 4 STP 0 0 3,002,010 0 7 SM 1,355 0 0 0 7 STP 13,646 0 0 0 Totals: 504,000 3,300,000 0 0 0

Need ID: 26112 Name: Juneau - Glacier Highway Improvements (Lemon Creek Area) Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 3 AC 749,050 0 0 0 CTP S 33 Juneau Glacier Highway Reconstruction 793 3 ACC 0 -749,050 0 0 Description: Resurface and improve Glacier Hwy from Glacier Highway Access Road to Twin Lakes. Improvements include: resurface entire length of roadway and address drainage needs, add 3 SM 73,550 0 0 0 pedestrian facilities on the water side of street, convert the Renninger Street intersection to a roundabout, add a traffic signal to the Davis Street intersection, adjust other driveways and intersections 3 STP 0 749,050 0 0 as needed, improve curb ramps to meet ADA standards as required according to the Alaska Preconstruction Manual, stripe bike lanes, determine crosswalk locations, install bus pullouts as needed, and 4 AC 0 12,280,950 0 0 address lighting needs. 4 ACC 0 0 0 -12,280,950 4 SM 0 1,219,050 0 0 4 STP 0 0 0 12,280,950 7 AC 452,925 0 0 0 7 ACC 0 -452,925 0 0 7 SM 44,958 0 0 0 7 STP 0 452,925 0 0 Totals: 1,320,483 13,500,000 0 0 0

Need ID: 26120 Name: King Cove Cold Bay Road Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 3 OSF 0 25,000 0 0 CTP S 37 King Cove New Construction 4 OSF 0 0 10,000,000 0 Description: This project will construct the third and final phase of the road connecting the City of King Cove with the City of Cold Bay and its all-weather airport. The project will construct a 12 mile single lane gravel road with turnouts. Funding is dependent on the U.S. Fish and Wildlife Service receiving a Record of Decision on the Izembek Land Exchange EIS that supports road construction. Totals: 0 25,000 10,000,000 0 20,000,000

Page 45 of 54 2018-2021 Draft STIP

Project Original Draft Need ID: 26330 Name: Haines Highway Reconstruction: Mile Point 11 to 23 (Milepost 12.2 to 23) Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 AC 0 55,036,850 0 0 NHS S 33 Haines Haines Highway Reconstruction 4 ACC 0 0 -27,518,425 -27,518,425 Description: Widen the highway to a paved width of 36' and improve the roadside environment. Improve drainage, straighten selected curves to a 55 mph design speed where able and other improvements, including addressing the mudslide area. This is one of three construction projects that fall under the Haines Highway Reconstruction Design project. See Need ID's 2152, 22279, and 4 NHPP 0 0 27,518,425 27,518,425 27829. 4 SM 0 5,463,150 0 0 Totals: 0 60,500,000 0 0 0

Need ID: 26336 Name: Ketchikan: Front, Mill, and Stedman Streets Reconstruction Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 NHPP 10,601,045 0 0 0 NHS S 36 Ketchikan Reconstruction 4 SM 952,665 0 0 0 Description: Reconstruction of the Front, Mill, and Stedman Street portion of the Tongass Highway from Grant Street to Deermont Street for a total of approximately 0.6 miles. Rehabilitate/replace pavement, and reconstruct sub-base, sidewalks and drainage structures as needed. Reconstruct/improve the intersections with Dock, Mission and Stedman Streets, including pedestrian crossings, Totals: traffic calming measures and stormwater drainage improvements, and improved curb ramps to meet ADA standards as required according to the Alaska Preconstruction Manual. 11,553,710 0 0 0 0

Need ID: 26348 Name: Alaska Peninsula Highway Bridges Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 EMRK 6,094,990 0 0 0 399 4 SM 605,010 0 0 0 400 7 AC 480,269 0 0 0 AHS S 37 Naknek Bridge Rehabilitation 402 7 ACC 0 -480,269 0 0 Description: Rehabilitate and/or replace bridges along the Alaska Peninsula Highway including Leader Creek Bridge (bridge # 400), Pauls Creek Bridge (bridge # 402), and King Salmon Creek Bridge 7 EMRK 156,521 0 0 0 (bridge # 399). Improvements may include widening the structures. Construction may be supplemented by IRR bridge funds. 7 SM 63,210 0 0 0 7 STP 0 480,269 0 0 Totals: 7,400,000 0 0 0 0

