LOCALITY MAP Compartment 2013 Badja State Forest No.567 Deua NP SOUTHERN REGION: BATEMANS BAY MANAGEMENT AREA SCAGoodL E:Good1:10 NR0,000
PEPPERS CREEK
BIG BADJA RIVER
EMP 1 Ñ 2013 v®
Wadbilliga NP
Kybeyan SCA Kybeyan NR Legend Sealed Road Major Forest Road TUROSS RIVER ® State Forest National Parks Planning Unit Formal Reserve Vacant Crown Land Informal Reserve Freehold Water Non Forest
Major Rivers G Emergency Meeting Point Á Evacuation Route KYBEYAN RIVER P Helicopter Landing Site Á Haulage Route Prepared By: Darryl Chaffey Harvest Plan Operational Map Version: 1 Compartment:2013
...... R...E.GI....O...N...A..L.. .M...AN.....A....G...E.R.... A..P...P...R..O...V..AL...... State Forest:BADJA No: 567 APPROVED: Daniel Tuan SOUTHERNREGION - Native Forests DATE: 23 / 03 / 2012 ³ Map Sheet: BELOWRA 8825-4S
26 27 28
_ _
95 _ 95
B ^ 2013 B B B B B B B B B H1 H4 2 B B C2 H B 94 B B B 94 _ ú^ C1 H3 B B B ú B B B B ^ B C3 H5 B ú _ B B úC5 C4 6H ú _ _ B ^ B 7 20m Wetland Buffer B H B 8 H B B B É
40m Wetland Buffer
93 726000E 27 28
LEGEND
BOUNDARIES NON HARVEST AREA FAUNA FEATURES ÉÉÉÉÉÉState Forest Boundary Wetland ^ Gang-gang Cockatoo ÉÉÉÉÉÉCompartment Boundary Wetland Buffer _ Spotted-tailed Quoll Harvesting Protection (FMZ 3A) ROADS Major Forest Ridge & Headwater Habitat (80m total width) 2> DRAINAGE Minor Forest 3 EPL Standard Existing (Major) Mapped LIC Drainage EPL Standard Existing (Minor) DUMPS & CROSSINGS STREAM EXCLUSION ZONES (EPL IHL 1 & TSL) EPL Licenced (New Construction) H Temporary Dry Weather Feature Filter Strip Protection Zone Operational Zone Unmapped N/A N/A N/A NET HARVEST AREA MAP FEATURES 1st Order 5m 5m 10m FMZ4/Resource Unit 1 - STS Heavy B Rocky Terrain 2nd order 5m 15m 10m FMZ 4/Resource Unit 2 - Excluded Forest Not avail. for harvest this operation 3rd order 5m 25m 10m 4th order 5m 45m 10m 0 125 250 500 750 1,000 Meters Scale: 1:15,000 Contour Interval 10m Prepared By: Darryl Chaffey Harvest Plan Forest Type Map Compartment:2013 State Forest:BADJA No: 567 SOUTHERNREGION - Native Forests Map Sheet: BELOWRA 8825-4S
26 27 28
95 95
154
112 114 154 162
162 94
112 154
162 159
154
É
726000E 27 28
LEGEND BOUNDARIES Forest Type Gross Area (ha) ÉÉÉÉÉÉState Forest Boundary ÉÉÉÉÉÉCompartment Boundary Type 112 Silvertop Ash 112 15.3 Type 114 Silvertop Ash - Stringybark 114 0.2 Type 154 Brown Barrel 154 167.4 ROADS Type 159 Mountain / Manna Gum 159 4.9 Major Forest 32> Minor Forest Type 162 White Ash 162 10.7 EPL Standard Existing (Major) EPL Standard Existing (Minor) Total 198.5 EPL Licenced (New Construction)
DRAINAGE 0 125 250 500 750 1,000 Scale: 1:15,000 Mapped LIC Drainage Meters Contour Interval 10m
G:\PLANNING\HarvestPlans\South Coast\Badja\Cpt-2013\HP_BB_2013_11\HP_BB_2013_11.mxd SouthernRegion – Compartment2013,Badja StateForest,BatemansBayManagementArea
FORESTSNEWSOUTHWALES-SOUTHERNREGION HARVESTINGPLANNATIVEFOREST
BadjaStateForest-Compartment2013
Certification ThisplanhasbeenpreparedinaccordancewiththeIntegratedForestryOperationsApproval issuedundertheForestryandNationalParkEstateAct1998.TheStandardHarvestPlan ConditionsforNativeForestOperationsinSouthernRegion,SouthCoastapplytothis operation. PreparedBy: DarrylChaffey EndorsedBy: Shane ApprovedBy: DanielTuan Harvest A/Harvest Clohesy Regional Planner PlanningTeam Manager Leader Signature Signature Signature
Date 21.03.2012 Date 21.03.2012 Date 21.03.2012 Note:ApprovalincludestheHarvestPlanOperationalMap (HPOM)withthe correspondingapprovaldatedisplayedon the map,verifyingfinalapprovedversion. Othermapsincludedwith thisplanareLocality,ForestTypeandRoading.
DescriptionofProposal
Harvestingofnative forest Harvestingofnativeforest,usingSingleTreeSelectionSilviculturesubjecttothe SouthernRegion,IFOArequirementswillbeundertakenwithin thisplanningunit. Theprimaryproductoftheharvestingishighqualitylargesawlogs(quotalogs),small highqualitysawlogs,veneerlogs,girders,poles&pileswheretimbermarketsare available.Partsoffelledlogsthatdonotmeethighqualitylogspecificationsare segregatedandgradedintootherclassificationssuchassalvagesawlogs,pulplogs& miscellaneoustimberse.g.split&roundposts,firewood,miningtimbers&craftwood. Theavailabilityofmiscellaneoustimbersdependsmainlyonforesttypes,log defectiveness&marketconditionsat the timeofharvesting.
Clause22 – IntegratedForestry OperationsApproval (IFOA)Consideration Allrelevantfactorshavebeenreviewedtakingintoaccountthevolumeandmonetary valueofeachforestproducttosupplyTermAgreementHolders.Theharvesting operationalsocomplies withClause22oftheIFOA.
Attachment1: SiteSafetyPlanprescribessafety requirementsandMedical EmergencyEvacuationPlanfor thisharvestingoperation. Attachment2: Roadingplanprescribes roadingrequirementsfor thisharvesting operation. Attachment3: BurningPlanprescribesburning requirementsfor thisharvesting operation. Post-harvestburningshouldbeconfinedasfaraspracticabletotheNetHarvestArea. SitespecificburningexclusionsassociatedwithFlora,Fauna,CulturalHeritage, Riparianandotherexclusionzonesareexplainedwithintherelevantsectionsofthis HarvestPlanandindicatedontheHPOM.
HP_BB_2013_11 21-03-12 1 SouthernRegion – Compartment2013,Badja StateForest,BatemansBayManagementArea
Wherepracticable,snigtrackpatternsshouldbedesignedtodoubleasbareearth controllinestopreventfireenteringspecifiedburningexclusionzonesandother tenures,i.e.SmokyMouse,SouthernBrownBandicoot&significantCulturalHeritage sites. Wherethisisnotpractical,theContractCoordinatoristoassesstheneedforabare earthbreaktobeconstructedclosetoharvestingexclusionboundariesandseek adviceandapprovalfromtheHarvestingTeamLeaderfortheadditionalearthworks. Specificareasidentifiedduringtheplanningstagewhichrequireamineralearthbreak areidentifiedin theburningplan.
