Your search for projects in State: SC, Total Results : 311
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
SC 1997 Water Trail Improvements Water Trail Improvements Sites Marked With Buoys Unspecified/Unidentifi $7,708 $7,708 $15,416
able
SC 1997 Trail Construction Trail Construction Construct Trail Unspecified/Unidentifi $12,000 $12,000 $24,000
able
SC 1998 Trailhead Improvements Trailhead Improvements Install Restroom Unspecified/Unidentifi $0 Unknown $0
able
SC 1998 Water Trail Improvements Water Trail Improvements Construct Canoe Access Points, Sign Unspecified/Unidentifi $0 Unknown $0
able
SC 1998 Trail Construction Trail Construction Construct Trail Unspecified/Unidentifi $0 Unknown $0
able
SC 1999 Mecca Trail Construct Trail Unspecified/Unidentifi $8,000 $2,000 $10,000
able
SC 2000 Wambaw Ranger District Public Information Facilities Fabricate and Install Interpretive Trail Signs Unspecified/Unidentifi $7,176 $1,794 $8,970
able
SC 2000 Various Trails Purchase Trail Maintenance Purchase Trail Maintenance Equipment, Trail Unspecified/Unidentifi $100,800 $25,200 $126,000
Equipment Renovation able
SC 2005 Tanyard Creek Bridge Bridge Construction Construct footbridge over Tanyard Creek & Unspecified/Unidentifi $85,000 $22,730 $107,730
Construction Viewing Platform able
SC 2005 Trail Construction Trail Construction Construct 8 ft. wide trail to connect from the Unspecified/Unidentifi $100,000 $25,000 $125,000
existing Riverwalk Park able
SC 2005 Trail Construction Trail Construction Construct 1.32 miles of trail Unspecified/Unidentifi $100,000 $25,000 $125,000
able
SC 2005 Accessible Trail Accessible Trail Create a accessible ADA trail, construct Unspecified/Unidentifi $100,000 $25,000 $125,000
Improvements overlook, bridges, stairs & trail tread. able
SC 2005 Trail and Trailhead Trail and Trailhead Expand trailhead, construct a trail underpass, Unspecified/Unidentifi $196,400 $50,000 $246,400
Construction reconstruction & trail maintenance able
SC 2006 Trail Construction Trail Construction Construct a multi-use trail Unspecified/Unidentifi $100,000 $25,000 $125,000
able
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
SC 2006 Accessible Trail Accessible Trail Construction Construct an ADA accessible trail, bridge, Unspecified/Unidentifi $100,000 $25,000 $125,000
boardwalk and interpretive signage able
SC 2006 Trail Construction Trail Construction Construct a 8 feet wide walking trail and Unspecified/Unidentifi $100,000 $25,000 $125,000
boardwalk able
SC 2006 Trail Construction Trail Construction Construct an eight feet wide trail Unspecified/Unidentifi $120,000 $30,000 $150,000
able
SC 2006 Water Trail Improvements Water Trail Improvements Construct a water trail head and restore Unspecified/Unidentifi $76,827 $30,000 $106,827
existing nature walking trail able
SC 2006 Trail and Underpass Trail and Underpass Construct a underpass, reconstruction, Unspecified/Unidentifi $210,800 $75,000 $285,800
Construction Construction maintenance and heavy maintenance able
SC 2007 Lynches State Scenic River Lynches State Scenic River Printing and publication of a river safety guide Multiple Counties $26,829 $33,536 $60,365
Trail Trail and signage at access points
SC 2008 Little Pee Dee Scenic River Little Pee Dee Scenic River Develop trail brochure and construct kiosks at Multiple Counties $29,500 $7,375 $36,875
Trail Trail approx. seven public river access points
SC 2008 Little River Trail Little River Trail Extension Extend the Little River Trail for 1.4 miles Unspecified/Unidentifi $56,400 $14,100 $70,500
able
SC 2008 New River Trail New River Trail - Trailhead Construct a parking lot and trailhead Unspecified/Unidentifi $85,726 $21,432 $107,158
Development Project amenities to provide access to the able
north/south section of the 5.2 mile new river
trail
SC 1993 Various Trails Purchase Trail Maintenance Purchase Equipment 1 Charlestown $3,195 $3,195 $6,390
Equipment
SC 1997 Various Trails Purchase Trail Maintenance Purchase Tractor 1 Charleston $6,000 $6,000 $12,000
Equipment
SC 1999 Cypress Gardens Trail Boardwalk Construction Construct Boardwalk 1 Berkeley $20,000 $5,000 $25,000
SC 2003 Waccamaw Neck Bikeway Construct Trail 1 Georgetown $102,789 $20,557 $123,346
SC 2005 Lady's Island Blueways Develop Trail Map Map blueway from Lady's Island boat landing 1 Beaufort $9,500 $3,000 $12,500
& City of Beaufort
SC 2007 Sewee Shell Ring Trail Sewee Shell Ring Parking Construct a boardwalk, viewing platform, new 1 Charleston $67,000 $150,000 $217,000
Lot, Trail Construction & trail, trail facility, kiosk and signage
Boardwalk
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
SC 2008 Hunting Island Trail Hunting Island Trail System Reconstruct 1.75 miles of lagoon recreational 1 Beaufort $100,000 $111,225 $211,225
access trail and the Marsh Island Boardwalk
Crossover Trail
SC 2009 Pigeon Point Park Walking Pigeon Point Park Walking Construction of walking trail at Pigeon Point 1 Beaufort $50,000 $12,500 $62,500
Trail Trail Park
SC 2009 West Ashley 3 Pipes West Ashley Greenway 3 Replacement of "Three Pipe Bridge" on the 1 Charleston $96,800 $24,200 $121,000
Greenway Pipes Bridge Replacement existing West Ashley Greenway
SC 2010 Sewee Visitor & Sewee Visitor & 1 Charleston $37,547 $9,387 $46,934
Environmental Education Environmental Education
Center Boardwalk Center Boardwalk
SC 2011 Sewee Center Boardwalk Sewee Visitor & 1 Charleston $38,400 $9,600 $48,000
Environmental Education
Center Boardwalk
Resurfacing Phase II
SC 2012 Waccamaw Neck Bikeway Waccamaw Neck Bikeway, 1 Georgetown $100,000 $25,000 $125,000
North-South Link
SC 2015 Palmetto Islands County Palmetto Islands County 1 Charleston $1,432 $358 $1,790
Park Marsh Boardwalks Park Marsh Boardwalks
SC 2015 Southside Park Trail Southside Park Trail 1 Beaufort $100,000 $25,000 $125,000
SC 2016 Palmetto Islands County Palmetto Islands County 1 Charleston $98,568 $24,642 $123,210
Park Marsh Boardwalks Park Marsh Boardwalks
SC 2017 Awendaw East Coast Awendaw East Coast Construct a 12 feet wide and 3,100 feet long 1 Charleston $100,000 $25,000 $125,000
Greenway Greenway trail located in the Town Park which is a
portion of the 12 mile Awendaw East Coast
Greenway.