Need ID: 26809 Name: Williamsport-Pile Bay Road, Iliamna River Bridge Replacement Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 AC 4,255,696 0 0 0 AHS S 37 Iliamna Bridge Replacement 2137 4 ACC 0 -4,255,696 0 0 Description: Construct a permanent bridge and remove temporary bridge over the Iliamna river. 4 EMRK 2,548,829 0 0 0 4 SM 758,520 0 0 0 4 STP 0 4,255,696 0 0 Totals: 7,563,045 0 0 0 0

Need ID: 27621 Name: Ketchikan - North Tongass Bridge Improvements, First Waterfall Creek and Second Waterfall Creek Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 ACC -272,910 0 0 0 414 2 STP 272,910 0 0 0 AHS S 36 Ketchikan North Tongass Highway Bridge Replacement 415 4 AC 9,097,000 0 0 0 Description: Replace or rehabilitate First Waterfall Creek Bridge (#0414) and second Waterfall Creek Bridge (#0415) to meet current standards for loading, width, and railing. 4 ACC 0 -9,097,000 0 0 4 SM 903,000 0 0 0 4 STP 0 9,097,000 0 0 Totals: 10,000,000 0 0 0 0

Page 46 of 54 2018-2021 Draft STIP

Project Original Draft Need ID: 27702 Name: Reconstruct Goose Creek (Kasaan) Rd - Phase I MP 1.5 to 3.0 Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 3PF 198,527 0 0 0 1184 4 FLAP 2,000,000 0 0 0 1893 Totals: 2,198,527 0 0 0 0 1894 FLAP S 35 Kasaan N/A Reconstruction 1895 Description: Construction of roadway from segments 9 and 10 of the PS&E package. Construction of the road will include clearing, horizontal and vertical realignment, installation of drainage, aggregate base, surfacing, signing, seeding erosion control, utility work and other improvements.

Need ID: 27766 Name: Ketchikan - So. Tongass Highway - Tongass Ave and Water St Viaduct and Tunnel Improvements Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 ACC -1,137,125 0 0 0 725 2 NHPP 1,591,975 0 0 0 NHS S 36 Ketchikan South Tongass Highway Resurface 797 2 SM 45,150 0 0 0 Description: This project will resurface pavement and construct improvements along South Tongass Highway (locally referred to as Tongass Ave and Water St) between Hoadley Creek Bridge and the 3 NHPP 454,850 0 0 0 South Tongass Highway Tunnel. Some segments of pavement in good condition may not be resurfaced. In addition to resurfacing and other routine improvements, project design should consider 3 SM 45,150 0 0 0 improvements to pedestrian and bike facilities, lane configurations, tunnel lighting, Hoadley Creek Bridge (#725)and Water St. Viaduct (#797). 4 AC 0 0 17,011,390 0 4 ACC 0 0 0 -17,011,390 4 NHPP 0 0 0 17,011,390 4 SM 0 0 1,688,610 0 7 NHPP 0 0 909,700 0 7 SM 0 0 90,300 0 Totals: 1,000,000 0 19,700,000 0 0

Need ID: 27829 Name: Haines Highway Reconstruction: Mile Point 3 to 12 (Milepost 3.5 to 12.3) Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 ACC -20,000,000 -20,318,774 0 0 NHS S 33 Haines Haines Highway Reconstruction 4 NHPP 20,000,000 20,318,774 0 0 Description: Widen the highway to a paved width of 36' and improve the roadside environment. Improve drainage, straighten selected curves to a 55 mph design speed where able and other 7 ACC -959,587 0 0 0 improvements. This is one of three construction projects that fall under the Haines Highway Reconstruction Design project. See Need ID's 2152, 22279, and 26330. This NID, 27829, also includes 7 NHPP 959,587 0 0 0 mitigation work that is required for all segments. 9 NHPP 272,910 0 0 0 9 SM 27,090 0 0 0 Totals: 300,000 0 0 0 0

Page 47 of 54 2018-2021 Draft STIP

Project Original Draft Need ID: 28271 Name: Prince of Wales - Neck Lake Rd Reconstruction: NPOWI Hwy to Whale Pass Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s Totals: 0 0 0 0 23,000,000 2326 2327 2328 2329 2330 CTP S 35 Whale Pass N/A Reconstruction 2331 Description: Reconstruct approximately 7.9 miles of Neck Lake Road (South Whale Pass Rd) to provide a narrow two lane paved road. Project begins at junction with NPOWI Highway and ends at Whale Pass seaplane terminal and boat launch ramp. Project may be split into two segments: NPOWI Highway to Marine Access Facility Junction and Marine Access Facility Junction to Whale Pass. Major work items include clearing, grading, drainage, subexcavation, base, paving, bridge and culvert replacement, high reflectivity signage, installation of safety guardrail systems, revegetation, and slope stabilization.