Area IdentificationandYieldEstimates
State Compartment/s Region Management Certification Harvest Forest Area Plan ID Badja 2013 Southern BatemansBay AS4708:2007 3837 ISO14001
Cpt Event ID 14797 GrossArea (ha) 198 NetHarvestArea(ha) 163 QuotaLogs (HQL) 20m³/ha HighQualitySmall 2 m3/ha Salvage 36m³/ha Pulp 100t/ha(88 m3/ha) EstimatedTotalYield (m3/ha) 146 EstimatedTotalVolume(m3) 12,118
HP_BB_2013_11 21-03-12 2 SouthernRegion – Compartment2013,Badja StateForest,BatemansBayManagementArea
ForestsNSW – SouthernRegion HarvestingPlanHP_BB_2013_11 Compartment2013
Attachment1–SiteSafetyPlan
SAFETYCONSIDERATIONS
EmergencyPlan Information
(a) MobilePhonereceptiononworksite: Good Poor Ö Nil Nearest reliable reception:HigherpointsonBadjaForestroad.
(b) ForestsNSWRadiofromworksite: ContractorRadioatworksite: ChannelNo: 236 UHFChannelNo:______Call to: BatemansBay ContractorRadioNo:_____ Callsignfrom: Yourname Call toBushBoss:______
(c) Emergencymeetingpoint forambulance(EMP1): JunctionofBadjaForestRoad&TurossFallsRoad. 1:100000mapsheet: Cobargo8825 MGAzone: 55 MGA Gridreference: E 725079 N5994248 Lat/LongforGPS: 36º10.19’S 149º30.04’E
(d) ClosestHelicopterLandingPlace: PrivatepropertyonBadjaStateForestwesternboundary. 1:100000mapsheet: Cobargo8825 MGAzone: 55 MGA Gridreference: E724130 N5993900 Lat/LongforGPS: 36º 10’32”S 149º 29’27”E
(e) ProcedureforobtainingAmbulanceassistance: Dial"000"ORCallBatemansBayForestryOffice1300880548forAmbulance assistance. Dial “112” onlyasanalternativeto “000” ifyouhaveaGSMdigitalmobilephone andyouareoutsideyourownprovider’s GSMnetworkcoveragearea.
HP_BB_2013_11 21-03-12 3 SouthernRegion – Compartment2013,Badja StateForest,BatemansBayManagementArea
"000" OperatorQuestion. Response 1.Police,Fire,Ambulance? AmbulanceWollongong.
2.Suburb (StateForestname): Badja (Nearesttownornamed locality): Countegany (NearestAmbulancestation): Cooma
3.Address: (NearestnamedState forest road): BadjaForestRoad.
4.NearestRoadJunction: TurossFallsRoad
5LocalGovernmentArea: CoomaMonaroCouncil
6.Natureoftheproblem: Give details ofaccident,numberand conditionofcasualties.
7.Whereis theaccident: Worksitelocation – (CentreofCompartment).
MGA Gridreference: Zone55 E727209 N5994065.
Lat/longforGPS: 36° 10'17"S149° 31'34"E.
8.DirectionstonavigatefromAmbulanceStationtomeetingpoint:
DirectionsfromCooma: Travel20kmontheCooma-NumerallaRoadtoNumeralla.Continuethrough NumerallaontheNumeralla-CounteganyRoadforapproximately12km. Numeralla-Countegany Road becomes Badja Road, continue for approximately4km.TurnrightontoBadjaForestRoadandgo4.5kmto TurossFallsRoad.ThisisEmergencyMeetingPoint1.NominateUHF Channel. 9.Injuries?: Givedetailedinformationaboutthecondition ofthecasualty.
10.CallbackNo.: GiveyourMobileNumber. orBatemansBayOffice:1300880548.
11.NameofReporter: Giveownname.
SiteSpecificIdentified Hazards
Assessmentofexistinghazardswasundertakenatthetimeofplanning.These hazardsarein theattached tableandwhereappropriate,controlstrategieshavebeen applied.Wherenocontrolstrategyhasbeendescribed,thecontractormustdevelop appropriatestrategiesaspartofthecontractorsSafetyManagementPlan.Acopyof thehazardassessmentandcontrolstrategiesisprovided toassistinthedevelopment ofthecontractorsSafetyManagementPlanforthisharvestingarea.
Identifiedhazards requiring riskassessmentandcontrolstrategyinSafety ManagementPlan
HP_BB_2013_11 21-03-12 4 SouthernRegion – Compartment2013,Badja StateForest,BatemansBayManagementArea
IDENTIFIED HAZARD RISK SUGGESTED CONTROL STRATEGY RATING 1.Adjoiningroadsofvarious 1 Warningsignsatintersections,roadclosureand trafficlevels trafficcontrol measures. 60km/hrspeedlimitonallStateForestgravel roadsunlessotherwisesignposted. CompliancewithForestsNSW lightsonpolicy. 2.Clifflines&rockyverysteep 3 Operatorstoassessworksitewithintwotree terrain lengths to identify immediate hazards. Communicatetootheroperatorsand marksites. 3.Hazardousordeadtrees 1 RefertoForestsNSWsafetystandard1.3.9. Assessareawithintwotreelengthsofworksite. Assessrisk,markanyDistinctlyDangerous Treeswiththesymbol Ø &ifnecessaryremove hazardormoveworksite.Usemachineryto assist with hazard removal if possible Contractorisresponsibleforimplementing controlstrategiesduringharvesting. 4. Overhead hazards 1 Referto Forests NSW safety standard associatedwithdumps 1.3.9.Assessoverheadhazardwithintwotree lengthsofthedump.Assessrisk,&ifnecessary remove hazard or relocate dump site. Contractorisresponsibleforimplementing controlstrategiesduringharvesting. 5.Dustfrompassingvehicles 2 Restrictspeed tominimisedustgeneration,slow alongdirthaulage routes downwhenpassingvehicles.Turnondriving andhazardlightstoincreasevisibility. 6. Trucks colliding with 2 Where practicable,trucks avoid using the oncoming schoolbuses or Numeralla to Cooma road on weekdays childrenontheroad. between7.00-8.30amand3.30-500pm.Drivers tobevigilantforchildrencrossingorplayingon orneartheroad. HazardNos.1and4areshownon theattached HPOM.
Trafficmanagement/roadclosures Theloggingcontractoris responsiblefortrafficcontrolonallroadswhenfellingiswithin twotreelengthsofthetallesttreetobefelledoftheroadorsniggingonroadsor loadingisoccurringwithin10metresofaroad.Warningoftrucksenteringmustbe displayed200metreseitherside ofallStateForestroadapproachesleadingto areaswhereharvestingoperationsareinprogress.
Warningoftimberharvestingoperationsmustbe displayed200metreseitherside of allthoroughfareStateForestroadapproachesleadingtoareaswhereharvesting operationsareinprogress.
Thisplanidentifieshaulagefrom thecompartmentwillbesouthviaPeters Roadand TurossFallsRoad turningleftontoBadjaForest Road thentoBadjaRoad (100km/hr Road).
HP_BB_2013_11 21-03-12 5 SouthernRegion – Compartment2013,Badja StateForest,BatemansBayManagementArea
TheintersectionofBadjaForestandBadja roadshasbeenassessedasachievinga minimumof200msightdistanceonbothapproaches.Thereforeat thisintersection additionalsignageinaccordancewithaTrafficControlPlanisnot required.