SC 2018 Stono River County Park Stono River County Park New Trail Construction 1 Stono $100,000 $25,000 $125,000
Access & Amenities Project
SC 2019 Pinckney/Kit Hall Trail Pinckney/Kit Hall Trail New Trail Construction 1 Charleston $100,000 $25,000 $125,000
Segment
SC 1993 Various Trails Trailhead Improvements Trailhead Improvements 1, 2, 3, 4, 5, 6 Statewide $747 $747 $1,494
SC 1993 Various Trails Bridge Installation Bridge and Signs 1, 2, 3, 4, 5, 6 Statewide $1,000 $1,000 $2,000
SC 1993 Various Trails Install Signs Install Trail Signs 1, 2, 3, 4, 5, 6 Statewide $2,159 $2,159 $4,318
SC 1993 Various Trails Bridge Installation Construct Bridge 1, 2, 3, 4, 5, 6 Statewide $2,500 $2,500 $5,000
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
SC 1993 Various Trails Install Signs Resurrection of Signs 1, 2, 3, 4, 5, 6 Statewide $2,500 $2,500 $5,000
SC 1993 Various Trails Trail Improvements Surface and Amenities 1, 2, 3, 4, 5, 6 Statewide $14,824 $14,824 $29,648
SC 1993 Various Trails Trail Relocation Relocation, Signing Improvements On 4 1, 2, 3, 4, 5, 6 Statewide $15,000 $15,000 $30,000
Trails
SC 1993 Boardwalk Construction Boardwalk Construction Construct 250' Boardwalk and Dock 1, 2, 3, 4, 5, 6 Statewide $25,300 $25,300 $50,600
SC 1996 Various Trails Trail Construction Construct Trail 1, 2, 3, 4, 5, 6 Statewide $1,800 $1,800 $3,600
SC 1996 Various Trails Trail Relocation Relocate Trail, Signing 1, 2, 3, 4, 5, 6 Statewide $2,130 $2,130 $4,260
SC 1996 Various Trails Trail Renovation Reconstruct Trail 1, 2, 3, 4, 5, 6 Statewide $5,449 $5,449 $10,898
SC 1996 Various Trails Trail Renovation Reconstruct Trail 1, 2, 3, 4, 5, 6 Statewide $5,688 $5,688 $11,376
SC 1996 Various Trails Trail Renovation Reconstruct Trail 1, 2, 3, 4, 5, 6 Statewide $6,140 $6,140 $12,280
SC 1996 Public Information Public Information Materials Produce Brochure 1, 2, 3, 4, 5, 6 Statewide $6,415 $6,415 $12,830
SC 1996 Public Information Public Information Materials Develop Web Site 1, 2, 3, 4, 5, 6 Statewide $7,000 $7,000 $14,000
SC 1996 Various Trails Trail Renovation Reconstruct Trail, Add Trailhead 1, 2, 3, 4, 5, 6 Statewide $12,534 $12,534 $25,068
SC 1997 Various Trails Trail Renovation Reconstruct Trail 1, 2, 3, 4, 5, 6 Statewide $966 $966 $1,932
SC 1998 Various Trails 1998 RTP Projects 1, 2, 3, 4, 5, 6 Statewide $537,113 $134,278 $671,391
SC 1998 Safety and Education Trail Training and Education Conduct Trail Conference and Workshops. 1, 2, 3, 4, 5, 6 Statewide $6,619 $6,619 $13,238
SC 1998 TNT Motorsports Trails Purchase Trail Maintenance Purchase Tractor 1, 2, 3, 4, 5, 6 Statewide $19,159 $19,159 $38,318
Equipment
SC 1998 Various Trails Purchase Trail Maintenance Purchase Equipment 1, 2, 3, 4, 5, 6 Statewide $0 Unknown $0
Equipment
SC 1998 Various Trails Purchase Trail tools Purchase tools 1, 2, 3, 4, 5, 6 Statewide $0 Unknown $0
SC 1999 Various Trails Trailhead Improvements Improve Trailheads, Signage 1, 2, 3, 4, 5, 6 Statewide $4,000 $1,000 $5,000
SC 1999 Various Trails Purchase Trail Maintenance Equipment Purchases and Trail Renovations 1, 2, 3, 4, 5, 6 Statewide $35,371 $8,842 $44,213
Equipment
SC 2002 FY 2002 Recreational Trails FY 2002 Recreational Trails 1, 2, 3, 4, 5, 6 Statewide $771,959 $192,990 $964,949
Projects Projects
SC 2019 Safety and Education 2019 PCF Wilderness 2019 PCF Wilderness First-aid Certifications 1, 2, 3, 4, 5, 6 Statewide $10,000 $2,000 $12,000
First-aid Certifications
SC 2018 Publications SC Trails Pocket Guide SC Trails Pocket Guide 1, 2, 3, 4, 5, 6 Statewide $2,440 $488 $2,928
SC 2018 Safety and Education Wilderness First Aid, CPR Wilderness First Aid, CPR and AED 1, 2, 3, 4, 5, 6 Statewide $8,850 $1,770 $10,620
and AED
SC 2018 Safety and Education ATV Certification Program ATV Certification Program for Public Lands 1, 2, 3, 4, 5, 6 Statewide $8,000 $1,600 $9,600
for Public Lands
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
SC 2004 Various Trails Trail Re-route Reroute and signage 1, 2, 3, 4, 5, 6, 7 Statewide $15,000 $5,000 $20,000
SC 2004 Various Trails Trail Construction Construct 4 miles of new trail. 1, 2, 3, 4, 5, 6, 7 Statewide $64,000 $16,000 $80,000
SC 2004 Various Trails Trail Construction Construct 2.3 miles of hiking trail. 1, 2, 3, 4, 5, 6, 7 Statewide $82,120 $22,000 $104,120
SC 2004 Various Trails Trail Construction Construct 2.2 miles of hiking and biking trails. 1, 2, 3, 4, 5, 6, 7 Statewide $100,000 $25,000 $125,000
SC 2004 Various Trails Trail Construction and Construct new trail & rehabilitation of existing 1, 2, 3, 4, 5, 6, 7 Statewide $100,000 $25,000 $125,000
Renovation trail.