Need ID: 28549 Name: Southcoast Areawide ADA Improvements Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 0 SM 45,150 316,050 180,600 180,600 NHS S 91 Southcoast Region N/A Reconstruction 0 STP 454,850 3,183,950 1,819,400 1,819,400 Description: This project will provide ADA improvements along routes in Southcoast. Initial phase includes auditing routes to determine ADA compliance and identify those issues that can be quickly resolved. Prioritization and construction of needed ADA improvements will be identified per the audit. Totals: 500,000 3,500,000 2,000,000 2,000,000 4,000,000

Need ID: 28769 Name: Juneau - Egan Dr and Riverside Intersection Improvement Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 NHPP 1,091,640 0 0 0 NHS S 34 Juneau Glacier Highway Reconstruction 4 SM 108,360 0 0 0 Description: This project will modify the intersections of Riverside Drive and Egan Drive to facilitate U-turns and install a median at the intersection of Glacier Highway North and Egan Drive to help 7 NHPP 9,097 0 0 0 improve safety and operations as a result of the prohibited left turn at Glacier Highway North. Project will include paving Egan Drive from Loop Road to Riverside. 7 SM 903 0 0 0 Totals: 1,210,000 0 0 0 0

Need ID: 28810 Name: Ketchikan - Herring Cove Bridge Improvement Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 ACC -434,444 0 0 0 AHS S 36 Ketchikan South Tongass Highway System Preservation 253 2 SM 0 31,826 0 0 Description: Replace the Herring Cove Bridge (No. 253) to include pedestrian facilities and improve the intersection of S. Tongass and Powerhouse Rd. and the intersection of S. Tongass and Wood Rd. 2 STP 434,444 320,626 0 0 3 SM 0 23,577 0 0 3 STP 0 237,523 0 0 4 AC 0 0 5,576,116 0 4 SM 0 0 553,505 0 7 AC 0 1,180,013 0 0 7 ACC 0 0 -1,180,013 0 7 SM 0 117,132 0 0 7 STP 0 0 1,180,013 0 Totals: 0 1,910,697 6,129,621 0 5,576,116

Page 48 of 54 2018-2021 Draft STIP

Project Original Draft Need ID: 28811 Name: Pelican - Main Street Bridge (No. 1268) Improvement Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 3PF 153,510 0 0 0 CTP S 35 Pelican N/A Bridge Rehabilitation 1268 4 AC 1,546,490 0 0 0 Description: Rehabilitate the Main Street Bridge also known as the Pelican Boardwalk. 4 ACC 0 -1,546,490 0 0 4 STP 0 1,546,490 0 0 Totals: 1,700,000 0 0 0 0

Need ID: 28890 Name: Ketchikan - Sayles/Gorge St. Viaduct (#1841) Improvement Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 3PF 0 0 9,030 0 CTP S 36 Ketchikan N/A Bridge Replacement 1841 2 ACC -363,880 0 0 0 Description: Replace or rehabilitate the Sayles/Gorge St. Viaduct (#1841) in Ketchikan 2 STP 363,880 0 90,970 0 3 3PF 0 0 9,030 0 3 STP 0 0 90,970 0 4 3PF 0 0 0 171,570 4 STP 0 0 0 1,728,430 7 3PF 0 0 0 9,030 7 STP 0 0 0 90,970 Totals: 0 0 200,000 2,000,000 0

Need ID: 29149 Name: Chignik Public Dock Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 ACC -4,819,813 0 0 0 AHS S 37 Chignik N/A New Construction 4 STP 4,819,813 0 0 0 Description: Construct graded uplands with rip-rap face, sheetpile dock, and fendering system Totals: 0 0 0 0 0