Roadintersectionsoutside thecontrolofForests NSWarenotcoveredby thisplanor anyForestsNSWTrafficControlPlan.HaulagecontractorsmustabidebyRTA road lawsandstandardoperatingproceduresin relation tohaulage routesoutside the controlofForestsNSW.
Dust,noiseandschoolbusroutes Schoolbusroute- theCoomatoNumerallaroadisusedbyschoolbusesbetween thehoursof7:00amto8:30amand3:30pmto5:00pm.Onweekdays,tothegreatest extentpracticable,loghaulageshouldavoidschoolbus timesontheabove roads.
SilvicultureandHarvestingPrescriptions
Year 1985 1989 2002 2006 TSI X X X X HRBurning J J X J Wildfires X X J X Logging m3 1086 2789 0 0 J -applies, X – notapplicable
Compartment No.ofSweeps BAAverage (m2/ha) BARange (m2/ha) 2013 10 29 24-34
SilviculturalPlanning SingleTreeSelection TheSTStract(163ha)isapredominantlymixedagedforestandwillbeharvested underaheavy(onecutregenerationharvest)singletreeselection(STS)regime.The objectivewithinthe84haharvestarea forthisoperation(ResourceUnit1)istoremove commerciallymatureanddefectivetreestocreatecanopyopeningsforregeneration, whilstretainingandminimisingdamagetoyoungregeneratingstems,seedtrees, habitatand recruitmenttrees. Itisenvisagedthatthenextharvestingoperationinthiscompartmentwouldbeon average30yearstime. TheSTStractforIFOApurposesincludestheNetHarvestArea/ResourceUnits1and 2ofCompartment2013asindicatedon theHPOM. SingleTreeSelection(STS)mustremovenomorethan45%oftheBasalArea (BA),whileretainingaminimum BAof10m2 perhectareacrossthetract.
HP_BB_2013_11 21-03-12 6 SouthernRegion – Compartment2013,Badja StateForest,BatemansBayManagementArea
1 Overstoreydominatedby Thissectionofthe Mature toovermatureuneven BrownBarrel (E.fastigata), compartmenthasundergone agedwellstockedforest(BA Manna Gum (E.Viminalis), lightselectivelogging range24-34m2/ha)in andNarrow-leaved targetingsawlogsinthepast averagetogood timber Peppermint (E.Radiata). (noexactrecords). condition.Standhas reached OtherspeciesincludeWhite endpointwithlimitedfurther Ash (E.fraxinoides)and growthpotential. SilvertopAsh (E.sieberi). 2 Overstoreydominatedby Thissectionofthe Thepredominantcohorts BrownBarrel (E.fastigata), compartmenthasundergone consistofregrowthand/or Manna Gum (E.Viminalis), lightselectivelogging early maturetreeswith andNarrow-leaved targetingsawlogsinthe scatteredovermature Peppermint (E.Radiata). 1980’s. remnantoverstoreyandis OtherspeciesincludeWhite wellstockedwithinfrequent Ash (E.fraxinoides)and gaps. SilvertopAsh (E.sieberi). The regrowthisinverygood timberconditionandthe remnantoverstoreyisinvery poortimbercondition.
HarvestingPrescription
Resource Unit % of NHA Silvicultural Treatment (Refer toHPOM fordetail)
1 51% STSheavy-1cutregenerationharvest: · Retainandprotectfromharvesting/firedamage: -poles/advancedgrowth(<40cmDBHOB)withgoodformand vigour, -habitatandrecruitment treesasperTSL, -4seedtrees/ha (canincludeothersuitable retainedtrees). Retainedtreesshouldbeevenlyspaced. · Allotherproductsshouldbe removed marketspermitting.If this objectivecannotbeachievedthefollowingoptionsshouldbe considered: -rejecttreefelling(ContractCoordinatormustfirstobtain approval fromharvesting teamleader), -deferharvestinguntilideal marketconditionsprevail, -considerharvestingunderalightormediumSTS regime. 2 49% RetainedBA,excludefromharvestdue tolowviabilityandaccess issues. Note:Theareaofeachsilviculturaltreatmentmustbemappedandrecordedinthe Postlogginginformationsectionofthisplan.
HP_BB_2013_11 21-03-12 7 SouthernRegion – Compartment2013,Badja StateForest,BatemansBayManagementArea
SpecialRequirements
Non-harvestareas TheHPOMindicatesthenon-harvestareasinthecompartment,asdetailedinthe legend.Harvestingdisturbanceisnotpermittedinnon-harvestareasunlessauthorised by theRegionalManager. NoxiousWeeds/Disease/PestsHygieneRequirements Therearenoknownnoxiousweeds,pathogensordiseasesinthecompartment. HarvestingMachineryisnotrequiredtobewasheddownpriortoleavingthe compartment.
ForestManagementZoning
FMZ3AandFMZ4- GeneralManagement(normalharvestingprescriptionsapply) occurwithin thecompartment.Refer toHPOMfor moredetail.
FMZ3A – Prescribedburningisonlypermittedintheseareaswherefiredoesnot conflictwithunderlyingprotectionzonese.g.rainforest,culturalheritageetc.(Referto culturalheritagefloraandfaunasectionsofthisplanand thestandardharvestplan conditionsformoredetail). Harvestingandharvesting machineryarenotallowedin theFMZ3A.
IFOARequiredApprovalofForestryActivities
Approvalshavenotbeenobtainedforsnigtrackconstructionand/oruseandlog haulageinFMZ3A.IftheContractCoordinatoridentifiestheneedforharvesting relatedactivitiestooccurwithinFMZ3Aduringtheoperation,theHarvestPlanner mustbecontactedtoseekRegionalManagerApproval.
AllStreamExclusionZonesrequirepriorRegionalManagerApprovalbeforeforest harvestingrelatedactivities(e.g.roadorsnigtrackconstruction&reopening)canbe undertaken.ItistheresponsibilityoftheContractCoordinatortoidentifyanyexclusion areaswhichwillneedtobecrossedduringharvesting.The ContractCoordinator should thencontactthe HarvestPlannertoobtain thenecessaryapproval.
CulturalHeritage
CulturalHeritage - Thereare no CulturalHeritagesiteswithinthecompartment.All relevantrepresentativeshavebeenconsulted&/orinspectedCompartment2013.Due totheconfidentialityof theCulturalHeritagesites,aCulturalHeritagesite mapwillonly beattachedtothespecificcopiesoftheplan.All10metreradiusexclusionbuffersare tobemarkedinthefieldas hardexclusionzones(i.e.pink&yellowtape) where loggingand/orroadworksarescheduledtobeundertaken. Alloperatorsmustbe takentoeachsitewithin theplannedareabeforeanyactivitiesarecommenced.
HP_BB_2013_11 21-03-12 8 SouthernRegion – Compartment2013,Badja StateForest,BatemansBayManagementArea
FloraandFauna
RefertoTSLBooklet forConditions Mark-UpConditions Duringthepre-harvestmarkuptheSFO/ContractCoordinatormustsearchforand record threatenedspecieshabitatfeaturesconsistentwithConditions5.2and8.6ofthe TSL.Searchesforthreatenedspeciesfeaturesmustbeconductedwithinthatportion ofthenetplannedareawhereharvestingwilloccur,andwithin50metresoutsidethis area(e.g.HCVOG,etc)(conditions5.1,5.2oftheTSL). Whereanyofthesefeaturesarefound,thefeaturemustberecorded,theHarvesting Plan,including theHPOM, mustbeamendedaccordinglyand theappropriatecondition applied.