SC 2004 Various Trails Trail Construction Construction of new trail facility 1, 2, 3, 4, 5, 6, 7 Statewide $100,000 $25,000 $125,000
SC 2004 Various Trails Trail and Boardwalk Construction of pedestrian bridge & trail and 1, 2, 3, 4, 5, 6, 7 Statewide $100,000 $25,000 $125,000
Construction elevated walkways.
SC 2004 Various Trails Trail Construction Construct multi-use trail. 1, 2, 3, 4, 5, 6, 7 Statewide $100,000 $25,000 $125,000
SC 2005 Various Trails Trail and Trailhead Construct parking area, pavilion, new trails 1, 2, 3, 4, 5, 6, 7 Statewide $53,988 $15,000 $68,988
Construction and rehab existing trails.
SC 2005 Various Trails Trail Safety Improvements Mitigate unsafe conditions & make trail more 1, 2, 3, 4, 5, 6, 7 Statewide $79,000 $20,000 $99,000
sustainable
SC 2005 Various Trails Trail and Trailhead Construct and rehab 14 miles of trail and new 1, 2, 3, 4, 5, 6, 7 Statewide $89,480 $25,000 $114,480
Construction trailhead
SC 2005 Various Trails Trail Renovation and Rehab and relocate fall-line and construct 1, 2, 3, 4, 5, 6, 7 Statewide $100,000 $25,000 $125,000
Construction trails
SC 2010 State Administration Administration Administration 1, 2, 3, 4, 5, 6, 7 Statewide $85,559 $21,390 $106,949
SC 2010 Safety and Education Education Education 1, 2, 3, 4, 5, 6, 7 Statewide $61,113 $15,278 $76,391
SC 2011 State Administration Administration Administration 1, 2, 3, 4, 5, 6, 7 Statewide $93,075 $23,269 $116,344
SC 2012 State Administration Administration Administration 1, 2, 3, 4, 5, 6, 7 Statewide $79,153 $19,788 $98,941
SC 2015 State Administration Administration Administration 1, 2, 3, 4, 5, 6, 7 Statewide $80,746 $20,187 $100,933
SC 2016 State Administration Administration Administration 1, 2, 3, 4, 5, 6, 7 Statewide $83,938 $20,984 $104,922
SC 2016 Safety and Education Education Education 1, 2, 3, 4, 5, 6, 7 Statewide $59,955 $14,989 $74,944
SC 2017 State Administration Administration Administration 1, 2, 3, 4, 5, 6, 7 Statewide $83,938 $20,984 $104,922
SC 2018 State Administration Administration Administration 1, 2, 3, 4, 5, 6, 7 Statewide $83,938 $20,984 $104,922
SC 2019 State Administration Administration Administration 1, 2, 3, 4, 5, 6, 7 Statewide $83,938 $20,984 $104,922
SC 1998 Goose Creek Trails Trail Construction Construct Trail 1, 6 Berkeley $0 Unknown $0
SC 2008 Wannamaker Nature Trail Wannamaker Nature Trails Improve 2.0 miles of existing nature trails for 1, 6 Berkeley $60,000 $15,000 $75,000
better access and maneuverability
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
SC 2008 Wambaw Cycle Trail Wambaw Cycle Trail Trail hardening on approx. 1/2 mile of the 1, 6 Berkeley $100,000 $25,000 $125,000
Hardening trail, conduct trail reconstruction and
maintenance on 40 miles
SC 2008 Wambaw Cycle Trail Wambaw Cycle Trail Rehab 40 miles OHV trail and maintenance 1, 6 Berkeley $600,000 $150,000 $750,000
Hardening
SC 2010 Wambaw Cycle Trail Wambaw Cycle Trail Rehab, maintain Gating and Signing 1, 6 Berkeley $156,000 $39,000 $195,000
Hardening, Wetland
Protection, and Compliance
Gating and Signing
SC 2011 Wambaw Cycle Trail Wambaw Cycle Trail 1, 6 Berkeley $65,040 $16,260 $81,300
Grooming
SC 2012 Wambaw Cycle Trailhead Wambaw Cycle Trailhead 1, 6 Berkeley $156,500 $39,125 $195,625
Redesign Redesign
SC 2013 Wambaw Cycle Trail Wambaw Cycle Trail Access Wambaw Cycle Trail Access and 1, 6 Charleston, Berkeley $284,000 $71,000 $355,000
and Improvements Improvements
SC 2013 Hanahan City Park Hanahan City Park Hanahan City Park 1, 6 Berkeley $100,000 $25,000 $125,000
SC 2014 Daufuskie Island Park Beaufort County Daufuskie Beaufort County Daufuskie Island Park 1, 6 Beaufort $98,702 $24,675 $123,377
Island Park
SC 2014 Wannamaker North Trail Wannamaker North Wannamaker North Trailhead and Hiker/Biker 1, 6 Berkeley, Charleston $100,000 $25,000 $125,000
Trailhead and Hiker/Biker Trail
Trail
SC 2015 Wambaw Cycle Trail Wambaw Cycle Trail Wambaw Cycle Trail Access and 1, 6 Charleston, Berkeley $172,000 $43,000 $215,000
Maintenance Improvements
SC 2019 Wambaw Cycle Trail Wambaw Cycle Trail 2018 & Wambaw Cycle Trail 2018 & 2019 1, 6 Charleston, Berkeley $40,000 $10,000 $50,000
2019 Enhancement Project Enhancement Project
SC 2019 Francis Beidler Forest Beidler Forest Boardwalk Beidler Forest Boardwalk Signage 1, 6 Berkeley, Dorchester $7,500 $1,500 $9,000
Signage
SC 1996 A C Floral High School Trail Construction Construct 2,200 foot Fitness/Nature Trail 2 Richland $11,924 $11,924 $23,848
Fitness Nature Trail
SC 1997 Harbison State Forest Trail Trail and Trailhead Construct Trail and Install Restroom 2 Richland $14,526 $14,526 $29,052
and Trailhead Construction