Need ID: 29209 Name: Chiniak Hwy Erosion Response Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 AC 8,869,575 0 0 0 AHS S 32 Kodiak Island N/A System Preservation 4 ACC 0 -8,869,575 0 0 Description: The purpose of this project is to implement solutions to problems related to erosion along the Chiniak Highway. 4 SM 880,425 0 0 0 4 STP 0 8,869,575 0 0 7 SM 90,300 0 0 0 7 STP 909,700 0 0 0 Totals: 10,750,000 0 0 0 0

Need ID: 29629 Name: Juneau - Riverside and Stephen Richards Congestion Mitigation Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 3PF 11,287 0 0 0 REQD S 34 Juneau N/A Reconstruction 2 CMAQ-M 113,713 0 0 0 Description: This project will reduce congestion in the Mendenhall Valley non-attainment area by improving the Riverside and Stephen Richards intersection. The current 4 way stop will be replaced 3 3PF 9,030 0 0 0 with a traffic control option that will improve traffic flow, particularly during am and pm peak periods. A compact roundabout and enhanced signalization will be considered as potential solutions to 3 CMAQ-M 90,970 0 0 0 current congestion at this intersection. 4 3PF 0 135,450 0 0 4 CMAQ-M 0 1,364,550 0 0 7 3PF 0 11,287 0 0 7 CMAQ-M 0 113,713 0 0 Totals: 225,000 1,625,000 0 0 0

Page 49 of 54 2018-2021 Draft STIP

Project Original Draft Need ID: 29875 Name: Kodiak - Harbor Channel Bridge Improvement Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 AC 0 0 12,735,800 0 AHS S 32 Kodiak N/A Bridge Rehabilitation 1189 4 SM 0 0 1,264,200 0 Description: Rehabilitate the Harbor Channel Bridge on Near Island Bridge Road. Rehabiliate per items recommended on 2014 Bridge Assessment including deck rehabilitation and repainting the steel 7 SM 0 0 9,030 0 superstructure. 7 STP 0 0 90,970 0 Totals: 0 0 14,100,000 0 12,735,800

Need ID: 29876 Name: Kodiak - Rezanoff Drive Resurface: Airport to Chiniak Hwy Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 SM 9,030 0 0 0 AHS S 32 Kodiak Station N/A System Preservation 2 STP 90,970 0 0 0 Description: Resurface Rezanoff Drive from the Airport to Chiniak Highway and repair a section of Rezanoff Drive from Carolyn St. to Marine Way. Address lighting, guardrails, drainage, culverts and 3 SM 9,030 0 0 0 other highway appurtenances as needed. 3 STP 90,970 0 0 0 4 AC 0 3,957,195 0 0 4 ACC 0 0 0 -3,957,195 4 SM 0 392,805 0 0 4 STP 0 0 0 3,957,195 7 SM 0 903 0 0 7 STP 0 9,097 0 0 Totals: 200,000 4,360,000 0 0 0

Need ID: 29877 Name: Kodiak - Chiniak Hwy Rehabilitate: Mile Point 5 to 21 (Milepost 15 to 31) Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 AC 0 454,850 0 0 AHS S 32 Kodiak Island N/A System Preservation 2 ACC -1,064,349 0 -454,850 0 Description: Rehabilitate approximately 16 miles of the Chiniak Highway from Milepost 15 to the end of pavement to improve and preserve the roadway subgrade and surface. Address lighting, 2 SM 0 45,150 0 0 guardrails, drainage, culverts and other highway appurtenances as needed. 2 STP 1,064,349 0 454,850 0 3 SM 0 18,060 0 0 3 STP 0 181,940 0 0 4 AC 0 0 0 20,923,100 4 SM 0 0 0 2,076,900 7 SM 0 0 0 4,515 7 STP 0 0 0 45,485 Totals: 0 700,000 0 23,050,000 20,923,100

Need ID: 29989 Name: Sand Point City Dock Replacement Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 AC 0 9,733,790 0 0 AHS S 37 Sand Point Marine Highway New Construction 4 ACC 0 0 0 -9,733,790 Description: Construct a new multi-use dock. The new dock will replace an old city dock that currently accommodates fishing vessels, barges, and state ferries, but is nearing the end of its service life. 4 SM 0 966,210 0 0 4 STP 0 0 0 9,733,790 Totals: 0 10,700,000 0 0 0