Speciesadequatelycoveredbygeneralprescriptions: Thefollowingspecieshavebeenrecordedinoraroundthecompartmentandare adequatelycoveredbythegeneralprescriptions.Nofurtherprotectionmeasuresare requiredfor thesespecies: OliveWhistler (Pachycephalaolivacea).
TreeRetention
Zone
NonRegrowth 10 10 J J J TSL condition 5.6a 5.6b 5.6g 5.6e 5.6f J-Conditionapplies
Generalexclusionzones Generalexclusionsaslistedbelowareshownon theHPOM. Feature/Condition TSL OccurswithinPlanning Unit cond’n Rainforest 5.4 No RiparianProtectionZones 5.7 Yes Ridge&HeadwaterHabitat 5.8 Yes (80mtotal) Wetlands 5.9 Yes (20and40m) HeathandScrub 5.10 No Rocky Outcrops and Cliffs 5.11 No Endangered Ecological Community NA Noneidentifiedduring theharvest planningprocess,contactecologist immediatelyifanypotentialareas ofEECareindentified.
HP_BB_2013_11 21-03-12 9 SouthernRegion – Compartment2013,Badja StateForest,BatemansBayManagementArea
GeneralThreatenedFloraandFaunaPrescriptions Feature Records in 2013 Licenceconditions under theTSCAct ThreatenedFrog General No 5.12 ProtectionMeasures BirdNestandRoostSite No 5.13 Protection TreeBatRoostProtection No 5.14.1 SubterraneanRoost No 5.14.2 Protection SignificantSubterranean No 5.14.3 RoostProtection Protectionofflying-fox No 5.14.4 Camps Burning Netplannedarea 5.16 GroundHabitatProtection Netplannedarea 5.17
Species&Site-SpecificThreatenedFloraandFaunaPrescriptions
ContractorsandsupervisorystaffmustimmediatelyreportanysightingsofSchedule1 and2speciestotheHarvestingTeamLeader.TheHarvestingPlanmustbeamended toincludeadditionalprescriptionsifnecessary. Thefollowingspecieshavebeenrecordedwithinornearbytheareaandthe associatedprescriptionsmustbeimplemented: Threatened species and habitat features Records in 2013 Licence conditions withintriggerdistance under theTSCActor relevantSite-specific prescription PowerfulOwl No 6.4 Ninoxstrenua SpottedtailedQuoll Yes 6.10 Dasyurusmaculatus Koala No 6.11 Phascolarctoscinereus Eastern Pygmy Possum No 1.3 Cercartetusnanus Flame Robin No 1.3 Petroicaphoenicea
Gang-gang Cockatoo Yes RefertoCondition5.13(a), Callocephalon fimbriatum (d)&(f)forGlossyBlack Cockatoo
HP_BB_2013_11 21-03-12 10 SouthernRegion – Compartment2013,Badja StateForest,BatemansBayManagementArea
FisheriesLicenceConditions
Therearenoknownrecordsofthreatenedfishspeciesorclass1or2aquatichabitatrelevantto thisoperation.Theconditionsofthefisherieslicencearenottriggeredforthisoperation.
SoilsandWaterProtection
RefertoEPLBooklet &StandardPlanConditions Site-specificEPLConditions
Elements Conditions UnmappedDrainageLines EPLdoesnotapply: refertodrainage featureprotectionbelow. DrainageFeatureProtection SeeHPOMforwidths InherentHazardClass 1 DispersibleSoils No SeasonalityHarvestingExclusions No SeasonalityBurningExclusions No LogDumps ReferrelevantconditionsforIHL SnigTracks ReferrelevantconditionsforIHL Roads SeeSchedule5ofEPLBooklet Slopelimitsforharvesting RefertoSchedule4B.3ofEPL
DrainageFeatureProtection Filterstrips(EPL),ProtectionZones(EPL),OperationalZones(EPL),ProtectionZones -hard(TSL)andProtectionZones-soft(TSL) mustberetainedalongalldrainagelines, prescribedstreamsandwatercourseswithinthenetplannedareaofthecompartment atminimumwidthsasstatedintheTablebelow.
StreamOrder EPLFilterStrip EPLProtection Zone EPL TSLProtection TSLProtection* Operational Zone (hard) (soft) Unmapped N/A# N/A# N/A# 1st order 5 5* 10 2ndorder 5 15* 10 3rd order 5 25* 10 4th order or 5 45* 10 greater Note:*TSLProtectionzones(hard&soft)arecontainedwithintheEPLFilter strip,whichhave thegreater levelofprotection. #forthisoperationForestsNSWhaschosen toharvest thisareawithoutEPL coverage.AllEPLconditionscontinue toapply except for the rulesapplying tofilter strips,protectionzonesandoperationalzonesof the unmappeddrainagelines. RefertoBestManagementPracticesforunmappeddrainagelinesinthestandard conditions.Harvestingofunmappeddrainagelines,MUSTNOToccurinunmapped
HP_BB_2013_11 21-03-12 11 SouthernRegion – Compartment2013,Badja StateForest,BatemansBayManagementArea drainagelineswhicharerunningorholdingwater.Itisthe responsibilityoftheContract Coordinator toinspecteachunmappeddrainage linepriortoharvestingit, todetermine ifitis runningorholdingwater.
LogDumpLocation 8logdumpsareindicatedontheHPOM.Fieldlocationoflogdumpsmustutilisethe mostlevelsiteavailableconsistentwiththelocationindicatedontheHPOM.Inherent HazardLevel1Conditions26,27,30,and33ofSchedule4of theEPL mustapply.
ExpectedFelling/Extraction&LoadingMethod Theexpectedfellingmethodismechanical,extractionmethodbyskidder,andloading methodisbyexcavator.
DrainageFeatureCrossings Nosnigtrackdrainagelinecrossingsareapprovedforuseondrainagefeatures.(Refer toHPOM).
MassMovement Compartment2013isnotinanareaidentifiedashavingapotentialformass movement.Nospecificprescriptions relating tomassmovement/sniggingarerequired.
Suitabilityofexistinglogdamsandgullystuffers Therearenoknownlogdamsorgullystuffersonsnigtrackcrossingsinthe compartments. Condition47ofSchedule4oftheEPL mustapply.
RoadWorks TheHPOMindicates thelocationofexisting roadsandcrossings. Feature Length &/or Number Work Required ExistingRoads 2780m Yes NewRoads 270m Yes ExistingCrossings 5 Yes NewCrossing 0 N/A Borrow&GravelPits 0 N/A
RoadingandCrossingdetailsarecontainedwithinAttachment2ofthisPlan. Theroadingandcrossingworksmustbeundertaken,bycontractororForests NSWstaff,priortothecommencementofharvestingactivityintheareaserved bytheroadorcrossing. ForestsNSWwillsuperviseandpayforthemaintenance works. WithinthecompartmentboundaryonlyroadsthatareshownontheHPOMasEPL standardorsealedmaybeusedforhaulage. RefertoEPLSchedule5–Operating Conditions forRoads. RoadswithinthecompartmentboundarymaybeusedwithContractCoordinator approvalforsniggingorextractionprovided theyaredrained toEPLspecifications.