SC 1997 Lexington County Trail Trail Construction Construct 3,600 Foot Trail With Lights 2 Lexington $20,000 $20,000 $40,000
System
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
SC 1997 Lexington School District Trail Construction Construct 3,400 Foot Trail With Lights 2 Lexington $20,000 $20,000 $40,000
Trails
SC 1998 Richland Trail and Bridge Trail and Bridge Construction Construct Trail, Foot Bridge 2 Richland $0 Unknown $0
SC 1998 North Augusta Bridge Bridge Installation Install Bridge 2 Aiken, Edgefield $0 Unknown $0
Installation
SC 2000 Midlands Mountain Trail Install New Drain Pipes 2 Richland $7,200 $1,800 $9,000
SC 2000 Greeneway Trail Land Acquisition Purchase 1.3 Miles Right of Way Along 2 Aiken $80,000 $20,000 $100,000
Savannah River
SC 2001 Bluffton Linear Park Construct Trail 2 Beaufort $50,000 $11,960 $61,960
SC 2001 Blackville Rail-Trail Construct Trail 2 Barnwell $50,000 $22,500 $72,500
SC 2001 Low Country Trail Bridges 2 Jasper $30,000 $60,000 $90,000
SC 2003 Crooked Pine Trail Trailhead, Parking 2 Richland $14,353 $28,706 $43,059
SC 2005 Saluda River Greenway Trail Trail Construction Extend the Saluda River Greenway Trail 2 Richland $100,000 $25,000 $125,000
SC 2007 Gibson Pond Park Trail Gibson Pond Park Trail Construct a trail and facilities that will be 2 Lexington $82,818 $20,705 $103,523
accessible to persons with disabilities
SC 2007 North Augusta Greeneway N. Augusta Greeneway Construct a 1.26 mile connector trail. 2 Aiken, Edgefield $100,000 $25,000 $125,000
Development - Pisgah
Connector
SC 2008 Crooked Creek Park Trail Crooked Creek Park Trail Crooked Creek Park trail extension 2 Lexington $47,921 $59,601 $107,522
Phase II
SC 2010 Fourteen Mile Creek Trail Lexington County 2 Lexington $100,000 $25,000 $125,000
Greenways - Fourteen Mile
Creek Trailhead
SC 2010 Cayce Riverwalk Riverwalk Expansion - 2 Lexington, Richland $100,000 $25,000 $125,000
Phase III - A
SC 2010 Fuller Park/Turkey Creek Fuller Park/Turkey Creek 2 Barnwell $60,726 $15,181 $75,907
Trail Trail
SC 2011 Environmental Educ. Center Environmental Education 2 Richland $100,000 $25,000 $125,000
Wetland Preserve Connector Center Wetland Preserve
Connector
SC 2011 Hardeeville Trail Sergeant Jasper 2 Jasper $97,084 $24,271 $121,355
Park/Hardeeville Trail
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
SC 2011 The Native American Nature The Native American Nature 2 Hampton $74,499 $18,625 $93,124
Trail Trail
SC 2013 Cayce Riverwalk Riverwalk; Phase IV Phase IV Riverwalk 2 Lexington $100,000 $25,000 $125,000
SC 2014 Lower Saluda River Blue Lower Saluda River Blue Lower Saluda River Blue Trail 2 Lexington $100,000 $25,000 $125,000
Trail Trail
SC 2018 North Augusta Greeneway North Augusta Greeneway Resurfacing 2 Aiken, Edgefield $100,000 $25,000 $125,000
Phase I Resurfacing
SC 2018 Generations Park Walking Generations Park Walking New Trail Construction 2 Kershaw $100,000 $25,000 $125,000
Trail Trail
SC 2019 Roy Warner Walking Trail Roy Warner Walking Trail New Trail Construction 2 Aiken $100,000 $25,000 $125,000
SC 2019 Silver Bluff Walking Trail Silver Bluff Walking Trail Trail Signage 2 Aiken $7,500 $1,500 $9,000
Signage
SC 2014 Taylor Street Trail Taylor Street Trail Taylor Street Trail 2, 6 Richland $98,850 $24,713 $123,563
SC 1993 Bridge Installation Bridge Installation Construct Bridge. 3 Oconee $25,000 $25,000 $50,000
SC 1996 Mountian Rest Trail Trail Construction Construct Trail 3 Oconee $9,000 $9,000 $18,000
Construction
SC 1996 Bridge Installation Bridge Installation Construct Bridge 3 Oconee $9,000 $9,000 $18,000
SC 1996 Land Acquisition Land Acquisition Purchase Land 3 Greenwood $15,000 $15,000 $30,000
SC 1996 Clemson University Trail and Trailhead Construct Trail, Trailheads 3 Pickens $40,000 $40,000 $80,000
Construction
SC 1998 Fair Oak Elementary School Trail Construction Construct Trail 3 Oconee $6,000 $6,000 $12,000
Trail
SC 1998 Oconee County Trail System Trail and Trailhead Install Restroom, Construct Trail 3 Oconee $0 Unknown $0
Construction
SC 1999 Bruce Hill-Shaver Trail Trail Construction Construct .5 Mile Trail 3 Oconee $10,400 $2,600 $13,000
SC 2000 Yellow Branch Falls Trail Construct .9 Mile Trail 3 Oconee $6,400 $1,600 $8,000
SC 2000 Table Rock Trail Relocate and Repair Park Trails 3 Pickens $40,000 $10,000 $50,000
SC 2001 Fort Mountain and Foothills Maintenance 3 Pickens $15,000 $10,000 $25,000
Trail
SC 2001 Parsons Mountain OHV Bridge 3 Abbeville $50,000 $15,500 $65,500
Trails
SC 2001 Mecca Trails Trail Renovations, Bridges 3 Abbeville, Edgefield $67,500 $17,500 $85,000
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
SC 2001 Parson's Mountain, Cedar Trail Renovation 3 Abbeville $93,179 $24,900 $118,079
Springs OHV Trail