Page 50 of 54 2018-2021 Draft STIP

Project Original Draft Need ID: 30206 Name: Gustavus and Glacier Bay National Park Pedestrian and Bicycle Connection Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 3PF 22,214 23,839 0 0 FLAP S 33 Gustavus N/A Planning 2 FLAP 223,786 240,161 0 0 Description: Construct a pedestrian/bicycle trail within the right of way of the existing state roadway and parallel to that roadway for 3.2 miles Totals: 246,000 264,000 0 0 0

Need ID: 30207 Name: Harris River Bridge Replacement Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 0 3PF 316 0 0 0 FLAP S 36 Hollis N/A Bridge Replacement 0 FLAP 3,184 0 0 0 Description: Purchase a regional standard OHV width (10 ft) bridge for the Harris River Crossing estimated to be 90-100 feet in length. 2 3PF 542 0 0 0 2 FLAP 5,458 0 0 0 4 3PF 0 16,444 0 0 4 FLAP 0 165,656 0 0 Totals: 9,500 182,100 0 0 0

Need ID: 30211 Name: Wrangell Non-Motorized Transportation System Development Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 3PF 8,010 0 0 0 FLAP S 36 Wrangell N/A Other 2 FLAP 80,690 0 0 0 Description: Improve or create off-road parking and new connector trails by providing hardened and delineated pathways to a network of existing informal footpaths, thus making them passable for 4 3PF 35,759 0 0 0 practical, secondary transportation purposes 4 FLAP 360,241 0 0 0 Totals: 484,700 0 0 0 0

Need ID: 30694 Name: City & Borough of Juneau, Electric Bus Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 0 3PF 70,070 0 0 0 REQD S 80 Juneau N/A Transit 0 5339 408,130 0 0 0 Description: FTA LoNo Emissions grant funding to purchase an electric bus and charge stations. Totals: 478,200 0 0 0 0

Need ID: 30729 Name: Inter-Island Ferry Authority (IFA) Vessel Refurbishments Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 3PF 412,522 0 0 0 AHS S 91 Prince of Wales Island Marine Highway Ferry Boats 4 AC 2,342,478 -2,342,478 0 0 Description: Refurbish IFA ferries to ensure regulatory compliance and up-to-date ships systems such as hull, deck, machinery, electrical, security, navigation, and passenger accommodations. 4 FBF 720,000 0 0 0 4 STP 0 2,342,478 0 0 Totals: 3,475,000 0 0 0 0

Need ID: 30829 Name: New Gravina Island Shuttle Ferry Berth and Related Terminal Improvements Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 EMRK 10,330,335 0 0 0 NHS S 36 Ketchikan N/A New Construction 4 SM 1,025,425 0 0 0 Description: Construct new ferry berth and other upland improvements to the airport ferry terminal on Gravina Island in Ketchikan, Alaska. Totals: 11,355,760 0 0 0 0

Page 51 of 54 2018-2021 Draft STIP

Project Original Draft Need ID: 30830 Name: Ketchikan - Revilla New Ferry Berth & Upland Improvements Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 FBF 35,217 0 0 0 NHS S 36 Ketchikan N/A Reconstruction 2 SM 354,783 0 0 0 Description: Construct new ferry terminal berthing facility for the airport ferry. 3 EMRK 4,548,500 0 0 0 3 SM 451,500 0 0 0 4 EMRK 0 15,766,775 0 0 4 SM 0 1,565,065 0 0 Totals: 5,390,000 17,331,840 0 0 0

Need ID: 30831 Name: Ketchikan - Revilla Refurbish Existing Ferry Berth Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 EMRK 0 3,599,952 0 0 NHS S 36 Ketchikan N/A Reconstruction 4 SM 0 357,344 0 0 Description: Refurbish the existing airport ferry terminal in Ketchikan. Totals: 0 3,957,296 0 0 0

Need ID: 30832 Name: Ketchikan - Revilla New Passenger Waiting Facility Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 EMRK 0 3,182,710 0 0 NHS S 36 Ketchikan N/A New Construction 4 SM 0 315,927 0 0 Description: Construct new airport ferry passenger waiting building in Kechikan Totals: 0 3,498,637 0 0 0

Need ID: 30833 Name: Ketchikan - Gravina Ferry Layup Facility Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 EMRK 0 17,312,538 0 0 NHS S 36 Ketchikan N/A New Construction 4 SM 0 1,718,502 0 0 Description: Construct new airport ferry layup facility on Gravina Island Totals: 0 19,031,040 0 0 0