HP_BB_2013_11 21-03-12 12 SouthernRegion – Compartment2013,Badja StateForest,BatemansBayManagementArea
LegalConditions
In2001,theCommonwealthandNSW GovernmentssignedaSouthernRegional ForestAgreementwhich,amongotherthings,allowsforthesupplyof timberfor20 yearsfrompubliclandsunderthefollowingNSWlegislation:
· ForestryAct1916,and · Forestry&NationalParkEstateAct1998
ThelatterActprovidesfortheSouthernForestAgreementandSouthernIntegrated Forest OperationsApproval (IFOA),bothapprovedbyNSW Government Ministersin May2002.Thisharvestplanisissuedundertheauthorityprovidedwithin theIFOA.
The IFOAalsocontainsthreelicencesissuedunder:
· Section55oftheProtectionoftheEnvironmentAct1997 (EPL) · ThreatenedSpeciesConservationAct1995 (TSL). · Section220ZWof theFisheriesManagementAct1994(FL).
Thisharvestplanwillbe managedinthefieldunder:
· LicencesissuedundertheForestryAct (1916) · ForestPracticesCodepart2 (TimberHarvesting inNativeForests-1999) andpart4 (ForestRoadsandFireTrails-1999) · StandardHarvestPlanConditionsforNativeForestOperationsUnderthe IFOA,SouthernRegion-SouthCoastArea.
Harvestingoperationsmustcomplywithallof theaboveLicencesand the Code (unlessotherwisespecified). Furtherinformationisavailablefrom http://www.environment.nsw.gov.au/
HP_BB_2013_11 21-03-12 13 SouthernRegion – Compartment2013,Badja StateForest,BatemansBayManagementArea
Pre-OperationalBriefing
IacknowledgethatIhavereceivedacopyoftheHarvestingPlanforCompartment 2013inBadjaStateForestandthatIhavebeenbriefedontheconditionsofthePlan andunderstandthesupervisionandoperationalcontrolrequirementsasexplainedto meby theHarvestingTeamLeaderorhis/herdelegate.
Position Name Signature Date
Details toRecord inContractCoordinatorNotes
· Datesofcommencementandcessationoflogging · Recordthecommencementandcompletionofharvestingateachdump · Recordtheoccurrenceoftemporarystoppingofharvestingateachdump. · Situationswheredrainagecouldnotbecompletedduetosaturatedsoilsmustbe recordedinContractCoordinator/SFONotes. · Recordthecommencementandcompletionofeachconstruction,upgradingor maintenanceofdrainagefeaturecrossingsbysnigtracksorextractiontracks. · Bi-weeklychecksof roaddrainagestructuresduringhaulageoperations. · Recordthedateofchecks,drainagestructurecomplianceandtheanyrepairs requiredwithin thespecified timeperiod. · RecordsofThreatenedFloraandFaunaidentifiedduringcompartment markup. · Minorvariationsassociatedwith movingoraddingdumps. · Dailyeventsofimportancee.g.Instructionstocrew,workactivity.
Post HarvestMappingFeatures Confirmation Checklist
Feature Planning Reason GIS update Harvesting Comments Updates (Error/New) tool Updates completed? SoilRegolith No MappedDrainage No Rainforest No Rocky outcrops No Wetlands No CulturalHeritage No ExistingRoads Yes Error Yes 2013/3Rd, existing unmapped. New Roads Yes New Yes 2013/4Rd Heath No
HP_BB_2013_11 21-03-12 14 SouthernRegion – Compartment2013,Badja StateForest,BatemansBayManagementArea
Powerlines etc No
HP_BB_2013_11 21-03-12 15 SouthernRegion – Compartment2013,Badja StateForest,BatemansBayManagementArea
ContractCoordinatorFeatureUsageRecord
Datesofcommencementandcessationoflogging Dateofcommencementoflogging:______Dateofcessationoflogging:______DUMPUSAGERECORD · Recordthecommencementandcompletionofharvestingateachdump · Recordtheoccurrenceoftemporarystoppingofharvestingateachdump.
Dump Start Finish *Track Dateof **Temporary track Date number date date drainage temporary drainagecompleted resumed completed cessation within5days within2days (yes/no) (yes/no)
*Atcompletionofsnigtrack/dump,trackdrainagemustbecompletedwithin 2 days unlesssoilissaturated. *Attemporarycessationofsnigtrackuse,trackdrainage mustbecompletedwithin 5 daysunlesssoilissaturated. Situationswheredrainagecouldnotbecompletedduetosaturatedsoilsmustbe recordedinContractCoordinator/SFONotes.
HP_BB_2013_11 21-03-12 16 SouthernRegion – Compartment2013,Badja StateForest,BatemansBayManagementArea
ContractCoordinator/SFONotes
Date Event Signed
HP_BB_2013_11 21-03-12 17 SouthernRegion – Compartment2013,Badja StateForest,BatemansBayManagementArea
ContractCoordinatorNotes/SFO(continued)
Date Event Signed
HP_BB_2013_11 21-03-12 18 SouthernRegion – Compartment2013,Badja StateForest,BatemansBayManagementArea
ContractCoordinator/SFONotes(continued)
Date Event Signed
HP_BB_2013_11 21-03-12 19 SouthernRegion – Compartment2013,Badja StateForest,BatemansBayManagementArea
ContractCoordinator/SFONotes(continued)
Date Event Signed
HP_BB_2013_11 21-03-12 20 SouthernRegion – Compartment2013,Badja StateForest,BatemansBayManagementArea
ContractCoordinator/SFONotes(continued)
Date Event Signed
HP_BB_2013_11 21-03-12 21 SouthernRegion – Compartment2013,Badja StateForest,BatemansBayManagementArea
ClearanceCertificate
COMPARTMENT:2013, BADJASTATEFOREST,SOUTHERNREGION
To...... ContractCoordinator
Irequestapprovalformetomovemyloggingcrewandallassociatedmachineryfromthe above-mentionedareatothenextcompartmentinaccordancewithSection3.5of theForest PracticesCode.
Icertifythat: (a) allpermanentroads,trailsandmitredrainshavebeenclearedofharvestingdebris; (b) buttdamage to retained treeshasbeenkept toacceptablelimits; (c) all trees markedfor removalhavebeenfelled; (d) utilisationlimitshavebeensatisfactorily met; (e) stumpheightsconform to requirements; (f) allhangingtreeshavebeenfelledandbroughtdown; (g) alllogdumpsiteshavebeensatisfactorily restoredasrequired; (h) harvestingdebrisisnotaccumulatedaround retainedtrees; (i) allaccumulatedlitterhasbeendisposedofproperly; (j) allfilterandbufferstrip requirementshavebeencompliedwith; (k) allsnigtrack,extractiontrackandtemporaryloggingroaddrainagehasbeen installedsatisfactorilyandotherrequiredrehabilitationworkhasbeencompleted; (l) allnecessaryrepairstodamagedroads,signs,fencesandotherstructureshave beencarriedout. (m) ______(insertquantity)rubberflapshavebeenrecoveredinasatisfactory conditionandreported to OperationsBranchforcollection. (n) allmachinery,equipmentandvehicleshavebeencheckedandarefreeofnoxious weeds,diseasesandpests.
IbelievethatIhavemetallmyobligationsundertheconditionsoftheTimberLicence, theEPLandTSLwhichapplytothecompartmentjustcompleted,asstatedinthis HarvestingPlan.
Signature...... Name...... ………...... Date...... Contractor
AsaresultofinspectionsoftheloggingoperationsmadeinaccordancewiththisHarvesting Plan,Iamsatisfiedthat,tothebestofmyknowledge,thecontractorresponsibleforthis harvestingoperationhassatisfactorilycompletedallworkandapprovalisgivenforher/him toremoveher/hismachineryandequipmentandleavethearea/commenceoperationsin anothercompartment.