SC 2001 Rock Creek Trail Construct Trail 3 Greenwood $50,000 $75,300 $125,300
SC 2003 Enoree OHV Trail Trailhead, Maintenance 3 Laurens $87,038 $17,407 $104,445
SC 2003 Mecca Trails Construct Trail 3 Mccormick $100,000 $20,000 $120,000
SC 2007 Forks Area Trail Forks Area Trail System 207 Construct a 9 mile single-track trail, signage 3 McCormick $100,000 $25,000 $125,000
and expand parking lot
SC 2008 Parson's Mountain, Cedar Parson's Mountain & Cedar Trail maintenance of 22.8 miles of trail on 3 Abbeville $31,000 $7,750 $38,750
Springs OHV Trail Springs OHV Trail Long Cane Ranger Dist. and 11.8 miles on
Rehabilitation Cedar Springs and Parson's Mountain
SC 2008 Lake Rabon Trails Trail Construction Add 1.5 miles of walking trails for Lake 3 Laurens $99,200 $36,275 $135,475
Rabon recreational area
SC 2009 Fountain Inn Greenway Fountain Inn Recreational Construct a paved multi-use trail 3 Greenville, Laurens $14,400 $3,600 $18,000
Greenway
SC 2009 Enoree OHV Trail Enoree OHV - Construct new elevated turns with arched 3 Laurens $40,280 $13,000 $53,280
Reconstruction culverts; construct silt basins; relocate one
section of trail; and 23 miles of heavy
maintenance
SC 2009 Table Rock Trail System Trail Construction and Construction of two new sections of trail, 3 Pickens $100,000 $25,000 $125,000
Viewing Platform viewing platform, and the restoration of
existing trail facilities
SC 2010 Nine Times Preserve Trail Nine Times Preserve Trail 3 Pickens $33,014 $8,253 $41,267
SC 2010 Parson's Mountain, Cedar Parson's Mountain & Cedar Trail Rehabilitation 3 Abbeville $12,000 $3,000 $15,000
Springs OHV Trail Springs OHV Trail
Rehabilitation
SC 2011 Parson's Mountain, Cedar Parson's Mountain & Cedar 3 Abbeville $40,000 $10,000 $50,000
Springs OHV Trail Springs OHV Trail
Rehabilitation
SC 2011 Enoree OHV Trail 2011 Enoree OHV Trail ou 3 Laurens $35,000 $8,750 $43,750
Enhancement Work
SC 2011 Lake Greenwood Blueway Lake Greenwood Blueway 3 Greenwood $20,000 $5,000 $25,000
SC 2011 Historic Horse Creek Water Historic Horse Creek Water 3 Aiken $40,000 $10,000 $50,000
Trail Trail
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
SC 2011 Lake Rabon Trails Lake Rabon Trails - Phase II 3 Laurens $100,000 $25,000 $125,000
SC 2011 Hagood Mill Nature Trail Hagood Mill Nature Trail 3 Pickens $56,960 $14,240 $71,200
Connecting Path
SC 2011 Cross Hill Town Park Trail Cross Hill Town Park 3 Laurens $26,000 $6,500 $32,500
SC 2011 Cambridge Trail Cambridge Trail 3 Greenwood $39,942 $9,986 $49,928
SC 2012 Town Creek Park Town Creek Park Phase II 3 Pickens $100,000 $25,000 $125,000
Trails
SC 2012 Brushy Creek Greenway Brushy Creek Greenway 3 Pickens $75,000 $18,750 $93,750
Phase One
SC 2013 Long Cane OHV Trail USDA Forest Service Long USDA Forest Service Long Cane OHV Trail 3 Abbeville, Edgefield, $24,000 $6,000 $30,000
Cane OHV Trail Greenwood,
McCormick, Saluda
SC 2013 Savannah Valley Railroad Savannah Valley Railroad Savannah Valley Railroad Trail 3 McCormick $35,600 $8,900 $44,500
Trail Trail
SC 2013 Mineral Spring Trail Mineral Spring Trail Mineral Spring Trail 3 Anderson $46,068 $11,517 $57,585
SC 2014 Lowndesville Town Park Lowndesville Town Park Lowndesville Town Park Trail 3 Abbeville $100,000 $25,000 $125,000
Trail Trail
SC 2014 Mineral Spring Trail Mineral Spring Trail Mineral Spring Trail 3 Anderson $33,932 $8,483 $42,415
SC 2015 Long Cane OHV Trails Long Cane OHV Trails USDA Forest Service Long Cane OHV Trail 3 Abbeville, Edgefield, $33,700 $8,425 $42,125
Greenwood,
McCormick, Saluda
SC 2015 Enoree OHV Trail Enoree OHV Trail Enoree OHV Trail Improvements 3 Newberry, Union, $127,900 $31,975 $159,875
2015/16/17 Chester, Laurens,
Fairfield
SC 2015 Palmetto Trail Palmetto Trail Extension 3 Pickens $100,000 $25,000 $125,000
SC 2015 Sassafras Peak Trail Sassafras Peak Trail & 3 Pickens $100,000 $25,000 $125,000
Observation Platform
SC 2015 Palmetto Trail Palmetto Trail Extension - 3 Oconee $100,000 $25,000 $125,000
Stumphouse Mountain
SC 2015 Sassafras Falls Trail Sassafras Falls Trail 3 Pickens $79,250 $19,813 $99,063
SC 2015 Doodle Trail Doodle Trail Extension & 3 Pickens $26,338 $6,583 $32,921
Amenities
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
SC 2016 Doodle Trail Doodle Trail Extension & 3 Pickens $73,662 $18,415 $92,077
Amenities
SC 2016 Lake Rabon Trails Lake Rabon Trails - Phase III 3 Laurens $81,700 $20,425 $102,125
SC 2016 Mineral Spring Trail Mineral Spring Trail 3 Anderson $76,130 $19,033 $95,163
SC 2017 Aiken County Recreation Aiken County Recreation Construct a 1,932 ft. long by 8 ft. wide paved 3 Aiken $29,600 $7,400 $37,000
Center Walking Track Center Walking Track walking track at the Aiken County Recreation
Center.