Need ID: 30834 Name: Ketchikan - Gravina Refurbish Existing Ferry Berth Facility Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 EMRK 0 5,497,397 0 0 NHS S 36 Ketchikan N/A Reconstruction 4 SM 0 545,691 0 0 Description: Reconstruct existing airport ferry terminal on Gravina Island. Totals: 0 6,043,088 0 0 0

Need ID: 30835 Name: Ketchikan - Gravina Freight Facility Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 EMRK 0 3,599,637 0 0 NHS S 36 Ketchikan N/A Reconstruction 4 SM 0 357,345 0 0 Description: Construct Gravina Island airport freight dock facility. Totals: 0 3,956,982 0 0 0

Need ID: 30836 Name: Ketchikan - Replace Airport Creek Bridge Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 3PF 650,000 0 0 0 NHS S 36 Ketchikan N/A Bridge Replacement 4 EMRK 2,290,603 0 0 0 Description: Replace the Airport Creek bridge. 4 SM 227,376 0 0 0 Totals: 3,167,979 0 0 0 0

Page 52 of 54 2018-2021 Draft STIP

Project Original Draft Need ID: 30887 Name: Ketchikan - Airport Shuttle Buses Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 EMRK 13,645 0 0 0 NHS S 36 Ketchikan N/A Transit 2 SM 1,355 0 0 0 Description: Purchase two 24 passenger wheelchair accessible buses for airport shuttle use. 4 EMRK 315,768 0 0 0 4 SM 31,344 0 0 0 Totals: 362,112 0 0 0 0

Need ID: 30949 Name: Ketchikan - Reconstruct Road to Airport Boundary Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 4 EMRK 3,118,961 0 0 0 NHS S 36 Ketchikan N/A Reconstruction 4 SM 309,599 0 0 0 Description: Reconstruct the road to the airport boundary on Gravina Island Totals: 3,428,560 0 0 0 0

Need ID: 31029 Name: Ketchikan Airport Ferry Capacity Modifications Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 EMRK 113,712 0 0 0 NHS S 36 Ketchikan N/A Ferry Boats 2 SM 11,288 0 0 0 Description: Modify existing airport ferry fleet to expand passenger and vehicle 4 EMRK 0 886,287 0 0 4 SM 0 99,263 0 0 Totals: 125,000 985,550 0 0 0

Need ID: 31030 Name: Ketchikan Road and Bridge Construction & Rehabilitation Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 EMRK 818,730 454,850 0 0 CTP S 36 Ketchikan N/A System Preservation 2 SM 81,270 45,150 0 0 Description: Construction and rehabilitation of Ketchikan roads and bridges in accordance with Borough transportation priorities. 3 EMRK 0 9,097 0 0 3 SM 0 903 0 0 4 EMRK 0 0 8,609,044 0 4 SM 0 0 854,564 0 7 EMRK 0 0 9,097 0 7 SM 0 0 903 0 Totals: 900,000 510,000 9,473,608 0 0

Need ID: 31031 Name: Black Sands Beach Trail - Construct Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 EMRK 113,712 0 0 0 CTP S 36 Ketchikan N/A New Construction 2 SM 11,288 0 0 0 Description: Construct recreational trail from Gravina Highway to Black Sands Beach State Park 3 EMRK 9,097 0 0 0 3 SM 903 0 0 0 4 EMRK 0 413,913 0 0 4 SM 0 41,087 0 0 7 EMRK 0 9,097 0 0 7 SM 0 903 0 0 Totals: 135,000 465,000 0 0 0

Page 53 of 54 2018-2021 Draft STIP

Project Original Draft Need ID: 31310 Name: Skagway - Klondike Highway Rehabilitation: Skagway River Bridge to Canadian Border Ph Fund FFY18 FFY19 FFY20 FFY21 After 2021 Program Region 2013 Election District Place Name Highway Primary Work Bridge #s 2 NHPP 0 1,637,460 0 909,700 NHS S 33 Skagway Klondike Highway System Preservation 2 SM 0 162,540 0 90,300 Description: This project will provide for the rehabilitation of the Klondike Highway. Focus will be on rehabilitating the pavement, critical safety improvements, drainage, and related improvements as 3 NHPP 0 0 0 9,097 necessary. 3 SM 0 0 0 903 7 NHPP 0 0 0 9,097 7 SM 0 0 0 903 Totals: 0 1,800,000 0 1,020,000 35,400,000

Page 54 of 54