Thisclearancedoesnotreleasethecontractorfromanyobligationtoundertakeany remedialworkifsubsequentdeficienciesareshowntoresultfrominadequatepractices duringtheharvestingoperation,whicharefoundduringanyinspectionsoftheareamade within12 monthsof thedateofthispost-harvestinginspection.
Lastinspectionwas madeon...... (Date)
Signed...... (Date)...... ContractCoordinator
HP_BB_2013_11 21-03-12 22 SouthernRegion – Compartment2013,Badja StateForest,BatemansBayManagementArea
PostLogging Information
Recordanycircumstancesofsignificancerelatingtotheharvestingofthiscompartment. Please draw orincludeany annotationsontheattached operationscalemap.
Summaryof silviculturaltreatment Treatmenttype Area(ha)subject Number ofAGS Comments to treatment gapscreated (Contract Coordinator estimate) AustralianGroupSelection SingleTreeSelection Thinning/Spacing Post HarvestSilviculture
Actualareaharvested(recordon attached HPOM)
Givereasonsforharvestableareasthatwerenotharvested(e.g.Toosteep,defectivetimber). Makereference to map.
PostLogging BasalAreasweeps
Dump No# Sweep1 Sweep2 Sweep3 Sweep4 Average
PostBA Average m2/ha PreBA Average 29m2/ha ComplywithmaximumSTSBAremoval of 45% orThinningBAremoval of 60% Y/N
Possiblenext cut(tick appropriateboxes)
Main producttype Anticipatedvolume Time to next harvest H M L 0 to5years Girders 5 to10years Veneer 10 to 20years Poles/piles 20 to 30years Quota 30plusyears Smalls/Thinnings Salvage Pulpwood/chipwood
HP_BB_2013_11 21-03-12 23 SouthernRegion – Compartment2013,Badja StateForest,BatemansBayManagementArea
ATTACHMENT2 ROADINGPLAN
Summaryof RoadingRequirements
Length of existingroads/trails to be maintained 2780m Length of newroads to beconstructed 270m Number of existingcrossings to bemaintained 5 Number of newcrossingsto be constructed 0 Length ofroad>10° 0m Massmovement prescriptions apply No Dispersiblesoilconditionsapply No Seasonality provisions apply No
Note: MaintenanceworksnotcompletedbyOperationsmustberecordedandpassed ontothe Contract Coordinatorfor completion anddocumentation. Thestartandfinishdatesofallmaintenanceandconstructionmustberecordedonthe individualroading sheets alongwithotherrelevant changesorexplanations. Allrubberflapsonminorforestroadsmustberemoved andreplacedwithtrafficable rolloverbankson completionofoperation.
HP_BB_2013_11 21-03-12 24 SouthernRegion – Compartment2013,Badja StateForest,BatemansBayManagementArea
CHECKLIST OFWORKSREQUIREDONROADS&CROSSINGS
Road/CrossingName Works Required Date Date Signature Started finished Peters Gradetorecrown/outfallpavement, openwindrowsandclearroadsideto 3meitherside.Ensureexistingpipes and mitre drainsare clearand working.InstallRubberFlapsasper markedinthefield.Installsilttraps asrequired.
Roaddrainagestructuresmust be maintainedinworkingorder during harvestand haulage(refertoEPL Schedule 5). Ops/Contract Coordinator Comments:
Bourkes Gradetorecrown/outfallpavement, openwindrowsandclearroadsideto 3meitherside.Ensureexistingpipes and mitre drainsare clearand working.InstallRubberFlapasper markedinthefield.Installsilttraps asrequired. Roaddrainagestructuresmust be maintainedinworkingorder during harvestand haulage(refertoEPL Schedule 5). Ops/Contract Coordinator Comments
2013/3Road Gradetorecrown/outfallpavement, openwindrowsandclearroadsideto 3meitherside.Ensureexistingmitre drains areclear andworking. InstallRubberFlapsas permarkedin thefield.Installsilt trapsasrequired. Roaddrainagestructuresmust be maintainedinworkingorder during harvestand haulage(refertoEPL Schedule 5). Ops/Contract Coordinator Comments
HP_BB_2013_11 21-03-12 25 SouthernRegion – Compartment2013,Badja StateForest,BatemansBayManagementArea
2013/4Road Gradetorecrown/outfallpavement, openwindrowsandclearroadsideto 3m eitherside. DraintoEPLstandards. Roaddrainagestructuresmust be maintainedinworkingorder during harvestand haulage(refertoEPL Schedule 5). Ops/Contract Coordinator Comments
C1 Natural Causeway. Refertocrossingplan attached. Roaddrainagestructuresmust be maintainedinworkingorder during harvestand haulage(refertoEPL Schedule 5). Ops/Contract Coordinator Comments
C2 Natural Causeway. Refertocrossingplan attached. Roaddrainagestructuresmust be maintainedinworkingorder during harvestand haulage(refertoEPL Schedule 5). Ops/Contract Coordinator Comments
C3 Natural Causeway. Refertocrossingplan attached. Roaddrainagestructuresmust be maintainedinworkingorder during harvestand haulage(refertoEPL Schedule 5). Ops/Contract Coordinator Comments
HP_BB_2013_11 21-03-12 26 SouthernRegion – Compartment2013,Badja StateForest,BatemansBayManagementArea
C4 Natural Causeway. Refertocrossingplan attached. Roaddrainagestructuresmust be maintainedinworkingorder during harvestand haulage(refertoEPL Schedule 5). Ops/Contract Coordinator Comments
C5 Natural Causeway. Refertocrossingplan attached. Roaddrainagestructuresmust be maintainedinworkingorder during harvestand haulage(refertoEPL Schedule 5). Ops/Contract Coordinator Comments
Note: MaintenanceworksnotcompletedbyOperationsmustberecordedandpassed.