SC 2018 Long Cane OHV Trails Long Cane OHV Trails Maintenance on existing trails 3 Abbeville, Edgefield, $27,500 $6,875 $34,375
2018/19 Greenwood,
McCormick, Saluda
SC 2018 Enoree OHV Trail Enoree OHV Trail 2018/2019 Enoree OHV Trail Improvements 3 Newberry, Union, $86,600 $21,650 $108,250
Chester, Laurens,
Fairfield
SC 2018 Palmetto Trail Ross Mountain Passage of New Trail Construction 3 Oconee $100,000 $25,000 $125,000
the Palmetto Trail
SC 2013 Conestee Park Connector Conestee Park Connector Conestee Park Connector Swamp Rabbit at 3, 4 Greenville $100,000 $25,000 $125,000
Trail Swamp Rabbit at Nature Nature Park
Park
SC 2014 Conestee Park Connector Conestee Village Connector Conestee Village Connector to Swamp 3, 4 Greenville $100,000 $25,000 $125,000
Trail to Swamp Rabbit Rabbit Trail
SC 2013 Enoree OHV Trail Enoree OHV Trail Enoree OHV Trail Improvements 3, 5 Newberry, Union, $77,050 $19,263 $96,313
Improvements Chester, Laurens,
Fairfield
SC 2001 Enoree OHV Trail Signage 4 Union, Laurens, $22,000 $8,000 $30,000
Chester, Newberry
SC 2001 Pinnacle Mountain Trail Bridge, Trail Renovation 4 Pickens $45,000 $20,000 $65,000
SC 2003 Paris Mountain Trails Construct Trail, Improvements 4 Greenville $51,720 $10,344 $62,064
SC 2007 Swamp Rabbit Trail Access to the Swamp Rabbit Construct three key trail access points, a new 4 Greenville $54,452 $68,065 $122,517
Rail Trail trail and rehab an existing trail
SC 2007 Lake Conestee Nature Trail Lake Conestee Nature Park - Construct a .87 mile trail system with a 4 Greenville $100,000 $150,000 $250,000
Phase II Trail System footbridge
SC 2008 The Reedy River Trail Trail Construction Pedestrian/Bike trail along the Reedy River 4 Greenville $100,000 $25,000 $125,000
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
SC 2008 Swamp Rabbit Trail Swamp Rabbit Trail Phase 1 Connect the City of Travelers Rest to Main St 4 Greenville $100,000 $25,000 $125,000
Greenville as it passes through the campus
of Furman University
SC 2009 Buckwalter Place Greenway Trail Construction Development of Phase 1 of a 1.35 mile 4 Beaufort $100,000 $26,079 $126,079
Trail recreational/nature trail in the Buckwalter
Place
SC 2009 Swamp Rabbit Trail Lake Conestee Nature Park - Develop a 8 foot wide paved trail on the 4 Greenville $100,000 $458,000 $558,000
Phase III Trail southern section of Swamp Rabbit Trail. This
will include approximately 1,500 ft. of
boardwalk
SC 2010 Wildcat Wayside Wildcat Wayside Roadside 4 Greenville $100,000 $25,000 $125,000
Park
SC 2010 Swamp Rabbit Trail Lake Conestee Nature Park - Trail Extension 4 Greenville $100,000 $25,000 $125,000
Swamp Rabbit Trail
Extension
SC 2010 Palmetto Trail Poinsett Reservoir Passage 4 Greenville $96,000 $24,000 $120,000
Phase 2
SC 2011 Swamp Rabbit Trail Swamp Rabbit Trail - Trail Extension 4 Greenville $100,000 $25,000 $125,000
Northern Extension
SC 2011 Lake Conestee Nature Park - Lake Conestee Nature Park - Trail Improvements 4 Greenville $100,000 $25,000 $125,000
Phase 4 Trail Improvements Phase 4 Trail Improvement
SC 2011 Bike Skills Trail Gateway Park - Bike Skills 4 Greenville $50,000 $12,500 $62,500
Trail/Park
SC 2012 Falls Park/Pedrick's Garden Falls Park/Pedrick's Garden 4 Greenville $100,000 $25,000 $125,000
SC 2012 Woodruff Recreational Trail Woodruff Recreational Trail 4 Spartanburg $55,790 $13,947 $69,737
(Leisure Center Phase)
SC 2012 Fountain Inn Greenway & Fountain Inn Greenway & 4 Greenville, Laurens $100,000 $25,000 $125,000
Multi-Use Recreational Trail Multi-Use Recreational Trail
SC 2019 Lake Conestee Nature Park Boardwalks & Observation Maintenance on Existing Trails 4 Greenville $86,960 $21,740 $108,700
Deck Rehab/Replacement
SC 2019 Silver Steps Falls Silver Steps Access and New trail construction 4 Greenville $100,000 $25,000 $125,000
Trailhead
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
SC 2018 Safety and Education Chainsaw and Cross-cut Chainsaw and Cross-cut Saw Certification 4 Greenville $2,440 $488 $2,928
Saw Certification
SC 1993 Sumter Trailhead Trailhead Construction Develop Trailhead 5 Sumter $3,795 $3,795 $7,590
Construction
SC 1996 Anne Springs Close Trail and Bridge Bridge and Renovation 5 York $9,435 $9,435 $18,870
Greenway Improvements
SC 1996 Rock Hill Trails Trail Construction Construct Trail 5 York $10,000 $10,000 $20,000
SC 1996 City of Union Trails Trail Renovation Reconstruct Trail 5 Union $10,000 $10,000 $20,000
SC 1996 Catawba Indian Nation Trail and Bridge Construction Construct Trail, 3 Bridges 5 York $15,886 $15,886 $31,772
SC 1997 Cherokee County Trailhead Trailhead Improvements Construct Parking 5 Cherokee $20,000 $20,000 $40,000
Improvements
SC 1997 Sumter Trail and Boardwalk Trail and Boardwalk Construct Trail and 200 Foot Boardwalk 5 Sumter $25,000 $25,000 $50,000
Construction
SC 1997 Sumter Trail and Boardwalk Trail Construction Construct Trail 5 Sumter $25,000 $25,000 $50,000
SC 1998 Anne Springs Close Trail Renovation Relocation and Extension of Trail 5 York $0 Unknown $0
Greenway
SC 1998 Fort Mill Trail Construction Trail Construction Construct 1,850' Paved Trail 5 York $0 Unknown $0
SC 1998 Manchester State Forest Trailhead Improvements Toilet, Sign Trail 5 Sumter, Clarendon $0 Unknown $0
SC 1998 Town of Clover Trails Trail Construction Construct 2500' Paved Trail 5 York $0 Unknown $0
SC 1998 Orchard Park Elementary Trail Construction Construct Trail 5 York $0 Unknown $0
School Trail
SC 1998 Trail Construction Trail Construction Construct 1,900' Paved Trail. 5 Union $0 Unknown $0
SC 1998 Rock Hill Boardwalk Boardwalk Construction Construct 350' Boardwalk 5 York $0 Unknown $0
SC 1999 Woods Ferry Horse Trail Construct Trail 5 Union $3,200 $800 $4,000
SC 1999 TNT Motorsports Trails Trailhead Improvements Improve OHV Trailhead 5 Chester $24,000 $6,000 $30,000
SC 2000 TNT Motorsports Trails Purchase Trail Maintenance Purchase Trail Maintenance Equipment, 5 Chester $36,000 $9,000 $45,000
Equipment Renovate Trail
SC 2000 Mecca Trails Develop New Trailheads, Maintenance 5 York $40,000 $10,000 $50,000
SC 2000 Anne Springs Close Install Info Kiosks 5 York $52,000 $13,000 $65,000
Greenway
SC 2001 TNT Motorsports Trails Trail Renovation 5 Chester $35,000 $9,687 $44,687
SC 2001 Sugar Creek Trail, River Construct Trails 5 York $40,000 $33,000 $73,000
Park Trail
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
SC 2001 Manchester Meadow Trails Bridge 5 York $70,000 $65,000 $135,000
SC 2003 Manchester Meadows Trail Construct Trail, Bridge 5 York $200,000 $40,000 $240,000
SC 2007 Nation Ford Greenway Nation Ford Greenway Construct a segment of the Nation Ford 5 York $12,589 $3,147 $15,736
Greenway
SC 2007 Crowders Connector Trail Crowders Connector Trail Construct a 2.2 mile connector trail 5 Unspecified/Unidentifi $57,600 $14,400 $72,000
able
SC 2007 Palmetto Trail Peak to Pomaria Rail Trail of Construct phase 1 of the Peak to Prosperity 5 Newberry $80,850 $20,213 $101,063
the Palmetto Trail Rail-Trail
SC 2008 Arcade Trail Arcade Trail Project Construct a 3,000 foot long, 12 feet wide, 5 York $100,000 $25,000 $125,000
paved asphalt trail. This trail begins at the
Arcade Textile Mill site
SC 2009 Yehasuri Trail Yehasuri Trail Improvements Improve 1.25 miles of the Yehasuri Trail 5 York $28,819 $7,204 $36,023
& Repairs along with install signage, benches and trash
receptacles along the trail
SC 2009 Wylie Park Trail Trail Construction Construct a ten foot wide (ADA) paved 5 Chester $100,000 $25,000 $125,000
walking trail.
