SECOND VALLEY WATER SUPPLY IMPROVEMENT PROJECT Procurement Workshop Kathmandu, 10 February 2021 Kathmandu – Demography

• Population ~ 3 million; floating population ~1.2 million

• Average household size – 4.2 persons

• 575 sq.km Valley Area

• 18 municipalities, 3 districts (Kathmandu, Bhaktapur, and Lalitpur)

• Bell shaped valley with elevation varying from 1400m at periphery – 1280m

• About 500 hotels; 44000 beds; Average 5000 tourists per day Kathmandu Water Supply – Overall Institutional Arrangements

Ministry of Water Supply Policy, Planning and (MWS) Capital Investment

Kathmandu Valley Water Water supply Supply Management Board infrastructure (KVWSMB) asset owner

Kathmandu Upatyaka Water supply Khanepani Limited (KUKL) Service Operator SKVWSIP – Institutional Arrangements

Institution SKVWSIP Implementation Structure MWS Executing Agency Project Implementation Directorate – KUKL Implementing Agency – Distribution network (PID-KUKL) and House service connections Melamchi Water Supply Development Board Implementing Agency – Bulk water (MWSDB) infrastructure SKVWSIP – Project Area WTP & DNI COVERAGE AREA WTP

JORPATI N

JORPATI S CHABAHIL

GOTATHAR

PEPSICOLA

KIRTIPUR THIMMI

BHAKTAPUR SKVWSIP – Overview & Timeline

• Total estimated project cost – $230 million • Project area: Greenfield development outside Ring Road in • Limited public water supply network; reliance on KUKL tankers, borewells, hand pumps, traditional water sources and private tankers • Beneficiaries: About 110,000 households

Aspects Arrangements Commencement of procurement First half of 2021 Implementation period January 2022 – December 2028 Completion date December 2028 SKVWSIP – Procurement Packages

Scope Indicative number of contracts WTP (255 MLD) 1 Distribution network (about 700 km total) 3–4 Structural retrofitting of Headwork structure of Melamchi water 1 diversion IT-based decision support system for O&M of Melamchi Tunnel 1 IT-based early warning system for Melamchi Headworks 1 Capacity building of KUKL to strengthen operational and technical 2 competencies Project Consultants 2 Contract Package – WTP Employer Melamchi Water Supply and Development Board WTP capacity 255 MLD Land Available Scope Construction and 8–10 years O&M Treatment Simple and easy O&M, mostly remote control & monitoring, Technology energy-efficient, proven technology, suitable for ’s climatic condition. Contract modality KPI based DBO contract Indicative (a) plant capacity, (b) yield, (c) water quality, (d) chemical Performance consumption, (e) energy efficiency, (f) equipment guarantee Guarantees Contract Packages – Distribution Network Employer Project Implementation Directorate – Kathmandu Upatyaka Khanepani Ltd (PID-KUKL) Network length 700 km Contract packages 3–4 packages Scope of individual • Laying of @200-250 km HDPE and DI pipelines contract package • 25,000–30,000 metered house service connections, • Establish and demonstrate DMA-based 24x7 pressurized water supply for 2–3 years Contract modality KPI based FIDIC GCC (Harmonized version) Admeasurement contract Indicative (a) Water quality at end user point, (b) residual pressure for 24x7 Performance continuous pressurized supply, (c) NRW, (d) Customer service Guarantees levels Proposed Water Treatment Plant Package under Second Kathmandu Valley Water Supply Improvement Project

Procurement Workshop

by Melamchi Water Supply Development Board

Feb 2021 Phasing of Bulk Water Supply Augmentation

Source Conveyance by Quantity Year Status Length MLD km Melamchi Melamchi 170 MWSP Near 26 diversion tunnel completion Yangri Yangri diversion 170 Phase II of 9 tunnel Kathmandu Valley Bulk Water Project Lerke Lerke diversion 170 Phase II of 2 tunnel Kathmandu Valley Bulk Water Project Total 510 SUNDARIJAL TREATMENT WORKS Capacity (MLD) FUNDING Status 85 PHASE 1 Part I (JICA Ready to commission supported) 85 PHASE 1 PART I (ADB Advance stage of supported) construction 255 PHASE 2 PART I (SKVWSP) Procurement preparatory works ongoing (85+85)*50%=85 PHASE 2 PART II Will be augmented later 510 TOTAL SKVWSIP – Proposed Project Area WTP & DNI COVERAGE AREA SUNDARIJAL WTP

JORPATI N

JORPATI CHABAHI S L

GOTATHA R

PEPSICOL A KIRTIPU R THIM MI BHAKTAPU R Contract Package – WTP Employer Melamchi Water Supply and Development Board WTP capacity 255 MLD Land Available Scope Construction and 8–10 years O&M Treatment Simple and easy O&M, mostly remote control & monitoring, Technology energy-efficient, proven technology, suitable for Nepal’s climatic condition. Contract modality KPI based DBO contract Indicative (a) plant capacity, (b) yield, (c) water quality, (d) chemical Performance consumption, (e) energy efficiency, (f) equipment guarantee Guarantees LOCATION OF WTP : EXISTING and PROPOSED GENERAL LAYOUT OF EXISTING AND PROPOSED PLANT UNITS THANK YOU