HP_BB_2013_11 21-03-12 27 SouthernRegion – Compartment2013,Badja StateForest,BatemansBayManagementArea
ATTACHMENT3 POST-HARVESTBURNINGPLAN
PlanningInformation
LGA: ??????Shire FuelManagementZone & Proposed BurnSummary
(Refer to Section1& 2of the HarvestPlanfor details) FuelLoad(t/ha): 50-150tons perhectareof LoggingSlash- est10 t/habetweenfallen tree heads. Season: autumn / winter/spring Zone 3B Post-Harvest Fuel ReductionObjectives:%ofnetplannedareatobeburned: approx 75% Reducefuels to: < 5 t/ha
RegionalBurning Guideline
MaxTemp (pC): 20°C Min RH (%): 40% MaxBKDI: 100 MaxWindSpeed(km/h): 15 km/h MaxFDI: 6(Calculate using McArthurMeteriffavourableconditionsdeteriorate) MinimumFuelMoisture Content: 12%(16%onedge of Main Drainagelines, notindryup-slope filterstrips) Max RateofSpread: 1.5m/min(Regulatewithlightingpattern.Eg,Asingle “spotfire” on theup- hillside of head,and don’tlight headsdirectlybeneathdeliberatelyretained trees) AverageFlameheight:5m (Post-loggingburn treehead debris only)
Scorch Height: to 15m (ie,scorch height=approx 3 timesflame height)
EnvironmentalPrescriptions
Flora,Fauna & OtherExclusions (Refer to Sections6, 7,8,9&10 of theHarvestPlanfor details)
Soil,Water &Aquatic Habitat Preferredmonthsofburn: April toSeptember(Post-Logging)
FilterStripProtection: Fire tobe excludedfrommain gullyfilterstrips usingfuelmoisture differentials.(Refer to Section11&12of HarvestPlan for details) Soilexposure: Mineralearth exposurelimited tolessthan15%of undisturbed area(postharvest burnonly) Aquatichabitatprotection-Fire tobeexcludedfrommain gullyfilterstrips usingfuelmoisture differentials.(Refer to Section12 of HarvestPlanfor details)
HP_BB_2013_11 21-03-12 28 SouthernRegion – Compartment2013,Badja StateForest,BatemansBayManagementArea
PLANNING INFORMATION
LGA: CoomaMonaro FuelManagementZone & Proposed Burn Summary
Refer toareaidentificationandsilvicultureandharvestingprescriptionsectionsofharvestplan. Season: Winter/ Spring Zone3B (Post-Harvest)
REGIONALBURNING GUIDELINES
MaxTemp (pC): 25 Min RH (%) : 30 MaxWind Speed(km/h): <20Southerlyaspect <15 Northerlyaspect
Max BKDI:<70 MaxFDI: 7 ( subjecttoareaassessment). Scorch Height: 0.6xdominant treeheight – PostLog 10m – Broad Area
MaxFuelMoisture Range: 12-25% Max Rateof Spread: <300m/hr. AverageFlameheight: upto4m – PostLog <1 – 2m – Broad Area
Fuel ReductionObjectives: 60 -80%ofnetarea tobeburned. Reduce fine fuels to:manageablelevels - PostLog 4 – 8t/ha – Broad Area
BURNAREA INFORMATION
Fuel loads: 50-150 tonsperhectareofloggingslash,10 – 20 tonsperhectareinbetweentreeheads.
Fuelarrangement: Multi-tieredstructure (litter,grasses,shrubs,eucalyptregenerationandmature trees)
Terrain: 0%>30°,0% @ 25°-30°, 1% @ 20°-25°, 23% @10°-20°, 76% @ 0°-10° slope.
Timesincelastburn:2006 IMPORTANTBURNINGPRESCRIPTIONS · Asmalltestburnmustalwaysbelitprior tomainburn.ThiswillassistindeterminingFIREBEHAVIOURand IGNITION PATTERNS. · Seek information from Contract Coordinatoronregrowthexcludedburnareas. · Sectionswillbelitbydriptorch toadeterminedignitionpattern. · Areaswillgenerallybeburnt from ridgetopsdownandintothewind tominimiseexcessive firebehaviour. · Minimise fire intensity inregrowthstands.
BURN OBJECTIVES
· To reducefuelloads to4-8 tonnes/ha. (assistingfuture firesuppression) · Aburncoveragebetween60-80% · Tocontain firewithindesignatedboundaries. · Toobserveand recorddata,assistingin futurehigh fuelloadandadvanced regrowthareaburns. · Tominimisecrownscorch;notexceeding10%ofdominantandco-dominantcrowns. · Tominimisedefectdamage to retainedregrowthstems.
HP_BB_2013_11 21-03-12 29 SouthernRegion – Compartment2013,Badja StateForest,BatemansBayManagementArea
ENVIRONMENTAL PRESCRIPTIONS
FLORAANDFAUNA:
Refer toFloraandFaunasectionsof the Harvestplandocument. H & R treesshouldberakedaroundif the riskofburningis high.Loggingslashcollectedaround retained treesshould notbeburnt.
SOIL,WATER &AQUATICHABITAT: Refer toSoilsandWaterandDrainageFeaturessectionsofthe Harvestplandocument.
· Preferredmonthsofburn – April toSeptember
· Fuelmoisturedifferentialswillbeutilisedtominimiseimpactsupondrainage featureswithin theburnarea
· Whereunmappeddrainagelinesarenotmodifiedharvestedzones,theburnsupervisorshouldpayparticular attentionto fuelmoisterdifferentialsasspecifiedin the regionalburningguidelinesandexcludedirectignition, ensuringthat>70%groundcoverwithin the remainingunmappeddrainagelinesisnotcompromised.
ABORIGINAL CULTURALHERITAGE:
Refer totheculturalheritagesectionof the Harvestplandocument. Significantsites,e.g. scar trees,groovestones,shouldbe rakedaroundtoprevent firedamage.Wherepracticallypossible,burningofscatteredartefactsshouldbeavoided.
CONTROLANDSTRATEGY
CONTROLLINES: EXISTING Description of Work Required Completed Descriptionofeachcontrolline Yes /No PetersRoad Nil Bourkes Roadand2013/3 Road Nil Drainagelines Fuelmoisture>16% Check for trees thatcouldburndownandfalloveranyboundary roadsandwetdownor rakearoundasnecessary PROPOSED Description of Work Required Completed Descriptionofeachcontrolline Yes /No Additionalcontrollinesmaybe requiredwheresnig Tobedeterminedby ContractCoordinator tracknetworkisnotadequatealongboundariesof NHA duringharvesting. SMOKEHAZARDANDMANAGEMENT: http://www.bom.gov.au/general/reg/smoke/nsw/index.shtml Smoke / Hazard ReductionSignsrequired?:……….. YES NO ( tick to indicate) Smoke DispersionForecastingviaBOMutilised?..... YES NO ( tick to indicate)
Safety Considerations (pre-burn) DAY DAY DAY DAY DAY DAY DAY 1 2 3 4 5 6 7 Personnel Namesoffirecrewdocumenteddaily.
Visitorsonsite Visitoronsiteinductioncarriedout
Neighbours Documentedinplan notified Trafficcontrol Trafficcontrolsignsto regulate trafficif required
Smokemanagement: Assessmentofprevailingwindsat thetimeofburn. Roadsidesignswarningofsmokehazard.
Supervisor toinitial
HP_BB_2013_11 21-03-12 30 SouthernRegion – Compartment2013,Badja StateForest,BatemansBayManagementArea
Pre-burnpreparationactivitiesandresponsibilities. Activity Specificationsandtasks Responsibility Signature (incdate) Fuelmonitoring Regularmonitoringprior toburning
Weathermonitoring Conductedprior toandduringburningoperations.
Trailpreparation Mineralearthcontrollinespreparedpriortoburning to containfirewithindesignatedburningblock. · D3 · Hand tools Neighbourliaison Notificationandcommunicationsdocumented.
Liaisonwithfire & “asabove” emergencyauthorities Media releases ToadviselocalcommunityofSFburningactivities.
Radiostationnotifications “asabove”
Equipment Ensureall requiredequipmentisavailable.
Communications “asabove”
Visitor Safety Burnissignposted. Allvisitors toreporttoburn supervisorimmediately
Burnapproval Dailyburnapprovalsgivenbydelegatedofficers
NOTIFICATION&RESOURCEREQUIREMENTS
Neighbours……………. Contractors……………. Lessees………………....
Apiarists…………….…. ShireFCO…………….. Govt Agencies………….