SC 2009 Buncombe Horse Trail Trail Relocation, Relocate and construct 1.3 miles of trail, 5 Newberry $30,000 $48,000 $78,000
Construction, and New construction of fiberglass bridge and
Bridge decommission of 1.3 miles of old trail
SC 2010 US 21 Bridge Connector US 21 Bridge Connector Bridge Connector 5 York $100,000 $25,000 $125,000
(South Side) (South Side)
SC 2011 Kings Mountain Kings Mountain State Park 5 Cherokee $57,600 $14,400 $72,000
Equestrian/Hiking Trail
SC 2012 Rocky Branch Natural Area Rocky Branch Natural Area 5 Newberry $26,800 $6,700 $33,500
Public Trail Public Trail
SC 2012 Lake Alice Drive Walking Lake Alice Drive Walking 5 Sumter $100,000 $25,000 $125,000
Trail Trail
SC 2012 McBee Walking Trail McBee Walking Trail 5 Chesterfield $97,833 $24,458 $122,291
SC 2013 Mount Zion Green Park Mt. Zion Green Park Mt. Zion Green Park 5 Fairfield $98,951 $24,738 $123,689
SC 2013 Rock Hill Riverwalk Riverwalk/River Park Trail Phase IV Riverwalk/River Park Trail 5 York $100,000 $25,000 $125,000
Connector Project; Phase IV Connector Project
SC 2014 Mount Zion Green Park Mt. Zion Green Park Mt. Zion Green Park 5 Fairfield $1,049 $262 $1,311
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
SC 2015 Riverwalk/River Park Trail Riverwalk/River Park Trail 5 York $100,000 $25,000 $125,000
Connector Project Connector Project
SC 2015 Flat Stack Trail Union Co. Flat Stack Trail 5 Union $100,000 $25,000 $125,000
Phase II
SC 2016 Sweet Gum Connector Trail Sweet Gum Connector Trail - 5 Kershaw $100,000 $25,000 $125,000
Phase 1
SC 2016 York County Culture & York County Culture & 5 York $90,593 $22,648 $113,241
Heritage Commission Heritage Commission
SC 2017 York County Culture & York County Culture & 5 York $9,406 $2,352 $11,758
Heritage Commission Heritage Commission
SC 2017 Millers Fork Trail Millers Fork Trail Construct Phase 1 of the Miller Fork Trail. 5 Laurens $99,100 $24,775 $123,875
Phase 1 will include the trail entrance,
trailhead and trailside signage, ADA
accessible gravel parking, .5 mile of ADA
natural & prepared trail surface with
pedestrian bridge and boardwalks.
SC 2018 Catawba River Trail Catawba River Trail Phase III Trail Construction 5 York $100,000 $25,000 $125,000
Extension - Phase III
SC 2018 Woods Ferry Trail Woods Ferry Trail Project Trail Facilites, New Trail Construction, 5 Union $59,200 $14,800 $74,000
Maintenance on Existing Trails
SC 2018 Scott Park Trail Scott Park Trail Maintenace on Existing Trails 5 Kershaw $100,000 $25,000 $125,000
SC 2018 Arts Park Connectivity Trail Arts Park Connectivity Trail New Trail Construction 5 Greenville, $100,000 $25,000 $125,000
Spartanburg
SC 2019 Cherokee Ford Road Trail Cherokee Ford Road Trail New Trail Construction 5 Cherokee $100,000 $25,000 $125,000
SC 2019 Anne Springs Close Trails, Tales, and Teachers II Trails, Tales, and Teachers II 5 York $7,900 $1,580 $9,480
Greenway
SC 2018 Catawba River Trail Catawba River Trail Catawba River Trail Educational Project 5 York $6,000 $1,200 $7,200
Educational Project
SC 2018 Anne Springs Close Trails, Tales, and Teachers II Trails, Tales, and Teachers II 5 York $9,600 $1,920 $11,520
Greenway
SC 2010 Patriot Park Trail System Patriot Park Trail System 5, 6 Sumter $100,000 $25,000 $125,000
SC 2013 Lake Alice Drive Walking Lake Alice Drive Walking Lake Alice Drive Walking Trail 5, 6 Sumter $100,000 $25,000 $125,000
Trail Trail
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
SC 2013 Pacolet and Lawson's Fork Pacolet and Lawson's Fork Pacolet and Lawson's Fork Blueway 5, 6 Spartanburg $100,000 $25,000 $125,000
Blueway Blueway
SC 2014 Shiloh Walking Trail Shiloh Walking Trail Shiloh Walking Trail 5, 6 Sumter $34,800 $8,700 $43,500
SC 1997 Santee State Park Trail Construction Construct Trail 6 Orangeburg $7,000 $7,000 $14,000
SC 1997 Boardwalk Construction Boardwalk Construction Construct 900 Foot Boardwalk 6 Jasper $13,500 $13,500 $27,000
SC 1998 Jasper Trailhead Trail Improvements Construct Deck, Kiosk, Signs. 6 Jasper $0 Unknown $0
Improvements
SC 1999 Congaree Swamp National Boardwalk Construction Construct Boardwalk 6 Richland $8,000 $2,000 $10,000
Monument Boardwalk
SC 1999 Cypress Trail Trail Construction Construct 1 Mile Paved Trail 6 Sumter $80,000 $20,000 $100,000
SC 1999 Cypress Trail Trail Construction Construct 1 Mile Paved Trail 6 Sumter $80,000 $20,000 $100,000
SC 2001 Mullet Hall County Park Construct Trail 6 Charleston $35,000 $1,700 $36,700
Equestrian Trail
SC 2001 Manchester OHV Trails Trail Renovation 6 Sumter $60,000 $18,958 $78,958
SC 2009 Lower Savannah River Trail Construction, Signs, Create walking nature trail on the old 301 6 Allendale $100,000 $31,780 $131,780
Alliance Greenway and Benches road bed. This includes the development of
trail bed design and signage, markers and
benches
SC 2015 Lake City Park Lake City Park 6 Florence $100,000 $25,000 $125,000
Boardwalk/Trail Boardwalk/Trail Project
SC 2016 Town of Brunson Walking Town of Brunson Walking 6 Hampton $79,600 $19,900 $99,500
Trail Trail
SC 2017 Ace Basin Greenway Ace Basin Greenway - Construct Phase1 of the ACE Basin 6 Colleton $100,000 $25,000 $125,000
Phase 1 Greenway. Phase 1 will be 1.83 miles long
from the crossroad of Folly Creek Lane &
Green Pond Highway north to Clover Hill
Road near Ritter Road.
SC 2017 Courthouse Park Courthouse Park 6 Dorchester $100,000 $25,000 $125,000
Recreational Trail Recreational Trail
SC 2017 Hollywood Trails at the Sap Hollywood Trails at the Sap - 6 Charleston $100,000 $25,000 $125,000
Phase One
SC 2019 Ace Basin Greenway Ace Basin Greenway - Construct Phase 2 of the ACE Basin 6 Colleton $100,000 $25,000 $125,000
Phase 2 Greenway.
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
SC 2019 Owens Field Park Owens Field Park Pump New trail construction 6 Richland $95,900 $23,975 $119,875
Track
SC 1997 Chesterfield Trailhead and Trailhead and Boardwalk Construct Parking, 500' Boardwalk 7 Chesterfield $20,000 $20,000 $40,000
Boardwalk Construction Construction
SC 1998 Town of Cheraw Trails Trail Construction Construct Paved Trail 7 Chesterfield, Marlboro $0 Unknown $0
SC 1998 Georgetown County Trail Trail Construction Construct Trail 7 Georgetown $0 Unknown $0
System
SC 1998 Marlboro County Trail Trail Construction and Lighting for Trail, Construct Trail 7 Marlboro $0 Unknown $0
System Improvements
SC 1999 Crooked Creek Trail Trail Construction Construct 1 Mile Trail 7 Marlboro $16,000 $4,000 $20,000
SC 1999 Great Pee Dee Trail Construct .5 Mile Trail 7 Chesterfield $19,200 $4,800 $24,000
SC 1999 Craig Mill Trail Construct 1 Mile Trail, Bridge 7 Chesterfield $32,000 $8,000 $40,000
SC 2000 Williamson Park Trail Install Drains, Trail Improvements 7 Darlington $54,000 $13,500 $67,500
SC 2000 Florence Rail-Trail Construct 2 Mile Trail On Abandoned Rail 7 Florence $80,000 $20,000 $100,000
Line
SC 2006 Loris Nature Park Trail Construction Construct a walking and hiking trail at Loris 7 Horry $82,621 $25,000 $107,621
Nature Park
SC 2007 Bike the Neck Trail Murrells Inlet Bike Bridge Construct a 731' in length bike lane and 7 Georgetown $62,000 $15,500 $77,500
bridge
SC 2008 Earlewood Park Earlewood Park Trail Extend trails throughout park and create 7 Richland $100,000 $25,000 $125,000
Multiple trailheads in Earlewood Park
SC 2009 Cox Ferry Lake Trail Cox Ferry Lake Recreation Build a 200 linear foot section of boardwalk at 7 Horry $24,000 $6,000 $30,000
Area Boardwalk Cox Ferry Lake Recreational area
SC 2014 East Coast Greenway East Coast Greenway East Coast Greenway in Horry County 7 Horry $60,950 $15,238 $76,188
SC 2014 Cox Ferry Lake Recreation Cox Ferry Lake Recreation Cox Ferry Lake Recreation Area 7 Horry $50,000 $12,500 $62,500
Area Area
SC 2015 East Bay Park Recreational East Bay Park Recreational 7 Georgetown $77,759 $19,440 $97,199
Trail Trail
SC 2016 Brightsville Trail Brightsville Trail Project 7 Marlboro $62,320 $15,580 $77,900
SC 2016 Zion Outdoor Wellness Zion Outdoor Wellness 7 Marion $76,077 $23,019 $99,096
Center Center
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
SC 2017 Zion Outdoor Wellness Zion Outdoor Wellness Installation of 1,645 x 8 ft. asphalt trail and 7 Marion $23,924 $5,980 $29,904
Center Center trailhead at the Zion Outdoor Wellness
Center.
SC 2017 Lake Wallace Walking Trail Lake Wallace Walking Trail Resurface 1.3 miles of Lake Wallace Walking 7 Marlboro $75,000 $18,750 $93,750
Trail and install benches along the trail.
SC 2017 Viking Greenway Viking Greenway Construct one and a half miles of multi-use 7 Dillon $85,424 $21,356 $106,780
trail that will connect existing community and
school pathways.
SC 2017 Grand Park Avenger API Grand Park Avenger API Construct a trailhead and a outdoor 7 Horry $100,000 $25,000 $125,000
Trailhead Trailhead educational classroom at the Avenger API
Trail, renovate vacant building by trail to
provide ADA compliant public restroom
facility, and lighting on the trail.
SC 2018 Viking Greenway Viking Greenway Phase 2 Construct multi-use trail that will connect 7 Dillon $61,209 $15,302 $76,511
existing community and school pathways.
SC 2018 High Hill Creek Bike and Run High Hill Creek Bike and Run New trail construction 7 Florence $76,892 $19,223 $96,115
Park Park
SC 2019 Viking Greenway Viking Greenway Phase 2 Construct multi-use trail that will connect 7 Dillon $38,791 $9,698 $48,489
existing community and school pathways.
Grand $19,831,022 $6,561,476 $26,392,498
Totals