NOTIFICATION REGISTER
RFS (RuralFire Service) Name Position Phone Number Notified FCO
NEIGHBOURS: (Refer tocompartmentplanning folderfordetailsprior toburning) Owner Postal Address Lot / Plan Phone Notification Reply Letterssent Received
APIARISTS: (Refer tocompartmentplanningfolder for detailsprior toburning) Name Site Number/s Phone Number Notified
HP_BB_2013_11 21-03-12 31 SouthernRegion – Compartment2013,Badja StateForest,BatemansBayManagementArea
DAILYCREWSMEACSBRIEFINGSHEET (tickdailywhenbriefed) SITUATION DAY123456 7 - Burnarea tobe treated (location,boundaries,controlline typesandexclusiveareas) ...... £££££££ - Burnareacharacteristics (e.g.terrain, forestcover,sensitiveareas,etc)...... £££££££ - Burnareaaccessby roadclass (checkedbeforehand,deadends,wateringpointsetc.)...... £££££££ - FuelLoadingsand firebehaviourprescriptions forthe HRBarea...... £££££££ - Stagingareas...... £££££££ - Expectedweather...... £££££££ MISSION - Overallaimofthehazardreductionburn...... £££££££ - Sitespecificaims forsectionsof the HRB(e.g.protectionofpatchesofadvanced regrowth, rainforestpockets,buildings,bridges,etc.)...... £££££££ - Secondaryaim/sshould the HRB escape...... £££££££ EXECUTION - Plantandmanpower resources (FNSW, RFS, DEC, others)...... £££££££ - Divisionofburnareainto ‘Sections’...... £££££££ - Startingpoints,startingtimes,finishtimes(start ‘downwind’ ifpossible)...... £££££££ - Safe ‘approved’ lightingpatternsanddirections...... £££££££ - Workdown-slope,keepingbelowactive fire(exceptwheregood fuelbreaksoccur)...... £££££££ - Locationandactivityofother burningcrews...... £££££££ - Personalandcrewsafety - buddysystemwhenlightingup...... £££££££ - Progress reportsatpre-designatedtimes...... £££££££ - Maintainawarenessofotherburningcrews (donotlightupbelowotherburningcrews)...... £££££££ - Expectedfirebehaviour, troublepointsandcontingencyplans...... £££££££ - Actionstobe takenin theeventofanescapee.g.topausethelight-up...... £££££££ - Endofburndebriefe.g.reportingareasrequiring ‘follow-up’ patrolsafterburn...... £££££££ ADMINISTRATION - Reporting field fireweather to theofficeatregular times...... £££££££ - Receiving forecastweatherreportsfromoffice...... £££££££ - Logisticalsupport(fuel, food,water,heavyplant,back-upcrewsetc.)...... £££££££ CONTROL, COMMAND,COMMUNICATIONS - Chainofcommand (burnsupervisorandsectorbosses)...... £££££££ - Communicationssystems forfire-groundandcommand (UHF & VHF radios,mobilephones)...... £££££££ SAFETY - Medical Emergency Evacuation Plan& Site Safety Plan...... £££££££ - Areasoflikely treeorlimbfallinghazards(methods toidentify/markhazards)...... £££££££ - Lookupandlookaroundprocedure(forselfandworkmates)...... £££££££ - Location firstaidkitsand firstaiders...... £££££££ - Pre-burnsafetyactionsincluding ‘Smoke Hazard’ signlocations,trafficcontrolplanetc...... £££££££ - Locationofsafetyzones,andescaperoutes...... £££££££ - Safeparkingof SFvehicleswithintheburnareaandvehiclespeedsduringtheburn...... £££££££ - Crewvehiclestohaveheadlightsandflashingbeaconsonwherepracticable...... £££££££ - Scheduleadequate restbreaksandsetappropriateworkpace...... £££££££ - Ensurecrewshaveaccesstosuppliesofdrinkingwater...... £££££££ - Visitors tothesiteareinductedinto the SSP...... £££££££
Day1 - Burn Supervisor………………………Date………….. Day2 -Burn Supervisor…………………………Date………….. Day3 - Burn Supervisor………………………Date………….. Day4 -Burn Supervisor…………………………Date………….. Day5 - Burn Supervisor………………………Date………….. Day6 -Burn Supervisor…………………………Date………….. Day7 - Burn Supervisor………………………Date………….. Day8 -Burn Supervisor…………………………Date…………..
EMPLOYEEIDENTIFICATION PROOF OF DATE SUPERVISOR OR EMPLOYEE NAME ACCREDITATION RELEVANT (E.g.FNSW RECORDS) AGENCY SIGNATURE Incident Controller BurnSupervisor CrewLeader
HP_BB_2013_11 21-03-12 32 SouthernRegion – Compartment2013,Badja StateForest,BatemansBayManagementArea
CrewLeader CrewMember CrewMember CrewMember CrewMember CrewMember CrewMember CrewMember CrewMember
Personnel and equipment requirements: Resource StateForests NPWS Brigades CONTRACT COORDINATOR Signature IncidentController CrewLeaders CrewMembers Tankers 1 Slip – on Units 1+ Dozer n/a Helicopter n/a Radios – handheld UHF 1perperson Weathermonitoringequip. 1percrew BurningOperations Record ForecastWeatherand Indices (Obtain fromOffice)
Seeattacheddailyweatherforecastsandrelevantindicesobtained from the BureauofMeteorology Burn SiteWeather Readings Takedailyonsitereadings (hourlyifpossible)andnoteun-forecastweatherchanges. Temp RH Wind WindSp. FDI FMC % COMMENTS Date Time (°C) (%) Direction (km/h)
HP_BB_2013_11 21-03-12 33 SouthernRegion – Compartment2013,Badja StateForest,BatemansBayManagementArea
FIREBEHAVIOUR PREDICTED ACTUAL FlameHeight ROS Assessment FlameHeight ROS Comments Date Time(hrs) (m) (m/hr) Method (average) (m/hr)
Ignitiondetails – DATE (s)……………….. Type: Aerial / Ground Method: Contour / Ridge / Roadedge / Topdisposal Pattern: Line/ Spots Incendiary Capsulesused:______(aerialignitiononly)
Ignitiondetails – DATE (s)……………….. Type: Aerial / Ground Method: Contour / Ridge / Roadedge / Topdisposal Pattern: Line/ Spots Incendiary Capsulesused:______(aerialignitiononly)
Ignitiondetails – DATE (s)……………….. Type: Aerial / Ground Method: Contour / Ridge / Roadedge / Topdisposal Pattern: Line/ Spots Incendiary Capsulesused:______(aerialignitiononly)
Ignitiondetails – DATE/s Type: Aerial / Ground Method: Contour / Ridge / Roadedge / Topdisposal Pattern: Line/ Spots Incendiary Capsulesused:______(aerialignitiononly)
POST BURNASSESSMENT Estimatedburncoverage(%ofnetarea):…………………..%
Estimatedburncoverage:…………………………………….ha
Fine fuelreduced toanaverageof :………………………….t/ha Estimatedareaofcrownscorch :……………………………. % OPERATIONAL PERFORMANCE REVIEW Burncomplete? Yes/No Followupactionrequired? Yes/No Burncontainedwithinplannedboundaries? Yes/No Burncoverageobjectivemet? Yes/No
Fine fuelreductionobjectivemet? Yes/No Environmentalprescriptionsmet? Yes/No Threatened SpeciesLicenseconditionsmet? Yes/No FisheriesLicenseconditionsmet? Yes/No
HP_BB_2013_11 21-03-12 34 SouthernRegion – Compartment2013,Badja StateForest,BatemansBayManagementArea
RemedialActionrequired (ifany):______
Remedialworkscertifiedcomplete.
Work Supervisor______Date:______
Comments:______Attachadditionalpagesasrequired
HP_BB_2013_11 21-03-12 35